OPTIMAL DISTRIBUTION PLANNING INCREASING CAPACITY AND IMPROVING EFFICIENCY AND RELIABILITY WITH MINIMAL-COST ROBUST INVESTMENT
|
|
|
- Maryann Carpenter
- 10 years ago
- Views:
Transcription
1 OPTIMAL DISTRIBUTION PLANNING INCREASING CAPACITY AND IMPROVING EFFICIENCY AND RELIABILITY WITH MINIMAL-COST ROBUST INVESTMENT L.A.F.M. Ferreira, P.M.S. Carvalho IST S.N.C. Grave L.M.F. Barruncho L.A. Jorge, E. Quaresma, J.A. Martins, F.C. Branco, F. Mira IOA EDINFOR EDP Distribuição Energia SUMMARY This paper is on optimal distribution planning. What does distribution planning mean here? What is the meaning of optimal in the context of distribution planning? In this paper, a distribution system is viewed as a network composed of many nodes (hundreds, sometimes thousands) and an even larger number of branches. The network operates radially. The redundancy of branches is typically of 5% to 15% 5% for large, widely spread networks with a strong rural component, 15% for smaller, urban networks. Redundancy serves reserve and reliability purposes, for it allows for network reconfiguration. Most of the nodes of a distribution system correspond to delivery points or load points. Some nodes are injection points distribution substations; some other nodes are switching stations; some others are simple connection points. Most of the branches correspond to electric cables. Other branches correspond to switching devices. Distribution planning is to choose a new distribution system from a set of possible distribution systems so as to meet the expected load profile in a better way, more reliably, and with fewer losses. The new distribution system is a plan, a plan to be carried out by project services if the plan comprises acquisition or installation of new equipment or a plan to be carried out by dispatch services if the plan involves only changes in the network configuration (i.e. switching operations). If one can define criteria to measure the goodness of a plan, then there will be one plan that ranks above the others that plan will be the optimal distribution plan. The optimal distribution plan is the subject matter of this paper. One can classify the activity of planning, hence the corresponding distribution plans, into the following three categories: Expansion Plan Operation Plan Emergency Plan An expansion plan is a plan to expand the distribution system, a plan to acquire and install new equipment so as to strengthen the system or to accommodate new loads. To choose an expansion plan means to choose the most appropriate set of investments from a set of all possible investments. A regular basis for the updating of an expansion plan should be a year. An operation plan is a plan to operate the system satisfactorily, i.e. a plan to modify the configuration of the network so as to accommodate the load, satisfy the voltage and current requirements, improve efficiency and increase reliability of the system. To choose an operation plan means to choose the most appropriate network configuration (i.e. the set of switching operations) from a set of all possible configurations. Operation planning should be carried out seasonally, or whenever the load changes or the network changes due to maintenance reasons. An emergency plan is a plan to operate the system following a contingency condition, a plan to attenuate the effects of the contingency and to lead the distribution system to a satisfactory, secure point of operation (if possible). The planning problem is formulated as an optimization problem and the algorithms and software requirements are addressed. For each planning activity, the paper reports the benefits of optimal planning in increasing capacity, improving efficiency and reliability, and selecting investments. Keywords Distribution planning, operation planning, expansion planning, emergency planning, capacity, efficiency, reliability, investment, reconfiguration.
2 OPTIMAL DISTRIBUTION PLANNING INCREASING CAPACITY AND IMPROVING EFFICIENCY AND RELIABILITY WITH MINIMAL-COST ROBUST INVESTMENT L.A.F.M. Ferreira, P.M.S. Carvalho IST S.N.C. Grave L.M.F. Barruncho L.A. Jorge, E. Quaresma, J.A. Martins, F.C. Branco, F. Mira IOA EDINFOR EDP Distribuição Energia Abstract The paper addresses the optimal distribution planning and its importance in three different contexts of distribution utilities practice: expansion planning, operation planning, and emergency planning. The planning problem is formulated as an optimization problem and the algorithms and software requirements are addressed. For each practice context, the paper reports the benefits of optimal planning in increasing capacity, improving efficiency and reliability, and selecting investments. Keywords Distribution planning, operation planning, expansion planning, emergency planning, capacity, efficiency, reliability, investment, reconfiguration. INTRODUCTION This paper is on optimal distribution planning. What does distribution planning mean here? What is the meaning of optimal in the context of distribution planning? In this paper, a distribution system is viewed as a network composed of many nodes (hundreds, sometimes thousands) and an even larger number of branches. The network operates radially. The redundancy of branches is typically of 5% to 15% 5% for large, widely spread networks with a strong rural component, 15% for smaller, urban networks. Redundancy serves reserve and reliability purposes, for it allows for network reconfiguration. Most of the nodes of a distribution system correspond to delivery points or load points. Some nodes are injection points distribution substations; some other nodes are switching stations; some others are simple connection points. Most of the branches correspond to electric cables. Other branches correspond to switching devices. Distribution planning is to choose a new distribution system from a set of possible distribution systems so as to meet