1 Transport Construction Authority Report for Auburn Stabling Project November 2010

2 Contents 1. Introduction 1 2. Existing Conditions Site Description Existing Operations Existing Road Network Characteristics Existing Traffic Management Controls Existing Traffic Volumes and Road Capacity Existing Intersection Performances Local Transport and Other Transport Issues Proposed Development General Description Traffic Impacts during Construction Traffic Generation during Construction Construction Period Road Network and Intersection Performance Local Transport and Other Transport Issues Traffic Impacts during Operation Traffic Generation Attributed to the Auburn Stabling Project (ASP) Traffic Generation Attributed to the Auburn Maintenance Centre Future Total Traffic Generation ASP and AMC Future Traffic Assignment during Operational Phase Future Road Network and Intersection Performance Conclusions 35 Table Index Table 1 Functional Classification of Roads 4 Table 2 Average Daily Flows 8 Table 3 AM and PM Peak Flows 9 Table 4 Indicative Volume Capacity Ratios 10 Table 5 Environmental Capacity Performance Standards on Residential Streets 11 Table 6 Assessment of Environmental Capacity Performance Standards 11

3 Table 7 Measures of Effectiveness for Level of Service Definition for Intersections 12 Table 8 Performance Criteria at Intersections 13 Table 9 Existing Intersection Performance 13 Table 10 Affected Bus Service 16 Table 11 Rail Services through Clyde Station and Auburn Station 16 Table 12 Construction Period Traffic Movements 22 Table 13 Environmental Capacity Performance Review Construction 24 Table 14 Construction Period Intersection Performances 25 Table 15 Staffing Requirements 27 Table 16 Total Future Traffic Generation AMC Operation 28 Table 17 Personnel and Shift Configuration during Morning and Evening Peak Periods 29 Table 18 Total Future Traffic Generation AMC Operation 30 Table 19 Total Future Traffic Generation 30 Table 20 Environmental Capacity Performance Review - Operational 32 Table 21 Operational Intersection Performances 32 Figure Index Figure 1 Location Map 3 Figure 2 Figure 3 Figure 4 Looking east along Manchester Road from the intersection with Chisholm Road 5 Looking south along Chisholm Road from the intersection with Manchester Road 6 Looking west along the Private Road, located to the west of Manchester Road 7 Figure 5 Existing Pedestrian Footpaths 15 Figure 6 Construction Traffic Haulage Routes 23 Appendices A Traffic Counts B SIDRA Outputs

4 1. Introduction Transport Construction Authority (TCA) has commissioned GHD Pty Ltd (GHD) to undertake the Review of Environmental Factors (REF) for the Auburn Stabling Project (ASP). A major component of this is the. The ASP is proposed to be located on RailCorp land, known as the Clyde Marshalling Yards, approximately 20 kilometres west of the Sydney Central Business District and within the Auburn local government area. The ASP site is located to the south-west of the Main West Line rail corridor, with the following four main services: the North Shore and Western line which travels from Berowra via Sydney s north shore to Parramatta and onto Emu Plains and Richmond the South line which travels between the City Circle and Campbelltown via Granville the Blue Mountains line which travels from Central Station through the Blue Mountains to Lithgow the Carlingford line which travels between Clyde and Carlingford. This has been prepared in accordance with the Guide to Traffic Generating Developments (Roads and Traffic Authority 2002) and considers the following issues: Existing Conditions a review of existing road features, traffic volumes, existing intersections performances and public transport. Future Conditions a review of additional traffic generated during construction and from the future operation of the proposed development, the daily traffic profile of the ASP, traffic assignment, assessment of the impact of the construction and future operation of the ASP on the road network and intersection performances in the vicinity of the site. 1

5 2. Existing Conditions 2.1 Site Description The proposed ASP is situated in the south-western section of an industrial precinct known as Clyde Marshalling Yards. The Clyde Marshalling Yards is an historic term describing a rail operations area dating back to the late 1800s. This area currently incorporates both RailCorp and privately owned industrial land. The Clyde Marshalling Yards is bounded by Parramatta Road to the north, Duck River to the west, Rawson Street to the east and Manchester Road to the south and is split into two sections by the Main West Line rail corridor, which runs east west through the precinct. Land to the west of the proposed ASP is used for industrial and commercial purposes. These businesses are accessed via Manchester Road to the south of the site. Where Manchester Road turns in a northerly direction, it is parallel to the path of Duck River. At this point, Manchester Road becomes a private road owned by RailCorp (referred to as the Private Road). Access to the ASP site is via the Private Road. On the western side of Duck River land use predominantly consists of low density residential dwellings, however a small number of industrial properties are also located along the western bank of Duck River. Land to the south and south-east of the ASP site consists of low density residential dwellings. Approximately 350 metres to the south-east of the site, surrounding Auburn Station, is a commercial and business precinct. The Auburn town centre contains some multi-storey residential dwellings which are generally located above businesses located at street level. A number of community facilities are located in close proximity to the Auburn town centre. These include St John s Primary School, Trinity Catholic College and St Joseph s Public Hospital. Currently there are three existing rail facilities operating within the Clyde Marshalling Yards to the south/south-west of the Main West Line. These facilities are: MainTrain Facility generally situated within the central portion of the site AMC to the north-west of the MainTrain Facility and east of the proposed ASP Manildra to the east of the proposed ASP and the MainTrain Facility. Existing access to the MainTrain Facility by both vehicles and pedestrians is via a level crossing across the existing tracks. This crossing provides vehicular access to the MainTrain site from Manchester Road. Access to the AMC site is via Manchester Road and the Private Road. The level crossing at the Clyde end provides the vehicular connection between the Private Road and the AMC site. Pedestrian access routes around the ASP site are currently limited, and occur at three locations: from the car park, located off Manchester Road to the MainTrain Facility this access is via an existing pedestrian footbridge located adjacent to the existing level crossing and is generally used by MainTrain workers from the AMC car park, located to the north of the ASP site to the AMC this access is via an existing pedestrian overbridge and is used by AMC workers from Clyde Station along the rail corridor to the AMC this access is via an existing pedestrian pathway and provides access across Duck River. 2

6 The location of the site is shown in Figure 1. Figure 1 Location Map 3

7 2.2 Existing Operations This section describes the existing operational characteristics and land use traffic generation within the Clyde Marshalling Yards. The RailCorp owned area of the Clyde Marshalling Yards is used as a rail based maintenance facility, with a variety of functions associated with the servicing of existing rail related rolling stock including: construction and engineering of rolling stock components workshops for maintenance of rolling stock workshops for visual presentation of rolling stock, including painting and repair works to carriages storage of rolling stock components and related machinery testing tracks and rail lines for train and carriage interchanges ancillary land uses including administrative office space and car parking. The south-western section of the Clyde Marshalling Yards is primarily accessible via the Private Road. Traffic data collected along the Private Road provides an indication of existing traffic generation of the south-western precinct. This would include some of the traffic associated with the AMC, which has recently become operational. RailCorp has confirmed that the current staffing of the AMC is minimal and only represents the core administration group. Although construction activities have been completed, there are occasionally heavy vehicles accessing the site due to associated minor works. The existing vehicle traffic generation of the south-western section of the Clyde Marshalling Yards accessing via the Private Road was recorded to be 1,074 vehicles per day. Approximately 9.2 percent of the daily vehicle movements (99 vehicles per hour) occur during the morning peak and 8.5 percent (91 vehicles per hour) in the evening peak periods. 2.3 Existing Road Network Characteristics The classification of roads on the existing road network can be used as an indication of the functional role each road plays with respect to the volume of traffic they should appropriately carry. The Roads and Traffic Authority (RTA) has developed a set of road hierarchy classifications (detailed in Table 1) indicating the typical daily and peak hour traffic volumes (expressed in terms of average annual daily traffic (AADT)) serviced by various classes of roads. Table 1 Functional Classification of Roads Type of Road Daily Traffic Volume (vpd) Peak Hour Traffic Volume (vph) Arterial Road >15,000 1,500 5,600 Sub-Arterial Road 5,000 20, ,000 Collector Road 2,000 10, ,000 Local Road <2, Notes: vph vehicles per hour; vpd vehicles per day 4

