1 Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd Venture House One Capital Court Sowton Industrial Estate Exeter EX2 7FW
2 Construction traffic management plan 1.0 Background 2.0 Days and Hours of construction and delivery 3.0 Route for Deliveries 4.0 Loading and Unloading of Plant and Materials 5.0 Storage of Plant and Materials 6.0 Programme of Works, Traffic Management Measures 7.0 Provision of Boundary Fencing/Hoarding 8.0 Parking for Site Personnel, Operatives and Visitors
3 1.0 Background The site has access from highways to the north being the main road into the village, the B3343 Beach Road and South Street to the south via the centre of the village. The existing drive which provides vehicular access to the site from Beach Road is restricted in width, initially forming a shared public footpath down towards South Street, with the main school entrance gates positioned at the first change in direction. Vehicular access along this route is normally limited to disabled users and occasional visitors. Staff has parking space provision within the grounds of the adjacent Village Community Hall. No change is proposed to these existing arrangements during the construction period. In addition, pedestrian access is available from the southern perimeter of the site which is close to the centre of the village. This dual access provides existing access from both the surrounding residential areas and the centre of the village. Woolacombe is a premier recreational sports resort and major surfing centre and as such becomes very busy at weekends and during the summer holiday period. The proposal is a new classroom and associated cloakroom/lobby, toilet and storeroom. The proposal will allow an increase of the Net Capacity to 210 and PAN to 30. The construction site must be organised so that vehicles and pedestrians using site routes are segregated and can move around safely. The routes need to be suitable for the persons or vehicles using them, in suitable positions and sufficient in number and size, this is so that incidents can be prevented by the effective management of transport operations throughout the construction process. Pedestrians and vehicles can be kept apart by management of the following: Entrances and exits - provide separate entry and exit gateways for pedestrians and vehicles; Walkways - provide firm, level, well-drained pedestrian walkways that take a direct route where possible; Crossings - where walkways cross roadways, provide a clearly signed and lit crossing point where drivers and pedestrians can see each other clearly; Visibility - make sure drivers driving out onto public roads can see both ways along the footway before they move on to it; the existing entrance has a visibility splay to enable this Obstructions do not block walkways so that pedestrians have to step onto the vehicle route; and Barriers - think about installing a barrier between the roadway and walkway. Vehicle movement will need to be minimised on site due to the restricted areas in which the contractor will have to work. This can be minimised by management of the following:
4 provide car and van parking for the workforce and visitors away from the work area; control entry to the work area; and Plan storage areas so that delivery vehicles do not have to cross the site. People who direct vehicle movements (banksmen) must be trained and authorised to do so. Make sure that all drivers and pedestrians know and understand the routes and traffic rules on site. Use standard road signs where appropriate Provide induction training for drivers, workers and visitors and send instructions out to visitors before their visit. This management will be greatly assisted by utilising the following: Banksmen - who can be appointed to control manoeuvres and who are trained in the task; Clothing - pedestrians on site should wear high-visibility clothing. Gatekeeper- to direct/summon banksmen Speed limits- restrict speed to 5 mph 2.0 Days and hours of construction and deliveries All deliveries will be notified to the Contractor s Project Manager/Traffic Management Co-ordinator in advance with specific times identified. These will be collated and held in a diary by the Co-ordinator who will manage the deliveries on a daily basis. The Co-ordinator will highlight any clashes and anticipated busy periods to streamline the processing of deliveries. Due to the constraints of the site all deliveries must contact the site before arrival and if pre-booked slots are missed then they should wait in the agreed location. On arrival at the agreed locations, drivers must wait and as described by signage and ring for attention. They will then be escorted to the appropriate location for unloading by the contractor s Banksmen. Unloading will be carried out at one of the material storage areas. All deliveries, where possible, must be able to be unloaded by forklift or mechanical means. No persons will be permitted to get on the back of vehicles without safe system of work in place for edge protection or fall arrest. Times and deliveries will be restricted to be outside of the times of pick up and drop off for the school. The delivery times should not be between 8.30 and 9.30 am, and 3 to 4 pm. All access roads used by contractors will be monitored for mud and any construction materials and cleared using a shovel and broom if required a mechanical road sweeper. 3.0 Route for Deliveries Site Access from Beach Road onto the identified site is via the narrow access lane into the school. As this is the main access into the school it has been decided that only managed and limited construction access should be provided here, and that the site is best accessed off South Street. This in turn limits the size and type of delivery vehicle. Therefore traditional small unit materials will be used as much as possible, e.g. Bricks, Blocks, etc. Larger, heavier elements like structural steelwork, long roofing sheets,
