CIP Newsletter. Animal Shelter
|
|
- Anthony Gregory Simon
- 7 years ago
- Views:
Transcription
1 Town of Little Elm 1st Quarter 2013 Animal Shelter The plans include the design and construction of a 3,497 square foot animal shelter located on Mark Tree Lane near the Public Works Service Center and the Wastewater Treatment Plant. The new animal shelter facility will have 24 dog kennels, cat room, adoption / viewing room, quarantine room, check-in room, washroom, reception desk and an office. The project will also have 12 dog runs and a sally port for the off loading of animals and food supplies. Project Status The animal shelter was relocated to a temporary location at the old central fire station. This move was necessary due to mold being discovered in the old location. The architect completed the construction documents and the Town s Construction Manager at Risk bid out the project. The Contract was approved by Town Council and construction is underway. Town Council was asked to approve a change order to add a fire suppression system at the August meeting. Currently, the underground utilities, pier installations, grade beams, foundation, and slab are complete. The steel was delivered the last week of November. Current activities are now limited to erecting the steel skeleton of the building. It is safer to keep other trades out of the building while steel is being placed. In the next few weeks, the roofing and the siding will be installed and the electrical and plumbing above ground installations will begin. This project is scheduled to be completed in March of 2013.
2 Page 2 CIP Newsletter Senior Center The Senior Center is now a completed structure, constructed for use by the Senior Citizens of the Town of Little Elm. The New Senior Center is located on the same site as the Recreation Center. The programming for the Senior Center includes a multi-use meeting room space to host senior events, kitchen, classroom, and other multi-use areas. The size of the facility is approximately 5,000 square feet. Project Status Community Recreation Center / Senior Center Community Recreation Center / Senior Center The contractor has completed the construction of the new Recreation Center. The Town hosted an open house to the general public from August The facility was free of charge during this period. The contractor has completed the punch list and Owner requested changes like adjustable height basketball goals and tile behind water fountains. The contractor has conducted Owner training and is now working on finishing the close out documents (as-built drawings, manuals and warranty information) and anticipates closing out the project in the next 30 days.
3 Page 3 Recreation Center The new Recreation Center is newly completed and located off Main Street near the intersection of Main Street and Button Street on a property currently owned by the Town of Little Elm. The site has access off Lakeshore Drive and Main Street. The programming for the Recreation Center includes a multi-use meeting room space to host public events and public/private meetings, multi-use recreational center for basketball, volleyball, exercise area, classroom and instructional leisure activities. The size of the facility is approximately 23,000 square feet.
4 Page 4 CIP Newsletter Graphic showing the scope work at the Courtesy Drop Site Wastewater Interceptor and Lift Station # 4 and # 6 Improvement Project The design includes detailed plans and specifications for the replacement of the existing eighteen inch (18 ) gravity main with a thirty inch (30 ) gravity sanitary sewer from the north side of Eldorado Parkway across from Brenda Lane through the Courtesy Drop Site and the Public Works Service Center into the main WWTP lift station and replacement of the existing service road due to the alignment and depth of the existing gravity sanitary sewer main. Another part of this project is the replacement of Lift Station # 4 on Main Street and Lift Station # 6 on Lakeshore Drive. Both lift stations were installed with the Town s original 1976 Sanitary Sewer System and need to be upgraded to current standards. Improvements will also be made to the courtesy drop site.
5 Page 5 Wastewater Interceptor and Lift Station # 4 and # 6 Improvement Project Project Status The contractor has completed approximately 98% of the total project. Staff will be preforming the final walk through and then presenting the project to Town Council for final acceptance in January Pictured below are the new compactors and the high capacity modular storage bins. These compactors have improved the function of the Town s courtesy drop site significantly. These compactors eliminate debris becoming airborne and condense bulk trash 3 to 1. The modular bins will allow the Public Works Department to purchase material in bulk at reduced prices. Having these materials on hand will also increase response and repair times for the for Parks Department and the Public Works Department.