8 2.3.1 Manchester Road This road functions as a collector road with connection to Chisholm Road and the Private Road (access to Clyde Marshalling Yards) at its western end and access to The Crescent South, Normanby Road and Cumberland Road at its eastern end. Manchester Road, shown in Figure 2, has two wide travel lanes, one in each direction, and sufficient width to accommodate kerbside parking lanes. This is a council maintained road. Figure 2 Looking east along Manchester Road from the intersection with Chisholm Road Chisholm Road Chisholm Road, also a council maintained road, functions as a collector road with connection to Manchester Road at its northern end and Regents Park industrial area at its southern end. Chisholm Road, shown in Figure 3, has two wide travel lanes, one in each direction, and sufficient width to accommodate kerbside parking lanes. Chisholm Road runs north south and is located south of the ASP site. 5

9 Figure 3 Looking south along Chisholm Road from the intersection with Manchester Road Private Road The Private Road, owned by RailCorp, functions as an industrial access road to RailCorp s maintenance facilities within the Clyde Marshalling Yards. The Private Road (shown in Figure 4) connects to Manchester Road and Chisholm Road at its eastern end and Clyde Marshalling Yards at its northern end. This road has a sealed carriageway comprising two wide travel lanes, one in each direction. The Private Road has low traffic volumes and is able to accommodate heavy vehicle traffic. This route is currently being used by heavy vehicles and employee traffic accessing sites within the Clyde Marshalling Yards. Residences with private driveway access are located along the southern side of the road while some industrial businesses are located along the northern side of the road. 6

10 Figure 4 Looking west along the Private Road, located to the west of Manchester Road The Crescent The Crescent is a council maintained road. It functions as a collector road with connection to Manchester Road and Cumberland Road at its southern end and at its northern end forms a T-junction with South Parade and Alice Street. The Crescent connects to a short section of South Parade that leads towards the railway bridge onto Rawson Street. This road has two travel lanes, one in each direction, and sufficient width to accommodate kerbside parking lanes. The Crescent Road runs east west and provides the link from Manchester Road to Rawson Street Rawson Street Rawson Street is a classified regional road performing a sub-arterial function connecting to Parramatta Road at its northern end and St Hilliers Road and Olympic Drive at its south-eastern end. It has a twolane two-way divided carriageway with kerb and gutter between St Hilliers Road and Northumberland Road. There are two lanes on the eastbound direction for the whole stretch of the road. The westbound direction from Northumberland Road to Macquarie Road is reduced to one lane but widens back to two lanes up to The Crescent. Westbound from The Crescent to Yillowra Street is again reduced to one lane but widens back to two lanes from Yillowra Street all the way to the intersection with Parramatta Road Cumberland Road Cumberland Road is a council maintained road. It functions as a trunk collector road with connection to Manchester Road at its northern end and St Johns Road at its southern end. It has two wide travel 7

11 lanes, one in each direction, and sufficient width to accommodate kerbside parking lanes. Cumberland Road runs north south and parallel to Chisholm Road on the east side. 2.4 Existing Traffic Management Controls The existing road network near the vicinity of the ASP site comprises the following traffic management features. Stop Control: On the Manchester Road (east) approach to Chisholm Road On the Private Road approach to Chisholm Road. Sign-Posted Speed Limits: 60 km/h along Manchester Road 60 km/h along Chisholm Road 60 km/hr along The Crescent 50 km/h along Cumberland Road 20 km/hr along The Private Road 2.5 Existing Traffic Volumes and Road Capacity A review of existing traffic operating conditions along Manchester Road and Chisholm Road has been undertaken as part of this study. The traffic conditions along the roads in the vicinity of the ASP site were obtained by undertaking automatic traffic counts along Manchester Road and the Private Road and intersection turning counts at Manchester Road / Chisholm Road. The automatic counts were conducted over a period of seven days from May 2010 while the intersection count was undertaken for a 2- hour time period during the morning and the evening peak periods on 13 May To supplement data from the traffic surveys, recent traffic data available from Auburn City Council was also obtained for the following roads: Chisholm Road (April 2010) Cumberland Road (November 2009) The Crescent (November 2009) Rawson Street (June 2009). A summary of the average daily traffic data (from the survey and from Council) is presented in Table 2. The peak hour traffic data is summarised in Table 3. Detailed results of the surveys are attached in Appendix A. Table 2 Location Average Daily Flows Weekday Direction one (vpd) % HV Direction two (vpd) % HV Chisholm Road (south of 2650 NB SB 8.7 8

12 Location Manchester Road) 1 Weekday Direction one (vpd) % HV Direction two (vpd) % HV Manchester Road (east of 2614 EB WB 12.4 Chisholm Road) 1 Private Road (west of 540 EB WB 16.2 Chisholm Road) 1 The Crescent NB SB 9.1 Cumberland Road (south of 2722 NB SB 4.1 Manchester Road) 2 Rawson Street NB SB 15.2 Notes: NB = Northbound; SB = Southbound; EB = Eastbound; WB = Westbound, HV = Heavy Vehicles; vpd = vehicles per day. 1 GHD Survey data 2 Traffic data from Auburn City Council Table 3 AM and PM Peak Flows Location AM PM Direction one % HV Direction two % HV Direction one % HV Direction two % HV Chisholm Road (south of Manchester Road) 1 Manchester Road (east of Chisholm Road) 1 Private Road (west of Chisholm Road) NB SB NB SB EB WB EB WB EB WB EB WB 18.1 The Crescent NB SB NB SB 6.8 Cumberland Road (south of Manchester Road) NB SB NB SB 5.4 Rawson Street NB SB NB SB 8.5 Notes: NB = Northbound; SB = Southbound; EB = Eastbound; WB = Westbound, HV = Heavy Vehicles. 1 GHD Survey data 2 Traffic data from Auburn City Council 9

13 2.5.1 Road Capacity The capacity of urban roads is generally determined by the capacity of the intersections. However, typical one-way mid-block lane capacities for a median or inner lane on urban arterial roads under interrupted flow conditions are 900 vehicles per hour per lane (undivided road) 1,000 vehicles per hour per lane (divided road). 1 The capacity falls to 600 vehicles per hour per lane for a kerbside lane with occasional parked vehicles. These capacities at times may increase under ideal conditions to 1,200-1,400 vehicles per hour per lane. Based on this, the mid-block capacities for the roads can be estimated and compared to the existing traffic volumes. Table 4 presents the indicative range of the volume to capacity ratios for the observed peak flows on the adjacent road network. Table 4 Indicative Volume Capacity Ratios Location Indicative Mid-Block Capacity 3 (vph) AM Peak (vph) Volume Capacity Ratio (VCR) PM Peak (vph) Volume Capacity Ratio (VCR) Chisholm Road (south of Manchester Road) 1 Manchester Road (east of Chisholm Road) Private Road (west of Chisholm Road) 1 The Crescent Cumberland Road (south of Manchester Road) Rawson Street Notes: vph = vehicles per hour. 1 GHD Survey data 2 Traffic data from Auburn City Council 3 Indicative values based on road geometry and lower limits of capacity It is evident from Table 4 that the key roads are operating within the corresponding design capacity Environmental Capacity Performance Standards The peak hour flow environmental goal for local and collector roads is determined by the functional classification and the physical characteristics of the street. A summary of the environmental performance standards on local residential streets is provided by the Guide to Traffic Generating Developments (RTA, October 2002) and is presented in Table 5. The environmental performance standards indicated below are typically used for residential streets in urban 1 AUSTROADS Guide to Traffic Engineering Practice Part 2: Roadway Capacity (1999), Table

