Transportation and Infrastructure Committee Minutes
|
|
|
- Donald Allen
- 10 years ago
- Views:
Transcription
1 Transprtatin and Infrastructure Cmmittee Minutes Executive Bardrm City Hall Avenue Surrey, B.C. MONDAY, MAY 13, 2013 Time: 2:00 pm Present: Chair - Cuncillr Gill Cuncillr Rasde Cuncillr Hunt Senirs Liaisn: Cuncillr Steele Guests: Elizabeth Mdel David Walters Absent: Staff Present: J. Ban, Transprtatin Manager V. Lalnde, General Manager, Engineering P. Bellefntaine, Transprtatin Planning Mgr. P. Lee, Rapid Transit & Strategic Prjects Mgr. D. Buchanan, Transprtatin Planner L. Luaifa, Legislative Services A. ADOPTION OF MINUTES 1. Minutes f the February 25 and April 15, 2013 meetings t be adpted. Mved by Cuncillr Steele Secnded by Cuncillr Hunt That the minutes f the Transprtatin Cmmittee meetings held n February 25 and April 15, 2013 be received. B. DELEGATIONS C. OUTSTANDING BUSINESS 1. Pattull Bridge Update The Manager f Rapid Transit and Strategic Prjects prvided an update n Pattull Bridge. An extensive Discussin Guide that includes a full list f alternatives alng with a shrt-list f alternatives that shuld mve frward fr further review will be distributed t bth New Westminster and Surrey Cuncils. New Westminster staff is managing an in-camera meeting t discuss the details. Public cnsultatin will include ten meetings held with 6 pen huses (3 in Surrey and 3 in New Westminster) and 4 small scale meetings with stakehlders and the public. h:\clerks\cuncil standing cmmittees\transprtatin and infrastructure cmmittee\minutes\2013\min tic dcx Page 2
2 Transprtatin and Infrastructure Cmmittee - Minutes May 13, 2013 Shrt-list Alternatives include: 1. Rehab*Existing Bridge 2 r 3 Lanes 2. Rehab*Existing Bridge 3 Lanes 3. Rehab Existing Bridge 4 lanes (culd nt address lane width/safety issues unless cantilevered a travel lane frm the bridge deck, which if feasible wuld be cstly) 3. New 4-lane bridge 4. New 5-lane bridge 5. New 6-lane bridge 6. New Surrey-Cquitlam Bridge (4 Lanes) plus Rehab Existing Bridge (2 r 3 Lanes) *Rehab ptins invlve seismic retrfit, structural imprvements and addressing pier scuring The Cmmittee discussed ging int public cnsultatins with all the alternatives t seek feedback and narrw the list f alternatives dwn. Staff recmmended that based n lcal and reginal mbility and ecnmic develpment needs that the City f Surrey des nt supprt the recmmendatin fr further analysis f the tw lane bridge rehabilitatin alternatives identified in the current Pattull Bridge Review materials. Staff nted that the participatin by Surrey residents was brught up at the cnsultatins in February, Surrey needs t d utreach wrk and identify key stakehlders t increase public participatin. RECOMMENDATION Mved by Cuncillr Hunt Secnded by Cuncillr Rasde That the Transprtatin and Infrastructure Cmmittee recmmends that Cuncil cnsider nt supprting further analysis f the tw lane bridge rehabilitatin alternatives identified in the Pattull Bridge Review Cnsultatin Discussin Guide and Feedback Frm, as currently prpsed by TransLink. 2. Rapid Transit Update File N The Manager f Rapid Transit and Strategic Prjects prvided an update n Rapid Transit in Surrey. The lcal calitin f business and cmmunity grups advcating fr LRT called Light Rail Links is grwing and nw has 16 members. Membership includes Century Grup, Value Industries, Fraser Valley Real Estate, White Rck Chamber f Cmmerce and Surrey Citizen Transprtatin Initiatives. A Twitter accunt and website have been established. The next meeting f the calitin is May 16. h:\clerks\cuncil standing cmmittees\transprtatin and infrastructure cmmittee\minutes\2013\min tic dcx Page 3
