Draft Terms of References (TOR)

Size: px
Start display at page:

Download "Draft Terms of References (TOR)"

Transcription

1 Draft Terms of References (TOR) (Based on the standard TOR notified by MoEF on dt and as per the guidelines given in Environmental Impact Assessment Guidance Manual for Building and Large Construction projects by MoEF) For PROPOSED RESIDENTIAL & COMMERCIAL PROJECT At On Plot aring S.no. 128/3/1/1(p), 128/3B/1, 128/3B/2, 128/3/C, 129/2, 129/2 /1, at Village Temghar & S.no. 40/1/1,40/1/2, 40/2/2, 40/3/2, 40/4, 40/5, 40/6, 40/7, 40/8, 40/9, 40/10, 40/11, 40/12, 40/13/1/A, 40/13/2, 42/0,43/1,43/2, 43/3,44/1/2, 44/2/2,44/2/3, 44/3/1, 44/3/2, 44/4, 44/5, 44/6,45/2/1, 45/2/2, 45/3/1, 45/3/2, 45/4,45/5,45/6,45/7,45/8,45/9, 45/10,45/11,45/12, 58/7/1, 58/7/2, 58/8, 58/9, 58/11, 58/12, 58/13, 58/16, 58/17, 58/18, 58/19, 58/20, 58/21, 58/22, 58/23, 83/1/1, 83/1/2, 83/2, 83/3, 83/4, 83/5, 83/6, 83/7, 83/8, 83/9, 84/1, at Village Bhadvad, Taluka Bhiwandi, District Thane, Maharashtra. By M/s. Prakhhyat Dwellings LLP 803/804, Silver Court, BPS Compound, Devidayal Road, Mulund (west), Mumbai Submitted to State Environment Expert Appraisal Committee II, Maharashtra Prepared by ULTRA-TECH (Environmental Consultancy & Laboratory) (An ISO Company, Accredited by NABET, Lab: Gazetted by MOEF, GoI) 224, Jai Commercial Complex, Eastern Express Highway, Opp. Cadbury Factory, Thane (W) deepa@ultratech.in, shekhartamhane@ultratech.in Website: Phone: (022) / Fax: (022)

2 1.0 INTRODUCTION & PROJECT DESCRIPTION: M/s. Prakhhyat Dwellings LLP has proposes Residential and Commercial Project on plot aring S.no. 128/3/1/1(p), 128/3B/1, 128/3B/2, 128/3/C, 129/2, 129/2 /1, at Village Temghar & S.no. 40/1/1,40/1/2, 40/2/2, 40/3/2, 40/4, 40/5, 40/6, 40/7, 40/8, 40/9, 40/10, 40/11, 40/12, 40/13/1/A, 40/13/2, 42/0,43/1,43/2, 43/3,44/1/2, 44/2/2,44/2/3, 44/3/1, 44/3/2, 44/4, 44/5, 44/6,45/2/1, 45/2/2, 45/3/1, 45/3/2, 45/4,45/5,45/6,45/7,45/8,45/9, 45/10,45/11,45/12, 58/7/1, 58/7/2, 58/8, 58/9, 58/11, 58/12, 58/13, 58/16, 58/17, 58/18, 58/19, 58/20, 58/21, 58/22, 58/23, 83/1/1, 83/1/2, 83/2, 83/3, 83/4, 83/5, 83/6, 83/7, 83/8, 83/9, 84/1, at Village Bhadvad, Taluka Bhiwandi, District Thane, Maharashtra. Project site is an open land and falls within the limits of Bhiwandi-Nizampur City Municipal Corporation (BNCMC). The proposed development comprises of Residential and commercial buildings. The region has residential use pattern comprising of residential and commercial development. As per the Environment Impact Assessment (EIA) Notification dated 14 th Septemr 2006 as amended, the proposed project falls under 'Category B1' with activity numr '8', which require preparation of EIA Report. The EIA Report shall address the environmental impacts of the project and proposes the mitigation measures for the same. The EIA Report shall prepared based on standard TOR notified by MoEF on dt and as per the guidelines given in Environmental Impact Assessment Guidance Manual for Building and Large Construction projects by MoEF. The area statement including the total plot area, green areas along with the built up area as per Floor Space Index (FSI) and the construction built up area which include FSI and non FSI area is explained as follows: Sr. No. Description Area (Sq. m.) 1. Plot Area 92, R.G area Permissible FSI 1, 49, Proposed Built-up area As per FSI 1,43, Total Construction Built-up Area (FSI + NON FSI) 2,54, Project Proposal: Residential Towers: 19 Nos. : Stilt + Podium + 14 Floors each Commercial Building: Ground + 3 Floors 2.0 STUDY AREA: The report shall include detailed characterization of existing status of environment in an area of 10 Km radius around the project site. Map of the study area clearly delineating the location of various monitoring stations (air/water/soil and noise) superimposed with location of habitats shall shown. Primary data is collected for one season except rainy season. Monitoring of the parameters shall carried out within the study area. 2

