1 Infrastructure Requirements and Costs Update for Strategic Locations This note provides an update to the infrastructure costs submitted in the Council s statements to Matters 9, 10, 12, and 14. North East of Leicester Sustainable Urban Extension CORE STRATEGY EMERGING PROPOSAL ESTIMATED COST New main road through the development from Barkby Thorpe Lane at the north to Sandhills Avenue to the south, performing the function of a high street where it passes through the new main centre. New link road westwards to link Melton Road and A607 north of the A607 / Barkby Thorpe Lane Junction TRANSPORT REQUIREMENTS New spine road within the SUE, performing the function of a high street where it passes through the new main centre (including bridge over the Midland Mainline). New link to Sandhills Avenue to the south (including bridge over the Melton Brook). New highway infrastructure to facilitate northern access - westwards to link Melton Road and A607 north of the A607 / Barkby Thorpe Lane Junction 23.5m Capacity improvements to Barkby Thorpe Lane and the A607/ Barkby Thorpe Lane Roundabout Other network improvements Improvements to Barkby Thorpe Lane and ASDA Roundabout / A607 Other network improvements New and enhanced bus services walking routes High quality bus corridors between the SUE and Leicester City Centre Network of cycle routes including access to Syston Railway Station and surface improvements to footpaths between the SUE and surrounding villages. COMMUNITY FACILITY REQUIREMENTS 3.5m 2m Primary School 3 Primary Schools 13.6m Secondary School Contributions Options or Contributions 13.4m Local centre including community facilities and a community centre Post 16 New Health Facility Police Workstation 2.8m 2.25m m Library 273,000 OPEN SPACE REQUIREMENTS
2 Parks totalling around 3.6 ha Around 23 ha of natural and semi-natural green space Around 5 ha of amenity green spaces Around 22 sites providing facilities for children Around 22 sites providing facilities for young people Around 29 ha of outdoor sports provision including around 13 ha of playing pitches and around 5 tennis courts Parks - open parkland and linear parks. Natural and semi-natural green space Amenity green spaces Smaller number of larger well equipped sites Smaller number of larger well equipped sites Outdoor sports provision including playing pitches and courts 1.34m 1.42m 0.71m 0.4m 0.4m 2.1m Around 4 indoor courts Indoor courts 1.8m Around 4ha of allotments Allotments 0.26m TOTAL COST 71.15m North of Birstall Direction of Growth CORE STRATEGY EMERGING PROPOSAL ESTIMATED COST New roundabout on the A6, north of the A46 interchange TRANSPORT REQUIREMENTS Primary access junction on the A6 (signalised roundabout) 8.2 million Appropriate access arrangements including a connection to the A6 and Rothley A two way connection with Loughborough Road, Rothley Appropriate capacity improvements at the A46 interchange. walking routes Bus service enhancements Improvements to A6/A46 junction and provision of bus gate and emergency access. walking routes, including a new underbridge to A6, connecting Broadnook with Wanlip, Birstall and Watermead Park via a nonvehicular route. Services 126/127 and 22A/22B as diverted and extended will deliver connections with key destinations at Birstall, Leicester and other settlements in Charnwood. COMMUNITY FACILITY REQUIREMENTS
3 Primary School Secondary School Contributions Local centre including community facilities and a community centre Providing an accessible, comprehensive and high quality network of multi-functional green spaces. 1 Primary School including dual use Hall Sufficient capacity to meet all of the generated places at nearest high school and upper school 5.5m 0 Post 16 places 579,810 Health facilities 594,184 Civic Amenity Site 77,505 Police 583,766 Libraries 81,525 OPEN SPACE REQUIREMENTS Emerging Masterplan includes a package of green infrastructure including a new Broadnook Park with maintenance and management overseen by a Broadnook Garden Suburb Trust including play facilities and sports pitches. 23.7m TOTAL COST 40.2 West of Loughborough Sustainable Urban Extension CORE STRATEGY EMERGING PROPOSAL ESTIMATED COST New strategic distributor road through the development to connect to the A512 at the south and the A6 (south of Hathern) to the north TRANSPORT REQUIREMENTS Strategic Link Road from the A512 to A6 (including A6 Site Access and a link to Hathern Road and providing a high street where it passes through the main centre) 15.2m New road providing the function of a high street where it passes through the main centre New road link from the distributor road to Hathern Road Dualling of the A512 between Snell s Nook Lane and M1 motorway J23 Capacity improvements to Dualling of the A512 between Snell s Nook Lane and M1 motorway J23. Capacity improvements to M1 motorway J23 fully signalled 50% Contribution of 3.7m of the total cost of 7.4m