3 Transprtatin and Infrastructure Cmmittee - Minutes May 13, 2013 D. NEW BUSINESS 1. King Gerge Bulevard A Great Street The Manager f Transprtatin prvided an update n King Gerge Bulevard. Surrey's City Centre Plan was apprved by Cuncil in July, Identified thrugh the public engagement prcess, was the existing highway riented cnfiguratin f King Gerge Bulevard (KGB) and the barrier it presented t creating a liveable City Centre. Staff has been examining design alternatives fr KGB t transfrm the crridr int a mre pedestrian riented street while acknwledging its arterial rad functin. Part f the design review prcess included the issue f jaywalking n KGB which needed t be addressed. Design wrkshps were held with staff and internatinal urban and street design experts which identified the key elements fr cnsideratin: Increase east/west cnnectins acrss the City Centre Enhance the pedestrian realm Segregate cycling facilities Prvide curb side parking Increase greening Any prject wuld likely include lking at reducing the speed limit frm 60 km t 50 km frm 94A t 108 Avenue. Tw ptins are being explred by staff: Optin A: Tw-way segregated bike lane n ne side f KGB Optin B: One-way segregated bike lanes n bth sides f KGB Staff's recmmendatins were as fllws: Cntinue with creating finer grained rad netwrk Pursue Optin A; Tw-way segregated bike lane Evaluate bundaries fr lwering the speed limit t 50 km/hr. Assess staging alternatives fr Optin A and undertake further assessment n integrating the prject with the existing n-street bicycle lanes n KGB nrth and suth f the prject Undertake further cnsultatin with stakehlders including Surrey City Centre BIA Cmmittee: Mved by Cuncillr Hunt Secnded by Cuncillr Rasde That the Transprtatin and Infrastructure 1. Endrse staff's recmmendatins and, 2. Cnsult with the Dwntwn Business Imprvement Assciatin n the prpsed prject befre ging t Cuncil. h:\clerks\cuncil standing cmmittees\transprtatin and infrastructure cmmittee\minutes\2013\min tic dcx Page 4
4 Transprtatin and Infrastructure Cmmittee - Minutes May 13, Surrey Central Exchange The Manager f Transprtatin prvided a reprt n Surrey Central Exchange with a presentatin f ptins fr a transit village. TransLink has $10 millin dllars f funding fr the prject which is required t be used within a specific time perid. The planning study has identified that the new transit exchange at Surrey Central wuld be based n an n-street pick-up and drp-ff mdel lcated between 102 and 103 Avenue. This wuld replace the current bus lp which is cnsidered t be unsuitable within the cre f the City Centre. The current and ptential future lt wnership was presented. This includes pprtunities fr SFU has t acquire additinal lands fr future expansin. TransLink has a 399 year lease n the existing transit exchange and have indicated that this is functining effectively. Hwever, there is a heavy and increasing reliance by transit vehicles fr n street pick up and drp ff and layver n City streets in the area. The preferred ptins fr cnsideratin invlves: Buses n City Parkway and n a newly cnstructed 102 A Avenue (the lcatin f the current exchange) plus the new 103 Avenue being cnstructed in cnjunctin the New City Hall and Civic 3 Plaza prjects. An ff-street layver, the lcatin f which staff are still wrking n with TransLink and SFU. Staff nted that the intent n 103 Avenue was t have an at grade pedestrian crssing acrss 103 Avenue with gentle ramps fr traffic n each apprach. The Cmmittee was supprtive f the n-street bus pick-up/drp-ff alng 102A Avenue and 103 Avenue and staff cntinuing t wrk t find an ff-street layver lcatin. Staff will prvide a further update t the Cmmittee as the planning prcess cntinues. 