Water Mains Rehabilitation Framework (NI) Northern Ireland Water

Size: px
Start display at page:

Download "Water Mains Rehabilitation Framework (NI) Northern Ireland Water"

Transcription

1 PROJECT: CLIENT: MAIN CONTRACTOR: Water Mains Rehabilitation Framework (NI) Northern Ireland Water Farrans Background Northern Ireland Water manages a water mains infrastructure that supplies 625 million litres of water per day to 1.7 million consumers in 795,000 households and businesses. The company also treats 134 million m 3 of wastewater, operates 2,700 treatment works, reservoirs and pumping stations and maintains over 26,500 km of water mains and over 14,500 km of sewers. NI Water has been under increasing pressure from Government and Regulators to become more efficient and needs to deliver a substantial programme of continuous planned work over a prolonged period. Under the company s three year Strategic Business Plan from 2007 to March 2010 NI Water invested some 778 million in water and wastewater infrastructure; 174 million in water treatment and storage facilities and mains improvement and 614 million in wastewater collection and treatment systems. In the longer term, the company is expecting to spend over 3 billion in total by Some water mains are over 100 years old and have become prone to bursts, leaks and pressure problems. As a consequence, NI Water has an ongoing programme for the improvement of existing water mains which will see 100 million invested in the upgrading of over 1000 kilometres of water mains throughout Northern Ireland. The Water Mains Rehabilitation Framework The Water Mains Rehabilitation Framework Agreement covers the management, design and construction of new water mains or the replacement or renovation of existing water mains up to 600mm nominal diameter using a range of technologies. The contract also covers miscellaneous ancillary works including service reservoirs and pumping stations. NI Water received eight bids in response to the tender advertisement for the framework in November 2008 and following an extensive evaluation process Farrans was named in March 2010 as one of two contractors sharing the 100 million contract. The contract period is 5 years, extendable up to 10 years from award. The framework contract has been established to deliver rehabilitation or replacement of mains identified under the NI Water capital works programme and schemes are sized from first time services ( 10k) through to large diameter trunk mains ( 10M). The contract will ensure that: Current high levels of drinking water quality will be maintained Leakage will be reduced Interruption to supply will be minimised Development and investment prospects across Northern Ireland will be enhanced

2 An Innovative Approach The framework projects, designed by Farrans along with their consultant Jacobs, involve site investigation, design, installation, testing and commissioning of new and replacement water mains throughout Northern Ireland with the aim of improving levels of service for NI Water s customers. Farrans and NI Water needed to take an innovative approach to the delivery of the contract for a number of reasons: NI Water had become a regulated business with defined Customer Service objectives and was required to reduce costs and staff resources. There was a need to reduce construction costs, increase productivity and develop NI Water as a long term sustainable business There was a requirement to deliver a sustained long term programme of work The NI Water Customer First Initiative required a reduction in supply interruptions (the Customer First Initiative is measured by quantity and duration of planned / unplanned interruptions and monitors benefits to NI Water customers) The Framework contract has strived to be innovative in a number of ways: Client / contractor objectives are aligned to the NI Water PC10 Business Plan. The cost-benefit analysis achieves PC10 objectives and demonstrates optimum investment There is an integrated team using shared web hosted systems including a project document management system, a customer contact database, works GPS tracking systems and a cost management database The enabling phase considers the entire construction lifecycle with particular emphasis on the continued operation of the live water network during construction and the resultant impact on NIW customers Construction performance is incentivised by work allocation with price-quality minicompetitions conducted between main contractors to secure allocation of additional works Farrans Customer Care Team is supported by a CRM (Customer Relationship Management) solution which tracks the receipt, management and resolution of all customer contacts received by the project Customer focus is engendered throughout the workforce via project specific customer care training for all site staff and operatives and performance is routinely monitored by customer care site audits Stakeholder needs and constraints are identified and a best-fit solution provided for business critical and health critical customers To minimise disruption, modern pipelaying and renovation techniques are used in excavations. The use of low-dig technology provides Farrans with the means to complete works with minimal disturbance to the surrounding ground surface, traffic and the environment

