1 Peru Business Opportunities: Infrastructure Zusammengestellt von: Swiss Chamber of Commerce in Peru Lima, September INFRASTRUCTURE SECTOR 1.1 Introduction In the recent years, Peru s GDP has enjoyed sustained growth of an average of 6.4%. Enjoying a strategic position in the region and a great variety of natural resources which represent considerable potential across a range of economic sectors, Peru has become one of the leader countries in the region. According to the Banco Central de Reserva del Peru (BCRP) it is expected that this trend will continue for the period of , when Peru will reach an average of 5.5% -6.5%. The peruvian growth is mainly the result of private investment and trade liberalization. Peru s foreign trade policy is being geared to open up markets, and the country has signed free trade agreements with many of the world s major economies, while negotiations with several others are ongoing. There is also a strict defense of international private investment. Despite this favorable trend, there is still a big gap between infrastructure projects and investment, that the government is planning to resolve in the next years. Peruvian government has prioritized the development of transport infrastructure (road, rail, ports and airports) to increase competitiveness and set up a logistics hub that integrates Latin America, with the Asia Pacific economic region. Infrastructure Development in Peru Sector Indicador Variation Vial Paved national highway network 52% 54% +2 pp Water Access of drinking water 68% 76% +8 pp Sanitation Drain access 66% 76% +10 pp Electricity Electricity access 74% 89% +15 pp Railways Km of rail networks 1,940 km 1,940 km 0 Health Hospital beds per 100 persons Font: Ministry of Transport, INEI, Ministry of Health (2012)

2 During the period of , Peru had a slight improvement in some sectors such as water, sanitation and electricity, but there is a big gap in vial projects, railways, health, among others. As an exemple, nowadays there are only four railroads in the country, mostly used to transport minerals or for tourism. Peru requires more investment in roads and railway infrastructure to serve the transport of persons, facilitate trade and the connection between remote places and main cities. During the period of , the Transport Sector began to improve its investment rates with the following results: Sector Investment (USD Mill) Roads 2,643 Ports 386 Airport 342 Railways 105 Airport 10% Ports 11% Railways 3% Total 3,476 Roads 76% As shown in the first table, one of the current requirements of infrastructure is to pave the roads of the national network and connect the country. These projects were the ones which received more attention in the last 2 years, improving the infrastructure sector and the possibilities for international companies. 1.2 Opportunities As we mentioned before, and according to the data analized by the Cooperación Andina de Fomento (CAF), there is still a big gap in various sectors of the infrastructure in Peru such as energy, communications, transportation, water and sanitation, among others. 2/10 Infrastructure Gap (USD Mill) Investment Maintenance Total Energy 20, ,868 Electric Power 12, ,085 Natural gas 7, ,784 Telecommunications 11,055 1,135 12,190 Wireline 1, ,319 Cell phone 7, ,359 broadband 2, ,508 Transport 25, ,888 Paved roads 16, ,582 Railways 3, ,481 Airports 1, ,545 Ports 4, ,278 Water and sanitation 3, ,960 Drinking water 1, ,747 Sanitation 2, ,214 Total 60,738 2,167 62,905

3 A part of this gap would be covered by 2016 with the execution projects promoted by the public sector (Central Government and Regional Governments). 1.3 What is needed? New Investment foreseen in Infrastructure USD Million Vial 11, Railways 5, Airports Ports Hidroways Total 17, According to the Global Competitiveness Report 2012, the quality of the peruvian infrastructure is still far away from a good position ( 3.6 points over 7 ) and is similar to the rest of the countries in Latin America. The challenge is to reach the level of the leaders in the region, such as Brazil and Chile. To reach this goal the entrance of specialized international companies is necessary. These could bring new high quality process and knowledge to the country and work together with national building companies. For the concession of projects, it is very common the have of consortiums, where different companies work together on the design, planning, execution and supervision of the project and the materials. The main construction companies in Peru are constantly seeking international companies that could be part of a consortium and contribute with specialized knowledge and high quality services or products. As shown in this report, Peru has prioritized infrastructure development in the transport sector (road, rail, airports, ports) to improve competitiveness and become a logistics hub that integrates Latin America and Asia Pacific. This trend is expected to continue increasing in the coming years and will generate a big framework of opportunities for international companies that may benefit from a secure and stable economy with great prospects. 2. MAIN STAKEHOLDERS AFIN ( The Association for the promotion of the national infrastructure (AFIN) brings together the leading infrastructure companies in energy, transport, telecommunications and sanitation. The purpose of this association is to promote investment and act as a platform for improving competitiveness, integration, development and modernization of Peru. CAPECO ( The Peruvian Chamber of Construction (CAPECO) is a nonprofit association that represents companies in the construction sector of Peru. 3/10

4 The objective of Capeco is to contribute to the progress of the peruvian development and promote the quality projects and the construction activity. PROINVERSION ( The Agency for Promotion of Private Investment (PROINVERSION) is the responsible organization for promoting and implementing the national policy on private investment, in accordance with the guidelines established by the Ministry of Economy and Finance, the economic plans and integration policy. The purpose is to promote private investment in order to boost the competitiveness of Peru and its sustainable development to improve the welfare of the population. Regional governments and provincial municipalities are also stakeholders that manage independent project portfolios. Opportunities for Swiss Companies specialized in - Engineering - Road Construction - Highways - Bridges - Tunnelling - Renewal and reconstruction - General Planning - Poject Management and Supervision - Hydropower plants and Energy Systems - Construction materials - Cables - Metal Mechanics - Security Products - Machinery 4/10