3. Highway 15 Crridr Intersectin Review The Manager f Transprtatin prvided a reprt n the Highway 15 Crridr Intersectin Review. The crridr review was initiated in respnse t the recent fatal cllisin at 32 Avenue and Highway 15 (176 Street). cmpleted in cperatin with the Ministry f Transprtatin and Infrastructure (MTI). The review examined the histry f cllisins bth at the intersectin itself as well as ther intersectins alng the crridr. The review als included an Advance Warning Flasher Warrant Assessment. Staff presented the cllisin histry at five selected intersectins alng Highway 15. The crash rates were cnsiderably less than verall average crash rates in the Fraser Valley and within the City. Nne f the City rads intersecting Highway 15 have speed limits abve 60 km/hr., which is a key criteria fr warranting the installatin f advance flashers. h:\clerks\cuncil standing cmmittees\transprtatin and infrastructure cmmittee\minutes\2013\min tic dcx Page 5
5 Transprtatin and Infrastructure Cmmittee - Minutes May 13, 2013 All f the intersectins meet stpping sight distance requirements and n grades n any City Rad appraches require mre than standard braking. The MTI did a full traffic review at the intersectin f 32 Avenue and Highway 15 (176 Street) and the intersectin was cnsidered apprpriately safe and the signal was perating as intended the day f the fatal cllisin. Subsequent t the cllisin, the driver wh ran the red light at the intersectin died in hspital and there are indicatins that he may have been suffering frm an underlying medical cnditin that culd have cntributed t the cllisin. Based n the analysis and warrant review fr advance flashing lights, n further wrk is planned t be undertaken at this lcatin as a result f the cllisin. E. ITEMS REFERRED BY COUNCIL F. CORRESPONDENCE G. INFORMATION ITEMS H. OTHER BUSINESS I. NEXT MEETING The next Transprtatin and Infrastructure Cmmittee is scheduled fr June 10, 2:00 pm in the Executive Bardrm. J. ADJOURNMENT: Cmmittee meeting d nw adjurn. Mved by Cuncillr Hunt Secnded by Cuncillr Steele That the Transprtatin and Infrastructure The Transprtatin and Infrastructure Cmmittee meeting adjurned at 3:05 p.m. Jane Sullivan, City Clerk Cuncillr Gill, Chair h:\clerks\cuncil standing cmmittees\transprtatin and infrastructure cmmittee\minutes\2013\min tic dcx Page 6
Baker Street Two Way Post-implementation monitoring strategy
Baker Tw Way Pst-implementatin mnitring strategy During the last cnsultatin in July 2015, varius issues and cncerns were raised. Respnse t the general traffic and envirnmental issues raised were prvided
This report provides Members with an update on of the financial performance of the Corporation s managed IS service contract with Agilisys Ltd.
Cmmittee: Date(s): Infrmatin Systems Sub Cmmittee 11 th March 2015 Subject: Agilisys Managed Service Financial Reprt Reprt f: Chamberlain Summary Public Fr Infrmatin This reprt prvides Members with an
Terms of Reference for the Fire Review Panel
Terms f Reference fr the Fire Review Panel Purpse The Fire Review Panel (the Panel) is appinted t prvide independent advice t the Minister f Internal Affairs (the Minister) abut hw the Gvernment can achieve:
Maintain a balanced budget primarily the General & Park Funds
EXHIBIT B City f Chic Budget Cntingency Plan P The purpse f the Budget Cntingency Plan is t establish a guideline and general apprach t respnd t adverse financial and ecnmic cnditins that culd negatively
Gravesham Borough Council
Classificatin: Part 1 Public Key Decisin: Please specify - N Gravesham Brugh Cuncil Reprt t: Perfrmance and Administratin Cmmittee Date: 12 Nvember 2015 Reprting fficer: Subject: Crprate Perfrmance Manager
FINANCE SCRUTINY SUB-COMMITTEE
REPORT FOR: PERFORMANCE AND FINANCE SCRUTINY SUB-COMMITTEE Date f Meeting: 6 January 2015 Subject: Staff Survey and Sickness Absence Mnitring Results and Actin plans Respnsible Officer: Scrutiny Lead Member
CMS Eligibility Requirements Checklist for MSSP ACO Participation
ATTACHMENT 1 CMS Eligibility Requirements Checklist fr MSSP ACO Participatin 1. General Eligibility Requirements ACO participants wrk tgether t manage and crdinate care fr Medicare fee-fr-service beneficiaries.
