1 90 Masterplan for landscape and urban housing, Newham, London 1 Client Barratt East London / London Development Agency Project duration: Contract value: 10 million Gross internal area: 71,000m Housing and mixed use development of 1,000 apartments on reclaimed industrial site, for Barratt East London / London Development Agency In association with Broadway Malyan, London 1 Image describing an urban character Landscape plan
2 1 Landscaped gardens Section drawing
3 1 Public realm Model view
4 1 View of courtyard Internal view of apartment
5 The scheme provides a wide range of apartments from individual to family sized homes, of mixed tenure, covered and secure car parking, open hard and soft landscaped areas of different scale and varying use and a range of non-residential uses from retail, office space and public facilities including a community crèche. Six buildings are organised around south facing landscaped courtyards. The buildings range in scale from five to eleven residential floors on a one to two storey plinth which houses entrances, car parking and non-residential uses. There is no singular landmark building within the development but instead the development is understood as a highly designed whole a piece of unified urban landscape which makes an appropriate background for city life and one which is connected to the wider urban context through access, route, view, massing, form, proximity and use. The architectural concept for the design of the building envelope has been to establish an overall identity for all of the buildings within the development which then may be modified in detail for each of the six buildings to take account of specific factors like internal planning and apartment type, orientation, view, proximity and scale. The concept establishes an architectural language, which is urban in character, using traditional materials and highly articulated in its tectonic ordering, layering of materials and proportion. The architecture is not intended to be flamboyant but instead to be careful and considered, making an appropriate and high quality addition to the architecture of the city. The grand scale of the buildings and their need to accommodate large numbers of people leads to an architecture which must employ repetition of elements and this has led the design to make reference to the warehouse buildings of the 19th Century and condominiums of the 0th Century which lie around and adjacent to the site. The design of the elevations acknowledges that there are two principle conditions in which to engage: outward facing facades with orientation towards the surrounding context of park, river, DLR, Tradewinds, North Woolwich Road and inward looking facades which surround and protect courtyards for each building. The starting point of the elevational detail was the variable figure and massing of each building form and its relationship to the ground. Each building volume emerges from a plinth-like base which varies between one and two storeys depending on the levels around the site. This plinth creates a visual datum from which residential floors rise and it is intended through its detail and material to have a strong relationship with the landscaping around it. Coloured concrete walls form this base with large window openings indicating the non residential uses or car parking areas with vertical plant walls incorporated on some elevations to provide acoustic and visual screening. Entrances to the apartments are by double storey arcaded porches which abut the plinth and project beyond the building envelope becoming highly visible extensions to the buildings. Each building volume is capped with a deep horizontal element. Made of concrete the capping projects beyond the face of the building envelope by varying degrees and provides a strong visual termination to the elevational arrangement below it. The effect of this multiple layering of elements; capping, frame, infill panel, windows and balconies is of a rich and variable façade treatment in which multiple elements are arranged to provide a sense of human scale to large building forms. The many differences within the whole make visual reference to the multiple and individual ownership and occupation within the building the strength of the whole being due to the composition of individual parts. The choice of materials and employment of colour is an important aspect of the façade design. The design proposes a predominant use of brick on the outward facing facades and of coloured render on the inward facing facades. A variety of brick types will be used and chosen to emphasise different aspects and outlooks around the development. A predominantly white/buff brick is proposed on facades facing the park, creating visual contrast to the vegetation and grass in a similar manner already apparent on the other side of the park with Barrier Point. Other elevations will have a variety of earthy, over-fired, plumb red and brown brick surfaces and on facetted facades (where the building forms chamfer) a charcoal black brick is proposed to emphasise its volumetric and three dimensional form. On inward facing facades, a palette of softer colours are employed to resonate with the courtyard landscaping. Each courtyard is proposed to be treated in a different tonal mix to emphasise the specific identity and character of each courtyard. The specification of brick types and colour renders remains contingent at this stage but it is important for the design that these provide a carefully co-ordinated ambience of colour and texture. Client: Barratt East London / LDA Collaborator: Broadway Malyan
