1 Permits to Dig / Permits to Excavate / Permits to work near underground services Aim and purpose The aim of this guidance is to identify what should be included in a permit to excavate / dig and additional items which are best practice to further improve controls in avoiding underground services. The purpose of any permit to excavate/dig is to make sure that: a) people are protected from harm b) underground services are protected c) people methodically follow the correct steps d) roles and responsibilities are correctly defined and understood e) contents and restrictions defined in the permit are properly discussed and communicated to all people involved in the excavation activity. 1) People who should be involved in the permit process The following people should be either involved in the issue, acceptance, monitoring or working under the control of the permit to excavate: a) The Issuer (a competent service coordinator) b) The Acceptor (a competent team leader or ganger) c) The Machine Driver and Banksman (need to be aware of service locations to prevent damage) d) The other Working Gang/Team members (need to be briefed on the hazards associated with the excavation works and the proximity of services and protection requirements and exclusion zones) e) The Supervisor and Manager (need to ensure compliance with the permitting regime and challenge non-conformances) f) Client representatives / third party owners (where they are involved in supervision or isolations) g) Other Contractors who may be working in the same excavation BPAUS 06 Version 01 November 2013 Page 1 of 5
2 2) Management and Issuing of Permits Suggested behaviours around permit issue and working The following active and positive behaviours by Management (including supervisory levels) and Personnel involved in excavation activities and working in close proximity to underground and overhead services should be encouraged: Permits must be completed and issued in the location in which they apply and not in a remote site office Only competent personnel should issue and accept a permit to excavate The issuer should actively engage with the Acceptor, Machine Driver, Banksman and other site personnel and involve them in identifying services, marking out and identifying trial holes during the permit issue stage The Issuer should walk the full excavation route with the Acceptor, Machine Driver and Banksman before permit issue to identify services covered by the permit Permits must not be allowed to overrun Where the activity or the scope changes significantly work must stop and a permit to excavate/dig should be re-issued All permits should be cancelled and handed over by the Issuer and Acceptor All gang/team members should sign the permit to confirm understanding and receive an appropriate briefing by the Issuer even when they join the team after the first day of the activity, i.e. not part of the work gang at the initial briefing All hold points stated on the permit must be followed and completed where actions or information are not evident or available at time of issue Management should regularly monitor compliance with the permit issue and acceptance system and challenge where non-compliance is evident 3) Permit requirements to manage isolations The permit should identify any isolated services and whether these have been arranged and completed. Where services are to be isolated the permit should either: Confirm that these isolations have either been completed give clear instructions as to the arrangements for isolation and any limitations on working practices prior to isolation Following works communicate with asset owner who undertook isolation to advise that restoration can be undertaken. OR BPAUS 06 Version 01 November 2013 Page 2 of 5
3 4) Suggested permit content A Permit should normally contain the following, and organisations should identify the appropriate place for Hold Points which will require positive confirmation prior to any work continuing. Permits should: Be in duplicate or triplicate formats to ensure that those who need copies have them Include the geographical area (Site/Section of works) to which the permit relates Clearly state date and time of issue, review / expiry date Confirm who the Issuer and Acceptor are and their designations Be issued by a competent person e.g. Appointed Services Coordinator Be accepted by a competent person who is responsible for the day to day supervision of the excavation work (e.g. a Team Leader/Ganger) Clearly state what methodology is being authorised e.g. breaking of surface, excavation, driving of steel sheets for excavation support, driving of piles, auger bore, horizontal directional drilling, etc. Cross reference whether they are to be used in conjunction with other permits, e.g. Confined space, Electrical, Drilling and tapping, Cutting, Temporary Works, Hot Works, etc., and are to be reviewed to ensure that they do not conflict with those permits. Specify the requirements for trial holes to be dug where appropriate Confirm that a full cable and pipe avoidance tool and frequency generator scan has been completed and services identified including visual surveys Confirm the requirements for re-scanning using the full range of modes of the cable and pipe avoidance tool and frequency generator, e.g. at least every 300mm during excavation works Confirm that located services are correctly marked and exclusion zones indicated (refer to section 5) Confirm that all utility and 3 rd party (e.g. oil pipelines) drawings are, available in colour (where applicable), within 3 months of date of issue from Owner, clear to read, have any associated cross sections provided and copies are provided to all relevant site personnel to ensure that where shared works are undertaken each team has a copy. The permit should be discussed by all people involved in the work activity. Briefings to plant operators and operatives to include control measures to be applied to exposed underground services. The briefing should provide the opportunity to discuss these controls and arrangements. (Refer to section 6 for the suggested checklist) BPAUS 06 Version 01 November 2013 Page 3 of 5
