PROVIDENCE RIVER PEDESTRIAN BRIDGE
|
|
- Christian Walker
- 7 years ago
- Views:
Transcription
1 PUBLIC MEETING City of Providence Department of Planning + Development
2 LOOKING BACK Project for Public Spaces (PPS) came to Providence to develop preliminary ideas for waterfront parks I-195 Pedestrian Bridge Committee began to meet to begin thinking about design and programming concepts for the pedestrian bridge City decided to hold design competition and created Selection Committee City issued an RFQ for design teams and then issued RFP to 11 finalists 2010 Final design was selected Since 2010 Advanced from conceptual design, integrated design with emerging plans for East and West Side waterfront parks Now at Pre-90% design Construction will begin in Spring of 2015
3 DESIGN CONSIDERATIONS o Must incorporate the five existing piers o Must be bicycle friendly and ADA compliant o Incorporated into design of waterfront parks o Allow for gathering spaces on bridge o Consideration of views o Durability of materials o Design themes city s history, innovation, creativity, design excellence
4 SELECTION COMMITEE o Rhode Island School of Design Provost (Chair) o Director of Rhode Island Department of Transportation o City of Providence Superintendent of Parks o City of Providence Director of Planning o Assistant Vice President, Planning, Design and Construction, Brown University o Private Business Representative Downtown Providence o Vice President of the Rhode Island Chapter of AIA o President of the Fox Point Neighborhood Association o Vice President of the Jewelry District Association o Executive Director, Rhode Island Historic Preservation and Heritage Commission
5 DESIGN COMPETITION SUBMISSION
6
7
8 KEY CHANGES SINCE COMPETITION o Reduced overall size of bridge total square footage of bridge desk o Eliminated event space at lower level o Eliminated walkway from east side to lower level space o Added seating elements -- serve as lighting elements o Added stairs to access two piers on east side DESIGN RETAINS THE ESSENTIAL CHARACTER OF THE ORIGINAL CONCEPT
9 INCORPORATION WITH WEST & EAST SIDE PARKS
10 EAST SIDE RENDERED PLAN
11 WEST SIDE RENDERED PLAN
12 VIEW FROM BRIDGE LANDING WEST SIDE PARK
13 OVERALL PLAN
14 LIGHTING SCHEME
15 BENCH AND LIGHTING ELEMENTS
16 BENCH AND LIGHTING ELEMENTS
17 BENCH AND LIGHTING ELEMENTS
18 VIEW- NORTH SIDE OF EAST ABUTMENT
19 VIEW LOOKING WEST
20 VIEW LOOKING EAST
21 BUDGET AND COST ESTIMATE Listed in the State Transportation Improvement Program (TIP) for $6M Current budget estimate is $5.5M OWNERSHIP AND MAINTENANCE Once constructed, bridge will be owned by the City of Providence Ongoing maintenance a priority, are working through ideas with I-195 Commission and other partners on best plan to ensure bridge will be maintained in excellent condition
