Venema Advies Nigeria Limited West Africa Data Center Limited. Datacenter Sustainability
|
|
|
- Roger Rose
- 10 years ago
- Views:
Transcription
1 Venema Advies Nigeria Limited West Africa Data Center Limited Datacenter Sustainability
2 Lord of War What if I have AIDS? Don't you worry? You worry too much! Why do you worry about something that can kill you in ten years. We know so many things that can kill you today.
3 Datacenters and Sustainability Two types of sustainability - Operational Sustainability - Environmental Sustainability
4 Operational Sustainability
5 5 key elements Operational Sustainability Site Selection Building Characteristics Fitness for Use Investment Effectiveness Management and Operations
6 Site Selection Regional natural disaster risks (seismic, lightning, snow/ice, tornado, flooding, etc.). Regional and site-specific natural and man-made disaster risks (adjacent land use, transportation corridors, aircraft flight paths, sink holes, abandoned mines, etc.). Dedicated vs. shared-use buildings and their inherent exposures (building a data center in a multistory office building, etc.). Utility (electric, water, and fiber) availability, diversity, and distribution path routing. Economics (utility consumption rates and demand charges, ability to exploit free cooling, etc.) and financial incentives (property and sales tax, rebates, reduced permit fees, low interest bonding, etc.). Parcel size vs. building footprint (providing for future growth, protection from unknown future neighbors). Site physical security (perimeter definition, setback from uncontrolled areas, controlled access for people, vehicle, and packages).
7 Datacenter running on petrol in Lagos?
8 Building Characteristics Consistency of the data center s location with the long-term business mission. Local/International codes, standards, and requirements and how they impact costs and site use. Understanding natural and man-made disaster risks and mitigating them by designing a building that is fully functional during and after the disaster. Power, cooling, and associated subsystem capacities are coordinated for common exhaust points. (Examples include chillers coordinated with UPS capacity, and thermal storage discharge capacity coordinated with UPS battery discharge duration; this enables a coordinated capital upgrade plan to be developed.) Support spaces (storage, shop, staging, etc.) to keep unnecessary activity and materials out of the computer room. Comprehensive commissioning of the completed construction; verification that the design intent was delivered. Certification! Use of incremental investment to maximize future available capacity (e.g., instead of using a 3,000-amp bus to match the immediate requirement, use a 4,000-amp bus to gain more ultimate capacity for a fractional increase in cost).
9 Modular Built Datacenter with Support Space
10 Fitness for Use Flexibility of the site and building design: the ability to accommodate reasonable but unknown future demands such as increased power and cooling capacity or functionality, enhanced security equipment, or additional security layers (plugand-play capacity expansions, pads for future equipment, ability to implement continuous cooling in the future, etc.). Robustness and redundancy of the design (use of a 90% redline rating, redundancy level [N, N+1, N+2], suitability of the specified equipment, ability to maintain a level of redundancy or Fault Tolerance during maintenance, technology choices, etc.). Consistency of the design philosophy across all 16 site subsystems (e.g., not having a robust electrical system supported by a bare bones mechanical system). Ease of maintenance and capacity expansion. Adaptive use of proven technology; avoiding unproven emerging edge technology for a mission critical site.
11 WADC Modular Datacenter
12 Investment Effectiveness The ability to meet the business mission initially and to meet an evolving business mission over time without obsoleting previous investment or disrupting computer operations to make changes. Ease of responding to the changing business requirements: Tactical vs. Strategic solutions and the life of the site. Actual realized IT yield or the ability of the site to support the maximum number of servers and other IT devices. Energy efficiency and effectiveness (energy efficiency ratios); considering how operating set points and practices impact operating expense. Some investment effectiveness factors can only be influenced during site selection; see Site Selection for those items. In the event of future resale, how valuable would a high-end buyer consider this data center?
13 Spreading Investment YEAR 1 YEAR 2 YEAR 3 YEAR 4
14 Management and Operations The existence and success of the Integrated Critical Environments (ICE) Team and the interdepartmental processes and interactions. (The Institute recommends that an ICE team include strategic and tactical members from both IT and Facilities who work together in an interactive and collaborative way to manage critical sites.) Departmental effectiveness and the competency to perform their respective tasks. Use of meaningful key performance metrics and dashboards. Staffing levels, training programs, tools, and other operating expense items.