5 3. RECENT PROJECTS WITH SWISS COMPANIES PARTICIPATION Pöyry Peru High Capacity Segregated Corridor (Metropolitano) Construction of the South Corridor for Bus System connecting downtown Lima with its area districts. - Design Review - Technical supervision, administrative, financial and environmental works - Quality control and cost control - Coordination of interfaces Metro de Lima Line 1 Section 1 and 2 - Section 1: Construction of elevated highway on stretch of 11.7km (9 stations) - Section 2: Construction of elevated viaduct structre (12.4 kms) 2 bridges over the Rimac River (10 stations) Metro de Lima Line 1 5/10

6 Energy Projects Hydropower Plant Angel (Puno) Hydropower Plant Machu Picchu II Lombardi Hydropower Plant Cerro del Aguila MW HPP Located on the Mantaro River, it includes an 80 m high gravity dam, a 5.7 km long headrace tunnel of around 90 m2 section, a partially lined vertical shaft D=8 m - H=240 m, an underground powerhouse with a total capacity of 510 MW. Lombardi Eng. Ltd is the main designer of the project and all the civil engineering schemes and the major hydromechanical and electrical equipment. 6/10

7 4. PROJECT PORTFOLIO Land Transportation Longitudinal de la Sierra road project - Section 2: Description: The project comprises the initial maintenance (140 km), rehabilitation and upgrading works (80km) and the operation and maintenance of all the Section in order to obtain the required level of service. Approximated length of 870 km. Estimated investment: US$ 175 million Longitudinal de la Sierra road project, Section 4 Description: The project comprises the rehabilitation and the upgrading works (117 km), regular initial maintenance (160 km) and operation and maintenance of all the Section, in order to obtain the required level of service. Approximated length of 640 km.estimated Investment: US$ 250 million Longitudinal de la Sierra road project, Section 5 Description: The project comprises the regular initial maintenance, and operation and maintenance of all the Section, in order to obtain the required level of service. Approximated length of 423 km. Estimated Investment: US$ 127 million 7/10

8 Railways Line 2 and Faucett Ave. - Gambetta Ave. of the Basic Network of the Metro of Lima and Callao Description: The project comprises the concession to design, build, finance, supply of electromechanical equipment, acquire rolling equipment, operate and maintain Line 2 of the electric mass transportation system. Line 2 and section of line 4, will have an approximated extension of 35 km and will cross 13 districts of Metropolitan Lima. Estimated investment: US$ 4.5 billion Airports New Chinchero - Cusco International Airport Description: Concession to design, build, finance, operate and maintain the new international airport of Chinchero Cusco. Estimated investment: US$ 356 million Ports General San Martín (Pisco) Port Terminal Description: The project comprises the concession to design, build, finance, maintain and operate the General San Martin port. The project comprises the upgrading and modernization of berth and storage areas to handle bulk cargo among others. Estimated investment: US$ 110 million The Amazon Waterways: Rivers Marañón and Amazonas. Description: The project comprises dredging works, ships transit signaling and maintenance so as to ensure adequate navigability conditions among the Yurimaguas, Pucallpa and Iquitos ports. Estimated investment: US$ 74 million 8/10

9 Salaverry Port Terminal. Estimated investment: US$ 129 million Pucallpa Port Terminal. Estimated investment: US$ 35 million San Juan de Marcona Port Terminal. Estimated investment: US$ 149 million Hydrocarbons Energy Security and Southern Gas Pipeline Description: The project comprises the concession to design, finance, build, operate, maintain and transfer of a natural gas distribution system. Estimated Investment: US$ million Mass Use of Natural Gas Nationwide Description: The project comprised the concession to design, finance, build, operate, and maintain a distribution system of natural gas, pipeline network. Estimated investment: US$ 205 million Liquid Petroleum Gas Supply System for Lima and Callao Description: The process comprises the concession to design, finance, build, operate, and maintain an LPG transport system from the producer facilities (Pisco) to El Callao port. The transport capacity will be 2800 TM/day when the commercial operation starts, and the fifth year will be 3500TM/day. Estimated investment : US$ 260 million LNG Supply System for the Domestic Market Description: The project comprised the concession to design, finance, build, operate and maintain a supply system. Estimated Investment : US$ 250 million. 9/10

10 Telecommunications National Fiber Optic Dorsal Network (Universal South, Center and North Coverage) Description: It includes projects for Universal Coverage, South, Central and North regions. Estimated investment: US$ 315 million Sanitation Main works and conduction of drinkable water supply for Lima. Estimated Investment: US$ 400 million Author s address: Corinne Schirmer Swiss Chamber of Commerce in Peru info@swisschamperu.org 10/10

Line 2 and Av. Faucett Av. Gambetta branch line concession of the Lima and Callao Basic Metro Network

Line 2 and Av. Faucett Av. Gambetta branch line concession of the Lima and Callao Basic Metro Network Line 2 and Av. Faucett Av. Gambetta branch line concession of the Lima and Mrs. Christy García Godos Naveda Head of Project December 2013 Diagnosis of the current situation Urban transport Buses Lack of

More information

Technical Council on Lifeline Earthquake Engineering (TCLEE) Anshel J. Schiff

Technical Council on Lifeline Earthquake Engineering (TCLEE) Anshel J. Schiff Technical Council on Lifeline Earthquake Engineering (TCLEE) by Anshel J. Schiff for GEER Joint Advisory Panel and Working Group Meeting October 7 & 8, 2004 Goals of TCLEE Elevate the state-of-the-art

More information

Special Issue Nr. 3 Regional Information - Mexico February 2015

Special Issue Nr. 3 Regional Information - Mexico February 2015 IMIA NEWS Special Issue Nr. 3 Regional Information - Mexico February 2015 The Mexican Engineering Insurance Market showed 54.5% growth in written premium in 2012 and 3.7% in 2013; those percentages amounted

More information

Hydropower Projects Portfolio

Hydropower Projects Portfolio Business Network Forum 18th Meeting, Iquitos- Peru, 04 March 2008 MINISTRY OF ENERGY AND MINES Hydropower Projects Portfolio By Jorge Aguinaga Diaz General Director for Electricity 1 Content I. GENERAL