14 conditions and mainly relates to streets with direct access to residential properties. Trunk collector roads and spine roads with no direct property access can carry higher traffic flows. Table 5 Environmental Capacity Performance Standards on Residential Streets Road Class Maximum Speed (km/h) Peak Hour Volume (vph) Average Daily Traffic (vpd) Local Access way maximum 1,000 maximum Local Street environmental goal 300 maximum Collector Street environmental goal 500 maximum 2,000 environmental goal 3,000 maximum 3,000 environmental goal 5,000 maximum In Table 6, the RTA guidelines have been applied to the existing peak hour flows on the local road network within the study area to determine whether these streets are meeting the environmental capacity. The environmental capacity performance standards outlined in Table 6 do not directly apply to The Crescent and Rawson Street owing to the fact that both roads function as trunk collector and subarterial roads with property access on only one side of the road. As such, Table 6 only provides an assessment for Chisholm Road, Manchester Road and the Private Road. Table 6 Assessment of Environmental Capacity Performance Standards Road Functional Classification Existing AM average peak hour two-way flows Existing PM average peak hour two-way flows Environmental Capacity (two-way flows) Volume compliance Chisholm Road (south of Manchester Road) Manchester Road (east of Chisholm Road) Private Road (west of Chisholm Road) Collector Yes Collector Yes Local Yes The peak hour flows along Chisholm Road and Manchester Road are below the maximum environmental goal for a collector street. The peak hour flows along the Private Road are below the maximum environmental goal for a local residential street. The results in Table 6 indicate that the traffic demands on the road network in the vicinity of the ASP site during the morning and evening peak periods are within an acceptable range with regard to environmental capacity. 11

15 2.6 Existing Intersection Performances The performance of the existing road network is largely dependent on the operating performance of key intersections, which are critical capacity control points on the road network. The SIDRA Intersection Analysis model has been used to assess the existing peak hour operating performance of the following intersections: Chisholm Road/ Manchester Road/ Private Road Manchester Road/ The Crescent / Normanby Road/ Cumberland Road. The above intersections form part of the main routes that will be utilised to access the site and are likely to be impacted by the traffic generated by the ASP. The Level of Service (or LoS) is the standard used to measure the performance of the intersection operation. This is defined as the qualitative assessment of the quantitative effect of factors such as speed, traffic volume, geometric features, delays and freedom of movement. The level of service concept is applied to intersections through measures of effectiveness, as summarised in Table 7. Table 7 Measures of Effectiveness for Level of Service Definition for Intersections Intersection Control Sign or merge control Traffic Signals Roundabout Measure of Effectiveness Average Delay (sec/vehicle) Delay to critical movements Queue length for critical movements Average Delay (sec/vehicle) Delay to critical movements Degree of Saturation Cycle Length Queue length for critical movements Average Delay (sec/vehicle) Delay to critical movements Degree of Saturation Queue length for critical movements The criteria for evaluating the operational performance of intersections are provided by the Guide to Traffic Generating Developments (RTA 2002). Table 8 presents the equivalent Level of Service thresholds based on the RTA Guide. The boundary values for average vehicle delays for each Level of Service category as used in the SIDRA intersection modelling is also provided. These boundary values are used in the assessment of intersection operational performance. 12

16 Table 8 Performance Criteria at Intersections Level of Service Average Delay Per Vehicle (AVD), secs/vehicle Traffic Signals, Roundabout Give-Way and Stop Signs RTA Guide SIDRA boundary values A Less than 14 AVD 14.5 Good operation Good operation B 15 to < AVD 28.5 Good with acceptable delays and spare capacity Acceptable delays and spare capacity C 29 to < AVD 42.5 Satisfactory Satisfactory but accident study required D 43 to < AVD 56.5 Operating near capacity E 57 to < AVD 70.0 At capacity; at signals incidents will cause excessive delays Near capacity and other accident study required At capacity and requires other control mode F Greater than 70 AVD > 70.0 Roundabouts require other control mode The average delay assessed for signalised intersections is over all movements. For roundabouts and priority control intersections (with Stop and Give Way signs or operating under the T-junction rule), the critical criterion for assessment is the movement with the highest delay per vehicle. Average delay is expressed in seconds per vehicle. The existing performance of the subject intersections during the morning and evening peak periods resulting from the SIDRA analysis are presented in Table 9 and movement summary outputs are attached in Appendix B. Table 9 Existing Intersection Performance Intersection Peak Period Average Delay, secs Level of Service Degree of Saturation Comments (a) (b) (c) Chisholm Road/ Manchester Road/ Private Road AM 19.3 B Worst movement Through from Manchester Road Approach All movements satisfactory 13

17 Intersection Peak Period Average Delay, secs Level of Service Degree of Saturation Comments (a) (b) (c) PM 16.2 B Worst movement Through from Manchester Road Approach All movements satisfactory The Crescent /Manchester, Cumberland/ Normanby (roundabout) AM 14.4 A Worst movement RT from Manchester Road Approach All movements satisfactory PM 16.6 B Worst movement RT from Normandy Road Approach All movements satisfactory Notes: a) The average delay for sign controlled intersections is selected from the movement with the highest average delay. The average delay for roundabouts is selected from the movement on the approach with the highest average delay. b) The level of service for sign controlled intersections is based on the highest average delay per vehicle for the most critical movement during peak conditions. The level of service for roundabouts is based on the highest average delay per vehicle for the most critical movement. c) The Degree of Saturation is defined as the ratio of the arrival flow (demand) to the capacity of each approach. As summarised in Table 9, the intersections of Manchester Road / Chisholm Road and The Crescent / Manchester Road / Cumberland Road currently operate at a satisfactory level of service during morning and evening critical peak periods. 2.7 Local Transport and Other Transport Issues Pedestrian and Cyclists Fairly low pedestrian activity was observed on the road network surrounding the ASP site. A footpath is provided along the southern side of Manchester Road, between Cumberland Road and Chisholm Road, which facilitates movement for pedestrians. There is also a pedestrian footpath from Clyde Station to the AMC (and ASP site). There are no cyclist facilities provided in the vicinity of the Clyde Marshalling Yards. The main desire line for pedestrian movement in the vicinity of the site is eastbound and westbound along Manchester Road, between the residential suburbs and the train station and town centre. Existing pedestrian facilities provide adequate linkages to the surrounding area and town centre. 14

18 Figure 5 shows the existing pedestrian desire lines. Figure 5 Existing Pedestrian Footpaths Legend Pedestrian footpath 15

19 2.7.2 Bus Services A bus service, provided by bus company Veolia, runs along Chisholm Road and Mona Street. The bus service provided is Route 908 that operates between Bankstown and Merrylands via Auburn. The operation of Route 908 is outlined in Table 10. Table 10 Affected Bus Service Route No. Route Description Weekday operation hours Weekday peak service frequency Weekday offpeak service frequency Weekend operation hours Weekend service frequency 908 Bankstown Auburn Merrylands 6.30am 6.30pm 30 mins 1 hour 7:45am 5.30pm 1 hour Levels of Services Only one bus route runs close to the study area. The route operates with a moderate level of service, with the frequency during the morning and evening peak periods of 30 minutes for the services to and from Bankstown. During weekends and the weekday off-peak, the frequency of the bus services declines, to a 1-hour frequency. The bus service provided can be used by workers to travel to and from the ASP site. It is unlikely the bus service would be impacted by additional traffic generation during the construction or future operational stages of the ASP site Rail Services The Main West Line is located to the north of the proposed ASP site. Auburn Station is located approximately 1.5 kilometres from the Clyde Marshalling Yards, along South Parade. Clyde Station is located 500 metres from the ASP site to the north-west, with a pedestrian footpath providing access from Clyde Station to the AMC. The operation of the Main West Line is outlined in Table 11. Table 11 Rail Services through Clyde Station and Auburn Station Route Description Weekday peak service frequency Weekday off-peak service frequency Weekend service frequency Western Line 15 mins 30 mins 30 mins Carlingford Line 30 mins 60 mins 60 mins South Line 10 mins 15 mins 30 mins Levels of Services The above information demonstrates that the Western Line operates with a moderate level of service, with the frequency during the morning and evening peak periods of 15 minutes for the services between Penrith and Hornsby. During weekends and weekday off-peak, the frequency of the rail services 16

20 declines, to a 30-minute frequency. The Carlingford Line operates with a 30 minutes frequency for peak period and 1 hour frequency for off-peak and weekends. The South Line operates with a good level of service, with a frequency of 10 minutes for services during the weekday peak period and 15 minutes during the weekday off-peak period. On weekends, the South Line operates on a 30-minute frequency. 17

21 3. Proposed Development 3.1 General Description The following sections describe the key features of the ASP. stabling facility capable of holding up to 16 eight-car suburban train sets, in the following arrangement: five terminating tracks along the western edge of the stabling yard which would be accessed from the Auburn Junction six through tracks which can be accessed from either the Auburn or Clyde Junctions five terminating tracks along the eastern edge of the stabling yard which would be accessed from the Clyde Junction walkways constructed between stabling tracks to provide access for personnel to the stabled trains one full length elevated walkway in the centre of the facility located at a level that provides door level access to two stabled trains connections from the existing network to the stabling facility in the vicinity of Auburn and Clyde Stations, involving track work, overhead wiring and signalling primary administration, amenities and storage building which would provide office space, storage facilities and staff amenities secondary amenities and storage building which would provide unisex toilet, storage and first aid facilities a new sectioning hut may be required to assist with powering the stabling facility new staff car park adjacent to the primary administration, amenities and storage building, with provision for approximately 40 vehicles changed access to the MainTrain site, involving the construction of a new overbridge to provide pedestrian and vehicular access across the proposed ASP tracks road works associated with connecting the ASP into the existing street network on the Private Road and at Manchester Road at the location of the new MainTrain access drainage works across the site with a stormwater drainage system noise attenuation structures (e.g. noise walls) two dry detention basins to supplement the site drainage and to mitigate against potential flooding remediation works on the site involving a cap and containment strategy. The works outlined below comprise the traffic and transport related components of the ASP. At-grade walkways through stabling area A series of at-grade walkways would be constructed throughout the stabling yard between the parallel tracks. The proposed walkways would provide cleaning personnel access to the stabled trains, with access available from both sides of each train. At the centre of the stabling yard (likely to be between 18

22 tracks 8 and 9 which are both through tracks), an elevated walkway would be constructed to provide door level access to the trains stabled on these tracks. Staff Car parking A new staff car park is to be constructed adjacent to the primary administration, amenities and storage building. This car park would be located directly adjacent to the AMC car park and would have space for approximately 40 vehicles. Roadworks A new access road would be provided from the Private Road near Duck River. This access would provide access to the primary building located within the ASP site. A new access point from Manchester Road would be required to provide access to the MainTrain Facility via a new overbridge. The new access is required as the existing access is via a level crossing which would not be able to operate during the operation of the stabling yard due to the frequency of services accessing the site. The new overbridge would be located at the western end of the existing MainTrain car park, approximately 200 metres east of Chisholm Road. The overbridge is to be positioned where the existing tracks are located within a cutting, to minimise the extent of earthworks and substructure required. The bridge would have a span of approximately 20 metres, located approximately six metres above the tracks to provide the required clearance for the new OHW lines. The road approaches would consist of three metre high embankment structures; however the intersection of the new access with Manchester Road would be constructed at the current level. The construction of the new overbridge would require the existing MainTrain car park to be modified, with the temporary loss of 32 car spaces during construction. Should replacement parking spaces be required to meet the parking demand at this site, an alternative location to offset the temporary loss of parking would be investigated prior to construction. The existing level crossing would remain in use for service maintenance and emergency access only. Lockable gates would be installed at the level crossing to prevent everyday use of this crossing. The ASP would not alter the existing MainTrain car park access, with the existing access to continue to provide access to the car park. 19

23 4. Traffic Impacts during Construction During the construction period, traffic movements would predominantly be related to the arrival and departure of construction workers and the delivery of material and equipment. The construction of the ASP would require approximately 22,400 truck movements. Construction workers movements are estimated at 190 per day. The following sections provide an assessment of the impact of the constructions works on the intersections of Manchester Road / Chisholm Road / Private Road and that of The Crescent / Manchester Road / Cumberland Road. 4.1 Traffic Generation during Construction Construction Program The construction program for the ASP is divided into four distinct phases of work as follows: Enabling works: involves the adjustment of any existing services within the ASP site that have the potential to affect the reliability of the main rail corridor. Main works: involves earthworks, construction of stabling facilities including the amenities building and overbridge, laying of track work and installation of signalling, power supply and other systems. Commissioning: involves the testing of all infrastructure and equipment prior to the ASP becoming operational for the stabling of trains. Demobilisation and rehabilitation of construction areas: involves the removal of all portable offices and amenities and removal of temporary service utility connections. Landscaping may also be undertaken as part of this final stage of the ASP Proposed Work Hours The construction period is likely to occur over a 24-month duration. The working hours proposed for the construction period would be as follows: Monday to Friday (7:00am 6:00pm) Saturday (8:00am 1:00pm) Sunday and public holidays (no work). There is potential for some out of hours construction (excluding any works undertaken during possession periods) in order to minimise the impacts on surrounding land uses. All works would be undertaken in line with the TCA Construction Noise Strategy. Night works would be required to be undertaken during a number of possession periods to connect the overhead wiring for the ASP into the existing CityRail network. Track and signalling connections would be completed as part of the Lidcombe to Granville Corridor Upgrade Program (LGCUP). These works would potentially occur for 24 hours a day during the scheduled possession periods. These possession periods form part of the RailCorp possession regime and would occur regardless of the ASP. 20

24 4.1.3 Construction Staging The construction timeframe is anticipated to commence late 2011 with a target completion date of end The indicative construction timeframe is as follows: Remediation works to take place from late 2011 to early 2013 Construction of the ASP with local signalling programmed to be carried out from late 2011 until late 2013 Full integration of the signalling with the main network by Heavy Vehicle Generation The total number of truck movements is estimated to be approximately 22,400 over the duration of the construction phase, based on single body truck movements. These movements include 8,600 truck movements associated with the importation of material for earthworks. These 8,600 movements for earthworks would occur over approximately a one year period (260 regular working days plus 50 Saturdays) with peak movements of approximately 30 movements per day, or 3 per hour. The other truck movements (13,800) are associated with the deliveries of construction components and materials expected to occur over the two-year duration of the construction. These movements translate to approximately 24 truck movements (during the construction peak period) per day or approximately 3 truck movements per hour during the peak hour. To provide a worst-case assessment of the busiest phase of construction, it has been assumed that a maximum of 54 truck movements per day or 6 truck movements per hour would be required. The majority of truck movements would occur during daylight construction hours. Some deliveries and removal of equipment (such as large cranes) at the site may require trucks to be used outside normal construction hours in accordance with RTA requirements Light Vehicle Traffic Generation It is estimated that approximately 95 construction personnel would be on site daily. Based on the worstcase assumption of a car driver rate of 100 per cent (i.e. each employee driving a car), traffic generation in the order of 190 light vehicle movements per day is expected and the workforce traffic movements are likely to be distributed based on a 100/0 split between arrivals and departures during the morning peak period and the reverse during the evening peak period. Based on the above assumptions, the traffic generation during the weekday construction morning peak period is estimated to be 95 light vehicle movements inbound and zero outbound while in the evening peak period, it is estimated to be the reverse at zero light vehicle movements inbound and 95 light vehicle movements outbound Total Construction Period Traffic Generation A summary of the traffic movements during the construction period is shown in Table

25 Table 12 Activity Construction Period Traffic Movements Daily traffic movements (vtpd) AM and PM Peak construction traffic movements (vtph) Light Vehicles Heavy Vehicles 54 6 Total Notes: vtpd = vehicle trips per day Traffic Assignment during Construction The existing directional traffic flows along the local traffic network surrounding the site forms the basis for the assumptions on the likely traffic movements during construction. For the purpose of this assessment, the future assignment of traffic generated by the proposed development has been predicted on the basis of the current directional split of traffic at the intersection of Manchester Road and Chisholm Road. The flows were observed as follows: Morning Peak 51 per cent or 48 light vehicles and 2 heavy vehicles approach the ASP site via Manchester Road (east of Chisholm Road) 49 per cent or 47 light vehicles and 1 heavy vehicle approach the ASP site via Chisholm Road (south of Manchester Road) 100 per cent of vehicles approach/ depart the ASP site via the Private Road (west of Manchester Road) 67 per cent or 2 heavy vehicles depart the Private Road via Manchester Road (east of Chisholm Road) 33 per cent or 1 heavy vehicle departs the Private Road via Chisholm Road (south of Manchester Road). Evening Peak 67 per cent or 2 heavy vehicles approach the ASP site via Manchester Road (east of Chisholm Road) 33 per cent or 1 heavy vehicle approaches the ASP site via Chisholm Road (south of Manchester Road) 100 per cent of vehicles approach/ depart the ASP site via the Private Road (west of Manchester Road) 44 per cent or 41 light vehicles and 2 heavy vehicles depart the Private Road via Manchester Road (east of Chisholm Road) 56 per cent or 54 light vehicles and 1 heavy vehicle depart the Private Road via Chisholm Road (south of Manchester Road). The likely haulage route is shown in Figure 6. 22

26 Figure 6 Construction Traffic Haulage Routes 23

27 It is also noted that the RTA has designated routes for B-Doubles. The estimated number of truck movements assumes single body trucks would be deployed. The truck numbers would be reduced significantly if larger trucks or B-Doubles were deployed but the traffic assignment for the truck movements would have to conform to the RTA designated routes for B-Doubles. Truck movements to the arterial road network would travel along Manchester Road, The Crescent and across the rail corridor, right into Rawson Street, left into St Hilliers Road, where both Parramatta Road and the M4 Motorway can be accessed to travel to either the east or west. 4.2 Construction Period Road Network and Intersection Performance Environmental Capacity Performance Standards The RTA guidelines described in Section have been applied to the construction period peak hour flows on the road network surrounding the site to determine whether each street would meet its environmental capacity. The environmental capacity performance of the road network in the vicinity of the site under construction period conditions is shown in Table 13. Table 13 Environmental Capacity Performance Review Construction Road Functional Classification Proposed AM average peak hour two-way flows Proposed PM average peak hour two-way flows Environmental Capacity (two-way) flows) Volume compliance Chisholm Road (south of Manchester Road) Manchester Road (east of Chisholm Road) Private Road (west of Chisholm Road) Collector Yes Collector Yes Local Yes The results indicate that the construction period traffic demands on the road network in the vicinity of the ASP site during the peak hours is within an acceptable range with regards to environmental capacity Intersection Performance The main traffic impact concerns the effect of the additional vehicles on the operational performance of key intersections. The SIDRA model has been used to assess the operational performance of the intersections of Chisholm Road / Manchester Road and The Crescent / Manchester Road / Cumberland Road. 24

28 Table 14 Construction Period Intersection Performances Intersection Peak Period Average Delay (secs) Level of Service (LOS) Comments Chisholm Road/ Manchester Road/ Private Road AM 18.3 B Worst movement Through from Manchester Road Approach All movements satisfactory PM 17.2 B Worst movement Through from Manchester Road Approach All movements satisfactory The Crescent / Manchester Road / Cumberland Road / Normanby (roundabout) AM 14.7 B Worst movement RT from Manchester Road Approach All movements satisfactory PM 16.7 B Worst movement RT from Normandy Road Approach All movements satisfactory Notes: a) The average delay for sign controlled intersections is selected from the movement with the highest average delay. The average delay for roundabouts is selected from the movement on the approach with the highest average delay. b) The level of service for sign controlled intersections is based on the highest average delay per vehicle for the most critical movement during peak conditions. The level of service for roundabouts is based on the highest average delay per vehicle for the most critical movement. The average delay per vehicle for the worst movement has decreased compared to the existing mainly due to the increase in traffic volume (more vehicle sharing the delay time, hence lower average). The results of the SIDRA analysis indicate that the subject intersections would operate satisfactorily under the projected construction traffic demand, with a minor increase in delay in some of the movements during the morning and evening peak periods compared to the existing situation. The results revealed both the intersection of Chisholm Road / Manchester Road / Private Road and the roundabout of The Crescent / Manchester Road / Cumberland Road / Normanby Road operate at Level of Service B for both the morning and evening peak periods. 25

29 4.3 Local Transport and Other Transport Issues Pedestrian and Cyclists The increase in vehicle movements generated by the construction at the ASP site is not likely to impact pedestrians and cyclists in the vicinity of the site due to the low number of additional vehicles generated. The pedestrian access to Clyde Station would be retained and would not be impacted by the proposed development. There are no designated cycle paths in the vicinity of the ASP site but cyclists could potentially use the existing footpath along Manchester Road, albeit very minimal. The additional number of vehicles to be generated by the ASP is also not likely to impact on cyclists. The construction of the proposed overbridge would not adversely impact the users of the existing pedestrian footbridge from the MainTrain car park to the MainTrain Facility. The existing pedestrian footbridge would be retained throughout the construction of the proposed overbridge to ensure pedestrians retain their access to the MainTrain Facilty Public Transport Bus services in the vicinity of the site would not be adversely affected by the construction at the site. The proposed development would retain satisfactory access to Manchester Road and Chisholm Road which link the site to the bus and rail services. Train services to on the Main West Line can be used by workers to travel to and from the ASP site. The rail service would not be impacted by the construction or future operation of the ASP Construction Parking A temporary parking area would be designated on the ASP site to accommodate construction staff parking and heavy vehicle parking. The location of the temporary parking area is likely to be within the construction site to the west of the proposed overbridge, although this would be confirmed developed during detailed design. The construction of the new MainTrain overbridge would involve the temporary removal of 32 parking spaces within the existing MainTrain car park. The need to offset the loss of parking, and an alternative location, would be investigated prior to construction as part of the Traffic Management Plan. The construction of the overbridge would not impact upon the existing access to the MainTrain car park. 26

30 5. Traffic Impacts during Operation The projected traffic generation during operation would be determined mainly by the number of employees and the associated car usage rate and the number of heavy vehicles likely to access the ASP site. Information on the future number of employees was derived from information provided by RailCorp and may be considered preliminary. The number of heavy vehicles likely to access the site is anticipated to be low. 5.1 Traffic Generation Attributed to the Auburn Stabling Project (ASP) Future Light Vehicle Traffic Generation of the Site Table 15 identifies the personnel required on site during operation. Table 15 Staffing Requirements Staff Groups Total Quantity Maximum at one time Timing of Maximum Train crew Drivers am to 5am 9pm to 12 midnight Guards am to 5am 9pm to 12 midnight Depot manager and personal assistant to the depot manager 2 2 Day shift Operations standards managers 1 1 Day/night shift rotation Administrative staff 1 1 Day shift Presentation services Shift manager 1 1 Various Supervisor 3 1 All year round Cleaners pm to 5.30am (7 days) Operations (yard control) Operations control 5 1 All year round Security Guard hour presence Train technicians Technician hour presence 27

31 Asset maintenance Maintenance staff Roving crews would respond to service calls and the maintenance schedule. Table 15 provides an indication of maximum number of staff present at the facility at any one time during operation. Although shift configuration is unknown, it is assumed that there would be a maximum of 52 personnel on-site at one time and they would arrive and depart at different times during a typical weekday. In assessing a worst-case scenario, it has been assumed that the shift changeover period would occur during the morning and evening peak periods. The future peak hour employee traffic generation during the weekday peak period is assumed to be a maximum of 52 light vehicle movements inbound and 52 light vehicle movements outbound during the morning peak and evening peak Future Heavy Vehicle Traffic Generation of the Site - ASP It is expected that truck movements during operation would be minimal. At most, it would be two trucks per day Total Traffic Generation from the ASP The daily peak hour traffic generation of the ASP is set out in Table 16. The maximum traffic generation due to the operation of the AMC is in the order of: 104 light vehicle movements per hour during morning peak period, comprising 104 employee trips (52 in and 52 out) and 2 heavy vehicle movements (1 in and 1 out) 104 light vehicle movements per hour during evening peak period, comprising 104 employee trips (52 in and 52 out) and 2 heavy vehicle movements (1 in and 1 out). Table 16 Total Future Traffic Generation AMC Operation Component Morning Peak (vtph) Evening Peak (vtph) Employee Traffic Heavy Vehicle Traffic 2 2 Total Notes: vtph vehicle trips per hour 5.2 Traffic Generation Attributed to the Auburn Maintenance Centre Construction of the AMC has recently been completed and operations are still in the initial stages. RailCorp has advised that only core administrative staff and personnel are currently attending the site and hence, the traffic counts undertaken for this study would not yet include the maximum expected traffic generation numbers for staff movements. 28

Lawson Outline Plan External Traffic Analysis Working Paper

Lawson Outline Plan External Traffic Analysis Working Paper Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000

More information

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014 LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management

More information

Figure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design.

Figure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design. A 0 NORTH 200 metres George Lane worksite North Strathfield Station worksite Strath eld Triangle A B Existing rail corridor Proposed underpass approach New/extended bridge Worksites Existing track Proposed

More information

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,

More information

Broderick Architects Mundaring Christian College, Parkerville Project Transport Assessment Report

Broderick Architects Mundaring Christian College, Parkerville Project Transport Assessment Report Mundaring Christian College, Parkerville Project Transport Assessment Report 232435-00 Issue 27 September 2013 This report takes into account the particular instructions and requirements of our client.

More information

Traffic Management During Construction

Traffic Management During Construction Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Integrated Public Transport Service Planning Guidelines. Sydney Metropolitan Area

Integrated Public Transport Service Planning Guidelines. Sydney Metropolitan Area Integrated Public Transport Service Planning Guidelines Sydney Metropolitan Area December 2013 CONTENTS 1. INTRODUCTION 3 1.1 Purpose 3 1.2 Background 3 1.3 Travel in Sydney Metropolitan Area 5 1.4 Objectives

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Nearly 38,000 vehicles cross the Shinnecock Canal on Sunrise Highway (NYS Route 27) daily, during peak summer months.

Nearly 38,000 vehicles cross the Shinnecock Canal on Sunrise Highway (NYS Route 27) daily, during peak summer months. 2. Traffic Characteristics Traffic volumes have increased in concert with population growth in the Towns of Southampton and East Hampton. The New York State Department of Transportation (NYSDOT) maintains

More information

Delineation. Section 4 Longitudinal markings

Delineation. Section 4 Longitudinal markings Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections

More information

THIS PAGE INTENTIONALLY LEFT BLANK

THIS PAGE INTENTIONALLY LEFT BLANK THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction

More information

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CHAPTER 2 CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CONTENTS I. INTRODUCTION...2-1 II. CAPACITY...2-2 III. DEMAND...2-2 IV. QUALITY AND LEVELS OF SERVICE...2-2 Service Flow Rates...2-3 Performance Measures...2-3

More information

Transportation Management Plan Template

Transportation Management Plan Template DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

Engagement with the community will be in accordance with Council s Community Participation Policy.

Engagement with the community will be in accordance with Council s Community Participation Policy. CLARENCE CITY COUNCIL ASSET MANAGEMENT 7 DEC 2015 86 11.5 ASSET MANAGEMENT 11.5.1 CLARENCE STREET SAFETY ASSESSMENT PROJECT (File No 04-03-01) EXECUTIVE SUMMARY PURPOSE The purpose of this report is to

More information

Amex Site Residential Development, Tarneit

Amex Site Residential Development, Tarneit Amex Site Residential Development, Tarneit Local Area Traffic Management Report Client: Amex Corporation Project No. 114430 Draft Report 13/12/13 Suite 1, 1 st Floor 132 Upper Heidelberg Road Ivanhoe Vic

More information

APPENDIX A FIVE YEAR GROUND TRANSPORT PLAN

APPENDIX A FIVE YEAR GROUND TRANSPORT PLAN A APPENDIX A APPENDIX A FIVE YEAR GROUND TRANSPORT PLAN 1.0 Airports Act 1996 S71(2)(ga) requirements This appendix provides details of the five year ground transport plan that is summarised in Chapter

More information

Section 6 Traffic Analysis

Section 6 Traffic Analysis Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis

More information

Transportation Impact Assessment Guidelines

Transportation Impact Assessment Guidelines Transportation Impact Assessment Guidelines Preface The following TIA Guidelines have been developed jointly by the City s Planning and Growth Management and Public Works and Services departments in an

More information

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

Roads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time?

Roads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time? Roads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time? Introduction This paper forms one of a series of thematic

More information

City of Kamloops Notre Dame Corridor Access Plan

City of Kamloops Notre Dame Corridor Access Plan FINAL REPORT This report is prepared for the sole use of ICBC. No representations of any kind are made by Urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd. does not have a contract.

More information

CR Tabs_Main:Layout 1 14/5/09 3:15 PM Page 13 Transport 13

CR Tabs_Main:Layout 1 14/5/09 3:15 PM Page 13 Transport 13 Transport 13 13 Transport 13.1 Introduction The Caval Ridge Mine Project has been divided into two distinctive phases for the purposes of this traffic assessment to account for the different traffic demand

More information

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008

More information

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application): Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports

More information

23 February 2015. Enfield Intermodal Logistics Centre

23 February 2015. Enfield Intermodal Logistics Centre Enfield Intermodal Logistics Centre Overarching Operational Traffic Management Plan February 2015 Table of Contents 1. Introduction... 2 2. Purpose of the Plan... 2 3. Objective of the Plan... 3 4. Road

More information

0.0 Curb Radii Guidelines Version 1.0.2

0.0 Curb Radii Guidelines Version 1.0.2 Background In early 2014, Transportation Services initiated a review of the Division's design guidelines and standards to move our organization in a direction consistent with the transportation departments

More information

Pedestrian Safety in Strip Shopping Centres

Pedestrian Safety in Strip Shopping Centres Pedestrian Safety in Strip Shopping Centres Author BE MTraffic MTransport MITE MIEAust CPEng Manager Transportation, Tasmania GHD Pty Ltd 2 Salamanca Square Hobart TAS 7000 Keith.midson@ghd.com.au +61

More information

Rooty Hill Regional Distribution Centre (RDC) CONSTRUCTION TRAFFIC MANAGEMENT PLAN

Rooty Hill Regional Distribution Centre (RDC) CONSTRUCTION TRAFFIC MANAGEMENT PLAN Rooty Hill Regional Distribution Centre RDC) CONSTRUCTION TRAFFIC MANAGEMENT PLAN Final Version 0) September 2011 Contents 1. Introduction 1 1.1. Background 1 1.2. Construction Work and Staging 2 1.3.

More information

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends

More information

M8 M73 M74 Motorway Improvements Project

M8 M73 M74 Motorway Improvements Project M8 M73 M74 Motorway Improvements Project October 2013 Introduction This major transport infrastructure project will complete and upgrade the M8 and key sections of the M73 and M74 to finalise the motorway

More information

LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS

LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS For discussion on 2 April 2001 LC Paper No. CB(1)907/00-01(03) LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS PWP Item No. 277CL Tseung Kwan O development, phase II, Remaining engineering works

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

Traffic Impact Study for the 3817-45 North Broadway Mixed-Use Development Chicago, Illinois. Prepared by

Traffic Impact Study for the 3817-45 North Broadway Mixed-Use Development Chicago, Illinois. Prepared by Traffic Impact Study for the Chicago, Illinois repared by March 30, 2015 1. Introduction This report summarizes the methodologies, results and findings of a traffic impact study conducted by Kenig, Lindgren,

More information

Appendix 14 Traffic Management Plan

Appendix 14 Traffic Management Plan Appendix 14 Traffic Management Plan Toms Gully Underground Project Table of Contents 1 Purpose... 3 2 Location & Production Overview... 3 3 Operations History... 3 4 Current Traffic Management & Traffic

More information

November 2014. Transforming Sydney. 60% more trains. Faster, more frequent services. No timetable just turn up and go

November 2014. Transforming Sydney. 60% more trains. Faster, more frequent services. No timetable just turn up and go November 2014 Transforming Sydney 60% more trains Faster, more frequent services No timetable just turn up and go Transforming Sydney A once in a generation transformation of Sydney s rail network Sydney

More information

Intersection Cost Comparison Spreadsheet User Manual ROUNDABOUT GUIDANCE VIRGINIA DEPARTMENT OF TRANSPORTATION

Intersection Cost Comparison Spreadsheet User Manual ROUNDABOUT GUIDANCE VIRGINIA DEPARTMENT OF TRANSPORTATION Intersection Cost Comparison Spreadsheet User Manual ROUNDABOUT GUIDANCE VIRGINIA DEPARTMENT OF TRANSPORTATION Version 2.5 i Virginia Department of Transportation Intersection Cost Comparison Spreadsheet

More information

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603 Framework Residential Travel Plan September 2013 CONTROL SHEET CLIENT: PROJECT TITLE: REPORT TITLE: THE

More information

TRAFFIC IMPACT ANALYSIS (TIA)

TRAFFIC IMPACT ANALYSIS (TIA) GUIDELINES FOR TRAFFIC IMPACT ANALYSIS (TIA) FOR REZONING APPLICATIONS AND OTHER DEVELOPMENT APPROVALS REQUIRING TRANSPORTATION IMPACT ANALYSIS IN SUMTER COUNTY, FLORIDA July 17, 2007 PURPOSE AND APPLICABILITY

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama

ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama ENGINEERING REPORT College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama Prepared for: The City of Auburn Prepared by: 3644 Vann Road Suite 100 Birmingham,

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro

More information

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment

More information

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street City of Seattle Department of Transportation Stone Way N Rechannelization: Before and After Study N 34th Street to N 50th Street May, 2010 INTRODUCTION Population density in Seattle is increasing within

More information

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s. Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library

More information

Presentation to Community Task Force July 9, 2007

Presentation to Community Task Force July 9, 2007 Alternative Evaluation Results Presentation to Community Task Force July 9, 2007 Outline of Presentation Overview of alternative evaluation Alternative evaluation methodology Process and assumptions General

More information

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive.

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive. planning report D&P/2857b/01 30 November 2015 Bollo Lane, Chiswick Business Park and Colonial Drive, Chiswick in the London Borough of Ealing planning application no. PP/2015/5442 Strategic planning application

More information

PERFORMANCE REPORT Quarter 2 2014/15

PERFORMANCE REPORT Quarter 2 2014/15 PERFORMANCE REPORT Quarter 2 2014/15 CONTENTS 1. RELIABILITY... 3 2. NETWORK DISRUPTION... 9 3. TRAFFIC VOLUMES... 15 4. TRAFFIC SPEEDS... 17 5. ROAD SAFETY... 18 6. ASSET AVAILABILITY... 19 7. STATE OF

More information

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety:

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety: Hamilton-Finn Suite 310 Tel. (403) 207-6000 Road Safety 3016 5th Avenue N.E. Fax. (403) 273-3440 Consultants Ltd. Calgary, Alberta dawatt.dawatt.com www.hamiltonfinn.ca January 19, 2005 Mr. Don Szarko,

More information

Austar Coal Mine, Stage 3 - Surface Infrastructure Site Traffic Management Plan

Austar Coal Mine, Stage 3 - Surface Infrastructure Site Traffic Management Plan Austar Coal Mine, Stage 3 - Surface Infrastructure Site Traffic Management Plan December 2009 Austar Coal Mine Pty Ltd Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 2107407A-PR_2539_RevB

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Context Sensitive Design for Urban Transportation in West Philadelphia

Context Sensitive Design for Urban Transportation in West Philadelphia Context Sensitive Design for Urban Transportation in West Philadelphia Transportation Research Board 85 th Annual Meeting 24 January 2006 Jeffrey M. Casello University of Waterloo Robert Wright City of

More information

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT 1 This General Guide provides information on how to manage traffic risks at a workplace. It is supported by specific guidance material on traffic management for shopping centres, construction workplaces,

More information

SECTION 6: TRANSPORTATION

SECTION 6: TRANSPORTATION 6.0 INTRODUCTION SECTION 6: TRANSPORTATION This section covers the design of the transportation system including but not limited to roadways, lanes, sidewalks and pathways located within road right of

More information

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension MEMORANDUM DATE: September 23, 2014 TO: Robert Nichols, Acting Corridor Design Manager Northgate Link Extension FROM: SUBJECT: COPIES: Katherine Casseday, PE, PTOE, Casseday Consulting Tony Lo, PE, Parsons

More information

BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS

BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS Documentation for: BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS Bennington, VT Prepared for: Bennington County Regional Commission & Town of Bennington August 2003 TABLE OF CONTENTS 1.0 INTRODUCTION...1

More information

Energy and. Resources

Energy and. Resources Tasmaniann Government 20122 Submission to Nation Buildin g 2 Program Domain Highway Planning (Part of Brooker Highway Upgrades submission to Infrastructure Australia) September 2012 Department of Infrastructure,

More information

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for

More information

Major and Minor Schemes

Major and Minor Schemes 1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment

More information

OVERVIEW PROJECT SUMMARY

OVERVIEW PROJECT SUMMARY OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining

More information

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance

More information

Footpath Extension Policy

Footpath Extension Policy 16.6.9 Footpath Extension Policy 1.0 FOOTPATH EXTENSION POLICY - INTENTION The Footpath Extension Policy provides for the ranking of new footpaths in the Council s footpath construction programme. The

More information

Guidelines for the Preparation of Transportation Impact Studies 8 th Revision

Guidelines for the Preparation of Transportation Impact Studies 8 th Revision Guidelines for the Preparation of Transportation Impact Studies 8 th Revision Halifax Regional Municipality Traffic and Right of Way Transportation and Public Works P.O. Box 1749 Halifax, Nova Scotia B3J

More information

Appendix E Traffic Impact Analysis

Appendix E Traffic Impact Analysis Appendix E Traffic Impact Analysis 2010 Facility Master Plan Factoria Recycling and Transfer Station November 2010 2010 Facility Master Plan Factoria Recycling and Transfer Station November 2010 Department

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West

More information

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS s A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS SURREY COUNTY COUNCIL S LOCAL COMMITTEE FOR REIGATE AND BANSTEAD 12 JANUARY 2004 KEY ISSUE To consider the conclusions of

More information

Construction Traffic Management Sub-Plan

Construction Traffic Management Sub-Plan B Appendix B Construction Traffic Management Sub-Plan 13 January 2012 CiviLake Construction Traffic Management Plan Prepared for CiviLake Prepared by AECOM Australia Pty Ltd Level 21, 420 George Street,

More information

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER JUNE 7, 2013 SUBMITTED TO: BOSTON REDEVELOPMENT AUTHORITY ONE CITY HALL SQUARE BOSTON, MA 02201

More information

Journey to Work Patterns in the Auckland Region

Journey to Work Patterns in the Auckland Region Analysis of Census Data for 2001-2013 1 INTRODUCTION... 1 DEFINITIONS OF WORKERS, JOBS AND EMPLOYMENT... 1 2 SCOPE OF THE ANALYSIS... 2 2.1 LEVELS OF ANALYSIS... 2 2.2 DATA INCLUDED IN THE ANALYSIS...