15 Environmental Sustainability
16 Difficulties
17 PUE = Power Usage Effectiveness PUE by inference is a measure of sustainability since reduced power consumption would result in lower carbon emissions. However, PUE does not take into account the sources of the power whether power is derived from wind, hydro, or coal makes a difference in sustainability.
18 CUE = Carbon Usage Effectiveness Realistic measure of environmental impact Reduce usage of diesel Stimulate alternative energy Stimulate greener IT environment
19 Petrol versus Natural Gas PETROL 3,14 kg CO2/liter NATURAL GAS 1,86 kg CO2/m3 DIESEL GENERATOR 1MW uses 270 liter per hour GAS GENERATOR 1MW uses 362m3 per hour Result?
20 CO2 Exhaust PETROL 847kg CO2 per hour NATURAL GAS 674kg CO2 per hour Natural Gas 21% less CO2
21 Trigeneration on gas
22 Trigeneration on gas Trigeneration combined with reversed heat for cooling can reduce cooling requirements with 30%. Cooling is almost the same as the used power capacity of IT equipment. 1MW of capacity is equivelant to 500kW of IT equipment in traditional datacenters Combined Heat Processing with Reversed Heat for Chillers reduces this to 700kW per 500kW of IT equipment.
23 Virtualization
24 FM200 fire supression Global Warming Alarm! Dont use FM200!
25 BREEAM / LEED Certification BREEAM (Building Research Establishment Environmental Assessment Method) is an environmental standard that rates the sustainability of buildings in the UK. The BREEAM environmental assessment aims to minimize environmental impact by ensuring sustainability best practices are in place while also lowering organisations' costs through energy efficiency.
26 Future A sustainable future for Nigeria depends on your choices!
Operational Sustainability and Its Impact on Data Center Uptime Performance, Investment Value, Energy Efficiency, and Resiliency
W h i t e P a p e r Operational Sustainability and Its Impact on Data Center Uptime Performance, Investment Value, By Vince Renaud, P.E., John H. Seader, P.E., and W. Pitt Turner IV, P.E. TM Executive
GREEN DATA CENTER DESIGN
Jeffrey Menig Global Facilities Facility Engineering The application of multiple available technologies resulting in improved energy optimization without significantly increasing capital investment. A
DATA CENTRE DESIGN AND
SPUSC 2008 SOUTH PACIFIC USER SERVICES CONFERENCE DATA CENTRE DESIGN AND ENERGY INITIATIVES Presented by Jarrad Clift Electrical Engineer Greenstar Accredited Presentation Content Data Centres General
Global Green Data Center Best Practices In Action
Global Green Data Center Best Practices In Action DOUG WASHBURN VICE PRESIDENT & RESEARCH DIRECTOR September 25, 2013 Four questions I will answer 1 Why is green important to your business? 2 Why is green
World s Greenest High Performance Data Center
World s Greenest High Performance Data Center EcoDataCenter Sustainability for future generations Our Services Colocation Data Center for Mission Critical Requirements Lockable racks, cages, private rooms
Subject: County of Los Angeles Data Center Space Requirement
Subject: County of Los Angeles Data Center Space Requirement The County of Los Angeles, Chief Executive Office, Real Estate Division (CEO-RED) is issuing this Property Search for the purchase of a vacant,
Greener Pastures for Your Data Center
W H I T E P A P E R Greener Pastures for Your Data Center 2 Executive Summary Following a green path, once a concept relegated to a small group of environmentalists and the U.S. Environmental Protection
The Pros and Cons of Modular Systems
The Pros and Cons of Modular Systems Kevin Brown, Vice President Global Data Center Offer Schneider Electric Schneider Electric 1 Foundational BUSINESS OVERVIEW Rev 2 Desired characteristics of pre-fabricated
Data Centre Cooling Technologies. Jon Pettitt, EMEA DataCenter Business Development Manager
Data Centre Cooling Technologies 1 Jon Pettitt, EMEA DataCenter Business Development Manager Munters Group Key facts 3.000 Employees 30 Countries Turnover of 470 M HQ in Sweden Global DC Support 25+ Data
THE GREEN DATA CENTER
GREEN IT THE GREEN DATA CENTER WHERE ECOLOGY MEETS ECONOMY We truly live in an information age. Data Centers serve a very important purpose they provide the global community with nearly unlimited access
Data Centers: Definitions, Concepts and Concerns