4 Identify and confirm that Service Providers have been contacted reference isolations and diversions where applicable and that the necessary arrangements have been made Identify critical high risk services, i.e. Medium, Intermediate and High Pressure gas pipelines, HV & EHV cables, Oil Pipelines, Overhead Cables and the associated safe systems of work either referenced or detailed. Where Utility and 3 rd Party Owners are required to be present during works this should be detailed on the permit Specify the control measures associated with the protection of any known cables or services in poor condition or which require support. Cross-reference Risk Assessments and safety Method Statements (RAMS) applicable to work around high risk services (and be attached to the permit) 5) The additional items are best practice and could be included in permit formats: Permits should not last longer than necessary, e.g. 1 week (shorter where there is likelihood of change of conditions) Stipulate that service prints are 1:500 for green field sites and 1:250 for congested sites Attach relevant work area sketches The use of a hazard diagram showing all underground service and 3 rd party apparatus locations and other associated hazards, i.e. substations, overhead cables, etc. The permit should identify the diameter of exclusion zones and the excluded plant and equipment. A zone plan should be attached to the permit to confirm which type of tools can be used to what proximity of each service to be encountered Whether under pressure drilling is required to identify the service and confirm whether the service is de-pressurised to allow work on the pipeline to proceed. This could result in the introduction of a permit to cut Record the calibration dates of the cable and pipe avoidance tool and frequency generator equipment (or other location equipment) to be used Machine Drivers/Banksman to sign and confirm acceptance of the permit controls Include compliance monitoring within the permit, i.e. the Issuer signs the permit to confirm that its requirements are continuing to be met. BPAUS 06 Version 01 November 2013 Page 4 of 5
5 6) Application of safety margins (proximity zones) Where congestion of underground services renders the 0.5m safety margin impracticable or where surface obstructions limit the space available the safety margin may be reduced but only if; 1) A safe method of work has been agreed with the asset owner and is documented in a site specific risk assessment, e.g. use of air lance and suction excavator, and 2) The cable has been exposed by hand digging under the surface to be broken out and is at a safe depth (at least 300mm) and 3) Physical precautions have been taken to prevent the tool striking the cable Refer to HS(G) 47 (page 25) for further details and guidance regarding protection zones. 7) Suggested 6 point checklist for Operatives and Machine Drivers/Banksman to sign: 1) Have you been briefed on the method statement and permit to excavate for this work? 2) Do you have accurate up to date drawing(s) of the site showing the location of all the services in the area, a key or legend, and the boundaries of your working area defined as well as a copy of the permit and RAMS? 3) Have you been shown the location of the existing services and have you been told of the safety zone for each service? 4) Can you see the service markings and are the critical high risk services adequately protected? 5) Do you know what equipment you can use and how close you can get to each service with it? 6) Have you had an opportunity to ask any questions and are you confident that you can carry out your work safely? BPAUS 06 Version 01 November 2013 Page 5 of 5
How To Safely Dig For Natural Gas
PNG DIAL B4-U-DIG book_final_nu 5/1/05 3:24 PM Page 2 Phoenix Natural Gas,197 Airport Road West, Belfast BT3 9ED. Tel. 08454 55 55 55. www.phoenix-natural-gas.com PNG DIAL B4-U-DIG book_final_nu 5/1/05
DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A TREATED WATER STORAGE POINT ON THE WATER NETWORK
ISOLATION OF A TREATED WATER STORAGE POINT ON Document Title: Document Reference: Work Instruction Isolation of a Treated Water Storage Point on the Water Network DOM-WN-WIN-00000301 Approved By: Asset
Excavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
EARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA
DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA Ensuring the Highest Level of Public, Worker and Community Safety with Effective Legislation for Damage Prevention / Protection of Buried Infrastructure
NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected]. Task Number Item Date(s) Recorded By
NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected] PIPELINE MAINTENANCE On-the-Job Training Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY This is
CHECKLIST FOR CARRYING OUT EXCAVATION AND PILING WORKS IN CHANGI/SELETAR AIRPORT
Attachment A9 CHECKLIST FOR CARRYING OUT EXCAVATION AND PILING WORKS IN CHANGI/SELETAR AIRPORT Objective: To locate and trace all underground services, both charted and uncharted, before commencement of
The Delivery Hub health, safety and environment Raising the bar 9 Underground service avoidance
Safe roads, reliable journeys, informed travellers The Delivery Hub health, safety and environment Raising the bar 9 Underground service avoidance Issued July 2013 Revised January 2015 An executive agency
Hazard Identification, Risk Assessment and Control Procedure
Hazard Identification, Risk Assessment and Control Procedure 1. Purpose To ensure that there is a formal process for hazard identification, risk assessment and control to effectively manage workplace and
Hazard Identification, Risk Assessment And Control Procedure
Hazard Identification, Risk Assessment And Control Procedure 1. Purpose 1.1 To ensure that there is a formal process for hazard identification, risk assessment and control to effectively manage hazards
Operational Control of the UKPN Low Voltage Distribution Network for EPN and LPN Regions
Operational Control of the UKPN Low Voltage Distribution Network for EPN and LPN Regions Owner Name Title Signature Steve White Head of Network Control and Operations Date 16 February 2016 Authoriser Name
Health and Safety Management Standards
Health and Safety Management Standards Health and Safety Curtin University APR 2012 PAGE LEFT INTENTIONALLY BLANK Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Health and Safety Documents...