Introduction. Welcome. 358-364 London Road, Mitcham
Introduction View from the southern junction of London Road and Cricket Green Welcome Thank you for attending our public exhibition and viewing the latest proposals for 358-364 London Road. As you may
More informationR&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction
Building Engineer UK Registration Board n.075077h Design and Access Statement for Application for Planning Permission for demolition of a garage and construction of an extension to an existing Victorian
More informationPalmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY
Committee Date: 23/01/2014 Application Number: 2013/09236/PA Accepted: 16/12/2013 Application Type: Full Planning Target Date: 17/03/2014 Ward: Nechells Palmer Street/Great Barr Street, (former MacDermid
More informationThe Zig Zag Building Victoria Street, London, SW1
The Zig Zag Building Victoria Street, London, SW1 The Zig Zag Building Victoria Street, London, SW1 Client: Land Securities Scope: Lead Design Architectural Services (CMT & Novated) Type: Offices, Retail,
More informationDesign and Access Statement. 141-145 Earls Court Road London SW5 9RH
J U L I A N A R E N D T A S S O C I A T E S 1 7 a P i n d o c k M e w s L i t t l e V e n i c e L o n d o n W 9 2 P Y F + 4 4 2 0 7 2 8 6 9 9 0 1 Design and Access Statement T + 4 4 2 0 7 2 8 6 9 9 9 1
More informationAccess onto roof from Center Block
2 2 Tap 4 Tank 3 3 4 5 5 6 4 1 Services PV panels Forth floor structure (later additions) Rooflights Access / Walkways Access onto roof from Center Block muf architecture/art LLP 4.3 Roof alterations and
More informationThis policy is the guiding document for all development within that area of Cable Beach pertaining to the Cable Beach Development Plan.
;, r it CABLE BEACH -ARCHITECTURAL DESIGN GUIDE'LINES This policy is the guiding document for all development within that area of Cable Beach pertaining to the Cable Beach Development Plan Where proposed
More information05 AREA/SITE SPECIFIC GUIDELINES
05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.
More informationIndustrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations
16.20.110 - Industrial Suburban District ( IS ) Figure REFERENCE Typical Buildings in the IS District Figure REFERENCE Site Plan of a typical development in the IS District Sections: 16.20.110.1 Composition
More informationWELCOME WELCOME TO THE PUBLIC EXHIBITION FOR THE ILONA ROSE HOUSE REDEVELOPMENT. ILONA ROSE HOUSE www.ilonarosehouse.com
WELCOME Manette Street from Charing Cross Road WELCOME TO THE PUBLIC EXHIBITION FOR THE REDEVELOPMENT. Corner of Charing Cross Road and Manette Street SOHO ESTATES Soho Estates began as a collection of
More informationOliver House. 51-53 City Road, EC1. Design & Access Statement Addendum Oliver House
51-53 City Road, EC1 01 Introduction 02 Revised Plans 03 Revisions to height & appearance 04 Summary Statement 01 Introduction 01 Introduction This document forms an addendum to the previous Design &
More information28.0 Development Permit Area #2 (Neighbourhood District)
28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character
More informationDESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines
DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the
More informationGold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road.
WELCOME Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road. The site covers approximately 0.37 hectares and
More informationScheme 3: Rehabilitation of Heritage Building and Redevelopment
Scheme 3: Rehabilitation of Heritage Building and Redevelopment 135 Keefer Street Constructed in 1910 for the Vancouver Gas Company, the building and surrounding site was used primarily by blacksmiths
More informationKINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156
APPENDIX C KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005 YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 REPORT BY HEAD OF PLANNING AND DEVELOPMENT SUMMARY
More informationHurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park.
HurlinghamRetailPark Aerial view of site Welcome Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. Londonewcastle, a specialist residential developer, has been
More informationWELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas
More informationWenslauer House Amsterdam Oud-West, 2015. 31/44 Architects Keizersgracht 117 1015 CJ Amsterdam The Netherlands T / +31 (0)6 3984 2010
31/44 Architects L/GB 1015 CJ Amsterdam The etherlands T / +31 (0)6 3984 2010 United Kingdom T / 31/44 has completed Wenslauer House, a new spacious family home on a constrained site in central Amsterdam.