22 SCHEDULE MOVING FORWARD NEXT STEPS Lambri Zerva, Rhode Island Department of Transportation
23 QUESTIONS? COMMENTS?
24 PLAN + ELEVATION VIEWS
25 ELEVATION VIEW
26 DETAILED ELEVATION VIEW
27 BENCH DESIGN
28 RAILING DETAIL
The Council of the City of New York. Economic Development Corporation
Hon. Melissa Mark-Viverito Speaker of the Council Hon. Julissa Ferreras Chair, Committee on Finance Hon. Daniel R. Garodnick Chair, Committee on Economic Development The Council of the City of New York
More informationRapid City Downtown Area Master Plan. Draft Plan Concepts April 2016
Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled
More informationWELCOME TO OUR EXHIBITION
WELCOME TO OUR EXHIBITION The purpose of the exhibition is to provide you with the opportunity to view our proposals and give feedback prior to the submission of a planning application to the London Borough
More informationJoint Development and Real Estate Committee. Board Item I-A. March 25, 2010
Joint Development and Real Estate Committee Board Item I-A March 25, 2010 Negotiate and Execute an Easement Agreement with the District of Columbia for the Metropolitan Branch Trail Bridge at Rhode Island
More informationOhio Department of Transportation. Lytle Tunnel Rehabilitation Phase 2 Public Information Meeting
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Lytle Tunnel Rehabilitation Phase 2 Public Information Meeting HAM-71-1.34, PID 87268 July 23, 2013 Project Overview Purpose
More information1. Upon receipt of a signed Budgetary Estimate, including an index number, the work of creating a Project begins as follows:
Project Development Revised 4/17/13 Process PROJECT INITIATION PHASE 1. Upon receipt of a signed Budgetary Estimate, including an index number, the work of creating a Project begins as follows: PRE-DESIGN
More informationFrederick. Frederick. Maryland. Smart Growth Successes. Frederick. Maryland Department of Planning
Frederick Frederick Maryland Smart Growth Successes Frederick Maryland Department of Planning Smart, Green & Growing Martin O Malley Governor Anthony G. Brown Lt. Governor Maryland Department of Planning
More informationMOTION NO. M2015-63 WSDOT Task Order for Final Design Services PROPOSED ACTION
MOTION NO. M2015-63 WSDOT Task Order for Final Design Services MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee 07/09/15 Final Action Ahmad Fazel, DECM Executive Director Ron Lewis, East
More informationRailyard Alternatives and I-280 Boulevard Feasibility Study. Planning Commission February 6, 2014
Railyard Alternatives and I-280 Boulevard Feasibility Study Planning Commission February 6, 2014 Problem Statement Major pieces of new infrastructure are planned including: Downtown Rail Extension (DTX)
More informationRevere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.
Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts Design and Development Guidelines Request for Qualifications and Expressions of Interest with Preliminary Development Plans Part
More informationWelcome to the 35/36th St Pedestrian Bridge Public Meeting
Welcome to the 35/ Pedestrian Bridge Public Meeting Preliminary Purpose The project s purpose is to provide additional pedestrian and bicycle connectivity over the heavy rail and commuter rail corridor
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MARCH 6, 2013 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Doris Nguyen, Associate
More informationPART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express
PART II SCHEDULE SECTION TITLE D E Scope of Services Special Terms and Conditions 11 SECTION D SCOPE OF SERVICES D.1 OVERVIEW A. The selected firm is referred to herein as either the Consultant or the
More informationCity Planning Heritage Preservation
1. Planning and Heritage This theme is examining the current built form, policy framework and zoning in the Study Area to help inform the larger Revitalization Initiative. Staff will bring forward recommendations
More informationDowntown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
More informationMEMORANDUM COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT
#19 MEMORANDUM COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT TO: SUBJECT: John C. Phillips, City Manager Downtown Riverfront Park Preliminary Design (Armory Park) REVISED Scope of Services Schreiber Anderson
More information3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
More informationCamden Community Conversation. Vibrancy Survey Results May 21, 2009
Camden Community Conversation Vibrancy Survey Results May 21, 2009 Prepared by Friends of Midcoast Maine For the Citizens of Camden Electronic survey and analysis by Jane Lafleur and Deborah Dodge. May
More informationOfficial Community Plan Guiding Principles:
Live, Work, Play CORPORATE STRATEGIC PLAN 2014-2015 Official Community Plan Guiding Principles: Sooke s Thriveability; Sustainability; Environmental Stewardship; Economic Diversification; Smart Growth;
More informationNew York Avenue-Florida Avenue- Galludet University Metro Station: A Case Study
New York Avenue-Florida Avenue- Galludet University Metro Station: A Case Study The New York Avenue-Florida Avenue-Galludet University Metro station in Washington DC is a result of planners and neighborhood