More information

The peruvian mining sector an overview

The peruvian mining sector an overview The peruvian mining sector an overview Pedro Martinez Carlevarino President January 19th, 2012 National Society of Mining, Oil and Energy (SNMPE) Our institution represents the main mining, hydrocarbons

More information

Consejo Mundial de Energía Foro Biregional de América del Norte y de América Latina y el Caribe

Consejo Mundial de Energía Foro Biregional de América del Norte y de América Latina y el Caribe Consejo Mundial de Energía Foro Biregional de América del Norte y de América Latina y el Caribe JUNIO DE 2006 Disclaimer Safe harbor statement under the Private Securities Litigation Reform Act of 1995:

More information

Peru s Energy Future. The non-renewable sources

Peru s Energy Future. The non-renewable sources Presentation to the Peru s Energy Future March 2015 The non-renewable sources Eleodoro Mayorga Alba CEPLAN Webinar July 2015 Content 1- Perú in Numbers 2- Energy medium-term outlook Diagnostic The last

More information

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS

More information

Barranquilla: Strategic Platform. Services. for BPO & IT

Barranquilla: Strategic Platform. Services. for BPO & IT Barranquilla: Strategic Platform for BPO & IT Services Contents 1. Barranquilla s Potential at a Glance 01 2. BPO& IT Industry in Colombia 04 3. BPO& IT Industry in Barranquilla 06 4. Student Population

More information

Moving Michigan s Automotive Cluster to Market Transportation and Logistics: Moving the Goods to World Markets

Moving Michigan s Automotive Cluster to Market Transportation and Logistics: Moving the Goods to World Markets Moving Michigan s Automotive Cluster to Market Transportation and Logistics: Moving the Goods to World Markets Glenn Stevens, Vice President, MICHauto and Strategic Development 9/29/14 1 The Detroit Regional

More information

Private Investment Promotion Plan

Private Investment Promotion Plan REPUBLIC OF PERU Private Investment Promotion Plan Project: Energy Security of the Country and Peru s South Gas Pipeline Development Private Investment Promotion Agency PROINVERSIÓN Committee in Energy

More information

Finding a niche in the global software marketplace: The case of the Peruvian firm LOLIMSA, Technologias para Salud.

Finding a niche in the global software marketplace: The case of the Peruvian firm LOLIMSA, Technologias para Salud. Finding a niche in the global software marketplace: The case of the Peruvian firm LOLIMSA, Technologias para Salud. This is the year of the launch of Peruvian software, like a rocket, said Alfredo Taboada,

More information

Vision Precision Value

Vision Precision Value Vision Precision Value Vision Energy and natural resources: new scenarios, new challenges The increasingly complex scenarios of the energy arena, natural resources, and environmental protection require

More information

Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu

Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Abstract This article summarises the general situation of Shanghai s integrated transport system and then determines the trends

More information

DAWEI Sea PROJECT Port Project DAWEI AND THE REGION

DAWEI Sea PROJECT Port Project DAWEI AND THE REGION February 2012 DAWEI Sea PROJECT Port Project DAWEI AND THE REGION PROJECT LOCATION Kunming India Middle East / Europe Dawei Africa Asia Regional Hub DAWEI Sea PROJECT Port Project DAWEI PROJECT OVERVIEW

More information

Electricity market drivers

Electricity market drivers Daniel Assandri Head of Power Systems ABB (China) Ltd Electricity market drivers March 2008 Global T&D Market Drivers ABB Power Systems division - slide # 2 ABB s view on and market drivers The Americas

More information

TRANSPORT INFRASTRUCTURES TO APPROXIMATE THE YEREVAN INTERNATIONAL AIRPORT ZVARTNOTS

TRANSPORT INFRASTRUCTURES TO APPROXIMATE THE YEREVAN INTERNATIONAL AIRPORT ZVARTNOTS TRACECA Investment Forum TRACECA PROJECT FICHE TRANSPORT INFRASTRUCTURES TO APPROXIMATE THE YEREVAN INTERNATIONAL AIRPORT ZVARTNOTS THE INTERNATIONAL LOGISTIC CENTER AND THE FREE ECONOMIC ZONE IN THE ADJACENT

More information

PLS 308: Damage, Loss and Needs Assessment. Infrastructure Transport, Telecommunication

PLS 308: Damage, Loss and Needs Assessment. Infrastructure Transport, Telecommunication PLS 308: Damage, Loss and Needs Assessment Infrastructure Transport, Telecommunication Transport Sub - sectors Road transport Railroad transport Air transport Water transport Communications Fixed-line

More information

INDIA CONSTRUCTION INTRODUCTION IMPORTANCE OF INFRASTRUCTURE CONSTRUCTION IN INDIA

INDIA CONSTRUCTION INTRODUCTION IMPORTANCE OF INFRASTRUCTURE CONSTRUCTION IN INDIA IMPORTANCE OF INFRASTRUCTURE CONSTRUCTION IN INDIA INTRODUCTION 1 5 M A R C H 2 0 0 9 Infrastructure development and maintenance is a major input to economic development and sustained growth in an economy.