GP WIND DELIVERABLE D2.2 STAKEHOLDERS QUESTIONNAIRE WP2
GP WIND DELIVERABLE D2.2 STAKEHOLDERS QUESTIONNAIRE WP2 Prject Name: GP WIND Gd Practice in recnciling nshre and ffshre wind with envirnmental bjectives Prject Duratin: 24 mnths (August 2010 July 2012)
Job Profile Data & Reporting Analyst (Grant Fund)
Jb Prfile Data & Reprting Analyst (Grant Fund) Directrate Lcatin Reprts t Hurs Finance Slihull Finance Directr Nminally 37 hurs but peratinally available at all times t meet Cmpany requirements Cntract
Patient Participation Report
Patient Participatin Reprt In 2011, Westngrve Partnership decided t establish a PPG (Patient Participatin Grup) that wuld allw us t engage with ur patients, receive feedback frm them and ensure that they
Document Management Versioning Strategy
1.0 Backgrund and Overview Dcument Management Versining Strategy Versining is an imprtant cmpnent f cntent creatin and management. Versin management is a key cmpnent f enterprise cntent management. The
Request for Proposal (RFP) RFP HQ2015-01 Training Session and Leadership Program Development Consulting Services
technserve.rg Date: January 5, 2014 Request fr Prpsal (RFP) RFP HQ2015-01 Training Sessin and Leadership Prgram Develpment Cnsulting Services Subject: Request fr Prpsal TechnServe Inc. (TNS) invites yu
Canby Façade Improvement Program
Canby Façade Imprvement Prgram G R A NT PROGRAM MANUAL ( a s a d p t e d S e p t e m b e r 1 4, 2 0 1 1) A Prject f Canby Urban Renewal Agency Managed by: Dwntwn Canby Main Street Prgram Ami Keiffer Canby
Re: Draft Performance Monitoring Framework and Draft Indicators for the Provincial Policy Statement, 2005
June 19, 2009 Kyle MacIntyre Team Lead PPS Perfrmance Mnitring Framewrk Ministry f Municipal Affairs and Husing Prvincial Planning Plicy Branch 777 Bay Street, 14 th Flr Trnt, ON M5G 2E5 Re: Draft Perfrmance
The team carried out 876 successful homelessness prevention interviews
Cabinet Lead Reprts Full Cuncil 17 th February 2016 Cuncillr Yvnne Weeks: Cabinet Lead fr Cmmunities Husing Enabling Currently there are 7 families and 3 single peple in B&B 3 are awaiting accmmdatin thrugh
Software and Hardware Change Management Policy for CDes Computer Labs
Sftware and Hardware Change Management Plicy fr CDes Cmputer Labs Overview The cmputer labs in the Cllege f Design are clsely integrated with the academic needs f faculty and students. Cmputer lab resurces
Internal Audit Charter and operating standards
Internal Audit Charter and perating standards 2 1 verview This dcument sets ut the basis fr internal audit: (i) the Internal Audit charter, which establishes the framewrk fr Internal Audit; and (ii) hw
Business Continuity Management Policy
Business Cntinuity Management Plicy Versin: 1.0 Last Amendment: Apprved by: Library Cuncil f New Suth Wales Plicy wner/spnsr: Directr, Operatins and Chief Financial Officer Plicy Cntact Officer: Senir
What payments will I need to make during the construction phase? Will the lender advance construction funds prior to the work being completed?
Q&A What is a cnstructin lan? A cnstructin lan prvides the financing fr the cnstructin f yur new hme. Cnstructin lans may be structured as a single r tw-settlement transactin. Cnstructin lans culd include
GFWC Leadership Education and Development Seminar (LEADS)
GFWC Leadership Educatin and Develpment Seminar (LEADS) Infrmatin fr GFWC State Federatins The GFWC LEADS prgram is intended t identify GFWC members at the grassrts level wh have the ptential and the desire
Executive Summary. City of Kawartha Lakes EMS Master Plan-Executive Summary February 2011
Executive Summary The City f Kawartha Lakes (the City) Emergency Medical Services (EMS) serves an area f apprximately 3,060 square kilmeters with a ppulatin f apprximately 74,561 persns. Over the next
SLDS Site Visit Report: Wisconsin May 30, 2012 2
INTRODUCTION The Statewide Lngitudinal Data Systems (SLDS) Grant Prgram cnducts site visits t its grantee states t assess prgress n SLDS grant-funded wrk, prvide technical assistance, and learn best practices.