3 The above innovations are being monitored through regular Board meetings and discussions between client, consultants and contractor to review the performance of the framework contract. A Quality System The installation of new, or replacement of existing utility mains can create major disruption to the surrounding environment. The framework contract requires the installation of water mains in diverse environments such as rural roads, urban housing estates and in city centres. It is essential that this work is carried out with minimum disruption to local business and domestic properties and to the general public and road users. People in the vicinity of the works may experience some inconvenience varying from interruptions to water supply, traffic disruption, noise pollution and restricted access to property. By utilising the best of modern methods Farrans ensures that construction projects meet the needs of all stakeholders, aiming for minimum disruption during the construction period, maximum quality of product and a cost effective delivery. Enabling Team Management Structure Farrans Contracts NIW Enabling Assistant Enabling Engineer Design Lead Network Operations Liaison Networks Field Site Investigation Teams Design Engineer Every effort is made to limit both the extent and the duration of any disruption and all parties wish to ensure that works are completed right first time : quality is therefore integral to the design and construction process. The process detailed below indicates the extent of the enabling works required before any work goes onto site.

4

5 The appraisal stage assesses existing network performance (structural, quality, hydraulic), establishes Needs, identifies Options, and formulates the design brief/work packages. A cost-benefit analysis of planned expenditure ensures that the achievement of objectives is assessed, the payback period is established and that the best use of resources follows a prioritisation process that directs expenditure to highest need. The site investigation phase considers constraints that may impact the proposed works, including, water network limitations; Roads Authority; stakeholders; critical customers; ground conditions; installation technique etc. Work package approval follows full investigation and detailed design, delivering greater cost certainty; programme certainty; identification and control of risk; workload balance; and control of rate of expenditure. Farrans use the enabling/design phase to consider the entire construction lifecycle from conception to completion. The designs must meet the needs outlined in the project brief and ensure that whole-life value is delivered by addressing 'buildability', maintainability and minimal disruption during construction, whilst considering health and safety and driving cost efficiencies. Collaborative tools and communication technologies are utilised at all stages of the process. There are clearly defined roles and responsibilities with shared web based systems (document management, design programming) that allow flexibility, mobility and reduced duplication and verification. There are also thorough risk management and mitigation procedures in place. There is a phased release of work packages facilitating a balanced workload and consistent quality and ensuring control of expenditure. Consistent workload also facilitates innovation of product and processes, for example off-site pre-sterilisation reduces time on-site. Benefits The innovative approach to the framework contract has already resulted in many benefits to both client and contractor: The contract has resulted in reduced leakage, improved water quality and pressure and reduced interruptions to supply There are reduced management costs to the client, reduced construction costs and year on year efficiencies There is a streamlined decision making process from conception to construction There is a consistent, balanced workload There is sustainable business development for the contractor as well as improved budget certainty and accuracy Expenditure is targeted and focused to deliver specific output with defined pay back periods

6 The quality of the process and improved service delivery will enhance reputations for NI Water, Farrans and the industry in general The implementation of the WRAP 2012 Halve Waste to Landfill initiative, measured by waste tonnage diverted from landfill results in benefits for the client, contractor and wider society One of the key benefits is the knowledge transfer to be gained from the project for both client and contractor and for the wider industry: Farrans knowledge transfer initiative BLUEPRINT ensures recording and transmission of best practice and innovation across operating divisions and across regions. Farrans KPI performance management illustrates performance across divisions and regions and identifies opportunities for improvement There is industry-wide knowledge transfer through NI Water engagement with both statutory and industry bodies (NIRAUC; Pipeline Industries Guild), generating information sharing with other Utility Authorities and contracting companies Farrans engagement with construction industry employer groups, safety bodies and trade organisations develops communication and sharing of best practice and innovation Conclusion Northern Ireland Water is committed to improving performance and to developing a reliable and secure water supply system that meets the increasingly stringent standards set by the European Union. The Framework Agreement has successfully aligned the objectives of both client and contractor to deliver the outputs of the Northern Ireland Water Business Plan. There is a strong partnering ethos based around NEC3 conditions of contract and the team is fully integrated with shared resources from conception through to the construction and operational stages. Farrans and all the members of the supply chain are working to challenging production targets with cost allowances, overhead allowances and margins set at competitive levels but are still driving innovation and better working practices to provide efficiencies wherever possible in the design and construction process.