More information

IFC s Experience in Financing Airports Queen Alia Airport: A Case Study. Dubai, February 23, 2011

IFC s Experience in Financing Airports Queen Alia Airport: A Case Study. Dubai, February 23, 2011 IFC s Experience in Financing Airports Queen Alia Airport: A Case Study Dubai, February 23, 2011 Content IFC An Overview IFC s Activities in Infrastructure, and IFC s Experience in Financing Airports Case

More information

Inter-American Development Bank. Financing Private Infrastructure with the IDB: EXR Business Seminar April 2006 Washington, DC

Inter-American Development Bank. Financing Private Infrastructure with the IDB: EXR Business Seminar April 2006 Washington, DC Inter-American Development Bank Financing Private Infrastructure with the IDB: EXR Business Seminar April 2006 Washington, DC Agenda IDB and the Private Sector Department IDB Benchmark Transportation Deals

More information

Climate Change Resilience Workshop IHA-World Bank meeting. 13 November 2015 Philippe MEUNIER

Climate Change Resilience Workshop IHA-World Bank meeting. 13 November 2015 Philippe MEUNIER Climate Change Resilience Workshop IHA-World Bank meeting 13 November 2015 Philippe MEUNIER CONTENTS Chapter 1 ENGIE and hydro production Chapter 2 Adaptation policy Chapter 3 Case studies ENGIE : An hydro

More information

Agricultural Catastrophic Insurance for Poor Farmers in Perú. Lourdes del Carpio Manager, Agricultural Insurance Rio de Janeiro, November 2011

Agricultural Catastrophic Insurance for Poor Farmers in Perú. Lourdes del Carpio Manager, Agricultural Insurance Rio de Janeiro, November 2011 Agricultural Catastrophic Insurance for Poor Farmers in Perú Lourdes del Carpio Manager, Agricultural Insurance p g, g Rio de Janeiro, November 2011 La Positiva Seguros Who we are? La Positiva Seguros

More information

City of Jakarta (Tanggerang) Total Greater Jakarta (Jabotabek) Area width 649.71 1294.38 3833.21 5777.30

City of Jakarta (Tanggerang) Total Greater Jakarta (Jabotabek) Area width 649.71 1294.38 3833.21 5777.30 1. The Disaster A heavy rainfall during the period of Jan 29-Feb 2 2007 has caused flood in some areas in greater Jakarta area. Floods are recurring phenomena in Jakarta area, it has happened regularly

More information

Presentation of Grupo ACS. September 2009

Presentation of Grupo ACS. September 2009 Presentation of Grupo ACS September 2009 Strategic vision A global leader in infrastructure development In the fields of civil and industrial engineering activities With sustainable and profitable growing

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

INVESTING ON RENEWABLE ENERGY IN ALBANIA

INVESTING ON RENEWABLE ENERGY IN ALBANIA INVESTING ON RENEWABLE ENERGY IN ALBANIA Introduction Who We Are Ayen Energy Group Our Investment in Albania Why We have Choosen to Invest in Albania Conclusion Turkey s Leading Energy Company One of the

More information

COWI s Role in the Copenhagen Metro Project

COWI s Role in the Copenhagen Metro Project COWI s Role in the Copenhagen Metro Project On the occasion of the award by the Copenhagen Cultural Foundation for COWI A/S part in the implementation of Phase 1 of the Copenhagen Metro 2 COWI s Role in

More information

Corredores de Comercio del NAFTA Laredo, Texas: Puente Comercial de las Américas

Corredores de Comercio del NAFTA Laredo, Texas: Puente Comercial de las Américas Corredores de Comercio del NAFTA Laredo, Texas: Puente Comercial de las Américas The Objective of recent trade missions to Central and South America: To position Laredo, Texas as a logistics hub, to promote

More information

COSIPLAN PLAN DE TRABAJO 2015 PRESIDENCY PRO TEMPORE URUGUAY 2014-2015

COSIPLAN PLAN DE TRABAJO 2015 PRESIDENCY PRO TEMPORE URUGUAY 2014-2015 PRESIDENCY PRO TEMPORE URUGUAY 2014-2015 1 WORK PLAN 2015 COSIPLAN Coordinating Committee 2 ACTION 1.1: Indicative Territorial Planning Methodology and Process Follow up on: COSIPLAN Projects Planning

More information

Colombia in the world

Colombia in the world Colombia in the world Proexport around the world Process of attracting Foreign Direct Investment Proexport offers detailed and professional assistance for investors that find interesting business opportunities

More information

BONATTI: COMPANY OVERVIEW

BONATTI: COMPANY OVERVIEW BONATTI: COMPANY OVERVIEW Bonatti is an International General Contractor which provides Engineering, Procurement, Construction and Operation & Maintenance Services to the Oil & Gas and Power Industry.

More information

Amir Bashirzadeh Tabrizi, Nassir Gifani. TOOSSAB Consulting Engineers Company e-mail: bashirzadeh@hotmail.com, nssrgifani@gmail.com.

Amir Bashirzadeh Tabrizi, Nassir Gifani. TOOSSAB Consulting Engineers Company e-mail: bashirzadeh@hotmail.com, nssrgifani@gmail.com. International Renewable Energy Congress November 5-7, 2010 Sousse, Tunisia Economical and Environmental Effects of Pressure Reducer Valve Substituting by Small Hydro Power-Plants in Gravity Water Transmission

More information

Leading Sectors for U.S. Export and Investment

Leading Sectors for U.S. Export and Investment Leading Sectors for U.S. Export and Investment Commercial Sectors Oil and Gas - Hydrocarbons Information and Communications Technology Public Works, Infrastructure Development, and Water Resources Healthcare

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )

More information

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas Transportation Association of Canada Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas The transportation funding and governance frameworks of Canada s metropolitan regions

More information

Inter-American Development Bank Financing of Responsible Oil and Gas Developments

Inter-American Development Bank Financing of Responsible Oil and Gas Developments 'IAIA12 Conference Proceedings' Energy Future The Role of Impact Assessment 32 nd Annual Meeting of the International Association for Impact Assessment 27 May- 1 June 2012, Centro de Congresso da Alfândega,

More information

Peruvian economic outlook and investment opportunities. Javier Correa Merchan Director, Investment Promotion Division Proinversión

Peruvian economic outlook and investment opportunities. Javier Correa Merchan Director, Investment Promotion Division Proinversión Peruvian economic outlook and investment opportunities Javier Correa Merchan Director, Investment Promotion Division Proinversión Our country: Peru Economic perspectives Investment environment Investment

More information

Price Based- best value- Procurement Horizontal. Yes* No Yes constructiontransportation

Price Based- best value- Procurement Horizontal. Yes* No Yes constructiontransportation Design Build Law Fact Sheet - Arkansas Vertical construction- public Yes** Yes Yes*** Yes * tes: * State Highway Commission has authority to do DB under Arkansas Statute Section (A.R. Stat.) 27-65-107.