Change Management Process
Change Management Prcess B1.10 Change Management Prcess 1. Intrductin This plicy utlines [Yur Cmpany] s apprach t managing change within the rganisatin. All changes in strategy, activities and prcesses
Implementing an electronic document and records management system using SharePoint 7
Reprt title Agenda item Implementing an electrnic dcument and recrds management system using SharePint 7 Meeting Finance, Prcurement & Prperty Cmmittee 16 June 2008 Date Reprt by Dcument Number Head f
Impact Partnership Business Plan 2011/12. Impact Partnership Payroll Services. Business Plan 2011/12
Impact Partnership Payrll Services Dcument Cntrl Authr(s) Apprver(s) Issue Dawn Richardsn Draft 1.0 D Darbyshire Draft 4.0 E. Esenu Draft 5.0 D Richardsn Draft 6.0 D Darbyshire D Wild v7 E Esenu D Darbyshire
NHS Citizen Assembly Stocktake (March 2015) Mental health and parity of esteem. Version 1
NHS Citizen Assembly Stcktake (March 2015) Mental health and parity f esteem Versin 1 1 Mental health and parity f esteem Parity f Esteem Objective 1. In line with the cmmitment in the Mandate, 2013 t
CTF-ENDORSED NF CLINICS: PRINCIPLES OF OPERATION
Pilt Guidelines 2006 CTF-ENDORSED NF CLINICS: PRINCIPLES OF OPERATION Backgrund Children s Tumr Fundatin supprts research directed tward finding treatments fr neurfibrmatsis (NF) as well as effrts fcused
TERM OF REFERENCE. for the English Based Curriculum Development (Primary) for Westline Education Group
TABLE OF CONTENT TERM OF REFERENCE fr the English Based Curriculum Develpment (Primary) fr Westline Educatin Grup 1- Cmpany Backgrund. 2 2- Strategic Challenges. 2 3- Cnsultancy Objectives. 2 4- Purpse
Organisational self-migration guide an overview V1-5 April 2014
Organisatinal self-migratin guide an verview V1-5 April 2014 Cpyright 2013, Health and Scial Care Infrmatin Centre. 1 Self Migratin t NHSmail an verview fr rganisatins Cntents Intrductin 3 1. Initial preparatins
Duration of job. Context and environment: (e.g. dept description, region description, organogram)
Rle Prfile Jb Descriptin Jb Title Ref n: Prgramme Manager, Services fr Internatinal Educatin Marketing Directrate r Regin East Asia Department/Cuntry Indnesia Lcatin f pst Jakarta Pay Band G Reprts t Senir
E-Business Strategies For a Cmpany s Bard
DATATEC LIMITED BOARD CHARTER / TERMS OF REFERENCE 1. CONSTITUTION The primary bjective f the Cmpany s Bard Charter is t set ut the rle and respnsibilities f the Bard f Directrs ( the Bard ) as well as
IFRS Discussion Group
IFRS Discussin Grup Reprt n the Public Meeting February 26, 2014 The IFRS Discussin Grup is a discussin frum nly. The Grup s purpse is t assist the Accunting Standards Bard (AcSB) regarding issues arising
Bakersfield College Program Review Annual Update
Bakersfield Cllege Prgram Review Annual Update I. Prgram Infrmatin: Prgram Name: Child Develpment Prgram Type: Instructinal Nn Instructinal Prgram Missin Statement: The child develpment faculty and staff
Audit Committee Charter. St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd
Audit Cmmittee Charter St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd Versin 2.0, 22 February 2016 Apprver Bard f Directrs St Andrew
The Allstate Foundation Domestic Violence Program 2015 Moving Ahead Financial Empowerment Grant
The Allstate Fundatin Dmestic Vilence Prgram 2015 Mving Ahead Financial Empwerment Grant Due Date: September 1, 2015 Online applicatin: https://www.grantrequest.cm/sid_1010?sa=sna&fid=35296 The Allstate
Interactive Catchment Plan Project Brief. Background to the organisation. How will we achieve this? What is a rivers trust?