Draft Water Services Strategic Plan

Draft Water Services Strategic Plan Draft Water Services Strategic Plan A Plan for the Future of Water Services Customer Water Wastewater Environment Growth Investment Safeguarding your water for your future Irish Water at a glance... Irish

More information

Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement

Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement Action Note 14/15 27 August 2015 Issue 1. Raising skills levels within the UK workforce is key to delivering sustainable

More information

Asset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future

Asset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future Asset Management Strategy (2013-2017) A New Approach for a sustainable future Contents Introduction... 2 The Asset Management Vision, Policy Statement & Strategic Themes... 5 Part B The Asset Management

More information

Highway Asset Management Strategy

Highway Asset Management Strategy 1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate

More information

CHANGES TO THE WAY STORMWATER MAINTENANCE IS BEING DELIVERED IN AUCKLAND

CHANGES TO THE WAY STORMWATER MAINTENANCE IS BEING DELIVERED IN AUCKLAND CHANGES TO THE WAY STORMWATER MAINTENANCE IS BEING DELIVERED IN AUCKLAND I.W Peffers Downer NZ Ltd ABSTRACT Since the amalgamation of the Auckland Council s in 2010 and the separation of stormwater management

More information

OUR ASSURANCE PLAN 2016/17 MARCH 2016. 1 Our Assurance Plan 2016/17

OUR ASSURANCE PLAN 2016/17 MARCH 2016. 1 Our Assurance Plan 2016/17 OUR ASSURANCE PLAN 2016/17 MARCH 2016 1 Our Assurance Plan 2016/17 ABOUT THIS DOCUMENT We publish a range of information about our services and performance. This helps to provide our customers and stakeholders

More information

Maintenance Strategy 2015 Owner: Kevin Bullimore Head of Infrastructure Next review 2020

Maintenance Strategy 2015 Owner: Kevin Bullimore Head of Infrastructure Next review 2020 Maintenance Strategy 2015 Owner: Kevin Bullimore Head of Infrastructure Next review 2020 Page 1 of 7 Maintenance Strategy Introduction The requirement for maintenance of premises, plant and equipment arises

More information

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting Rebuilding Flood Damaged Roads in South East Queensland in the middle of the Coal Seam Gas Expansion/Explosion - A Local Governments Experience and Learning's David Pemberton [email protected] Mobile

More information

guide for obtaining new water and waste water services

guide for obtaining new water and waste water services You can write to us at: Customer Connections Scottish Water 419 Balmore Road Glasgow G22 6NU Please quote this reference code when contacting us: SWP&DS/DG2 04/08 Alternative formats of this leaflet can

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

Corporate Governance Service Business Plan 2011-2016. Modernising Services

Corporate Governance Service Business Plan 2011-2016. Modernising Services Corporate Governance Service Business Plan 2011-2016 Modernising Services Index 1. Executive Summary 3 2. Vision and Strategy 4 3. Service Overview 3.1 What Services do we and Will we Deliver? 5 3.2 How

More information

6.0 Procurement procedure 1 Infrastructure

6.0 Procurement procedure 1 Infrastructure Page 6-1 6.0 Procurement procedure 1 Infrastructure 6.1 Overview Introduction Procurement procedure 1 Infrastructure consists of four parts: guidelines for understanding the strategic context for the procurement

More information

Wales Procurement Policy Statement

Wales Procurement Policy Statement Wales Procurement Policy Statement In December 2012 I launched the Wales Procurement Policy Statement (WPPS) setting out the principles by which I expect public sector procurement to be delivered in Wales.

