1 Framework Pinhoe Area Access Strategy January 2011 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD 1

2 PREPARED BY Name: Matt Collins Position: Assistant Transportation Planning Officer Date: October 2010 AGREED BY Name: Jamie Hulland Position: Transportation Studies Manager Date: January 2011 ISSUED BY Name: Dave Black Position: Head of Planning and Transportation Date: January

3 CONTENTS 1. INTRODUCTION Purpose of the report BACKGROUND Local Planning Context Masterplanning Approach Pressures and Constraints ACCESS STRATEGY Overview Improving the range and quality of sustainable transport options Enhancing the public realm and improving safety and local traffic management Providing additional Route Choice ASSESSING THE IMPACTS OF GROWTH Methodology Double Mini Roundabout impacts Chancel Lane impacts Cheynegate Lane impacts CONCLUSIONS Summary of Analysis FIGURES APPENDIX FEASIBILITY REPORT SEPTEMBER Brief Feasibility Study Additional Considerations Costs Summary

4 1. Introduction 1.1. Purpose of the report This report has been prepared as a framework for future discussions between developers and local planning and highways authorities. The purpose is to set out the likely transportation improvements that will be needed to support growth planned in the Pinhoe area both in Exeter City and East Devon District Council administrative boundaries A deferred County Development Management Committee decision for a development proposal of 450 dwellings recommended that a masterplan approach be investigated. This was considered necessary to comprehensively plan for education provision and develop a transportation strategy which would address existing issues and support sustainable economic development This transportation access strategy seeks to identify a range of measures aimed at reducing car use by providing attractive sustainable alternatives; improving local conditions for existing residents, and distributing traffic away from busy routes and sensitive junctions. 2. Background 2.1. Local Planning Context The East Devon District Council LDF Core Strategy Preferred Approach document (Sept 2010) proposes 800 dwellings in the Pinhoe area east of the double mini roundabouts The Exeter City Council Core Strategy Proposed Submission (July 2010) makes no specific reference to residential use in the north east of the city. However, with a need to accommodate 5000 dwellings in the city (excluding the strategic allocations of Monkerton/Hill Barton, Newcourt and South West Exeter), some of this growth could be accommodated in the Pinhoe area Pre-application discussions have been held for 4 major developments totalling up to 1500 dwellings in the Pinhoe area (see Figure 1). These comprise of approximately: 450 dwellings at Old Park Farm East Devon District 350 dwellings at Pinn Court 1 East Devon District 400 dwellings at Pinhoe Quarry Exeter City 250 dwellings at Ibstock Brickworks Exeter City 10000m 2 of employment at Ibstock Brickworks Exeter City In the recent planning application for Old Park Farm, the highways authority were satisfied that 450 dwellings could be accommodated with a minimal impact on the double mini roundabouts, subject to improved walking and 1 Pre application discussions have indicated up to 800 dwellings on this site; however, proximity to the motorway may reduce the level of development. The East Devon District Council LDF Core Strategy Preferred Approach has indicated a total of 800 dwellings east of the double mini roundabouts, with 450 dwellings at Old Park Farm and the remaining 350 dwellings accommodated either at Old Park Farm or Pinn Court. 4

5 cycling links, upgrade of rail station facilities, public realm improvements, an enhanced bus service from Cullompton and a small scale Park and Ride facility The purpose of these measures was to encourage both existing and new residents in the local area to transfer to more sustainable modes in order to minimise car use. Furthermore, due to the concentrated period of queuing at the double minis, there was also scope for people to adjust their journey times by either leaving earlier or later to avoid the congestion Due to the sensitivity of the double mini roundabouts, the analysis concluded that further development to the south (i.e. at Pinn Court) would not be appropriate until a later stage of the LDF plan period. Additional development beyond 450 dwellings could only be achieved following major transport improvements delivered as part of the East of Exeter developments including Monkerton, Skypark, Science Park and Cranbrook, which may help offset the impact of new development traffic In strategic planning terms, 450 dwellings in isolation would not deliver sustainable community benefits; the scale of development is unlikely to support a local shop and a new Primary School would be unviable. This has implications for the transport network with people needing to travel further afield, most likely by car, for local services. This reinforces the need to comprehensively plan for a larger urban area, taking a more strategic approach to transportation and education provision To the west of the double mini roundabouts, approximately 700 dwellings at the Quarry and Brickworks could put more pressure on Pinhoe village centre. Additional traffic accessing Cumberland Way via Church Hill could result in increased queuing on the approach from Cullompton with traffic needing to give way to the right. This further emphasises the need to consider the wider transport network and ways to make the existing road network operate efficiently in the future Masterplanning Approach A masterplan for Monkerton has recently been approved by Exeter City Council and takes a comprehensive, integrated approach to land use and transport planning for the area. The process involved District and County Council officers, key stakeholders, land agents and developers and has resulted in a scheme which takes into account education, accessibility, green infrastructure, community and energy infrastructure requirements. A transportation access strategy was developed to identify how impacts at Junction 29, on Honiton Road and Pinhoe Road could be managed To the South West of the Pinhoe Area the Science Park includes a large employment facility and establishes the east-west route through to the emerging Cranbrook development and Sky Park Facility. The emerging infrastructure in this area will help to provide additional route choices for any traffic travelling between the Pinhoe area and the east of Exeter A masterplanning approach to address strategic issues of education and transportation, in particular, has been recommended for the Old Park Farm and Pinn Court proposals. A joined-up approach to deliver transportation improvements associated with the Pinhoe Quarry and Ibstock brickworks 5