Interactive Catchment Plan Prject Brief Backgrund t the rganisatin The Suth East Rivers Trust is an envirnmental charity dedicated t the cnservatin and restratin f rivers in the suth east f England, including
CCHIIM ICD-10 Continuing Education Requirements for AHIMA Certified Professionals (& Frequently Asked Questions for Recertification)
CCHIIM ICD-10 Cntinuing Educatin Requirements fr AHIMA Certified Prfessinals (& Frequently Asked Questins fr Recertificatin) The transitin t ICD-10-CM and ICD-10-PCS is anticipated t imprve the capture
Florida Distance Learning Consortium 1753 West Paul Dirac Drive Tallahassee, FL 32310 V: 850-922-3359 F: 850-922-3109 S: 292-3359
Learning Object Repsitry Funding Summary by State States with Funding 1. Nrth Carlina Learning Object Repsitry (NCLOR) http://www.nclr.its.state.nc.us/nclrprd/lgn.d Status: Nt yet in prductin: test envirnment
Colorado Health Benefit Exchange Board Advisory Group Selection Process, Timeline, Charters and Nominee Form
Clrad Health Benefit Exchange Bard Selectin Prcess, Timeline, Charters and Nminee Frm Backgrund At the COHBE Bard meeting n April 9, 2012, staff shared a mem utlining a recmmendatin t frm vlunteer s (Health
CASSOWARY COAST REGIONAL COUNCIL POLICY ENTERPRISE RISK MANAGEMENT
CASSOWARY COAST REGIONAL COUNCIL POLICY ENTERPRISE RISK MANAGEMENT Plicy Number: 2.20 1. Authrity Lcal Gvernment Act 2009 Lcal Gvernment Regulatin 2012 AS/NZS ISO 31000-2009 Risk Management Principles
Ref. RFP 2015/104. Invitation to tender. International Retirement Plan. Project Green Climate Fund. 11 May 2015
Ref. RFP 2015/104 Invitatin t tender Internatinal Retirement Plan Prject Green Climate Fund 11 May 2015 Ref. RFP 2015/104 Table f cntents Sectin Page A. Intrductin... 1 B. Cmpletin f this dcument and timescale...
Business Plan 2014-15
Cmmissin fr Lcal Administratin in England Business Plan 2014-15 All Business Plan activity is linked t ur fur Strategic Objectives LGO Business Plan 2014-2015 v web 3 Page 1 descriptin 1. Prvide a cmplaints
SECTION J QUALITY ASSURANCE AND IMPROVEMENT PROGRAM
Audit Manual Sectin J SECTION J QUALITY ASSURANCE AND IMPROVEMENT PROGRAM Ref. Plicy and Practice Requirements IIA Standards and Other references J 1 Plicy: The Head f Internal Audit shall develp and maintain
10 th May 2010. Dear Peter, Re: Audit Quality in Australia: A Strategic Review
10 th May 2010 Mr. Peter Levy Audit Quality Strategic Review Crpratins and Financial Services Divisin The Treasury Langtn Crescent PARKES ACT 2600 Dear Peter, Re: Audit Quality in Australia: A Strategic
THE FACULTY OF LAW AND SOCIAL SCIENCES. Department of Economics and Department of Development Studies
Appendix G REC 25 May 2011 THE FACULTY OF LAW AND SOCIAL SCIENCES Department f Ecnmics and Department f Develpment Studies PROGRAMME SPECIFICATIONS FOR THE DEGREES OF MPHIL AND PHD IN INTERNATIONAL DEVELOPMENT
Human Resources Committee Meeting Douglas County, Nebraska
Human Resurces Cmmittee Meeting Duglas Cunty, Nebraska Mnday, May 18, 2015 The meeting cnvened at 2:01 p.m. in Rm 903 f the Omaha-Duglas Civic Center, 1819 Farnam Street, Omaha, NE 68183. A cpy f the Open
THIRD PARTY PROCUREMENT PROCEDURES
ADDENDUM #1 THIRD PARTY PROCUREMENT PROCEDURES NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS TRANSPORTATION DEPARTMENT JUNE 2011 OVERVIEW These prcedures establish standards and guidelines fr the Nrth Central
UNIVERSITY OF CALIFORNIA MERCED PERFORMANCE MANAGEMENT GUIDELINES
