1 Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States Postal Service REVIEW AUTHORITY Federal Project in the District 40 U.S.C. 8722(b)(1) NCPC FILE NUMBER 7643 NCPC MAP FILE NUMBER 52.00(38.00)44102 APPLICANT S REQUEST Preliminary and final approval of site development plans PROPOSED ACTION Approve as requested ACTION ITEM TYPE Consent Calendar PROJECT SUMMARY The United States Postal Service (USPS) proposes to reconfigure the existing employee south parking area to accommodate both employee and postal vehicles at the Curseen-Morris Processing and Distribution Center in Northeast Washington, DC. The south parking area currently accommodates 1219 employee vehicles; reconfiguration of the parking area will result in a total of 1088 parking spaces, with 197 assigned to postal vehicles in a secure area, and 891 assigned for employee parking. KEY INFORMATION The Curseen-Morris Processing and Distribution Center, at 680,000 square feet on acres, is a major mail distribution center for the region. Reconfiguration of the existing parking area allows the USPS to move an existing carrier operation from a nearby highcost leased facility into this USPS-owned facility. RECOMMENDATION The Commission: Approves the preliminary and final site development plans for the Curseen-Morris Processing and Distribution Center Parking Lot in Washington, DC.

2 Executive Director s Recommendation Page 2 PROJECT REVIEW TIMELINE Previous actions None. Remaining actions (anticipated) None. Prepared by J. Hinkle February 26, 2015

3 Executive Director s Recommendation Page 3 I. PROJECT DESCRIPTION Site / Background / Proposal The United States Postal Service (USPS) has requested preliminary and final approval of site development plans for a project to reconfigure an existing employee parking area to accommodate both employee and postal vehicles at the Curseen-Morris Processing and Distribution Center (P&DC) in Northeast Washington, DC. The P&DC is a 680,000-square-foot USPS-owned facility located on a acre site. The site is bound by Brentwood Road to the east and the Washington Metropolitan Area Transit Authority Metrorail and other rail tracks on the south and west. The Rhode Island Plaza low-rise commercial shopping center borders the site on the northeast. The Rhode Island Ave-Brentwood Metro station and new medium-density apartments are to the north of the site. While the facility maintains a public postal service center on the east side of the site with access from Brentwood Road, the facility is a major mail distribution center within the region. Figure 1: Project location within Northeast Washington

4 Executive Director s Recommendation Page 4 Figure 2:South parking area, the project site Apart from the P&DC structure, the majority of the site is developed with parking for both employees and postal vehicles, with a surplus of employee parking spaces for the current number of employees at the facility. There is a 9.3 acre employee parking lot on the south end of the building providing 1219 employee parking spaces. At the front entrance to the retail portion of the facility, there are 52 customer parking spaces and an additional 69 employee parking spaces. At the north end of the facility, there is a 7.8 acre parking lot for postal vehicles, including trucks and carriers, where carrier and truck loading and unloading currently occurs. As part of an USPS consolidation/optimization program, the USPS proposes to consolidate an existing carrier operation from a nearby high-cost leased facility into this USPS-owned branch. Due to new efficiencies in mail processing and sorting equipment, over time the amount of floor space required for these operations has decreased, freeing up floor area within the Curseen-Morris facility for additional carriers and allowing for the consolidation of facilities. Following the proposed consolidation, the USPS projects assigned employment at the facility to rise by 151, from 992 employees to However, even with the projected rise in employment, with nearby access to public transportation, including Metro bus stops and the Metro rail station, the total existing 1219 employee parking spaces at the south parking lot are no longer required. As

5 Executive Director s Recommendation Page 5 such, the USPS proposes to reorganize the south parking area to accommodate both postal vehicles and employee parking. The proposed parking layout will incorporate a secure fenced area for 197 postal carrier vehicles with three separate entrances to the secured area from within the existing employee parking lot. New pedestrian ramps from the processing and distribution center building to the secure parking area will allow for vehicle loading and unloading. Placement of the secured parking area will require the relocation of handicap parking spaces and a number of employee parking spaces to elsewhere in the south parking lot. Currently, the lower end of the south parking lot is unused due to the decline in the number of employees required at this facility, and as such the proposed layout will fully utilize that portion of the parking lot for employee parking. With the reorganized parking layout, the total number of parking spots in the south parking lot will be reduced by 131 spaces. The majority of the existing asphalt parking areas and associated concrete sidewalks, curbs and driveways are in good condition and most of the existing materials will remain in place in the reorganization of the parking lot. To accommodate the reconfigured parking area minor internal island areas with landscaping and 16 existing trees will be removed and replaced at a one-to-one ratio with new landscaped islands and trees. Construction is anticipated to begin in the summer of 2015 with a completion in the fall of The project is estimated to cost approximately $1,352,000. Figure 3: Existing condition of the area of the proposed reconfigured parking, with the parking islands to be removed identified