More informationPerth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager
Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager 4(9) 09/161 Alteration and Extension to Existing Public House to Provide a New Bookmakers
More information4 Alternatives and Design Evolution
4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that
More informationK M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
More informationmass & Figure / plinth & Canopy
ss 2010: Universität für Angewandte Kunst, Wien, o. Univ. Prof. Greg Lynn MASS (PLINTH) & FIGURE (CANOPY): COMPOSITE AND/OR INTRICATE TECTONIC This semester we will continue the topic of producing massive
More informationCircular No : URA/PB/2004/29-CUDD Fax: 6220 3201 Our Ref : DC/ADMIN/CIRCULAR/PB_04 Date : 6 Sep 2004
Circular No : URA/PB/2004/29-CUDD Fax: 6220 3201 Our Ref : DC/ADMIN/CIRCULAR/PB_04 Date : 6 Sep 2004 CIRCULAR TO PROFESSIONAL INSTITUTES GUIDELINES TO ENCOURAGE MORE INNOVATIVE AND BETTER DESIGN OF ROOFTOPS.
More informationDesign Essentials. Stockland Residential Communities 1 st January 2014
Design Essentials Stockland Residential Communities 1 st January 2014 WELCOME TO THE DESIGN ESSENTIALS The Design Essentials form part of your Contract of Sale and assist when designing your home and landscape.
More informationSolar Panels to be Affixed to the Roof of an Existing Warehouse Unit
Application No: 11/1683N Location: Proposal: Applicant: Expiry Date: UNIT DC 360, FOURTH AVENUE, CREWE Solar Panels to be Affixed to the Roof of an Existing Warehouse Unit Mr A Fornal, Juwi Renewable Energies
More informationCITY COUNCIL PACKET MEMORANDUM
CITY COUNCIL PACKET MEMORANDUM DOCUMENT: Final Plan and Final Plat SUBJECT: City Center Lenexa The Domain at City Center CONTACT PERSON: Beccy Yocham, Director of Community Development DATE: December 3,
More informationMobile Network Base Station Design Guide User Manual
Mobile Network Base Station Design Guide User Manual Prepared for the Mobile Carriers Forum and the Design and Innovation Programme Taskforce February 2008 Consultant Contact: Nicole Halsey, Director Urban
More informationK M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
More informationVALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS
Planning Services, Civic Offices, New Road, Grays, Essex RM17 6SL VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Checklists to ensure prompt validation: Checklist 1 for ALL applications for planning
More informationDRAYCOT ROAD RED LION ROAD MAYROYD AVENUE KINGSMEAD AVENUE HAMILTON AVENUE. SIte Aerial view courtesy of Bing Maps
DRAYCOT ROAD RED LION ROAD MAYROYD AVENUE KINGSMEAD AVENUE HAMILTON AVENUE SIte Aerial view courtesy of Bing Maps South West London and St. George s Mental Health NHS Trust Tolworth Hospital - Landscape
More information8 DELIVERING THE MOVEMENT FRAMEWORK
8 DELIVERING THE MOVEMENT FRAMEWORK Introduction 8.1 The purpose of this section of the design code is to orchestrate the delivery of essential road infrastructure highlighted in the masterplan and movement
More information1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
More informationLiving Options Varsity Lakes, Australia
Living Options Varsity Lakes, Australia Summary Varsity Lakes is a master planned community located at the Gold Coast, Queensland that comprises 4,500 homes. The development is based around Lake Orr and
More informationwww.thefurlongphase2.co.uk
Welcome Thank you for coming along today to view our plans for Phase 2 of The Furlong Shopping Centre. We are undertaking a consultation programme that will run up to and beyond submission of the planning
More informationOffice campus at Princeton Forrestal Center. Research and development facilities of the future. a development by
COLLEGE PARK III OFFICE CAMPUS AT PRINCETON FORRESTAL CENTER Office campus at Princeton Forrestal Center Research and development facilities of the future. a development by S O U T H R I D G E A S S O
More informationPlanning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.