More information1. Consolidate Fire Chief and Police Chief positions into a Public Safety Director Position
City of Charlevoix 2014 Cooperation, Collaboration and Consolidation of Services Plan Category 2 of the State of Michigan Economic Vitality Incentive Program In an unique public/private cooperative effort,
More informationDENSITY AND PUBLIC SPACE AT BISHOP STREET
DENSITY AND PUBLIC SPACE AT BISHOP STREET Niehoff Urban Studio Senior Planning Capstone Spring 2015 Justin M. Lightfield U N I V E R S I T Y O F C I N C I N N A T I Table of Contents Overview... 3 Design
More informationDowntown Community Planning Council Meeting offebruary 18, 2015
- san diego Item #12 DATE ISSUED: ATTENTION: SUBJECT: February 13, 2015 Downtown Community Planning Council Meeting offebruary 18, 2015 Consideration of Support for Grant Applications for the San Diego
More informationRDA Development Opportunities
RDA Development Opportunities West Capitol Hill Development Opportunity Marmalade Block Development RDA hired Citiventure Associates to create a development strategy and implementation plan RDA property
More informationBicycle and Pedestrian Subcommittee (BPS) Recommendation FY 2015 Transportation Alternatives Program (TAP) Allocation
Bicycle and Pedestrian Subcommittee (BPS) Recommendation FY 2015 Transportation Alternatives Program (TAP) Allocation The Montgomery Metropolitan Planning Organization (MPO) receives a direct annual allocation
More informationCASE FILE NUMBER: LU 14-155978 HR SOLAR ARRAY GENERAL INFORMATION
Date: June 25, 2014 To: From: Interested Person Jennifer Kenny, Land Use Services 503-823-7011 / Jennifer.Kenny@portlandoregon.gov NOTICE OF A TYPE II DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD The Bureau
More informationHarlem River Bridges Access Plan
Harlem River Bridges Access Plan Workshop Round 2 September 10, 2015 Harlem River Bridges Access Plan: Overview Agenda Presentation: Background + overview of concepts for review (15 20 min) Participation:
More informationPREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN
TO: FROM: SUBJECT: Honorable Mayor and City Council Planning & Community Development Department PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN RECOMMENDATION: This report is for
More informationSeptember 2005. Sponsored by: John H. Chafee Blackstone River Valley National Heritage Corridor Commission Woonsocket, RI
Sponsored by: John H. Chafee Blackstone River Valley National Heritage Corridor Commission Woonsocket, RI Worcester Historical Museum Worcester, MA September 2005 mawald/ld/0909700/graphics/covers/september05cover
More informationSILICON VALLEY INTERNET CAPITAL 301 UNIVERSITY AVENUE, PALO ALTO, CALIFORNIA
Kaplan Architects is a San Francisco based architectural firm doing projects throughout the Bay Area and beyond. Edward Kaplan AIA, NCARB is an award winning, licensed architect and has been responsible
More informationSpace Management Guidelines
Virginia Commonwealth University Facilities Management Planning & Design Space Management Guidelines 700 West Grace Street Suite 1400 Richmond, VA 23284-3000 804-828-7006 SPACE MANAGEMENT GUIDELINES AND
More informationSchenk-Atwood Neighborhood Business District Master Plan
Schenk-Atwood Neighborhood Business District Master Plan Prepared for the Schenk-Atwood Revitalization Association (SARA) and the City of Madison SCHREIBER/ANDERSON ASSOCIATES, INC. BEST Real Estate Group,
More informationEDMONDS DOWNTOWN BUSINESS IMPROVEMENT DISTRICT REQUEST FOR PROPOSAL Branding/Marketing/Website Design
EDMONDS DOWNTOWN BUSINESS IMPROVEMENT DISTRICT REQUEST FOR PROPOSAL Branding/Marketing/Website Design RFP#13 001 PURPOSE: On behalf of the Edmonds Downtown Business Improvement District (EDBID), the EDBID
More informationREQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES
REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES Big Rapids Public Schools Building Program 2005 OWNER Big Rapids Public Schools 21034 15-Mile Road Big Rapids, Michigan 49307 PHONE: (231) 796-2627
More informationTechnical Memorandum: Land Use Study
2. Development Density The Lower East Side covers a large area, and so it is reasonable that it represents more than a third of all buildable surface area in the study area (Table 1). Looking at existing
More informationRequest for Proposal
Request for Proposal Business Plan for the Development of the North Bay Community Waterfront Park 1. Introduction: This Request for Proposal ( RFP ) seeks to establish a firm or consortium of firms ( Consultant
More informationCity Public Realm Framework Plan and MPRB Downtown Service Area Master Plan
City Public Realm Framework Plan and MPRB Downtown Service Area Master Plan Project Description The Minneapolis Parks and Recreation Board (MPRB) and the City of Minneapolis are beginning a planning process
More informationCarlsbad Springs Solar Project
Date: July 16, 2015 Qualified Applicant: Invenergy LLC 120 Front Street East, Suite 201 Toronto, ON M5A 4L9 Registered Proponent: Carlsbad Springs Solar Energy Partnership Email: carlsbadspringssolarinfo@invenergyllc.com
More informationREHABILITATION PACKAGE 1-a
1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened
More informationI-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015
I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General
