Proposed Action: Morrow Flat Substation Construction and Related Improvements Near Boardman, Oregon
|
|
|
- Martin Cobb
- 9 years ago
- Views:
Transcription
1 DOE F e Electronic Form Approved by CGIR - 01/20/95 (8-89) United States Government memorandum Department of Energy Bonneville Power Administration DATE: August 8, 2014 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum TO : Charla Burke Project Manager TEP-TPP-1 Proposed Action: Morrow Flat Substation Construction and Related Improvements Near Boardman, Oregon Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B 4.11 Electric power substations and interconnection facilities, and B4.13 Upgrading and rebuilding existing powerlines Location: Morrow, Umatilla and Gilliam counties, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to build a 230/115-kilovolt (kv) substation called Morrow Flat Substation near Boardman, Oregon. This project would also entail the following activities to support the proposed substation: Replacing steel transmission towers, and installing wires and conductor, one mile in both directions of the proposed substation Reducing sag in the McNary-Boardman and McNary-Jones Canyon transmission lines, using a variety of methods that would include replacing towers Installing communicatons equipment at three nearby substations Making road improvements These enhancements would help BPA serve up to 250 megawatts of load growth in the Boardman, Oregon area, and ensure that safety and operational standards are met. The increase in demand comes from existing development and food processing plants, as well the development of new data centers. The proposed project would include activities in Umatilla, Morrow and Gilliam counties. Morrow Flat Substation would be approximately 1.5 miles east of the existing Boardman Substation, along an existing corridor containing three BPA transmission lines the 230-kV McNary-Boardman, 230-kV McNary-Jones Canyon and 500-kV McNary-Coyote Springs. The McNary-Boardman and McNary-Jones Canyon lines would feed through Morrow Flat Substation. Approximately 22 acres of land zoned for industrial use, and formerly for agricultural production, would be developed for the substation. The site would be excavated and graded; and a grounding mat would be placed 18 inches below the surface, extending outside the substation fence perimeter by 4 feet. A 3-inch layer of rock would be placed over the grounding mat. Equipment to be installed in the fenced substation yard would include power circuit breakers, voltage and current transformers, a power transformer, disconnect switches, bus tubing and pedestals, substation dead-end towers, transformer towers, control house and conduit, electrical panel boards, station service rack, lighting, oil containment and a drainage system. Access to the substation site would be via Lewis and Clark Drive, an existing paved road.
2 To support the installation of the substation, communication equipment would also be installed within the control house at McNary, Jones Canyon and Boardman substations, to remotely protect equipment from outages or other major system disturbances. This equipment consists of racks of computers and other devices that allow grid operators to monitor the system and make adjustments. At McNary Substation, a three-pole wood structure within the substation yard would be replaced to straighten the alignment of the conductor and reduce the lateral tension on the structure. 2 To support the weight of the additional overhead ground wire and new conductor that would be added to the transmission lines one mile in each direction from the proposed substation, 22 steel-lattice towers designed to withstand the weight and torque would replace the existing steel towers. As part of the project, BPA would need to make other improvements to the McNary-Boardman and McNary-Jones Canyon transmission lines. Analysis shows impairments on both lines that would need to be corrected to meet operational and safety standards. Line impairments occur when the conductor sags too close to the ground. Where the impairments are relatively small, at 32 towers, the line would be raised by making changes to the towers hardware, such as shortening the insulator strings or conductor spans. At these locations, the conductor would be temporarily unclipped from the insulators and fixed to a rigid surface, such as a boom truck or the tower itself, while the insulator string is replaced or the conductor span shortened. At 33 towers, where the line impairment is larger, new towers approximately 10 to 20 feet taller would be built. One new dead-end structure would be added on the McNary-Boardman line. New towers would be placed within 50 to 70 feet of their existing location in the same alignment as the rest of the transmission line. All of the new towers would be between 80 and 105 feet tall, and designed with fall protection measures to ensure worker safety. The area of disturbance at each tower would be approximately 100 by 100 feet. Plate footings would be installed at suspension structures. These plates would consist of a 4-foot by 4- foot steel plate, buried 9.5 feet deep, at each of the four tower corners. Grillage footings (a framework of crossing beams that helps provide support) would be used at dead-end structures. These footings would consist of a 15-foot by 15-foot assembly of steel I-beams, welded together, and buried 12.5 feet deep. Once the new tower is in place, the old tower would be removed, the concrete footings would be cut off two feet below grade, and the site covered with soil and reseeded. Construction equipment may include line trucks, crane, excavator and bulldozer. BPA would need to acquire rights and make improvements to the road system that accesses the towers where construction activities would occur. BPA would acquire rights to 3.5 miles of roads, improve 1.6 miles of road, reconstruct 2.4 miles and construct 375 feet of new road. Road improvements would include grubbing and