the expected load profile in a better way, more reliably, and with fewer losses. The new distribution system is a plan, a plan to be carried out by project services if the plan comprises acquisition or installation of new equipment or a plan to be carried out by dispatch services if the plan involves only changes in the network configuration (i.e. switching operations). If one can define criteria to measure the goodness of a plan, then there will be one plan that ranks above the others that plan will be the optimal distribution plan. The optimal distribution plan is the subject matter of this paper. One can classify the activity of planning, hence the corresponding distribution plans, into the following three categories: Expansion Plan Operation Plan Emergency Plan An expansion plan is a plan to expand the distribution system, a plan to acquire and install new equipment so as to strengthen the system or to accommodate new loads. To choose an expansion plan means to choose the most appropriate set of investments from a set of all possible investments. A regular basis for the updating of an expansion plan should be a year. An operation plan is a plan to operate the system satisfactorily, i.e. a plan to modify the configuration of the network so as to accommodate the load, satisfy the voltage and current requirements, improve efficiency and increase reliability of the system. To choose an operation plan means to choose the most appropriate network configuration (i.e. the set of switching operations) from a set of all possible configurations. Operation planning should be carried out seasonally, or whenever the load changes or the network changes due to maintenance reasons. An emergency plan is a plan to operate the system following a contingency condition, a plan to attenuate the effects of the contingency and to lead the distribution system to a satisfactory, secure point of operation (if possible). The paper presents illustrative results concerning each one of the foregoing distribution plans. However, the three plans can be presented and discussed within a common formulation the object of next section. Let us reference the approaches to the planning problem taken in recent years. There have been many approaches: quadratic programming and heuristics [1], by branch-andbound and heuristics [2], branch-exchange and heuristics [3], neural networks [4], expert systems [5], and genetic algorithms [6-7]. Genetic algorithms have been found to be promising: they can accommodate complex objective functions, as required for a correct representation of the planning problem. However, they have been shown to be too slow to deal with large-scale problems [6-7]. References to our previous work include [8-18]. OPTIMAL DISTRIBUTION PLANNING
3 Formulation The distribution-planning problem can be formulated as follows: Min f(u) subject to u U where U is the set of all possible trees of the network, and f is a function which maps each tree u onto a corresponding value f(u), a measurement of the cost of u. The function f is usually very complex, does not follow an analytical expression, and its behavior cannot be assumed a priori. To evaluate f(u) one needs to run a full AC nonlinear power flow and analyse the network for power losses, reliability indices, structure patterns and other complex, user-defined performance criteria. The formulation presented here has evolved a long way since the problem formulation of [8]. It reflects our experience with the evolutionary model we have successively developed [8-18]. Algorithms The problem formulated in the foregoing is an optimization problem, but it is not a conventional convex programming type of problem. Because of the nature of f and because U is a discrete set, the optimization problem is not susceptible to mathematical programming algorithms. Our experience has led, upon successive iterations, to formulate the problem as a problem of choosing the optimal tree. As a result, we have designed specific evolutionary-based algorithms to search for that optimal tree [12-13]. Software From the many implementation issues, such as data structures for the evolutionary algorithm and network operation, and relationships with other techniques used (GIS), the following software results should be pointed out: R1 Investment decisions Investment decisions associated with the network branches: equipment and corresponding installation showing where new cables should be installed and existing cables replaced. The cables are selected from a specified set and the output shows the routes selected for new cables and identifies where common trenching (multiple cable route) is required. Similarly, for investment decisions associated with network nodes: equipment and corresponding installation showing new and replacing transformers, and additional switching capabilities for new connections. R2 Topological decisions These decisions comprise the selection of possible new branches, to connect disconnected existing branches, and to disconnect connected existing branches. R3 Voltage-current analysis A complete voltage-current analysis is carried out including the branches where cable current limits is exceeded and the nodes where system voltage levels are not satisfied. R4 Reliability: fault analysis and corrective switching. A fault can occur anywhere in the network, and the occurrence probability can be assessed from the fault rate statistics for each network branch. Following a circuit fault outage, in the majority of cases, supply restoration comprises a switching operation to a nearby feeder. A fault is simulated for each branch, and the feeder and corresponding switching operations are selected and the Expected Energy Not Supplied (EENS) is evaluated. Occasionally, even the best choice of switching may, due to cable current limits, prevent restoration of all power supplies. All these situations are analysed, the