6 proposals is also considered necessary for the LDF process. This document considers the transportation issues that need addressing in the Pinhoe area and proposes a strategy to deliver sustainable growth Pressures and Constraints There are a number of constraints on the local highway network that would need addressing as part of future development proposals in the Pinhoe area. These are highlighted in Figure As recent surveys indicated, the most significant issue is the double mini roundabouts at Pinhoe, where there are existing queues between and on the B3181 approach from Cullompton (see Figure 3). As the graph indicates, queuing occurs during a very concentrated period of the day (between and 09.00), which reinforces the idea that if people adjusted their journey times, the impacts on the roundabouts could be reduced Nevertheless, there is potential for all four of the Pinhoe area development proposals to impact on these sensitive junctions as it provides a convenient route for trips to the motorway, Exeter Business Park and Sowton (via Cumberland Way) and in the future, east of Exeter developments. This is likely to result in increased queuing and delays on the Church Hill and B3181 southbound arms Pinn Lane is a narrow road, serving residential development in the Monkerton area. The route was previously used as a rat run for traffic from the Pinhoe / Cullompton corridors accessing the Exeter Business Park / Jct 29 until Cumberland Way was constructed. The northern end (Station Road) serves the railway station and is one of the approaches to the double mini roundabouts, which contributes to delays and queues during peak periods Harrington Lane and Beacon Lane currently provide an east-west link connecting the communities of Pinhoe, Beacon Heath and Pennsylvania with the city centre. It provides an alternative, cross city route to Pinhoe Road. However the narrow, single lane bridge on Beacon Lane, near the junction with Cheynegate Lane, is a major constraint on this corridor. There is limited capacity to accommodate large volumes of traffic and citybound development traffic from the Quarry / brickworks developments would increase queues and delays in the area with increased likelihood of traffic accidents due to the poor road alignment Chancel Lane is a residential road north of the railway line, although there are a number of capacity and safety constraints making it unsuitable for increased volumes of traffic. The road has parking on both sides of the road, residential frontages and a single lane railway bridge on a bend with poor forward visibility. Due to its proximity to the Quarry / brickworks developments, new residents are likely to use the road to access Pinhoe Road and destinations in the vicinity of the motorway to the detriment of the local community Traffic levels are relatively low in the local area, although there are a number of constraints on routes which development traffic will use. These constraints include narrow railway or river crossings and, in the case of the double mini roundabouts, a complex junction in a busy village centre with 5 6

7 approach arms. Being located on the eastern edge of the city, it is well located for new employment growth to the east of Exeter. This will offer opportunities to encourage more sustainable modes of travel, including walking and cycling for shorter distance journeys. The developments are also well served by bus services and are within reasonable distance of the rail station at Pinhoe. The following section sets out the transport strategy for accommodating growth in the Pinhoe area. 7

8 3. Access Strategy 3.1. Overview A number of options have been considered to help mitigate the impact of up to 1500 dwellings in the Pinhoe area. There are three strands to this strategy: Minimising car use by improving the range and quality of sustainable transport options Enhancing the public realm and improving safety and local traffic management to address transportation issues for existing local residents Increasing permeability from the north of the city by providing additional route choice to distribute traffic away from sensitive junctions, and The following sections outline the mitigation measures required to deliver the level of growth planned in the Pinhoe area, some of which are indicated in Figure Improving the range and quality of sustainable transport options minimising car use and promoting greener, healthier ways of travelling Direct and permeable walking and cycling links will need to be designed into development layouts to offer safe and convenient access to key services and facilities, including local shops, jobs, schools, bus stops and rail stations. There is a pedestrian / cycle link running along the south of the brickworks site, adjacent to the railway. Improved links will be needed to connect to Pinhoe Village and the Primary School Funding for a new, high quality cycle link has been secured providing a direct connection between communities in Broadclyst and Pinhoe. This will also benefit new residents at the Old Park Farm and Pinn Court developments. It would also connect into the planned primary cycle route offering a direct, predominantly segregated route from the edge of Exeter to the city centre. This will prove attractive for commuters, school children and will help encourage healthier, more physically active ways of travelling by also improving access to leisure opportunities (e.g. at Killerton/Poltimore) The Monkerton masterplan has a strong cycle network built into the design and it is important that the Pinhoe area developments connect into these routes to offer easy, safe access to the east of Exeter developments via the new M5 pedestrian/cycle bridge. A toucan crossing near Parker s Cross Lane would provide access from the new Broadclyst cycle route into the Monkerton area, where cyclists would use quieter residential roads to access the new bridge. It will also be important to provide convenient cycle connections from the quarry / brickstocks area, through the Monkerton development, to access the rail station. 8