4 M1 motorway J23 controlled scheme. Site access from signalled controlled roundabout to serve SUE and SEP. Other network improvements New and enhanced bus Services New and improved cycling and walking routes Junction Improvements in Loughborough Bus Service Provision New and improved cycling and walking routes off site 275, m 445,000 COMMUNITY FACILITY REQUIREMENTS Two Primary Schools Two Primary Schools 10.3m Secondary School Contributions Secondary Contribution 321,771 Post 16 places 0 Local Centre Health facilities 1.6m - 2.5m for an expansion of existing or provision of a new facility Libraries 273,000 Policing 1.3m OPEN SPACE REQUIREMENTS Public access to, restoration and long term management of Garendon Historic Park and Gardens Around 3.4 ha of amenity green space Registered Park Restoration and Public Access Listed Buildings - to level of repair and restoration Around 3.4 ha of amenity green space 2.7m ,000 Sites providing facilities for children and Young People Play facilities 512,000 Around 22.8 ha of outdoor sports provision including around 9 hectares of playing pitches and around 4 tennis courts Outdoor sports provision 1.5m Around 3 indoor courts Indoor Sports facility 1.5m
5 Around 2.5 ha of allotments Around 2.5 ha of allotments 266,000 Other Abnormal cost for Power substation anticipated 4m contribution to the total cost of 8m TOTAL COST 48m Shepshed Direction of Growth CORE STRATEGY EMERGING PROPOSAL DEVELOPER CONTRIBUTIONS (from 1,260 homes) walking routes Routes provided within approved sites. Bus service enhancements to Shepshed and Loughborough Provision of bus passes for residents of new development Other road infrastructure and network improvements as identified by an appropriate Transport Assessment Contributions to travel information packs for new residents Provision of bus shelters, bus stops, information cases and real time information systems. Contributions towards: M1 Junction 23 Improvements A512 Duelling 471,986 Found not to be necessary upon preparation of a Transport Assessment Improvements to the A512 / Tickow Lane junction 277,760 Improvements to the A512 / Charnwood Road junction Improvements to the A512 / Leicester Road junction 26.9% from site % from site 8 6.4% from site 9 Gap funding subject to LLEP application 23.1% from site % from site 8 7.2% from site 9 Gap funding subject to LLEP application
6 CORE STRATEGY EMERGING PROPOSAL DEVELOPER CONTRIBUTIONS (from 1,260 homes) Traffic calming on Belton Street Primary and Secondary school places Other local junction improvements Contribution towards primary school places Contribution towards secondary school places 73,064 5,060,559 Small range of shops services and facilities Development that contributes to the regeneration of Shepshed Other Contributions (Civic amenity, public art and off site recreation) Health facilities 297,724 Policing 314,289 Libraries 44,758 Contributions towards public realm improvements identified through the Town Centre Master Plan 173, ,231 TOTAL CONTRIBUTIONS 7,108,171 (plus the costs of junction improvements to A512)
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
More informationMajor and Minor Schemes
1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment
More informationThe Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan
The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603 Framework Residential Travel Plan September 2013 CONTROL SHEET CLIENT: PROJECT TITLE: REPORT TITLE: THE
More information6. Social & Community Facilities
6.1. Objectives The built environment, with appropriate housing, public spaces and community facilities provides a basic platform to ensure residents have the best opportunity to build their own community.
