1 UNIT: Machine, Tool, and Lab Safety NO. OF DAYS: 15 KEY LEARNING(S): Safe and proper use of tools and machines. UNIT : How do I safely work in the basic home repair lab & How to apply machines and tools? D2. Diagnose a malfunctioning system and use tools, materials, and knowledge to repair It. Classroom rules and expectations General safety rules Power tool safety and Use How Do I operate the machines and tools in a safe and proper manner? Lumber Fasteners Hand tools Safety devices E6. What are they rules and expectations while working the shop setting?
2 UNIT: Wall, Window, and Door Framing KEY LEARNING(S): Proper door, window, and wall framing UNIT : How do I correctly install walls doors and windows? E6. Installing walls, windows, and doors. How do I know if the framing is structurally sound or if it is malfunctioning? How do I repair a broken wall door or window frame? Lumber Fasteners Miter saw Framing square Plumb Dimensional lumber sill NO. OF DAYS:20 Rare use of vocab usage. Header Jack/cripple stud. Stud Pneumatic nailer Top plate/bottom plate O.C.-On center E7. Analyze the technologies of prefabrication and new structural materials and processes as they pertain to constructing the modern How do I correctly frame and install walls, windows and doors.
3 UNIT: Wiring KEY LEARNING(S): Wiring of residential dwellings UNIT : How do I safely install and maintain residential wiring? NO. OF DAYS: E6 Measuring and laying out rough wire through wall frames to their designated fixtures. How do I know if the wiring is wrong? Wire Outlets Switches Hanging light fixtures Cutters Outlet Switch Plyers Strippers Crimpers Conduit Gauge Junction box E7 Analyze the technologies of prefabrication and new structural materials and processes as they pertain to constructing the modern Installing multiple electrical components (switch, outlet, light fixture) How do I repair defective wiring?
4 UNIT: Plumbing KEY LEARNING(S): Proper installation and repair of residential plumbing UNIT : How do I install/maintain and repair plumbing components E6 Installing, maintaining and repairing plumbing through drywall. How do I properly install piping? PVC pipe ½ Purple primer/cement Hose bibb ½ copper pipe Copper fittings Propane torch Solder/flux Tubing cutting NO. OF DAYS:10 PVC pipe PVC adhesives E7 Analyze the technologies of prefabrication and new structural materials and processes as they pertain to constructing the modern How do I repair that plumbing?
5 UNIT: Drywall installation and repair KEY LEARNING(S): Proper installation and repair of drywall UNIT : How do I install drywall and is it repair when damaged? C2: Analyze a prototype and/or create a working model to test a design concept by making actual observations and necessary adjustments. Drywall Installation and repair What are the steps, tools and materials to install drywall properly? Drywall Joint compound Joint knife Drywall tape Lumbers Drywall Framing Fasteners NO. OF DAYS:15 Joint compound Corner bead Taping knife D2. Diagnose a malfunctioning system and use tools, materials, and knowledge to repair it. How do know if the drywall is in need of repair or replacement? How do I repair drywall after it had been damaged?
6 UNIT: Flooring Applications in a residential structure KEY LEARNING(S): The students will install and repair various flooring styles. UNIT : How to apply and repair various flooring applications? C2: Analyze a prototype and/or create a working model to test a design concept by making actual observations and necessary adjustments. Installation and repair of flooring applications. How do install and care for various flooring application in a residential structure? Tile Tile cutter Grout Thin set OSB NO. OF DAYS:5 Thin set Notch trowel Tile spacers Grout float D2. Diagnose a malfunctioning system and use tools, materials, and knowledge to repair it. How do I know if the flooring is in need of repair or replacement? How do I repair broken flooring in a residential structure?