clearing vegetation, shaping and compacting the subgrade, adding rock and installing drainage features. Temporary disturbances would include the construction of guard structures at road crossings, railroad crossings and line crossings where the new conductor will be installed. Eight pulling and tensioning sites, typically 100 by 300 feet each, would also be required to provide a space where workers would tighten the conductor and ground wire to the proper tension once it is mounted on the transmission structures. Construction materials would be either stored in a temporarily graded, graveled and fenced area south of the substation, or within an existing fenced and graveled lot near the project corridor accessible by existing maintained roads. Findings: BPA has determined that the proposed action complies with Section and Appendix B of Subpart D of the Department of Energy s (DOE) National Environmental Policy Act (NEPA) Regulations (57 FR 15144, Apr. 24, 1992, as amended at 61 FR , July 9, 1996;
3 3 61 FR 64608, Dec. 6, 1996, 76 FR 63764, Nov. 14, 2011). The proposed action does not present any extraordinary circumstances that may affect the significance of the environmental effects of the proposal. The proposal is not connected [40 C.F.R (a)(1)] to other actions with potentially significant impacts, has not been segmented to meet the definition of a categorical exclusion, is not related to other proposed actions with cumulatively significant impacts [40 C.F.R (a)(2)], and is not precluded by 40 C.F.R or 10 C.F.R Moreover, the proposed action would not (i) threaten a violation of applicable statutory, regulatory, or permit requirements for environment, safety, and health, (ii) require siting and construction or major expansion of waste storage, disposal, recovery, or treatment facilities, (iii) disturb hazardous substances, pollutants, contaminants, or Comprehensive Environmental Response, Compensation and Liability Act-excluded petroleum and natural gas products that pre-exist in the environment such that there would be uncontrolled or unpermitted releases, (iv) have the potential to cause significant impacts on environmentally sensitive resources, or (v) involve genetically engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contained or confined in a manner designed and operated to prevent unauthorized release into the environment and conducted in accordance with applicable requirements. Based on the provisions identified on the attachment, this proposed action meets the requirements for the Categorical Exclusion referenced above. We therefore determine that the proposed action may be categorically excluded from further NEPA review and documentation. /s/ Carolyn A. Sharp Carolyn A. Sharp Contract Environmental Protection Specialist Act 1 Group Reviewed by: /s/ David Kennedy for Gene Lynard Supervisory Environmental Protection Specialist Concur: /s/ Katherine S. Pierce Date: August 8, 2014 Katherine S. Pierce NEPA Compliance Officer Attachment: Provisions Environmental Checklist for Categorical Exclusions
4 ATTACHMENT 4 PROVISIONS This categorical exclusion will meet the following provisions: Wetlands: Avoid using wetland areas for construction staging, equipment or materials storage, fueling of vehicles or related activities. Use existing road systems to access structure locations. Flag or stake wetland boundaries in the vicinity of construction areas and avoid these areas during construction. Use construction matting when accessing towers located within wetlands to avoid soil compaction and loss of wetland function. Weed Control: A Weed Management Plan will be developed for the project based on the preconstruction Undesirable Plant Survey Report and will include baseline information on known weed occurrences in spring 2014 field surveys; include specific actions in the management plan to minimize spread and control infestations, including construction BMPs, control actions (chemical, cultural, biological, and physical methods) both pre- and post-construction, and actions to be taken to monitor the spread of weeds into the project vicinity for at least 18 months after project implementation. Build vehicle and equipment washing stations in areas of high concentration of noxious weeds where vehicles and equipment in use will be washed daily prior to entering and leaving the project area. Site stabilization is a critical step in reducing the potential for weeds to colonize a freshly disturbed area. Implement restoration or stabilization actions as soon as is reasonably possible after ground disturbing activities with a native seed mix, a seed mix recommended by ODFW or as agreed upon with landowners for use on their property. Perform additional noxious weed treatments until restored areas are relatively weed free. Monitor seed germination of seeded areas with at least 3 field visits per year until site stabilization (defined as at least 70 percent cover by native or acceptable nonnative species) is achieved; if vegetative cover is inadequate, implement contingency measures and reseed areas as appropriate to ensure adequate revegetation of disturbed soils. Dust Abatement: Water or use palliatives on exposed soil surfaces in areas disturbed during construction. Encourage construction personnel to travel at low speeds on access roads and at construction sites to minimize dust. Coyote Springs Wildlife Management Area Avoid construction within the Coyote Springs Wildlife Management Area from the Thanksgiving holiday through the end of January when recreational use is at its peak. Use flaggers and/or signage around construction sites to reduce user conflicts with recreational use within the management area. Oregon Department of Fish and Wildlife will post notice of construction schedule in the game bird regulations publications. Implement restoration or stabilization actions to restore the site as soon as is reasonably possible after ground disturbing activities and revegetate with a seed mix recommended by ODFW.