6 Page 6 CIP Newsletter Little Elm Library Remodel Expansion includes renovation to the existing library as well as making modifications allowing the use of additional space within Town Hall. The $835,000 expansion and renovation will double the current library space and enable more room for a larger book and audiovisual collection, more space for all age programming, separate areas for adults and youth, increased computer availability, additional meeting rooms, and quiet study areas. The expansion includes relocation of the utility billing office to an upstairs space of Town Hall along with other work on the second floor of Town Hall that will address acoustics and efficient space planning. Funding for this project is available through the approved Recreation and Leisure Bonds Library Expansion Project. A rendering of the Teen Room
7 Page 7 Project Status Little Elm Library Remodel Modifications of the second floor office space, which included filling in the circular lobby floor opening, filling in the rectangular opening at the Council Chambers entrance, and the relocation of the Water Billing Department are now complete. With this upfront work completed the Library renovation/expansion is well underway. The Little Elm Library Phase 1 expansion is nearing completion (the area previously occupied by the Police Department). Currently, the contractor is painting, installing new light fixtures, built in cabinets, lava tile in the children s area (a tile that changes color when pressure is applied to the tile), glass walls and preparing the floor for carpet installation. It is expected that the flooring installation will begin the week of December 17th and then on December 20th the Library shelving will be delivered. The Library will be closed to the public (relocated to the Little Elm Community Center) from December 12th to January 14th. Staff will move from its current location and re-open on January 14th in the former police and utility billing area of Town Hall. The Phase 1 area is approximately 40% larger than the existing Library and will provide space for an expanded book collection, children s area, public seating, interior book drop, business center, storage and expanded staff work areas. Once this move is complete, workers will start remodeling the existing Library space (now currently occupied by the Library). This will provide new book display, expanded public computer area, computer training area, meeting room, teen room, public seating, two study rooms and more than double the existing library. Actual constructed Teen Room
8 Page 8 CIP Newsletter Elevated Water Tower Site - Two Million Gallon (2 MG) This project will include a two million gallon elevated water tower storage tank. Town Council approved the tower location. The tower is to be located at the intersection of Little Elm Parkway and Eldorado Parkway on property that is currently owned by the Town. This will complete the ultimate need for elevated water within the Town.
9 Page 9 Elevated Water Tower Site - Two Million Gallon (2 MG) Project Status Town Council approved the purchase of the surplus right-of-way from TxDOT for property located at the southwest corner of Eldorado Parkway and Little Elm Parkway. Town Council approved this land swap that benefited the Town and the adjacent land owner. The design engineer submitted the plans to TCEQ in order to expedite the schedule. The Eldorado EST project recently bid with Landmark Structures as the low bidder. The construction contract was presented and awarded at the December 4th Town Council meeting. Construction of the Eldorado EST is scheduled to be finished by July On December 4 th Town Council awarded the construction contract to Landmark for $5,569, Now that the contract is approved Staff will schedule the preconstruction meeting and get the project started soon after January 1, 2013.
10 Page 10 Projects Completed or Closed Out in the Last Year Public Safety Center Kings Crossing Lift Station Lewisville Lake Boring Project Main Street Irrigation Well Eldorado Parkway Streetscape and Gateway Improvements Witt-Woodlake Connector Cottonwood Ball Park Irrigation Well Eldorado Water and Wastewater Project Main Street (West) Paving and Drainage Phase I Back Up Generator Project Solar Cell Grant Project Projects to be Completed or Closed Out in the Next Couple Months Wastewater Interceptor and Lift Station # 4 and # 6 Improvement Project Lobo Lane & Drainage Project Veterans Memorial Bridge FM 423 Water & Sewer Relocation Phase 1 Senior Center Recreation Center
11 Page Utility Relocation Project The design includes detailed plans and specifications for the replacement of the existing ten inch (10 ) force main with a fourteen inch (14 ) sanitary sewer force main from just north side of Frisco Ranch down to the existing Kroger force main recently installed and into an existing manhole on Eldorado Parkway just before the Woodlake Parkway intersection. The existing sanitary sewer force main is undersized for future development on the Doe Creek Peninsula. In addition to the force main, there are several sections of existing water and sanitary sewer gravity mains within the limits of the FM 423 TxDOT improvements that need to be adjusted or relocated due to conflicts. Funding for this design and construction is available through the Utility CIP Bond Fund. A majority of the work will be reimbursable to the Town from TxDOT since these lines are within existing easements. The design engineer believes that reimbursable number to be approximately eighty percent (80%) from experience on dealing with reimbursement relocation projects in the past with TxDOT. Project Status The contractor is complete with the Phase 1 force main construction and is working on completing the final punch list items. The Phase 1 waterline project is scheduled to be complete by the end of December Phase II design has been completed and the TxDOT Reimbursement Application was submitted back to TxDOT, along with the required notification for TCEQ. Once TxDOT and TCEQ approval has been received, FNI will prepare the project for bid.
12 Page 12 CIP Newsletter Little Elm and Denton County Projects Lobo Lane Paving & Drainage Project The project includes the design and construction of underground storm water system to improve drainage and construction of a concrete street with sidewalk improvements, a trail to connect Cottonwood Park to Little Elm Park along the West side of Lobo Lane adding street lighting, and landscape enhancements. Improvements will provide increased capacity for existing schools, marina development, Cottonwood Sports Complex, and industrial development. The project scope was increased to include extending Lobo Lane through Little Elm Park and connecting to newly finished Main.
13 Page 13 Little Elm and Denton County Projects Lobo Lane Paving & Drainage Project Project Status The easement from the United States Army Corps of Engineers has been received. All contractor work has been completed with the exception of the connection of the soccer field lighting to CoServ power. CoServ is in the process of bringing power to the soccer lighting.
14 Page 14 CIP Newsletter Little Elm and Denton County Projects Witt Road Bridge This project includes design and bridge construction for Witt Road over the Cottonwood Creek. The old bridge had an extremely low elevation and was frequently closed due to high water. This roadway connects FM 423 to Eldorado Parkway and is instrumental to local mobility and emergency response time. This bridge is located on the only north-south thoroughfare through Little Elm. Group of attendees at the Veterans Bridge Dedication Ceremony Pictured are the banners on the bridge light poles
15 Page 15 Little Elm and Denton County Projects Project Status Witt Road Bridge and Streetscapes/ Veterans Memorial Bridge On November 11th, the Town of Little Elm held a Veterans Memorial Bridge Dedication Ceremony. There were approximately 400 people in attendance. Several dignitaries and elected officials were also present. The American Legion took a major roll with a Flag Presentation and providing several military vehicles. Banners with the names of Little Elm s active military personnel were installed on the bridge street light poles. Witt Road Bridge Pictured is the overlook Bridge Structure - Work on the bridge rails; both pedestrian and traffic, continues on both ends of the bridge. The North bound lanes have been opened to the public since September. The project engineer is putting together a schedule for preliminary inspection/ walking for the bridge structure itself in the next 7-10 days. Electrical power up is scheduled to take place prior to Christmas day. Road, Trails and Landscaping All Road concrete has been poured. Trails are completely paved and sidewalks are at 96% completion. Landscaping and irrigation is at 82% and the second phase of the project going north towards Eldorado is 46% complete. Screening walls are at 38% at the Glen Cove section on Witt and the Marina Vista section begins this week with Board on Board fencing. View of the completed bridge surface
16 Page 16 CIP Newsletter Little Elm and Denton County Projects
17 Page 17 Little Elm and Denton County Projects Main Street (East) & Lakeshore Realignment Phase II The Main Street Phase II Improvements will reconstruct Main Street from the Clark Street intersection to Eldorado Parkway. Also included is a realignment of Lakeshore Drive to Clark Street with parking and a bus loop turn around at the LEISD King Early Learning Center. This new section will be a thirty one foot (31 ) concrete pavement, eight foot (8 ) trail sidewalk along the North side of Main Street and a five foot (5 ) sidewalk on the South side with new barrier free ramps and stamped intersection crossings, trees along the curb, water, wastewater gravity line and force main, irrigation, street lighting, and underground drainage improvements. These drainage, water, and utility improvements are designed to improve access and serve future expansion with the Community Recreation Center & Senior Center Site, Main Street, Lakeshore Drive, Button Street, and Clark Street. Project Status The design completed 100% plans and specs for Lakeshore Main. The project was put out to bid and bids were opened the last week in October. Since that time, Staff has been working with the design engineer and the contractor to produce a scope of work to include changes to Beard Park. On December 4th, Town Council approved a change order to redesign the electrical drawing and make changes to the Beard Park parking lot design. The changes to Beard Park were necessary to accommodate the new wake board facility. King Road West King Road will be widened to four-lanes from Witt Road West to the Town Limit. This project will provide a four-lane undivided roadway which would service transportation needs for the surrounding neighborhoods, Hackberry Elementary School, and improved access for commercial and retail businesses along King Road. The improved roadway will improve access and increase development along King Road and Witt Road. Project Status The design engineer met with the Town and turned in 100% plans and specs for the King Road (signed and sealed) project. Plans for this project will be held until funding becomes available.
18 Page 18 Texas Department of Transportation Projects Aerial view of the Little Elm Bridge Eldorado Parkway Through Little Elm (FM 720) JD Abrams continues work throughout the project limits. They have now installed and moved the traffic to the temporary paving necessary for completing the Phase 1 construction. The contractor has installed a large amount of the Phase 1 storm sewer and will continue with its installation. Construction of the bridge across Lewisville Lake is well underway. All of the bridge beams are in place and the contractor completed all but a few sections of bridge deck. JD Abrams is projecting that the first half of the bridge will be complete and open to traffic in early 2013 and will begin the demo of the old bridge soon after that. Staff will continue to attend the weekly construction meetings and coordinate any necessary road or lane closures.
19 Page 19 Texas Department of Transportation Projects FM 423 (Middle Section, from 720 to just North of The Colony) Austin Bridge and Road was awarded the bid for this project ($29 Million). The construction is underway with completion expected in December Austin Bridge and Road is continuing to work on the stamped concrete in the medians and other final details and expects to have all traffic lanes open by the end of December Other than that, only a few items remain to be completed on this project. FM 423 Eldorado Parkway to US 380 (North Section) TxDOT has acquired most of the right of ways (ROWs). Utility relocation has now commenced and all utility companies are scheduled to be completed by July The design plans are finished and TxDOT is anticipating bidding the project out in the spring. TxDOT is projecting construction to take approximately months. Staff will continue to attend the Monthly Utility Coordination Meeting. FM 720 (Eldorado Parkway to US 380) The design plans are 60% complete and TxDOT continues to develop the construction documents. TxDOT has obtained the environmental clearance to start the right-of-way process. The engineer will now work on the completion of the right-of-way map. The construction documents were expected in March of The project is expected to be bid out in fall of Aerial view of the Little Elm Bridge
20 Page 20 The Town with a Lake Attitude! 100 West Eldorado Parkway Little Elm, Texas For Question and Comments Please ltompkins@littleelm.org Public Safety Center Plans include the design and construction of an approximately sized 42,000 square foot combined police facility and central fire station to be located on Eldorado Parkway in front of Town Hall. The police facility will accommodate current overcrowding issues and future staff growth. The facility will include a jail, municipal court office, sally port, juvenile/victim interview rooms, storage, evidence storage, emergency operations center, patrol officer, and detective work areas. The new central fire station provides sufficient accommodations to properly operate a future, two company fire station. Productivity and efficiency improves overall when operating the departments under one roof. As the Town s growth continues, the central fire station will be able to manage the anticipated increase in call volume and services. The new facility will be able to house two engine companies, medic crews, future rescue company, future battalion chief, administration personnel, training room, hands-on training room, inspections, investigations, EMS supplies, bunker gear supply, rehab, conference room, and emergency operations center. Project Status The building is complete and the contractor has finished punch list items and change items. This project was presented to council for acceptance. This project will be removed from future reports.
City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP
City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer
More informationPLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationD3 April 8, 2015 Public Hearing
D3 April 8, 2015 Public Hearing APPLICANT AND PROPERTY OWNER: ASSEMBLY OF YAH, INC. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Religious Facility - church) ADDRESS / DESCRIPTION: 5151 Locke
More informationThe City of Basehor, Kansas
The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The
More informationDevelopment Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer
Development Services Department City of San Antonio Development Process 101 Permits & Licenses Michael Dice Development Services Manager Kathy Rodriguez Deputy Historic Preservation Officer 1 Permit &
More informationThe Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519
More informationin Marina Del Rey Prepared by: County of Los Angeles Department of Public Works
Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty
More informationDescription Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationRoadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
More informationNational Archives and Record Administration
National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair
More informationC-2 Construction, Inc. - NAICS Codes
C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining
More informationFacility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
More informationINVENTORY OF CITY FACILITIES
The City of Sachse operates and maintains its public buildings to serve the citizens of the community. Identification of the purpose, function and current use of each of these buildings is necessary to
More informationCity of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx.
cityoflavernia@lavernia-tx.gov Commercial New/Remodel Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be
More informationEL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013
PERMIT AUTHORIZATION EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013 El Lago ordinances require the issuance of building permits as a method of enforcing code minimums, ensuring
More informationDEPARTMENT OF DEVELOPMENT SERVICES PLANNING FEES AND COSTS Revised 10/26/2012
ZONING DEPARTMENT OF DEVELOPMENT SERVICES PLANNING FEES AND COSTS Revised 10/26/2012 [ ] PD Sketch Plan with phasing plan $2,000 plus $20/acre over 5 acres Retainer - $1,500 [ ] PD Preliminary Site Plan
More informationCity of Hilshire Village Pine Creek Ln Reconstruction
City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project
More informationNATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It
More informationTOWN OF HILLSBOROUGH BUILDING & PLANNING DEPARTMENT DESIGN, CONSTRUCTION AND LANDSCAPE PROFESSIONAL NEWSLETTER Fall Greetings 2013
TOWN OF HILLSBOROUGH BUILDING & PLANNING DEPARTMENT DESIGN, CONSTRUCTION AND LANDSCAPE PROFESSIONAL NEWSLETTER Fall Greetings 2013 TIS THE SEASON - GRADING MORATORIUM! Once again our Grading Moratorium
More informationSEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
More informationMoving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements
Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King
More informationElectric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
More informationProject Management Division
CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins
More informationTOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water
More informationMAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationGranger Bay Boulevard and Green Point Roundabout
Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access
More informationAngelo State University Construction Report
May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning
More informationSOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900
Walmart Outparcels For Sale College Station, TX Store # 1150 1815 Brothers Blvd FM 2818 W SOLD Texas Ave S/ Hwy 6 Longmire Dr Brothers Blvd Lot 1 For more information about this site, contact: Lot 1: ±2.41
More informationTown of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015
Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency
More informationCapital Projects Town Hall Meeting
Capital Projects Town Hall Meeting Planning, Architectural & Engineering Services September 15, 2014 Agenda Project Updates Recently Completed and in Construction Projects in Design Projects in Planning
More informationSingle Family Residential Building Permit Questions & Answers
Single Family Residential Building Permit Questions & Answers Prepared by Dept. of Public Works Revised 07/01/13 200 East Park Street Edwardsville, IL 62025 (618) 692-7535 (618) 692-7505(Fax) Hours: Monday
More informationResidential Building Permits Information
City of Bonham Building Department 514 Chestnut St. Bonham, Texas 75418 OFFICE: (903) 583-7555 FAX: (903)583-5761 Residential Building Permits Information Application for Permits: To apply for a permit,
More informationCITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
More informationFILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request
FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box
More informationDIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012
DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012 Project Review: DCAC Meeting #2 March 8, 2012 Reviewed stakeholder meetings Online survey findings Market Assessment Macro Market Factors,
More informationFIRE RESTORATION-REBUILD PROCESS SANTA BARABARA GETTING STARTED:
FIRE RESTORATION-REBUILD PROCESS SANTA BARABARA INSURANCE GETTING STARTED: 1. Contact Insurance Company meeting with insurance adjuster to get funds for the rebuilding process started. 2. Set up a construction
More informationHow To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
More informationCity of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement
City of Balch Springs, Texas Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement Balch Springs is a city in Dallas County, Texas, United States. It is a suburb of Dallas and part
More informationBond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
More informationDevelopment Services Guidelines
Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look
More informationWOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME
WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through
More information3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
More informationSCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
More informationCHEROKEE WATER COMPANY
CHEROKEE WATER COMPANY CONSTRUCTION RULES AND REGULATIONS TABLE OF CONTENTS (Revised 10/14) I. DEFINITIONS... 14 II. ENFORCEMENT OF RULES AND REGULATIONS... 15 III. NON-CONFORMING STRUCTURES... 15 IV.
More informationBuilding Permits: When are they required?