9 Improved access to Pinhoe rail station and parking facilities for cyclists will encourage both new and existing residents to travel by rail into the city. In the longer term, with an increased frequency planned between Paignton and Exeter St James Park in 2016, there are opportunities with revenue support to extend this service to Cranbrook. This would enable a half hour frequency between Pinhoe and the city centre A Park and Change facility has been proposed for the Old Park Farm development, serving the B3181 Cullompton corridor. There are a number of villages and rural communities not served by the 1 service, and this facility will help capture trips currently passing through the double mini roundabouts and contributing towards delays With new growth there are opportunities to enhance existing bus routes and influence travel behaviour of new and existing communities. Increasing the frequency and improving the choice of destinations will increase the attractiveness of bus travel and help encourage residents to switch mode and reduce their car use For the Old Park Farm development, there are plans to use developer funds to provide additional buses on the 1 route from Cullompton. With additional buses, there are opportunities to alter the route of some citybound services to increase the choice of key destinations in the city. Some buses currently using Pinhoe Road, for instance, could instead route via Cumberland Way and Heavitree Road and serve major employment areas including Exeter Business Park (Met Office), Sowton Industrial Estate and the RD&E hospital. New and existing residents along the Cullompton-Pinhoe corridor would benefit from this and help remove car trips from the double mini roundabouts There are opportunities with the Pinn Court site to provide a bus gate into the existing Monkerton residential area at Parkers Cross Lane to improve access for existing residents and provide greater priority for buses travelling along the B3181. Buses avoiding delays at the double mini roundabouts would help encourage modal shift by offering more competitive journey times and better reliability For new residents in the Harrington Lane area, there are opportunities to extend the F service to deliver a frequent bus service within easy walking distance of development. This service can be significantly enhanced if combined with new road infrastructure described below. There are also opportunities to enhance the B service during peak periods to increase frequency to Exeter Business Park, which would also offer benefits to existing residents along the corridor In addition to the above measures, there are other demand management measures that can be used to influence travel behaviour, either through providing incentives to walk, cycle or travel by bus or rail, or by introducing parking charges to discourage employees from using their car. This is an approach adopted at County Hall and has recently been agreed for the Skypark and Science Park developments. Effective travel planning will therefore have an important role in reducing car use and encouraging new residents to travel in a more sustainable way during peak periods. Comprehensive residential travel plans will also have a role in influencing travel behaviour of new residents. These can be a useful tool in encouraging 9

10 people to travel sustainably from the outset, rather than getting into the habit of driving because they may be unfamiliar with the alternative travel choices Enhancing the public realm and improving safety and local traffic management addressing transportation issues for existing local residents A number of factors contribute towards delays at the double minis and a village centre enhancement scheme will be developed in consultation with residents and local stakeholders to improve local conditions and enable the junction to operate more efficiently. A number of contributing traffic management issues will be taken into account to improve the flow of traffic including the Pinhoe local centre car park access and egress arrangements and pedestrian crossing / bus stop locations Soft traffic calming measures on Chancel Lane will be introduced to reduce the speed of traffic and discourage development traffic from using the road as a through route to Pinhoe Road. A 6ft vehicle width restriction will also be put in place. These measures will be complemented by a new route which will provide a more attractive, alternative north-south link, described below Measures to improve the safety of the road over the bridge on Chancel Lane will be needed, including consideration for vulnerable road users such as children, elderly people and cyclists Providing additional Route Choice increasing permeability and distribute traffic away from sensitive junctions A new route connecting Harrington Lane with Pinhoe Road, via Exhibition Way is considered essential to mitigate the impacts of new development traffic (see Figure 2). This would also remove existing traffic from unsuitable routes including Church Hill, the double mini roundabouts, Beacon Lane and Chancel Lane where existing capacity or safety issues exist. The Pinhoe Quarry and Ibstock brickwork sites should deliver this route, which will require Exeter City Council owned land at the southern end. On street parking on Exhibition Way would need to be rationalised, and improvements to the signalised junction with Pinhoe Road With crossings of the railway line poor in the local area (e.g. Chancel Lane, Summer Lane and Beacon Lane), there are aspirations for the bridge to carry two lanes of traffic. A 5.6m wide carriageway could be achieved without replacing the existing structure at high costs, although a separate pedestrian / cycle bridge would be needed to provide safe access for vulnerable road users. Further structural surveys will be needed to assess the costs and feasibility of making the bridge accessible to vehicles Land will be acquired from developers in the Pilton Centre, north western part of the Monkerton development to widen Pinhoe Road (citybound) on the approach to Exhibition Way. This would allow a dedicated right turn lane into Exhibition Way and two ahead lanes towards the Pinhoe Sainsbury s junction. 10

11 To accommodate new dwellings on the site south of the B3181 at Pinn Court, some initial options for highway improvements on Langaton Lane have been investigated (see Figure 2 and Appendix for feasibility study). The improvements would allow traffic from the Cullompton direction to bypass the double mini roundabouts via a new route from the B3181 connecting into Langaton Lane. This would serve destinations east of the motorway, where future job opportunities will be. Preliminary designs have considered widening Langaton Lane to improve the standard of road for vehicular traffic and also provide a footway and cycleway. Shuttle working traffic signals or give and take priority measures would be used to deal with constraints at the railway bridge and the Pin Brook east of the motorway. The link would be designed to have a two-way capacity of between 500 and 1000 vehicles and so would not be suitable for significant levels of traffic. Even so, by removing this level of traffic from passing through the double mini roundabouts, it would help offset the traffic impacts of the Old Park Farm and Pinn Court developments The recently approved Monkerton and Hill Barton masterplan includes plans for a new, high standard east-west link road between Tithebarn Lane and Cumberland Way (Figure 4). This will be delivered by development in the Monkerton area and will relieve pressure on Junction 29 and the Honiton Road corridor in the longer term. This new link road will also help reduce impacts on the double mini roundabouts by diverting some citybound traffic currently using Station Road onto Cumberland Way via the east-west link road. The link road will also reduce the attractiveness of Pinn Lane as a through route for traffic between Pinhoe and Exeter Business Park with opportunities to stop up the Pinn Lane link south of the link road into Grenadier Road. 11

