Case Study: HV Cable Strike With Steel Pin Whilst Erecting A Marquee:
|
|
|
- Lawrence Leonard
- 10 years ago
- Views:
Transcription
1 Case Study: HV Cable Strike With Steel Pin Whilst Erecting A Marquee: The above Image demonstrates the impact on an HV cable when a 910mm long steel pin was driven into the ground. The task was to erect a marquee for a charity event on a section of ground which had been used for the same purpose for the previous 3 years, fortunately on this occasion, the operatives received no injuries. The investigation into this incident discovered that no cable records had been consulted prior to the erection of the marquee and that the use of a cable locator had not taken place. ScottishPower cable records should always be consulted prior to any ground penetration taking place. Cable record enquiries are to be directed to ScottishPower Data Management section. Prior to any excavations taking place cable records should always be consulted.
2 Case Study: Marquee Erection (No Cable Records, No Ground Penetration) The above images demonstrate a high voltage cable (11,000 volts) damaged with a steel pin during the erection of a marquee. The operatives struck the cable at two locations, the above image highlights that the cable skin was pierced with the steel pin being driven into the ground to provide support for the marquee, however at the second cable damage the operative was extremely fortunate that he did not receive life changing injuries. Whilst driving the steel pin into the ground, the steel pin came into contact with the high voltage cable the impact caused flames to shoot up the steel pin towards the operative. This dangerous occurrence incident could easily have been avoided if cable records had been requested from SP Energy Networks Data Management Section. Do Not Take A Chance With The Electricity Network, Never Drive Objects Into The Ground Without Interpretation Of Utility Records
3 Case Study: HV Cable Strike Whilst Erecting Marquee On Private Ground The above image highlights the impact on the ScottishPower high voltage network when a steel pin was being driven into the ground to support a marquee which was in the process of being erected, no SP Energy Networks cable records on site. The operative was using a tent pole inserter (whacker) when the steel pin came into contact with the 11,000 volt cable, the impact caused flames to shoot up the steel pin towards the operative utilising the whacker. On this occasion it was purely good fortune that the operative did not sustain serious injuries. This cable strike and the potential for serious injuries to be inflicted on the operative could easily have been avoided. How do companies expect to avoid serious injuries to operatives / contact with the underground electricity network if the correct utility information is not being supplied to their operatives. Prior To Ground Penetration Taking Place Cable Records Should Always Be Consulted, Always Assume Cables Are Present Until Proved Otherwise
4 Case Study: High Voltage Cable Damaged In Process Of Erecting Marquees The above image highlights a situation when a high voltage cable was damaged when a 910mm long steel pin was driven into the ground whilst erecting a marquee. This example demonstrates the impact on the ScottishPower network due to poor implementation of safe working practices. On this occasion no ScottishPower cable records or cable avoidance tool on site. Please contact ScottishPower cable records prior to commencing any work.. Please Note: The above telephone and fax numbers should only be used to apply for plans of the location of ScottishPower's infrastructure by third parties involved in current excavations or the planning of future works. All other enquiries should be directed to:
5 Case Study: Marquee And Circus Tent Erection A recent high voltage cable damage incident was caused by a marquee company driving a steel pin into the ground penetrating a ScottishPower cable. ScottishPower are deeply concerned that the site risk assessment did not identify the dangers of this work practice. There is a real safety issue that a marquee or Circus Company s employees/contractor s could be seriously injured whilst driving steel pins into the ground during the process of erecting marquees and circus tents. Contractors should also be aware of other potential hazards prior to instigating the works, for example: overhead lines. Prior To Any Ground Penetration Taking Place Cable Records Should Always Be Consulted, Always Assume Cables Are Present Until Proved Otherwise