corresponding EENS value computed, and the selected switching reported. Other reliability indices (SAIDI, SAIFI, ASCI) are also computed. Interface Distribution planning software has to interface with the technical and geographical data, and with the user. The software makes use of cutting-edge graphic technologies to build up a friendly, fast geographical, multi-monitor multi-window user interface. It has capabilities for continuous, instantaneous analysis of the network every change the user makes in the network (for example, a new connection, or an increase in load) makes an instantaneous change in all views of the network. Zooming and panning are readily available at all times, continuously and instantaneously. The interface also includes the following: easy-to-use, intuitive editing facilities; special filters for symbols, ids, voltages, currents, flows, loads, investments, and reliability indices; colored patterns for investment, voltage, current, loss, reliability, and for feeder configuration; automaticallyscaled mapping facilities, and querying facilities. RESULTS We present a set of results concerning an urban distribution system of 385 nodes, 442 branches (Table 1). The results comprise the three types of planning: emergency, operation, and expansion. Results for larger networks are also presented in Table 1. Emergency Plan Consider the following major event: the outage of the main substation. The main substation is in the middle of the town (load center) and is the major power supply to the network. The other two substations play normally a secondary role. The key issue here is capacity, i.e. to maintain as much load as possible. Consider two plans: a simplistic plan, Plan P1, and the optimal plan. Plan P1 connects the feeders under outage to the neighboring feeders still in service. Some of those
4 connections heavily overload the circuits in service. The system can feed about 45% of the total load system capacity is 45%. The optimal plan does provide for nonobvious, deeper connections within the system the resulting system capacity increases to 88%. Fig. 1 depicts these results. Operation Plan Consider a distribution system operating satisfactorily, without problems, i.e. no voltage violations, no current violations. The question that may arise is whether the system is operating in the most appropriate configuration, i.e. is it optimal? Fig 2 compares the performance of the no problem system with the optimal configuration system. Losses decrease to a much lower value; expected energy not supplied and duration of interruptions also decrease. Thus, an optimal plan may lead to a substantial improvement in efficiency and reliability. [Note that the improvement in efficiency and reliability are with no investment costs, just reconfiguration costs.] What about capacity what are the capacity gains by reconfiguration? Fig. 3 shows the gains in capacity. Although the system load was causing no voltage and no current violations, they appear when the load profile is raised to 17% of the original load profile. For the optimal configuration (the same one that yields the results of Fig. 2), voltage or current violations only appear when the assigned load is 18% of the original load profile a substantial increase in capacity. Expansion Plan Consider a distribution system that needs expansion to satisfy load growth. [Note that expansion of the system is always necessary to satisfy the new loads, may be necessary to satisfy the load growth (increase in capacity), and may be desired to improve the efficiency and reliability of the system]. Consider two plans: a simplistic plan, Plan P2, and the optimal plan. Plan P2 reinforces weak branches and provides local relief to the weakest areas of the system. The optimal plan selects from the set of possible new connections and reinforcements those that are more important to increase overall capacity, to improve overall efficiency and reliability. Plan P2 selects on the basis of local information, whereas the optimal plan selects on the basis of global, network-wide information. Fig. 5 compares the performance of Plan P2 with the optimal plan. The investment costs are slightly higher. The losses decrease to a much lower value; expected energy not supplied and duration of interruptions also decrease. Thus, an optimal plan may lead to a substantial improvement in efficiency and reliability, with the same amount of investment. As far as capacity is concerned, the new additions of Plan P2 provide for a capacity reserve of about 5%. The optimal plan leads to about 1% reserve (see Fig. 4). [We note that gains in efficiency and reliability may justify investments; thus, the optimal system tends to have a considerable amount of reserve.] Complexity What is the level of complexity involved in the process of proposing an optimal plan? The complexity depends heavily on the scale of the problem, as given by the number of nodes, number of branches, number of possibilities for reconfiguration. Table 1 illustrates the level of complexity involved. Three networks are presented. Larger networks include rural areas larger scale, fewer reconfiguration options. Note that thousands of full AC power flows are required, and millions of faults have to be simulated and the corresponding corrective actions also simulated to evaluate the solutions generated along the optimization process. Number (#) CONCLUSION Table 1. Complexity vs. problem scale Networks Nodes 385 2,22 8,964 Branches 442 2,336 9,8 Substations AC Power Flows 7,4 13,2 26,4 Simulated Faults 2,464,2 26,67, 215,136, Proposed Changes Wall-Clock Time 8 s 6 min 28 min Distribution planning which include expansion planning, operation planning, and emergency planning can be made optimal. The benefits of optimal planning in increasing capacity, improving efficiency and reliability, and selecting investments have been reported.