3 Fig. 1: Study area of Proposed Project 10 Km radius around the plot boundary Fig. 2: Toposheet map of 10 Km radius around the plot boundary 3

4 EIA study for this project shall done as per the standard TOR notified by MoEF on dt and as per the guidelines given in Environmental Impact Assessment Guidance Manual for Township and Area Development projects by MoEF. Proposed Terms of References (TOR) for conducting EIA Study are as follows: Sr. A Proposed Terms of References (TOR) for conducting EIA Study as per the standard TOR notified by MoEF on dt Site Analysis and Project Details 1. Examine details of land use as per Master Plan and land use around 10 km radius of the project site. Analysis should made based on latest satellite imagery for land use with raw images. Check on flood plain of any river 2. Submit details of: Remarks 2.1. Environmentally sensitive places 2.2. Land acquisition status, rehabilitation of communities villages examined 2.3. Present status of such activities examined 3. Examine baseline environmental quality along with projected incremental load due to the project 4. Environmental data to considered in relation to the project development would (a) land, (b) groundwater, (c) surface water, (d) air, (e) bio-diversity, (f) noise and vibrations, (g) socio economic and health 5. Details of litigation pending against the project, if any, with direction /order passed by any Court of Law against the Project should given B Land 6. Submit a copy of the contour plan with slopes, drainage pattern of the site and surrounding area. Any obstruction of the same by the project 7. Submit the present land use and permission required for any conversion such as forest, agriculture etc. C Water examined Not applicable 8. Ground water classification as per the Central Ground Water Authority Not applicable 9. Examine the details of Source of water, water requirement, use of treated waste water and prepare a water balance chart 10. Rain water harvesting proposals should made with due safeguards for ground water quality. Maximize recycling of water and utilization of rain water. Examine details 11. Examine soil characteristics and depth of ground water table for rainwater harvesting D Solid Waste Management examined 12. Examine details of solid waste generation treatment and its disposal 4

5 Sr. E Proposed Terms of References (TOR) for conducting EIA Study as per the standard TOR notified by MoEF on dt Flora and Fauna Remarks 13. Submit the details of the trees to felled for the project F Energy 14. Examine and submit details of use of solar energy and alternative source of energy to reduce the fossil energy consumption. Energy conservation and energy efficiency 15. DG sets are likely to used during construction and operational phase of the project. Emissions from DG sets must taken into consideration while estimating the impacts on air environment. Examine and submit details G Traffic and Transportation 16. Examine road/rail connectivity to the project site and impact on the traffic due to the proposed project. Present and future traffic and transport facilities for the region should analyzed with measures for preventing traffic congestion and providing faster trouble free system to reach different destinations in the city 17. A detailed traffic and transportation study should made for existing and projected passenger and cargo traffic 18. Examine the details of transport of materials for construction which should include source and availability H Disaster Management Plan 19. Submit details of a comprehensive Disaster Management Plan including emergency evacuation during natural and man-made disaster I Environmental Management and Monitoring Plan 20. Examine separately the details for construction and operation phases both for Environmental Management Plan and Environmental Monitoring Plan with cost and parameters 21. Submit Roles and responsibility of the developer etc for compliance of environmental regulations under the provisions of EP Act. 22. The cost of the Project (capital cost and recurring cost) as well as the cost towards implementation of EMP should clearly spelt out 3.0 METHODOLOGY studied and The methodology for conducting the baseline environmental survey considered is as per EIA Guidance Manual-Building, Construction, Township and Area Development projects by MoEF. Baseline information with respect to air quality, noise level and soil quality in the study area were collected by conducting primary sampling / field studies. Baseline status of Land, Biological and Socio-economical environment are also studied by an accredited expert. 5