6 Case Study: Driving Steel Pins Into The Ground Whilst Erecting A Marquee The above image highlights the practice of driving steel pins into the ground during the process of erecting a marquee. The operative is using a tent pole inserter (whacker) to drive the steel pins into the ground to support the marquee. The majority of supports will have a minimum of four steel pins per support. Prior to driving steel pins into the ground, marquee companies should always carry out a risk assessment and implement a safe system of work. A major part of the risk assessment should be to determine if utilities, both underground and overhead are present at the marquee erection location. Risk Assessment / Safe System Of work Required Prior To Ground Penetration Being Implemented
7 Case Study: Erecting Marquees-Tents (Always Procure Cable Records) The above image highlights the supporting structure required to ensure the stability of a marquee, on this occasion as many as seven steel pins may be hammered into the ground for this single support. Prior to erecting a marquee-tent a risk assessment should always be instigated to determine if it is safe to construct the marquee-tent. The fact that marqueetents have been erected historically in areas of land for numerous years without coming into contact with utilities, does not absolve clients/marquee companies from their responsibilities to ensure that their contractors/workforce are operating in a safe working environment. No Cable Records Supplied, No Ground Penetration To Take Place
EARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
ScottishPower Distribution Cables & Equipment. Metal Theft
ScottishPower Distribution Cables & Equipment Metal Theft April 2012 As an aid to deterring to metal theft this booklet has been put together to help identify the types of utility power cables and associated
Transmission Business Electrical Incident & Safety Performance Reporting Guide
Transmission Business Electrical Incident & Safety Performance Reporting Guide December 2011 Version 1.0 Energy Safe Victoria PO Box 262 Collins Street West MELBOURNE VIC 8007 AUSTRALIA Telephone (03)
Code of Practice Electricity transmission and distribution asset management. February 2009
Code of Practice Electricity transmission and distribution asset management February 2009 CONTENTS 1 PREFACE...4 2 APPLICATION AND OBJECTIVES...5 3 SCOPE...6 4 DEFINITIONS...7 5 DESIGN AND CONSTRUCTION...11
Getting Connected. A guide to how to apply for a New Connection to the Network
Getting Connected A guide to how to apply for a New Connection to the Network About Us SP Energy Networks is part of the ScottishPower Group of companies. We provide power on behalf of supply companies
Operational Control of the UKPN Low Voltage Distribution Network for EPN and LPN Regions
Operational Control of the UKPN Low Voltage Distribution Network for EPN and LPN Regions Owner Name Title Signature Steve White Head of Network Control and Operations Date 16 February 2016 Authoriser Name
Corporate Standard. Contractor Management
Corporate Standard Contents Purpose... 2 Scope... 2 Definitions... 2 Background... 3 Specific Requirements... 4 Responsibilities... 11 Review Date... 11 References... 11 Date Issued July 2010 Management
AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES
overhead 23/11/04 2:28 PM Page 1 AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES ESB Code 9803203 overhead 23/11/04 2:28 PM Page 2 overhead 23/11/04 2:28 PM Page 3 Page 1 of 20
High Voltage. Hazards
High Voltage Hazards HV Hazards Substations, Overhead Lines, Cables Safety Incidents Requirements for Designers, Constructors Construction Regs 2013 and other Legislation Codes of Practice Other Guidance
Excavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
Technical Guidance Note 287. Third-party guidance for working near National Grid Electricity Transmission equipment
Technical Guidance Note 287 Third-party guidance for working near National Grid Electricity Transmission equipment 02 Purpose and scope... 3 Part 1 Electricity Transmission infrastructure... 4 Overhead
Accidents - how to deal with them
Accidents - how to deal with them Introduction Following an accident on site there seem to be so many things to do. This FactFile Information Sheet aims to provide clear guidance on the steps that should
ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV
1. SCOPE This document details PowerSystems requirements for electrical testing of HV Equipment up to and including 33kV. 2. ISSUE RECORD This is a Reference document. The current version of Controlled
DRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL 21.11.2013
DRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL 21.11.2013 1. EN 16228-1../7 & EN 791 & EN 996 2. STABILITY OF THE RIGS; 3. AUSTRALIAN STANDARDS AND REGULATION RELATED
INCIDENT REPORTING POLICY
INCIDENT REPORTING POLICY Revised April 2011 1 Incident Reporting Policy Introduction This policy has been developed to detail the standards to be applied following an accident or incident at Northumbria
Trees and powerlines. Office of the Technical Regulator. Web: sa.gov.au/energysafe Phone: 8226 5500 Email: [email protected]