More informationA new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils
More informationDepartment of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure
Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state
More informationCOPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited
COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation
More informationFramework Pinhoe Area Access Strategy
Framework Pinhoe Area Access Strategy January 2011 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD 1 PREPARED BY Name: Matt Collins Position: Assistant Transportation Planning Officer
More informationDEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
More informationCouncil Objective: Improve road network and influence improvements in public transport. Quarter 2 Progress Report 2015-16
Council Objective: Improve road network and influence improvements in public transport Quarter 2 Progress Report 2015-16 If you need this information in another language or format, please contact us to
More information6 Streetscape character 6.1
6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London
More informationA number of key guiding principals underline the approach to transportation within the plan area. These include:
Transportation The principal form of transportation infrastructure will be vehicular roads augmented by a network of pedestrian and cycle routes. Transport infrastructure development will be commensurate
More informationDelivery Plan. Service Delivery Plan 2007/08 Template 1. Desired Outcome
Delivery Plan Theme 1 Deliver Loughborough Eastern Gateway Project Director Apr 05 Mar 09 Balanced Scorecard Initiative Scheme approved Mar 07 Agreement with Network Rail Dec 06 Final agreement with preferred
More informationShannon Corner Service Centre, 208-212 Burlington Road, New Malden, KT3 4NP
Shannon Corner Service Centre, 08-1 Burlington Road, New Malden, KT NP S1 Total site area (ha) 0.05ha Current MOT Car Repair Undeveloped land (ha) 0 Number of units 1 Grid reference TQ 680 Sequential status
More informationOn the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers
FOR SALE On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers Land at Teville Gate, Teville Road, Worthing, West Sussex BN11 1AZ ibrochure - www.cbre-ibrochure.co.uk/worthing ENTER
More informationDROMANTINE. Driving Directions. Please print or use the following guide to locate Dromantine Retreat And Conference Centre.
DROMANTINE RETREAT AND CONFERENCE CENTRE Driving Directions Please print or use the following guide to locate Dromantine Retreat And Conference Centre. We also have an interactive Google map on our website
More informationAmex Site Residential Development, Tarneit
Amex Site Residential Development, Tarneit Local Area Traffic Management Report Client: Amex Corporation Project No. 114430 Draft Report 13/12/13 Suite 1, 1 st Floor 132 Upper Heidelberg Road Ivanhoe Vic
More informationPrince Michael of Kent Court
Prince Michael of Kent Court Purpose built in 1994 and extended, Prince Michael of Kent Court is situated in its own grounds in a pleasant residential area, just 10 minutes from Watford town centre and
More informationRUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11
S RUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11 22 nd OCTOBER 2004 KEY ISSUES The Transportation Select Committee has asked all local transportation
More informationKey Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
More information1 in 30 year surface water flooding assessment Environment and Transport Department
1 in 30 year surface water flooding assessment 1 in 30 year surface water flood risk Number of properties at risk per 1km square 100 plus 25 100 5 25 293 NOTE Number of properties at risk calculated using
More informationKENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
More informationEnergy and. Resources
Tasmaniann Government 20122 Submission to Nation Buildin g 2 Program Domain Highway Planning (Part of Brooker Highway Upgrades submission to Infrastructure Australia) September 2012 Department of Infrastructure,
More informationOffers In Excess Of 175,000
14 Tetbury Drive, Shepshed, Leicestershire, LE12 9NF 01509 600610 sinclairestateagents.co.uk Offers In Excess Of 175,000 Property at a glance Three Bedroom Detached Cul De Sac Position Off Road Parking
More informationwww.thefurlongphase2.co.uk
Welcome Thank you for coming along today to view our plans for Phase 2 of The Furlong Shopping Centre. We are undertaking a consultation programme that will run up to and beyond submission of the planning
More informationLawson Outline Plan External Traffic Analysis Working Paper
Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000
More informationTravel and Transport Plan
Travel and Transport Plan Travel Plan Co-ordinator Adrian Howell (Stadium Manager) Sussex County Football Association, Culver Road, Lancing, West Sussex BN15 9AX Telephone: 01903-768575 Email: adrian.howell@sussexfa.com
More informationTewkesbury. March 2015
Tewkesbury March 2015 1. Market Update Retailer Trends International retailers still entering the UK but more selective about their store footprint. Right-sizing existing retailers want representation