More information

Holman Fenwick Willan CONSTRUCTION CAPABILITY

Holman Fenwick Willan CONSTRUCTION CAPABILITY Holman Fenwick Willan CONSTRUCTION CAPABILITY WHY CHOOSE HFW FOR YOUR NEEDS IN CONSTRUCTION? HFW s construction law team is one of the largest specialist international groups in the market. The partners

More information

Thailand focus 2014 Competencies & Growth potentials. Arkhom Termpittayapaisith

Thailand focus 2014 Competencies & Growth potentials. Arkhom Termpittayapaisith Thailand Focus 2014 What s new in Thailand s Economic Development Strategy Thailand focus 2014 Competencies & Growth potentials Arkhom Termpittayapaisith Secretary-General Office of the National Economic

More information

Economic 360 for Indonesia: Growth Prospects and Emerging Opportunities in the ICT Industry

Economic 360 for Indonesia: Growth Prospects and Emerging Opportunities in the ICT Industry Economic 360 for Indonesia: Growth Prospects and Emerging Opportunities in the ICT Industry Indonesia s ICT Industry Decoded: Hardware, Software, and Telecom to Propel Growth April 2012 Contents Executive

More information

Riga Facts & Figures. Riga Facts &

Riga Facts & Figures. Riga Facts & Riga Facts & Figures 1 Riga Facts & Figures 2015 2 Riga Facts & Figures TABLE OF CONTENTS 1. General Information...1 2. Economics...4 3. Territory...12 Riga Facts & Figures 2015 Riga Facts & Figures 1

More information

Canada Trade Mission to Colombia and Peru

Canada Trade Mission to Colombia and Peru Canada Trade Mission to and Peru Dates: August 10-15, 2014 Cities: Bogota (), Lima (Peru) Focus: Oil & Gas Mining Defence & Security Led by: The Honourable Ed Fast, Minister of International Trade THE

More information

Passenger Transport Statistic

Passenger Transport Statistic Passenger Transport Statistic Methodological note May 2016 Index 1. Purpose 2. Scope 2.1. Population scope 2.2. Time scope 2.3. Geographical scope 3. Statistical unit 4. Definition of the variables 5.

More information

Electric and Natural Gas Distribution Systems. Presented by Brian Beam New Jersey Board of Public Utilities Division of Reliability & Security

Electric and Natural Gas Distribution Systems. Presented by Brian Beam New Jersey Board of Public Utilities Division of Reliability & Security Electric and Natural Gas Distribution Systems Presented by Brian Beam New Jersey Board of Public Utilities Division of Reliability & Security 1 New Jersey's Energy Profile To meet the energy needs (BTUs

More information

#PPP PROJECTS. Dimitri Zaninovich. Director of Infrastructure and Sustainable Energy National Planning Department

#PPP PROJECTS. Dimitri Zaninovich. Director of Infrastructure and Sustainable Energy National Planning Department #PPP PROJECTS Dimitri Zaninovich Director of Infrastructure and Sustainable Energy National Planning Department February, 2014 1. Starting Point Colombia s Macroeconomic Overview Upcoming Opportunities

More information

Pragati Maidan, New Delhi 20-22 May, 2015. Smarter Solutions for a Better Tomorrow. Organiser. www.smartcitiesindia.com. Exhibitions India Group

Pragati Maidan, New Delhi 20-22 May, 2015. Smarter Solutions for a Better Tomorrow. Organiser. www.smartcitiesindia.com. Exhibitions India Group Pragati Maidan, New Delhi 20-22 May, 2015 er Solutions for a Better Tomorrow Organiser www.smartcitiesindia.com Exhibitions India Group SMART Cities INDIA er Solutions for a Better Tomorrow As India s

More information

Chicago s Business Climate

Chicago s Business Climate Chicago s Business Climate Home to an unrivaled economy, workforce, and quality of life, Chicago is a thriving metropolis, yet a tight-knit community for business and residents. The city s dynamic character

More information

SECURING FLORIDA S FUTURE WWW.FLORIDACHAMBER.COM. Securing Florida s

SECURING FLORIDA S FUTURE WWW.FLORIDACHAMBER.COM. Securing Florida s Securing Florida s Florida A State of Change Florida Trade and Logistics Study Phase I (2010) Document existing and project future trade flows Recommend strategies for Florida to compete globally Phase

More information

Spain leads the world market for infrastructure development

Spain leads the world market for infrastructure development ARI ARI 52/2014 5 November 2014 Spain leads the world market for infrastructure development William Chislett Associate Analyst at the Elcano Royal Institute and author of Spain: What Everyone Needs to

More information

Chilean port system Cargo handled in 1997

Chilean port system Cargo handled in 1997 1 1.1 Introduction In December 1997 the Chilean Government obtained approval from Congress for a new law which provides for the establishment of ten independent Empresas Portuarias ( Port Companies ) to

More information

BTG Pactual& CelfinSouthern Cone Andean Conference 2013. Santiago, June 5 and 6, 2013

BTG Pactual& CelfinSouthern Cone Andean Conference 2013. Santiago, June 5 and 6, 2013 BTG Pactual& CelfinSouthern Cone Andean Conference 2013 Santiago, June 5 and 6, 2013 COMPANY STRUCTURE Affiliates that consolidate 60% 68% 50% 100% Besalco Construcciones Besalco MD Montajes Kipreos Hospital