5 1 88% 1 Before: 1% Capacity [%] 45% Before vs. Optimal Plan 52% 63% 8% Plan P1 Optimal Plan Losses EENS SAIDI Fig.1. Post-fault capacity after main substation outage Plan P1 vs. optimal emergency plan 2 18% Fig.2. System indices before vs. after optimal reconfiguration 2 23% 153% Capacity [%] 1 17% Capacity [%] 1 Before Optimal Plan Fig.3. Network capacity Before vs. after optimal reconfiguration. Plan P2 Optimal Plan Fig.4. Planned capacity Plan P2 vs. optimal expansion plan. 1 12% Plan P2: 1% Plan P2 vs. Optimal Plan 47% 56% 79% Investment Losses EENS SAIDI Fig.5. System indices Plan P2 vs. after optimal expansion plan
6 References [1] C.C. Liu, S.J. Lee, K. Vu, Loss Minimization of Distribution Feeders: Optimality and Algorithms, IEEE Trans. Power Delivery, Vol. 4, No 2 (1989). [2] Merlin, H. Back, Search for Minimum-Loss Operating Tree Configuration for an Urban Power Distribution System, Proc. of the 5th PSCC, Cambridge (1975). [3] M.E. Baran, F.F. Wu, Network Reconfiguration in Distribution Systems for Loss Reduction and Load Balancing, IEEE Trans. Power Delivery, Vol. 4, No 2 (1989). [4] K. Kin, Y. Ko, K.H. Hung, Artificial Neural Network Based Feeder for Loss Reduction in Distribution Systems, IEEE Trans. Power Delivery, Vol. 8, No 3 (1993). [5] T. Taylor, D. Lubkeman, Implementation of Heuristic Search Strategies for Distribution Feeder Reconfiguration, IEEE Trans. Power Delivery, Vol. 5, No 1 (199). [6] K. Nara, A. Shiose, M. Kitagawa, T. Ishihara Implementation of Genetic Algorithm for Distribution Systems Loss Minimum Re-configuration, IEEE Trans. Power Systems, Vol. 7, No 3, (1992). [7] V. Miranda, J.V. Ranito, L.M. Proença, Genetic Algorithms in Optimal Multistage Distribution Network Planning, IEEE Trans. Power Systems, Vol. 9, No 4, 1994). [8] L.A.F.M. Ferreira, P.M.S. Carvalho, L.M.F. Barruncho, Four Steps for Decision-Making in Distribution Planning, Proc. ELAB 96, Porto,, [9] L.A.F.M. Ferreira, P.M.S. Carvalho, L.M.F. Barruncho, An Evolutionary Approach to Decision-Making in Distribution Systems, 14th International Conference and Exhibition on Electricity Distribution, CIRED 97, Birmingham, UK, 1997 [1] P.M.S. Carvalho, L.A.F.M. Ferreira, F.G. Lobo, L.M.F. Barruncho, DistributionNetwork Expansion Planning under Uncertainty: a Hedging Algorithm in an Evolutionary Approach, Proc. PICA 97, Columbus, Ohio, USA, [11] P.M.S. Carvalho, L.A.F.M. Ferreira, L.M.F. Barruncho, Optimal Distribution Network Expansion Planning Under Uncertainty by Evolutionary Decision Convergence, International Journal of Electrical Power & Energy Systems (Special Issue on PSCC 96), Vol. 2, No. 2, February [12].P.M.S. Carvalho, L.A.F.M. Ferreira, L.M.F. Barruncho, Evolutionary Approach to Radial Network Planning: Algorithmic Operators, International Journal of Engineering Intelligent Systems, Vol 6, No 3, pp , [13] P.M.S. Carvalho, L.A.F.M. Ferreira, L.M.F. Barruncho, Solving Radial Topology Constrained Problems with Evolutionary Algorithms, Proc. Simulated Evolution and Learning, SEAL 98, Canberra, Australia, [14] L.A.F.M. Ferreira, P.M.S. Carvalho, L.M.F. Barruncho, Evolutionary Computation Applied to Topological Configuration of Large-Scale Power Networks, Proc. Simulated Evolution and Learning, SEAL 98, Canberra, Australia, [15] L.M. Ferreira, P.S. Carvalho, L.M. Barruncho, L.A. Jorge, C.A. Santos, 'Advanced Distribution Planning Improves Development and Operation', Transmission and Distribution World, Vol. 5, No 11, pp , Oct., [16] L.A.F.M. Ferreira, P.M.S. Carvalho, L.M.F. Barruncho, An Evolutionary Approach to Decision-Making in Distribution Systems, 14th International Conference and Exhibition on Electricity Distribution (CIRED 97), Birmingham, UK, [17] P.M.S. Carvalho, L.A.F.M. Ferreira, L.M.F. Barruncho, Hedging Large-Scale Distribution System Investments Against Uncertainty, Proc. PES Winter Meeting, NY, USA, Feb [18] L.A.F.M. Ferreira, P.M.S. Carvalho, L.M.F. Barruncho, L.A. Jorge, F.C. Branco, C.A. Santos, Distribution Planning of Large Urban Networks: Software, Algorithms, Practice and Experience, 15th International Conference and Exhibition on Electricity Distribution (CIRED 99), Nice, France, 1999.
A Reactive Tabu Search for Service Restoration in Electric Power Distribution Systems
IEEE International Conference on Evolutionary Computation May 4-11 1998, Anchorage, Alaska A Reactive Tabu Search for Service Restoration in Electric Power Distribution Systems Sakae Toune, Hiroyuki Fudo,
Phase Balancing of Distribution Systems Using a Heuristic Search Approach
Phase Balancing of Distribution Systems Using a Heuristic Search Approach Lin, Chia-Hung*, Kang, Meei-Song**, Chuang, Hui-Jen**, and Ho, Chin-Ying** *National Kaohsiung University of Applied Sciences **Kao
Optimal Branch Exchange for Feeder Reconfiguration in Distribution Networks
Optimal Branch Exchange for Feeder Reconfiguration in Distribution Networks Qiuyu Peng and Steven H. Low Engr. & App. Sci., Caltech, CA Abstract The feeder reconfiguration problem chooses the on/off status
Radial Distribution Network Reconfiguration for Loss Reduction and Load Balancing using Plant Growth Simulation Algorithm
International Journal on Electrical Engineering and Informatics - olume 2, Number 4, 2010 Radial Distribution Network Reconfiguration for Loss Reduction and Load Balancing using Plant Growth imulation
Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. [email protected]. [email protected]
Agenda do Mini-Curso Sérgio Yoshio Fujii [email protected] Ethan Boardman [email protected] Agenda do Mini-Curso Sistemas de Distribuição (DMS) Characteristics of Distribution Network
Network Reconfiguration for Service Restoration in Shipboard Power Distribution Systems
IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 16, NO. 4, NOVEMBER 2001 653 Network Reconfiguration for Service Restoration in Shipboard Power Distribution Systems Karen L. Butler, Senior Member, IEEE, N. D.