section 5 machine guarding and lockout
section machine guarding and lockout This section covers ways to physically protect people working in and around machinery. It includes information on: machinery guards lockout systems emergency stop confined
ANNEX 2 Emergency / Pollution Incident Response Plan
ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...
Guidelines for Excavations
O c t o b e r 2 0 0 1 Guidelines for Excavations in the vicinity of gas lines Technical Standards & Safety Authority Putting Public Safety First Guidelines for Excavations in the Vicinity of Gas Lines
Procedure. Work Health and Safety General construction. Document number: PRO-00005. Description Process Owner Approved for issue. Rev no.
Procedure Work Health and Safety General construction Document number: PRO-00005 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority
Fire Safety Risk Assessment Checklist for Residential Care Premises
Checklist for Residential Care Premises Name of Premises: Address of Premises: Name of Responsible Person: What area / location does the assessment cover? Does the assessment cover the whole site YES or
High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance
Annex I To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance 1. Introduction a. These Safety
2015 HSC Information and Digital Technology Digital animation Marking Guidelines
2015 HSC Information and Digital Technology Digital animation Marking Guidelines Section I Multiple-choice Answer Key Question Answer 1 B 2 C 3 B 4 A 5 B 6 D 7 D 8 A 9 A 10 C 11 C 12 D 13 B 14 D 15 D 16
Tremline Pty Ltd trading as The Hills Bark Blower
JSA No: Rev: 10011 Date: 10010 ABN 1 07 880 6 Website: wwwbarkblowercomau Job Number Start Time: Vehicle : Max Length Hose Date: Company Name: Product: Quantities Depth Job site address: Description of
EUROPEAN INDUSTRIAL GASES ASSOCIATION
WORK PERMIT SYSTEMS IGC Doc 40/02/E EUROPEAN INDUSTRIAL GASES ASSOCIATION AVENUE DES ARTS 3-5 B 1210 BRUSSELS Tel : +32 2 217 70 98 Fax : +32 2 219 85 14 E-mail : [email protected] Internet : http://www.eiga.org
Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:
Electricity Thank you for considering for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information for your application
Life Saving Rules SAFETY BY CHOICE, NOT BY CHANCE
Life Saving Rules SAFETY BY CHOICE, NOT BY CHANCE Foreword from Kevin Reinhart The 12 Life Saving Rules are a part of Nexen s continued commitment to create a safe work environment for our employees. The
mit to Original Authorised Issue number Prepared Review date March 2014 copies up Electrified Interim Page 1 Manager National Standards
Interim Guide to Electrical Perm mit to Work ( EF201) in the Auckland Electrified Area Issue number Prepared (P) Reviewed (R) Amended (A) Approved by Authorised for release by Review date Original 22 November
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
1.1.4 The findings from Fire Risk Assessment must be incorporated into the FRAMS Action Plan to manage fire safety at each premise.