15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places
More information13 Oakleigh Gardens London N20 9AB
Location 13 Oakleigh Gardens London N20 9AB Reference: 15/00608/HSE Received: 2nd February 2015 Accepted: 2nd February 2015 Ward: Oakleigh Expiry 30th March 2015 Applicant: Mr A Peqini Proposal: Single
More informationWelcome to our exhibition
Welcome to our exhibition Welcome to this public exhibition for Cherry Park, Westfield, Stratford. This exhibition has been organised to update residents on Cherry Park, the next phase of development in
More informationPresentation: Proposed Plan Amendments
Epstein s Rehabilitation Plan Presentation: Proposed Plan Amendments MORRISTOWN REDEVELOPMENT ENTITY March 14, 2013 Epstein s Rehabilitation Plan Presentation Part 1: Morristown Planning Division Neighborhood
More informationSCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose
SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance
More informationA Guide for Residents. Sutton Garden Suburb Conservation Area
A Guide for Residents Sutton Garden Suburb Conservation Area Introduction This leaflet is designed to provide residents with information and advice about living in the Sutton Garden Suburb Conservation
More informationErection of replacement warehouse building and erection of two buildings in connection with builder s merchants
Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder
More informationRiverside Community College District / Renaissance Block
Riverside Community College District / Renaissance Block Site Location Parking Structure Four levels 224 parking spaces Access Street Coil School of the Arts Two levels 36,420 sf Plaza of the Arts Culinary
More informationDISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf
DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf Discovery Hall reflects its dynamic program and dramatic site, as well as the collaborative and student-centered spirit of
More informationDevelopment Brief Erskine Lodge Site, Great Whelnetham
Development Brief Erskine Lodge Site, Great Whelnetham Development Brief Contents 1.0 Introduction 2.0 Site Context 3.0 Development Constraints 4.0 Whelnetham Context Analysis 5.0 Development Opportunities
More informationOffice building Laan op Zuid Rotterdam. van den Oever, Zaaijer & Partners architecten
Office building Laan op Zuid Rotterdam van den Oever, Zaaijer & Partners architecten Office building Laan op Zuid Rotterdam In recent years, subareas of the Kop van Zuid area of Rotterdam have been redeveloped,
More informationWIMBLEDON No.1 COURT. WIMBLEDON No.1 COURT
WIMBLEDON No.1 COURT WIMBLEDON No.1 COURT 1 GRIMSHAW 2 WIMBLEDON No.1 COURT EXECUTIVE SUMMARY INTRODUCTION In April 2013 The All England Lawn Tennis Club published its new Master Plan for the long term
More informationCUMBERLAND PARK FACTORY DRAFT CONSERVATION AREA APPRAISAL
CUMBERLAND PARK FACTORY DRAFT CONSERVATION AREA APPRAISAL FEBRUARY 2016 INFORMATION Version Draft Conservation Area Appraisal for consultation Published by Old Oak & Park Royal Development Corporation
More informationReplacement Windows and Doors
Replacement Windows and Doors Short Policy Guide: Need for Planning Permission and Listed Building Consent For Replacement Windows and Doors Produced by City Development Department, Dundee City Council,
More informationGlossop Design & Place Making Strategy
Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance
More informationWelcome & background. www.theperfumefactory.info
Welcome & background Essential Living welcomes you to this community involvement event introducing the proposed redevelopment of The Perfume Factory, North Acton. EXISTING SITE PLAN AERIAL VIEW OF SITE
More informationMount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020
More informationPlanning & Building Control Division. Development. East Ayrshire Planning. Design Guidance
Planning & Building Control Division Design Guidance 1 East Ayrshire Planning Design Guidance Householder Development 1 EAST AYRSHIRE PLANNING: DESIGN GUIDANCE Design of the built environment can affect
More informationExempted Development - Frequently Asked Questions
Exempted Development - Frequently Asked Questions Important Pre-Conditions Please note all exempted development is subject to certain restrictions as set out in Articles 6, 7, 8, 9 and 10 of the Regulations.