12 4. Assessing the impacts of Growth 4.1. Methodology Figures 5 to 7 give an indication of the changing traffic flows resulting from planned growth in the 4 major residential growth areas in Pinhoe. Figure 5 shows existing morning peak movements. It was established from the queue data that queuing impacts are worst in the period. Figure 6 gives an indication of the additional traffic generated and how it impacts on the sensitive parts of the network. Figure 7 shows how traffic levels change following introduction of additional road infrastructure, as described in section The traffic generation assumes a low vehicular trip rate, which could only be achieved with a strong commitment to reducing car use, in line with the recommendations in section 3.2. The following sections assess the impacts of the residual development traffic on the network A simple spreadsheet model has been developed using challenging but robust trip rates. The distribution of traffic is as agreed for the Old Park Farm planning applications and through scoping discussions for the Pinhoe Quarry area developments Double Mini Roundabout impacts It is evident from Figure 6 that with development there is an increase in traffic approaching the double mini roundabouts in the AM peak from 1800 vehicles to over 2000 vehicles. This level of increase, concentrated on the Church Hill and Pinn Hill (Cullompton) approaches will increase delays to an unacceptable level. As vehicles need to give way, the right turning vehicles on Church Hill impact on the ahead movement from Pinn Hill. With the level of additional traffic forecast for this corridor, this will exacerbate existing delays, which have an average of 20 vehicles queuing throughout the AM peak (approximately 120metres) Figure 7 indicates that with new road infrastructure at Exhibition Way and connecting to Langaton Lane, the traffic levels are reduced to approximately 1800 vehicles, which is comparable to existing levels. Exhibition Way mitigates any predicted increase on Church Hill (approximately 60 additional vehicles) and the Langaton Lane link is expected to attract approximately 170 trips from the Old Park Farm and Pinn Court developments as well as some existing trips from the B3181. This is a conservative estimate, with the road capable of accommodating up to 500 trips. There may therefore be even greater benefits to the B3181 corridor and the double mini roundabouts with further growth in jobs east of the motorway There is also a reduction of approximately 45 vehicles northbound on Station Road who instead will use the East-West Link Road, which will be delivered as part of the Monkerton development Chancel Lane impacts It is evident from Figure 6 that without any improvements to the existing road network, there would be an increase of approximately 175 vehicles in the 12

13 AM peak, which would present a safety concern on Chancel Lane, as well as impact negatively on existing local residents. The Exhibition Way Link would provide a more suitable route than Chancel Lane, with the standard of road, crossing of the railway and signal control at its junction with Pinhoe Road more capable of managing traffic on the local road network If Exhibition Way is to become an important route between Harrington Lane and Pinhoe Road, then there will need to be improvements to the signal junction at the southern end. Currently, there are two lanes: an ahead lane and an ahead / right turn lane. Given the increase in traffic on Pinhoe Road (with growth from Monkerton and Pinhoe area (eastern) developments) and increased use of Exhibition Way, it will be necessary to have a dedicated right turn lane and two straight ahead lanes on Pinhoe Road (from Pinhoe). This will require securing some land from development on the northern boundary of the Monkerton growth area (Pilton area) Cheynegate Lane impacts This route will still prove an attractive option for residents living along Harrington Lane, which is evident by the forecast increase of approximately 100 vehicles in the AM peak both with and without the Exhibition Way Link Road. In reality, due to the capacity constraint, traffic may be encouraged to use alternative routes such as Exhibition Way, Chancel Lane or Church Hill. Exhibition Way would be able to accommodate this level of increase with signal control at the junction with Pinhoe Road, although without this link, the impacts on Chancel Lane and Church Hill would be acceptable. 13

14 5. Conclusions 5.1. Summary of Analysis The above analysis assesses the traffic impacts on parts of the network where there are known capacity and safety issues in the Pinhoe area. The strategy for Pinhoe has a strong emphasis on minimising car use by improving the choice of sustainable modes to access key services and facilities. The area is located on a major transport corridor into the city and, being located on the edge of Exeter, is reasonably close to jobs planned for Skypark and Science Park. There are good opportunities to encourage high levels of walking, cycling, bus and rail use but development will still generate traffic which will exacerbate existing problems. The findings demonstrate the importance of delivering new roads in the local area to help mitigate the residual traffic impacts A summary of the mitigation measures are included in the table below: Improving the range and quality of sustainable transport options Enhancing the public realm and improving safety and local traffic management Providing additional route choice Permeable walking and cycling links to make short distance trips attractive and safe New, high quality cycle link has been secured between Pinhoe and Broadclyst, which will connect into the primary cycle network providing direct access to the city centre Improved links and connections into existing routes and planned routes at Monkerton to provide ease of access to Pinhoe village, schools, jobs and leisure pursuits Improved access and facilities at the rail station, including toucan crossing near Parker s Cross Lane and secure cycle parking Half hour rail service between Pinhoe and the city centre will be possible (subject to revenue support) following frequency improvements between Paignton & St. James Park in 2016 Park and Change facility serving rural communities east of the double mini roundabouts Enhanced bus routes, using bus gates / priority measures to avoid congestion points and improve journey time reliability Improved bus service provision providing greater choice of destinations, e.g. to east of Exeter and Exeter Business Park Effective travel planning (residential and workplace) Village centre enhancement scheme to improve local environment and address local traffic management issues Soft traffic calming and safety measures on Chancel Lane to better manage traffic flows and discourage increased traffic Safety measures to manage traffic across Chancel Lane bridge Harrington Lane to Exhibition Way link road to relieve pressure on Church Hill, Beacon Lane and Chancel Lane Widen approach to Pinhoe Sainsbury s junction to manage traffic using Exhibition Way Upgrade of Langaton Lane east of the motorway to remove some East of Exeter bound trips from Pinhoe Village New East-West Link Road between Cumberland Way and Tithebarn Lane to remove some trips from Station Road too double mini roundabouts Stopping up of Pinn Lane south east of East-West link road to reduce rat running into Exeter Business Park 14