Data Centers: Definitions, Concepts and Concerns Arash Mousavi DCC September 2013 Agenda 1. Introduction 2. Issues in Modern Data Centers: Siemens Integrated Data Center Solutions 3. Issues in Modern Data
Smart Energy Consumption and the Smart Grid
Smart Energy Consumption and the Smart Grid Executive Summary The nation s outdated electrical infrastructure is being transformed. Fundamental changes that add intelligence, integrated communications
Data Center Combined Heat and Power Benefits and Implementation. Justin Grau, Google Inc. Sam Brewer, GEM Energy
Data Center Combined Heat and Power Benefits and Implementation Justin Grau, Google Inc. Sam Brewer, GEM Energy Data Center Challenges Electric Load Densification Thermal Dissipation Requires constant
Top 5 Trends in Data Center Energy Efficiency
Top 5 Trends in Data Center Energy Efficiency By Todd Boucher, Principal Leading Edge Design Group 603.632.4507 @ledesigngroup Copyright 2012 Leading Edge Design Group www.ledesigngroup.com 1 In 2007,
Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009
Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of
Capgemini UK Infrastructure Outsourcing
Together. Free your energies Capgemini UK Infrastructure Outsourcing Project Arthur Improved Data Centre Efficiency Paul Feeney Capgemini Tony Mills Spie Matthew Hall Project Arthur The Toltec data centre,
As close to perfection. development and production. Modular data center
As close to perfection development and production Modular data center August 2014 What is GreenMDC modular data center? Basically it is the modular design construction which is realized by the principle
ALWAYS ON GLOBALSWITCH.COM
ALWAYS ON GLOBALSWITCH.COM Data Centre Design Considerations Kelvin Fong Managing Director, Hong Kong ALWAYS ON GLOBALSWITCH.COM Agenda 1. Introduction to Global Switch 2. Customer Requirements 3. Development
Guideline for Water and Energy Considerations During Federal Data Center Consolidations
Guideline for Water and Energy Considerations During Federal Data Center Consolidations Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory
Eni Green Data Center - Specification
Eni Green Data Center - Specification Green IT Adopting the principles of sustainable development is one of the key missions in the field of information technology today. 2% of the world s CO2 emissions
Data Centre Outsourcing a Buyer s Guide
Data Centre Outsourcing a Buyer s Guide The inside guide to deciding whether to outsource your data centre facility and operations and how to select an appropriate partner. This Guide will help you Determine
The Data Center Tier Performance Standards and Their Importance to the Owner s Project Requirements
The Data Center Tier Performance Standards and Their Importance to the Owner s Project Requirements Edward P Rafter, P.E. CxAP Tier IV Consulting Group Synopsis The data center industry has experienced
Overview of Green Energy Strategies and Techniques for Modern Data Centers
Overview of Green Energy Strategies and Techniques for Modern Data Centers Introduction Data centers ensure the operation of critical business IT equipment including servers, networking and storage devices.
University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008
University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008 Contents Welcome and Introduction Chapter 1: Data centre energy recap Chapter 2: Co-generation Chapter 3: CTC case study
Automation's Modular Containerized Datacenter Solutions
SAFE Automation's Modular Containerized Datacenter Solutions Automation's SAFE (Secure, Autonomous, Flexible, Efficient) Modular Containerized Datacenter offers a fast, flexible and efficient solution
Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings
WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Lars Strong, P.E., Upsite Technologies, Inc. Kenneth G. Brill, Upsite Technologies, Inc. 505.798.0200
Data Center CH1. Elk Grove Village, IL
Data Center CH1 Elk Grove Village, IL powerful/ efficient /reliable solutions > Data Center CH1 ABOUT DUPONT FABROS TECHOLOGY (DFT) DFT is a leading owner, developer, operator and manager of wholesale
Bytes and BTUs: Holistic Approaches to Data Center Energy Efficiency. Steve Hammond NREL
Bytes and BTUs: Holistic Approaches to Data Center Energy Efficiency NREL 1 National Renewable Energy Laboratory Presentation Road Map A Holistic Approach to Efficiency: Power, Packaging, Cooling, Integration
Data Centre Basiglio, Milan Flexible, advanced and efficient by design.