More informationSTICKLEY AUDITORIUM RENOVATION Community and Stakeholder Presentation
STICKLEY AUDITORIUM RENOVATION Community and Stakeholder Presentation APRIL 30, 2014 SCHEMATIC DESIGN PROGRESS Code Study Analysis: key issues and resolutions Seating Analysis of sightlines, seating and
More informationShaping Whanganui. Have your say, korero mai
Shaping Whanganui Have your say, korero mai Outer Commercial Design Guidelines Discussion Document Background The Outer Commercial zone of the District Plan sits on the outside of the central shopping
More informationREQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:
REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT
More informationLandscape Design Statement
17` Landscape Design Statement Housing Development, Princess Avenue, Poulton-le-Fylde for the Regenda Group ReLandscape l a n ds c ap e archi t ec t u r e + e n v i r o nm e ntal p l an n in g JANUARY
More informationPROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON
Page 1 of 57 PLANNING COMMITTEE REPORT Agenda Item 5.4 PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON 4 September 2007 Division Sustainability and Regulatory Services
More informationAdvice can also be sought from specific specialist officers in the Council.
Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information
More informationjohn jay college of criminal justice
AIA NEW YORK CHAPTER 2013 DESIGN AWARDS ARCHITECTURE john jay college of criminal justice NEW YORK, NEW YORK FULL PROJECT NARRATIVE John Jay College of Criminal Justice s new building provides all the
More informationFrampton Arms & Lyttleton House London
Frampton Arms & Lyttleton House London Henley Halebrown Rorrison HHbR The two sites that form this project lie on the boundary of Frampton Park Estate, about a quarter of a mile apart. The strategy for
More informations p planning Date: 26 April 2012 10 CHRISTCHURCH STREET, LONDON SW3 4AR (LPA APP REF: PP/12/00249/Q21) GROUNDS OF APPEAL
Date: 26 April 2012 Ref: R12229 10 CHRISTCHURCH STREET, LONDON SW3 4AR (LPA APP REF: PP/12/00249/Q21) GROUNDS OF APPEAL 1.1 Based on the Council's reason for refusal we believe the main issue in this case
More informationIFMA Building Tour THE MAIN LIBRARY AT GOODWOOD. a library in the park ~ a park in the library 07.15.2014
IFMA Building Tour THE MAIN LIBRARY AT GOODWOOD a library in the park ~ a park in the library 07.15.2014 COLLABORATIVE PROJECT TEAM The location of the library and its development within Independence Park
More informationPlanning and Design Statement New Housing at Limonds Wynd, Ayr
Planning and Design Statement New Housing at Limonds Wynd, Ayr Planning and Design Statement New Housing at Limonds Wynd, Ayr On behalf of Ayrshire Housing Prepared by John Gilbert Architects Introduction...
More informationAPPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley
More informationASYMPTOTE ARCHITECTURE / GENT SINT-PIETERS GENT SINT-PIETERS PRE-DESIGN : SITE B1 KLANKBORDGROEP JUNE 2012
ASYMPTOTE ARCHITECTURE / GENT SINT-PIETERS GENT SINT-PIETERS PRE-DESIGN : SITE B1 KLANKBORDGROEP JUNE 2012 URBAN GENT BELGIUM 1.1 DESIGN CONCEPT INTRODUCTION Asymptote s design for Site B1 of the Gent
More informationredland house, bristol - public consultation exhibition
Preliminary proposals for a new office building on Simplyhealth Stoford Redland Hill Simplyhealth propose to build a new office building on Redland Hill to expand the company and its existing links with
More information1 Amendment C195 to the Boroondara Planning Scheme - Maling Road Built Form Controls - Adoption
1 Amendment C195 to the Boroondara Planning Scheme - Maling Road Built Form Controls - Adoption Abstract The purpose of this report is to inform Council of the outcomes of the Urban Planning Special Committee
More information2.1. Architectural Character. Mountain. Agrarian. Craftsman. Gold Rush
2 A r c h i t e c t u r a l C h a r a c t e r 2.1 Introduction Development within the corridor is not required to be any one architectural style but should incorporate elements from one of the following
More informationIntroduction. Two storey & first floor rear extensions. two storey rear 1
Introduction This advice leaflet has been produced to help in the planning of your house extension, by identifying the main points to consider, in order to achieve an acceptable proposal. This leaflet
More informationNew Waterloo. Transforming the Elizabeth House site
New Waterloo Transforming the Elizabeth House site 02 Transforming Elizabeth House 03 Transforming Elizabeth House Transforming Elizabeth House This booklet has been produced by Chelsfield and London &
More informationPark View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.