INSTALLATION INSTRUCTIONS
door frames Engineered product systems INSTALLATION INSTRUCTIONS door frames MINIMALIST DOOR FRAME Fry Reglet Flush Door frames are designed for use with 3 5/8 studs with ½ drywall both sides (4 5/8 throat
More informationBorges Construction Company A limited liability Corporation Page1 of 1
Page1 of 1 The following is a quote to remodel the master bathroom at your home: Materials Labor Demolition 1 Dumpster $ 225.00 $ - 2 Remove existing carpet $ - $ 50.00 3 Remove existing tile $ - $ 80.00
More informationInstalling Window and Door Mouldings
Installing Window and Door Mouldings About Window and Door Mouldings The trim around windows and doors greatly influences the look and style of your interior. They also bridge the gaps and cover spaces
More informationElectrical Wiring Technical Bulletin
Electrical Wiring Technical Bulletin Overview In general, SIP construction is easier and more cost effective when things are planned and thought out before the panels are manufactured. This process will
More informationQUOTATION FOR EXAMPLE BATHROOM RENOVATION
QUOTATION FOR EXAMPLE BATHROOM RENOVATION Prepared For: PEGASUS Client 99 Washington St Melrose, MA 02176 Quotation valid for 90 from: 12/21/10 PEGASUS Design-To-Build is pleased to have the opportunity
More informationnecessary for years of satisfactory service. SmartBlock insulating form concrete walls share the
Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final
More informationDE Frame with C Series Sidelight
TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder
More informationDETAILED INSTALLATION GUIDE
DETAILED INSTALLATION GUIDE Warning: Risk of Electrical Shock, Fire or Personal Injury Once Installed and your wiring is run through your SMARTWALL system there is risk of electrical shock, fire or personal
More informationSingle Family Residential Basement Finish
How to Use This Guide Building Guide Pottawattamie County Planning & Development Department Building & Safety Division Single Family Residential Basement Finish Provide two (2) sets of plans and complete
More informationK. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11
K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins
More informationREDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES
REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES Tools Required Tape Measure Hammer Slotted Screw Driver #2 & #3 Philips Screw Driver 3-4 Foot Level 12 Pry Bar Cold Chisel
More informationAcumen Enterprises, Inc.
Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter
More informationHow To Repair A Boat Landing Deck With A Boat Bed
RESIDENTIAL INSULATED SHEATHING INSTALLATION GUIDE Residential Insulated Sheathing Installation Guide ROXUL COMFORTBOARD IS Table of Contents Slab-on-grade-to Above Grade Wall...1 Foundation Wall at Footing
More informationShower Walls and Tub Surrounds
Reverso en español TEC Skill Set How-To Project Guide Shower Walls and Tub Surrounds 3 Steps to a Beautiful Tile Surface! 1. Prepare the surface 2. Set the tile 3. Grout and caulk H.B. Fuller Construction
More informationWhitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.
Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal
More informationA TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS
A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS Insurance Inspection Report 1234 Main Street Tallahassee, Florida Report Prepared For: Charles Smith Report Prepared
More informationKnauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap
Tile Backing Will not deteriorate in water Easy to score and snap Resistant to mould and mildew Knauf Aquapanel Interior Cement board for wet areas Knauf Aquapanel Interior Cement Board Drywall for Wet
More informationMark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
More informationInspection Report of 1895 Jamesport Circle PSL, Fl 33953 Prepared for Yen Ho
Inspection Report of 1895 Jamesport Circle PSL, Fl 33953 Prepared for Yen Ho The State of Florida requires the builder to build in compliance with the Florida Building Code. Florida State Statutes 455
More informationHow To Build A Basement House
Single Family Basement Finish Purpose of Guide The purpose of this guide is to assist you in the permit process for your project. This handout is intended as a basic plan submittal under the 2009 International
More informationThis handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.
Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org
More informationPDmB, Inc. Definitions
Page 1 of 11 Definitions S Satisfactory Meets industry standards for proper material and installation NP Not Present Condition or item was not present at time of inspection NI Not Inspected Condition or
More informationMRI RF SHIELDING DESIGN
MRI RF SHIELDING DESIGN Nelco s MRI RF Shielding is specifically designed for the MRI industry. Our engineers have developed a shielded enclosure made entirely of nonmagnetic materials that is unsurpassed
More informationGreenGuard Housewrap Installation Guide
000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be
More informationToilet Plumbing. Here is a selection of different types of W.Cs and urinals. Can you match the pictures to the names below?
Toilet Plumbing. Here is a selection of different types of W.Cs and urinals. Can you match the pictures to the names below? J. H. I. A. European water closet B. Indian style W.C C. Urinal corner (to be
More informationNATIONAL DIPLOMA IN ARCHITECTURAL TECHNOLOGY
PROGRAMME: COURSE NAME: NATIONAL DIPLOMA IN ARCHITECTURAL TECHNOLOGY SITE MANAGEMENT COURSE CODE: BLD 206 DURATION: 0 3 3 UNITS: 3 UNITS GOAL: GENERAL OBJECTIVES: On completion of this module the trainee
More informationResidential Building Inspection Policies
CONCRETE 1. A footing inspection has been called in, but a monolithic slab shows on the plans. Cancel the footing and create a slab inspection, as long as there is a Passed Plumbing Rough (05). 2. A stemwall
More informationNew Employee / Applicant - Information Pack (Includes: Driver Back round Release Form, Skills & Tools Assessment
New Employee / Applicant - Information Pack (Includes: Driver Back round Release Form, Skills & Tools Assessment Included are the following: Personal information form Driver Back round Check Authorization
More informationInstallation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B
Installation Guide and Wall Surrounds SERIES 7104 1021861-2-B Thank You For Choosing Sterling We appreciate your commitment to Sterling value. Please take a few minutes to review this manual before you
More informationHomeSpec REPORT SUMMARY
HomeSpec 04/25/2007 Ms. Rachel Trujeque Re: 13038 West Plum Road Lot #1225 - Peoria, AZ. 85383 - Pre Drywall Inspection Dear Ms. Trujeque, At your request, a visual pre drywall inspection of the above
More informationImprove Comfort. Lower Energy Costs with GREAT STUFF Insulating Foam Sealants.
Improve Comfort. Lower Energy Costs with GREAT STUFF Insulating Foam Sealants. Air-Seal Audit Checklist United States Canada l Residential Air leaks account for 25 40%* of the energy used for heating and
More informationRepairing Drywall Techniques for fixing everything from popped screws to big holes
Repairing Drywall Techniques for fixing everything from popped screws to big holes BY MYRON R. FERGUSON C racks or holes in drywall, wet or stained drywall, peeling joint tape, popped nails or screws.
More informationOHIO MEDICAL CORPORATION. Medical Gas Panel. Installation and Maintenance Manual
OHIO MEDICAL CORPORATION Medical Gas Panel Installation and Maintenance Manual P/N 255105 (Rev.5) 08/2005 P/N 255105 (Rev.5) 08/2005 PAGE 2 OHIO MEDICAL CORPORATION PAGE 3 1.0 User Responsibilities The
More informationSUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: 1860. Inspection Date: Saturday, February XX, XXXX
SUMMARY REPORT Report Number: 1860 Inspection Date: Saturday, February XX, XXXX Property Address: XX XXXXX XXX Toronto, ON XXX XZX Client Name: Xxxx Xxxxxxxxxxxxx Prepared by: Andrew Marioselva BSc,CHI
More informationElectrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
More informationVanishing Lid Trays Construction Methods with Tile or Masonry
1-800-447-2838 Installation Instructions Vanishing Lid Trays Construction Methods with Tile or Masonry Table of Contents 1. Tools and Equipment...1 2. Vanishing Lid Trays...3 2.1 Materials for Finished
More informationLIGHT FLOOR AND WALL FRAMING