5 and to a lesser degree windows, will be limited and deliveries must be carefully undertaken and programmed. Larger deliveries including site cabins and storage containers will be craned over the security fence via South Street. A section of the fence may be temporarily removed and reinstated to help aid with deliveries. Map showing main routes to the site and proposed site set up Main school access B3343, Beach Road, Woolacombe Proposed area of development Proposed area for Contractor s site cabin. storage container South Street, Woolacombe and proposed area to load and unload plant and materials via crane or other mechanical means. 4.0 Loading and unloading of Plant and Materials It is anticipated that the loading and unloading of plant and materials will be via South Street using a crane or other mechanical means. A section of the existing metal fencing may be temporarily removed and reinstated on completion to assist this process. Times and deliveries will be restricted to be outside of the times of pick up and drop off for the school. The delivery times should not be between 8.30 and 9.30 am, and 3 to 4 pm. 5.0 Storage of Plant and Materials The storage of plant and materials will be within easy access of the point of unloading to minimise movement through the site for vehicles and plant. It should be close to the contractor s compound but located to be free of obstruction. This will be further determined upon the appointment of a main
6 contractor for this scheme, however it is anticipated this will be located to the south of site Via South Street. 6.0 Programme of Works, Traffic Management Measures An overall programme of work has been provisionally included, although this is subject to detailed scrutiny by the main contractor appointed at a later date. The contractor programme will have a detailed breakdown of all site activities and will be subject to the approval of the project manager/contract administrator. 7.0 Provision of Boundary Fencing/Hoarding There will be Heras fencing secured to a minimum height of 2 metres alongside the construction site areas or solid panel hoarding in areas with high/low viewing panels to help reduce unauthorised access to site. This fence will be checked daily and maintained as necessary and it will be the responsibility of the Site Manager to open and lock the gates each working day to ensure the site is not left open and unattended at any time. There is a pedestrian entrance point from southern perimeter from South Street which remain in use throughout the construction phase. The fencing will run alongside this to prohibit any pedestrians accessing into the construction site from this direction to ensure complete separation. 8.0 Parking for Site Personnel, Operatives and Visitors The project aim is to reduce vehicle movements to and from the site as far as possible. To achieve this all sub-contractors will be asked to car share or use crew buses at their pre-order meeting Due to the restrictions on site there will be no parking within the school boundary. However, local arrangements may take place between the appointed contractor and the community hall. Site personnel and school visitors will be encouraged to park away from the site or use public transport.
Construction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd
More informationConstruction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
More informationSite Layout & Traffic Plan
Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction
More informationUniversity Arms Hotel, Cambridge
Traffic Management Plan For University Arms Hotel, Cambridge Prepared By: James Batterbee Number: M1342 / Rev B Date: 29 th August 2014 CONTENTS: (1) INTRODUCTION (2) VEHICLE ACCESS & EGRESS AND PEDESTRIAN
More informationCONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13
Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if
More informationConstruction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
More informationGENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT
1 This General Guide provides information on how to manage traffic risks at a workplace. It is supported by specific guidance material on traffic management for shopping centres, construction workplaces,
More informationLogo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details
Logo here Ref : xxxx Dated xxxxxx Mandatory H&S 905 Rev 1: xxxxx Page 1 of 1 Project: Project No: Date: Prepared by: Enter details Enter details Enter details Enter details Delivery Address: Enter details
More informationThis document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.
UNIVERSITY OF HERTFORDSHIRE HIGHER EDUCATION CORPORATION SITE RULES FOR CONTRACTORS The University s Site Rules for Contractors are issued on the authority of the Director of Estates, Hospitality and Contract
More informationAbu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI CoP 44.0 Traffic Management and Logistics Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude
More informationConstruction Management Statement. Introduction. Contents
Construction Management Statement Project Name Dee Point Primary School Introduction On all Morgan Sindall projects, the safety and welfare of all is of paramount importance. This document concentrates
More informationConstruction Phase Traffic Management Plan
Construction Phase Traffic Management Plan The Construction Phase Traffic Management Plan is in connection with the application for the development of a single Wind Turbine and Ancillary Works on land
More informationCONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12
If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need
More informationHousehold waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
More informationTHIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction
More informationCONSTRUCTION MANAGEMENT PLAN
CONSTRUCTION MANAGEMENT PLAN for CHILDRENS CENTRE, PRIMARY CLASSROOM & REPLACEMENT PRESCHOOL AT CLYST ST MARY PRIMARY SCHOOL EXETER, DEVON EX5 1BG REVISION A 7 May 2010 1 P a g e Mansell have been appointed
More informationRockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
More informationInformation Sheet. What is a Workplace Transport Risk Assessment?
Workplace Transport Safety Risk Assessment Information Sheet This information sheet provides basic information on conducting a workplace transport risk assessment. The information is aimed at employers,
More informationMadras College Site Traffic Management Plan (South Street) August 2015
Madras College Site Traffic Management Plan (South Street) August 2015 South Street, St. Andrews, KY16 9EJ Kilrymont Road, St. Andrews, KY16 8DE Telephone (01334) 659402 Telephone (01334) 659401 Email
More informationTraffic Management Plan - Depot Procedure
Traffic Management Plan - Depot Procedure Date: 1/8/13 Version: TMPDPGWT001 Status: Approved 1. Purpose This procedure outlines the traffic management plan which must be followed for the Depots. 2. Scope
More informationCONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management
More informationPhysical Security Assessment Form
Physical Security Assessment Form Security Self-Assessment T Wake 10 February 2012 Security Assessment Contents Facility / Site Security Assessment Form... 3 Identification Details... 3 Facility Details...
More informationLT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014
LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington
More informationNorth Camden Town Neighbourhood Forum. 1. The meeting was organised as a drop-in session to accommodate all attendees on different schedules.
Camden Road Construction Liaison Meeting Tuesday 12 th May 2015, 5pm - 7pm The Irish Centre, Camden Square Attendees: Local representatives (LR) Anne Holt (AH) Polly Holt (PH) Gill Scott (GS) James Demos
More informationDELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners
Redwood Partnership Transportation Limited Maritime House Basin Road North Portslade Brighton BN41 1WR T: 01273 414515 F: 01273 376824 E: consult@redwoodpartnership.co.uk www.redwoodpartnership.co.uk REDWOOD
More informationTRAFFIC MANAGEMENT IN WORKPLACES
TRAFFIC MANAGEMENT IN WORKPLACES Code of Practice TABLE OF CONTENTS FOREWORD... 3 SCOPE AND APPLICATION... 3 1. INTRODUCTION... 4 1.1 The meaning of key terms... 4 1.2 Who has health and safety duties
More informationSite Traffic Management Plan
Masterton Primary School Aberdour Road Dunfermline Fife KY11 8HY Telephone: 01383 602455 Email: masterton.enquiries@fife.gov.uk Head Teacher: Mr Stephen Humphries Site Traffic Management Plan Date December
More informationRepton Primary School. Traffic Management Plan
Repton Primary School Traffic Management Plan Headteacher: Mrs H Wallis Signature: H Wallis Date: 26 th June 2015 Chair of Governors: Mrs L Eaton Signature: L Eaton Date: 26 th June 2015 8 th June 2015
More informationDevelopment Layout Design
Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose
More informationTraffic Management Issue 1.0 Revision: v2 October 2014
Disclaimer IMPORTANT: The information in this guide is of a general nature, and should not be relied upon as individual professional advice. If necessary, legal advice should be obtained from a legal practitioner
More informationConstruction Site Set Up Requirements
Process Code Number Revision COP A 035 B Document Title Construction Site Set Up Requirements B 1/11/10 SRC SAT DH Final A 1/10/10 SRC MI Draft comment Rev. Date Prepared Reviewed Approved Detail/Comment
More informationLincoln Minster School. Security
Lincoln Minster School Security Policy Statement Security plays a vital role in ensuring the effective management of Lincoln Minster School, which is committed to providing a safe and secure environment
More informationFoulford Primary School Site Traffic Management Plan. December 2012 (Review date October 2013)
Foulford Primary School Leuchatsbeath Drive Cowdenbeath Fife KY4 9SN Foulford Primary School Site Traffic Management Plan December 2012 (Review date October 2013) Site Traffic Management Plan Foulford
More informationCORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 9 SEPT12
SITE PROCEDURES BSPA VERSION 9 PAGE 1 OF 9 CONTENTS PAGE 1. GENERAL INFORMATION 3 2. ACCESS 3 3. SECURITY 3 4. VEHICLE PARKING 4 5. PERMITS TO WORK 4 6. DELIVERY, UNLOADING AND STORAGE 4 7. HOURS OF WORK
More informationGalloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited
Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status
More informationWorkplace transport safety A brief guide
Workplace transport safety A brief guide Introduction Every year, there are over 5000 accidents involving transport in the workplace. About 50 of these result in people being killed (www.hse.gov.uk/statistics).
More information1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
More informationBROKEN HILL OPERATIONS Rasp Mine Project Traffic Management Plan
BROKEN HILL OPERATIONS Document History and Status Revision Date issued Reviewed by Approved by Date approved Revision type A 31-Mar-11 SKK TC 31-Mar-11 Issued for information B 18-July-11 SW GT 18-July-11
More informationConstruction Management Plan (CMP) Application
About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction
More informationDesign & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon.
Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, ARC-RP-A-002 Prepared by ARCMC Ltd July 2012: Issue A Contents 1. Introduction 2. Application Proposal
More informationWorkplace Health, Safety & Welfare
Relevant Legislation Workplace (Health, Safety and Welfare) Regulations 1992 Construction (Design & Management) Regulations 2015 Provision & Use of Work Equipment Regulations 1998 (PUWER) Lifting Operations
More informationTriton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
More informationSite Security and Access Policy and Procedures. Written By. Kent Walmsley Creation date Summer 2010 Adopted by Governors 7 December 2010 Reviewed By
Site Security and Access Policy and Procedures Written By Kent Walmsley Creation date Summer 2010 Adopted by Governors 7 December 2010 Reviewed By David Neild Last Reviewed date Autumn 2014 (VERSION 4)
More informationSite Traffic Management Plan
Pathhead Primary School Cairns Street West Kirkcaldy Fife KY1 2JA Telephone: 01592 583450 Email: pathheadps.enquiries@fife.gov.uk Headteacher Julie M Anderson Site Traffic Management Plan December 2012
More informationGRWF BOP TRAFFIC MANAGEMENT PROTOCOL
GRWF BOP TRAFFIC MANAGEMENT PROTOCOL References: GRWF Traffic Management Plan GR-PM-PLN-0005 GRWF BOP Traffic Management Plan Rev:0 Rev Date: 4/4/13 Authorised by: C Fazekas Page 1 of 28 1.0 Overview Traffic
More informationWorkplace Transport Safety Reversing Vehicles Information Sheet What are the dangers associated with reversing vehicles? Why is reversing a problem?