6 Executive Director s Recommendation Page 6 Figure 4: Site plan of the reconfigured parking area, with the new parking islands and landscaping highlighted II. PROJECT ANALYSIS/CONFORMANCE The project will reconfigure an existing employee parking area to accommodate both postal vehicles and employee parking. The postal vehicles will be within a new secured area designed to allow for loading and unloading of the currier vehicles. Much of the existing paving, curbs, sidewalks, and driveways will remain. Minimal site disturbance will occur; this disturbance will involve the reconfiguration of the parking lot islands, removal of existing trees and the planting of new trees at a one-to-one ratio, the placement of a new security fence, and new pedestrian ramps from the postal building to the secure postal vehicle parking area. The Comprehensive Plan for the National Capital (Comprehensive Plan) provides goals and policies that guide the Commission in evaluating and acting on plans and projects in the National Capital Region. The proposed project is generally consistent with the Comprehensive Plan and in particular, the consolidation of postal operations is consistent with the policy in the Federal Workplace Element that encourages the federal government to utilize available federally owned land or space before leasing land or building space, and to monitor utilization rates of land and

7 Executive Director s Recommendation Page 7 building space to ensure their efficient use. While the site will remain above the Comprehensive Plan s recommended ratio of 0.25 employee parking spaces per every employee for federal facilities within the historic boundaries of the District of Columbia, the project does reduce available employee parking in the south parking area by 328 spaces (131 existing parking spaces will be eliminated, another 197 will be newly designated for postal vehicle use). Combined with a projected increase in assigned employment at the facility by 151 (from 992 to 1143), the parking ratio will move closer to NCPC s recommended ratio for employee parking (the current ratio is 1.30 parking spaces per employee, or 1288 spaces for 992 employees); post reconfiguration of the south parking area the ratio will become 0.84 parking spaces per employee, or 960 spaces for 1143 employees). The USPS should continue to strive to meet the NCPC recommended ratio of 0.25 employee parking spaces per every employee as future projects at the facility are proposed. Parking Spaces per Employees Existing Employee Parking South area 1219 East area 69 Total 1288 Existing employees: 992 Spaces per employee: 1.30 Proposed Employee Parking South area 891* East area 69 Total 960 Projected employees: 1143 Spaces per employee: 0.84 * Reduced by 328; 131 parking spaces are eliminated, 197 parking spaces are designated for USPS currier vehicles While the consolidation of postal operations at the facility will increase the number of postal vehicles using the site, the increase is not expected to negatively impact area traffic as the site continues to operate with less employees and less employee traffic than it was initially designed to accommodate. As the proposed reconfiguration of the south parking area does not modify the use of the site as a postal facility and supports the Comprehensive Plan s policy to consolidate federal facilities where efficiencies can be gained, involves minimal modifications to existing conditions, and improves upon the facility s employee parking ratio, NCPC staff recommends that the Commission approve the preliminary and final site development plans for the Curseen-Morris Processing and Distribution Center Parking Lot.

8 Executive Director s Recommendation Page 8 National Environmental Policy Act (NEPA) In conformance with the National Environmental Policy Act, the USPS has determined that this proposed project qualifies for a Categorical Exclusion under section (e)(11) of 39 CFR Section (e)(11) allows a Categorical Exclusion for the Expansion or improvement of an existing facility where the expansion is within the boundaries of the site or occurs in a previously developed area unless the proposed action is listed as requiring an EA in NCPC has its own review requirements under NEPA and has determined that the proposed project qualifies for a Categorical Exclusion C.21. under Section 8 of its Environmental and Historic Preservation Policies and Procedures. C.21. applies to the Review and approval of acquisition of occupiable space by lease acquisition, construction, or expansion, or improvement of an existing facility where all of the following conditions are met: (a) The structure and proposed use are in compliance with local planning and zoning and any applicable District of Columbia, state, or federal requirements; (b) The proposed use will not substantially increase the number of motor vehicles at the facility; (c) The site and the scale of construction are consistent with those of existing adjacent or nearby buildings; and (d) There is no evidence of community controversy or other environmental issues. National Historic Preservation Act (NHPA) In conformance with the National Historic Preservation Act, the USPS determined that the project would have no adverse effect on historic properties including archaeological resources included in, or eligible for inclusion in, the National Register of Historic Places. A cemetery was located to the north of the subject property, but there are no indications that the cemetery extended to the location of the parking lot. The District of Columbia State Historic Preservation Officer concurred with the USPS determination and indicated that there were no archaeological concerns regarding the project. NCPC also has an independent responsibility to comply with NHPA and NCPC has elected to designate the USPS as lead agency pursuant to 36 CFR (a)(2). III. CONSULTATION Coordination with local agencies The Coordinating Committee reviewed the proposal at its February 11, 2015 meeting. The Committee forwarded the proposed preliminary and final site development plans to the Commission with the statement that the proposal has been coordinated with all participating agencies. The participating agencies were: NCPC; the District Department of Planning; the District of Columbia Historic Preservation Office; the District Department of Transportation; the General Services Administration; the National Park Service; and the Washington Metropolitan Area Transit Authority.