The calm after the storm
The calm after the storm Human decision support in storm outage recovery Rafael Ochoa, Amitava Sen It s a fact of life that interruptions in an electrical distribution utility happen. Although they can
A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES
A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES A Roberts, T Berry, W D Wilson Schneider Electric Ltd, UK SYNOPSIS This paper describes the features of a modern Distribution
IMPROVED NETWORK PARAMETER ERROR IDENTIFICATION USING MULTIPLE MEASUREMENT SCANS
IMPROVED NETWORK PARAMETER ERROR IDENTIFICATION USING MULTIPLE MEASUREMENT SCANS Liuxi Zhang and Ali Abur Department of Electrical and Computer Engineering Northeastern University Boston, MA, USA [email protected]
ONE OF THE anticipated main benefits of a distribution
Reconfiguration and Load Balancing in the LV and MV Distribution Networks for Optimal Performance Mukwanga W. Siti, Dan Valentin Nicolae, Adisa A. Jimoh, Member, IEEE, and Abhisek Ukil Abstract To get
Application of GA for Optimal Location of FACTS Devices for Steady State Voltage Stability Enhancement of Power System
I.J. Intelligent Systems and Applications, 2014, 03, 69-75 Published Online February 2014 in MECS (http://www.mecs-press.org/) DOI: 10.5815/ijisa.2014.03.07 Application of GA for Optimal Location of Devices
Email: [email protected]. 2Azerbaijan Shahid Madani University. This paper is extracted from the M.Sc. Thesis
Introduce an Optimal Pricing Strategy Using the Parameter of "Contingency Analysis" Neplan Software in the Power Market Case Study (Azerbaijan Electricity Network) ABSTRACT Jalil Modabe 1, Navid Taghizadegan
Monitoring Underground Power Networks
Monitoring Underground Power Networks By Mark Stiles Merve Cankaya ABSTRACT Underground electric distribution systems are common in large cities throughout the United States. Power usage for the entire
Utilities the way we see it
Utilities the way we see it Advanced Distribution Management Systems How to choose the right solution to improve your utility s safety, reliability, asset protection and quality of service Photo provided
Iman Ziari. M.Sc, B.Eng (Electrical Engineering) A Thesis submitted in Partial Fulfillment of the Requirement for the Degree of. Doctor of Philosophy
Planning of Distribution Networks for Medium Voltage and Low Voltage Iman Ziari M.Sc, B.Eng (Electrical Engineering) A Thesis submitted in Partial Fulfillment of the Requirement for the Degree of Doctor
ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe
NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3
An Improved Ant Colony Optimization Algorithm for Software Project Planning and Scheduling
An Improved Ant Colony Optimization Algorithm for Software Project Planning and Scheduling Avinash Mahadik Department Of Computer Engineering Alard College Of Engineering And Management,Marunje, Pune [email protected]
A Survey of Models and Algorithms for Emergency Response Logistics in Electric Distribution Systems - Part II: Contingency Planning Level
A Survey of Models and Algorithms for Emergency Response Logistics in Electric Distribution Systems - Part II: Contingency Nathalie Perrier Bruno Agard Pierre Baptiste Jean-Marc Frayret André Langevin
6545(Print), ISSN 0976 6553(Online) Volume 4, Issue 2, March April (2013), IAEME & TECHNOLOGY (IJEET)
INTERNATIONAL International Journal of JOURNAL Electrical Engineering OF ELECTRICAL and Technology (IJEET), ENGINEERING ISSN 0976 & TECHNOLOGY (IJEET) ISSN 0976 6545(Print) ISSN 0976 6553(Online) Volume
International Journal of Software and Web Sciences (IJSWS) www.iasir.net
International Association of Scientific Innovation and Research (IASIR) (An Association Unifying the Sciences, Engineering, and Applied Research) ISSN (Print): 2279-0063 ISSN (Online): 2279-0071 International
Preparing for Distributed Energy Resources
Preparing for Distributed Energy Resources Executive summary Many utilities are turning to Smart Grid solutions such as distributed energy resources (DERs) small-scale renewable energy sources and energy
Next Generation Distribution Management Systems (DMS) and Distributed Energy Resource Management Systems (DERMS)
Next Generation Distribution Management Systems (DMS) and Distributed Energy Resource Management Systems (DERMS) S. S. (Mani) Venkata, Principal Scientist Glenn Brice, Director, DMS and DERMS Alstom Grid
A Changing Map. Four Decades of Service Restoration at Alabama Power. By G. Larry Clark
Four Decades of Service Restoration at Alabama Power Wikid77 (from National Atlas of the United States ogical su ates GEol United St rvey C.S. Ham mond an d Co., Ne w york R Digital Object Identifier 10.1109/MPE.2013.2285607
SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID
SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID Amparo MOCHOLÍ MUNERA, Carlos BLASCO LLOPIS, Irene AGUADO CORTEZÓN, Vicente FUSTER ROIG Instituto Tecnológico de la Energía
Power System Security Monitoring, Analysis, and Control. George Gross
ECE 573 Power System Operations and Control Power System Security Monitoring, Analysis, and Control George Gross Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign
ADMS(Advanced Distribution Management System ) in Smart Grid
ADMS(Advanced Distribution Management System ) in Smart Grid 柯 佾 寬 博 士 Yi-Kuan Ke, Ph.D. 2014/03/28 Smart Grid Solution Smart Grid Solution Overview Smart Grid Solutions Smart Network Operation - Distribution
Multiobjective Multicast Routing Algorithm
Multiobjective Multicast Routing Algorithm Jorge Crichigno, Benjamín Barán P. O. Box 9 - National University of Asunción Asunción Paraguay. Tel/Fax: (+9-) 89 {jcrichigno, bbaran}@cnc.una.py http://www.una.py
White Paper. Convergence of Information and Operation Technologies (IT & OT) to Build a Successful Smart Grid
White Paper Convergence of Information and Operation Technologies (IT & OT) to Build a Successful Smart Grid Contents Executive Summary... 3 Integration of IT and OT... 4 Smarter Grid using Integrated
Network Consulting for Power Grid Optimization
Network Consulting for Power Grid Optimization Project experience in India Network Consulting Competences Page 1 Our worldwide representation Manchester The Hague Denver Schenectady San Diego Houston Mexico
Seven-Year Electric Service Reliability Statistics Summary
Oregon Investor-owned Utilities Seven-Year Electric Service Reliability Statistics Summary 2007-2013 June 2014 Report available at http://[email protected] (Click on Safety, then click on Reports ) Information
Efficient DNS based Load Balancing for Bursty Web Application Traffic
ISSN Volume 1, No.1, September October 2012 International Journal of Science the and Internet. Applied However, Information this trend leads Technology to sudden burst of Available Online at http://warse.org/pdfs/ijmcis01112012.pdf
Big Data Collection and Utilization for Operational Support of Smarter Social Infrastructure
Hitachi Review Vol. 63 (2014), No. 1 18 Big Data Collection and Utilization for Operational Support of Smarter Social Infrastructure Kazuaki Iwamura Hideki Tonooka Yoshihiro Mizuno Yuichi Mashita OVERVIEW:
F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China
ELECTRIC POWER DISTRIBUTION SYSTEMS F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China Keywords: Distribution system planning, Load characteristics, Subtransmission Lines, Distribution
A Direct Numerical Method for Observability Analysis
IEEE TRANSACTIONS ON POWER SYSTEMS, VOL 15, NO 2, MAY 2000 625 A Direct Numerical Method for Observability Analysis Bei Gou and Ali Abur, Senior Member, IEEE Abstract This paper presents an algebraic method
Xiaoguang Yang, Valentina Cecchi, Karen Miu, Chika Nwankpa
Reconfigurable Distribution Automation and Control Laboratory: A Network Reconfiguration Experiment for Load Balancing and Loss Reduction in Power Distribution Systems Xiaoguang Yang, Valentina Cecchi,
International Journal of Emerging Technology & Research
International Journal of Emerging Technology & Research An Implementation Scheme For Software Project Management With Event-Based Scheduler Using Ant Colony Optimization Roshni Jain 1, Monali Kankariya
METHODOLOGICAL CONSIDERATIONS OF DRIVE SYSTEM SIMULATION, WHEN COUPLING FINITE ELEMENT MACHINE MODELS WITH THE CIRCUIT SIMULATOR MODELS OF CONVERTERS.
