Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations
|
|
|
- Teresa Alexander
- 10 years ago
- Views:
Transcription
1 Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-137 Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations Pile driving (including pile withdrawal) operations and the like generate vibrations and settlements which, if not properly controlled, may have adverse effects on, or cause damage to, adjacent buildings/structures/services, in particular, non-structural elements therein. For the purpose of this practice note, such operations are termed as pile driving operations. 2. This practice note aims to provide guidelines on the control of ground-borne vibrations and ground settlements generated from pile driving or similar operations with a view to minimizing possible damage to adjacent properties and streets. Authorized Persons (AP)/Registered Structural Engineers (RSE) are reminded that under the Buildings Ordinance, it is their responsibility to ensure that the building works carried out will not impair the stability of, or cause damage to any building, structure, land, street or services. They should also exercise their professional judgment in choosing suitable and safe construction methods and provide vigilant supervision over the works throughout the construction period. Piling Plan Submission 3. Piling plans submitted for approval should, in general, follow the requirements laid down in PNAP APP-18. AP/RSE s particular attention should be paid to the monitoring requirements and the required appraisal report at items 4(k) and 4(o) therein respectively for adjacent buildings/structures/services. Depending on the structural condition of the adjacent buildings/structures/services, the Building Authority (BA) may require the following details to be included in the appraisal report : (a) (b) (c) Pre-construction condition survey with a full set of photographic record of the external and common areas of the buildings/structures/services that are vulnerable to vibration and settlement damage. If access to some internal areas can be gained, the condition therein should also be recorded. Recommended vibration and settlement control limits (with due consideration of the recommendations given in Appendix A and Appendix B of this practice note) and monitoring proposal. Critical locations for monitoring should be identified by the RSE and included in the monitoring proposal. Preliminary appraisal including a vibration and settlement assessment of the stability of the structural and non-structural elements of adjacent buildings/structures/services under the expected ground-borne vibrations and ground settlements. /(d)..
2 - 2 - (d) (e) (f) If vibration control limits greater than those given in Appendix A are to be adopted, a detailed assessment of the magnitude of the ground-borne vibrations generated by the piling operations should be made. Under such circumstances, reference could be made to Technical Note 142 published by CIRIA of the UK for such assessment or to any other relevant references acceptable to the BA. Consideration should also be given to the cumulative effects from the driving of all piles at the site. The structural stability of all adjacent buildings/structures/services due to the effects of ground-borne vibrations in item (c) above should also be appraised by detailed engineering analyses. A monitoring proposal to monitor the movements of adjacent grounds and buildings/structures/services. If the site is situated close to buildings/structures/services that are vulnerable to damage caused by the piling operations, a trial pile proposal to confirm the accuracy of the vibration and settlement assessments and the effects of the pile driving operations on adjacent buildings/structures/services (see paragraphs 7 to 8 below). Required actions from the RSE prior to consent application for piling works 4. Prior to consent application, the RSE is required to confirm with the Registered Specialist Contractor (RSC) the method of construction including the maximum number of piles to be driven concurrently and the relevant details of the construction plants. In case there are changes from the approved details, the RSE should submit an amendment plan together with a re-assessment of the ground-borne vibrations and ground settlements and, if necessary, revise the appraisal report for item 3(c) above. Final reports for items 3(b) & (c) above shall be submitted together with the amendment submission. 5. It should be noted that certain types of piles installed by percussive/vibratory equipment may cause significant damage to vibration sensitive buildings/structures/services such as those mentioned in Appendix A of this practice note. Such method will not normally be accepted by the BA unless it can be satisfactorily demonstrated to the BA by means of trial piling as described below. Prior to the installation of the trial piles, precautionary measures such as the provision of shoring for temporary support to cracked structural members of adjacent buildings may need to be provided. Trial /Test Pile(s) for Vibration and Settlement Control 6. If the adjacent buildings/structures/services are not vulnerable to the effects of vibration from the pile driving operations, the magnitude of ground-borne vibrations and ground settlements as assessed at item 3(b) or the re-assessed values at paragraph 4 above, as appropriate, can be verified during the driving test of piles. Ground-borne vibrations should be measured during the driving of the test pile(s) as /detailed..