Executive Director s Recommendation Commission Meeting: November 5, 2015

Executive Director s Recommendation Commission Meeting: November 5, 2015 Executive Director s Recommendation Commission Meeting: November 5, 2015 PROJECT Surface Parking Lots Fort Belvoir, North Area Fort Belvoir, Virginia SUBMITTED BY United States Department of Defense, Department

More information

Executive Director s Recommendation Commission Meeting: July 11, 2013

Executive Director s Recommendation Commission Meeting: July 11, 2013 Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: November 5, 2015

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: November 5, 2015 PLANNED UNIT DEVELOPMENT STAFF REPORT Date: November 5, 2015 DEVELOPMENT NAME Maritech Marine Subdivision, Phase 2 LOCATION 915 South Lawrence Street (West side of Lawrence Franklin Connector at the West

More information

Environmental Impact Statement for the Washington Union Station Expansion Project

Environmental Impact Statement for the Washington Union Station Expansion Project This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

PLANNING DIVISION STAFF REPORT February 23, 2015. Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810

PLANNING DIVISION STAFF REPORT February 23, 2015. Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810 PLANNING DIVISION STAFF REPORT PREPARED FOR THE PLAN COMMISSION Project Address: Application Type: Legistar File ID # 36810 Prepared By: Summary Conditional Use Timothy M. Parks, Planning Division Report

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

NEPA DOCUMENT MANAGER

NEPA DOCUMENT MANAGER MEMORANDUM FOR NEPA FILE FROM: SUBJECT: MARK LUSK NEPA DOCUMENT MANAGER Supplement Analysis for the Exide Technologies' Proposed Project under the Electric Drive Vehicle Battery and Component Manufacturing

More information

Requested Action: Special Use Permit to allow an Auto Service Station with Convenience Mart within the B-2 District. NORTH

Requested Action: Special Use Permit to allow an Auto Service Station with Convenience Mart within the B-2 District. NORTH STAFF DEVELOPMENT COMMITTEE REPORT To: Plan Commission Prepared By: Sam Hubbard, Development Planner Meeting Date: October 26, 2016 Date Prepared: October 21, 2016 Project Title: Marathon Gas Station Redevelopment

More information

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of

More information

FOR SALE. The Friedman Building 1701 18th Avenue South, Seattle 98144. Nicholas T. Gill 206.505.9410. Allan Friedman. 206.505.

FOR SALE. The Friedman Building 1701 18th Avenue South, Seattle 98144. Nicholas T. Gill 206.505.9410. Allan Friedman. 206.505. FOR SALE FOR MORE INFORMATION PLEASE CONTACT: The Friedman Building 1701 18th Avenue South, Seattle 98144 PRICE: $4,800,000 FEATURES: LAND SF: 40,000 SF + Fantastic Large Townhome Site BUILDING SF: 33,332

More information

WHEREAS, the underground garage is being jointly funded by the DCC and the USCAAF; and

WHEREAS, the underground garage is being jointly funded by the DCC and the USCAAF; and GSA National Capital Region MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES GENERAL SERVICES ADMINISTRATION, THE DISTRICT OF COLUMBIA COURTS, THE UNITED STATES COURT OF APPEALS FOR THE ARMED FORCES, THE

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Consent Agenda Date: 3/3/2016 Pike and Rose Phase II Limited Amendment Site Plan No. 82013012B Mike

More information

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box

More information

(2) To provide information so that plant materials can be appropriately selected and properly used.

(2) To provide information so that plant materials can be appropriately selected and properly used. YUBA COUNTY LANDSCAPING ORDINANCE 12.87.010 Findings Whenever large numbers of people are closely grouped together in an urban environment, numerous landscape decisions must be made to accommodate their

More information

7.0 City of Woodstock Land Use Policies. 7.4 Community Facilities and Minor Institutional Uses

7.0 City of Woodstock Land Use Policies. 7.4 Community Facilities and Minor Institutional Uses 7.0 City of Woodstock Land Use Policies 7.4 Community Facilities and Minor Institutional Uses 7.4.1 Strategic Approach In keeping with the initiatives set out in the Municipal Development Strategy, and

More information

Finding of No Significant Impact

Finding of No Significant Impact Finding of No Significant Impact PROPOSED CONSTRUCTION AND OPERATION OF OPERATIONAL READINESS TRAINING COMPLEX FORT HUNTER LIGGETT, MONTEREY COUNTY, CALIFORNIA Pursuant to the Council on Environmental

More information

RESIDENTIAL DRIVEWAYS

RESIDENTIAL DRIVEWAYS RESIDENTIAL DRIVEWAYS If you have specific questions or want to confirm your plans, our staff is available to assist in person, by telephone, or by e-mail. City of St. Petersburg Division of Development