More information

Chapter 23. Multilane Highways. 23.1 Introduction. 23.2 Multilane Highways. 23.2.1 Highway Classification

Chapter 23. Multilane Highways. 23.1 Introduction. 23.2 Multilane Highways. 23.2.1 Highway Classification Chapter 23 Multilane Highways 23.1 Introduction Increasing traffic flow has forced engineers to increase the number of lanes of highways in order to provide good manoeuvring facilities to the users. The

More information

Project Traffic Management Plan for Design & Construction of the Port Botany Expansion Project of Sydney Ports Corporation Document No: PLAN-TM-001

Project Traffic Management Plan for Design & Construction of the Port Botany Expansion Project of Sydney Ports Corporation Document No: PLAN-TM-001 Project Traffic Management Plan for Design & Construction of the Port Botany Expansion Project of Sydney Ports Corporation Document No: PLAN-TM-001 PLAN-TM-001 [5W] Traffic Management Plan.doc Page 1 of29

More information

NSW bicycle guidelines

NSW bicycle guidelines NSW bicycle guidelines NSW Bicycle Guidelines Roads and Traffic Authority www.rta.nsw.gov.au VERSION: 1.2 ISSUED: July 2005 APPROVED BY: Signed R. Lunsmann General Manager Bicycle and Pedestrian Branch

More information

The electric multiple unit services and the Wairarapa services are currently provided under contract to Greater Wellington Regional Council.

The electric multiple unit services and the Wairarapa services are currently provided under contract to Greater Wellington Regional Council. PAGE 17 OF 36 Appendix B: Tranz Metro (Wellington) Important Notice The information presented in this appendix is intended to provide Respondents with an overview of the Tranz Metro (Wellington) business.

More information

Richmond upon Thames College. Draft Planning Brief. May 2008

Richmond upon Thames College. Draft Planning Brief. May 2008 Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of

More information

Bedford s Network Management Strategy (2011 2021) November 2010

Bedford s Network Management Strategy (2011 2021) November 2010 Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national

More information

Transportation Component

Transportation Component Final Report Transportation Component Institutional Master Plan Brown University Prepared for Brown University Providence, Rhode Island Prepared by /Vanasse Hangen Brustlin, Inc. Transportation, Land Development,

More information

APPENDIX J TRAFFIC STUDY

APPENDIX J TRAFFIC STUDY APPENDIX J TRAFFIC STUDY May 7, 2014 Ms. Leianne Humble Denise Duffy and Associates, Inc. 947 Cass Street, Suite 5 Monterey, CA 93940 Re: Traffic Study for the Heritage Oaks Memorial Park in San Jose,

More information

Development Management Report

Development Management Report Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: stuart.thomas@shropshire.gov.uk Tel: 01743 252665 Fax:

More information

EXHIBIT A Accessible Truck Routes Map

EXHIBIT A Accessible Truck Routes Map EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT

More information

BlipTrack. Case Studies. ANPR vs. Bluetooth. This case describes how data from ANPR cameras match corresponding Bluetooth sensor data.

BlipTrack. Case Studies. ANPR vs. Bluetooth. This case describes how data from ANPR cameras match corresponding Bluetooth sensor data. ANPR vs. Bluetooth This case describes how data from ANPR cameras match corresponding Bluetooth sensor data. The map shows an arterial road in the city of Aalborg with a total of 4 lanes, 2 in each direction.

More information

TH 23 Access Management Study Richmond to Paynesville

TH 23 Access Management Study Richmond to Paynesville TH 23 Access Management Study Richmond to Paynesville Prepared For: Minnesota Department of Transportation District 8 Prepared By: Short Elliott Hendrickson Inc. July 2015 Table of Contents I. Introduction...

More information

Principles of Traffic Management on sites / road network

Principles of Traffic Management on sites / road network IOSH Ireland, Construction Specialist Section Springfield Hotel, Leixlip, County Kildare. 25 March 2015 Principles of Traffic Management on sites / road network Padraig Watters, Chartered Engineer This

More information

Route Optimisation / Traffic Signals Efficiency

Route Optimisation / Traffic Signals Efficiency Route Optimisation / Traffic Signals Efficiency Glossary Auckland Council Advanced Real-time Traffic Information System Auckland Transport Closed Circuit Television (Traffic cameras) Full Time Equivalent

More information

Framework Traffic Management for Shared Zones in Large Private Estates AITPM 2014 National Conference

Framework Traffic Management for Shared Zones in Large Private Estates AITPM 2014 National Conference Framework Traffic Management for Shared Zones in Large Private Estates AITPM 2014 National Conference Presented by : Wayne Johnson Senior Project Manager GTA Consultants Wayne.johnson@gta.com.au Outline

More information

FORESTRY TRUCK ROUTES FOR MAKARAU & PUHOI

FORESTRY TRUCK ROUTES FOR MAKARAU & PUHOI FORESTRY TRUCK ROUTES FOR MAKARAU & PUHOI TRANSPORTATION ASSESSMENT Prepared by E.R. Hebner Reviewed by P.R. Brown 20 October 2011 Rev6 6 CONTENTS 1 EXECUTIVE SUMMARY... 1 2 INTRODUCTION... 2 3 ROUTE CHARACTERISTICS...

More information

Construction Phase Traffic Management Plan

Construction Phase Traffic Management Plan Construction Phase Traffic Management Plan The Construction Phase Traffic Management Plan is in connection with the application for the development of a single Wind Turbine and Ancillary Works on land

More information

Site Layout & Traffic Plan

Site Layout & Traffic Plan Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction

More information

First Transit Contra Flow Lane in Downtown San Francisco

First Transit Contra Flow Lane in Downtown San Francisco Introduction First Transit Contra Flow Lane in Downtown San Francisco Javad Mirabdal, Bond Yee Traffic congestion places a tremendous burden on transit vehicles in cities worldwide. San Francisco, located

More information

Maymorn Structure Plan: Infrastructure Costs Estimate

Maymorn Structure Plan: Infrastructure Costs Estimate Report Maymorn Structure Plan: Infrastructure Costs Estimate Prepared for Upper Hutt City Council (Client) By Beca Carter Hollings & Ferner Ltd (Beca) 22 June 2010 Beca 2012 (unless Beca has expressly

More information

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction Devonport EfW CHP Facility CEMP Proposal for Non Destructive Testing Activities. 1. Introduction This application is issued in compliance with the principles of the approved Construction Environmental

More information

RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON

RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON DELIVERY AND SERVICING PLAN August 2015 Introduction This Delivery and Servicing Plan (DSP) has been prepared in relation to the proposed redevelopment of Raeburn

More information

RICHARD REID & ASSOCIATES LTD CITYMAKERS

RICHARD REID & ASSOCIATES LTD CITYMAKERS RICHARD REID & ASSOCIATES LTD CITYMAKERS 3/9 Tudor Street Devonport Auckland 0624 NEW ZEALAND T: (09) 445 3289 M: (027) 640 8367 F: (09) 445 4307 richard@richardreid.co.nz www.richardreid.co.nz 2 December

More information

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage

More information

Victoria Government Gazette

Victoria Government Gazette Victoria Government Gazette No. S 351 Tuesday 31 August 2010 By Authority of Victorian Government Printer ROAD MANAGEMENT ACT 2004 CODE OF PRACTICE WORKSITE SAFETY TRAFFIC MANAGEMENT SPECIAL 2 S 351 31

More information

Construction Management Plan (CMP) Application

Construction Management Plan (CMP) Application About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction

More information