CHAPTER 1 LIGHT FLOOR AND WALL FRAMING In the normal sequence of construction events, the floor and wall activities follow the completed foundation work. In this chapter, we ll examine established methods
More informationDIABLO VALLEY COLLEGE CATALOG 2015-2016
STEAMFITTING STMFT Tish Young, Dean Physical Sciences and Engineering Division Physical Sciences Building, Room 263 Possible career opportunities In collaboration with Plumbers and Steamfitters Union Local
More informationPANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
More informationTHINGS YOU SHOULD KNOW
INSTALLATION INSTRUCTIONS Value Sized Roll The quickest, easiest, cleanest way to install tile. No Mortar, No Mixing, No Mess Complete Your Project in a Day No Waiting Between Setting and Grouting THINGS
More informationINSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
More informationAll content including text and photographs are protected by law - Copyright 2010 by www.vldesign.com
Step by step directions for building your own 1500 gallon aquarium, 350 Gallon Sump, and a radiant heater. PART 1 Building the aquarium PART 2 Building the sump PART 3 The plumbing PART 4 The radiant heater
More informationHow To Install An Intercom Or Door Phone System For Your Home Or Business. Provided by www.intercomsonline.com
How To Install An Intercom Or Door Phone System For Your Home Or Business. Provided by www.intercomsonline.com If you decide you want to install a wired intercom or door phone system in your home or business,
More informationLesson Plan Course Title: Construction Technology
Lesson Plan Course Title: Construction Technology Session Title: Wall Framing, Doors Performance Objective: Upon completion of this assignment, the student will be able to properly identify, gather sizing
More informationINSTALLATION IMPORTANT INSTALLER/OWNER RESPONSIBILITY TOOLS & EQUIPMENT NEEDED FOR INSTALLATION PRE-INSTALLATION PROCEDURES & JOBSITE CONDITIONS
IMPORTANT It is important that you read & understand the following information and instructions in their entirety before proceeding with installation. Please thoroughly inspect all Flooring products in
More informationTypical Finished Basement Details
Fauquier County, Virginia Typical Finished Basement Details Based on the 2012 International Residential Code Finished basements must be constructed in conformance with this document. For requirements,
More informationFree 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details
Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details Brought To You By: MyShedPlans Click Here To Download 12,000 Shed Plans >> 12 x 8 Basic Shed This 8 12-ft. shed features a simple
More informationMAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015
MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015 **Disclaimer: This document is to serve as informational purposes only. This is not a code book or a final interpretation of the
More informationHow to Install GoBoard:
How to Install GoBoard: A Step-by-Step Guide Durable, Ultra-Lightweight, Waterproof Tile Backer Board Introducing GoBoard Every tiling project requires a durable, waterproof surface under the tile, called
More informationPlumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector
Plumbing Helpful Hints Residential Construction Bert Polk Plumbing Inspector Lincoln County 2015 Waste and vent fittings Vent 90 medium 90 long 90 1/16 bend,1/8 bend,1/6 bend, medium 90 san tee combination
More informationTypical Finished Basement Details
Fairfax County, Virginia Typical Finished Basement Details Based on the 2012 International Residential Code Finished basements must be constructed in conformance with this document. For requirements, details
More informationPrerequisites: WorkKeys testing and a copy of high school diploma or GED.
MULTICRAFT MAINTENANCE Industrial Track or Facility Track Contact: Tim Broseus at (740) 364-2275 or tbroseus@c-tec.edu The supply/demand ratio for pre-trained multicraft maintenance technicians is high.
More informationInspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com
More informationSWF Home Inspections
Cover Page SWF Home Inspections Property Inspection Report Inspection prepared for: Mr & Mrs Home Buyer Real Estate Agent: My Favorite Agent - Date of Inspection: 7/4/2013 Age of Home: 2004 Size: 1568
More informationRSMeans. Business Solutions
RSMeans Business Solutions BASF Corporation Time & Motion Study November 2006 Submitted to: BuildingInsight, LLC Christopher J. Fennell, President Submitted by: Reed Construction Data/RSMeans 63 Smiths
More informationSteel Door Frame Installation in Steel Stud Construction
Steel Door Frame Installation in Steel Stud Construction For use with the Steel Door Institute (SDI) video How to Install a Steel Door Frames in Steel Stud Construction This manual gives you step-by-step
More informationInstallation Instructions
Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate
More informationCONSTRUCTION DETAILS & LOAD DESIGN CHARTS
Office and Production 126 New Pace Rd., PO Box 279 Newcomerstown, OH 43832 1-800-446-2188, Fax: 740-498-4184 www.buildwithsips.com CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Table of Contents Description
More informationThe better way to build TM. Installation Manual. EXTERIOR WALL SIPs
The better way to build TM Installation Manual EXTERIOR WALL SIPs July 2015 EXTERIOR WALL SIPs Installation Manual Table of Contents Topics General Requirements................................... 3 Materials..............................................
More informationThe purpose of this document is to provide standards for persons requesting or subject to County building inspections.
STANDARD OPERATING PROCEDURE BUILDING & SITE DEVELOPMENT Number: 310.1 Approval: Yves Khawam Effective Date: December 27, 2006 Subject: Requirements for County building inspections Page 1 of 7 1.0 PURPOSE:
More informationHome Ownership & Basic Home Repair
Fair Lawn Public Schools Fair Lawn, NJ Home Ownership & Basic Home Repair Technology Education Department Ronald Durso, Ed.S. Department Supervisor Steven Mondadori & Ronald Durso Curriculum Authors August
More informationSPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This
More informationChapter 130. Texas Essential Knowledge and Skills for Career and Technical Education. Subchapter B. Architecture and Construction
Text of Adopted New 19 TAC Chapter 130. Texas Essential Knowledge and Skills for Career and Technical Education Subchapter B. Architecture and Construction 130.41. Implementation of Texas Essential Knowledge
More informationGENERAL ELECTRICAL REQUIREMENTS
GENERAL ELECTRICAL REQUIREMENTS RECEPTACLE SPACING Within 6-feet of the edge of any door HABITABLE Not more than 12-feet apart along wall ROOMS: At all wall spaces 24 or more wide Within 24 of edge of
More informationTechnical Data. wedi Fundo Shower System Primo
Technical Data wedi Fundo Shower System Primo Technical Data wedi Fundo Shower System-Primo Overview There are several ways to build and make a shower tileable. There is only one fully equipped and performance
More informationTABLE 1. Rugged cast aluminum alloy casing,celcon waterways with nichrome parts White (unless stainless steel housing)
CHRONOMITE INSTANT-FLOW MICRO WATER HEATER INSTALLATION AND OPERATION INSTRUCTIONS - (LOW FLOW MODELS) (Before installation, compare electrical needed for the model of heater selected) TABLE 1 Model No.
More informationBrick Veneer Construction
Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power
More informationRESERVDELSLISTA NORMFINISH DP14
1-A Glove L with lining 401100 1 pc 1-B Door L complete 400600 1 pc 1-C Main switch O-I 400101 1 pc 1-D START / STOP switch 400301 1 pc 1-E Fan motor 1,5 kw 400200 1 pc 1-F Gauge blast pressure 400400
More informationHfHMD uses LP SmartSide siding and trim.
HfHMD uses LP SmartSide siding and trim. These products are: More durable than cement fiber board. Much more volunteer-friendly to install. When installed correctly, have a 5/50- year pro-rated warranty.
More informationBOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER
BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION # BLOCK LOT VACANT YES NO CURRENT OWNER NAME ADDRESS TELEPHONE # PROSPECTIVE
More informationPERMITS REQUIRED & PERMIT EXEMPTIONS
PERMITS REQUIRED & PERMIT EXEMPTIONS This guideline is intended to assist the applicant in determining what types of construction work require a permit. The 1997 California Uniform Administrative Code,
More informationBUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207
BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist
More informationFAQs. 19. Does the sub floor need to be level before I install my new direct-to-stud bathtub or shower base?