More information

Small Hydropower in Jaén, Spain

Small Hydropower in Jaén, Spain Small hydropower in the province of Jaén (Spain): base of local sustainable development Blas Ogayar Fernández Universidad de Jaén. IDEA José A. La Cal Herrera Agener Index: 1. Introduction 2. Study. Methodology

More information

GENERAL INFORMATION. Area (km2) 406.752. Population 6.672.631 (2012) Ciudad del Este, Encarnación y Concepción. Other important cities

GENERAL INFORMATION. Area (km2) 406.752. Population 6.672.631 (2012) Ciudad del Este, Encarnación y Concepción. Other important cities Paraguay GENERAL INFORMATION GENERAL INFORMATION Area (km2) 406.752 Oficial Languages Currency Spanish and Guarani Guaraní (Gs.) Population 6.672.631 (2012) GDP in US Millions Capital Other important cities

More information

Peru Trade fairs. Swiss Chamber of Commerce in Peru. Compiled by: Lima, May 2014. PERU ENERGY 2014 Lima, February 12-13, 2014 www.peruenergia.com.

Peru Trade fairs. Swiss Chamber of Commerce in Peru. Compiled by: Lima, May 2014. PERU ENERGY 2014 Lima, February 12-13, 2014 www.peruenergia.com. Peru Trade fairs Compiled by: Swiss Chamber of Commerce in Peru Lima, May 2014 PERU ENERGY 2014 Lima, February 12-13, 2014 www.peruenergia.com.pe Peru Energy is a platform for investors and executives

More information

MAJOR INFRASTRUCTURE WORKS LED BY SPANISH COMPANIES

MAJOR INFRASTRUCTURE WORKS LED BY SPANISH COMPANIES MAJOR INFRASTRUCTURE WORKS LED BY SPANISH COMPANIES MAJOR INFRASTRUCTURE WORKS LED BY SPANISH COMPANIES DESIGN AND CONSTRUCTION OF THE HIGH-SPEED RAILWAY LINE BETWEEN MECCA AND MEDINA, INCLUDING 35 TRAINS

More information

TRANS-PACIFIC PARTNERSHIP GOVERNMENT PROCUREMENT CHAPTER PERU S FINAL MARKET ACCESS OFFER ON GOVERNMENT PROCUREMENT

TRANS-PACIFIC PARTNERSHIP GOVERNMENT PROCUREMENT CHAPTER PERU S FINAL MARKET ACCESS OFFER ON GOVERNMENT PROCUREMENT TRANS-PACIFIC PARTNERSHIP GOVERNMENT PROCUREMENT CHAPTER PERU S FINAL MARKET ACCESS OFFER ON GOVERNMENT PROCUREMENT SECTION A: CENTRAL LEVEL OF GOVERNMENT ENTITIES Goods Threshold: Services Threshold:

More information

To refer to the key figures as you read, please fold out the next page.

To refer to the key figures as you read, please fold out the next page. Semi-Annual Report 2006 KFW BANKENGRUPPE. Development of operations. In the first half of 2006 the volume of financing commitments made by KfW Bankengruppe was, at EUR 33.3 billion, 45 % higher than in

More information

Transport trends and challenges in the Russian Federation

Transport trends and challenges in the Russian Federation The Ministry of Transport of the Russian Federation Transport trends and challenges in the Russian Federation 24 th session Working Party on Transport Trends and Economics (WP.5) UNECE Inland Transport

More information

About FICCI Welcome to FICCI New Delhi December 2013

About FICCI Welcome to FICCI New Delhi December 2013 About FICCI About us Established in 1927 by Mahatma Gandhi India s largest and oldest Apex Business Organization Impacted the liberalization & globalization of the Indian economy since the 1990s 70 verticals

More information

THE COMPANY Safety, swiftness, efficiency constantly evolving. SERVICES Innovative and secure. Fixed Base Operator

THE COMPANY Safety, swiftness, efficiency constantly evolving. SERVICES Innovative and secure. Fixed Base Operator THE COMPANY Safety, swiftness, efficiency constantly evolving SERVICES Innovative and secure 01. Cargo Services Reliable logistical processes, innovative and secure 02. Ground Handling Services A comprehensive

More information

Corporate Presentation

Corporate Presentation 1 Corporate Presentation 2 We are a peruvian Holding leading to serve the Logistics Chain for Foreign Trade for over 40 years, and provide Port and Airport Infrastructure. AIH Presence through the Logistics

More information

Passenger Rail System: Spain s experience

Passenger Rail System: Spain s experience Passenger Rail System: Spain s experience Chicago, March 2012 Jesús Planchuelo Martínez de Haro SENER. Civil Engineering & Architecture Department Director Member of Tecniberia Index I. The Spanish Engineering

More information

Port of Beira. 22/06/12, Pretoria. Félix Machado Sales & Marketing Manager

Port of Beira. 22/06/12, Pretoria. Félix Machado Sales & Marketing Manager Cornelder de Moçambique Port of Beira 22/06/12, Pretoria Félix Machado Sales & Marketing Manager Why Choose the Beira Corridor? Reason 1: Location & Costs Reason 1: Location & Costs Beira Corridor Reason

More information

Taoyuan Aerotropolis Infrastructure Project and. Taoyuan International Airport Terminal 3 Project TAIWAN

Taoyuan Aerotropolis Infrastructure Project and. Taoyuan International Airport Terminal 3 Project TAIWAN Taoyuan Aerotropolis Infrastructure Project and Taoyuan International Airport Terminal 3 Project TAIWAN The Taoyuan Aerotropolis Infrastructure Project, seen as a prime driver of Taiwan s future economic

More information

OUR CONVERSATION TODAY

OUR CONVERSATION TODAY OUR CONVERSATION TODAY Our goal is to raise the level of awareness around the oil supply chain among key stakeholders in order to facilitate positive working relationships and more informed decision making.