15 Figures 15

16 DATE January 2011 DESIGNED MC CHECKED JH Pinhoe Area Developments SCALE NTS FIGURE 1

17 DATE January 2011 DESIGNED MC CHECKED JH Pinhoe Area Constraints (dashed) & Improvements (solid) SCALE NTS FIGURE 2

18 DATE January 2011 DESIGNED MC CHECKED JH Queuing at Double Mini Roundabouts SCALE NTS FIGURE 3

19 DATE January 2011 DESIGNED DC CHECKED JH East-West Link Road SCALE NTS FIGURE 4

20 Monkerton Study Area Pinhoe Area Access Strategy DATE January 2011 DESIGNED MC CHECKED JH Base Year 2008 Counts SCALE NTS FIGURE 5

21 DATE January 2011 DESIGNED MC CHECKED JH Impact of Pinhoe Developments SCALE NTS FIGURE 6

22 DATE January 2011 DESIGNED MC CHECKED JH Impact of Pinhoe Developments with new Road Infrastructure SCALE NTS FIGURE 7

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West

More information

Major and Minor Schemes

Major and Minor Schemes 1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends

More information

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603 Framework Residential Travel Plan September 2013 CONTROL SHEET CLIENT: PROJECT TITLE: REPORT TITLE: THE

More information

Lawson Outline Plan External Traffic Analysis Working Paper

Lawson Outline Plan External Traffic Analysis Working Paper Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS s A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS SURREY COUNTY COUNCIL S LOCAL COMMITTEE FOR REIGATE AND BANSTEAD 12 JANUARY 2004 KEY ISSUE To consider the conclusions of

More information

How To Develop A Balanced Transport System In Devon

How To Develop A Balanced Transport System In Devon Devon Structure Plan First Review - 1995 to 2011 7 Transportation (T Policies) Explanatory Memorandum (September 1999) (Policies and Proposals adopted February 1999) 7. TRANSPORTATION 7.1 Transportation

More information

Bedford s Network Management Strategy (2011 2021) November 2010

Bedford s Network Management Strategy (2011 2021) November 2010 Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

A number of key guiding principals underline the approach to transportation within the plan area. These include:

A number of key guiding principals underline the approach to transportation within the plan area. These include: Transportation The principal form of transportation infrastructure will be vehicular roads augmented by a network of pedestrian and cycle routes. Transport infrastructure development will be commensurate

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment

More information

Segregation of Shared Use Routes

Segregation of Shared Use Routes Segregation of Shared Use Routes Technical Information Note No. 19 April 2014 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling

More information

LAND SOUTH OF BUTLER S GREEN ROAD, HAYWARDS HEATH TRANSPORT ASSESSMENT

LAND SOUTH OF BUTLER S GREEN ROAD, HAYWARDS HEATH TRANSPORT ASSESSMENT LAND SOUTH OF BUTLER S GREEN ROAD, HAYWARDS HEATH TRANSPORT ASSESSMENT JULY 2011 LAND SOUTH OF BUTLER S GREEN ROAD, HAYWARDS HEATH TRANSPORT ASSESSMENT PREPARED FOR W.T LAMB HOLDINGS LTD FMW CONSULTANCY

More information

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners Redwood Partnership Transportation Limited Maritime House Basin Road North Portslade Brighton BN41 1WR T: 01273 414515 F: 01273 376824 E: consult@redwoodpartnership.co.uk www.redwoodpartnership.co.uk REDWOOD

More information

Joined-Up Cycling. Cycle Links for Horsham Town Centre

Joined-Up Cycling. Cycle Links for Horsham Town Centre Joined-Up Cycling Cycle Links for Horsham Town Centre 1 4 3 6 2 5 Proposals to improve cycle access to the town at the Albion Way/Bishopric junction and join up some of the fragmented cycle routes in the

More information

The Mersey Gateway Project

The Mersey Gateway Project The Mersey Gateway Project The Mersey Gateway Project is a major scheme to build a new six-lane toll bridge over the River Mersey in the north west of England. It will link the towns of Runcorn and Widnes

More information

Cycle Strategy 2006 2011

Cycle Strategy 2006 2011 Cycle Strategy 2006 2011 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 POLICY BACKGROUND... 2 3 BACKGROUND... 6 4 MAIN OBJECTIVES... 8 5 TARGETS... 9 6 THE CYCLE NETWORK... 10 7 CONCLUSION... 13 Appendix A:

More information

6 Streetscape character 6.1

6 Streetscape character 6.1 6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London

More information

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014 LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington

More information

Assessment of Site Deliverability in the Market Towns

Assessment of Site Deliverability in the Market Towns East Cambridgeshire District Council of Site Deliverability in the Market Towns August 2014 Annex 1 to the Site Results Technical Background Paper (February 2013) 0 Contents: 1. Introduction 1.1 Role of