Data Centre Basiglio, Milan Flexible, advanced and efficient by design. TelecityGroup Via Francesco Sforza 13 Milano 3 City 20080 Basiglio MI Italy Tel: +39 02 36679500 [email protected] www.telecitygroup.it
Energy-efficient data center achieves 2N reliability; MTU Onsite Energy generator sets provide critical backup
Press Release Contact: Gary Mason Tognum America Inc. Phone: +1 248 560 8480 E-mail: [email protected] Agency contact: Robert E. Sheldon, APR Creative Communications Consultants, Inc. Phone: +1 210
310 Exam Questions. 1) Discuss the energy efficiency, and why increasing efficiency does not lower the amount of total energy consumed.
310 Exam Questions 1) Discuss the energy efficiency, and why increasing efficiency does not lower the amount of total energy consumed. 2) What are the three main aspects that make an energy source sustainable?
7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America
7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer
Value stacking with Data Center Infrastructure Management (DCIM) - driving energy and capacity efficiency -
Press Frimley, UK 13 April 2016 PRESS RELEASE For immediate Release Value stacking with Data Center Infrastructure Management (DCIM) - driving energy and capacity efficiency - Organisations rely heavily
Data Center Infrastructure Management: ERP for the Data Center Manager
Data Center Infrastructure Management: ERP for the Data Center Manager 1 2 Topics What s DCIM & the ERP Analogy Why DCIM How DCIM Works How DCIM Helps 3 DCIM by Definition DCIM is a system that collects
Jan Kremer s Data Center Design Consultancy
Jan Kremer s Data Center Design Consultancy Datacenter Design Jan Kremer has designed a Tier Level 3 Datacenter for one of the main banks in Saudi Arabia This included Floor Plans, Power Requirements,
Measuring Power in your Data Center: The Roadmap to your PUE and Carbon Footprint
Measuring Power in your Data Center: The Roadmap to your PUE and Carbon Footprint Energy usage in the data center Electricity Transformer/ UPS Air 10% Movement 12% Cooling 25% Lighting, etc. 3% IT Equipment
IBM Portable Modular Data Center Overview for Critical Facilities Round Table
Brian Canney Global Services Executive, IBM GTS Site and Facilities Services April 2011 IBM Portable Modular Data Center Overview for Critical Facilities Round Table 2009 IBM Corporation Key messages Containers
StruxureWare. How to reconcile efficiency and availability in a virtualized data center. for data centers
How to reconcile efficiency and availability in a virtualized data center TM StruxureWare for data centers Soeren Brogaard Jensen 27th of October 2011 Vilnius, Litauen Schneider Electric the global specialist
Presented by Edward P. Rafter, P.E., CxAP Tier IV Consulting Group
Presented by Edward P. Rafter, P.E., CxAP Tier IV Consulting Group The data center industry has experienced several evolutions over the past 20 years. One principal change has been the development of the
Consulting Engineering Outsourcing
Consulting Engineering Outsourcing Opportunities, challenges and strategies 5.º Fórum Lusófono das Comunicações Maputo, 24 de Abril de 2014 Maksen 2014 Consulting Engineering Outsourcing AGENDA 01. Data
Zen Internet Case Study
Zen Internet Case Study About Zen Internet Zen Internet is an independent Internet Service Provider (ISP) that offers a full range of data, voice, and hosting services to businesses and residential users
Direct Fresh Air Free Cooling of Data Centres
White Paper Introduction There have been many different cooling systems deployed in Data Centres in the past to maintain an acceptable environment for the equipment and for Data Centre operatives. The
Specialty Environment Design Mission Critical Facilities
Brian M. Medina PE Associate Brett M. Griffin PE, LEED AP Vice President Environmental Systems Design, Inc. Mission Critical Facilities Specialty Environment Design Mission Critical Facilities March 25,
Modular Data Centre. Flexible, scalable high performance modular data centre solutions. Data Centre Solutions...energy efficient by design
Data Centre Solutions...energy efficient by design Modular Data Centre Flexible, scalable high performance modular data centre solutions Creating an effective workspace environment The Modular Data Centre