The Townhouses Park View Place A A Compass House A T T T Royal Wharf Gardens Endeavour House T A A Thameside House T Sienna House A A A A T Apartments Townhouses River Thames Compass House Compass House
More informationCity of Fort Lauderdale Historic Preservation Design Guidelines
City of Fort Lauderdale Historic Preservation Design Guidelines New Construction & Additions When considering the construction of a new building within a historic context, property owners are encouraged
More informationThe New Texas Historic Preservation Tax Credit
How do you apply? Tips for Part 1/A - Evaluation of Significance: Application processing takes 30 days, however new National Register listings generally can take 1 year for reviews and final approval by
More informationOn the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers
FOR SALE On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers Land at Teville Gate, Teville Road, Worthing, West Sussex BN11 1AZ ibrochure - www.cbre-ibrochure.co.uk/worthing ENTER
More informationA CONDO- COLLABORATION OF ART, FASHION, DESIGN AND GOOD TASTE IN TORONTO S SOHO SOUTH NEIGHBOURHOOD AT RICHMOND AND PETER.
RICHMOND/PETER A CONDO- COLLABORATION OF ART, FASHION, DESIGN AND GOOD TASTE IN TORONTO S SOHO SOUTH NEIGHBOURHOOD AT RICHMOND AND PETER. The story of Tableau unfolds below, on and above a table. Historical
More informationDESIGN GUIDANCE NOTE: 11 PORCHES
DESIGN GUIDANCE NOTE: 11 PORCHES 1. INTRODUCTION This guidance note is one of a series giving advice on various types of development within Barnet. It advises on designing porch extensions including canopies.
More informationARCHITETTO ANDREA FERRARO
ARCHITETTO ANDREA FERRARO Via F. Baldinucci n. 3-20158 Milano - Italia Tel. (+39).02.56.81.43.93 r.a. - Fax (+39) 02.56.94.110 e-mail: architetto@andreaferraro.it www.architettoferraro.com CAREER AND PROFESSIONAL
More informationINTERIOR SPACES HOME AND ART Perpignan 26 January, 2006 Barcelona 27 & 28 January 2006
INTERIOR SPACES HOME AND ART Perpignan 26 January, 2006 Barcelona 27 & 28 January 2006 Faculty of Architecture & Town Planning Technion Israel Institute of Technology Technion city, Haifa, 32000, Israel
More informationPrior to submission of drawings for building permit, the architectural control process will be undertaken for the developer and/or builders.
6.0 Design Review process 6.0 Design Review Process The design review process will coordinate the public and private realm architecture for the community, i.e., the site planning, streetscape, and architecture
More informationAlternatives and Design Evolution: Planning Application 1 - RBKC
3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan
More informationtechnology UICK progressive sustainable any design, any shape, any colour, anywhere you like!
uality using advanced building technology UICK uality innovative progressive sustainable any design, any shape, any colour, anywhere you like! 2 NicheQ is an award winning progressive and innovative builder
More informationMANAGEMENT PLAN STONE BAY RIFLE RANGE HISTORIC DISTRICT MCB CAMP LEJEUNE
MANAGEMENT PLAN STONE BAY RIFLE RANGE HISTORIC DISTRICT MCB CAMP LEJEUNE This management plan is to be used in association with procedures outlined in Chapter of the Historic Buildings Management Handbook.