SEDM 24 June 16th - 18th, CPRI (Italy) METHODOLOGICL CONSIDERTIONS OF DRIVE SYSTEM SIMULTION, WHEN COUPLING FINITE ELEMENT MCHINE MODELS WITH THE CIRCUIT SIMULTOR MODELS OF CONVERTERS. Áron Szûcs BB Electrical
Electric Distribution Network Multi objective Design Using Problem Specific Genetic Algorithm
Electric Distribution Network Multi objective Design Using Problem Specific Genetic Algorithm 1 Parita Vinodbhai Desai, 2 Jignesh Patel, 3 Sangeeta Jagdish Gurjar 1 Department of Electrical Engineering,
CHAPTER 1 INTRODUCTION
CHAPTER 1 INTRODUCTION Power systems form the largest man made complex system. It basically consists of generating sources, transmission network and distribution centers. Secure and economic operation
Software Project Planning and Resource Allocation Using Ant Colony Optimization with Uncertainty Handling
Software Project Planning and Resource Allocation Using Ant Colony Optimization with Uncertainty Handling Vivek Kurien1, Rashmi S Nair2 PG Student, Dept of Computer Science, MCET, Anad, Tvm, Kerala, India
Res. J. Appl. Sci. Eng. Technol., 8(24): 2439-2450, 2014
Research Journal of Applied Sciences, Engineering and Technology 8(24): 2439-2450, 2014 ISSN: 2040-7459; e-issn: 2040-7467 Maxwell Scientific Organization, 2014 Submitted: September 22, 2014 Accepted:
On the Road to. Duke takes the road less traveled and arrives at a new level of distribution automation.
On the Road to Intelligent CONTINUOUS REMOTE MONITORING INTEGRATED VOLT/VAR CONTROL Duke takes the road less traveled and arrives at a new level of distribution automation. LAYING A SOLID FOUNDATION In
Modeling Simulation Technology Research for Distribution Network Planning *
Energy and Power Engineering, 2013, 5, 980-985 doi:10.4236/epe.2013.54b188 Published Online July 2013 (http://www.scirp.org/journal/epe) Modeling Simulation Technology Research for Distribution Network
American International Journal of Research in Science, Technology, Engineering & Mathematics
American International Journal of Research in Science, Technology, Engineering & Mathematics Available online at http://www.iasir.net ISSN (Print): 2328-349, ISSN (Online): 2328-3580, ISSN (CD-ROM): 2328-3629
A progressive method to solve large-scale AC Optimal Power Flow with discrete variables and control of the feasibility
A progressive method to solve large-scale AC Optimal Power Flow with discrete variables and control of the feasibility Manuel Ruiz, Jean Maeght, Alexandre Marié, Patrick Panciatici and Arnaud Renaud [email protected]
ENHANCED HYBRID FRAMEWORK OF RELIABILITY ANALYSIS FOR SAFETY CRITICAL NETWORK INFRASTRUCTURE
ENHANCED HYBRID FRAMEWORK OF RELIABILITY ANALYSIS FOR SAFETY CRITICAL NETWORK INFRASTRUCTURE Chandana Priyanka G. H., Aarthi R. S., Chakaravarthi S., Selvamani K. 2 and Kannan A. 3 Department of Computer
Generic Reliability Evaluation Method for Industrial Grids with Variable Frequency Drives
Energy and Power Engineering, 2013, 5, 83-88 doi:10.4236/epe.2013.54b016 Published Online July 2013 (http://www.scirp.org/journal/epe) Generic Reliability Evaluation Method for Industrial Grids with Variable
Hybrid processing of SCADA and synchronized phasor measurements for tracking network state
IEEE PES General Meeting, Denver, USA, July 2015 1 Hybrid processing of SCADA and synchronized phasor measurements for tracking network state Boris Alcaide-Moreno Claudio Fuerte-Esquivel Universidad Michoacana
14.10.2014. Overview. Swarms in nature. Fish, birds, ants, termites, Introduction to swarm intelligence principles Particle Swarm Optimization (PSO)
Overview Kyrre Glette kyrrehg@ifi INF3490 Swarm Intelligence Particle Swarm Optimization Introduction to swarm intelligence principles Particle Swarm Optimization (PSO) 3 Swarms in nature Fish, birds,
Typical Data Requirements Data Required for Power System Evaluation
Summary 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com [email protected] Harmonic Filter & Power Capacitor Bank Application Studies This document describes NEPSI
EVALUATION OF ALTERNATIVE BACKUP PROTECTION SCHEMES ON A 66KV DISTRIBUTION NETWORK
EVALUATION OF ALTERNATIVE BACKUP PROTECTION SCHEMES ON A 66KV DISTRIBUTION NETWORK F. Malone*, P.D. Doyle *ESB International, Ireland [email protected] ESB International, Ireland [email protected]
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES C. Schwaegerl*, M.H.J. Bollen, K. Karoui #, A. Yagmur + *Siemens AG, # Tractebel STRI AB
Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards
Redundancy = Protection from Network Failure. Redundancy Standards WP-31-REV0-4708-1/5 Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards For a very
For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)
24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690
Power products and systems. Intelligent solutions for power distribution Zone concept