More information

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers Contents Page 1 Introduction 2 2 Objectives of the Strategy 2 3 Data Quality Standards 3 4 The National Indicator Set 3 5 Structure of this Strategy 3 5.1 Awareness 4 5.2 Definitions 4 5.3 Recording 4

More information

Delivering Excellence in Insurance Claims Handling

Delivering Excellence in Insurance Claims Handling Delivering Excellence in Insurance Claims Handling Guide to Best Practice Delivering Excellence in Insurance Claims Handling Contents Page 1. Introduction 1 2. Executive Summary 2 3. Components of Best

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John

More information

TAUHEEDUL EDUCATION TRUST

TAUHEEDUL EDUCATION TRUST TAUHEEDUL EDUCATION TRUST JOB DESCRIPTION Job Title: Base: Head of Human Resources Tauheedul Education Trust Central Office Reports to: Chief Executive Grade: TSM4 Sc 54-59 Staff Responsibility for: As

More information

SUPPLY CHAIN CODE OF PRACTICE. Streamlining processes and increasing value for the oil and gas industry

SUPPLY CHAIN CODE OF PRACTICE. Streamlining processes and increasing value for the oil and gas industry SUPPLY CHAIN CODE OF PRACTICE Streamlining processes and increasing value for the oil and gas industry About The Supply Chain Code of Practice The Supply Chain Code of Practice (SCCoP) outlines a set

More information

ICT Digital Transformation Programme

ICT Digital Transformation Programme Officer and Date Item Cabinet 11 th May 2016 Public ICT Digital Transformation Programme Responsible Officer: Clive Wright, Chief Executive Email: [email protected] Tel: 01743 252007 1.0 Summary

More information

Management. Level 3 Diploma in Management (QCF) 2014 Skills CFA Level 3 Diploma in Management (QCF) Page 1

Management. Level 3 Diploma in Management (QCF) 2014 Skills CFA Level 3 Diploma in Management (QCF) Page 1 Management Level 3 Diploma in Management (QCF) 2014 Skills CFA Level 3 Diploma in Management (QCF) Page 1 Level 3 Diploma in Management (combined qualification) Qualification Title Credit Value 55 Level

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal

More information

BSO Board Director of Human Resources & Corporate Services Business Continuity Policy. 28 February 2012

BSO Board Director of Human Resources & Corporate Services Business Continuity Policy. 28 February 2012 To: From: Subject: Status: Date of Meeting: BSO Board Director of Human Resources & Corporate Services Business Continuity Policy For Approval 28 February 2012 The Board is asked to agree the attached

More information

Site waste it s criminal A simple guide to Site Waste Management Plans

Site waste it s criminal A simple guide to Site Waste Management Plans Site waste it s criminal A simple guide to Site Waste Management Plans Introduction 10m tonnes of construction products are wasted every year, at a cost of 1.5 billion Much of this site waste is harmful

More information

Digital Inclusion Programme Started. BL2a

Digital Inclusion Programme Started. BL2a PROJECT BRIEF Project Name Digital Inclusion Programme Status: Started Release 18.05.2011 Reference Number: BL2a Purpose This document provides a firm foundation for a project and defines all major aspects

More information

JE PANEL/BENCHMARKING REF NO: 867/4 EVALUATION DATE:

JE PANEL/BENCHMARKING REF NO: 867/4 EVALUATION DATE: 1. JOB TITLE Job Title: Project Manager (Transport Infrastructure) Reports to: Design Programme Manager Service: Highways and Transport Environment & Infrastructure Date: November 2014 2. JOB PURPOSE To

More information

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document)

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document) SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW (reproduced review document) Highway Network Management Best Value Review Report of the Member Panel Summary of Key Findings Leicestershire County Council

More information

your water pressure explained

your water pressure explained your water pressure explained water networks your responsibility low pressure Our water networks are designed so that a typical home has a plentiful supply of water pressure and flow. There are however

More information

Chapter 3 Objective: Meet Customer Expectations

Chapter 3 Objective: Meet Customer Expectations Chapter 3 Objective: Meet Customer Expectations 13 Irish Water Water Services Strategic Plan Our Strategic Aim Establish both Customer Trust and a Reputation for Excellent Service Introduction Irish Water

More information

Slough Borough Council. Highway Asset Management Strategy

Slough Borough Council. Highway Asset Management Strategy Slough Borough Council Highway Asset Management Strategy OUR AMBITION USING RESOURCES WISELY By 2019 the Council s income and the value of its assets will be maximised 1 Key Priorities 1.1 We understand