Modular Chiller Plants for data centers. Downtime isn t acceptable
Modular Chiller Plants for data centers Downtime isn t acceptable Reducing risk with Quick Start A direct solution to your most important challenge uptime. At Johnson Controls we protect our customers
National Grid Your Partner in Energy Solutions
National Grid Your Partner in Energy Solutions National Grid Webinar: Enhancing Reliability, Capacity and Capital Expenditure through Data Center Efficiency April 8, 2014 Presented by: Fran Boucher National
Township of Severn Energy Management Plan
Township of Severn Management Plan Figure 1: Management Plan Framework Commit Declaration of Commitment Vision Statement Understand Stakeholder Needs Current Situation Past & Present Initiatives Plan Goals
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to
TAV Tunisie FIFTH INTERNATIONAL FORUM ON ENERGY FOR SUSTAINABLE DEVELOPMENT. International Airport Enfidha-Hammamet 4-7 November 2014
TAV Tunisie FIFTH INTERNATIONAL FORUM ON ENERGY FOR SUSTAINABLE DEVELOPMENT International Airport Enfidha-Hammamet 4-7 November 2014 PRESENTATION OF THE INTERNATIONAL AIRPORT ENFIDHA-HAMMAMET CO2 EMISSIONS
Data Center Technology: Physical Infrastructure
Data Center Technology: Physical Infrastructure IT Trends Affecting New Technologies and Energy Efficiency Imperatives in the Data Center Hisham Elzahhar Regional Enterprise & System Manager, Schneider
Datacenter Assessment
The Netmagic team has compiled this Checklist to help you evaluate, compare and select datacenter facilities to meet your hosting, business continuity and disaster recovery needs. Based on industry best
CYRUSONE COMPANY OVERVIEW BUILT FOR TOMORROW. READY TODAY.
CYRUSONE COMPANY OVERVIEW BUILT FOR TOMORROW. READY TODAY. ABOUT CYRUSONE GLOBAL DATA CENTER FACILITIES. A Global Leader 24 high performance data centers worldwide Servicing 9 of top 20 Global Fortune
Green Data Centre Design
Green Data Centre Design A Holistic Approach Stantec Consulting Ltd. Aleks Milojkovic, P.Eng., RCDD, LEED AP Tommy Chiu, EIT, RCDD, LEED AP STANDARDS ENERGY EQUIPMENT MATERIALS EXAMPLES CONCLUSION STANDARDS
Growing your greenhouse business faster with gas engines.
Growing your greenhouse business faster with gas engines. Our combined heat and power engines can increase the efficiency and profitability of your greenhouses. Because it s not just your plants that need
Datacenter Efficiency
EXECUTIVE STRATEGY BRIEF Operating highly-efficient datacenters is imperative as more consumers and companies move to a cloud computing environment. With high energy costs and pressure to reduce carbon
Auditing a data centre but to what standard?
Auditing a data centre but to what standard? Matt Flowerday RCDD Capitoline LLP [email protected] www.capitoline.me Data centre auditing Capitoline has audited over 30 data centres in the UK,
Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.
Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. Equinix Telecity Kvastvägen 25-29 128 62 Sköndal Stockholm Sweden Tel: +46 (0) 8 799 3800 [email protected] www.telecitygroup.se
Boilers and cogeneration/trigeneration. Abhi Sawant Business Development Manager Simons Green Energy
Boilers and cogeneration/trigeneration Abhi Sawant Business Development Manager Simons Green Energy HEATING - COOLING - SUSTAINABLE ENERGY ENERGY EFFICIENCY IN BOILERS, COGENERATION & TRIGENERATION Presented
NIGERIA S PREMIUM DATA CENTRE
NIGERIA S PREMIUM DATA CENTRE TIER III DESIGN CERTIFIED SECURE RELIABLE SCALABLE 1 WHY WOULD YOU WANT TO BUILD A DATA CENTRE? IT TAKES MILLIONS OF US DOLLARS TO BUILD AN EFFICIENT DATA CENTRE. A KEY ASSET,
DATA CENTERS BEST IN CLASS
Data Energy Audit Chameleon Data Center DATA CENTERS BEST IN CLASS... By Wouter Kok, MSc, Strategic Advisor Global Data Center Practice Deerns leads the way in making data centers greener, by reducing
Enabling an agile Data Centre in a (Fr)agile market
Enabling an agile Data Centre in a (Fr)agile market Phil Dodsworth Director, Data Centre Solutions 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without
Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures
Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle
How green is your data center?