Trees and powerlines Office of the Technical Regulator For more energy information: Web: sa.gov.au/energysafe hone: 8226 5500 Email: [email protected] owerlines are an important part of our everyday
ICM Project Underground Infrastructure and Cable
EB 0 00 Tab Schedule B ( pages) ICM Project Underground Infrastructure and Cable Handwell Replacement Segment (THESL) EB 0 00 Tab Schedule B I EXECUTIVE SUMMARY. Project Description 0 The handwell replacement
Safety During Power Restoration. Steve Thompson Emergency Operations Director Alabama Power Company
Safety During Power Restoration Steve Thompson Emergency Operations Director Alabama Power Company Safety & Training Responsibilities During Major Outages Staging Area Responsibilities Orientations for
Health and safety policy
1. General statement of intent The Company recognises and accepts its responsibilities as an employer to ensure, so far as is reasonably practicable, the health, safety and welfare of its employees and
Incident Investigation and Reporting Procedures - Code of Practice 3.11
- Code of Practice 3.11 Distribution: To be brought to the attention of all Heads of Service, managers, supervisors, employees, trade union representatives and Head Teachers Introduction This code of practice
Create EWR for an Un-Metered New Connection (REC)
Create EWR for an Un-Metered New Connection (REC) Overview Introduction The purpose of this work instruction is to provide the step by step instructions for a Registered Electrical Contractor to create
Building Electrical Infrastructure
Building Electrical Infrastructure Industrial & Commercial Connections, Industrial / Urban Residential Development, Asset Relocation, Street Lighting Our Company Our vision is to combine electrical engineering
Risk Control Industry Guide Series. Utility Contractors Industry
Risk Control Industry Guide Series Utility Contractors Industry This study reflects on information derived from insurance claims. These claims form a database that can be analyzed to determine the many
Trees and powerlines. Office of the Technical Regulator. sa.gov.au/energysafe
Trees and powerlines Office of the Technical Regulator sa.gov.au/energysafe owerlines are an important part of our everyday lives, bringing electricity to our homes and businesses. egetation needs to be
Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-137 Ground-borne Vibrations and Ground Settlements Arising from Pile
Rev. No. 2 Safety Procedure Page No. i Contractor Safety Requirements Date: 04/01/05 FOREWORD
Safety Procedure Page No. i FOREWORD This document, Contractor Safety Requirements, represents the current contractor safety requirements that are unique to operations at National Grid. This document does
FRAMEWORK FOR UNDERTAKING WORK NEAR OVERHEAD AND UNDERGROUND ASSETS
CONSTRUCTION AND UTILITIES JUNE 2006 FRAMEWORK FOR UNDERTAKING WORK NEAR OVERHEAD AND UNDERGROUND ASSETS A GUIDE TO THE NO GO ZONES WorkSafe s expectations for safe work practice. Definitions............................
Working together. to prevent cable damage. a partnership for reliable and quality power
Working together to prevent cable damage a partnership for reliable and quality power contents introduction...1 cable damage can be prevented...2 3 how you can help...4 7 good practices to do it right...8
The following list show a range of words which you may use to describe an accident. Try to find these words in the grid below:
Accident Word Search Cymru - Wales The following list show a range of words which you may use to describe an accident. Try to find these words in the grid below: Help Reassure Emergency Conscious Ambulance
Policy Number: 054 Work Health and Safety July 2015
Policy Number: 054 Work Health and Safety July 2015 TRIM Ref: TD14/318 Policy Details 1. Owner Manager, Business Operations 2. Compliance is required by Staff, contractors and volunteers 3. Approved by
CHEMSKILL RETURN TO WORK AND RISK MANAGEMENT PROTOCOL (This document can be found under the Contractor s Section at www.chemskill.com.au.
CHEMSKILL RETURN TO WORK AND RISK MANAGEMENT PROTOCOL (This document can be found under the Contractor s Section at www.chemskill.com.au.) ChemSkill is committed to providing a safe and healthy work environment
Event Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES
EVENT PLANNING GUIDANCE NOTES 1 Event Planning Guidance Notes Important issues This documentation is not a full and authoritative statement of the law, statutory guidance or best practice in planning,
How To Safely Dig For Natural Gas
PNG DIAL B4-U-DIG book_final_nu 5/1/05 3:24 PM Page 2 Phoenix Natural Gas,197 Airport Road West, Belfast BT3 9ED. Tel. 08454 55 55 55. www.phoenix-natural-gas.com PNG DIAL B4-U-DIG book_final_nu 5/1/05
Accident and Incident Annual Statistics
Accident and Incident Annual Statistics Certain incidents are Reportable to the Health and Safety Executive (HSE) under the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 1995, (RIDDOR).