More information

Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY

Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY Committee Date: 23/01/2014 Application Number: 2013/09236/PA Accepted: 16/12/2013 Application Type: Full Planning Target Date: 17/03/2014 Ward: Nechells Palmer Street/Great Barr Street, (former MacDermid

More information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular

More information

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site. 1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises

More information

Traffic Management During Construction

Traffic Management During Construction Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to

More information

Glossop Design & Place Making Strategy

Glossop Design & Place Making Strategy Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance

More information

Street Design Guide. Leeds Local Development Framework

Street Design Guide. Leeds Local Development Framework Street Design Guide Leeds Local Development Framework Supplementary Planning Document Main Report August 2009 If you do not speak English and need help in understanding this document, please phone: (0113)

More information

Household waste & recycling storage requirements

Household waste & recycling storage requirements South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well

More information

East Midlands Intermodal Park, South Derbyshire Proposals for a Strategic Rail Freight Interchange

East Midlands Intermodal Park, South Derbyshire Proposals for a Strategic Rail Freight Interchange Newsletter: Issue 1 (May 2014) Welcome + This newsletter announces the start of Goodman Shepherd s consultation on its proposals for the East Midlands Intermodal Park (EMIP) in South Derbyshire. Goodman

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

3.0 Planning Policies

3.0 Planning Policies 3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The

More information

Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application)

Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Examining Authority s (ExA) Record of Unaccompanied Inspection of Sites to Which the Application or

More information

Land at Cofton Lake Road Cofton Hackett

Land at Cofton Lake Road Cofton Hackett Land at Cofton Lake Road Cofton Hackett Prepared by Pegasus Planning Group Richborough Estates February 2009 Bir.3085 1 2 Introduction This Background Document has been produced on behalf of Richborough

More information

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive.

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive. planning report D&P/2857b/01 30 November 2015 Bollo Lane, Chiswick Business Park and Colonial Drive, Chiswick in the London Borough of Ealing planning application no. PP/2015/5442 Strategic planning application

More information

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve

More information

SWANSEA METRO PROJECT (BUS RAPID TRANSIT) Gwyn Ephraim Arup David Whitehead City and County of Swansea

SWANSEA METRO PROJECT (BUS RAPID TRANSIT) Gwyn Ephraim Arup David Whitehead City and County of Swansea SWANSEA METRO PROJECT (BUS RAPID TRANSIT) Gwyn Ephraim Arup David Whitehead City and County of Swansea 1. INTRODUCTION 1.1 Background In the last decade a new 'intermediate' form of public transport has

More information

HIGHWAY DESIGN GUIDE 1 PRINCIPLES AND RESPONSIBILITES

HIGHWAY DESIGN GUIDE 1 PRINCIPLES AND RESPONSIBILITES 1 PRINCIPLES AND RESPONSIBILITES CONTENT 1.1 Purpose and Format 1.2 Role of the Highway Authority 1.3 Road Hierarchy 1.4 Fitting Developments into the existing highway network 1.5 Highway Agreements 1.6

More information

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance

More information

IPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES

IPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES IPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES Information from Suffolk County Council Information publicly available - free of charge Information available - with

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

Infrastructure Requirements and Costs Update for Strategic Locations

Infrastructure Requirements and Costs Update for Strategic Locations Infrastructure Requirements and Costs Update for Strategic Locations This note provides an update to the infrastructure costs submitted in the Council s statements to Matters 9, 10, 12, and 14. North East

More information

TRAFFIC POLICY NOTE DTP 34/05 LOCAL SPEED LIMITS. Policy. Preamble. Devon Local Transport Plan Objectives. Revisions

TRAFFIC POLICY NOTE DTP 34/05 LOCAL SPEED LIMITS. Policy. Preamble. Devon Local Transport Plan Objectives. Revisions TRAFFIC POLICY NOTE LOCAL SPEED LIMITS DTP 34/05 Policy To work in partnership with local communities and in consultation with the police to: Provide 30 mph speed limits in communities Provide 20mph speed

More information

Stage 2 A660 Otley Rd Cycling Study

Stage 2 A660 Otley Rd Cycling Study Stage 2 A660 Otley Rd Cycling Study Cycle Audit Final Report October 2008 Page 1 of 19 Contents Page 1.0 Introduction 4 2.0 The Benefits of Increasing Cycling 4 3.0 Methodology 5 3.0 Background - Site

More information

HIGHWAY DESIGN GUIDE. 1.1 Foreword

HIGHWAY DESIGN GUIDE. 1.1 Foreword HIGHWAY DESIGN GUIDE Part 1 INTRODUCTION 1.1 Foreword Coventry City Council wants Coventry to be a growing, accessible city where people choose to live, work and be educated, and where businesses choose

More information

Wakefield Council Street Design Guide

Wakefield Council Street Design Guide A new vision for developing Wakefield District Wakefield Council Street Design Guide A guide for residential, commercial and mixed use development in Wakefield district. www.wakefield.gov.uk Information

More information

M8 M73 M74 Motorway Improvements Project

M8 M73 M74 Motorway Improvements Project M8 M73 M74 Motorway Improvements Project October 2013 Introduction This major transport infrastructure project will complete and upgrade the M8 and key sections of the M73 and M74 to finalise the motorway

More information

Delineation. Section 4 Longitudinal markings

Delineation. Section 4 Longitudinal markings Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Framework Servicing Management Plan

Framework Servicing Management Plan Framework Servicing Management Plan 66-74 Notting Hill Gate Stranton Properties Ltd September 2014 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from Stranton