More information

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective

More information

UNITED WATER LEAK DETECTION SERVICE

UNITED WATER LEAK DETECTION SERVICE UNITED WATER LEAK DETECTION SERVICE M. O'BRIEN Field Supervisor, United Water International ABSTRACT This paper details information on United Water's recently developed leak detection service, the aim

More information

SEC. Specialist Engineering Contractors Group HEALTH AND SAFETY STRATEGY GROUP. www.secgroup.org.uk

SEC. Specialist Engineering Contractors Group HEALTH AND SAFETY STRATEGY GROUP. www.secgroup.org.uk Specialist Engineering Contractors Group HEALTH AND SAFETY www.secgroup.org.uk Message from the Group Chairman The Specialist Engineering Contractors Group ( Group) is the focal point for the sector s

More information

Water Resource Plan 2015 (Summary Report) Ensuring customers have clear, fresh, safe drinking water to 2040 and beyond

Water Resource Plan 2015 (Summary Report) Ensuring customers have clear, fresh, safe drinking water to 2040 and beyond () Ensuring customers have clear, fresh, safe drinking water to 2040 and beyond November 2014 Overview Our Water Resource Plan sets out our strategy to secure the reliable supply of drinking water to

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal

More information

Specialists in the Refurbishment, Replacement and Renewal of Water Mains throughout the UK

Specialists in the Refurbishment, Replacement and Renewal of Water Mains throughout the UK Specialists in the Refurbishment, Replacement and Renewal of Water Mains throughout the UK North East Pipelines Limited Manor House Farm, East Cowton, Northallerton, DL7 0DE Tel: 01325 713296 Mob: 07802

More information

Homes and Environment Scrutiny Committee. (Environment & Transport)

Homes and Environment Scrutiny Committee. (Environment & Transport) REPORT TO: REPORT NO: Homes and Environment Scrutiny Committee HHPPE/89/15S DATE: 9 September 2015 LEAD MEMBER: Councillor David A Bithell (Environment & Transport) CONTACT OFFICER: Neil Taunt (Tel: 729734)

More information

Monitoring Highways England The monitoring framework

Monitoring Highways England The monitoring framework Monitoring Highways England The monitoring framework October 2015 Contents Executive summary 4 Roads reform 4 ORR s role in monitoring Highways England 5 What we will do next 10 1. Overview of this document

More information

Intelligent Procurement

Intelligent Procurement Intelligent Procurement Lessons and pitfalls Making a Difference - Construction - Stewart Heaney Divisional Director Construction, CPD Making a Difference Construction Procurement Stewart Heaney Divisional

More information

Alphington sewer replacement

Alphington sewer replacement Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800

More information

Procurement requirements for reducing waste and using resources efficiently

Procurement requirements for reducing waste and using resources efficiently Guidance for building and civil engineering projects Procurement requirements for reducing waste and using resources efficiently Model procurement wording for clients and contractors to cut waste on construction

More information

WOMEN S HEALTH VICTORIA POSITION DESCRIPTION

WOMEN S HEALTH VICTORIA POSITION DESCRIPTION WOMEN S HEALTH VICTORIA POSITION DESCRIPTION Title Classification Team Work location Employment type Policy and Health Promotion Manager WHV Enterprise Agreement 2013 Level 5 Classification Policy and

More information

Technical Journal. Paper 142

Technical Journal. Paper 142 Technical Journal 09 Paper 142 142 Kevin Balaam Programme Manager Highways & Transportation Atkins The Area 6 MAC approach to planning and programme management Introduction Steve Dickinson Schemes Manager

More information

TOWNSVILLE WATER Customer Service Standards

TOWNSVILLE WATER Customer Service Standards TOWNSVILLE WATER Customer Service Standards CONTENTS Townsville Water who are we? 3 What is the Customer Service Standard? 3 >> Does the Customer Service Standard apply to me? 3 >> What will Townsville

More information

Social Return on Investment

Social Return on Investment Social Return on Investment Case study - London Borough September 2014 Overview The Social Value Act is transforming public sector procurement. Business needs to embrace this opportunity and use it to