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MARCH 6, 2013 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Doris Nguyen, Associate
More informationProjects. Cultural centre in Jinan. Europaconcorsi Beta. Grand Theatre. JINAN, China. Publications Jinan Cultural Centre
Language: Italiano English Europaconcorsi Beta Projects JINAN, China Cultural centre in Jinan Grand Theatre PAUL ANDREU ARCHITECTE PARIS, RICHEZ_ASSOCIÉS ARCHITECTURE, BIAD Publications Jinan Cultural
More informationHouseholder Applications: Supplementary Planning Guidance GENERAL POINTS
Householder Applications: Supplementary Planning Guidance Environment Committee: 28 January 2004 Chief Planning Officer Town Hall The Parade Epsom Surrey KT18 5BY tel 01372 732000 web www.epsom-ewell.gov.uk
More informationCharging for Pre-Application Advice. Guidance Note London Borough of Newham. March 2015
Charging for Pre-Application Advice Guidance Note London Borough of Newham March 2015 This guidance note provides information regarding the Council s preapplication advice service and the relevant charges.
More informationRevere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.
Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts Design and Development Guidelines Request for Qualifications and Expressions of Interest with Preliminary Development Plans Part
More informationSite visit to the University of Nottingham Jubilee Campus
Site visit to the University of Nottingham Jubilee Campus Peter Heaslip. Chris Bruce, John Lawlor, Paul Horan 25 February 2003 Original Campus Map University Park Existing University Park The main campus,
More informationHISTORIC LANDSCAPE LYTCHETT MINSTER SCHOOL STOWE SCHOOL COOMBE HOUSE TRACY PARK
New design in the context of a historic setting is an exciting challenge, allowing both modern and traditional design motifs to be used. Integrating new design having understood the history of the site
More informationDesign & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon.
Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, ARC-RP-A-002 Prepared by ARCMC Ltd July 2012: Issue A Contents 1. Introduction 2. Application Proposal
More informationResidential design guidance: Roof extensions
Residential design guidance: Roof extensions Introduction Conversions of roof-space to useable accommodation can be a relatively cheap and effective way to extend residential property. However, roof alterations
More informationIn an age where life is increasingly fast-paced, and every day stresses can wear us down, it s important to find the time to slow down.
Sharing Towpaths A consultation on towpath use for the Canal & River Trust The Canal & River Trust is consulting with stakeholders, local authorities, communities and partners in order to put together
More informationHole In One. Freehold 425,000 + VAT SOLE SELLING RIGHTS REF: NW-315821. Forest Drive, Lytham, St Annes, Lancashire FY8 4QF
Hole In One Forest Drive, Lytham, St Annes, Lancashire FY8 4QF Freehold 425,000 + VAT Lancashire Freehold Densely populated residential area Lounge bar. Dining room & Public bar Private flat Site area
More informationSCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
More informationOMC Study Group MEETING 3: NOTES. Section 1: Building Design Page 2 Section 2: Site Layout Page 9 Section 3: Summary Page 16
OMC Study Group MEETING 3: NOTES Section 1: Building Design Page 2 Section 2: Site Layout Page 9 Section 3: Summary Page 16 Section 1 Building Design Page 2 of 16 General Comments during Building Design
More informationThe Oman Proton Therapy and Imaging Center. 2015 AIA DC Chapter Unbuilt Awards
The Oman Proton Therapy and Imaging Center Project Overview The new cancer treatment facility is comprised of two separate buildings at the entrance of the German University of Technology in Muscat, Oman.
More informationBROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208
BROWNSVILLE STRUCTURES STUDY July 2012 Prepared by LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 TABLE OF CONTENTS I. SUMMARY OF BUILDING ANALYSIS.. 1 II. INDIVIDUAL BUILDING
More information