More information

Alternatives and Design Evolution: Planning Application 1 - RBKC

Alternatives and Design Evolution: Planning Application 1 - RBKC 3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan

More information

Amex Site Residential Development, Tarneit

Amex Site Residential Development, Tarneit Amex Site Residential Development, Tarneit Local Area Traffic Management Report Client: Amex Corporation Project No. 114430 Draft Report 13/12/13 Suite 1, 1 st Floor 132 Upper Heidelberg Road Ivanhoe Vic

More information

Major Improvement Schemes in Basingstoke

Major Improvement Schemes in Basingstoke Major Improvement Schemes in Basingstoke 1. Welcome Welcome to this exhibition, which provides information about the planned highway improvements being delivered in Basingstoke from 2015 2018. A30 Winchester

More information

LAND AT KINGSTON FARM BRADFORD ON AVON TRANSPORT ASSESSMENT

LAND AT KINGSTON FARM BRADFORD ON AVON TRANSPORT ASSESSMENT LAND AT KINGSTON FARM BRADFORD ON AVON TRANSPORT ASSESSMENT FEBRUARY 2013 PROPOSED DEVELOPMENT OF LAND AT KINGSTON FARM, BRADFORD ON AVON TRANSPORT ASSESSMENT PREPARED FOR BOA PROPERTY LTD. FMW CONSULTANCY

More information

1327 Stratford Road, Hall Green, Birmingham, B28 9HH

1327 Stratford Road, Hall Green, Birmingham, B28 9HH Committee Date: 08/01/2015 Application Number: 2014/03089/PA Accepted: 19/06/2014 Application Type: Full Planning Target Date: 14/08/2014 Ward: Hall Green 1327 Stratford Road, Hall Green, Birmingham, B28

More information

Transport for sustainable communities: a guide for developers

Transport for sustainable communities: a guide for developers Transport for sustainable communities: a guide for developers March 2013 www.tfgm.com 2 TRANSPORT FOR GREATER MANCHESTER Contents Transport for sustainable communities: a guide for developers 1 Introduction

More information

Development Management Report

Development Management Report Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: stuart.thomas@shropshire.gov.uk Tel: 01743 252665 Fax:

More information

RUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11

RUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11 S RUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11 22 nd OCTOBER 2004 KEY ISSUES The Transportation Select Committee has asked all local transportation

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

TRANSPORT ASSESSMENT GUIDANCE

TRANSPORT ASSESSMENT GUIDANCE TRANSPORT ASSESSMENT GUIDANCE Contents 1 INTRODUCTION...1 Purpose of the Guidance...1 Policy Context...1 Who Should Read This Document?...2 Structure of Guidance...3 2 ASSESSMENT PRINCIPLES AND PROCESS...4

More information

Site Layout & Traffic Plan

Site Layout & Traffic Plan Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction

More information

EDIN BVRGH + DM Guideline: Transport Requirements - Developer Contributions Guideline. Item no. Planning Committee 4 October 2007. 1 Purpose of report

EDIN BVRGH + DM Guideline: Transport Requirements - Developer Contributions Guideline. Item no. Planning Committee 4 October 2007. 1 Purpose of report ~ ~ ~~ ~ ~ ~~ EDIN BVRGH + THE CITY OF EDINBURGH COUNCIL Item no 17 Report no PC/034/07-08/CD DM Guideline: Transport Requirements - Developer Contributions Guideline Planning Committee 4 October 2007

More information

Introduction. This presentation covers

Introduction. This presentation covers A27 Route Strategy Introduction This presentation covers Study objectives Guiding Principles Initial options sifting Three package assessment Preferred package assessment Description Cost Cost benefit

More information

8 DELIVERING THE MOVEMENT FRAMEWORK

8 DELIVERING THE MOVEMENT FRAMEWORK 8 DELIVERING THE MOVEMENT FRAMEWORK Introduction 8.1 The purpose of this section of the design code is to orchestrate the delivery of essential road infrastructure highlighted in the masterplan and movement

More information

Transport Construction Authority Report for Auburn Stabling Project. Traffic Impact Assessment

Transport Construction Authority Report for Auburn Stabling Project. Traffic Impact Assessment Transport Construction Authority Report for Auburn Stabling Project November 2010 Contents 1. Introduction 1 2. Existing Conditions 2 2.1 Site Description 2 2.2 Existing Operations 4 2.3 Existing Road

More information

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort

More information

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues

More information

Wakefield Council. Cycle Strategy for Wakefield 2013 A guide to delivering cycle infrastructure. www.wakefield.gov.uk

Wakefield Council. Cycle Strategy for Wakefield 2013 A guide to delivering cycle infrastructure. www.wakefield.gov.uk Wakefield Council Cycle Strategy for Wakefield 2013 A guide to delivering cycle infrastructure www.wakefield.gov.uk - A guide to delivering cycle infrastructure Executive Summary This document presents

More information

Highway Asset Management Strategy

Highway Asset Management Strategy September 2015 SECTION DESCRIPTION 1 Foreword by Councillor Simon Jones, Portfolio Holder for Highways and Transport. PAGE 3 2 ASSET MANAGEMENT POLICY 3 3 ALIGNMENT TO SHROPSHIRE CORPORATE OBJECTIVES 5

More information

Criteria 3: Criteria 4: Traffic flow and traffic signals. Shakespeare Grove would be made one way running into Acland Street.