More information

Informatization Development of Shanghai

Informatization Development of Shanghai C IF A L S H A NG H A I INT E R NA T IO NA L T R A INING C E NT E R Informatization Development of Shanghai WU Yugang CIFAL Shanghai International Training Center April 2012 Informatization Development

More information

Agenda. Historical Tecon Santos Mesquita CONVICON Tecon Imbituba Financial Highlights Bagres Port. of Santos Expansion Corporate Governance

Agenda. Historical Tecon Santos Mesquita CONVICON Tecon Imbituba Financial Highlights Bagres Port. of Santos Expansion Corporate Governance 1 Agenda Historical Tecon Santos Mesquita CONVICON Tecon Imbituba Financial Highlights Barnabé-Bagres Bagres Port of Santos Expansion Corporate Governance 2 Historical Santos Brasil was founded in 1997

More information

The Heartland Corridor: Crossing Mountains, Crossing Sectors

The Heartland Corridor: Crossing Mountains, Crossing Sectors Nathan Dorfman MPA Candidate; University of Pittsburgh 2014 ASPA Founders Fellows Application Executive Summary The Heartland Corridor: Crossing Mountains, Crossing Sectors This paper will discuss how

More information

Regions of Portugal - Alentejo

Regions of Portugal - Alentejo Regions of - Area Why? has the largest land area in mainland 31,605.2 km 2 (1/3 of the national territory), with an international land border of 432 km and a coastline of 179 km Area (km 2 ): 31,604.9

More information

AS ELIGIBLE FOR THE APP

AS ELIGIBLE FOR THE APP INITIATIVE FOR THE INTEGRATION OF REGIONAL INFRASTRUCTURE IN SOUTH AMERICA IIRSA PROJECTS IDENTIFIED AT THE NATIONALLEVEL LEVEL AS ELIGIBLE FOR THE APP Presentation of and debate about the results of the

More information

Canadian Rail: Gearing Up in the West

Canadian Rail: Gearing Up in the West Canadian Rail: Gearing Up in the West WCWGA 42 nd Annual Convention January 6, 2012 Moose Jaw, Saskatchewan Bruce R. Burrows V.P., Public and Corporate Affairs Outline 1. Who we are 2. How Railways Do

More information

Goiás. 340,086.698 sq.km. State Area. Goiânia. Capital. Capital population 1,333,767. State Population 6,154,996. Economically active population 63.

Goiás. 340,086.698 sq.km. State Area. Goiânia. Capital. Capital population 1,333,767. State Population 6,154,996. Economically active population 63. State State Area Capital 340,086.698 sq.km Goiânia Capital population 1,333,767 State Population 6,154,996 Economically active population 63.3% Populational growth rate 16.8% Unemployment rate 7.6% GDP

More information

As Powerful as Water

As Powerful as Water As Powerful as Water With enhanced power by accumulating strengths and taking advantageous terrain, water occupies a leading position when it runs from the peak. Strategy of Maintaining a Leading Position

More information

For Your Information P-6 DETERMINING WHETHER YOUR UTILITY PROBLEM IS REGULATED BY THE PUC

For Your Information P-6 DETERMINING WHETHER YOUR UTILITY PROBLEM IS REGULATED BY THE PUC Colorado Public Utilities Commission For Your Information P-6 DETERMINING WHETHER YOUR UTILITY PROBLEM IS REGULATED BY THE PUC Are you wondering if a utility company is regulated by the Colorado Public

More information

Mega Manila: Partnership in Action

Mega Manila: Partnership in Action Domestic WastewaterManagement in Mega Manila: Partnership in Action Leonor C. Cleofas Deputy Administrator Metropolitan Waterworks and Sewerage System Securing the Future Today The MWSS Privatization On

More information

GROWING ALONG WITH PERÚ

GROWING ALONG WITH PERÚ GROWING ALONG WITH PERÚ GROWING ALONG WITH PERU Andino Investment Holding S.A.A. is a Peruvian Holding leading to serve the Logistics Chain for foreign trade for over 40 years, and provide port and airport

More information

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO Advantages of Port Lobito (1) Predominant geological locations Facing the Atlantic, Port Lobito locates around 30km north to Beguela City, and it

More information

ANNEX III Quantitative Restrictions (Chapter 11)

ANNEX III Quantitative Restrictions (Chapter 11) ANNEX III Quantitative Restrictions (Chapter 11) Annex III 1. The Schedule of a Party sets out the non-discriminatory quantitative restrictions maintained by that Party pursuant to Article 11.6. 2. Each

More information

Telecommunications Regulatory Agency OSIPTEL

Telecommunications Regulatory Agency OSIPTEL National Plan Proposal for Broadband Development in Peru. OSIPTEL s Role and Learned Lessons. Luis Pacheco Research Deputy Manager Department of Regulatory Policy and Competition Telecommunications Regulatory

More information

Climate Change and Infrastructure Planning Ahead

Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports

More information

FINANCING OF INFRASTRUCTURE - DEFINITION OF 'INFRASTRUCTURE LENDING'

FINANCING OF INFRASTRUCTURE - DEFINITION OF 'INFRASTRUCTURE LENDING' FINANCING OF INFRASTRUCTURE - DEFINITION OF 'INFRASTRUCTURE LENDING' CIRCULAR DNBS. PD. CC. NO. 354/03.10.001/2013-14, DATED 2-8-2013 Government of India, vide its Gazette Notifications dated April 5,

More information

RENEWABLE ENERGY DEVELOPMENT AND BUSINESS OPPORTUNITIES IN VIETNAM

RENEWABLE ENERGY DEVELOPMENT AND BUSINESS OPPORTUNITIES IN VIETNAM BITEC, Bangkok Friday 3 rd June 2011 RENEWABLE ENERGY DEVELOPMENT AND BUSINESS OPPORTUNITIES IN VIETNAM M.Eng. Nguyen Dang Anh Thi Deputy Director, Energy Conservation Center of Ho Chi Minh City, Vietnam