Power products and systems Intelligent solutions for power distribution Zone concept Securing continuous power supply ABB is one of the world's leading power and automation technology companies whose products,
Network Structure or Topology
Volume 1, Issue 2, July 2013 International Journal of Advance Research in Computer Science and Management Studies Research Paper Available online at: www.ijarcsms.com Network Structure or Topology Kartik
Nuclear Power Plant Electrical Power Supply System Requirements
1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, [email protected] Abstract Various regulations and standards require from electrical power system of the
How To Swap Output Phases Of A Power Supply With A Power Converter
211 2nd Power Electronics, Drive Systems and Technologies Conference A New phase sequence Detector for the Three-Phase Rotary Loads M. Alizadeh Bidgoli, A. Soori, M. Tavakoli Bina K. N. Toosi University
INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN
INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN Yun CHEN SMEPC,State Grid China [email protected] ABSTRACT From the background of intelligent distribution network construction,
Improving Market Clearing Software Performance to Meet Existing and Future Challenges MISO s Perspective
Improving Market Clearing Software Performance to Meet Existing and Future Challenges MISO s Perspective FERC Technical Conference on Increasing Real-Time and Day-Ahead Market Efficiency through Improved
Preparing for the Future: How Asset Management Will Evolve in the Age of the Smart Grid
Preparing for the Future: How Asset Management Will Evolve in the Age of the Smart Grid Executive summary Most utilities struggle to organize information about their distribution network assets. Operations,
A MULTILEVEL INVERTER FOR SYNCHRONIZING THE GRID WITH RENEWABLE ENERGY SOURCES BY IMPLEMENTING BATTERY CUM DC-DC CONERTER
A MULTILEVEL INVERTER FOR SYNCHRONIZING THE GRID WITH RENEWABLE ENERGY SOURCES BY IMPLEMENTING BATTERY CUM DC-DC CONERTER 1 KARUNYA CHRISTOBAL LYDIA. S, 2 SHANMUGASUNDARI. A, 3 ANANDHI.Y 1,2,3 Electrical
ON SUITABILITY OF FPGA BASED EVOLVABLE HARDWARE SYSTEMS TO INTEGRATE RECONFIGURABLE CIRCUITS WITH HOST PROCESSING UNIT
216 ON SUITABILITY OF FPGA BASED EVOLVABLE HARDWARE SYSTEMS TO INTEGRATE RECONFIGURABLE CIRCUITS WITH HOST PROCESSING UNIT *P.Nirmalkumar, **J.Raja Paul Perinbam, @S.Ravi and #B.Rajan *Research Scholar,
Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation
Optimization of Asset Management in High Voltage Substation Based on Monitoring and Power System Operation Yotaro Suzui, Hiroi Kojima, Naoi Hayaawa, Fumihiro Endo, Hitoshi Oubo Nagoya University Furo-cho,
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 SPECIAL ADDITIONAL RESPONSIBILITIES...
Analecta Vol. 8, No. 2 ISSN 2064-7964
EXPERIMENTAL APPLICATIONS OF ARTIFICIAL NEURAL NETWORKS IN ENGINEERING PROCESSING SYSTEM S. Dadvandipour Institute of Information Engineering, University of Miskolc, Egyetemváros, 3515, Miskolc, Hungary,
16 West Coast Regional Plan
16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast
COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited
PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date
Weather-readiness assessment model for Utilities. Shy Muralidharan Global Product Manager Energy Solutions Schneider Electric
Weather-readiness assessment model for Utilities Shy Muralidharan Global Product Manager Energy Solutions Schneider Electric 1 Agenda > Impact of weather on Utilities businesses > Why should you be weather
REQUIREMENTS FOR A REAL-TIME RISK MONITORING TOOL TO REDUCE TRANSMISSION GRID NUCLEAR PLANT VULNERABILITIES
REQUIREMENTS FOR A REAL-TIME RISK MONITORING TOOL TO REDUCE TRANSMISSION GRID NUCLEAR PLANT VULNERABILITIES M. D. Muhlheim, 1 L. C. Markel, 2 F. J. Rahn, 3 and B. P. Singh 4 1 Oak Ridge National Laboratory,
An Alternative Approach to Improving SAIDI and SAIFI Indicators
An Alternative Approach to Improving SAIDI and SAIFI Indicators Philippe Deschamps - Schneider Electric Industries - France Jean-Christophe Orsini - Schneider Electric Industries - France Kaare Seest Rasmussen
Chapter 2 The Research on Fault Diagnosis of Building Electrical System Based on RBF Neural Network
Chapter 2 The Research on Fault Diagnosis of Building Electrical System Based on RBF Neural Network Qian Wu, Yahui Wang, Long Zhang and Li Shen Abstract Building electrical system fault diagnosis is the
Technology White Paper Capacity Constrained Smart Grid Design
Capacity Constrained Smart Grid Design Smart Devices Smart Networks Smart Planning EDX Wireless Tel: +1-541-345-0019 I Fax: +1-541-345-8145 I [email protected] I www.edx.com Mark Chapman and Greg Leon EDX Wireless
VOLATILITY AND DEVIATION OF DISTRIBUTED SOLAR
VOLATILITY AND DEVIATION OF DISTRIBUTED SOLAR Andrew Goldstein Yale University 68 High Street New Haven, CT 06511 [email protected] Alexander Thornton Shawn Kerrigan Locus Energy 657 Mission St.