Criteria 3: Criteria 4: Traffic flow and traffic signals. Shakespeare Grove would be made one way running into Acland Street. Attachment D - Option Analysis Acland Street Acland Street Options Criteria 1: Criteria 7: Local access to the shopping strip - by walking, bike riding and by car (parking) Traffic flow and traffic signals

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

STROUD TOWN COUNCIL WALKING AND TRANSPORT STRATEGY March 2004

STROUD TOWN COUNCIL WALKING AND TRANSPORT STRATEGY March 2004 STROUD TOWN COUNCIL WALKING AND TRANSPORT STRATEGY March 2004 VISION To create an attractive town environment which encourages people to move about on foot; and in which it is easy for those with mobility

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Service 2014-15. First request normally supplied free of charge, but minimum charge for additional requests:

Service 2014-15. First request normally supplied free of charge, but minimum charge for additional requests: FEES AND CHARGES 2014/15: Highways, Planning, Transport Services and Engineering Design Group Service 2014-15 1 Traffic and Road Safety Data 1.1 Accident/Traffic Statistics Members of the Public (i) First

More information

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas

More information

PART 3 TD 50/04 THE GEOMETRIC LAYOUT OF SIGNAL- CONTROLLED JUNCTIONS AND SIGNALISED ROUNDABOUTS SUMMARY

PART 3 TD 50/04 THE GEOMETRIC LAYOUT OF SIGNAL- CONTROLLED JUNCTIONS AND SIGNALISED ROUNDABOUTS SUMMARY DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 6 SECTION 2 ROAD GEOMETRY JUNCTIONS PART 3 TD 50/04 THE GEOMETRIC LAYOUT OF SIGNAL- CONTROLLED JUNCTIONS AND SIGNALISED ROUNDABOUTS SUMMARY This document sets

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s. Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library

More information

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application): Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS

LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS For discussion on 2 April 2001 LC Paper No. CB(1)907/00-01(03) LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS PWP Item No. 277CL Tseung Kwan O development, phase II, Remaining engineering works

More information

Supplementary Planning Document. Radlett. District Centre Key Locations. Planning brief. March 2011. Hertsmere Borough Council

Supplementary Planning Document. Radlett. District Centre Key Locations. Planning brief. March 2011. Hertsmere Borough Council Supplementary Planning Document Radlett District Centre Key Locations Planning brief March 2011 Hertsmere Borough Council Large print and languages Hertsmere Borough Council aims to provide information

More information

Rural Road Safety Policy in Korea: Lesson Learned

Rural Road Safety Policy in Korea: Lesson Learned Regional Seminar on Safe, Climate Adaptive and Disaster Resilient Transport for Sustainable Development Nov. 17 th, Seoul Rural Road Safety Policy in Korea: Lesson Learned Sangjin HAN Korea Transport Institute

More information

Council Objective: Improve road network and influence improvements in public transport. Quarter 2 Progress Report 2015-16

Council Objective: Improve road network and influence improvements in public transport. Quarter 2 Progress Report 2015-16 Council Objective: Improve road network and influence improvements in public transport Quarter 2 Progress Report 2015-16 If you need this information in another language or format, please contact us to

More information

Transport Mobility Management: Small Changes - Big Impacts

Transport Mobility Management: Small Changes - Big Impacts Transport Mobility Management: Small Changes - Big Impacts Understanding TMM in the Urban Context Damian PRICE and Amy LEATHER Abstract Although Transport Mobility Management (TMM) is still considered

More information

LTP3 Issue log and decision matrix - online responses

LTP3 Issue log and decision matrix - online responses LTP3 Issue log and decision matrix - online responses ID Comment summary / identified issue Discussion Points What has been changed? Q1. Do you think the vision sets our what transport in Plymouth should

More information

Part 3 Design guidance

Part 3 Design guidance Section DG1: Introduction Part 3 Design guidance 3.1 The guidance contained in this part is intended to help you design development layouts that provide safe and free movement for all road users, including

More information

Guildford Station Regeneration

Guildford Station Regeneration Welcome Thank you for taking the time to view our proposals for the redevelopment of Guildford station. We have now submitted a planning application and would like to hear what you think of our plans.

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

Network Management & Congestion Strategy

Network Management & Congestion Strategy Network Management & Congestion Strategy ENVIRONMENT & REGENERATION Luton Borough Council Department of Environment and Regeneration Network Management and Congestion Strategy for Luton 2008 to 2012 Mehmood

More information

Exeter Bridge Road Widening Report of Surveys

Exeter Bridge Road Widening Report of Surveys March 2014 Draft Report Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD PREPARED BY Name: Lloyd Orriel Position: Graduate Transport Planner Date: November 2013 CHECKED BY Name: Samantha

More information

PERFORMANCE REPORT Quarter 2 2014/15

PERFORMANCE REPORT Quarter 2 2014/15 PERFORMANCE REPORT Quarter 2 2014/15 CONTENTS 1. RELIABILITY... 3 2. NETWORK DISRUPTION... 9 3. TRAFFIC VOLUMES... 15 4. TRAFFIC SPEEDS... 17 5. ROAD SAFETY... 18 6. ASSET AVAILABILITY... 19 7. STATE OF

More information

Leigh Park Area Safety Scheme, Havant, Hampshire

Leigh Park Area Safety Scheme, Havant, Hampshire Traffic Advisory Leaflet 2/99 April 1999 Leigh Park Area Safety Scheme, Havant, Hampshire The scheme The Leigh Park Area Safety Scheme includes the area in the Leigh Park Estate bounded by Middle Park

More information