6 4.0 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES: The anticipated negative and positive impacts on the land, water, air, ecological and socioeconomic environment during the construction and operation phase shall predicted. Impact identification for this project shall done by using modified Delphi Technique. Mitigation measures shall suggested to reduce adverse impacts due to the development. Best environmental practices for conservation of natural resources, environmental management plan, environmental monitoring programme including budgeting for the expenditure proposed, corpus funding for long term maintenance of environmental management facilities in future shall suggested. 5.0 ENVIRONMENTAL MONITORING PROGRAM: Environmental Monitoring Program shall include: Frequency, location, parameters of monitoring Summary matrix of environmental monitoring, during construction and operation stage Requirement of monitoring facilities Compilation and analysis of data and reporting system 6.0 ADDITIONAL STUDIES: Additional studies which are carried out are as follows and same shall incorporated in EIA report Risk Assessment Disaster Management Plan Natural Resource Conservation Air Emission and Dispersion Modeling 7.0 PROJECT BENEFITS: Details about the improvements in physical infrastructure, social infrastructure, employment potential and other nefits that are accrued shall incorporated. Employment potential of this project during construction and operation phases shall evaluated. 8.0 ENVIRONMENTAL MANAGEMENT PLAN: Adequate environmental management measures will incorporated during the entire planning, construction and operating stages of the project to minimize any adverse environmental impact and assure sustainable development of the area. Project specific EMP with location and design specific details shall include the following elements for construction phase and operation phase Air Pollution Control and Management Noise Control and Management Water Conservation Sewage Treatment and Operation and Maintenance Storm water management Solid, Hazardous and E Waste Management Energy Conservation and use of Non conventional energy Traffic Management Plantation, Landscaping and Land Management Management of Social Issues Occupational, Safety and Health issues Environmental Monitoring Emergency Response Plans for emergency scenarios 6

7 Environmental Management System For the effective and consistent functioning, an Environmental Management System (EMS) will established at the site. The following components will part of the EMS: Environmental Policy Objectives & Targets Structure and Responsibility Emergency Planning Environmental Monitoring Programme Operation and Maintenance of Environmental Management Facilities like STP, rain water Harvesting, solar systems, landscape development, solid waste management system. Non-conformance & Corrective and Preventive Action Short term and long term budgetary provisions for the EMP Submission of six monthly reports to Regional office, MoEF for compliance of conditions in Environmental Clearance. 9.0 DISCLOSURE OF CONSULTANT ENGAGED: The consultants engaged and nature of consultancy rendered shall listed in EIA. Enclosures: 1. Location plan 2. Google image 3. Layout plan 7

8

9 V I L L A G E B O U N D A R Y O F S A R O L I TYPE 3B R.G PROVIDED SQ.MT S. NO AMENITY AREA= SQ.FT. 6.00M WIDE ACCESS ROAD 14 TYPE 9A ENTRY-2 LEGENDS PLOT BOUNDARY AMENITY AREA R.G. AREA OTHER PLOT COMMERCIAL BLDG 5 TYPE 3C H C M T R ATTACHED 46 6 TYPE-1 TYPE-1 TYPE-1 TYPE-1 TYPE-1 TYPE-1 TYPE 3C TYPE 3C ENTRY-3 TYPE-1 ENTRY-1 COMMERCIAL BUILDING ( 14 FLOOR ) AREA/ FLR =8500 SQ.FT. a H C M T R H C M T R

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Identifying Environmental Aspects

Identifying Environmental Aspects Identifying Environmental Aspects How an organization interfaces with the environment Environmental Aspect: Element of an organization s activities, products, or services that can interact with the environment.

More information

TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT

TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT TERMS OF REFERENCE for an ENVIRONMENTAL IMPACT ASSESSMENT for a PROPOSED RESORT DEVELOPMENT at BIG AND LITTLE PELICAN CAY PORTLAND BIGHT, ST. CATHERINE, JAMAICA TABLE OF CONTENTS BACKGROUND 4 1. Executive

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

SUBDIVISION AND DEVELOPMENT REGULATION

SUBDIVISION AND DEVELOPMENT REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT SUBDIVISION AND DEVELOPMENT REGULATION Alberta Regulation 43/2002 With amendments up to and including Alberta Regulation 119/2014 Office Consolidation Published

More information

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

COASTAL APPLICATION FOR A MAJOR SITING PERMIT Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and

More information

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University.

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Page 1 of 6 INTRODUCTION Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Millennium Hall is described as

More information

Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University.

Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University. Page 1 of 5 INTRODUCTION Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University. Queen Lane Addition is described as follows: Medical

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities

Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities 40/F, Revenue Tower, 5 Gloucester Road, Wan Chai, Hong Kong 香 港 灣 仔 告 士 打 道 5 號 稅 務 大 樓 40 樓 ACE-EIA Paper 2/2009 For advice Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment

More information

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Civil Engineering and Architecture (CEA) Detailed Outline

Civil Engineering and Architecture (CEA) Detailed Outline Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of

More information

SYLLABUS FOR RECRUITMENT TEST FOR THE POST OF ASSISTANT TOWN PLANNER (GROUP-A) IN TOWN & COUNTRY PLANNING DEPARTMENT, HARYANA

SYLLABUS FOR RECRUITMENT TEST FOR THE POST OF ASSISTANT TOWN PLANNER (GROUP-A) IN TOWN & COUNTRY PLANNING DEPARTMENT, HARYANA SYLLABUS FOR RECRUITMENT TEST FOR THE POST OF ASSISTANT TOWN PLANNER (GROUP-A) IN TOWN & COUNTRY PLANNING DEPARTMENT, HARYANA 1. MATERIALS AND PRINCIPLES OF CONSTRUCTION:- Site Development and Layouts,

More information

12 ENERGY. 12.1 Introduction

12 ENERGY. 12.1 Introduction 12 Energy 12.1 Introduction Otago is a hydro-electric power producing region and a major exporter of electricity in New Zealand today. The two large existing hydro-electric schemes in the region, Roxburgh

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

at a disposal site for which a permit has been issued; or

at a disposal site for which a permit has been issued; or Version 1/19 June 2000 INTERPRETATION OF THE DEFINITION OF DISPOSAL SITES WITH REGARD TO THE ISSUING OF PERMITS FOR WASTE INCINERATORS, WASTE MANAGEMENT FACILITIES AND OTHER ALTERNATIVE WASTE DISPOSAL

More information

INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs)

INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs) UNITED REPUBLIC OF TANZANIA INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs) 1. Introduction The United Republic of Tanzania, which comprises of Tanzania Mainland and Zanzibar, brings forth her Intended

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

Proposed Terms of Reference (TOR) For

Proposed Terms of Reference (TOR) For Proposed Terms of Reference (TOR) For OBJECTIVE Environmental Impact Assessment of Proposed Delhi to Jaipur Expressway of 8/6/4 lanes ( Green Field Project) Terms of Reference (TOR) are proposed for preparation

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

Introduction to. Aalborg s Sustainability Strategy 2013-2016

Introduction to. Aalborg s Sustainability Strategy 2013-2016 Introduction to Aalborg s Sustainability Strategy 2013-2016 2 Foreword Aalborg should be a sustainable municipality, which will be to the benefit of local citizens, businesses and the environment. With

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY

2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY TABLE OF CONTENTS 1. INTRODUCTION... 3 2. DESCRIPTION OF ACTIVITY... 4 3. DESCRIPTION OF THE ENVIRONMENT... 4 4. DESCRIPTION OF THE ACTIVITY IN RELATION TO THE ENVIRONMENT...

More information

NAPA COUNTY WATERSHED SYMPOSIUM

NAPA COUNTY WATERSHED SYMPOSIUM Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

NAPCS Product List for NAICS 54162: Environmental Consulting Services

NAPCS Product List for NAICS 54162: Environmental Consulting Services NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION PLANNING DIVISION CITY OF SUNNYVALE P.O. BOX 3707 SUNNYVALE, CA 94088-3707 NOTICE OF PREPARATION TO: Responsible, Trustee, and Other Interested Public Agencies FROM: Sunnyvale Community Development 456

More information

Iowa Smart Planning. Legislative Guide March 2011

Iowa Smart Planning. Legislative Guide March 2011 Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The

More information

Carmarthenshire LDP Site Assessment Proforma

Carmarthenshire LDP Site Assessment Proforma Carmarthenshire LDP Site Assessment Proforma 1. Site Details Ref: SC1/h1 Site Ref (where applicable): Location: Parc Puw, Drefach Felindre Site Area (Ha): Eisting Use* *if candidate site as proposed by

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

APPENDIX I FORM 1. 2. S. No. in the schedule 8(a) Building and Construction project.

APPENDIX I FORM 1. 2. S. No. in the schedule 8(a) Building and Construction project. 1568651343757 01234567418199129126 76566544740738 313148746568 012204653107 81664 633840 91 APPENDIX I FORM 1 Basic Information Sr No. Item Details 1 Name of the project/s Proposed Residential and Commercial

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

It s hard to avoid the word green these days.