More informationOVERARCHING SPATIAL POLICIES
3 OVERARCHING SPATIAL POLICIES 29 Overarching Spatial Policies 3.1 This chapter contains policies addressing the following policy themes: OSP 1: Optimising growth OSP 2: Land use OSP 3: Connections and
More informationDorset Green SANGs Report
Dorset Green SANGs Report April 2012 FARRELLS Contents 1.0 Introduction 1.1 Accessible Green Spaces 2.0 SANGs Objectives 2.1 Proposals 2.2 Ecology Park 2.3 Village Green 2.4 Country Heritage Park 2.5 Dorset
More informationInfrastructure Plan. Scoping Report
Infrastructure Plan Scoping Report November - I - 2009 Infrastructure Plan Scoping Report Contents: Page 1.0 Introduction 1 2.0 Approach 5 3.0 Timetable 7 - I - 1.0 Introduction 1.1 The Infrastructure
More informationFacilities and Prices
Facilities and Prices April September 2012 Charnwood s Health & Fitness prices frozen until September 2012 Welcome to Charnwood s. We aim to provide an affordable and diverse range of quality leisure facilities
More information74 Rivington Street. Planning Statement JULY 2013 DP9. 100 Pall Mall. London SW1Y 5NQ. Tel: 020 7004 1700. Fax: 020 7004 1790
74 Rivington Street Planning Statement JULY 2013 DP9 100 Pall Mall London SW1Y 5NQ Tel: 020 7004 1700 Fax: 020 7004 1790 CONTENTS Page 1.0 Introduction 1 2.0 Site Description 2 3.0 The Proposed Development
More informationSouthwark. Directions to ABC Selfstore. 54 80 Ossory Road London SE1 5AN
to ABC Selfstore Southwark 54 80 Ossory Road London SE1 5AN t: 0800 046 1943 e: southwark@abcselfstore.co.uk w: abcselfstore.co.uk/southwark By Bus, nearest stop: Malt Street Stop (Outside ASDA or Opposite
More informationTown of Amherst Flood Plan Annex
Town of Amherst Flood Plan Annex The following document is an annex to the Town of Amherst Disaster Plan and is specifically used as a guideline for Flooding events Flood Plans can enable a flexible response
More informationInfrastructure Development Plan (IDP)
Infrastructure Development Plan (IDP) INTRODUCTION Investment in the city s infrastructure is needed to cope with the proposed scale of growth identified in the Local Development Plan (LDP). This infrastructure
More informationLLITM Public Transport Supply Model
LLITM Public Transport Supply Model Paul Smith 11 th May 2011 Leicestershire County Council Public Transport in Leicestershire Sustainable transport moving from an abstract concept to necessity PT modes
More informationSector Design Concepts
Section C Sector Design Concepts C7 Sector 7 Great North Road Underpass 6 6 6 C7. Existing situation Sector 7 refers to the cut and cover section of the project linking the northern end of the deep tunnels
More informationLeicester and Leicestershire Local Investment Plan
Page 1 of 43 Foreword Since 2008 the impact and implications of the downturn in the global economy for the national and sub regional economies are evident. In response, the Coalition Government has set
More informationFIRST STREET NORTH CREATING PLACES FOR PEOPLE
About This Consultation Manchester City Council and Ask Property Developments are seeking to develop First Street North, a 2.2 acre site to the north of the Number One Building, within the 20 acre First
More informationhttp://www.betterbankside.co.uk/travel/bankside-speed-walkers Local http://www.southwark.gov.uk/downloads/download/3058/dickens_2012
Thames Path Walk Section 2: Albert Bridge to Tower Bridge Albert Bridge, SW11 http://www.walklondon.org.uk/section.asp?s=51 Bankside Community Mondays Space, 18 Great Guildford 1.10pm Street, London SE1
More informationCITY MEETS CENTRE. Be part of the Cardiff Exciting Hotel Development Opportunity
Exciting otel Development Opportunity CITY MEETS CENTRE JR Smart are seeking to secure an internationally branded hotel on part of the site and will consider the sale of part of the site for hotel development
More informationAlternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
More informationBlock C Borthwick Street, London, SE8 3JY
AVAILABLE SPACE Block C Borthwick Street, London, SE8 3JY The property will comprise a mixed use building of steel portal frame construction arranged over eight floors with ground floor office/medical
More informationTraffic Management During Construction
Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to
More informationSCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose
SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance
More informationThe Mersey Gateway Project
The Mersey Gateway Project The Mersey Gateway Project is a major scheme to build a new six-lane toll bridge over the River Mersey in the north west of England. It will link the towns of Runcorn and Widnes
More informationShort Term Projects. Potential Projects Longer Term
Chipping Norton Town Partnership Action Plan (V3.1 November 2005) Short Term s Feasibility Study for Enterprise Centre Development of a town Business Directory Skills Audit A Website for Chipping Norton
More informationComment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
More informationStowmarket Area Action Plan (AAP) Examination