Information Sheet. What is a Workplace Transport Risk Assessment?
Workplace Transport Safety Risk Assessment Information Sheet This information sheet provides basic information on conducting a workplace transport risk assessment. The information is aimed at employers,
School or service safety advisor (SSA) role
School or service safety advisor (SSA) role Document control information Published document name: ssa-role-gn Date issued: January 2012 Version: 1.0 School or service safety advisor (SSA) role Previous
HS307 Hazard & Incident Reporting Procedure
Policy Hierarchy link Responsible Officer Contact Officer HS307 Hazard & Incident Reporting Procedure Work Health and Safety Act 2011 Work Health and Safety Regulation 2011 Work Health and Safety Policy
SUPPLY CHAIN PREQUALIFICATION PACKAGE
SUPPLY CHAIN PREQUALIFICATION PACKAGE 2015 PREQUALIFICATION AS AN APPROVED SUBCONTRACTOR / SUPPLIER In order for your company to be registered as an approved Vendor with StructureTone Limited, we require
Electrical safety rules
Electrical safety rules 2015 DISCLAIMER The material contained in this publication has been developed for the use of ActewAGL, its contractors and all others working on or near ActewAGL s electricity
4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information
4. REQUEST FOR ELECTRIC SERVICE To establish an electric service, temporary or permanent, contact UI s Customer Care Center by calling: 1-800-722-5584 (7:00 a.m. 7:00 p.m., Monday Friday and 7:00 AM to
NEW FIRE SAFETY LEGISLATION
NEW FIRE SAFETY LEGISLATION The Fire and Rescue Services (Northern Ireland) Order 2006 The Fire Safety Regulations (Northern Ireland) 2010 Fire Safety legislation changed A SHORT GUIDE TO MAKING YOUR PREMISES
GLOSSARY OF TERMINOLOGY
GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.
Permits to Dig / Permits to Excavate / Permits to work near underground services
Permits to Dig / Permits to Excavate / Permits to work near underground services Aim and purpose The aim of this guidance is to identify what should be included in a permit to excavate / dig and additional
DEFECTS LIABILITY COVER, CONSTRUCTION INSURANCE
IMIA 6-59 (98)E DEFECTS LIABILITY COVER, CONSTRUCTION INSURANCE Report to 1998 Conference by Derrick Werner Historic Development Introduction Objective Background Information Investigations Findings Conclusions
Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008
Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008 Purpose of Investigation This incident is investigated, and published in accordance
GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
Distribution Business Electrical Safety Performance Reporting Guidelines
Distribution Business Electrical Safety Performance Reporting Guidelines 1. General The Electricity Safety Act 1998 (the Act) specifies that Energy Safe Victoria (ESV) has eleven functions. Two of the
Approved Meter Sockets and Cabinets
Single Unit Residential Guide 1 PHASE, 120/240 VOLT S METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to center of meter ± 100 mm ( 4
4.05e WHS Guidelines for Incident Investigation Procedures Page 1 of 7
Page 1 of 7 1 Purpose It is a legal requirement under the NSW Work Health and Safety Act 2011 and NSW Work Health and Safety Regulation 2011 to identify hazards, assess the risk of those hazards, implement
Guidance Notes for the NEC Engineering and Construction Contract
The first objective of the Risk Register is to identify the risks inherent in a project. Some of these risks are generic, and will apply to whatever work is carried out. An example is the risk of errors
METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS
METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS Revision Date Prepared By Approved By Method Statement IF Kits BAC Corrosion Control Limited Stafford Park 11 Telford TF3 3AY Tel: 01952 290321 Fax:
THE ELECTRICAL CONTRACTOR SAFETY PROGRAM GUIDE
THE ELECTRICAL CONTRACTOR SAFETY PROGRAM GUIDE December 2013 Electrical Hazard Warning Sign Disclaimer Whilst this guide endeavours to provide general information on work health and safety issues relating