It s hard to avoid the word green these days. Going green : Environmental jobs for scientists and engineers Alice Ramey Alice Ramey is an economist in the Office of Occupational Statistics and Employment Projections, BLS. She is available at (202)

More information

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT FOR DEVELOPMENT OF RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117 UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU. PROMOTER: M/S. PRESTIGE ESTATES PROJECTS LTD. BENGALURU

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by

More information

VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS

VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Planning Services, Civic Offices, New Road, Grays, Essex RM17 6SL VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Checklists to ensure prompt validation: Checklist 1 for ALL applications for planning

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE Arabian Sea Mumbai KARNATAKA Delhi Chennai Nepal Calcutta Bay of Bengal PRESENTATION Improving the performance of Public Water Utilities A case study of Bangalore By N.C. MUNIYAPPA, Chairman, BWSSB LOCATION

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014 Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development

More information

ENVIRONMENTAL ASSESSMANT AND MANAGAMENT PLAN

ENVIRONMENTAL ASSESSMANT AND MANAGAMENT PLAN Consultancy Services for Preparation of Feasibility Report of Two- Laning of Km 0.0 to Km 38.750 of SH-22 comprising the section from Mandrayal to Karauli (Highway 1 Package 13) TERMS OF REFERENCE (proposed)

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.: SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

COMPANY NAME. Environmental Management System Manual

COMPANY NAME. Environmental Management System Manual Revision No. : 1 Date : DD MM YYYY Prepared by : Approved by : (EMR) (Top Management) Revision History Revision Date Description Sections Affected Revised By Approved By Table of Content 0.0 Terms and

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

An Introduction to Conservation Covenants. A Guide For Developers and Planning Departments

An Introduction to Conservation Covenants. A Guide For Developers and Planning Departments An Introduction to Conservation Covenants A Guide For Developers and Planning Departments The Land Trust Alliance of BC Revised April 2007 Photo: Millard Piercy Watershed Courtenay, BC several conservation

More information

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations? Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview Purpose of Subdivision/ Land Development Ordinances (SALDO) Municipalities Planning Code Process Design

More information

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. 6 RENEWABLE ENERGY Image Source: (Word Clip Art Stock Photo, 2011) Date: May, 2015 BACKGROUND PLANNING AND DEVELOPMENT SERVICES DEPARTMENT 789

More information

TORs for proposed EIA & RA study

TORs for proposed EIA & RA study TORs for proposed EIA & RA study 1. The EIA study for the proposed project shall be carried out based on the latest environmental quality status around the project site (10 km radial distance) for one

More information

Towards a Green and Sustainable IIT Kanpur

Towards a Green and Sustainable IIT Kanpur Towards a Green and Sustainable IIT Kanpur Saving the environment is not only about introducing energy saving devices. It is about changing people s mindset and making them want to save the environment

More information

Creating Green Jobs within the Environment and Culture sector.

Creating Green Jobs within the Environment and Culture sector. Creating Green Jobs within the Environment and Culture sector. Matilda Skosana Environmental Programmes (ILO Definition): 1. DEFINITION OF GREEN JOB. Jobs are green when they help reduce negative environmental

More information

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102 CHAPTER 9 PERMITTING 9.1 England and Wales 100 9.1.1 T24 exemption for on-farm AD 100 9.1.2 T25 exemption for off-farm AD 100 9.1.3 Standard rules environmental permits 100 9.1.4 Standard rules for on-farm

More information

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

ENVIRONMENTAL IMPACT ASSESSMENT REPORT ENVIRONMENTAL IMPACT ASSESSMENT REPORT for Investment Proposal: BUILDING A NEW NUCLEAR UNIT OF THE LATEST CHAPTER 12: CONCLUSION OF THE TEAM AND TEAM LEADER PREPARING THE ASSESSMENT original copy PREPARED

More information

APPENDIX I. Revised FORM 1

APPENDIX I. Revised FORM 1 APPENDIX I Revised FORM 1 Basic Information Serial No. Item Details 1.1 Name of the project/s Proposed Residential Project by S. S. Properties at S. No.31/ & 32, Tal.- Mulshi, Dist. Pune 2. S. No. in the

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

Cathkin Relief Road Planning Statement

Cathkin Relief Road Planning Statement Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide

More information