1. Where is the serial number of my tub located? 2. What can I use to clean my tub or shower? 3. What is an Above Floor Rough-in? 4. Can I replace my towel bar? 5. What are grommets? 6. Why do some bathing
More informationInformation for Construction Contractors. Terry O Neill Taxpayer Service Specialist
Information for Construction Contractors Terry O Neill Taxpayer Service Specialist Today s Webinar Definitions and details 4 types of contractors Sales tax for each type of contractor Materials, Equipment,
More informationModule 7. Plumber: Sink Installation
Module 7 Plumber: Sink Installation 138 The picture below shows a sample sink installation station. 139 Module 7 Plumber: Sink Installation Module Overview This module will involve the proper setup and
More informationDUROCK Brand Cement Board. installation guide. Substrate and ceramic tile installation for walls, floors, countertops and wall shields.
DUROCK Brand Cement Board installation guide Substrate and ceramic tile installation for walls, floors, countertops and wall shields. DUROCK Brand Cement Board... Strength beneath the surface A ceramic
More informationSAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010
Best Barns USA Assembly Book Revised November 29, 2010 SAMPLE INSTRUCTIONS the Denver 12'x 12' or 12'x16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775
More informationWINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING
WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements
More informationMarch 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
More information2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
More informationClad Direct Glaze Window Installation Instructions
Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationWindow Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
More informationBuilding Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
More informationTexas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG)
Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG) Subrecipient Name: Homeowner Name: Home Address: Homeowner Signature: Building Contractor Name and Address: Work
More informationEngineered Wood Foundations
Engineered Wood Foundations Emeraldfoundations.com 1 EWF Planning and Installation manual This manual will serve as a guide to planning and installing an Emerald Foundation system. This system is comprised
More informationGuidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
More informationReference Guide for Obtaining Permits and Utility Services For New Construction
Reference Guide for Obtaining Permits and Utility Services For New Construction (Revised 04-2012) Table of Contents City Offices Telephone Numbers...1 Application for Utilities...2 Building Permits New
More informationRoped Hydraulic Residential Elevator Specifications
January 1, 2004 Roped Hydraulic Residential Elevator Specifications P.O. Box 749, 5191 Stump Rd., Plumsteadville, PA 18949 Toll Free: 888-443-2800, Phone: 215-766-3380, Fax: 215-766-3385 CONTENTS Part
More informationArizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST
It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist
More information4 Installation Requirements
4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming
More informationINSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS
2009 Pella Corporation INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Part Number: 80WH0100 Installation Instructions for Typical Wood Frame Construction.
More information2.9 WINDOW & DOOR BUCKS
2.9 WINDOW & DOOR BUCKS Bucks provide attachment surfaces for windows and doors while holding back concrete from these openings during concrete placement. Mark the center and edges of openings as you place
More informationEucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.
i This instruction sheet describes the proper methods for installing Eucatex decorative wall paneling. Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in
More informationSpeed-Mat Rectangle Cutter
Speed-Mat Rectangle Cutter 1 Honeycomb baseboard. 2 Left hold down. 14 3 Bottom hold down. 4 4 Left / right rule. 8 5 8 5 Left / right rule pointer. 1 6 Top / bottom rule. 7 Top / bottom rule pointer.
More informationAMERICAN GOTHIC PLAYHOUSE
AMERICAN GOTHIC PLAYHOUSE Project Plan #856 Sheet 1 of 5 Pick a spot and get started with the beautiful that your kids will love. The design of the playhouse includes 35 square feet of interior space plus
More informationBuilding, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule
More informationCity of Fort Smith Building Permit Process Frequently Asked Questions
Question: W ho must obtain a building permit? City of Fort Smith Building Permit Process Frequently Asked Questions Answer: This answer is the same for residential or commercial building. Any owner or
More informationVA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation
More informationHOMEOWNER S PERMIT GUIDE
HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448
More information