More information

The River Devoll Project

The River Devoll Project EVN Hydropower Development in Albania The River Devoll Project Dr. Michael Laengle, CFO Agenda > EVN Overview and strategy > Albania Electricity market in SEE > The River Devoll project 2 Company profile

More information

Climate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun

Climate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun Climate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun SHEP Ghana s Self-help Electrification Programme By Henry Vanderpuye Energy Consultant, Ministry of Energy

More information

Mexico s Legal and Business Regulatory Framework

Mexico s Legal and Business Regulatory Framework Mexico s Legal and Business Regulatory Framework Mexico s commercial openness has benefited Mexicans by both creating jobs, and promoting their products and services in international markets. 10 free trade

More information

UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT TRANSIT TRANSPORT SYSTEMS FOR BOLIVIA AND PARAGUAY. Issues, actions and constraints

UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT TRANSIT TRANSPORT SYSTEMS FOR BOLIVIA AND PARAGUAY. Issues, actions and constraints Distr. GENERAL UNCTAD/LDC/91 3 August 1994 Original: ENGLISH ENGLISH, FRENCH AND SPANISH ONLY UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT TRANSIT TRANSPORT SYSTEMS FOR BOLIVIA AND PARAGUAY Issues,

More information

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : sunilfah@iitr.ernet.in

More information

APEC Information Privacy Principles in the Development of Outsourcing Business: Contact Center in Peru

APEC Information Privacy Principles in the Development of Outsourcing Business: Contact Center in Peru 2008/SOM1/ECSG/SEM/018 APEC Information Privacy Principles in the Development of Outsourcing Business: Contact Center in Peru Submitted by: Peru Technical Assistance Seminar on International Implementation

More information

Professor Dimitrios Tsamboulas National Technical University of Athens, Greece Expert

Professor Dimitrios Tsamboulas National Technical University of Athens, Greece Expert UNECE Workshop on Good practices and new tools for financing transport infrastructure 2 nd Session Benchmarking of Transport Infrastructure Construction Costs 8 th September 2014, Geneva Professor Dimitrios

More information

Foreign Direct Investors Outlays to Acquire or Establish U.S. Businesses Rose in 2004

Foreign Direct Investors Outlays to Acquire or Establish U.S. Businesses Rose in 2004 EMBARGOED UNTIL RELEASE AT 8:30 A.M. EDT, WEDNESDAY JUNE 1, 2005 Thomas Anderson: (202) 606-9879 BEA 05-23 Foreign Direct Investors Outlays to Acquire or Establish U.S. Businesses Rose in 2004 In 2004,

More information

Presented by: Rhonda Irby Business Development Ghazanfar Group. Ghazanfar Group. Afghanistan s Leading Energy Company

Presented by: Rhonda Irby Business Development Ghazanfar Group. Ghazanfar Group. Afghanistan s Leading Energy Company Presented by: Rhonda Irby Business Development Ghazanfar Group Ghazanfar Group Afghanistan s Leading Energy Company Overview of the Ghazanfar Group Presented by Rhonda Irby Business Development Manager

More information

U.S. Logistics & Multimodal Transport Presentation

U.S. Logistics & Multimodal Transport Presentation Your Logo Here CFCFA Feb 2011Chongqing Meeting U.S. Logistics & Multimodal Transport Presentation Andy Hokfan Sze www.fastraxx.com, andy.sze@fastraxx.com 1-630-910-6777 Presentation Outline General Information

More information

GUIDELINES FOR TOTAL PROJECT COST MANAGEMENT

GUIDELINES FOR TOTAL PROJECT COST MANAGEMENT GUIDELINES FOR TOTAL PROJECT COST MANAGEMENT March 2013 MINISTRY OF STRATEGY AND FINANCE TABLE OF CONTENTS CHAPTER Ⅰ GENERAL PROVISIONS Article 1 (Purpose)... 1 Article 2 (Definition of Total Project Cost)...

More information

Republic of Angola. Law of Delimitation of The Sectors of Economic Activity: Law No 13/94

Republic of Angola. Law of Delimitation of The Sectors of Economic Activity: Law No 13/94 Republic of Angola Law of Delimitation of The Sectors of Economic Activity: Law No 13/94 2 September 1994 Law No 10/88, of July 2nd, called "The Law of Economic Activities", denies the private sector access

More information

THE NATIONAL CERTIFICATE (VOCATIONAL)

THE NATIONAL CERTIFICATE (VOCATIONAL) THE NATIONAL CERTIFICATE () The National Certificate (Vocational) subjects are offered at Levels 2, 3 & 4 of the National Qualification Framework (NQF). All NCV programs consist of a fundamental learning

More information

A. TAX AT A GLANCE B. TAX LEVY SOURCES TYPES AND LIMITS OF LEVIES:

A. TAX AT A GLANCE B. TAX LEVY SOURCES TYPES AND LIMITS OF LEVIES: A. TAX AT A GLANCE The maximum allowable levy for 2015 is $95.1 million. For 2015 the levy will be $73.0 million. The millage rate is estimated to be $0.1891. The 2015 levy will be used for: o General

More information

FLORIDA DEPARTMENT OF TRANSPORTATION. 2012 Florida Redevelopment Association Annual Conference October 24-26, 2012

FLORIDA DEPARTMENT OF TRANSPORTATION. 2012 Florida Redevelopment Association Annual Conference October 24-26, 2012 FLORIDA DEPARTMENT OF TRANSPORTATION 2012 Florida Redevelopment Association Annual Conference October 24-26, 2012 Presentation Outline Freight Mobility & Trade Plan Background Status of the plan Passenger

More information

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide Renew provides multidisciplinary engineering services to maintain and develop UK infrastructure focused in

More information