Fire Safety Policy 1.1 Policy Statement of Intent 1.1.1 Under the current UK Legislation (In England and Wales, the Regulatory Reform (Fire Safety) Order 2005, Fire (Scotland) Act 2005, Fire and Rescue
How To Retaining Wall Guide
How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra
WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES
WHS UNIT WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES Contents 1 Purpose... 1 2 Scope... 1 3 Definitions... 1 4 Responsibilities... 1 4.1 WHS Unit... 1 4.2 Auditor(s)... 1 4.3 Managers of Faculties
Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety
Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground
Golden Safety Rules booklet. No one gets hurt, no incidents
Golden Safety Rules booklet No one gets hurt, no incidents The Golden Safety Rules exist to keep you safe There s nothing more important than your safety and that of your workmates. That s why we ve adopted
WORK AT HEIGHT. STFC Safety Code No 9. Rev. 1.4, Issued April, 2015
WORK AT HEIGHT STFC Safety Code No 9 Rev. 1.4, Issued April, 2015 Note - This document may have been superseded by a more recent version. Revisions 1 Initial Launch November 2007 1.1 Amendments to training
Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time
Trial Exams C Standards and Regulations Examination No: GH-08-C- This test is intended to gauge your knowledge of essential information contained within AS/CA S009:2013. To qualify for an allpication to
ISO 9001:2015 Overview of the Revised International Standard
ISO 9001:2015 Overview of the Revised International Standard Introduction This document provides: a summary of the new ISO 9001:2015 structure. an overview of the new and revised ISO 9001:2015 requirements
HSE information sheet Industrial radiography - managing radiation risks Ionising Radiation Protection Series No. 1(rev 1)
HSE information sheet Industrial radiography - managing radiation risks Ionising Radiation Protection Series No. 1(rev 1) Introduction This information sheet is for clients and main or principal contractors
It was my assignment to physically inspect the 8 trees on site near the proposed construction,
July 11, 2013 Tariton Properties 2555 Park Blvd Palo Alto, CA 94306 Re: Tree Survey To Whom It May Concern: Assignment It was my assignment to physically inspect the 8 trees on site near the proposed construction,
Management of Lifting with Mobile Cranes
Management of Lifting with Mobile Cranes IOSH Eastern Branch 9 th December 2011 Tim Watson CPA Technical Consultant Topics Construction Plant-hire Association LOLER and Planning Lifting Operations Contract
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS
Guidance to Prevent Slips, Trips & Falls
Guidance to Prevent Slips, Trips & Falls Published June 2005 CONTENTS 1. Scope of this guidance 2. New plant/ installations 3. Maintenance 4. Housekeeping 1. Scope of this guidance Slips, trips and falls
Overview of PG&E Cross Bore Inspection Program
Overview of PG&E Cross Bore Inspection Program Presented by: Greg Scoby, PE Vice President Technical Services Frontline Energy Services [email protected] Cross Bore Unintended conflict between
LEAKING SUPPLY PIPE? YOUR GUIDE TO WATER SUPPLY LEAKS. You were out when we visited today.
LEAKING SUPPLY PIPE? YOUR GUIDE TO WATER SUPPLY LEAKS You were out when we visited today. Check the back of this leaflet to find out why we called and what happens next. NW FSM3-1/15 INTRODUCTION Helping
Guidelines for Fiber Optic Cable Permits
Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: [email protected] 14685 Avion Parkway
Utilities and existing services
Construction Services Building standards for mechanical and electrical installations Utilities and existing services October 2012 Directorate: Environment Construction Services - Building standards for
One-Call Notification Screening
Purpose Reference The purpose of this document is to share learnings with pipeline operators related to the process of receiving, analyzing, and managing notifications from the State One-call Center to
No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974
The Police Treatment Centres Health and Safety Legal Compliance Register No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 2.
Mechanical Installation
Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s
OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)
OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained
Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Table of Contents Purpose... 2 Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Associated
SAFETY and HEALTH MANAGEMENT STANDARDS
SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents
Page85. Lock-out Tag-out Plan
Page85 Lock-out Tag-out Plan Page86 Lock-out / Tag-Out Plan Table of Contents 1. Policy 2. Purpose 3. Scope 4. General Procedures 5. Application of Control Procedure 6. Release from Control Procedure 7.