More information

Quality Assurance of Pre-registration Tutors

Quality Assurance of Pre-registration Tutors Quality Assurance of Pre-registration Tutors The Pharmaceutical Society of Northern Ireland must provide quality assurance in all aspects of the Pre-registration training programme including the standard

More information

2016-2021 Highway Asset Management Strategy

2016-2021 Highway Asset Management Strategy 2016-2021 Highway Asset Management Strategy Barnsley MBC 2016-2021 v0.1 0 BARNSLEY COUNCIL ASSET MANAGEMENT IMPLEMENTATION STRATEGY Contents 1.0 Introduction 2 Page 2.0 Legislative Requirements 2 3.0 Planning

More information

RCT HOMES HOUSING ASSOCIATION JOB DESCRIPTION

RCT HOMES HOUSING ASSOCIATION JOB DESCRIPTION RCT HOMES HOUSING ASSOCIATION JOB DESCRIPTION TITLE: REPORTING TO: RESPONSIBLE FOR: Financial Accountant Group Accountant Assistant Accountant 1. Overall Objectives 1.1. To provide the Financial Accounting

More information

National Infrastructure Maintenance Strategy (NIMS) Infrastructure Maintenance Budgeting Guideline. cidb development through partnership

National Infrastructure Maintenance Strategy (NIMS) Infrastructure Maintenance Budgeting Guideline. cidb development through partnership National Infrastructure Maintenance Strategy (NIMS) Infrastructure Maintenance Budgeting Guideline cidb development through partnership CONTENTS 1 Purpose 2 Context and Background - Need for Infrastructure

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupo District Council (TDC) currently uses to determine long term maintenance, renewal

More information

Job Description. To lead and effectively manage the Empty Homes team which is responsible for:

Job Description. To lead and effectively manage the Empty Homes team which is responsible for: Job Description Post Title Post Number Service Area / Department SDU Accountable to (Line Manager) Responsible for (Direct Reports Post Title) Empty Homes Manager RT01008 Leasehold and Lettings Housing

More information

This document outlines Wales & West Utilities Business Plan for the next regulatory period from 2013-2021.

This document outlines Wales & West Utilities Business Plan for the next regulatory period from 2013-2021. This document outlines Wales & West Utilities Business Plan for the next regulatory period from 2013-2021. It has been prepared following extensive consultation with a wide range of stakeholders and reflects

More information

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX]

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX] EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014 2014 No. [XXXX] 1. This explanatory memorandum has been prepared by the Department for Energy

More information

PROJECT MANAGER. Grade: Salary:

PROJECT MANAGER. Grade: Salary: PROJECT MANAGER Grade: Salary: Career Grade F/G* *see career grade structure 24,427 to 33,771 per annum Status: 12 months fixed term contract with potential for a further 12 months extension subject to

More information

COST EFFECTIVE APPROACHES FOR PRESCRIBED DAM ASSET MANAGEMENT

COST EFFECTIVE APPROACHES FOR PRESCRIBED DAM ASSET MANAGEMENT COST EFFECTIVE APPROACHES FOR PRESCRIBED DAM ASSET MANAGEMENT Haris Pinidiya Sydney Water, NSW, Australia ABSTRACT Dams need to be dewatered in an emergency, typically by operating scour valves. Operating

More information

Recruitment and Selection Services Centre Team Leader

Recruitment and Selection Services Centre Team Leader Job Description Recruitment and Selection Team Leader Band 5 Job Title: Band: Reports to: Recruitment and Selection Services Centre Team Leader 5 ( 21,388-27,901 per annum) Service Delivery Manager Accountable

More information

2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines

2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines 2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines Introduction The guidelines below provide departments and entities with information to make budget submissions for capital projects

More information

PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT

PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT Eur Ing Steve Mustard, Product Manager, LogicaCMG Dr Mark Thornton, Solutions Director, Helveta Abstract Supervisory Control And

More information

2016/17 Budget proposal Integrated Impact Assessment (IIA)

2016/17 Budget proposal Integrated Impact Assessment (IIA) 2016/17 Budget proposal Integrated Impact Assessment (IIA) Informing our approach to fairness Name of proposal Fairer Housing Unit Date of original assessment 20 November 2015 Lead officer Amanda Senior,