More informationImplementing Plans Through Public / Private Partnerships
Implementing Plans Through Public / Private Partnerships WAPA / WASLA 2006 Spring Conference Mark A. Olinger Department of Planning & Development City of Madison April 7, 2006 Outline Planning s s Role
More informationUNION CITY BOARD OF EDUCATION 3912 BERGEN TURNPIKE UNION CITY, NEW JERSEY 07087 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES
UNION CITY BOARD OF EDUCATION 3912 BERGEN TURNPIKE UNION CITY, NEW JERSEY 07087 REQUEST FOR QUALIFICATIONS for CONSTRUCTION MANAGEMENT SERVICES for the Sara M. Gilmore Elementary School Renovation and
More informationLand Use and Zoning. Land Use Within the Port Madison Indian Reservation
Land Use and Zoning Land Use Within the Port Madison Indian Reservation A portion of the Suquamish Rural Village is Trust land, owned either by the Tribe or individual tribal members. The following list
More informationImplementing the Transportation Alternatives Program for the National Capital Region
Implementing the Transportation Alternatives Program for the National Capital Region Safe Routes to School Regional Meeting October 29, 2013 Sarah Crawford National Capital Region Transportation Planning
More informationCITY OF BELLEVUE CITY COUNCIL. Summary Minutes of Study Session. 6:00 p.m. Bellevue, Washington
CITY OF BELLEVUE CITY COUNCIL Summary Minutes of Study Session November 3, 2003 Council Conference Room 6:00 p.m. Bellevue, Washington PRESENT: ABSENT: Mayor Marshall, Deputy Mayor Degginger, and Councilmembers
More informationCHIPPEWA FALLS RIVERFRONT PARK
CHIPPEWA FALLS RIVERFRONT PARK PHASE 1: MASTER PLAN REVIEW AND EVALUATION E-NEWSLETTER #1 Friday, April 4, 2014 MISSION STATEMENT: VISION 2020 CHIPPEWA FALLS Enhance the natural beauty, recreational opportunity
More informationAlewife Working Group June 14, 2016
Alewife Working Group June 14, 2016 cambridgema.gov/citywideplan 1 Agenda What we ve heard Past plans and studies for Alewife Alewife Revitalization Plan (1979) Citywide Plan (1997-2000) Concord-Alewife
More informationSOUTH STREET LANDING AND RIVER HOUSE PROVIDENCE, RHODE ISLAND
PROJECT SUMMARY The $206 million development includes three separate projects (1 commercial, 1 residential, 1 parking garage) that will be permitted, designed and constructed on different schedules between
More informationINSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER
INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER JUNE 7, 2013 SUBMITTED TO: BOSTON REDEVELOPMENT AUTHORITY ONE CITY HALL SQUARE BOSTON, MA 02201
More informationExecutive Director s Recommendation Commission Meeting: March 5, 2015
Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States
More informationEanes Independent School District
EANES INDEPENDENT SCHOOL DISTRICT 601 Camp Craft Road Austin, Texas 78746 Request for Qualifications Construction Manager at Risk Services Eanes Independent School District Construct a District Operations
More informationADDENDUM No. 1. RFP No. 909. Request for Proposals for Architectural Services. Due: Tuesday, August 19, 2014 by 10:00 A.M.
ADDENDUM No. 1 RFP No. 909 Request for Proposals for Architectural Services Due: Tuesday, August 19, 2014 by 10:00 A.M. The following changes, additions, and/or deletions shall be made to the Request for
More informationISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning
Understanding the Hospital Planning, Design, and Construction Process Introduction California s acute care hospitals are an essential health care resource that serve a wide range of patients during times
More informationVillage of Dexter. Request for Architectural Services for Facilities Assessment
Village of Dexter Request for Architectural Services for Facilities Assessment The Village of Dexter is requesting proposals for architectural services for a facility assessment involving Village Offices
More informationInterior Design IV Gary Leivers AIA, RIBA, LEED AP
Interior Design IV Fall 2013 T-Th 7:00-9:40 Gary Leivers AIA, RIBA, LEED AP gpleivers@hedev.com 619 929 2854 COURSE OUTLINE Building on previously studied design concepts, you will apply your knowledge
More informationContext Sensitive Design for Urban Transportation in West Philadelphia
Context Sensitive Design for Urban Transportation in West Philadelphia Transportation Research Board 85 th Annual Meeting 24 January 2006 Jeffrey M. Casello University of Waterloo Robert Wright City of
More informationHard copies should be sent to: The Denver Waldorf School Attn: Lori Pucelik 940 Fillmore St Denver, CO 80206
April 24, 2013 RE: THE DENVER WALDORF SCHOOL SCHEMATIC DESIGN ARCHITECTURAL SERVICES REQUEST FOR PROPOSAL Dear Contact, Beecher Development Services has been retained by to provide Owners Representation
More informationPublic Art Opportunity Request for Qualifications (RFQ) Approximately $22,500 is available for public art
Orange County and the Orange County Convention Center Orlando, FL Public Art Opportunity Request for Qualifications (RFQ) Approximately $22,500 is available for public art The Orange County Public Art
More informationKEYPORT COMMUNITY PLAN
PLANNING COMMISSION TASKS Collect Public Comments on Draft Plan. Provide Clear Direction for: Preferred LAMIRD Boundary Lot Clustering Provision View Protection Recommendation to Board of County Commissioners.
More informationDOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094
DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094 A JOINT RESOLUTION OF THE GOVERNING BODIES OF DOUGLAS COUNTY AND THE CITY OF LAWRENCE CONCERNING THE SOUTH LAWRENCE TRAFFICWAY;
More informationchange your view 10 Exchange Place Jersey City, NJ
is a prestigious 30-story tower offering full floors of 24,000 SF to 39,000 SF of office space as well as smaller suite availabilities. Ideally situated on the Hudson River, is minutes to and from New
More informationPUBLIC FACILITY REHABILITATION AND ACTIVATION
PUBLIC FACILITY REHABILITATION AND ACTIVATION 60 BUFFALO S LWRP PROPOSED PROJECTS PF1. City Auto Impound City of Buffalo Terminus of Dart Street, immediately south of the Scajaquada Expressway and west
More informationREQUEST FOR PROPOSAL FOR ARCHITECTURAL DESIGN SERVICES. The Battery Conservancy
REQUEST FOR PROPOSAL FOR ARCHITECTURAL DESIGN SERVICES The Battery Conservancy Issue Date: March 23, 2012 Responses Due: April 20, 2012 Introduction The Battery Conservancy ( TBC ) is a 501(c)(3) not-for-profit
More informationPublic Spaces That Aren t Just an Afterthought
NY REAL ESTATE COMMERCIAL Public Spaces That Aren t Just an Afterthought Developers invest more in what were initially zoning concessions Rendering of the renovated public space at 180 Maiden Lane. PHOTO:
More informationP U B L I C F A C I L I T I E S R E V I E W C O M M I T T E E M E E T I N G
P U B L I C F A C I L I T I E S R E V I E W C O M M I T T E E M E E T I N G DATE: March 18, 2015 TIME: 7:00 p.m. Meeting PLACE: Abingdon Elementary School Media Center (Library) 3035 South Abingdon Street
More informationDesign-Build Process for Project Managers
Vermont Agency of Transportation Design-Build Process for Project Managers This document provides guidance on the preliminary engineering and procurement process and roles and responsibilities of key personnel
More informationCity of Tampa Zoning Districts
City of Tampa Zoning Districts The city is divided by chapter 2 into zoning districts, the boundaries and designations of which are shown in a series of maps, covering in combination the entire land and
More informationCapitalization and Depreciation of Property, Plant, and Equipment
Boston College Office of the Financial Vice President Capitalization and Depreciation of Property, Plant, and Equipment University Policy Overview It is the policy of Boston College (the University) to
More informationCobourg Tourism Asset Feasibility Study
Cobourg Tourism Asset Feasibility Study 1 P R E S E N T A T I O N T O C O B O U R G M U N I C I P A L C O U N C I L A U G U S T 1 0 TH, 2 0 1 5 Project Objectives Screen and assess the investment readiness
More informationDirector, Community Planning, Toronto and East York District 14 227468 STE 27 OZ & 14 227473 STE 27 RH
STAFF REPORT ACTION REQUIRED 68 & 70 Charles Street East & 628, 634, 636 & 638 Church Street- Zoning Amendment and Rental Housing Demolition Application under Municipal Code Chapter 667 Final Report Date:
More informationThe Physical and Economic Assessment
CHAPTER 2 The Physical and Economic Assessment 9 Chicago River North Branch 300 360 Chicago River Main Branch Lake Michigan Figure 2.2 The Street Grid extending in all directions allows the downtown to
More informationSTOP CONSOLIDATION TRANSIT STRATEGIES
TRANSIT STRATEGIES STOP CONSOLIDATION Transit stops are the places where people access transit service, and greatly impact many elements of passengers transit experiences. They are typically thought of
More informationREPORT CARD: The Economic Impacts of Historic Preservation in Michigan
Michigan Historic Preservation Network November 2006 REPORT CARD: The Economic Impacts of Historic Preservation in Michigan The building already has a story; all you do is add the next interesting chapter.
More informationSMCRA PROJECT NO: CRA 010713 REQUEST FOR LETTERS OF INTEREST & QUALIFICATIONS FOR DEVELOPMENT OF THE MADISON SQUARE MIXED-USE PROPERTY ASSEMBLAGE
SMCRA PROJECT NO: CRA 010713 REQUEST FOR LETTERS OF INTEREST & QUALIFICATIONS FOR DEVELOPMENT OF THE MADISON SQUARE MIXED-USE PROPERTY ASSEMBLAGE A REDEVELOPMENT OPPORTUNITY IN THE SOUTH MIAMI COMMUNITY
More informationMotorcycle & Pedestrian Master Plans in Indianapolis, Indiana
PROJECT PURPOSE The Warsaw + Winona Lake Bicycle and Pedestrian Master Plan establishes a comprehensive framework for a connected bicycle and pedestrian system that will be used for both recreation and
More informationThe Impact of Building Shape on Space Planning Efficiency By Randall Walker, AIA, Executive Vice President, Kirksey
The Impact of Building Shape on Space Planning Efficiency By Randall Walker, AIA, Executive Vice President, Kirksey What is the value of test-fitting a tenant into several prospective buildings? What variation
More information68 & 70 Charles Street East & 628, 634, 636 & 638 Church Street- Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 68 & 70 Charles Street East & 628, 634, 636 & 638 Church Street- Zoning Amendment Application - Preliminary Report Date: November 21, 2014 To: From: Wards: Reference Number:
More informationPhases 2 & 3, & Addendum Urban Structure Plan Options for West Whitby
7. 5 A d v a n t a g e s a n d D i s a d v a n t a g e s Table 22 summarizes the advantages and disadvantages of each option based on the evaluation of Table 16. Dillon Consulting Limited Page 75 Table
More informationCalifornia Community Colleges Online Education Initiative
California Community Colleges Online Education Initiative Common Course Management System (CCMS) Butte- Glenn Community College District (BGCCD) June 16, 2014 California Community Colleges Common Course
More informationThe Gateway Program and Hudson Tunnel Project
The Gateway Program and Hudson Tunnel Project Presented to: NJ State Senate Oversight Committee Stephen Gardner Executive Vice President NEC Business Development August 10, 2015 1 The Need for Gateway
More informationSummary Community Workshop #2 Fruitvale San Antonio Senior Center. Wednesday, April 22, 2009 7:00-9:00 p.m.
Summary Community Workshop #2 Wednesday, April 22, 2009 7:00-9:00 p.m. Workshop Format and Process The City of Oakland is preparing a Specific Plan that will help define and determine a common vision for
More informationVice President for Finance and Administration. Pratt Institute Brooklyn, NY
Vice President for Finance and Administration Pratt Institute Brooklyn, NY December 2014 Vice President for Finance and Administration Pratt Institute Pratt Institute, one of the nation s most respected
More information22.01 SETTLEMENT 24/04/2014 C73
22.01 SETTLEMENT 24/04/2014 C73 22.01-1 Urban Growth and Development 24/04/2014 C73 This policy applies to the urban areas and fringes of Portland, Heywood, Casterton, Dartmoor, Nelson, Cape Bridgewater,
More informationRESIDENTIAL DRIVEWAYS
RESIDENTIAL DRIVEWAYS If you have specific questions or want to confirm your plans, our staff is available to assist in person, by telephone, or by e-mail. City of St. Petersburg Division of Development
More informationBackground and Goals for the Project
City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering
More informationFinancing Options for the Ford Highland Park Project
Financing Options for the Ford Highland Park Project Prepared for: Woodward Heritage 5401 Woodward Avenue Detroit, Michigan 48202 Prepared by: 76 East Forest Avenue Detroit, Michigan 48201 December 2005
More informationGuiding Principles. McCauley Area Focused Urban Design Plan. 1 Connect: Chinatown and Little Italy with downtown and surrounding areas
McCauley Area Guiding Principles 1 Connect: Chinatown and Little Italy with downtown and surrounding areas 2 Strengthen: Cultural character in Chinatown and Little Italy 3 Develop: Strong East West pedestrian
More informationREQUEST FOR PROPOSAL FACILITIES MASTER PLAN PENNSYLVANIA HIGHLANDS COMMUNITY COLLEGE
101 Community College Way Johnstown, PA 15904 814.262.6400 1.888.385.PEAK www.pennhighlands.edu REQUEST FOR PROPOSAL FACILITIES MASTER PLAN PENNSYLVANIA HIGHLANDS COMMUNITY COLLEGE 1. Overview Pennsylvania
More informationPerformance Center/Block Revitalization Meeting Notes Summary
Performance Center/Block Revitalization Meeting Notes Summary Fall 2010 Meeting Schedule August 31: East End Neighborhood officers at ADC September 9: East End Association at East End September 23: Workshop
More informationSubmittal Requirements for Development Projects
Submittal Requirements for Development Projects 2004 Mission Statement: The Denver Urban Renewal Authority is a full-service redevelopment agency engaged in neighborhood and downtown revitalization, economic
More informationCITY OF SACRAMENTO CALIFORNIA. January 18, 2005 SUBJECT: APPROVAL OF FEDERAL TRANSPORTATION PRIORITIES FOR FY06 APPROPRIATIONS AND REAUTHORIZATION
DEPARTMENT OF TRANSPORTATION OFFICE OF THE DIRECTOR CITY OF SACRAMENTO CALIFORNIA 660 J STREET ROOM 250 SACRAMENTO, CA 95814-2413 PH 916-808-7100 FAX 916-264-5573 City Council Sacramento, California Honorable
More informationComprehensive Plan Committee Kick-off Meeting A G E N D A
Comprehensive Plan Committee Kick-off Meeting A G E N D A Monday, June 1, 2015, 5:30-7:00 PM 530 Evans Street Sheppard Memorial Library, Room A Greenville, NC 27858 1. Welcome and introductions Merrill
More informationCARMEL PLACE, NEW YORK, NY
CARMEL PLACE, NEW YORK, NY Carmel Place (formerly known as MY MICRO NY), winner of the adapt NYC competition, optimizes modular construction to provide the city with housing solutions for the expanding
More informationMAYOR S OFFICE OF TRANSPORTATION AND UTILITIES D E P U T Y M A Y O R R I N A C U T L E R
PARKLET GUIDELINES - HOW TO TURN A PARKING SPACE INTO TO A PARKLET 1 Spring is upon us, and that means we are all itching to get outside and enjoy our neighborhood. If you made it out to West Philly last
More informationEnvision Venice Strategic Plan for Fiscal Year Ending. September 30, 2016. Preserving and Enhancing the Venice Quality of Life.
Adopted April 28, 2015 October 1, 2015 through September 30, 2016 Envision Venice Strategic Plan for Fiscal Year Ending September 30, 2016 Preserving and Enhancing the Venice Quality of Life Table of Contents
More informationTHE VIRGINIA SHOW BUILDING Request for Proposals 5101-23 Virginia Avenue St. Louis, Missouri 63111
THE VIRGINIA SHOW BUILDING Request for Proposals 5101-23 Virginia Avenue St. Louis, Missouri 63111 SUBMISSION DEADLINE: NONE Community Development Administration and Land Reutilization Authority of the
More informationGold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road.
WELCOME Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road. The site covers approximately 0.37 hectares and
More informationTechnical Presentation 2012-11-09
Technical Presentation 2012-11-09 Forum Equity Partners is a leading Canadian infrastructure investment and development firm, specializing in public sector development opportunities and public-private
More informationCity of Red Wing REQUEST FOR QUALIFICATIONS. Levee Park - Riverboat & Transient Boat Dockage, Park and Promenade Improvements Professional Services
City of Red Wing REQUEST FOR QUALIFICATIONS Levee Park - Riverboat & Transient Boat Dockage, Park and Promenade Improvements Professional Services RFQ Release Date: November 2, 2015 Statement of Qualifications
More informationREBUILDING THE CTA FORREST CLAYPOOL, PRESIDENT CHRIS BUSHELL, SVP, INFRASTRUCTURE
REBUILDING THE CTA FORREST CLAYPOOL, PRESIDENT CHRIS BUSHELL, SVP, INFRASTRUCTURE Our Commitment: Increasing Investment Despite Lean Times Even while facing a $277M deficit, we are finding ways to rebuild
More information