Red Oak Fire Rescue SECTION: 3000. New Car Technology
New Car Technology PURPOSE The purpose of this section is to; give basic knowledge of, and to set basic guidelines for handling a response to an incident pertaining to new car technologies including: Supplemental
Work in Substations - General
Work in Substations - General Summary: This document supports the Power System Safety Rules and its requirements assembled under Work in Substations General Category 3 and apply to all persons working
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS
Work Health and Safety (WHS) Policy
Basketball Queensland s Commitment Basketball Queensland (BQ) is committed to achieving organisational best practice in Work Health, and Safety (WHS). BQ has an organisational goal of Zero Harm and Loss
The Delivery Hub health, safety and environment Raising the bar 9 Underground service avoidance
Safe roads, reliable journeys, informed travellers The Delivery Hub health, safety and environment Raising the bar 9 Underground service avoidance Issued July 2013 Revised January 2015 An executive agency
Accident and Dangerous Occurrence Reporting Policy. Effective from January 2013
Accident and Dangerous Occurrence Reporting Policy Effective from January 2013 Contents 1 Accident reporting general statement... 3 2 Accident and dangerous occurrence book... 3 3 Accident reporting procedures
2002 No. 2665 ELECTRICITY. The Electricity Safety, Quality and Continuity Regulations 2002
STATUTORY INSTRUMENTS 2002 No. 2665 ELECTRICITY The Electricity Safety, Quality and Continuity Regulations 2002 Made - - - - - 24th October 2002 Laid before Parliament 28th October 2002 Coming into force
ASSET MANAGEMENT LCNI 2014 Wednesday 22 nd October. Jennifer Woodruff Innovation & Low Carbon Networks Engineer
ASSET MANAGEMENT LCNI 2014 Wednesday 22 nd October Jennifer Woodruff Innovation & Low Carbon Networks Engineer Asset Management Efficient asset management ensures that risk is effectively managed and returns
Corporate Standard. Contractor Management
WORK HEALTH & SAFETY CORPORATE STANDARD Accountability Head of People and Culture Corporate Standard Contractor Management 14/6/12 TABLE OF CONTENTS Requirements\Controlled s - Restricted Access\5. Works
SAFETY ALERT SWITCHBOARD INTERNAL SEGREGATION AND IP RATING. May 2014 BACKGROUND
SAFETY ALERT SWITCHBOARD INTERNAL SEGREGATION AND IP RATING May 2014 BACKGROUND There has been a recent serious incident involving a large arc event caused by material falling through an opening in a switchboard
environment briefing02
PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The
AUGUST 2013 INFORMATION BULLETIN. Livestock transport
AUGUST 2013 INFORMATION BULLETIN Livestock transport Introduction This information bulletin provides information that is relevant to operators and drivers involved in the transport of livestock. It details
Communications Program For Electrical Engineering Safety 2008-2012
Communications Program For Electrical Engineering Safety 2008-2012 Spreading the Word on Electrical Engineering Safety Strategy for communicating Electrical OH&S material To targeted audiences associated
Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time
Trial Exams C Standards and Regulations Examination No: GH-08-C- This test is intended to gauge your knowledge of essential information contained within AS/CA S009:2013. To qualify for an allpication to
SITE CONTRACTOR PROCEDURES
SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment
Application for. Commercial New Service
Application for Commercial New Service Welcome to Lake Country Power! In order to make your new service installation easy, we provide individualized help to process and install a new service. In order
Independent Contractor Policy
Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor
TIG torches... 3-2 to 3-5 Tungsten electrodes... 3-6 to 3-7 TIG consumables... 3-8 Miscellaneous... 3-9
3- welding torches........................................................... 3-2 to 3-5 Tungsten electrodes........................................ 3-6 to 3-7 consumables........................................................