More information

Internal Audit Division

Internal Audit Division Internal Audit Division at the Financial Conduct Authority Information Pack April 2013 Contents of Information Pack A. Introduction B. Internal Audit Terms of Reference C. Organisation D. Skills and Competencies

More information

ROADING ASSET MANAGEMENT PLAN

ROADING ASSET MANAGEMENT PLAN ROADING ASSET MANAGEMENT PLAN 1 EXECUTIVE SUMMARY 1.1 Overview This Roading Asset Management Plan (RAMP) follows the format recommended by the National Asset Management Steering Group (NAMS) and is largely

More information

Corporate Risk Management Policy

Corporate Risk Management Policy Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction

More information

SUFFOLK COUNTY COUNCIL PROCUREMENT RULES. Version 2 Jan 2016. Page 1 of 19

SUFFOLK COUNTY COUNCIL PROCUREMENT RULES. Version 2 Jan 2016. Page 1 of 19 SUFFOLK COUNTY COUNCIL PROCUREMENT RULES 2015 Version 2 Jan 2016. Page 1 of 19 TABLE OF CONTENTS 1. Introduction and Definitions... 3 2. Scope... 4 3. General Principles... 5 4. Responsibilities... 7 5.

More information

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen Shields Date: 20

More information

A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS

A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS Introduction Toby Bourke (MWHSoft), Graham McGonigal (MWH) There is currently widespread concern

More information

Why Smart Water Networks Boost Efficiency

Why Smart Water Networks Boost Efficiency Why Smart Water Networks Boost Efficiency by Jeff M. Miller and Mark Leinmiller Executive summary The Smart Water Network (SWAN) is the water utility industry s equivalent to the energy industry s Smart

More information

Emergency management in Cardiff. A practical guide

Emergency management in Cardiff. A practical guide Emergency management in Cardiff A practical guide Emergency management in Cardiff Introduction It is very unlikely that any of us will ever be caught up in an emergency or disaster, but by being informed

More information

6 STEP 6 - PREPARING THE ACTION PLAN 2

6 STEP 6 - PREPARING THE ACTION PLAN 2 CONTENTS 6 STEP 6 - PREPARING THE ACTION PLAN 2 6.1 USER GUIDE TO THIS STEP 2 6.2 KEY MESSAGES OF THIS STEP 4 6.3 PREPARING THE ACTION PLAN 5 6.4 PRE-FEASIBILITY STUDY 8 6.5 PREPARING AN INVESTMENT PLAN

More information

Solihull Clinical Commissioning Group

Solihull Clinical Commissioning Group Solihull Clinical Commissioning Group Business Continuity Policy Version v1 Ratified by SMT Date ratified 24 February 2014 Name of originator / author CSU Corporate Services Review date Annual Target audience

More information

Sustainable Development Strategy

Sustainable Development Strategy Sustainable Development Strategy Our vision and strategy: A railway fit for the future 2013 2024 Document Ref: SBPT204 Version 0.71 Executive summary Network Rail exists to generate outstanding value for

More information

Securing Information in an Outsourcing Environment (Guidance for Critical Infrastructure Providers) Executive Overview Supplement.

Securing Information in an Outsourcing Environment (Guidance for Critical Infrastructure Providers) Executive Overview Supplement. Securing Information in an Outsourcing Environment (Guidance for Critical Infrastructure Providers) Executive Overview Supplement June 2011 DISCLAIMER: This document is intended as a general guide only.

More information

JOB DESCRIPTION. Be responsible for ensuring the implementation of standard operating procedures (SOPs) and systems documentation.