Siemens Answers: Sustainable Future How green is your data center? Istanbul June 01, 2010 Agenda 1 Solution 2 Siemens Data Center Approach 2 Designing with multiple power density zones can reduce energy
Low Carbon Data Centres without compromise
Low Carbon Data Centres without compromise Thursday 16 th September 2010 Pip Squire, Engineering & Project Director delivered by: Ark Continuity - Continuously Delivering high integrity data centres Introduction
Introduction to Datacenters & the Cloud
Introduction to Datacenters & the Cloud Datacenter Design Alex M. Hurd Clarkson Open Source Institute March 24, 2015 Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud March 24, 2015 1 / 14 Overview
DataCenter 2020: first results for energy-optimization at existing data centers
DataCenter : first results for energy-optimization at existing data centers July Powered by WHITE PAPER: DataCenter DataCenter : first results for energy-optimization at existing data centers Introduction
The World s Largest Datacenter
The World s Largest Datacenter High-level security and access control. Current structure allows 120.000 m2 white space The Norwegian Location - Lefdal Mine Conditions in Norway are conducive to Norway
Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)
Drives and motors A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC) The power behind the data Private and public businesses, from banks to
Carbon Dioxide Membrane Separation for Carbon Capture using Direct FuelCell Systems
Carbon Dioxide Membrane Separation for Carbon Capture using Direct FuelCell Systems DFC Technology Used as Electrochemical Membrane for CO 2 Purification and Capture during Power Generation FCE s Direct
Common mistakes in datacentre planning
Common mistakes in datacentre planning White Paper Last edited: March 2013 Document Control Document Information Title Author Common mistakes in datacentre planning Nick Ewing This document is based upon
N O W A V A I L A B L E
N O W A V A I L A B L E 5 0, 0 0 0 S F P O W E R E D S H E L L D A T A C E N T E R I I Data Center Park Catawba County, North Carolina S P E C I F I C A T I O N S Contact Doug Hollidge for more information
Data Centre Harbour Exchange Square Campus, London Access to unrivalled connectivity.
Data Centre Harbour Exchange Square Campus, London Access to unrivalled connectivity. TelecityGroup 6/7 Harbour Exchange London E14 9GE United Kingdom Tel: +44 (0)20 7001 0101 [email protected] www.telecitygroup.com
Leveraging Renewable Energy in Data Centers: Present and Future
Leveraging Renewable Energy in Data Centers: Present and Future Ricardo Bianchini Department of Computer Science Collaborators: Josep L. Berral, Inigo Goiri, Jordi Guitart, Md. Haque, William Katsak, Kien
One of the many issues facing cities, towns and campuses throughout. Making Connections in Miami: Cover Story
Cover Story Making Connections in Miami: County improves plants, integrates cooling loops One of the many issues facing cities, towns and campuses throughout North America is the challenge of replacing
Data Center Colocation Build vs. Buy
Data Center Colocation Build vs. Buy Comparing the total cost of ownership of building your own data center vs. buying third-party colocation services Executive Summary As businesses grow, the need for
Data Center Site Infrastructure Tier Standard: Operational Sustainability
U P T I M E I N S T I T U T E, L L C Data Center Site Infrastructure Tier Standard: Operational Sustainability Prepared by Uptime Institute Professional Services, LLC Copyright 2010 by Uptime Institute,
Introduction to IT Infrastructure Components and Their Operation. Balázs Kuti
Introduction to IT Infrastructure Components and Their Operation Balázs Kuti Agenda Challenges faced by enterprises today, scale of the IT plant Diversity of an IT plant Key Server Infrastructure Components
Engineering & Support Services
Engineering & Support Services Expert Project, Engineering & Customer Support Services Providing a range of Engineering and Support Services for:- Mission Critical Environments Data Centres & Server Room
DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences
DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences November 2011 Powered by DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no
Data centre experts. Advanced power protection for data centres
Data centre experts Advanced power protection for data centres A robust power protection strategy is critical to successful data centre operations. Uninterruptible Power Supplies Limited (UPSL), a Kohler
City of Peterborough s Corporate Energy Management Plan
City of Peterborough s Corporate Energy Management Plan 1. troduction Successful energy management depends on the integration of energy efficient practices into the business as usual conduct of the organization,
The World s Largest Datacenter
The World s Largest Datacenter High-level security and access control. 120 000 m2 floor space - roof height 19 meters. Current structure allows 250 000 m2 white space. THE NORWEGIAN SOLUTION Location -