3 - 3 - detailed in paragraph 8 below and the associated settlements recorded upon the completion of the test. The RSE will be required, under BO section 17 and in accordance with the Code of Practice for Site Supervision to provide quality supervision of the pile driving works to ensure that the allowable limits of the ground-borne vibrations and ground settlements will not be exceeded. The effects of the pile driving operations on the adjacent buildings/structures/services should also be assessed by the RSE during the driving of the test pile(s). 7. In cases where buildings or structures that are particularly vulnerable to the effects of vibration, such as declared monuments or masonry buildings, are in the proximity of the piling site, the AP/RSE should submit for approval a trial pile proposal to confirm the magnitude of ground-borne vibrations assessed at item 3(b) or the re-assessed values at paragraph 4 above, as appropriate, at each critical ground condition where generation of maximum ground-borne vibrations will be expected (usually at the highest founding level/obstruction at shallow depth/interbedded strata of rock and soil). The number of such trial pile(s) would depend on the actual site condition in particular for very large construction site. The RSE will be required, under BO section 17 and in accordance with the Code of Practice for Site Supervision to provide quality supervision of the pile driving works to ensure the allowable limits of the ground-borne vibrations will not be exceeded. 8. For the vibration monitoring of trial/test pile(s), the maximum ground-borne vibrations, measured in terms of peak particle velocity (ppv), should be recorded at every meter length of penetration of pile, at final set and at levels where obstructions are encountered. The monitoring readings should be taken by a properly calibrated device under the direction of the RSE with the agreement of the BA. If the measured ground-borne vibrations have been found to exceed the allowable values or if damage to either the structural or non-structural elements of the adjacent buildings/structures/services has been observed, all pile driving operations should be stopped and the agreed precautionary measures referred to at item 4(o) of PNAP APP-18 should be reviewed and revised as necessary, and submitted by the RSE to the BA for agreement. The suspended pile driving operations should not be resumed without the prior agreement of the BA. 9. A condition survey of all adjacent buildings/structures/services should be carried out after the completion of the trial piles for confirmation of the effects of the pile driving operations. Two sets of trial piling report on ground-borne vibrations and ground settlements and their effects on adjacent buildings/structures/services should be submitted to the BA for consideration prior to the application for consent to the commencement of the driving of the working piles. 10. To address the concerns of the occupants of adjacent buildings affected by the vibrations of pile driving operations, the AP/RSE/RSC are advised to formulate a Public Relations Plan (PR Plan), setting out the actions to be carried out before and after the commencement of the pile driving operations. Guidelines on the PR Plan are given in Appendix C of this practice note. The purpose of the PR Plan is to put in place a system to notify in advance the nearby occupants of the forthcoming pile driving /operations,..
4 - 4 - operations, to facilitate communication between the affected occupants and the contractor, to minimize possible complaints, and to enable the AP/RSE/RSC to handle complaints in a timely and effective manner. The RSE is advised to submit the PR Plan to the BA for agreement prior to the commencement of pile driving operations. Required actions from the RSE during the pile driving operations 11. The RSE is required to submit the related works programme of the pile driving operations setting out clearly the types and duration of the major vibration-generating construction activities to the BA prior to the commencement of pile driving operations. The supervision of the monitoring works should be provided in accordance with the Code of Practice for Site Supervision. The RSE should review the site situation from time to time and if found necessary, suspend the pile driving operations, revise the precautionary measures and/or vibration monitoring proposal and submit them to the BA for agreement prior to the resumption of the pile driving operations. Reference shall be made to item 4(k) of PNAP APP-18. Requirements for controlling vibrations and settlements arising from site formation and excavation and lateral support works 12. The installation of temporary pile walls such as steel sheet piles, pipe piles or steel channel plankings are often included in the site formation and excavation and lateral support works. Such temporary pile walls, if installed by percussive or vibratory methods, are likely to generate vibrations and settlements that may cause damage to adjacent buildings/structures/services, particularly those that are vulnerable to vibrations. Excessive vibrations are also likely to be experienced during the removal of underground obstructions. Guide values on limits of vibration and ground settlements are given in Appendices A and B respectively to this practice note. A detailed vibration and settlement monitoring proposal on all adjacent buildings, structures, land, streets or services should be included in the site formation or excavation and lateral supports plans to be submitted to the BA for approval/acceptance. If there are vibration sensitive buildings in the proximity of the site, a test pile proposal to confirm the accuracy of the vibration assessments and effects of the piling works on adjacent buildings/structures/services shall be included in the plans for the approval/acceptance of the BA. The AP/RSE/RGE will be required, under BO Section 17 and in accordance with the Code of Practice for Site Supervision to provide quality supervision of the piling works. Ref. : BD/GP/BREG/C/36 ( AU Choi-kai ) Building Authority This PNAP is previously known as PNAP 289 First issue May 2004 This revision February 2012 (AD/NB2) (General revamp and appendices B & C added)
5 Appendix A (PNAP APP-137) Vibration Measurement and Recommended Ground-borne Vibration Limits Resulting from Piling and Similar Operations Vibration measurement The effect of ground-borne vibration from piling works on adjacent structures should be assessed by the maximum peak particle velocity (ppv). The maximum ppv should be evaluated from the peak particle velocities at three orthogonal axes measured at ground levels of the structures in question. All such measurements should be made by properly calibrated device and under the supervision of the RSE or his representatives. Recommended Ground-borne vibration limits 2. For the detailed assessment of the effects of ground-borne vibrations on adjacent buildings/structures/services, an engineering analysis should be carried out. Reference could be made to BS 7385 Part 1 : 1990 or similar references. 3. In the absence of an engineering analysis, the following empirical guidelines may be used for reference : Type of building Robust and stable buildings in general Vibration-sensitive/ dilapidated buildings Guide values of maximum ppv (mm/sec) Transient Vibration (eg. Drop hammer) Continuous Vibration (eg. Vibratory hammer) The above guide values of maximum ppv are suggested to give minimal risks of vibration-induced damage. Due attention should also be paid to sensitive buildings close to the piling site such as hospitals, academic institutes, declared monuments, old buildings with shallow foundations, old tunnels/caverns, buildings installed with sensitive equipment, masonry retaining walls or sites with history of instability, monuments or buildings with historical significance etc. A more stringent control on the allowable limit of ppv for these buildings may have to be specified based on site and building conditions together with the duration and frequency of the exciting source. 5. The AP/RSE/RGE is also required to fulfill the requirements imposed by other government departments. 6. For vibration impacts on existing railway and related structures, technical requirements given in PNAP APP-24 may be useful. (Rev. 2/2012)
6 Recommended Ground Settlement Limits Resulting from Piling and Similar Operations Appendix B (PNAP APP-137) Ground movements. The ground movements arising from pile driving and similar operations depend on several factors including installation method, construction sequence, sub-soil geology, groundwater conditions, layout of the piling works and workmanship. Excessive ground movements in the vicinity of the pile driving and similar operations may be detrimental to adjacent buildings or structures, especially those supported by shallow foundations, piles with inadequate lateral resistance or foundations with inherently low factors of safety. Tolerable ground settlement limits 2. As different structures will have different tolerance in accommodating movements of their foundations, acceptance of estimated ground settlements should be considered on a case-by-case basis with respect to the integrity, stability and functionality of the supported structures. 3. Provided that there are no particularly sensitive adjacent buildings, structures and services, the following may be taken as the AAA trigger values in accordance with item 4(k) of PNAP APP- 18 for reference purpose: Instrument Criterion Alert Alarm Action Ground settlement marker Total settlement 12mm 18mm 25mm Services settlement marker Total settlement & Angular distortion 12mm or 1:600 18mm or 1:450 25mm or 1:300 Building tilting marker Angular distortion 1:1000 1:750 1:500 Remarks : The Action Level response actions should be taken if any of the following criteria occurs: Any monitoring station has a reading reaching the serviceability limit which is defined as the maximum calculated movements estimated in the design or the maximum allowable movement or response of the adjacent ground, groundwater regime, structures and services, or in the absence of calculation, the empirical limits given in table above, whichever is applicable. Undue settlement as indicated in any check points (e.g. an increase of 5mm between two consecutive daily readings). Sign of distress or damages observed in any adjacent structures and/or services. (2/2012)
7 Appendix C (PNAP APP-137) Guidelines on Public Relations Plan (PR Plan) A PR Plan should include the following information : i) Background of the project, including list of vibration-generating construction activities and its tentative construction programme; ii) iii) iv) Details of AP, RSE, RGE and RSC of the project; Organization chart including the appointment of a PR Officer; Objectives of the PR Plan; v) List of concerned groups (eg Owners Corporation, Mutual Aid Committee, District Council etc.); vi) vii) viii) ix) List of vibration sensitive buildings/structures/services; List of public relation activities (e.g. briefing session; posting notices; issuing notifications on works programme etc.); List of telephone hotlines and contact persons for public enquiries; and Complaint handling system to resolve complaints or incidents in timely and effective manner. (2/2012)
Demolition Works Measures for Public Safety
Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-21 Buildings Department Practice Note
Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc)
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-57 Requirements for an Excavation and Lateral Support Plan Building
Design and Construction of Cantilevered Reinforced Concrete Structures
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures
Practice Note for Authorized Persons, Buildings Department Registered Structural Engineers and APP-13 Registered Geotechnical Engineers
Practice Note for Authorized Persons, Buildings Department Registered Structural Engineers and APP-13 Registered Geotechnical Engineers Submission of Certificate of Completion of Building Works Application
Site Auditing for Building Works. This practice note provides details of the strategy on auditing building works by the Buildings Department (BD).
Buildings Department Practice te for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers ADM-18 Site Auditing for Building Works Introduction This practice note provides
Water Supply and Wells
Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-4 Buildings Department Practice Note
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire
CODE OF PRACTICE FOR SITE SUPERVISION 2009
CODE OF PRACTICE FOR SITE SUPERVISION 2009 i FOREWORD The Supervision Plan System has been implemented since December 1997 with the issuance of the Technical Memorandum for Supervision Plans (the Technical
Buildings Department Practice Note for Registered Contractors 38. Registration of General Building Contractors and Specialist Contractors
Buildings Department Practice Note for Registered Contractors 38 Registration of General Building Contractors and Specialist Contractors This practice note covers solely the registration of general building
Application for Registration as Authorized Persons, Registered Structural Engineers, Registered Geotechnical Engineers and Registered Inspectors
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-7 Application for Registration as Authorized Persons, Registered Structural
Computer Programs for Use in Structural and Geotechnical Design
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers ADM-6 Computer Programs for Use in Structural and Geotechnical Design An
Guidance Notes for Applicants on Registration as General Building Contractors / Specialist Contractors
Guidance Notes for Applicants on Registration as General Building Contractors / Specialist Contractors Sections 8, 8A, 8B, 8C, 8D, 8E and 8F of the Buildings Ordinance (BO) govern the current contractors
Terms of Reference for Vibration Monitoring of Quarry Blasting. Public Consultation
Terms of Reference for Vibration Monitoring of Quarry Blasting Public Consultation 1 Terms of Reference for Vibration Monitoring of Quarry Blasting 1. Introduction Malta has a number of quarry operators
Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets
Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets January 2011 Edition All rights reserved. No part of this publication
CCE-TRK-SPN-010 Specification for Movement Monitoring of Railway Track
Reference No. CCE-TRK-SPN-010 Version 1.0 Operative Date 02/08/2011 Status LIVE Prepared by Nick West, Colin Hedderly Checked by Cathal Mangan Approved by Éamonn Ballance CCE DEPARTMENT TECHNICAL SPECIFICATION
Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
Geotechnical Building Works (GBW) Submission Requirements
Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.
JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management
JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project
Construction and Demolition Waste
Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers ADV-19 Buildings Department Practice Note
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction
GUIDE TO TRENCH EXCAVATIONS (SHORING SUPPORT AND DRAINAGE MEASURES)
GUIDE TO TRENCH EXCAVATIONS (SHORING SUPPORT AND DRAINAGE MEASURES) Utilities Technical Liaison Committee HIGHWAYS DEPARTMENT and Geotechnical Engineering Office CIVIL ENGINEERING DEPARTMENT THE GOVERNMENT
REQUIREMENTS RESPECTING THE SECURITY OF OFFSHORE FACILITIES
REQUIREMENTS RESPECTING THE SECURITY OF OFFSHORE FACILITIES Definitions 1. In these requirements: C-NLOPB means the Canada-Newfoundland and Labrador Offshore Petroleum Board; Chief Safety Officer means
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF
WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE
WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water
Smart Meters Programme Schedule 8.6. (Business Continuity and Disaster Recovery Plan) (CSP North version)
Smart Meters Programme Schedule 8.6 (Business Continuity and Disaster Recovery Plan) (CSP North version) Schedule 8.6 (Business Continuity and Disaster Recovery Plan) (CSP North version) Amendment History
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
SECTION 02401 SHEETING, SHORING AND BRACING
SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
Settlement & Vibration Monitoring for Transmission Line Foundation Installation
Settlement & Vibration Monitoring for Transmission Line Foundation Installation R. Heath Forbes, P.E. S&ME, Inc. William M. Camp, III, P.E. S&ME, Inc. Presented By: Heath Forbes, P.E. Project Engineer
BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
PROPOSAL FOR CONTRACTORS ALL RISKS
PROPOSAL FOR CONTRACTORS ALL RISKS 1. Title of contract (If project consist of several sections, specify section(s) to be insured) 2. Location of site Country/Province/district City/town/village 3. Name
Anirudhan I.V. Geotechnical Solutions, Chennai
Anirudhan I.V. Geotechnical Solutions, Chennai Often inadequate In some cases, excess In some cases, disoriented Bad investigation Once in a while good ones Depends on one type of investigation, often
Monitoring Ground Vibration arising from Piling and Civil Engineering Projects
Monitoring Ground Vibration arising from Piling and Civil Engineering Projects By Andy Maslin of Accudata Limited May 2004 (Revised May 2015) 1. Introduction 2. Units of Measurement 3. Instrumentation
Chapter 4 Section 2 - Emergency Excavation Permit Administration Procedure
Chapter 4 Section 2 - Emergency Excavation Permit Administration Procedure 1.0 Introduction 1.1 Under section 10C of the Land (Miscellaneous Provisions) Ordinance (LMPO), the Director of Highways (DHy)
Building over or close to a public sewer
Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000
Federation of Piling Specialists
Federation of Piling Specialists COMPANY NAME CONTRACT NAME TENDER REF SCHEDULE OF ATTENDANCES AND FACILITIES TO BE PROVIDED BY THE CLIENT TO A STEEL SHEET PILING SPECIALIST For the purposes of this document
Building Approval Process
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers ADM-19 Building Approval Process Introduction The Buildings Department (BD)
FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012
FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 Building and Housing has published technical guidance for foundation repairs and reconstruction for residential properties in green zone Foundation Technical
WHOLE FIRM COMPLIANCE REVIEW GENERAL COMPLIANCE REVIEW CHECK LIST