5 Environmental Checklist for Categorical Exclusions 5 Name of Proposed Project: Morrow Flat Substation Construction and Transmission Line Improvements near Boardman, Oregon Work Order #: , , This project does not have the potential to cause significant impacts on the following environmentally sensitive resources. See 10 CFR 1021, Subpart D, Appendix B for complete descriptions of the resources. This checklist is to be used as a summary further discussion may be included in the Categorical Exclusion Memorandum. Environmental Resources No Potential for Significance No Potential, with Conditions (describe) 1. Historic Properties and Cultural Resources X Cultural survey conducted April/May No effect determination, SHPO concurrence received 7/23/ T & E Species, or their habitat(s) X None present. Washington ground squirrel surveys (candidate species) conducted spring Floodplains or wetlands X Wetland delineation survey completed spring Permanent impacts to all floodplains and wetlands will be avoided. 4. Areas of special designation X Effects to Coyote Springs Wildlife Management Area will be minimized by scheduling construction before peak recreational use and following provisions listed in the CX.. 5. Health & safety X New towers will have fall protection design features. 6. Prime or unique farmlands X Tower relocations have been optimized to minimize effects to agriculture. Where unavoidable, landowners will be compensated for lost productivity. 7. Special sources of water X West Extension Irrigation District canals present in study area will not be effected by project activities. 8. Other (describe) X Noxious weed survey conducted spring Data will be used to prepare weed management plan and identify locations of wash stations. List supporting documentation: Cultural Resource Survey Report (2014) Section 106 Consultation Correspondence Washington Ground Squirrel Surveys (2014) Wetland Delineation Report (2014) Signed: \s\ Carolyn Sharp Date: August 8, 2014
Categorical Exclusion Determination Bonneville Power Administration Department of Energy
Categorical Exclusion Determination Bonneville Power Administration Department of Energy Proposed Action: Removal and Relocation of Equipment from Leased Area in Titan Data Center Project Manager: Molly
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: DOI-BLM-OR-V060-2015-032-CX CE Exemption category: 516 DM 11.9, E.12: Grants of right-of-way wholly within the boundaries
Hyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
Floodplain Development Land Use Review
COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review
Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE
WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE 1 1 Welcome to The Eldorado-Ivanpah Transmission Project Open House How is the open house organized? This
APPENDIX C Noxious Weed Management Plan
APPENDIX C Noxious Weed Management Plan Prospector Pipeline Company North Elko Pipeline TABLE OF CONTENTS 1 INTRODUCTION... 89 1.1 Project Description... 89 1.2 Plan Purpose... 89 1.3 Goals and Objectives...
U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526
A. Background U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526 Categorical Exclusion Determination and Decision
Appendix C. Municipal Planning and Site Restoration Considerations
Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished
Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702
Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 November 2011 TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 RESPONSIBILITY
Wildlife Habitat Conservation and Management Plan
Wildlife Habitat Conservation and Management Plan For [Applicant Name] [Insert photo of property] Developed in Cooperation with Jane Doe Habitat Conservation Biologist Oregon Department of Fish and Wildlife
Storm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado
WCAO-GJ-FONSI -14-01 United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado FINDING OF NO SIGNIFICANT IMPACT SPURLIN MESA LATERAL OF THE CRAWFORD
PUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested
HARDWICK TOWNSHIP WARREN COUNTY, NEW JERSEY
HARDWICK TOWNSHIP WARREN COUNTY, NEW JERSEY AN ORDINANCE TO AMEND CHAPTER XIII OF THE REVISED GENERAL ORDINANCES BEING THE LAND DEVELOPMENT ORDINANCE OF THE TOWNSHIP OF HARDWICK TOWNSHIP IN ORDER TO ADOPT
Underground Commercial Electric Service
Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer
US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing
US 281 AT PREMONT PUBLIC HEARING Hearing Purpose The purpose of tonight s Public Hearing is for the public to: Learn about the status of the proposed project Review the purpose and need for the project
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
U.S. DEPARTMENT OF THE INTERIOR BUREAU OF INDIAN AFFAIRS RECORD OF DECISION COYOTE BUSINESS PARK
U.S. DEPARTMENT OF THE INTERIOR BUREAU OF INDIAN AFFAIRS February 2007 RECORD OF DECISION COYOTE BUSINESS PARK Agency: Action: Summary: Bureau of Indian Affairs Northwest Region Record of Decision Bureau
PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY
PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements
REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:
EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
Management Plan Template For Conservation Easements Held by CPW
Management Plan Template For Conservation Easements Held by CPW The following template provides guidelines for developing a management plan for a property that will have a Conservation Easement held by
Determination of NEPA Adequacy (DNA)
DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT OFFICE GRANTS PASS RESOURCE AREA 2164 NE SPALDING AVENUE GRANTS PASS, OR 97526 Determination of NEPA Adequacy (DNA) Office: Grants
Transmission Foundations Case History : Helical piles Hydro One Networks Inc.