Procedures and guidance for recording and reporting accidents / incidents in schools
Procedures and guidance for recording and reporting accidents / incidents in schools This document forms part of the overall package of information relating to accidents / incidents that is available on
Contractor s Safe Working Agreement
Contractor s Safe Working Agreement This statement provides details on how I/we, the Trade Contractor will manage the health and safety hazards associated with my/our work. ASSESSING WORKPLACE HEALTH AND
Document ref: MG(M)201 Version no: 01 Page no: 1 / 12. Contractor rules
Page no: 1 / 12 Contractor rules Table of Contents Purpose... 2 Scope... 2 1. Responsibilities... 2 2. Planning Stage... 3 3. Site induction, emergency procedures and documentation... 3 4. Risk Assessment
1.0 Examples on common security provisions/common welfare provisions
1.0 Examples on common security provisions/common welfare provisions Demands for quality Who Period A. Traffic areas on the site 1. Access roads to the site For heavy traffic from the machinery Main contractor
Rehabilitation and Return to Work Policy. Overview. Purpose. Scope. Policy
Rehabilitation and Return to Work Policy Overview At NBN Co we are safe, disciplined and reliable. We act on our responsibilities to identify and remove potential and recognised risk to a healthy and safe
BASILDON BOROUGH COUNCIL CORPORATE RISK MANAGEMENT UPDATE. Commissioning Director for Corporate Support
BASILDON BOROUGH COUNCIL Report to: Audit and Risk Committee 14 November 2012 CORPORATE RISK MANAGEMENT UPDATE Report by: Commissioning Director for Corporate Support Enquiries to: Paula Mills, Manager
Good Practice Guide. The Selection of Access Methods to Install and Dismantle Safety Netting
Good Practice Guide The Selection of Access Methods to Install and Dismantle Safety Netting FASET is the trade association for the safety net rigging and temporary safety systems industry. This document
Root & Contributing Causes. Site Answers & Comments: Preventative / Recommended / Accepted Steps of Risk Mitigation, Points of Interest:
EMESRT RISK: Risk of injury due to stored energy systems, such as accumulators, with no means to isolate or reduce to zero energy. Click to view this EMESRT Risk Failure under pressure All mines are strongly
ACCIDENT/INCIDENT REPORTING AND INVESTIGATION
ACT PUBLIC SECTOR ACCIDENT/INCIDENT REPORTING AND INVESTIGATION 1. PURPOSE ACT Government Directorates and entities are required to report and investigate all workplace accidents and incidents and ensure
High-voltage systems. Identifying high-voltage overhead conductors
High-voltage systems Working safely around high-voltage conductors (over 750 V) is a challenge for many workers in British Columbia. High-voltage systems are generally associated with utility services
Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer
Size template Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer The average system size has doubled since 2010 Key Network Issues Reverse power on up to 12 off 11 kv feeders
ESB Telecoms Ltd Contractor Safety Guidelines
ESB Telecoms Ltd Contractor Safety Guidelines Version Date Issued by Reason for Change 1 27 th January 2003 P Gregg 2 24 th June 2003 P Gregg Addition of contents 3 18 th May 2007 P Gregg Revision of section
G9 Offshore wind health and safety association
G9 Offshore wind health and safety association 2013 annual incident data report www.g9offshorewind.com About the G9 Offshore wind health and safety association The primary aim of the G9 is to deliver world
UK MANAGING AGENTS ACCIDENT AND INCIDENTS GUIDANCE
UK MANAGING AGENTS ACCIDENT AND INCIDENTS GUIDANCE Version 3 September 2012 Document Control Owner Originator Date Originated British Land Company PLC Ark Workplace Risk Ltd 30 th March 2012 Copy Issued
Electrical Hazards. Power Tools. Extension Cords
Electrical Hazards Electrical hazards can be found in nearly every roofing work site. Whether the hazard is posed by worn or damaged power tools or cords, improperly grounded tools or equipment, or the
Assessment of Soil Resistivity on Grounding of Electrical Systems: A Case Study of North-East Zone, Nigeria
Assessment of Soil Resistivity on Grounding of Electrical Systems: A Case Study of North-East Zone, Nigeria Abstract Gabriel A. Adegboyega and Kehinde O. Odeyemi Department of Electrical and Electronic
Procedure. Work Health and Safety Incident Notification. Document number: PRO-00388. Description Process Owner Approved for issue. Rev no.
Procedure Work Health and Safety Incident Notification Document number: PRO-00388 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority
Circuit Electrical Testing
Safe Isolation Procedure Circuit Electrical Testing Site Safety Management It is essential from the outset that effective management and control of the system, apparatus and equipment used on site is achieved