Stowmarket Area Action Plan (AAP) Examination Main Matters, Issues and Questions Matter 3 - Employment (Appendix) This contains additional information in support of the Hearing Statement and relates to
More informationVale of Glamorgan Local Development Plan 2011-2026. Contents. Page. 2. Infrastructure Requirements 2. 3. Site Viability 4
Vale of Glamorgan Local Development Plan 2011-2026 Contents Page 1. Introduction 2 2. Infrastructure Requirements 2 3. Site Viability 4 4. Community Infrastructure Levy 4 5. Update position on Residential
More informationSite Layout & Traffic Plan
Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction
More information21.03 SETTLEMENT AND HOUSING
21.03 SETTLEMENT AND HOUSING 09/10/2014 C187Prop osed C189 21.03-1 Housing 09/10/2014 C187 This clause provides local content to support Clause 11 (Settlement) and 15 (Built Environment and Heritage) and
More informationPlanning Policy Statement 8 (PPS 8) Open Space, Sport and Outdoor Recreation
Planning Policy Statement 8 (PPS 8) Open Space, Sport and Outdoor Recreation Planning Policy Statements (PPSs) set out the policies of the Department of the Environment on particular aspects of land-use
More informationMoray Economic Strategy Implementation Programme Status Update September to December 2013
Moray Economic Strategy Implementation Programme Status Update September to December 2013 Overall A media centre newsroom has been purchased by members of the partnership to provide information about implementation
More informationWELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas
More informationSignificant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk
December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort
More informationInvestment Partnership for South Leeds
Investment Partnership for South Leeds June 2011 INVESTMENT STRATEGY Connecting Communities & Opportunities SUMMARY REPORT SUMMARY REPORT What is The Investment Strategy for South Leeds... It provides
More informationLand at Cofton Lake Road Cofton Hackett
Land at Cofton Lake Road Cofton Hackett Prepared by Pegasus Planning Group Richborough Estates February 2009 Bir.3085 1 2 Introduction This Background Document has been produced on behalf of Richborough
More informationFootpath Extension Policy
16.6.9 Footpath Extension Policy 1.0 FOOTPATH EXTENSION POLICY - INTENTION The Footpath Extension Policy provides for the ranking of new footpaths in the Council s footpath construction programme. The
More informationLODE WITH LONGMEADOW ACTION PLAN
LODE WITH LONGMEADOW ACTION PLAN Date adopted by Parish Council: Apr-2008 Date of this update: dd-mmm-yyyy Timescales for action: Priority: Should be started within 1 year of the date this plan was adopted.
More informationMINUTES of a meeting of the CABINET MEMBER FOR HIGHWAYS AND TRANSPORT held at County Hall, Matlock on 7 May 2010 PRESENT
MINUTES of a meeting of the CABINET MEMBER FOR HIGHWAYS AND TRANSPORT held at County Hall, Matlock on 7 May 2010 PRESENT Councillor C Jackson (Cabinet Member) Also in attendance Councillor B C Lucas. The
More informationPlace Shaping Committee
Place Shaping Committee Agenda Date Thursday 3 July 2014 Members of the Place Shaping Committee Mr S A Vincent Chairman Miss A M J Cassam Mr W F Couzens Mr J J Emsell Mr A P Findlay Mr R R Foulger Mr I
More informationCROYDON MAJOR ACTIVITY CENTRE PARKING STUDY
CROYDON MAJOR ACTIVITY CENTRE PARKING STUDY December 2011 EXECUTIVE SUMMARY Strategic Context The Croydon Town Centre has been classified as a Major Activity Centre (MAC) in the Melbourne 2030 metropolitan
More informationSTADIUM PLACE. Atrractive 1, 2, 3 and 4-bedroom homes available through L&Q s Shared Ownership scheme
STADIUM Atrractive 1, 2, 3 and 4-bedroom homes available through L&Q s Shared Ownership scheme Computer Generated Image of Stadium Place is indicative only STADIUM STADIUM VITAL STATISTICS London Borough
More informationMount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020
More information7 Guiding delivery - next steps: efficient transport network management
7 Guiding delivery - next steps: efficient transport network management Council Plan priorities 2011-2014: making places easier to reach; a resilient economy Making the best use of existing roads for the
More informationThe Places THE PLACES
4 THE PLACES 51 The Places Key Issues 1. OPDC s draft Local Plan includes thematic policies. These policies will be applied to any site across the OPDC area but would not, by themselves, result in distinctive
More informationClean, Green, Fun! Cady Way. Trail
Clean, Green, Fun! Cady Way Trail Seminole County Burkett Osceola 426 Mizell Sylvan 426 Ward Memorial Cady Way 436 426 551 Nan Waunatta Martha Mira Pearl George Virginia Berry Irma Winter Pines Golf Course
More informationACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE
ACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE 1.1 The National Planning Policy Framework sets out what good design should aim to achieve, in a set of six statements that are complementary to policies contained
More informationSite Proposal 15. suitable modern space. The design of any proposals will need to be sensitive to the railway line.