2015 HSC Information and Digital Technology Web and software applications Marking Guidelines
2015 HSC Information and Digital Technology Web and software applications Marking Guidelines Section I Multiple-choice Answer Key Question Answer 1 B 2 C 3 B 4 A 5 B 6 D 7 D 8 A 9 A 10 C 11 C 12 A 13 B
AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES
overhead 23/11/04 2:28 PM Page 1 AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES ESB Code 9803203 overhead 23/11/04 2:28 PM Page 2 overhead 23/11/04 2:28 PM Page 3 Page 1 of 20
Trenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
OCCUPATIONAL HEALTH AND SAFETY REGULATION
Province of Alberta OCCUPATIONAL HEALTH AND SAFETY ACT OCCUPATIONAL HEALTH AND SAFETY REGULATION Alberta Regulation 62/2003 With amendments up to and including Alberta Regulation 284/2009 Office Consolidation
MANAGEMENT OF MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY. Senior Managers Operational Group. staff)
MANAGEMENT OF MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY Version: 3 Ratified by: Date ratified: December 2013 Title of originator/author: Title of responsible committee/group: Senior
UNIT D: REVIEW HEALTH AND SAFETY PROCEDURES IN WORKPLACES
Elements in this unit are: UNIT D: REVIEW HEALTH AND SAFETY D.1 Prepare to undertake a review of health and safety in a workplace D.2 Carry out a review of workplace health and safety implementation Unit
Safety. Vopak Fundamentals on Safety
Safety Vopak Fundamentals on Safety Introduction Every person working at a Vopak location should be able to go home at the end of the working day without having suffered or caused harm in any way. Eliminating
Lifting Equipment - Work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it.
LIFTING EQUIPMENT POLICY Background and Legislation The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) apply in all premises and work situations subject to the Health and Safety at Work,
David Hicks Consultants Ltd Industrial Roofing & Cladding Consultants
28 Orwell Drive, Aylesbury, Bucks, HP21 9JN Office: 01296 719 775 Mobile: 07980 432 848 Roof Inspection Risk Assessment & Method Statement This document is prepared to cover any type of roof construction
Schoeller Allibert Limited Job Description. Reports to: Operations Director Date of Completion. 04/05/16
Schoeller Allibert Limited Job Description Job Title. Process Manager Location: Winsford Name Department. Operations Reports to: Operations Director Date of Completion. 04/05/16 Job Purpose. To manage
Level 1 Certificate in Network Construction Operations - Gas (6028-10)
Level 1 Certificate in Network Construction Operations - Gas (6028-10) Learner logbook www.cityandguilds.com January 2013 Version 2.0 Qualification title Number QAN Level 1 Certificate in Network Construction
Information Sheet. What is a Workplace Transport Risk Assessment?
Workplace Transport Safety Risk Assessment Information Sheet This information sheet provides basic information on conducting a workplace transport risk assessment. The information is aimed at employers,
METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS
METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS Revision Date Prepared By Approved By Method Statement IF Kits BAC Corrosion Control Limited Stafford Park 11 Telford TF3 3AY Tel: 01952 290321 Fax:
Water Leakage & Your Responsibilities
Water Leakage & Your Responsibilities Information & Guidance Contents 1. Introduction 2. Who is responsible for underground pipework? 3. Who is responsible for repairing the supply pipe if there is a leak?
Procedure for Working in or around Excavations
RMS WHS Procedure: PN 066P12 (for Policy No. PN066) Procedure for Working in or around 1 of 15 Contents 1 Purpose... 3 2 Scope... 3 3 General requirements... 4 4 Definitions... 4 5 Responsibilities...
WHS Contractor Management Procedure
Procedure Approved: 09/07/2013 Next Review: 09/07/2015 1. Overview The District council of Mount Remarkable Council is committed to engaging quality Contractors who have a sound understanding and commitment
Statutes in translation Please note that this translations are not official translations. The translation is furnished for information purposes only
Statutes in translation Please note that this translations are not official translations. The translation is furnished for information purposes only and the documents are not legal documents. The texts
Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS
Australian Transport Council National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS Edition 1 Draft for comment issued 20 December 2005 Endorsed by the Australian Transport
Site inspection: Workplace transport checklist
Site inspection: Workplace transport checklist The following checklist is a guide to what employers should consider when assessing the risk from vehicles in the workplace. It may not be comprehensive for
Contents. Introduction 1. Element-1 Safety policy & organisation 2. Element-2 Safe work procedures 3. Element-3 Safety training 4
GUIDELINES ON THE IMPLEMENTATION OF SAFETY MANAGEMENT SYSTEM FOR THE METALWORKING INDUSTRY Jointly developed by: Metalworking Industry Safety Promotion Committee Occupational Safety Department and Occupational
SITE CONTRACTOR PROCEDURES
SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment
MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV
MEDIUM VOLTAGE SUBSTATION PRACTICES MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES This presentation covers some safety aspects
Sample Risk Management Policy and Procedure
Sample Risk Management Policy and Procedure 1. Purpose and Scope This policy establishes the process for the management of risks faced by [organisation]. The aim of risk management is to maximise opportunities
Sakhalin Energy Investment Company LTD. Corporate Procedure For Lifting Operations Over Live Process Areas
Classification: Unclassified Issue Purpose Issue For Use March 2006 Sakhalin Energy Investment Company LTD. Corporate Procedure For Lifting Operations Over Live Process Areas Revision: 01 The copyright
A. In this chapter, the following terms have the meanings indicated.
08.07.02.01 Title 08 DEPARTMENT OF NATURAL RESOURCES Subtitle 07 FORESTS AND PARKS Chapter 02 Roadside Tree Care Authority: Natural Resources Article, 5-209 and 5-406, Annotated Code of Maryland.01 Purpose.