WHOLE FIRM COMPLIANCE REVIEW GENERAL COMPLIANCE REVIEW CHECK LIST This checklist has been designed to make it relevant to most firms. However, you should consider carefully whether the points raised are
Personal Data (Privacy) Ordinance and Electronic Health Record Sharing System (Points to Note for Healthcare Providers and Healthcare Professionals)
Personal Data (Privacy) Ordinance and Electronic Health Record Sharing System (Points to Note for Healthcare Providers and Healthcare Professionals) The Electronic Health Record Sharing System Ordinance
Application for Approval of Overseas Inspection Agency for Pressure Vessels
Occupational Safety and Health Division 18 Havelock Road #03-02 Singapore 059764 Tel: 64385122 www.mom.gov.sg [email protected] Application for Approval of Overseas Inspection Agency for Pressure Vessels
REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE
ATTACHMENT 9 REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE Requirements 1 The Professional Engineers Board will register a candidate as a professional
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL
QUESTIONNAIRE AND PROPOSAL FOR CONTRACTORS ALL RISK INSURANCE
GA Insurance House, Ralph Bunche Road, P O Box 42166-00100 Nairobi, Kenya. Telephone: 2711633 Fax 2714542 E-mail: [email protected] QUESTIONNAIRE AND PROPOSAL FOR CONTRACTORS ALL RISK INSURANCE AGENT:
Specific amendments to the Capacity Allocation and Congestion Management Network Code
Annex: Specific amendments to the Capacity Allocation and Congestion Management Network Code I. Amendments with respect to entry into force and application The Network Code defines deadlines for several
Professional Engineers Providing Structural Engineering Services In Buildings
GUIDELINE Professional Engineers Providing Structural Engineering Services In Buildings 1995 Published by Association of Professional Engineers of Ontario Revised 12/11/98 CONTENTS INTRODUCTION...3 PART
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
SERVICES 2015 ISO 18001
SERVICES 2015 A family business with a solid foundation of experience, we handle all aspects of site investigation.... Phase 1 Environmental Studies Phase 2 Intrusive Investigations Phase 3 Remediation
ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)
ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:
A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society
(Rev.0 July 2009) (Rev.1 June 2012) (Rev.2 Oct 2013) (Rev.3 Jan 2015) (Rev.4 July 2015) (Rev.5 Jan 2016) Procedure for Transfer of Class TABLE OF CONTENTS Procedure for Transfer of Class Application Definitions
There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.
Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,
CONTRACTORS ALL RISKS INSURANCE PROPOSAL FORM CONTRACTORS ALL RISKS INSURANCE PROPOSAL FORM
Allied Cooperative Insurance Group (ACIG) شركة املجموعة املتحدة للتاأمني التعاوين ) أ سيج( CONTRACTORS ALL RISKS INSURANCE Call us: 920012331 www.acig.com.sa CONTRACTORS ALL RISKS INSURANCE UCONTRACTORS
DNV GL Assessment Checklist ISO 9001:2015
DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization
BUILDERS RISK / WRAP-UP LIABILITY APPLICATION
BUILDERS RISK / WRAP-UP LIABILITY APPLICATION Please complete the General Information section for All Projects and specific sections for Wrap-Up Liability and Builders Risk for each coverage as required.
Contract Works. Proposal Form
Proposal Form Contract Works Specified Contract Works and Legal Liability Arranged through ASR Underwriting Agencies Pty Ltd Underwritten by Certain Underwriters at Lloyd s IMPORTANT NOTES TM PLEASE READ
90 Brighton Road, Surbiton, Surrey
90 Brighton Road, Surbiton, Surrey Civil and Structural Engineering Basement Feasibility Report Mixed Use Scheme 108802-REP-002 March 2015 Contents 1. Executive Summary... 3 2. Site Description and Constraints...
SACOS INSURANCE COMPANY LTD
SACOS INSURANCE COMPANY LTD P.O Box 636 Republic of Seychelles Telephone: 295000 Fax: 224495 E-mail: [email protected] Website: www.sacos.sc YOU SHOULD FULLY AND FAITHFULLY GIVE THE FACTS YOU KNOW OR
PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM ARCHITECTS AND CONSULTING ENGINEERS PROJECT COVER
PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM ARCHITECTS AND CONSULTING ENGINEERS PROJECT COVER I. General data Name of firm. Address of head office. Address of branch office(s) and name(s) of resident
ORI Gu idel in es f o r Inst it u t ion s an d Wh ist l eblow e rs: (November 20, 1995)
ORI Gu idel in es f o r Inst it u t ion s an d Wh ist l eblow e rs: Responding to Possible Retaliation Against Whistleblowers in Extramural Research (November 20, 1995) I. INTRODUCTION The Office of Research
PUBLIC SERVICE ACT 2005. An Act to make provision in respect of the public service of Lesotho and for related matters. PART I - PRELIMINARY
PUBLIC SERVICE ACT 2005 An Act to make provision in respect of the public service of Lesotho and for related matters. Enacted by the Parliament of Lesotho Short title and commencement PART I - PRELIMINARY
Tunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
Document Comparison. AIA Documents A134 2009 and A131CMc 2003
Document Comparison AIA Documents A134 2009 and A131CMc 2003 AIA Document A134 2009 is in the right-hand column. Corresponding sections of AIA Document A131 CMc 2003 are in the left-hand column. Sections
Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
Code of Practice for Agents Undertaking Renovation Grants
Code of Practice for Agents Undertaking Renovation Grants July 1998 Contents Introduction Page 1 Approved List of Agents Page 1 Procurement Page 2 Approval Page 5 Works in Progress Page 6 Completion Page
Statutes in translation Please note that this translations are not official translations. The translation is furnished for information purposes only
Statutes in translation Please note that this translations are not official translations. The translation is furnished for information purposes only and the documents are not legal documents. The texts
Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014
for Inspecting and Certifying Buildings and Works Building Control Regulations 2014 February, 2014 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1 1.3 Application
THE JOINT CODE OF PRACTICE FOR RISK MANAGEMENT OF TUNNEL WORKS IN THE UK
MASTER 07/09/03 JCoP 9/9/03 8:42 am Page 1 Logo t/c Published by: The British Tunnelling Society THE JOINT CODE OF PRACTICE FOR RISK MANAGEMENT OF TUNNEL WORKS IN THE UK Prepared jointly by The Association
First Fix Leak Repair Scheme
Irish Water First Fix Leak Repair Scheme For Domestic Water Customers CER Consultation Public Submissions: Irish Water Response Submission to the CER Reg_PP_IW_FFLRS_003 31/07/15 1 Introduction This document
Working together. to prevent cable damage. a partnership for reliable and quality power
Working together to prevent cable damage a partnership for reliable and quality power contents introduction...1 cable damage can be prevented...2 3 how you can help...4 7 good practices to do it right...8
GUERNSEY FINANCIAL SERVICES COMMISSION
GUERNSEY FINANCIAL SERVICES COMMISSION LICENCE APPLICATIONS FOR ENTITIES ACTING IN RESPECT OF QUALIFYING INVESTOR FUNDS OR REGISTERED CLOSED-ENDED INVESTMENT FUNDS GUIDANCE In recent years, the Commission
REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale
REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale Report
Practice Notes in Force
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers ADM-1 Practice Notes in Force The Building Authority (BA) issues practice
Lighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: [email protected] Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011
BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under
Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011
Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial
PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1
City of Orem FLOOD DAMAGE PREVENTION 10-1-1 CHAPTER 10. Article 10-1. Article 10-2. Article 10-3. Article 10-4. Article 10-5. FLOOD DAMAGE PREVENTION Purposes Definitions General Provisions Administration
CIVL451. Soil Exploration and Characterization
CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally
Guidance Notes for Applicants of the Certificate for Clinical Trial on Medical Device
Guidance Notes for Applicants of the Certificate for Clinical Trial on Medical Device List of Contents Page 1. Introduction 1.1 The Medical Device Administrative Control System and the 3 proposed legislation
1 RCNY 101-07 CHAPTER 100
1 RCNY 101-07 CHAPTER 100 Subchapter A Administration 101-07 Approved Agencies. (a) Definitions. For the purposes of this section, all terms used herein shall have the same meanings as set forth in the
EVENT SAFETY MANAGEMENT PLAN. A Small/ Medium Scale Event
EVENT SAFETY MANAGEMENT PLAN For A Small/ Medium Scale Event To be held at Location: Date: CONTENTS Section Page INTRODUCTION 1 1.0 Event Details 2 1.1 Event Overview & Location 1.2 Event Schedule & Timings
California Department of Public Health Drinking Water Program. TMF Assessment Form. ASSESSMENT TYPE: Funding Project New System Change of Ownership
California Department of Public Health Drinking Water Program TMF Assessment Form ASSESSMENT TYPE: Funding Project New System Change of Ownership WATER SYSTEM CLASSIFICATION: Community Water System Nontransient
Amenity Features. encouraging efficient and effective building management; enhancing the quality of life for residents and users;
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-42 Amenity Features Amenity features are loosely defined as those elements
COLLECTIVE INVESTMENT SCHEMES ACT 2008 COLLECTIVE INVESTMENT SCHEMES (REGULATED FUND) REGULATIONS 2010
Statutory Document No. 161/10 COLLECTIVE INVESTMENT SCHEMES ACT 2008 COLLECTIVE INVESTMENT SCHEMES (REGULATED FUND) REGULATIONS 2010 1 Title 2 Commencement 3 Interpretation INDEX THE GOVERNING BODY 4 Composition
OSWER OSWER OSWER DIRECTIVE DIRECTIVE DIRECTIVE
United States Environmental Protection Agency Office of Solid Waste and Emergency Response DIRECTIVE NUMBER: 9650.12 TITLE: Suggested Procedures For Review Of State UST Applications DATE: May 1992 ORIGINATING
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum
Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation
WDC 14-056 - Whakatane Central Business District Geotechnical Investigation
WDC 14-056 - Whakatane Central Business District Geotechnical Investigation Data Delivery Report Simon Henderson 11/4/2014 Site investigation relating to the ground investigation of the Whakatane central
Project Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services
Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services January 2010 Contents Project Management Page Local Decontamination Units (LDUs) Construction Project Management...3
Review Plan. F-4 Channel Rehabilitation. Tropicana and Flamingo Washes, Clark County, Nevada for Plans and Specification
Review Plan F-4 Channel Rehabilitation Tropicana and Flamingo Washes, Clark County, Nevada for Plans and Specification June 2015 (THIS PAGE LEFT INTENTIONALLY BLANK) Review Plan F-4 Channel Rehabilitation
Professional Indemnity Insurance Architects and Consulting Engineers Single Project Cover
Professional Indemnity Insurance Architects and Consulting Engineers Single Project Cover Proposal Form ADNIC is a Public Joint Stock Company incorporated in the United Arab Emirates by Law No. (4) of
PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS
PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS Jan 2012 CONTENTS GENERAL... 1 1 Background... 1 2 Qualifications and Expectations of Structural Engineers... 1
FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements
GHTF/SG4/N28R4:2008 FINAL DOCUMENT Title: Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Authoring Group: GHTF Study Group 4 Endorsed by: The Global Harmonization