UNIVERSITY OF CALIFORNIA MERCED PERFORMANCE MANAGEMENT GUIDELINES REFERENCES AND RELATED POLICIES A. UC PPSM 2 -Definitin f Terms B. UC PPSM 12 -Nndiscriminatin in Emplyment C. UC PPSM 14 -Affirmative
An Innovative Outsourcing Solution for Ennis General Hospital. - Improved Radiology Services at Reduced Cost
GLOBAL DIAGNOSTICS & ENNIS GENERAL HOSPITAL. An Innvative Outsurcing Slutin fr Ennis General Hspital - Imprved Radilgy Services at Reduced Cst Sinead O Cnnr General Manager, Glbal Diagnstics Ireland September
FEEDBACK FROM THE VICTORIA QUALITY COUNCIL INTERHOSPITAL PATIENT TRANSFER WORKSHOP
FEEDBACK FROM THE VICTORIA QUALITY COUNCIL INTERHOSPITAL PATIENT TRANSFER WORKSHOP Results arising frm the survey f Participants at the Victrian Quality Cuncil (VQC) Interhspital Patient Transfer Wrkshp
Overview of the Final Requirements for Meaningful Use - 2015 through 2017
Overview f the Final Requirements fr Meaningful Use - 2015 thrugh 2017 On Oct. 6, 2015, the Centers fr Medicare & Medicaid Services (CMS) issued a final rule utlining the requirements fr eligible prfessinal
STUDENTS Policv 2750. Student Welfare. Wellness
STUDENTS Plicv 2750 Student Welfare Wellness The District prmtes healthy schls, by supprting wellness, gd nutritin, and regular physical activity as part f the ttal learning envirnment. The District supprts
The actions discussed below in this Appendix assume that the firm has already taken three foundation steps:
MAKING YOUR MARK 6.1 Gd Practice This sectin presents an example f gd practice fr firms executing plans t enter the resurces sectr supply chain fr the first time, r fr thse firms already in the supply
Corporate Standards for data quality and the collation of data for external presentation
The University f Kent Crprate Standards fr data quality and the cllatin f data fr external presentatin This paper intrduces a set f standards with the aim f safeguarding the University s psitin in published
CCHIIM ICD-10 Continuing Education Requirements for AHIMA Certified Professionals (& Frequently Asked Questions for Recertification)
CCHIIM ICD-10 Cntinuing Educatin Requirements fr AHIMA Certified Prfessinals (& Frequently Asked Questins fr Recertificatin) The transitin t ICD-10-CM and ICD-10-PCS is anticipated t imprve the capture
CDE Data Governance Program - CDE-Specific and SLDS (P20+) Programs
CDE Data Gvernance Prgram - CDE-Specific and SLDS (P20+) Prgrams On September 27 th and 28 th, State Supprt Team (SST) Members Crey Chatis and Jeff Sellers visited Clrad t help CDE begin a Data Gvernance
Occupational Therapy Working Group: Service Delivery review and Fee Review
Occupatinal Therapy Australia Victria Divisin Terms f Reference submissin Occupatinal Therapy Wrking Grup: Service Delivery review and Fee Review HDSG (TAC and VWA) July 2014 Occupatinal Therapy Australia
A3 TEMPLATE - RQHR STRATEGY
A3 TEMPLATE - RQHR STRATEGY Title: ED Waits and Patient Flw Strategy Which prvincial hshin/utcme des this strategy supprt: By March 31, 2017, n patient will wait fr care in the Emergency Rm. Primary Owner
TAKING OWNERSHIP OF HEALTH CARE
TAKING OWNERSHIP OF HEALTH CARE TIPS FOR PARENTS AND CAREGIVERS Are yu ready fr the day when yu take yur sn r yur daughter fr a medical appintment and the dctr r medical staff says t yu, as the parent
Meeting Minutes for January 17, 2013