JOB DESCRIPTION. Be responsible for ensuring the implementation of standard operating procedures (SOPs) and systems documentation. JOB DESCRIPTION Job Title: Specialist Reporting To: Infrastructure Department(s)/Location: Clydebank / Norseman Job Reference number: 1. JOB PURPOSE Provide specific specialist and more general support

More information

Risk Management & Business Continuity Manual 2011-2014

Risk Management & Business Continuity Manual 2011-2014 ANNEX C Risk Management & Business Continuity Manual 2011-2014 Produced by the Risk Produced and by the Business Risk and Business Continuity Continuity Team Team February 2011 April 2011 Draft V.10 Page

More information

REPORT 4 FOR DECISION. This report will be considered in public

REPORT 4 FOR DECISION. This report will be considered in public REPORT 4 Subject: Safety Readiness for the Summer 2013 Events Programme Agenda item: Public Item 7 Report No: 4 Meeting date: 28 May 2013 Report to: Board Report of: Mark Camley, Interim Executive Director

More information

District Health Management

District Health Management S E C T I O N 3 District Health Management About this section This section describes the responsibilities of district management teams and outlines the district health management cycle. Special emphasis

More information

Business Resources. QCF Units of Assessment Final NVQ Units April 2010

Business Resources. QCF Units of Assessment Final NVQ Units April 2010 Business Resources QCF Units of Assessment Final NVQ Units April 2010 6 Graphite Square Vauxhall Walk London SE11 5EE T: 0207 0919620 F: 0207 0917340 [email protected] www.skillscfa.org Contents No. Title

More information

Intelligent solutions developed for the healthcare sector

Intelligent solutions developed for the healthcare sector Intelligent solutions developed for the healthcare sector 1 With 2,796 staff operating across 27 regional locations, Equiniti is a trusted partner of healthcare organisations in the public and private

More information

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client

More information

Operations Manager Job Description March 2012

Operations Manager Job Description March 2012 Operations Manager Job Description March 2012 Thermaflo is seeking an experienced Operations Manager with a technical background in process engineering. At Thermaflo we strongly believe that the success

More information

Emergency Management and Business Continuity Policy

Emergency Management and Business Continuity Policy www.surreycc.gov.uk Making Surrey a better place Emergency Management and Business Continuity Policy 4 TH EDITION June 2011 Title Emergency Management and Business Continuity Policy Version 4.0 Policy

More information

Northern Ireland Environment Agency Corporate Social Responsibility

Northern Ireland Environment Agency Corporate Social Responsibility Northern Ireland Environment Agency Corporate Social Responsibility September 2011 Introduction This document has been prepared by the Northern Ireland Environment Agency (NIEA) in line with general NICS

More information

Treating Customers Fairly. October 2015

Treating Customers Fairly. October 2015 Treating Customers Fairly October 2015 Our promise to treat you fairly At SSE we are committed to giving excellent service and treating customers fairly. Our 2015 Treating Customers Fairly Statement sets

More information

Principal Advisor Safety, Health and Wellbeing

Principal Advisor Safety, Health and Wellbeing Principal Advisor Safety, Health and Wellbeing New Zealand Fire Service Position Description Job # Business Area: Location: Reports to: TBC People and Capability Wellington Date: June 2015 Position Context

More information

COMPREHENSIVE ASSET MANAGEMENT STRATEGY

COMPREHENSIVE ASSET MANAGEMENT STRATEGY COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A TREATED WATER STORAGE POINT ON THE WATER NETWORK

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A TREATED WATER STORAGE POINT ON THE WATER NETWORK ISOLATION OF A TREATED WATER STORAGE POINT ON Document Title: Document Reference: Work Instruction Isolation of a Treated Water Storage Point on the Water Network DOM-WN-WIN-00000301 Approved By: Asset

More information

TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT. Engineering Services POLICY DIRECTIVE

TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT. Engineering Services POLICY DIRECTIVE TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT Engineering Services POLICY DIRECTIVE This Asset Management policy will ensure that Asset Management is clearly recognised by Council and community in accordance

More information

London Underground Environment Strategy

London Underground Environment Strategy London Underground Environment Strategy 2008 2013 mayor of london Transport for London Contents Introduction 3 London Underground Environment strategy 4 Managing environmental impacts 5 Embedding environment

More information

Basics of Sustainability. Environmental Impact Assessments (EIA)

Basics of Sustainability. Environmental Impact Assessments (EIA) Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6

More information

LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH

LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH Dr. Petros Kolovopoulos (Hydro-Comp Enterprises Ltd, Cyprus), Dr Dinos Constantinides (Hydro-Comp Enterprises Ltd, Cyprus) Key words: Asset Management,

More information