Guidelines For Sealing Groundwater Wells
Guidelines For Sealing Groundwater Wells Government of Newfoundland and Labrador Department of Environment and Conservation Water Resources Management Division Government of Newfoundland and Labrador Department
HEALTH AND SAFETY MANAGEMENT
Health & Safety Services Unit name goes here Safety Code of Practice 2 Part A 5 th Edition, November 2015 Unit name goes here HEALTH AND SAFETY MANAGEMENT Organisation and Responsibilities University of
OGP Life-Saving Rules
International Association of Oil & Gas Producers OGP Life-Saving Rules Speaker support pack for the Induction presentation Report No. 459_6a, Mar 2013 Information for those responsible for the implementation
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
Application for the Alteration of a Gas Supply
Application for the Alteration of a Gas Supply SSE Enterprise Utilities is a trading name of SSE Utility Solutions Limited which is part of the SSE Group. The Registered Office of SSE Utility Solutions
Fire Risk Assessment Safety Checklist
Fire Risk Assessment Safety Checklist This checklist has been prepared to help you comply with The Regulatory Reform Fire Safety Order 2005 What is the Regulatory Reform (Fire Safety) Order 2005? The Regulatory
SAFETY AND HEALTH PROGRAM
PROGRAM NUMBER NO. PAGES 05-005 10 REVISION ISSUE DATE Revision 2 11/1/2005 SAFETY AND HEALTH PROGRAM Confined Space Entry 1.0 INTRODUCTION Confined Space Entry is a serious workplace hazard, capable of
PROCEDURES PREVENTION OF ACCIDENTAL IGNITION
Page No: 1 of 7 6.0 PURPOSE (192.751) All possible precautions shall be exercised to prevent the accidental escape and ignition of gas. Whenever possible, potential sources of ignition should be eliminated
GUIDE TO IMPLEMENTING A REGULATORY FOOD SAFETY AUDITOR SYSTEM
GUIDE TO IMPLEMENTING A REGULATORY FOOD SAFETY AUDITOR SYSTEM FEBRUARY 2016 2 Contents Introduction... 4 Scope and objectives... 5 Scope... 5 Objectives... 5 Responsibilities... 5 The role of the licensee
Excavation Safe Working Practices
Excavation Safe Working Practices The Construction (Health, Safety and Welfare) Regulations 1996 under Excavations (Regulation 12) states that:- All practicable steps shall be taken where necessary to
Network Risk Assessment Guideline
Network Risk Assessment Guideline Network Risk Assessment Guideline Table of Contents Revision history... ii 1. Purpose and Scope... 1 2. Definitions, Abbreviations and Acronyms... 1 3. References... 2
QUALIFICATION HANDBOOK
QUALIFICATION HANDBOOK Level 2 and 3 NVQ Certificate in Rail Engineering Traction and Rolling Stock (7597-05/10) September 2011 Version 1.1 (September 2011) Qualification at a glance Subject area Rail
WORKPLACE INDUCTION FOR CONSTRUCTION WORKPLACES INFORMATION SHEET 1
WORKPLACE INDUCTION FOR CONSTRUCTION WORKPLACES INFORMATION SHEET 1 Overview This Information Sheet provides advice for persons conducting a business or undertaking (PCBUs) including builders and principal
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY Dumfries Timber Co. Ltd. is committed to comply with our legal duties in order to provide a safe and healthy working environment
SAMPLE ASSESSMENT KIT. BSB41307 Certificate IV in Marketing
SAMPLE ASSESSMENT KIT BSB41307 Certificate IV in Marketing I n c l u d e s : A s s e s s m e nt Tasks M a r k i n g G u i d e M a p p i n g A s s e s s m e nt R e c o r d T o o l ASSESSMENT TASKS BSBWHS401A
Electrical Safety Policy
Electrical Safety Policy Version Number: V2 Name of originator/author: Director of Estates and Facilities Name of responsible committee: Estates and Facilities Committee Name of executive lead: Chief Operating
Tunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering