1 Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Examining Authority s (ExA) Record of Unaccompanied Inspection of Sites to Which the Application or Specified Matters Relates The Examining Inspector (ExA), Jeremy Aston undertook the inspections on 28 July 2015 starting at Goxhill at 10am and finishing at Paull at 5.00pm. The weather changed during the inspection. At 10am (Goxhill) it was overcast with light rain. The rain got slightly heavier until lunchtime but had ceased by 2pm. During this period visibility was limited to 1-2km. After 2pm the sky brightened and visibility improved to 6-10km. The inspections were undertaken by car and on foot on public roads and footpaths. A route was planned having regard to issues raised in relevant representations, enabling the ExA to obtain views of the proposed transport route to and from each site, a close up inspection of each construction area identified in the application documents [APP-09], views into each construction area from further afield and views across the SPA/SAC from Paull. The route of the inspection is identified on the attached plans which were extracted from the Initial Traffic Management Plan [APP-083]. The numbers in the table below refer to those marked on copies of the application plans thereby defining the route taken. Where additional numbers are indicated these refer to the proximity of each inspection location to either the position of traffic noise measurements (NML) [APP-064], viewsheds from the bird surveys (VP3), or ecological noise monitoring stations [APP-027] all of which are contained within the application Environmental Statement. No inspection was made at location 12A (Goxhill) during the initial visit but this was completed at 10.40am on the 8 September 2015 ahead of the Preliminary Meeting. Weather during this second visit was bright and dry with excellent long range visibility of 5-10km. Both the Goxhill and Paull construction compounds and the proposed transport routes were inspected for a second time on this visit. This was following receipt of the relevant representations and is the subject of an additional USV note published below. 1
2 Time Location (see attached plans) Description USV No 1-28 July 2015 GOXHILL INSPECTION 10AM-15:00pm Arrive via M180 then at Junction 5 take A15 north At Beaumontcote exit B1206 east towards Barrow on Humber Wold Road through Barrow on Humber. Noted S bend before Barrow and that it is otherwise largely straight College Road (farm field entrance). Inspect junction Return to junction then proceed along Wold Road to Goxhill Road 10:45 2 Inspect Goxhill Road Junction on foot. Goxhill Road towards Goxhill (not part of designated route in the initial Transport Management Plan) 11:00 3 Goxhill Road inspect junction with Thornton Road on foot. 11:15 4 & 5 Turn left along Thornton Road inspect road (with 5 parked cars on right) and note railway bridge which has road narrows sign and is located on a bend. 11:20 6 Continue along Ferry Road through village. Note S bend at Elm Lane, road narrowing and tight right then left bend with turning off to North End. Inspect road on foot. 11:30 7 Leave the village and continue into open countryside along single track lane. Noted road sign (bumpy/uneven road warning). Noted wide soft verge either side of road with hedges (where present) set back behind. Park in passing place near Riverside Lodge and exit car. 11:45 8 Continue along Ferry Road. Inspect end of Netgangs Lane. Noted lane reduces further in width at this point. 11:55 9 Continue along ferry Road to the 90 degree right bend into East Marsh Road. Inspect road and local area. Lady arrives in white van to walk x3 dogs in nearby field. 12:05 10 Noted that road surface up to this point fair/good however along East Marsh Lane after farm on left it deteriorates and wheel tracks are sunken. Park in farm entrance. Noted localised road edge damage and previous strip repairs to surfacing. 12:15 11 (NML4) Corner of proposed haul road parking near entrance to Fir Tree Farm. Noted that the final section of track leading to Goxhill site is badly potholed and rutted with large deep puddles. Noted that the road not suitable for a road car. Note overhead HV lines and pole transformer. Exit car to walk. 13:15 12 (VPD) Inspect site on foot along track. Note drainage ditch to right 3-4m deep. Noted Track in poor condition. Observed views across farmland to right and left. Noted ground is level, fields interspersed with farm hedges and bounded by drainage ditches. Observed the sea defence and pole transformer just outside site entrance. Return to car. Note site enclosed by mature hedgerow and palisade fencing. Observe grey power cabinet. Note that all fields surrounding site planted with arable crops. Observe NSIP notice displayed. 13:20 13 (NML2 & NML3) Chapel Field Road - Stopping at first farm on the right inspect views back over large field that will form the main construction compound. 13:25 14 & 15 (NML1) Continue along road and park on soft verge at entrance to drive of Chapel Farm. Inspect public footpath on foot past house and across next field to brook. Noted topography but farm field boundaries (hedges) limit views of the site and dense boundary noted to perimeter of Chapel Farm. 13:50 16 Chapel Field Road. Inspect area near Fishery and entrance to Airfield. Noted that airfield has warehouse and grain store sign. Noted new tarmac drive into airfield. Chapel lane widens at this point. 14:10 17 Continue along Chapel Lane. Noted narrowing of road for bridge over stream which then reduces to single lane with passing place sign. Observed NSIP notice regarding diversion hung on footpath sign at South End. Park at entrance to farm field. Exit car for view over field (diversion) and walk back to bridge/stream. 14:20 18 Continue along Church Side to Soff Lane and turn left into Soff Lane. Stop at industrial estate (other end of proposed diversion). Drive onto railway crossing. Inspect railway crossing on foot. View crossing sign. 14:25 19 Continue along end of Soff lane to T junction with College Road. Turn right 20 Stop on left in access drive to property. 21 & 22 Park on the left ahead of the T junction between College Road and Thornton Road turn into Thornton Road stopping on left near farm. Inspect junction on foot. Noted slight dip in College Road near junction. 14:45 23 Continue along Thornton Road, stopping on left ahead of Goxhill Road. 2
3 Inspect the junction on foot. 24 Return to College Road. Turn left into College Road from Thornton Road at T junction. Pass the starting point (see 1). Drive into Goxhill village to Spar shop via Goxhill Road. 15:00 After a short break drive the entire route from 6 through to 24 once again without stopping to get a feel for the route. Depart area at 3pm for Paull. 12A (VPC See separate USV note (below) following inspection in good weather on Ecological ahead of the Preliminary Meeting. Noise Monitoring 1) PAULL INSPECTION 15:30-17:00pm 15:25 1 Turn off Hull Road at roundabout and drive along Paull Road towards the village. Noted that Paull Road is a wide largely straight carriageway. 15:30 At T Junction turn right towards Paull. On entering village take first left Back Road through a residential area and into Thorngumbald Road passing site. Noted that the residential area has houses to left and right and cars parked on the highway. 15:35 3 (NML6) Inspect the AGI compound on foot including the site compound area to the north of the highway. Noted HP gas markers all along road edge lots of pipes exit into field. Noted some arable crop removed and trial pits evident. Visibility very good of the surrounding countryside. Inspected on foot the road to the Paull Strays Reserve car park. Noted notice that states that EA flood re-alignment scheme was completed in 2003, 7M. Note and enter the car park and then the reserve on foot. Walk up the steps of the tidal defences (25 No) and note marker posts in the field to the southeast for the pipeline route. 16:45 4 (VP2 & Ecological Noise Monitoring 3) North west along the path on top of the defence bund towards the Thorngumbald Drain EA station inspected. Noted Pole transformer to pump house and HV supply to AGI. Observed difference in levels between the seaward reserve and the site compound. Inspected the access track to the EA pumping station giving a close up view of the existing AGI. Noted that the AGI is on level ground behind sea defences. Noted Cottage opposite and Thorngumbald drain to that edge. 16:50 5 Thorngumbald Road, Back Road Town End Road, to village centre and village hall. All inspected. View the defence wall towards Goxhill and the Paull AGI. Good visibility. 17:00 2 Main Street end of Paull Road T Junction to 2 inspected. Noted that this is the proposed access route entrance to avoid the village, utilising the entrance to an existing farm. End of USV 1 3
4 Time Location (see attached plans) Description USV No 2-8 September 2015 GOXHILL INSPECTION 10.20AM-11:30pm Arrive at Thornton Road and park just before Barrow Road junction on left heading into Goxhill by 30mph sign Move forward and park on Thornton Road just after Barrow Road junction. Observe parked cars and vehicle movements At railway bridge which has road narrows sign and is located on a bend catch up with large HGV and follow to Netgangs Road. 6 Continue along Ferry Road through village. Note S bend at Elm Lane, road narrowing and tight right then left bend with turning off to North End. Observe passage of HGV and taxi. 7 Leave the village still following HGV and continue into open countryside along single track lane. 8 Continue along Ferry Road. HGV lorry turned off left into Netgangs Lane. Noted some recent patch repairs to holes in road. 9 Continue along Ferry Road to the 90 degree right bend into East Marsh Road Continue following route from USV 1 11 (NML4) & 12 (VPD) Travel along rutted and severely potholed track leading off tarmac highway past Goxhill AGI using 4x4. Large number of cars and people present continue past turning left towards river. 10:45 12A Travel to end of this lane passing fly tipping material arriving at the sea (flood) defence and edge of River Humber. Second AGI compound noted on left and access up onto sea defence and along sea defence wall. Exit car and walk along sea defence wall to tunnel/gas pipe alignment. Very few birds visible. 66% of arable crop removed from 3 rd field in (from sea defence located AGI) am most of the vehicles at the AGI (1km away) depart. Sea defence is grass covered with vehicle access (tracks) along top. Note difference in levels between mudflats and farmland. Take in views out across marsh and river to Paull. Paull Holme Strays and Humber Bridge clearly visible. Walk out along track to the river. Approximately 10-20m of mud visible as tide not quiet at high point. At waters edge no waders or birds in the water but note limited bird activity overhead. Can hear combine operating approximately 1km away. Rumble from docks and port area at Hull. Some bird song from farm fields audible. Return to car and head back along track to AGI. Note field on left (opposite AGI) has all arable crop removed (NML2 & Re-join Chapel Field Road and drive back towards Soff Lane diversion. NML3) Continue along Chapel Lane. Stop near narrowing of road for bridge over stream note fence panel replaced marking boundary to property on the corner (Littlecroft). Note that archaeological work underway in field of proposed Soff Lane diversion. 18 Continue along route of USV 1 19 Continue along route of USV 1 21 & 22 Continue along route of USV Continue along route of USV 1. Then leave and head to Hull. PAULL INSPECTION 15:30-16:30pm 15:30 1 Leave Hull drive past docks to turning for Paull. Drive towards village. 15:50 At T Junction turn right towards Paull. On entering village take first left Back Road through a residential area and into Thorngumbald Road passing site. All as USV1. 15:55 3 (NML6) Drive past the site to the bend to identify location of properties in this location. Return towards the site and turn left into Paul Holme Strays Reserve. Leave the car and walk up onto the sea defence wall. Look back to the Goxhill site. Excellent visibility. No significant bird activity evident. 3 RV vehicles and a car in the reserve car park. Return to car and leave the site. 16:30 5 Leave Paull the same route as USV1. End 4
5
6
Site Layout & Traffic Plan
Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction
More informationConstruction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West
More informationConstruction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
More informationSite Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
More informationDevelopment Layout Design
Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose
More informationTriton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
More informationDEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
More information1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
More informationLincolnshire Walks. Round Horncastle
Lincolnshire Walks Round Horncastle A walk of 221/ 2 km (14miles) (with shorter options) Introduction Horncastle is an attractive market town lying at the south-west foot of the Lincolnshire Wolds and
More informationchapter 3 basic driving skills
chapter 3 basic driving skills When curving to the left, keep the front wheels close to the right edge of the lane to keep your driver s side rear wheels out of the next lane of traffic. Curve ahead slow
More informationAPPENDIX A: ASSET INFORMATION STRATEGY
APPENDIX A: ASSET INFORMATION STRATEGY A1 1 Appendix A: Asset Information Strategy A1.0 Highway Assets For the purpose of this plan the Highway assets within Coventry have been broken down into nine groupings
More informationErection of replacement warehouse building and erection of two buildings in connection with builder s merchants
Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder
More informationGalloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited
Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status
More informationArdessie Hydro Electric Project
Ardessie Hydro Electric Project Appendix T - Traffic Management Plan 13 th December 2014 V1.0 Jacinta MacDermot DHG Hydro Ltd 7 St James s Gardens London W11 4RB Jacinta.macdermot@dhghydro.com 077 888
More information9e) 100m past Dynevor Arms Pub go past lone bungalow on L then turn L along designated footpath. Emerge on main Rd (A469) turn L, then after 30m
9e) 100m past Dynevor Arms Pub go past lone bungalow on L then turn L along designated footpath. Emerge on main Rd (A469) turn L, then after 30m cross rd (CAREFUL) and head up obvious footpath opposite
More information6 Streetscape character 6.1
6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London
More informationConstruction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd
More informationAPPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley
More informationPavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage
Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 5.3: Condition
More informationSERVICES AND HIGHWAY PROBLEMS AND THEIR LOCATIONS DRAINS & OVERHANGS TO PATHWAYS
SERVICES AND HIGHWAY PROBLEMS AND THEIR LOCATIONS DRAINS & OVERHANGS TO PATHWAYS Following Parish Council meeting of 21st May 2014 various problems regarding drains, overhanging branches on walkways and
More informationLincolnshire Walks. Marston & Hougham
Lincolnshire Walks Marston & Hougham Three circular walks of 4, 8 and 11km (2 ½, 5 and 7 miles) Introduction The villages of Marston and Hougham are situated six miles north of Grantham to the east of
More informationConstruction Phase Traffic Management Plan
Construction Phase Traffic Management Plan The Construction Phase Traffic Management Plan is in connection with the application for the development of a single Wind Turbine and Ancillary Works on land
More informationParking On-street parking Front garden parking Off-street parking
Nae place mair braw A guide to placemaking in Perth and Kinross Whan I haik't up to Craigie Hill And lookit east and west; "In a' the world," said I to mysel', "My ain shire is the best." Parking On-street
More informationNewbiggin House Farm,
Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane
More informationK M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
More informationMINUTES OF THE MONTHLY MEETING OF POTTO PARISH COUNCIL HELD ON MONDAY, 15 FEBRUARY 2010 AT 7.15 PM IN THE VILLAGE HALL
624 MINUTES OF THE MONTHLY MEETING OF POTTO PARISH COUNCIL HELD ON MONDAY, 15 FEBRUARY 2010 AT 7.15 PM IN THE VILLAGE HALL Present: Councillor Mr A Wilde (Chairman) Councillors Mesdames D Hardy and E Griffin,
More informationAlphington sewer replacement
Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800
More informationEssex County Council Flood Investigation Report
Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd
More informationDesign & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon.
Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, ARC-RP-A-002 Prepared by ARCMC Ltd July 2012: Issue A Contents 1. Introduction 2. Application Proposal
More informationK M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
More informationDevelopment Management Report
Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: stuart.thomas@shropshire.gov.uk Tel: 01743 252665 Fax:
More informationHighway Asset Management Strategy
1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate
More informationThe Boscastle Flood 2004
The Boscastle Flood 2004 by Phil Bull Causes of the Flood Physical Causes The flood took Boscastle entirely by surprise - it was a flash flood event & the village is not prone to regular annual flooding
More informationCONSTRUCTION SEQUENCE & PROGRAMME
CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone
More informationShannon Corner Service Centre, 208-212 Burlington Road, New Malden, KT3 4NP
Shannon Corner Service Centre, 08-1 Burlington Road, New Malden, KT NP S1 Total site area (ha) 0.05ha Current MOT Car Repair Undeveloped land (ha) 0 Number of units 1 Grid reference TQ 680 Sequential status
More informationSite Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site
More informationenvironment briefing02
PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The
More informationSutton Harbour Holdings PLC. March 2007
Sutton Harbour Holdings PLC March 2007 Contents!! " # # $ % % &'(&'' ) ) ( * + ', *!$ -,!'! #. / $$ #% 00& ' 00&1 $ Executive Summary!! " WSP Development and Transportation has been engaged by Sutton
More informationComment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
More informationDROMANTINE. Driving Directions. Please print or use the following guide to locate Dromantine Retreat And Conference Centre.
DROMANTINE RETREAT AND CONFERENCE CENTRE Driving Directions Please print or use the following guide to locate Dromantine Retreat And Conference Centre. We also have an interactive Google map on our website
More information8 DELIVERING THE MOVEMENT FRAMEWORK
8 DELIVERING THE MOVEMENT FRAMEWORK Introduction 8.1 The purpose of this section of the design code is to orchestrate the delivery of essential road infrastructure highlighted in the masterplan and movement
More informationFramework Pinhoe Area Access Strategy
Framework Pinhoe Area Access Strategy January 2011 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD 1 PREPARED BY Name: Matt Collins Position: Assistant Transportation Planning Officer
More informationFLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House
More informationMajor and Minor Schemes
1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment
More informationSite Alternative Deliverability Report. SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable. Local Development Plan
Local Development Plan Site Alternative Deliverability Report Brecon Beacons National Park Authority SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable SALT 034 Ty Nant Groesffordd (Llanfrynach) Existing
More informationPow Beck, St Bees to Seascale promenade
www.naturalengland.org.uk Chapter 2: Pow Beck, St Bees to Seascale promenade Coastal Access: Whitehaven to Silecroft - Natural England s Proposals Part 2.1: Introduction Start Point: Pow Beck, St Bees
More informationParish Flood Report: Broadwell & Kencot
Parish Flood Report: Broadwell & Kencot Version 1 This report may be revised in the future to incorporate ongoing consultation results Boardwell & Kencot Flood Report 1 of 37 June 2008 Contents 1.0 INTRODUCTION...3
More informationManaging Public Use of Freeway Emergency Access Gates and Median Crossovers
Managing Public Use of Freeway Emergency Access Gates and Median Crossovers Operational Instruction Transport Services Division TRAFFIC MANAGEMENT Operational Instructions Managing Public Use of Freeway
More informationWELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas
More informationCllrs T G Cutmore, B T Hazlewood, K H Hudson, Mrs J R Lumley, Mrs J E McPherson, Mrs C E Roe, Cllrs C G Seagers, D J Sperring and I H Ward.
Rochford District Councillors: Other Agencies: Officers: Cllrs T G Cutmore, B T Hazlewood, K H Hudson, Mrs J R Lumley, Mrs J E McPherson, Mrs C E Roe, Cllrs C G Seagers, D J Sperring and I H Ward. R Baranowski
More informationDEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008
DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment
More informationArchitectural Condition Survey
Architectural Condition Survey Santa Fe Railroad / AMTRAK Depot, Lawrence. Kansas for the City of Lawrence, 2002 Survey: (student) PI: William Carswell, Associate Dean, School of Architecture, University
More informationADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
More informationPLANNING & REGULATION COMMITTEE 16 JANUARY 2012
Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK
More informationGEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS
GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS Huge landslide Leyte, Phillipines, 1998 2000 casulties Small debris
More informationHousehold waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
More informationHow To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
More informationAGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
More informationVEHICLE CROSSOVER INFORMATION PACK
VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)
More informationWelcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area
More informationLand at Cofton Lake Road Cofton Hackett
Land at Cofton Lake Road Cofton Hackett Prepared by Pegasus Planning Group Richborough Estates February 2009 Bir.3085 1 2 Introduction This Background Document has been produced on behalf of Richborough
More informationAction plans for hotspot locations - Ash Study
Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side
More informationHIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings
HIGHWAY DESIGN REPORT Appendix 4 Proposed Design Principles for City Passings June 2000 Contents Page 1 Introduction 2 1.1 Purpose 2 1.2 Definition of city passing 2 1.3 Safety Problems 2 1.4 Planning
More informationInternational No-Dig 2013 31 st International Conference and Exhibition. Sydney, Australia 1-4 September 2013. Paper 2.12
International No-Dig 2013 31 st International Conference and Exhibition Sydney, Australia 1-4 September 2013 Paper 2.12 TIDAL AFFECTED SEWER REHABILITATION IN BALLINA SHIRE Kieran Woodall Project Manager
More informationConstruction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
More informationMaximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road
Signs giving orders Signs with red circles are mostly prohibitive. Plates below signs qualify their message. Entry to 20 mph zone End of 20 mph zone Maximum speed National speed limit applies School crossing
More informationPlanning, Design & Access Statement
Planning, Design & Access Statement Hazell House, Burnthurst Lane, Princethorpe Client: Warwickshire & Northamptonshire Air Ambulance IG Land & Planning 1 Thornton Close, Crick, Northants, NN6 7GE Tel/Fax
More informationRide Safe. How you can avoid the 5 most common motorcycle accidents. Produced with the support of The Department for Transport
Ride Safe How you can avoid the 5 most common motorcycle accidents Produced with the support of The Department for Transport Ride Safe How you can avoid th Riding a motorbike safely requires both skill
More informationJoined-Up Cycling. Cycle Links for Horsham Town Centre
Joined-Up Cycling Cycle Links for Horsham Town Centre 1 4 3 6 2 5 Proposals to improve cycle access to the town at the Albion Way/Bishopric junction and join up some of the fragmented cycle routes in the
More informationGas to the West INFORMATION LEAFLET. gastothewest.com. info@gastothewest.com. www
Gas to the West INFORMATION LEAFLET 0800 975 2322 gastothewest.com @ info@gastothewest.com Gas to the West 1. INTRODUCTION This Gas to the West Project is a major energy infrastructure project to extend
More informationSignificant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk
December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort
More informationTOWN OF HARRISBURG FIRE DEPARTMENT 6450 Morehead Road, Harrisburg North Carolina 28075 Phone: 704 455 3574 Fax 704 455 6391 www.harrisburgfd.
FLOOD FACTS AND SAFETY TIPS Floods are one of the most common hazards in the United States. Flood effects can be local, impacting a neighborhood or community, or very large, affecting entire river basins
More informationBe a responsible walker
Be a responsible walker Please remember the countryside is a place where people live and work and where wildlife makes its home. To protect the Lincolnshire countryside for other visitors please respect
More informationHow To Understand Were Street
24. Were Street Context Were Street is an asymmetrically aligned double-sided Activity Centre, split into 2 activity clusters separated by residential housing. The centre is approximately 145 metres long
More informationIncident Management: Before and After Storm Events. Caroline Barford & Caroline Timlett Coastal Engineers
Incident Management: Before and After Storm Events Caroline Barford & Caroline Timlett Coastal Engineers Presentation Overview Overview of Area concerned Before & During Storm Events Coastal Flood Response
More information11.2 The proposals to deal with the leachate within the closed Lodmoor North Landfill site are assessed in Chapter 10 Geology and Soils.
Chapter Eleven Water Quality, Drainage and Hydrogeology Introduction 11.1 This Chapter considers the impact of the Relief Road on the hydrology of the area and considers both surface and groundwater. Runoff
More informationapproval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
More informationSample Test Questions
Section 1 Sample Test Questions 2. Look at the picture marked 2. The first section of the SLEP test measures ability to understand spoken English and is 35-40 minutes long. It is divided into four parts,
More informationReducing Slips, Trips and Falls
Reducing Slips, Trips and Falls The University of Birmingham is involved with work at the cutting edge of technology and research, often using potentially hazardous equipment, materials or substances or
More informationPRE-PURCHASE INSPECTION REPORT
PRE-PURCHASE INSPECTION REPORT PREPARED FOR: PROPERTY ADDRESS: Waiheke Island DATE: 21 November 2012 Page 1 of 13 (a) This is a report of a visual only, non-invasive inspection of the areas of the building
More informationMajor Improvement Schemes in Basingstoke
Major Improvement Schemes in Basingstoke 1. Welcome Welcome to this exhibition, which provides information about the planned highway improvements being delivered in Basingstoke from 2015 2018. A30 Winchester
More informationKings Road, Beith. Development Brief. Part 1: Site Specific Information
Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular
More informationHIGHWAY DESIGN GUIDE. 1.1 Foreword
HIGHWAY DESIGN GUIDE Part 1 INTRODUCTION 1.1 Foreword Coventry City Council wants Coventry to be a growing, accessible city where people choose to live, work and be educated, and where businesses choose
More informationAA Streetwatch Survey 1
17 January 2011 Page 1 of 31 Contents Introduction...3 The Survey...3 Most/least serious issues...4 Results by Region...6 Overall rankings...6 Maps showing regional ranking by issue...7 Results by Postcode
More informationGUIDANCE FOR FUTURE PLANNING PROPOSALS AND THEIR IMPACT ON WASTE VEHICLES SOUTH AND VALE
GUIDANCE FOR FUTURE PLANNING PROPOSALS AND THEIR IMPACT ON WASTE VEHICLES SOUTH AND VALE Policy DC7 New developments must make adequate provision for the sorting, storage and collection of waste arising
More informationClaims for compensation
Claims for compensation Relating to an incident on the highway or footway which resulted in personal injury and/or damage to property Introduction This document is about compensation claims for incidents
More informationWORPLESDON PARISH COUNCIL FLOOD PLAN. February 2015
Appendix A WORPLESDON PARISH COUNCIL FLOOD PLAN February 2015 This Flood Plan has been created so that, in the event of flooding in the area covered by Worplesdon Parish Council, there is a clear understanding
More informationSUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y
Foundation A foundation is the bottom part of a building. It s the element that anchors the building to the ground and transmits the building s gravity load directly to the earth. Water damage weakens
More informationNote of Neighbourhood Meeting & Priorities
Note of Neighbourhood Meeting & Priorities Neighbourhood Manadon with Widey Date 08/03/2012 Time (start & finish) 6pm-7.15 Venue Crownhill Library Councillors/Officials (name & title) in attendance; Chair
More informationRecycling & Energy Recovery Facility
Recycling & Energy Recovery Facility Cross Green Industrial Estate Leeds Environmental Statement Volume 1: Non-Technical Summary The Proposed Development Project Background Leeds City Council (LCC) intends
More informationNOISE IMPACT AND MITIGATION STUDY
Environmental Consulting Services 18488 Prospect Road Suite 1, Saratoga, CA 95070 Phone: (408) 257-1045 FAX: (408) 257-7235 NOISE IMPACT AND MITIGATION STUDY Carmel Canine Sports Center Project 8100 Valley
More informationIPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES
IPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES Information from Suffolk County Council Information publicly available - free of charge Information available - with
More information2012 Program Report. Agricultural Group Drainage Program
2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout
More informationA Guide to Accident Prevention on Motorcycles
A Guide to Accident Prevention on Motorcycles SEE me now? Always ride with your dipped headlight on DAY AND NIGHT Avoiding the 5 most common motorcycle accidents... 1 Collisions at Junctions... These can
More informationUniversity Arms Hotel, Cambridge
Traffic Management Plan For University Arms Hotel, Cambridge Prepared By: James Batterbee Number: M1342 / Rev B Date: 29 th August 2014 CONTENTS: (1) INTRODUCTION (2) VEHICLE ACCESS & EGRESS AND PEDESTRIAN
More informationGovernment of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL
Government of the People s Republic of Bangladesh Ministry of Communications PAVEMENT INVENTORY SURVEY MANUAL MAY 2005 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. ROAD NUMBERING... 4 2.1 OBJECTIVE...4 2.2
More informationRegulations relating to pedestrian and vehicle traffic (traffic rules)
Regulations no. 747 of 21 March 1986: Regulations relating to pedestrian and vehicle traffic (traffic rules) Table of contents: Regulations relating to pedestrian and vehicle traffic (traffic rules)....2
More informationLAND AT MANOR HOUSE FARM WIGHILL, TADCASTER TO LET. on a Farm Business Tenancy for a term of up to 5 years *********
LAND AT MANOR HOUSE FARM WIGHILL, TADCASTER TO LET on a Farm Business Tenancy for a term of up to 5 years ********* HIGHLY PRODUCTIVE ARABLE LAND SET IN A RING FENCE with the option of a GENERAL PURPOSE
More information770 TH Tseung Kwan O Development, Phase II, Grade Separated Interchange T1/P1/P2
770 TH Tseung Kwan O Development, Phase II, Grade Separated Interchange T1/P1/P2 Introduction The T1/P1/P2 junction is situated, north of Tseung Kwan O (TKO) Town Centre, at the junction of TKO Tunnel
More informationRural Road Safety Policy in Korea: Lesson Learned
Regional Seminar on Safe, Climate Adaptive and Disaster Resilient Transport for Sustainable Development Nov. 17 th, Seoul Rural Road Safety Policy in Korea: Lesson Learned Sangjin HAN Korea Transport Institute
More information