Site Proposal 15 West Barnes Library West Barnes Lane, 10 Station Road, New Malden, Surrey, KT3 6JJ Site area Site description 0.1ha Single storey building tucked away behind Motspur Park station. To the
More informationStudent Travel Options
Environment Team Student Travel Options Is it time to your travel? www.le.ac.uk/travelplan 2 UNIVERSITY OF LEICESTER ENVIRONMENT TEAM Is it time to your travel? The University of Leicester has made a commitment
More informationTowns: Ardrossan. Key
Towns: Ardrossan The development of Ardrossan is well underway with the recent development of the marina and adjacent housing by Clyde Port. The strategy seeks to extend and improve the quality of this
More informationAlternatives and Design Evolution: Planning Application 1 - RBKC
3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan
More informationHORLEY TOWN COUNCIL Planning & Development Committee
Present HORLEY TOWN COUNCIL Planning & Development Committee Minutes of a Meeting of the above-named Committee held at the Town Council Offices, Albert Road, Horley on 26 August 2014, at 7.30 pm Cllrs
More informationretail ideas refreshing communities regenerating HOME REGENERATION COMMUNITIES DESTINATIONS PORTFOLIO SCHEMES CONTACT
refreshing retail ideas regenerating communities 20+ UK retail schemes 3 million sq ft retail space 1.3 billion property portfolio regeneration through retail St. Modwen is the UK s leading regeneration
More informationKey Themes for Langham s Neighbourhood Plan
2014 Key Themes for Langham s Neighbourhood Plan What is a Neighbourhood Plan? The concept of a Neighbourhood Plan was introduced via the Localism Act of 2011. It gives communities the right to shape the
More informationThe achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1
Cornwall Local Plan 2010-2030: Proposed Monitoring Framework Part 1: Strategic Policies Policy 1: Presumption in Favour of Sustainable Development Policy 2: Spatial Strategy Policy 2a Key Targets Job provision
More informationFor more information, visit: rethinkingstreets.com
For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,
More information4.6. ECOCITY Tübingen - Derendingen
4.6. ECOCITY Tübingen - Derendingen 4.6.1 General information The attractive university town of Tübingen is located in south-western Germany and faces a high demand for housing, especially to keep young
More informationSite Deliverability Statement Development at: Bridgnorth Road, Much Wenlock. Persimmon Homes October 2013
Site Deliverability Statement Development at: Bridgnorth Road, Much Wenlock Persimmon Homes October 2013 Contents Site Deliverability Statement Development at: Bridgnorth Road, Much Wenlock. 1.INTRODUCTION
More information2015 2016 - Council Tax Facts and Figures on Finance
2015 2016 - Council Tax Facts and Figures on Finance 1 Contents R Foreword 3 Facts and figures on finance 1 Your Council Tax helps pay for the following 4 2 Our spending plans 5 3 How your Council services
More informationPOSITIVELY+ LOCATED. Everglade Campus 82 Waterloo Road, Macquarie Park, NSW
POSITIVELY+ LOCATED 82 Waterloo Road, Macquarie Park, NSW 02 opportunity+ is a high profile, four level office building featuring a blend of native landscaping and unique building design. Located in the
More informationLEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION
1 LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION STATEMENT BY CROUDACE STRATEGIC LIMITED ISSUES 7 AND 8 STRATEGIC SITES (POLICIES SP5/SP6)
More informationTO COLCHESTER A120 A138 JUNCTION 19 BOREHAM INTERCHANGE A12 TO M25 AND LONDON
CHELMSFORD BUSINESS PARK CAMBRIDGE A45 SAFFRON WALDEN BURY ST EDMUNDS A1088 STOWMARKET TO LOWESTOFT A14 A12 IPSWICH TO COLCHESTER A12 M11 STANSTED BISHOP'S 8 STORTFORD 7 A120 CHELMSFORD 27 6 M25 BRENTWOOD
More informationSite Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site
More informationParks, Forestry & Recreation
Re: PE4.6 Parks, Forestry & Recreation Service Level Review Parks and Environment Committee Presentation June 22, 2015 Overview Recommended Service Levels by Program Program Map Service Levels and Service
More informationSummary of feedback from two Forums hosted by Auckland Council s Ethnic Peoples Advisory Panel
Summary of feedback from two Forums hosted by Auckland Council s Ethnic Peoples Advisory Panel Executive Summary: The Auckland Council s Ethnic Peoples Advisory Panel (EPAP) in its April 2011 meeting agreed
More informationoffice space available now 1,750-29,300 sq ft
office space available now 1,750-29,300 sq ft cambridge cb23 6dn 2010, 2020 and 2030 are three individual buildings, comprising of 130,000 sq ft, at Cambourne Business Park under the new ownership of CUBE
More informationHow to find us. 0161 280 8280 www.burycollege.ac.uk
How to find us 0161 280 8280 www.burycollege.ac.uk Bury College - A college that s easy to reach Directions KEY eception From the motorway Exit M66 Junction 2. Follow the signs for Bury town centre (1
More informationCorporate Park 8150-8180 Corporate Park Dr Cincinnati, OH 45242
FOR LEASE Corporate Park 8150-8180 Corporate Park Dr Cincinnati, OH 45242 Property Highlights Total SF: 136,000 Available RSF: 13,155 Asking $13.95/SF + electric Suite sizes from 520 SF to 4,326 SF Four
More information"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T
"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T Gorzów Wielkopolski Gorzów Wielkopolski is an important regional city centre
More informationEcological function planning research of expo area in Jinjiang City s rural reconstruction
SHS Web of Conferences 24, 01003 (2016) DOI: 10.1051/ shsconf/20162401003 C Owned by the authors, published by EDP Sciences, 2016 Ecological function planning research of expo area in Jinjiang City s rural
More informationAssessment of Site Deliverability in the Market Towns
East Cambridgeshire District Council of Site Deliverability in the Market Towns August 2014 Annex 1 to the Site Results Technical Background Paper (February 2013) 0 Contents: 1. Introduction 1.1 Role of
More informationPARK VIEW RESIDENTIAL LARGE FORMAT NON-FOOD RETAIL MARKS & SPENCER OPENING IN 2015 TOWN CENTRE PHASE 1 SEVEN HOUSE SAINSBURY S LONGBRIDGE LANE RETAIL
PROGRESS PARK VIEW RESIDENTIAL LICKEY ROAD EXTRACARE CENTRE RESIDENTIAL SCHEME LARGE FORMAT NON-FOOD RETAIL MULTI STOREY CAR PARK MARKS & SPENCER OPENING IN 2015 TOWN CENTRE PHASE 1 PARK POINT AUSTIN PARK
More informationRichmond upon Thames College. Draft Planning Brief. May 2008
Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of
More informationWhat lessons for future urban regeneration in East London can be learnt from projects in the past? Year 11 Geography fieldtrip.
What lessons for future urban regeneration in East London can be learnt from projects in the past? Year 11 Geography fieldtrip January 2008 Group Names 1 Aim of the day East London: Urban regeneration
More informationEast Staffordshire Borough Council Infrastructure Delivery Study Part 1 Growth options assessment
Part of Peter Brett Associates LLP Roger Tym & Partners t: 0116 249 3970 3 Museum Square e: 0116 249 3971 Leicester e: leicester@tymconsult.com LE1 6UF w: www.tymconsult.com East Staffordshire Borough
More informationKelham Hall. Nottinghamshire NG23 5QX. To.: Agenda. South of
To.: Members of the Planning Committee Kelham Hall Kelham Newark Nottinghamshire NG23 5QX www.newark-sherwooddc.gov.uk Telephone: 01636 655247 Email: catharine.saxton@nsdc.info Your ref: Our ref: Dear
More informationAn Introduction to Haarlemmermeer
An Introduction to Haarlemmermeer History 1852 Haarlemmer Lake drained 1855 Independent municipality 1856 First balloon landing 1911 First aircraft landing 1933 Motorways (A4-A44), Amsterdam - The Hague