Planning of UMTS Cellular Networks for Data Services Based on HSDPA
Planning of UMTS Cellular Networks for Data Services Based on HSDPA Diana Ladeira, Pedro Costa, Luís M. Correia 1, Luís Santo 2 1 IST/IT Technical University of Lisbon, Lisbon, Portugal 2 Optimus, Lisbon,
Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015
Title: Integrating Management of Truck and Rail Systems in LA Project Number: 3.1a Year: 2013-2017 INTERIM REPORT August 2015 Principal Investigator Maged Dessouky Researcher Lunce Fu MetroFreight Center
IESO Supply Deliverability Guidelines
PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents
Journal of Theoretical and Applied Information Technology 20 th July 2015. Vol.77. No.2 2005-2015 JATIT & LLS. All rights reserved.
EFFICIENT LOAD BALANCING USING ANT COLONY OPTIMIZATION MOHAMMAD H. NADIMI-SHAHRAKI, ELNAZ SHAFIGH FARD, FARAMARZ SAFI Department of Computer Engineering, Najafabad branch, Islamic Azad University, Najafabad,
Optimization applications in finance, securities, banking and insurance
IBM Software IBM ILOG Optimization and Analytical Decision Support Solutions White Paper Optimization applications in finance, securities, banking and insurance 2 Optimization applications in finance,
Flauncher and DVMS Deploying and Scheduling Thousands of Virtual Machines on Hundreds of Nodes Distributed Geographically
Flauncher and Deploying and Scheduling Thousands of Virtual Machines on Hundreds of Nodes Distributed Geographically Daniel Balouek, Adrien Lèbre, Flavien Quesnel To cite this version: Daniel Balouek,
Distributed Dynamic Load Balancing for Iterative-Stencil Applications
Distributed Dynamic Load Balancing for Iterative-Stencil Applications G. Dethier 1, P. Marchot 2 and P.A. de Marneffe 1 1 EECS Department, University of Liege, Belgium 2 Chemical Engineering Department,
Using reporting and data mining techniques to improve knowledge of subscribers; applications to customer profiling and fraud management
Using reporting and data mining techniques to improve knowledge of subscribers; applications to customer profiling and fraud management Paper Jean-Louis Amat Abstract One of the main issues of operators
Power over Ethernet technology for industrial Ethernet networks
Power over Ethernet technology for industrial Ethernet networks Introduction Ethernet networking has grown beyond office and home usage to become a very successful protocol suite used in many industrial
A Network Reference Model for Distribution Regulation and Planning: the Spanish Case
A Network Reference Model for Distribution Regulation and Planning: the Spanish Case Jesús Pascual Peco González Instituto de Investigación Tecnológica (IIT) Universidad Pontificia Comillas, Madrid http://www.iit.upco.es
Information Services for Smart Grids
Smart Grid and Renewable Energy, 2009, 8 12 Published Online September 2009 (http://www.scirp.org/journal/sgre/). ABSTRACT Interconnected and integrated electrical power systems, by their very dynamic
A Proposed Scheme for Software Project Scheduling and Allocation with Event Based Scheduler using Ant Colony Optimization
A Proposed Scheme for Software Project Scheduling and Allocation with Event Based Scheduler using Ant Colony Optimization Arjita sharma 1, Niyati R Bhele 2, Snehal S Dhamale 3, Bharati Parkhe 4 NMIET,
How To Use Neural Networks In Data Mining
International Journal of Electronics and Computer Science Engineering 1449 Available Online at www.ijecse.org ISSN- 2277-1956 Neural Networks in Data Mining Priyanka Gaur Department of Information and
Research on the Performance Optimization of Hadoop in Big Data Environment
Vol.8, No.5 (015), pp.93-304 http://dx.doi.org/10.1457/idta.015.8.5.6 Research on the Performance Optimization of Hadoop in Big Data Environment Jia Min-Zheng Department of Information Engineering, Beiing
THREE DIMENSIONAL REPRESENTATION OF AMINO ACID CHARAC- TERISTICS
THREE DIMENSIONAL REPRESENTATION OF AMINO ACID CHARAC- TERISTICS O.U. Sezerman 1, R. Islamaj 2, E. Alpaydin 2 1 Laborotory of Computational Biology, Sabancı University, Istanbul, Turkey. 2 Computer Engineering
Neural Network Design in Cloud Computing
International Journal of Computer Trends and Technology- volume4issue2-2013 ABSTRACT: Neural Network Design in Cloud Computing B.Rajkumar #1,T.Gopikiran #2,S.Satyanarayana *3 #1,#2Department of Computer