There are tw purpses t these bi-mnthly calls: Meeting Minutes fr January 17, 2013 1. Prvide updates that may affect wrkflw user studies 2. Prvide a frum fr MIP Studies Users t ask questins and raise cncerns
ATL: Atlas Transformation Language. ATL Installation Guide
ATL: Atlas Transfrmatin Language ATL Installatin Guide - versin 0.1 - Nvember 2005 by ATLAS grup LINA & INRIA Nantes Cntent 1 Intrductin... 3 2 Installing ADT frm binaries... 3 2.1 Installing Eclipse and
CCPRF. Request for Proposals. Monitoring Services. November 25, 2009
CCPRF Request fr Prpsals Mnitring Services Nvember 25, 2009 Table f Cntents SECTION I... 1 1.1 INTRODUCTION AND OPPORTUNITY... 1 1.2 OBJECTIVES OF RFP... 1 1.3 STATEMENT OF WORK... 1 SECTION II... 2 2.1
Major capital investment in councils. Good practice checklist for project managers
Majr capital investment in cuncils checklist fr prject managers Prepared by Audit Sctland March 2013 b The Accunts Cmmissin The Accunts Cmmissin is a statutry, independent bdy which, thrugh the audit prcess,
Ghnjasryj. Aged Care Emergency. Model of Care
Ghnjasryj Aged Care Emergency Mdel f Care Nvember 2013 INTRODUCTION It is well dcumented that lder peple require emergency care mre ften than ther ppulatins, and generally have lnger Emergency Department
Rochester Downtown Façade Improvement Grants Program
Rchester Dwntwn Façade Imprvement Grants Prgram Presented by the Rchester Dwntwn Alliance and the City f Rchester, MN If yu have any questins please cntact Jn Eckhff at 507-424-5677 r [email protected]
Arizona Revised Statutes
Arizna Revised Statutes Title 28 - Transprtatin Laws Chapter 1. Definitins and Penalties Article 1. Definitins 28-101. Definitins... 6. "Bicycle" means a device, including a racing wheelchair, that is
400 Oyster Point Blvd, Suite 124, South San Francisco, CA 94080 (855) 385-3776 www.caleqro.com
Behaviral Health Cncepts, Inc. - Califrnia EQRO 400 Oyster Pint Blvd, Suite 124, Suth San Francisc, CA 94080 (855) 385-3776 www.caleqr.cm Feedback t CalEQRO Outside Review Draft Reprt FY14-15 All feedback
Specification for Oxford to Cambridge Expressway Strategic Study
Specificatin fr Oxfrd t Cambridge Expressway Strategic Study 1. Intrductin The Oxfrd t Cambridge Expressway Study is a strategic study spnsred by the Department fr Transprt. The requirement fr this study
Standardization or Harmonization? You need Both
Standardizatin r? Yu need Bth Albrecht Richen and Ansgar Steinhrst Recently the CFO f a majr cnsumer electrnics cmpany stated, We dn t need standardizatin f ur wrldwide prcesses, we need harmnizatin. Is
Global Services Coalition Objectives for the Doha Development Agenda
Glbal Services Calitin Objectives fr the Dha Develpment Agenda Attachment 2 Submissin t the Mrtimer Review Exprt Plicies and Prgrams June 2008 The Australian Services Rundtable is an active cre member
Submission of the Canadian Association for Graduate Studies to the House of Commons Standing Committee on Finance on the 2015 Federal Budget
Submissin f the Canadian Assciatin fr Graduate Studies t the Huse f Cmmns Standing Cmmittee n Finance n the 2015 Federal Budget Summary The Canadian Assciatin fr Graduate Studies (CAGS) thanks the Huse
Advanced Diploma in Credit Management (Distance Learning Programme) and. Diploma in Credit Management (Distance Learning Programme) Conferred by
Advanced Diplma in Credit Management (Distance Learning Prgramme) and Diplma in Credit Management (Distance Learning Prgramme) Cnferred by Sri Lanka Institute f Credit Management Nw yu have an pprtunity