Transmission Foundations Case History : Helical piles Hydro One Networks Inc. www.hubbellpowersystems.com Late in 2008, an aerial patrol discovered three 500kV towers with partially-collapsed foundations
U.S. Department of Transportation Federal Highway Administration. Western Federal Lands Highway Division Vancouver, Washington
U.S. Department of Transportation Federal Highway Administration Western Federal Lands Highway Division Vancouver, Washington Juniper Dunes Access Road WA Franklin 2013(1) Finding of No Significant Impact
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES
Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Frequently Asked Transmission Pipeline Questions
Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
Quick fix for frost heave:
Quick fix for frost heave: HELICAL PILES Megan Milbradt Civil Engineer Basin Electric Power Shane Vasbinder Civil Engineer Basin Electric Power Concrete piers were 6 inches to 2 feet out of the ground.
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations
SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,
Section 401 Water Quality Certification
Section 401 Water Quality Certification Department of Health Environmental Management Division Clean Water Branch Voice: (808) 586-4309 Fax: (808) 586-4352 http://www.hawaii.gov/health/environmental/water/cleanwater/index.html
Stormwater Wetland Design and Construction Mitigation Duke Bitsko. Construction Activities, Schedule and Sequence Tom Ritchie
September 7, 2011 Welcome Catherine Daly Woodbury DCR Coordination Dan Driscoll Project Background Catherine Daly Woodbury Stormwater Wetland Design and Construction Mitigation Duke Bitsko Construction
CHAPTER 4 ALTERNATIVES COMPARISON
CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections
Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES
P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES 1. Acceptance of Electricity Service By establishing or requesting a POD or by continuing an
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
DELAWARE TOWNSHIP ORDINANCE #2011-06LU
DELAWARE TOWNSHIP ORDINANCE #2011-06LU AN ORDINANCE SUPPLEMENTING AND AMENDING THE LAND USE ORDINANCE OF THE TOWNSHIP OF DELAWARE BY PERMITTING SOLAR ENERGY SYSTEMS. #2011-06LU WHEREAS, it is the purpose
INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
OSU Extension FACT SHEET
OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding
Description Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
How To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants
OMB Approval No.: 0648-0538 Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants Instructions The National Environmental Policy
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA
SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA A. LAND USE ELEMENT INTERPRETIVE GUIDELINES B. COMMUNITY BENEFITS C. COUNTY ACTION ITEMS Adopted by the Board of Supervisors November 9, 1999 A. Santa
Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum
Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
Gold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements
Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available
5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
MBJ Environmental Programmes
MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the
Negotiating Pipeline Easements
FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Introduction Shale Oil and Gas Development Fact Sheet Series Negotiating Pipeline Easements Peggy Kirk Hall Director, OSU
Beseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
City of Beaumont, Texas Grading Permit Information
General Information City of Beaumont, Texas Grading Permit Information The permit application shall be signed by the property owner (or lessee) or his authorized representative and by the contractor (if
Storm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.
Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
CHAPTER 3 page 69 LOCAL FLOODPLAIN REGULATIONS AND NFIP STANDARDS
CHAPTER 3 page 69 LOCAL FLOODPLAIN REGULATIONS AND NFIP STANDARDS LOCAL FLOODPLAIN REGULATIONS AND NFIP STANDARDS, page 69 THE PARTICIPATION OF A COMMUNITY IN THE NFIP IS MADE POSSIBLE BY ITS ADOPTION
City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257
City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257 APPLICATION FOR DEMOLITION PERMIT Permit Number: Date Received:
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B
TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING
TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET
When power interruptions happen.
When power interruptions happen. We know it s never a good time to have your power go out, so we work all year pruning trees and investing in our system to cut down on problems before they start. Outage
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:
CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
IESO Supply Deliverability Guidelines
PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents