Angelo State University Construction Report
|
|
|
- Abigail Goodman
- 10 years ago
- Views:
Transcription
1 May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning and Construction Prepared by: Rick Stinnett, Construction Inspector
2 University Hall Demolition EFI Global, Inc. ARC Construction Services ASU and Texas Tech officials selected the consulting firm EFI Global Incorporated to design abatement and demolition plans for this building. Recently, ARC Abatement was awarded the contract for the project which will start within the next 30 days. At this time, the duration of the project is estimated to last throughout the summer months. When abatement and selective interior demolition has been completed, the building will be imploded and debris will be cleared for the new Plaza Verde dorm site. Porter Henderson Library Technology Renovations SHWGroup, LLP Consolidated Contractors The plan for the Porter Henderson Library IT Commons Renovation is to convert a portion of the first floor from current use as a periodical and research area to a library commons. The project will include office space for library and IT staff, storage space, workrooms, student service counters, seminar rooms and food service. Significant design and coordination with new fixtures, furniture and equipment will be required. It is anticipated that some improvements will need to be made to existing HVAC, electrical and lighting systems to accommodate more robust technology requirements. The project will include ADA and various code improvements plus demolition and reconstruction of interior finishes in approximately half of the first floor. The new area will have a separate entrance for use during extended hours. SHW Group was selected to lead the design and Consolidated Contractors will oversee construction at this facility. At this time, the project has been temporarily delayed due to legislative discussion over tuition increases. Carr Hall Bathroom Renovations Agnew Associates /CasaBella Architects - Consolidated Contractors ASU Office of Facilities Planning and Construction has employed a design team to develop plans and a scope of work for plumbing renovations to Carr Hall this summer. Consolidated workers will begin demolition work on May 18 th and asbestos abatement is scheduled to begin on May 29 th. Planned improvements will include bathroom renovations to visitor facilities, dorm rooms and the director s quarters. Several other changes will be made to storage rooms throughout the building. 2
3 Hardeman Renovation Student Service Center Good, Fulton and Farrell Architects Lee Lewis Construction Approximately 10,500 square feet of new construction is to be added to the current building. This is to provide the balance of the programming requirements, including a Great Hall student services lobby and a new Center for Multicultural and International Studies. Some site and landscape work is to be performed in the immediate area of the Hardeman Building to integrate the new design with the surrounding campus and adjacent surface parking lots. The project is anticipated to meet LEED Certification requirements at a minimum, with a goal of achieving LEED Silver Status. Total construction cost is anticipated to be $8.2 million. The design team is proceeding with plans and the contractor is pricing the project. Plaza Verde Dormitory Randall Scott Architects At this time, the design team is working with ASU representatives on design formats for the project. Parking Study for ASU Campus Walker Parking ASU OFPC ASU officials have discussed the parking study with the consultant and Texas Tech officials. Last Thursday, the Board of Regents tabled the proposal. ASU will amend the document and resubmit for a vote by Tech Regents when they meet in June. CHP Pool Filter Replacement ASU OFPC Basic Industries The contractor is scheduled to work on the pool during the break between graduation and the first summer term. ASU will close the facility during this two week period and install a new filtering system. 3
4 Temporary Office Space Hardeman Project ASU OFPC Nortex - Basic Industries Modular buildings are in place at the former site of Runnels Hall. The Nortex project manager will meet with FPC staff today and review completed construction of the buildings, ramp, steps and awnings. ASU has contracted the utility installations to Basic Industries. The plumbing, electrical and data services are being established at this time by local subcontractors. CHP Remodel F&S Partners Lee Lewis Construction Angelo State University has completed preliminary planning with F&S Partners. The scope of work of this project includes the addition of approximately 15,700 square feet of two-story, steel frame structure and interior renovations of the existing building. Initial programming addressed the square footage requirements and design of the project. Site work includes utility extension, site development and landscaping. The exterior will be a mixture of masonry and windows along the campus mall. Inside, a new weight/cardio room, rock climbing wall, and an elevated running track will be included in the construction. Existing racquetball courts, dance studio and weight room will receive new finishes under a later phase of construction. The vision of this renovation is to enhance student activities and campus life as well as promote health and wellness among student, faculty and staff. Lee Lewis Construction was hired as the construction manager at-risk firm to oversee construction of this project. At this time, design documents are being developed by the architect. 4
5 Centennial Master Plan for ASU Facility Programming ASU is currently working with Facility Programming on the contract documents. Residence Hall Alarm Reporting System Dean Alderson and Associates - ASU OFPC Basic Industries Alderson and Associates of San Antonio have been working with ASU officials for reporting upgrades which will connect Texan Hall, Massie Dorms, Carr Hall and the new Centennial Dorm to the current ONYXWorks Work Station. This system was established in 2006 and can be used to monitor individual addresses or rooms at student housing. New upgrades will allow for faster response time to emergency situations in student housing. Also, the new Plaza Verde Dormitory will be connected to the system during construction. Basic Industries is pricing this project for Facilities Planning and Construction. Central Plant Fuel Storage Tank Dean Alderson and Associates ASU OFPC The engineer is studying the existing underground fuel storage tank situation at the Central Plant. Dean Alderson is developing plans for a new 10,000 gallon above-ground fuel tank in an accessible area to the plant. The diesel fuel will be used in a reserve capacity for the current natural gas supply used for campus heating. The existing underground tank will be removed and the site remediated if necessary. Planetarium Renovation ASU OFPC Basic Industries Basic Industries will replace carpet in the planetarium in the next few months. As part of the remodeling for this space, West Office Supply will make repairs to the seating. All of this work will take place during the second term of the summer session. 5
6 Classroom Enhancement Projects Vincent NPS Rooms & Carr 101 ASU OFPC Basic Industries The office of Facilities Planning and Construction is working with Basic Industries this summer to remodel rooms in the Vincent NPS and Carr EFA Buildings. In the Vincent project, the wall separating rooms 287 and 289 will be removed, creating a larger classroom. Ceiling and floor repairs will be completed by the end of the summer. In Carr 101, cosmetic repairs and multimedia upgrades are scheduled. Cavness 200 ASU OFPC - Basic Industries Basic Industries is pricing renovation projects for the lecture room in Cavness 200. New seating, floor repairs and other cosmetic renovations will be added this summer. Primavera Software Installation ASU OFPC ASU Project Office The addition of Primavera scheduling software will be implemented by several ASU departments during the course of the summer. Several training sessions have already been completed by staff members. The new software will be available to schedule and track projects within various departments on campus. 6
The work has continued on final Phase 4 and is nearing completion.
Updates-January 22, 2013 29369-Rehab Plaza Deck/Drainage Budget: $18,000,000, constr. Start 8/2009 The work has continued on final Phase 4 and is nearing completion. The main plaza area of phase 4 is now
City of Hill Country Village Residential Construction/Development Packet
City of Hill Country Village Residential Construction/Development Packet City Hall has developed this Construction/Development Packet to consolidate instructions, the permits required, and zoning rules
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional
Project Management Division
CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins
Executive Flight Office & Hangar
ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 Exceptional value for world class 64,305 sq. ft. hangar facility in Eastern Washington ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 THE
Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1
School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
New Jersey City University Gilligan Student Union Center
New Jersey City University Gilligan Student Union Center The RBA Group worked with New Jersey City University in a major renovation of their Gilligan Student Union building. We were contracted to reassess,
ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning
Understanding the Hospital Planning, Design, and Construction Process Introduction California s acute care hospitals are an essential health care resource that serve a wide range of patients during times
Schedule B to By-law 33-2009
Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to
Schedule B to By-law 33-2009 Part A Fees Payable for Permits
Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or
OHLONE COMMUNITY COLLEGE BOND MEASURE G
Monthly Report OHLONE COMMUNITY COLLEGE BOND MEASURE G Fremont, California June 2014 TABLE OF CONTENTS 1. Executive Summary 2. Safety Status 3. Schedule Status 4. Design Progress 5. Construction Progress
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management
Building Description Project Description Estimated Cost Notes Total Deferred
Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field
Development Services Guidelines
Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
Exhibit C: Scope of Work and Schedule of Deliverables
Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza
Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015
Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency
A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1
A Guide to Building Permits for Home Owners / Renovators Address: 1 Carden Street Guelph, Ontario N1H 3A1 Oct 2009 Telephone: 519-837-5615 Committee of Adjustment 519-837-5615 option #5 email: [email protected]
Case Studies. Disaster Recovery Restoration Remediation Decontamination 800.808.1553 www.rolyncompanies.com
Case Studies 800.808.1553 www.rolyncompanies.com Property Type: College Loss Type: Water and Flood Location: Hyattsville, Maryland Once Rolyn received clearance from the insurance adjuster, crews began
Important Information for Owners of Buildings in Flood Zones
Important Information for Owners of Buildings in Flood Zones Rebuilding your home after the storm? Adding on, renovating, or remodeling your home? Here is information YOU need to know about the 50 percent
Development Services Guidelines
Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look
Commercial Building Valuation Report
INSURED State Office of Risk Management Effective Date: 300 W 15th Street Expiration Date: Austin, TX 78701 Cost as of: 12/2013 BUILDING 1 Athletics/PCI - 206 3302 N. Ben Wilson Victoria, TX 77901 Location
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State
CHARLOTTE COUNTY Community Development Department
CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete
Chicago Public Schools
Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school
Notice to Property Owners
Modification or Repair of your Flood Prone Property Notice to Property Owners Rebuilding or Remodeling Your Home If your home or business sustained damage, or if you are making improvements to the structure
SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER
NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below
APPLICATION & RULES FOR OWNERS, CONTRACTORS, MOVERS
THE STRATFORD AT PELICAN BAY CONDOMINIUM ASSOCIATION, INC. Remodeling, Renovating, Altering, Repairing and Moving APPLICATION & RULES FOR OWNERS, CONTRACTORS, MOVERS 5601 TURTLE BAY DR. NAPLES, FL 34108
MARQUETTE UNIVERSITY: McCabe Hall
MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate
The following terms should be understood prior to review of the Services Policy:
1.0 BACKGROUND AND PURPOSE The Department of Facilities Management (FM) at the Colorado School of Mines has developed a Services policy to define for the campus community the types of services provided
BUILDING PERMIT RESIDENTIAL BASEMENT FINISH
BUILDING PERMIT RESIDENTIAL BASEMENT FINISH DOCUMENTS YOU WILL NEED 1. Building Permit Residential Basement Finish Package 2. Contractors copy of state and business license ADDITIONAL FORMS YOU MAY NEED
Description of Project Statewide Student Data Warehouse
Description of Project Statewide Student Data Warehouse The Department of Education (DE) uses Rebuild Iowa Infrastructure Fund funding to support critical components of Iowa s Statewide Longitudinal Data
Public Building Commission of Chicago. Board Meeting August 20, 2013
Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting
NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)
NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE) If your home or business is located within a 100-year floodplain and it was constructed through a County Building
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011
Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction
Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:
Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows: UCC-F100, Construction Permit Application pg. 1. Applicant
BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General
BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General Property Address: Property Owner: Lot: Block: Subdivision: Lot Size: Scope of Work: Note: Please attach copies of all general
San Antonio College. Energy Systems Laboratory TEXAS ENGINEERING EXPERIMENT STATION TEXAS A&M UNIVERSITY SYSTEM
CLIMATE ACTION PLAN 2011 For: San Antonio College 1300 San Pedro Ave., San Antonio, TX 78212. (210) 486-0000 Prepared by: Energy Systems Laboratory TEXAS ENGINEERING EXPERIMENT STATION TEXAS A&M UNIVERSITY
City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx.
[email protected] Commercial New/Remodel Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
Flexible Office Space Up to 66,240 Ft 2
Flexible Office Space Up to 66,240 Ft 2 Building Description: Wide Open Large Office Complex Numerous Perimeter Offices, Conference & Break Rooms and Wide Open Office Space Throughout Can Be Modified to
The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop
The University of Akron Main Campus Biennium 1 July 2016- June 2018 1 Electrical Infrastructure Loop $2,400,000 Scope: Replace center campus deteriorated 4,160 volt cable and duct bank with 23,000 volt
Building Permits: When are they required?
Building Permits: When are they required? Generally, you need to obtain a building permit from the City whenever you construct, enlarge, alter, repair, move, remove, improve, convert, or demolish a building
Interior Design IV Gary Leivers AIA, RIBA, LEED AP
Interior Design IV Fall 2013 T-Th 7:00-9:40 Gary Leivers AIA, RIBA, LEED AP [email protected] 619 929 2854 COURSE OUTLINE Building on previously studied design concepts, you will apply your knowledge
D Sample Notices to Property Owners, Sample Affidavits, and Other Material
D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully
Tuition and Fees. Jim Brunjes Vice Chancellor and Chief Financial Officer. Fiscal Year 2016. March 5, 2015
Tuition and Fees Fiscal Year 2016 Jim Brunjes Vice Chancellor and Chief Financial Officer March 5, 2015 Hazlewood Exemption Page 2 Hazlewood Exemption Fiscal Years 2011 to 2014 Texas Tech University FY11
Historic Tax Credits in Texas: Combining the New State Credit with the Federal Investment Tax Credit. Downtown Amarillo 17 December 2013
Historic Tax Credits in Texas: Combining the New State Credit with the Federal Investment Tax Credit Downtown Amarillo 17 December 2013 Ben Dupuy Anna Mod Stonehenge is a nationally respected finance company
WHEN IS A PERMIT REQUIRED?
WHEN IS A PERMIT REQUIRED? Any owner, builder, contractor, or other authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure,
Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent
Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent Scope for Irvinton Village Unit #512 Overall Scope: Demolition, Renovation, and
GENERAL LIABILITY PROGRAM FOR ARTISAN CONTRACTORS
GENERAL LIABILITY PROGRAM FOR ARTISAN CONTRACTORS Approved Territory AL, DE, GA, IL, IN, KY, MD, MS, NC, NJ, OH, SC, TN, WV. Eligible Risks The Artisan Contractor Program provides general liability coverage
CITY OF CHICAGO SMALL BUSINESS IMPROVEMENT FUND (SBIF) PROGRAM RULES
CITY OF CHICAGO SMALL BUSINESS IMPROVEMENT FUND (SBIF) PROGRAM RULES The City of Chicago s Small Business Improvement Fund is a Tax Increment Financing (TIF) program, which will reimburse building owners
Part 2 Definitions for this Policy 2.1. ADA / TAS the Americans with Disabilities Act / Texas Accessibility Standards.
Office of Space Management Page 1 of 6 Part 1 Purpose 1.1. This policy establishes space allocation and space use guidelines for UTSA entities occupying space in UTSA-owned and UTSA-leased facilities.
48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.
Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two
Commercial Building Valuation Report
INSURED University of Houston - Victoria Effective Date: Expiration Date: Cost as of: 09/2010 BUILDING 1 217 - University Center 77901 Location Adjustments Climatic Region: High Wind Region: Seismic Zone:
SECTION XI OPINION OF PROBABLE COST
SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing
HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number: 300-004
HOWARD UNIVERSITY Policy Number: 300-004 Policy Title: ASSET CAPITALIZATION Responsible Officer: Chief Financial Officer Responsible Offices: Office of the Controller, Departments of Strategic Sourcing
RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE
RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE Residential Course of Construction policies, also known as Builder s Risk, are designed to cover the property owner for potential loss while the property
The University of Texas at San Antonio Office of Environmental Health, Safety and Risk Management. Mold & Water Intrusion Safety Plan
The University of Texas at San Antonio Office of Environmental Health, Safety and Risk Management Mold & Water Intrusion Safety Plan i. Signature Page This Mold and Water Intrusion Safety Plan has been
Sample Outline (courtesy of City of Guelph Museums) Building Conservation Plan
Sample Outline (courtesy of City of Guelph Museums) Building Conservation Plan 1. Introduction 2. Commemorative Integrity Statement/Statement of Purpose 3. Contacts Staff City Contacts Ambulance Cold Storage
Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School
Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The
CAPITAL EXPENDITURES
CAPITAL EXPENDITURES 1 CAPITAL EXPENDITURES CAPITAL EXPENDITURES PLANNING On March 1, 2010 the AmherstPelham Regional School committee adopted a policy for developing a formal capital needs planning process.
Construction Technologies Career Field Pathways and Course Structure
Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry
STATE UNIVERSITY OF NEW YORK COLLEGE AT NEW PALTZ 2015 CAMPUS STATEMENT
STATE UNIVERSITY OF NEW YORK COLLEGE AT NEW PALTZ 2015 CAMPUS STATEMENT The State University of New York at New Paltz traces its beginnings to 1828, when a group of leading citizens founded the New Paltz
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW
APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW Parcel Number: Owner s Name: Co-Owner s Name: Owner s Mailing Address: Owner Phone Number: FIRM Panel: Lowest Floor Elevation (excluding garage):
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
Capital Projects Town Hall Meeting
Capital Projects Town Hall Meeting Planning, Architectural & Engineering Services September 15, 2014 Agenda Project Updates Recently Completed and in Construction Projects in Design Projects in Planning
PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN
TO: FROM: SUBJECT: Honorable Mayor and City Council Planning & Community Development Department PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN RECOMMENDATION: This report is for
2015-2016 Design Scenario Interior Design STAR Event
2015-2016 Design Scenario Interior Design STAR Event The Pocono s Children s Camp Developed with input by professional members of The American Society of Interior Designers (ASID) Project Overview and
2. What building projects are exempted? (permit not required)
BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It
Columbus State Community College MASTER PLANNING
Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT
DESIGN AND CONSTRUCTION DEPARTMENT - July 2014
DESIGN AND CONSTRUCTION DEPARTMENT - Project or 1 Elementary School 46 (Aliana) AutoArch Bartlett Cocke General ors Construct a new 850 capacity elementary school in the Aliana Master Planned Community.
Construction of 86 Dummer Street: Questions and Answers for Trustman Residents
Construction of 86 Dummer Street: Questions and Answers for Trustman Residents July, 2014 Introduction The Brookline Housing Authority (BHA) realized five years ago that the Trustman parking lot is large