Workplace Transport Safety Reversing Vehicles Information Sheet This information sheet aims to raise awareness of the dangers caused by reversing vehicles in the workplace. It provides basic information,
More informationSignificant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk
December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort
More informationRAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON
RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON DELIVERY AND SERVICING PLAN August 2015 Introduction This Delivery and Servicing Plan (DSP) has been prepared in relation to the proposed redevelopment of Raeburn
More informationCITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
More information17 Traffic Management Plan
17 Traffic Management Plan Introduction The Traffic Management Plan has prepared for Glastonbury Festival Ltd by the Off Site Manager following a process of consultation and on going dialogue with the
More informationLevel 1 Award in Health and Safety in a Construction Environment
Level 1 Award in Health and Safety in a Construction Environment Student notes (sample) www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion
More informationTRAFFIC MANAGEMENT PLAN FOR THE PORT AND INDUSTRIAL ESTATE OF POINT LISAS
POINT LISAS INDUSTRIAL PORT DEVELOPMENT CORPORATION LIMITED TRAFFIC MANAGEMENT PLAN FOR THE PORT AND INDUSTRIAL ESTATE OF POINT LISAS Page 1 Document Distribution Page COPY # LOCATION HOLDER DATE 1 2 3
More informationHow To Prevent Accidents At Work
2 Preventing vehicle accidents Construction work is considered to be one of the most hazardous industrial activities in the EU. The rate of injury in the construction industry is higher than in other industries.
More informationParking Regulations. Why?
Parking Regulations Why? The aim is to make the Campus a safer place. Despite there being empty parking spaces available for use most days we still have a minority who regularly park inconsiderately and
More informationApplication No: 5/11/9004 District: South Lakeland
DEVELOPMENT CONTROL AND REGULATION COMMITTEE 20 July 2011 A Report by the Assistant Director - Planning & Sustainability Application No: 5/11/9004 District: South Lakeland Applicant: United Utilities Clearwater
More informationDevonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction
Devonport EfW CHP Facility CEMP Proposal for Non Destructive Testing Activities. 1. Introduction This application is issued in compliance with the principles of the approved Construction Environmental
More informationConstruction Management Plan Template
Plan Template Planning Permit Number:... Date Planning Permit Issued:... Approval Stamp (Office Use only): Standard Plan Template Project details Company Operational Details.. Directors Name Company Name
More informationLIGHT VEHICLE, MOBILE EQUIPMENT AND TRAFFIC MANAGEMENT
DOCUMENT INFORMATION Description Document Owner Queensland Nickel Light Vehicle, Mobile Equipment and Traffic Management Requirements Safety & Risk Superintendent DOCUMENT HISTORY and APPROVAL Rev Date
More informationBEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008
BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 JBA Prepared by : John Barnett and Associates / SLR Consulting 7 Dundrum Business Park
More informationA Self-Audit of Your Current Campus Security Systems
A Self-Audit of Your Current Campus Security Systems Security Solutions for Education, Business & Public Safety Free Consultations on ID Card Systems, Access Control, Call Recording, Video Surveillance,
More informationSTONEBRIDGE COMMUNITY FUNDAY
STONEBRIDGE COMMUNITY FUNDAY General Assessment Activity assessed: Planning and Delivery of the Stonebridge Community Funday Location: Name of assessor: A Smith Date of assessment: 21 May 2014 Version
More informationTRAFFIC MANAGEMENT PLAN
TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South
More informationRAVENSCOTE JUNIOR SCHOOL. Security POLICY. Headteacher
RAVENSCOTE JUNIOR SCHOOL Security POLICY 2015 Date of Approval Date of Review Signed Mr D Harris Signed Mrs J. Brill Headteacher Chair of Governors Ravenscote Junior School Security Policy At Ravenscote
More informationSite inspection: Workplace transport checklist
Site inspection: Workplace transport checklist The following checklist is a guide to what employers should consider when assessing the risk from vehicles in the workplace. It may not be comprehensive for
More informationErection of replacement warehouse building and erection of two buildings in connection with builder s merchants
Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder
More informationWaste Collection Operations
Occupational Road Risk & Fleet Management System Management of vehicles Fit & proper person to The and manage the are trained and hold a Certificate of Professional Competence in National Road Haulage
More informationAPPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley
More informationINTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS
INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues
More informationFREMANTLE PORTS 2015 T R A F F I C M A N A G E M E N T P L A N F A C T S H E E T
FREMANTLE PORTS 2015 T R A F F I C M A N A G E M E N T P L A N F A C T S H E E T PLANNING BRANCH Introduction The management of traffic is important to the operation of the port as a whole to allow for
More informationFramework Pinhoe Area Access Strategy
Framework Pinhoe Area Access Strategy January 2011 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD 1 PREPARED BY Name: Matt Collins Position: Assistant Transportation Planning Officer
More informationHome Security Assessment Checklist DATE
Home Security Assessment Checklist DATE PREFACE The Home Security Assessment Checklist is designed to assist justices, judges, and other court officials in determining their level of security at home.
More informationWelcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area
More informationGUIDELINES FOR THE DESIGN OF OFF-STREET CAR PARKING FACILITIES
GUIDELINES FOR THE DESIGN OF OFF-STREET CAR PARKING FACILITIES SECTION 1 SCOPE AND GENERAL 1.1 SCOPE These Guidelines set out the minimum requirements for the design and layout of off-street parking facilities,
More informationThe Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan
The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603 Framework Residential Travel Plan September 2013 CONTROL SHEET CLIENT: PROJECT TITLE: REPORT TITLE: THE
More informationWhistler Village Construction Management Strategy
Whistler Village Construction Management Strategy Purpose: To mitigate the impacts of construction activity on the Whistler Village resort experience and on Village businesses and property owners. Objectives:
More informationWalking Route the assigned or authorized route a pupil walks to arrive at school or at the designated bus stop.
BUSINESS NON-INSTRUCTION OPERATION 3541 TRANSPORTATION I. GENERAL It is the goal of the Board of Education to establish for the public schools an appropriate transportation system one which will enable
More informationManaging Public Use of Freeway Emergency Access Gates and Median Crossovers
Managing Public Use of Freeway Emergency Access Gates and Median Crossovers Operational Instruction Transport Services Division TRAFFIC MANAGEMENT Operational Instructions Managing Public Use of Freeway
More informationPalmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY
Committee Date: 23/01/2014 Application Number: 2013/09236/PA Accepted: 16/12/2013 Application Type: Full Planning Target Date: 17/03/2014 Ward: Nechells Palmer Street/Great Barr Street, (former MacDermid
More information1. Rules for users of powered wheelchairs and powered mobility scooters
Jersey Highway Code Introduction The Minister for Transport and Technical Services has issued directions for the guidance of road users, the Highway Code. The Highway Code for Jersey is the Official Highway
More informationWaste Collection Operations. Loader/Lead Loader - Refuse Collection (A3)
SERVICE AREA Waste Management SECTION Waste Collection Operations POST TITLE Loader/Lead Loader - Refuse Collection (A3) Some key points about this job: 1) The role is graded at A3 so will attract a basic
More informationProposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011
Proposed Sports Hall at Oldfield School Kelston Road Bath BA1 9AB Construction Management Plan June 2011 CONTENTS 1.0 Introduction 2.0 Site Location 3.0 Proposed Development 4.0 Construction Management
More information5.1 Parking Policy 1. INTRODUCTION
5.1 Parking Policy 1. INTRODUCTION This policy consolidates the City s parking requirements and outlines its approach to the provision of off-street parking facilities for non-residential and residential
More informationSecurity Tools. Forms. Physical Security Assessment Security Plan Template Traffic Control Plan Template
Security Tools Forms Physical Security Assessment Security Plan Template Traffic Control Plan Template 1 Physical Security Assessment (PSA) Date: I. PHYSICAL SECURITY ASSESSMENT (PSA): EXTERIOR OF THE
More informationTraffic Volume Counts
Traffic Volume Counts Prepare 1. Communicate with other staff/departments 2. Review historical data trends 3. Review citizen input 4. Request traffic control Select Location 1. Select the proper location
More informationApplication by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application)
Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Examining Authority s (ExA) Record of Unaccompanied Inspection of Sites to Which the Application or
More informationACCESS AUDIT OF WESTPORT HOUSE
ACCESS AUDIT OF WESTPORT HOUSE Large sign on the highway to indicate the entrance to Purbeck District Council Large and wide entrance Entrance showing sign for opening times Entrance sign Main entrance
More informationTemporary Traffic Management
Temporary Traffic Management Tom Kiddle 4 th July 2012 Temporary Traffic Management Auckland Transport TTM Operation Requirements AT TTM Audits Qualified Persons on site Pedestrian Management 1 AT Temporary
More informationAPPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES
Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan
More information23 February 2015. Enfield Intermodal Logistics Centre
Enfield Intermodal Logistics Centre Overarching Operational Traffic Management Plan February 2015 Table of Contents 1. Introduction... 2 2. Purpose of the Plan... 2 3. Objective of the Plan... 3 4. Road
More informationUrban Vehicle Crossing Application To be completed and fees paid for prior to approval
Urban Vehicle Crossing Application To be completed and fees paid for prior to approval Applicant Details Name: Postal Address: Telephone Home: Work: Signed: Date: Proposed Contractor: Proposed Start Date:
More informationBest Practice Guide for Managing Litter and Illegal Dumping at Clothing Bins
Best Practice Guide for Managing Litter and Illegal Dumping at Clothing Bins 2013 Acknowledgements: The research for this guide was completed by Equilibrium OMG Pty Ltd (trading as Equilibrium) for Sustainability
More informationAppendix 6 Storage and Collection of Waste and Recycling
Appendix 6 Storage and Collection of Waste and Recycling Appendix 6 Storage and Collection of Waste and Recycling September 2008 (Version 2) 1 Appendix 6 Appendix 6 Design and Sustainability SPD Storage
More informationCONTRACTOR SAFETY MANAGEMENT PROCEDURE
CONTRACTOR SAFETY MANAGEMENT PROCEDURE Version 1.0 TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced July 20, 2015 Date(s) modified June 11,
More informationQuorn Hall International Centre Visitor Risk Assessment
Quorn Hall International Centre Visitor Risk Assessment a The intention of this document is to highlight any potential hazards to residential and day visitors to Quorn Hall and explain who is affected
More informationTraffic Management Plan
China Civil Engineering Construction Corporation The Rarotonga Water Ring Mains Upgrade Project (Te Mato Vai) of the Cook Islands Traffic Management Plan Compilation: Chinese Civil Engineering Corporation
More information********* Shorter notice periods will be considered, however this will be at the discretion of the University.
Filming Guidelines The University of Strathclyde welcomes production companies and filmmakers to use its estate as locations. From the beauty of Ross Priory on the shores of Loch Lomond to the city centre
More informationDesigning Out Crime Assessment
Designing Out Crime Assessment New Flats (Affordable Housing) Yew Tree Road Moreton Wirral CH46 8UA Construction of flats complex. For Bernard Taylor Partnership Ltd o.iu@bernardtaylor.co.uk Tel 0161 443
More informationRisk Assessment for visits by schools and other groups including children.
Perrygrove Railway Risk Assessment for visits by schools and other groups including children. Page 1 Risk Assessment for visits by schools and other groups including children. Introduction Perrygrove Railway
More informationCorrections Management (Maintenance and Capital Upgrades) Policy 2014
Australian Capital Territory Corrections Management (Maintenance and Capital Upgrades) Policy 2014 Notifiable instrument made under the Corrections Management Act 2007, section 14(1) (Corrections policies
More informationSlips, trips and falls Policy
Slips, trips and falls Policy Slips, trips and falls are the most common cause of injuries in workplaces and the second highest cause of over 3 day injuries. They occasionally cause fatalities and the
More information