Building Permits: When are they required? Generally, you need to obtain a building permit from the City whenever you construct, enlarge, alter, repair, move, remove, improve, convert, or demolish a building
More informationMULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3
TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete
More informationFOR SALE Office Building
1712 West State Street Bristol, Tennessee 37620 State TR # 13-11-003 Open house on April 26, 2016 from 1:00-3:00pm EST FOR SALE Office Building OFFERING MEMORANDUM Contact Information Jeff Jones 615-445-9984
More informationTD AMERITRADE Park Omaha
TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment
More informationFIBER-OPTIC CABLE PLAN CHECK
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans
More informationThe Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
More informationWhen is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
More informationSECTION XI OPINION OF PROBABLE COST
SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing
More informationFOR IMMEDIATE RELEASE September 17, 2013 Contact:
NEWS RELEASE FOR IMMEDIATE RELEASE September 17, 2013 Contact: Diana L. Klink 757.514.4104 757.359.1845 Tim Kelley 757.514.4103 757.871.3039 UPDATE (Bridge Road/Mills Godwin Bridge) The work scheduled
More informationREQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:
REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT
More informationAccela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)
Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR) Version 1.2 9/30/2010 Table of Contents IVR Instructions...3 Initial Entry Instructions...3 Permit Access Instructions
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationAlternatives Presentation Meeting Middlebury WCRS(23)
Alternatives Presentation Meeting Middlebury WCRS(23) Main Street (VT 30/TH 2 Bridge 102) and Merchants Row (TH 8 Bridge 2) over Vermont Railway June 4, 2013 Twilight Hall Auditorium, Middlebury College
More informationSECTION 5 DRAFTING STANDARDS
SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.
More informationThe Colony Community Development Corporation Strategic Plan
The Colony Community Development Corporation Strategic Plan Executive Summary The Colony Community Development Corporation was formed after the passage of the 4A/4B Sales Tax that was approved by The Colony
More informationPreserve the Tax-Exempt Status of Municipal Bonds
The, and its members, support the preservation of the existing tax-exempt status of municipal bonds. Specifically, FAC supports legislative provisions that: Uphold the tax-exempt status of municipal bonds.
More informationMOBILE HOME LAW. Revised November 2001
MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS
More informationFACILITIES MANAGEMENT - MAINTENANCE, REPAIR, AND RENOVATION
Page 1 Policy: XIII.B.1 Issued: February 9, 1994 Owner: Chief Facilities Officer Latest Revision: FACILITIES MANAGEMENT - MAINTENANCE, REPAIR, AND RENOVATION 1.0 Purpose 2.0 Policy 2.1 Facilities Maintenance
More informationNATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)
NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE) If your home or business is located within a 100-year floodplain and it was constructed through a County Building
More informationORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
More informationAREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop
FILE NO.: Z-8958 NAME: Rock Structure Repair Short-form PID LOCATION: Located at 8024 Stanton Road DEVELOPER: Rock Structure Repair Attn. Rudy Gutierrez 3 Kipling Court Little Rock, AR 72209 ENGINEER:
More informationSAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
More informationWESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
More informationUNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY
UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY The term capitalized fixed assets includes land, improvements to land, easements, buildings, building improvements, vehicles, machinery, furniture,
More informationSECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
More informationNAHB 1-00-0000 PRODUCT DEFINITION
NAHB Standard Homebuilder Cost Codes Cost Code Description 1-00-0000 PRODUCT DEFINITION 1-01-0000 PREAQUISITION COSTS 1-01-0110 Feasibility Study 1-01-0120 Environmental Impact Study 1-01-0130 Option Fees
More informationBUSINESS USE PERMIT APPLICATION
BUSINESS USE PERMIT APPLICATION Instructions and Information for Business Use Permits and Temporary Certificates of Occupancy are included at the end of this application. Planning and Development Services
More informationEvanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions
Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations
More informationLAND USE CODE CHAPTER 18.68 GENERAL REGULATIONS
CHAPTER 18.68 GENERAL REGULATIONS SECTIONS: 18.68.010 Fences. 18.68.020 Vision Clearance Area. 18.68.030 Access. 18.68.040 Yard Requirements. 18.68.050 Special Setback Requirements. 18.68.070 Land Surveys.
More informationOPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
More informationCITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST
CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all
More information12 February 8, 2012 Public Hearing APPLICANT:
12 February 8, 2012 Public Hearing APPLICANT: PROPERTY OWNER: VIRGINIA BEACH ASSOCIATES, LC REQUEST: Conditional Change of Zoning (I-1 to Conditional A-36) STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:
More informationEstimated Cost of Repair
1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:
More informationHazardous Materials in Project Development
Hazardous Materials in Project Development Environmental Documentation TxDOT Environmental Affairs Division Release Date: 2/2014 510.01.DS Version 1 Table of Contents Overview... 3 Assessment Type and/or
More informationFinding of No Significant Impact
Finding of No Significant Impact PROPOSED CONSTRUCTION AND OPERATION OF OPERATIONAL READINESS TRAINING COMPLEX FORT HUNTER LIGGETT, MONTEREY COUNTY, CALIFORNIA Pursuant to the Council on Environmental
More informationPROPERTY EVALUATION AND RESERVE FUND STUDY
PROPERTY EVALUATION AND RESERVE FUND STUDY COMPLEX NORTH & WEST AVENUES LAS VEGAS, NV Prepared for: HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM ENGINEERS 22 Monument Square Portland, ME 04101 CONTENTS
More informationSingle-Family Permit Handbook. City of Bellevue. Welcome! When is a permit required? Development Services Handout P-1
City of Bellevue Development Services Handout P-1 Single-Family Permit Handbook July 2006 Welcome! For the single-family homeowner, going to City Hall for a permit can be a bit intimidating. The City of
More informationCOPPER BEECH TOWNHOME DEVELOPMENT
COPPER BEECH TOWNHOME DEVELOPMENT This 28 acre, 30 Townhome development is slated to open doors in time for the 2007 2008 college school year. To accommodate this project s tight time line, Dennis Corporation
More information3.11 Utilities. 3.11.1 Affected Environment. 3.11.2 Environmental Consequences
3 Affected Environment and Environmental Consequences 3.11 Utilities 3.11.1 Affected Environment Sterling Highway MP 45 60 Project Draft SEIS Cooper Landing and the surrounding area are rural and do not
More informationDoes Wall Township require an inspection by the building department on resale of a home?
Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,
More informationSummary of Position Changes
FY 2017 Position Actions Total Change: 53 Regular Merit Positions NEW POSITIONS 70 Facilities Management Maintenance for Public Safety Headquarters 3 Facilities Management Maintenance for original Mt.
More informationTHIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 14-MC-2194 ADDENDUM NUMBER ONE January 24, 2014 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
More information32315 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JUNE 5, 2014
32315 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JUNE 5, 2014 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT (JOC) PROJECTS
More informationGuidelines for Rights of Way
Guidelines for Rights of Way Guidelines for Statutory Rights of Way for Engineering and Public Works Infrastructure Rights of Way (Drainage, Sanitary, Water & Electrical Utilities) A Statutory Right of
More informationAPPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES
Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan
More informationNew Home Construction Packet
New Home Construction Packet Congratulations! You are building a new home in Meyerland. This packet of information was assembled to assist you with the process. It contains all the forms that you will
More informationA Guide for the Homeowner/Builder
A Guide for the Homeowner/Builder To repair, alter, add to or construct a new home, carport, garage, sundeck or other work Plus other related information Table of Contents 1. Introduction... 1 2. Building
More informationArchitectural Review
Kylemont at Lansbrook Homeowners Association (HOA) General Information and Guidelines April 2015 Board of Directors (BOD) Selection and Term Per the Kylemont By-Laws, the BOD is to consist of an odd number
More informationSWIMMING POOL, SPA, & HOT TUB GUIDELINES
SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015
More informationHartsfield-Jackson Atlanta International Airport s
Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,
More informationLighthouse Engineering, L.L.C.
Wednesday, August 20, 2014 Lighthouse Engineering, L.L.C. Michael Gandy, P.E. Registered Professional Engineer (TX: 95672) Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website:
More informationTOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET
TOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET FISCAL YEAR 2005/2006 TRANSPORTATION SOURCE OF FUNDS: Beginning fund balance and anticipated revenue. Over the course of the past fiscal years
More informationSection 801 Driveway Access Onto Public Right-of-Ways
Section 801:00 Section 801 Driveway Access Onto Public Right-of-Ways Section 801:00. Definitions. The following words and terms, when used in this Article, shall have the following meanings, unless the
More information