More information

FINAL SITE PLAN CHECKLIST

FINAL SITE PLAN CHECKLIST For Official Use Only PC Case Number: Planner: DRC Date: Planning Department *140 W. Patrick Street * Frederick, Maryland 21701 * 301-600-1499 FINAL SITE PLAN CHECKLIST The following is a checklist which

More information

Request Conditional Use Permit (Automobile Repair Garage and Bulk Storage) Staff Planner Jimmy McNamara

Request Conditional Use Permit (Automobile Repair Garage and Bulk Storage) Staff Planner Jimmy McNamara Applicant Property Owner J & J Shikellamy, LLC Public Hearing March 9, 2016 (Deferred on 02/10/2016) City Council Election District Beach Agenda Item D2 Request Conditional Use Permit (Automobile Repair

More information

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North STAFF REPORT December 20, 2004 To: From: Subject: North District Community Council Director of Community Planning - North Preliminary Report Respecting Revised Application OPA & Rezoning Application 01

More information

FILE NO.: Z-8403. LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street

FILE NO.: Z-8403. LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street FILE NO.: Z-8403 NAME: Glason Short-form POD LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street DEVELOPER: Dennis Glason c/o the Law Office of Simmons S.

More information

CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS. TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL.

CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS. TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL. CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL June 10, 2008 I. INTRODUCTION The for the Central Corridor LRT project

More information

Chapter 16.44. MANUFACTURED AND MOBILE HOMES AND TRAILER PARKS (Ord. 890 section 42, 1993)

Chapter 16.44. MANUFACTURED AND MOBILE HOMES AND TRAILER PARKS (Ord. 890 section 42, 1993) Chapter 16.44 MANUFACTURED AND MOBILE HOMES AND TRAILER PARKS (Ord. 890 section 42, 1993) Sections: 16.44.010 Regulations generally. 16.44.020 Plot plans. 16.44.030 Standards and criteria. 16.44.040 Parking

More information

BEACON AVENUE URBAN RENEWAL PROJECT

BEACON AVENUE URBAN RENEWAL PROJECT BEACON AVENUE URBAN RENEWAL PROJECT City of Jersey City Adopted May, 1976 Block and Lot Updates August 6, 2012 Amended September 13, 2012 DIVISION OF CITY PLANNING Beacon Avenue Urban Renewal Project Table

More information

North Face. South Face. Figure 1.1-2 Science Park Station Exteriors. Pg 1-3 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

North Face. South Face. Figure 1.1-2 Science Park Station Exteriors. Pg 1-3 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY North Face South Face MASSACHUSETTS BAY TRANSPORTATION AUTHORITY Pg 1-3 Figure 1.1-2 Science Park Station Exteriors MASSACHUSETTS BAY TRANSPORTATION AUTHORITY Pg 1-4 Figure 1.1-3 Science Park Station Platform

More information

PLANNING COMMISSION REPORT

PLANNING COMMISSION REPORT PLANNING COMMISSION REPORT REZONING CASE NO. RZ-12-003 REPORT DATE: August 20, 2012 CASE NAME: 6010 W 1 st Avenue Rezoning PLANNING COMMISSION DATE: September 5, 2012 ADDRESS OF REZONING PROPOSAL: 6010

More information

ARTICLE IV. DRIVEWAYS

ARTICLE IV. DRIVEWAYS ARTICLE IV. DRIVEWAYS 10-20-390 Definitions. For purposes of this article, the following definitions shall apply: Commercial driveway means any Class B driveway as specified in section 10-20- 420 of this

More information

City of Portsmouth Application for Driveway Permit Contact Information

City of Portsmouth Application for Driveway Permit Contact Information City of Portsmouth Application for Driveway Permit Contact Information Dave Desfosses djdesfosses@cityofportsmouth.com (603) 766-1411 Forms can be completed and mailed to: Dave Desfosses Dept. of Public

More information

Approval of Term Sheet for New Carrollton Joint Development

Approval of Term Sheet for New Carrollton Joint Development Planning, Program Development and Real Estate Committee Item V B January 8, 2015 Approval of Term Sheet for New Carrollton Joint Development Washington Metropolitan Area Transit Authority Board Action/Information

More information

Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon.

Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon. Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, ARC-RP-A-002 Prepared by ARCMC Ltd July 2012: Issue A Contents 1. Introduction 2. Application Proposal

More information

CITY OF WEST PALM BEACH PLANNING BOARD Meeting Date: September 24, 2012 Planning Board Case No. 1248Q

CITY OF WEST PALM BEACH PLANNING BOARD Meeting Date: September 24, 2012 Planning Board Case No. 1248Q CITY OF WEST PALM BEACH PLANNING BOARD Meeting Date: September 24, 2012 Planning Board Case No. 1248Q Morse Life Major Planned Development Amendment Location Aerial I. REQUEST Morse Campus outlined in

More information

BLOCK 400 PLANNED COMMUNITY DISTRICT

BLOCK 400 PLANNED COMMUNITY DISTRICT BLOCK 400 PLANNED COMMUNITY DISTRICT Newport Center December 1983 Newport Beach, California Ordinance 88-119 Adopted December 12, 1988 Amendment No. 672 Resolution No. 95-115 Adopted October 9, 1995 Amendment

More information

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY The term " Complete Streets" describes a comprehensive, integrated transportation network with

More information

D3 April 8, 2015 Public Hearing

D3 April 8, 2015 Public Hearing D3 April 8, 2015 Public Hearing APPLICANT AND PROPERTY OWNER: ASSEMBLY OF YAH, INC. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Religious Facility - church) ADDRESS / DESCRIPTION: 5151 Locke

More information

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST August 2003 Background: The Federal Highway Administration (FHWA) has retained all approval rights to the control

More information

Landscaping Regulations

Landscaping Regulations 1003.162 Landscaping Regulations 1. Scope of Provisions. This section contains the landscaping regulations that apply to all zoning districts. Developments subject to the conditional use permit procedure

More information

Lot Line Adjustment & Street Vacation Application

Lot Line Adjustment & Street Vacation Application Community Development Department Planning Division 26135 Mureau Road Calabasas, CA 91302-3172 T: 818.878.4225 F: 818.878.4208 www.cityofcalabasas.com Lot Line Adjustment & Street Vacation Application PROPERTY

More information

Minor Accommodation Planning Review Application

Minor Accommodation Planning Review Application City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 Tel. (310) 285 1141 Fax. (310) 858 5966 Planning Review Overview: Minor Accommodation Planning Review Application Before

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

City Code of ANN ARBOR, MICHIGAN Chapter 55 Zoning

City Code of ANN ARBOR, MICHIGAN Chapter 55 Zoning ARTICLE II. USE REGULATIONS 5:10.2. R1A, R1B, R1C, R1D single family dwelling district (1) Intent. (a) These single family residential districts are designed to provide an environment of predominantly

More information

ELEMENT 4 - FUTURE LAND USE ELEMENT

ELEMENT 4 - FUTURE LAND USE ELEMENT ELEMENT 4 - FUTURE LAND USE ELEMENT Goal 1 To create a long-range development pattern which directs growth into developable areas and away from environmentally sensitive areas, in a manner that is compatible

More information

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop FILE NO.: Z-8958 NAME: Rock Structure Repair Short-form PID LOCATION: Located at 8024 Stanton Road DEVELOPER: Rock Structure Repair Attn. Rudy Gutierrez 3 Kipling Court Little Rock, AR 72209 ENGINEER:

More information

LONDON ROAD SEVENOAKS

LONDON ROAD SEVENOAKS WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission

More information

TOWN BOARD OF THE TOWN OF NORTH SALEM WESTCHESTER COUNTY, NEW YORK LOCAL LAW # OF THE YEAR 2012

TOWN BOARD OF THE TOWN OF NORTH SALEM WESTCHESTER COUNTY, NEW YORK LOCAL LAW # OF THE YEAR 2012 TOWN BOARD OF THE TOWN OF NORTH SALEM WESTCHESTER COUNTY, NEW YORK LOCAL LAW # OF THE YEAR 2012 CHAPTER 250, ZONING ORDINANCE AMENDMENTS - PD-CCRC DISTRICT Section 1. Purpose: The purpose of this Local

More information

Chapter 7 ZONING PLAN

Chapter 7 ZONING PLAN Chapter 7 ZONING PLAN Introduction This Chapter opens with a general description of a zoning plan. It is followed by a brief explanation of the relationship between this Growth Management Plan and the

More information

Florida Avenue Multimodal Transportation Study. June 19, 2013

Florida Avenue Multimodal Transportation Study. June 19, 2013 Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights

More information

REAL ESTATE ACQUISITION

REAL ESTATE ACQUISITION REAL ESTATE ACQUISITION Summary of Real Estate Acquisition Guidelines Planning Phase 1. Define the right-of-way needed through preliminary design of the project; 2. Obtain surveys for right-of-way needed;

More information

Bicycle and Pedestrian Facility Design Discussion

Bicycle and Pedestrian Facility Design Discussion HEAL Active Transportation Bicycle and Pedestrian Facility Design Discussion September 9, 2014 Major Design Considerations Rural and urban Areas Sidewalk location considerations Crosswalk locations and

More information

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM CITYOFOBERLIN OHIO CITY OF OBERLIN, OHIO FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM Background In October, 2011, the City of Oberlin Planning

More information

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing

More information

PART 9 LANDSCAPE REGULATIONS

PART 9 LANDSCAPE REGULATIONS PART 9 LANDSCAPE REGULATIONS SECTION 88 APPLICABILITY (1) Any new Development shall require Landscaping of the Site in accordance with this Section where applicable. An expansion or change to an existing

More information

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL A division of Hudson Group Ltd ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1 Inner Business Zone Outer Business Zone PALMERSTON NORTH CITY COUNCIL 1 2 A division of Hudson Group Ltd Prepared

More information

Dorchester County Proposed Rural Zoning Districts and Development Options

Dorchester County Proposed Rural Zoning Districts and Development Options Dorchester County Proposed Rural Zoning Districts and Development Options PLANNING COMMISSION PUBLIC MEETINGS January 2012 Table of Contents Glossary... 1 Why Zoning?... 3 Types of Uses and Required Permitting

More information

CHECKLIST FOR DEVELOPMENT DESIGN REVIEW & ADMINISTRATIVE SITE PLAN

CHECKLIST FOR DEVELOPMENT DESIGN REVIEW & ADMINISTRATIVE SITE PLAN CITY OF FONTANA Planning Division 8353 Sierra Avenue, Fontana CA 92335 (909) 350-7640 CHECKLIST FOR DEVELOPMENT DESIGN REVIEW & ADMINISTRATIVE SITE PLAN SECTION 1: Application Procedure and Filing Requirements

More information

PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN

PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN TO: FROM: SUBJECT: Honorable Mayor and City Council Planning & Community Development Department PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN RECOMMENDATION: This report is for

More information

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015 AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015 The Planning and Development Department hereby forwards

More information

CERTIFICATE OF APPROVAL OF LOCATION (CAL) APPLICATION Page 2

CERTIFICATE OF APPROVAL OF LOCATION (CAL) APPLICATION Page 2 C ITY OF N EW H AVEN, CONNECTICUT NEW HAVEN CITY PLAN COMMISSION 5 th Floor PHONE 203.946.6378 165 CHURCH STREET NEW HAVEN, CONNECTICUT 06510-2010 FAX 203.946.7815 FOR CITY USE ONLY CAL Filing Type Fee

More information

SHELL GAS STATION AND CONVENIENCE STORE REMODEL P ; DESIGN REVIEW APN ; 7473 REDWOOD BOULEVARD

SHELL GAS STATION AND CONVENIENCE STORE REMODEL P ; DESIGN REVIEW APN ; 7473 REDWOOD BOULEVARD DESIGN REVIEW COMMISSION (DRC) STAFF REPORT (Workshop) WORKSHOP DATE: August 19th, 2015 STAFF: SUBJECT: Matt Gilster, Planner I (415) 493-4708; mgilster@novato.org SHELL GAS STATION AND CONVENIENCE STORE

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Implementing the Transportation Alternatives Program for the National Capital Region

Implementing the Transportation Alternatives Program for the National Capital Region Implementing the Transportation Alternatives Program for the National Capital Region Safe Routes to School Regional Meeting October 29, 2013 Sarah Crawford National Capital Region Transportation Planning

More information

Advisory Council On Historic Preservation

Advisory Council On Historic Preservation Advisory Council On Historic Preservation The Old Post Office Building 1100 Pennsylvania Avenue, NW, #809 Washington, DC 20004 MEMORANDUM OF AGREEMENT AMONG THE U.S. DEPARTMENT OF HOUSING AND URBAN Al'ID

More information

REZONE OF 2728 LINCOLN WAY, 112 AND 114 S. HYLAND AND 115 S

REZONE OF 2728 LINCOLN WAY, 112 AND 114 S. HYLAND AND 115 S ITEM #: 34 DATE: 09-27-16 COUNCIL ACTION FORM SUBJECT: REZONE OF 2728 LINCOLN WAY, 112 AND 114 S. HYLAND AND 115 S. SHELDON AVENUE FROM RH (RESIDENTIAL HIGH DENSITY) AND O-UIW (UNIVERSITY WEST IMPACT OVERLAY)

More information

ARTICLE 887. PD 887. Valley View - Galleria Area Special Purpose District

ARTICLE 887. PD 887. Valley View - Galleria Area Special Purpose District ARTICLE 887. PD 887. Valley View - Galleria Area Special Purpose District SEC. 51P-887.101. LEGISLATIVE HISTORY. PD 887 was established by Ordinance No. 29032, passed by the Dallas City Council on June

More information

Beaverton Arts Program 2016 Temporary Sculpture Call for Artists Call to Artists Temporary Sculpture Installation Beaverton, Oregon

Beaverton Arts Program 2016 Temporary Sculpture Call for Artists Call to Artists Temporary Sculpture Installation Beaverton, Oregon Short Description: Overview: Sculptors are invited to submit images of existing sculptural works for temporary placement (24 months) in prominent outdoor settings in Beaverton, seven miles west of Portland,

More information

RESOLUTION NO. R Operations and Maintenance Satellite Facility Baseline Scope, Schedule and Budget, Phase Gates 5 & 6, and Facility Naming

RESOLUTION NO. R Operations and Maintenance Satellite Facility Baseline Scope, Schedule and Budget, Phase Gates 5 & 6, and Facility Naming RESOLUTION NO. R2016-18 Operations and Maintenance Satellite Facility Baseline Scope, Schedule and Budget, Phase Gates 5 & 6, and Facility Naming MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Board

More information

Opal Service District Plan

Opal Service District Plan 8 The Opal Service District includes a variety of planned land uses including commercial, mixed-use, flex office, industrial, and hospitality. This Plan seeks to simplify the land use categories to allow

More information

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program Capacity Deficiency Project Application Jackson MPO Surface Transportation Program The following information must be completed for all Capacity Deficiency proposed Jackson MPO STP projects. MPO staff will

More information

ZONING SITE PLAN APPLICATION FOR RESIDENTIAL DEVELOPMENT (Multiple-family dwellings, Mobile home parks, Townhouses, and Cluster housing developments)

ZONING SITE PLAN APPLICATION FOR RESIDENTIAL DEVELOPMENT (Multiple-family dwellings, Mobile home parks, Townhouses, and Cluster housing developments) ZONING SITE PLAN APPLICATION FOR RESIDENTIAL DEVELOPMENT (Multiple-family dwellings, Mobile home parks, Townhouses, and Cluster housing developments) Shenandoah County Office of Community Development 600

More information

6 October 9, 2013 Public Hearing APPLICANT AND PROPERTY OWNER: LYNNHAVEN SHOPPING CENTER

6 October 9, 2013 Public Hearing APPLICANT AND PROPERTY OWNER: LYNNHAVEN SHOPPING CENTER 6 October 9, 2013 Public Hearing APPLICANT AND PROPERTY OWNER: LYNNHAVEN SHOPPING CENTER STAFF PLANNER: Kristine Gay REQUEST: Conditional Use Permit (Indoor Commercial Recreation Facility) ADDRESS / DESCRIPTION:

More information

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101

More information

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT PLANNING AND ZONING BOARD STAFF REPORT TO: Planning and Zoning Board FROM: Carlos M. Rivero, City Planner DATE: May 11, 2015 RE: International

More information

COTA Bus, Vehicle Maintenance and Repair Facility

COTA Bus, Vehicle Maintenance and Repair Facility COTA Bus, Vehicle Maintenance and Repair Facility During the planning stage of COTA s new facilities, a Title VI equity analysis is required. The purpose of the study is to ensure that COTA selects a location

More information

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals: Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota Land Use Goals: 1. Growth in Wadena will be undertaken in such a manner as to create a full range of living, working, shopping,

More information

Block A-24 REDEVELOPMENT PLAN

Block A-24 REDEVELOPMENT PLAN Block A-24 REDEVELOPMENT PLAN TABLE OF CONTENTS I. Introduction II. Description of Project Area A. Existing Uses and Conditions B. Boundary Description III. Goals and Objectives IV. Redevelopment Activities

More information

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations

More information

Site Plan Approval. (2) Applicability

Site Plan Approval. (2) Applicability (H) Site Plan Approval Commentary Current 10-2 sets out site plan procedures that require all but some very minor developments to go through a long review process involving approval by the City Commission

More information

Implementing Instructions - Sustainable Locations for Federal Facilities

Implementing Instructions - Sustainable Locations for Federal Facilities Implementing Instructions - Sustainable Locations for Federal Facilities Page 1 Background On October 5, 2009, President Obama signed Executive Order (E.O.) 13514, Federal Leadership in Environmental,

More information

IV. LIGHTING. General Lighting Principles

IV. LIGHTING. General Lighting Principles IV. LIGHTING Introduction General Lighting Principles Driveways Parking Lots, Outdoor Sales & Service Areas Pedestrian Spaces Building Facades & Landscape Lighting Gas Station, Convenience Stores & Drive-Through

More information

Southern California International Gateway Project Description

Southern California International Gateway Project Description Southern California International Gateway Project Description Introduction This Supplemental Notice of Preparation and Initial Study is to inform Responsible, Trustee Agencies, and the public that the

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Elba Liquefaction Company, L.L.C. Southern LNG Company, L.L.C. Elba Express Company, L.L.C. Docket No. PF13-3-000 NOTICE OF INTENT TO PREPARE

More information

EMERYVILLE PLANNING COMMISSION STAFF REPORT. Planning and Building Department Economic Development & Housing Department City Attorney s Office

EMERYVILLE PLANNING COMMISSION STAFF REPORT. Planning and Building Department Economic Development & Housing Department City Attorney s Office EMERYVILLE PLANNING COMMISSION STAFF REPORT Agenda Date: September 24, 2009 Report Date: September 17, 2009 TO: FROM: SUBJECT: Planning Commission Planning and Building Department Economic Development

More information

Joint Development and Real Estate Committee. Board Item I-A. March 25, 2010

Joint Development and Real Estate Committee. Board Item I-A. March 25, 2010 Joint Development and Real Estate Committee Board Item I-A March 25, 2010 Negotiate and Execute an Easement Agreement with the District of Columbia for the Metropolitan Branch Trail Bridge at Rhode Island

More information

154.037 FENCES. (B) General requirements.

154.037 FENCES. (B) General requirements. 154.037 FENCES. Every fence constructed or erected in the city shall comply with the regulations of this section. No fence shall be erected or constructed until a permit has been issued in accordance with

More information

Board of Adjustment. Case Report A-29-16. 6001 Lead Mine Road Location Map. Case File:

Board of Adjustment. Case Report A-29-16. 6001 Lead Mine Road Location Map. Case File: Case File: A-29-16 Board of Adjustment Case Report City of Raleigh Planning & Development Department One Exchange Plaza Raleigh, NC 27601 (919) 996-2475 www.raleighnc.gov Case File: Property Address: Property

More information

UPMC Mercy Master Plan

UPMC Mercy Master Plan UPMC Mercy Master Plan U P M C M e r c y : T h e n & N o w Maintained UPMC Mercy s Catholic mission; increased uncompensated care by 15%. Preserved existing jobs; increased employment by 243 jobs. Approximately

More information

3 September 9, 2015 Public Hearing

3 September 9, 2015 Public Hearing 3 September 9, 2015 Public Hearing APPLICANT: PI TELECOM INFRASTRUCTURE T, LLC PROPERTY OWNER: JSW HOLDINGS, LLC STAFF PLANNER: Carolyn A.K. Smith REQUEST: Conditional Use Permit (communications tower-monopole)

More information

Libor DRAFT Plan. Improve existing gravel parking area to create 12 parking spaces.

Libor DRAFT Plan. Improve existing gravel parking area to create 12 parking spaces. Libor DRAFT Plan Improve existing gravel parking area to create 12 parking spaces. Expand parking area to create 25 additional spaces with 2 van accessible ADA compliant handicapped stalls with asphalt

More information

ORDINANCE NO. BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF TWIN FALLS, IDAHO:

ORDINANCE NO. BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF TWIN FALLS, IDAHO: ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TWIN FALLS, IDAHO, AMENDING CHAPTER 18 OF TITLE 3 OF THE TWIN FALLS CITY CODE REGULATING MOBILE AND MOTORIZED FOOD CONCESSIONAIRES BY REORGANIZNG

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED 2 and 50 Sheppard Avenue East (Entrance Connection to Sheppard- Yonge Station) Date: July 11, 2016 To: From: TTC Board Chief Executive Officer Summary A redevelopment of the

More information

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 8.12 AGENDA TITLE: MEETING DATE: May 13, 2015 PREPARED BY: Adopt a resolution finding the Intelligent Transportation System Phase 4 Project (WTC001)

More information

Oneida Campus. Workforce Investment Area 4

Oneida Campus. Workforce Investment Area 4 OVERTON WHITE SCOTT CAMPBELL MORGAN ANDERSON UNION KNOX CUMBERLAND ROANE SEVIER BLOUNT N IN EI GS MONROE M CM RH EA LOUDON M TCAT Oneida/Huntsville is located in Local Workforce Investment Area 4, which

More information

PLANNING COMMISSION REPORT

PLANNING COMMISSION REPORT PLANNING COMMISSION REPORT REZONING CASE NO. RZ-11-001 REPORT DATE: May 21, 2012 CASE NAME: Lakewood Gateway Official PLANNING COMMISSION DATE: June 6, 2012 Development Plan (ODP) Rezoning ADDRESS OF REZONING

More information

Transportation Districts Policies

Transportation Districts Policies Transportation Districts Policies Policy 6.35 North Transportation District Reinforce neighborhood livability and commercial activity by planning and investing in a multimodal transportation network, relieving

More information

CITY OF MADISON LANDSCAPE WORKSHEET

CITY OF MADISON LANDSCAPE WORKSHEET CITY OF MADISON LANDSCAPE WORKSHEET Section 28.142 Madison General Ordinance Project Location / Address Name of Project Owner / Contact Contact Phone Contact Email ** Landscape plans for zoning lots greater

More information

Lower Manhattan Development Corporation. World Trade Center Memorial and Cultural Program Amended General Project Plan September 16, 2003

Lower Manhattan Development Corporation. World Trade Center Memorial and Cultural Program Amended General Project Plan September 16, 2003 1. Introduction Lower Manhattan Development Corporation World Trade Center Memorial and Cultural Program Amended General Project Plan September 16, 2003 The Lower Manhattan Development Corporation ( LMDC

More information

Evergreen Cemetery: Brentwood Parcel Advisory Board Meeting #2

Evergreen Cemetery: Brentwood Parcel Advisory Board Meeting #2 Evergreen Cemetery: Brentwood Parcel Advisory Board Meeting #2 Date: March 16, 2010 Meeting Notes Attending: Cynthia Loebenstein, Friends of Evergreen Noni Ames, Maine Olmsted Alliance for Parks and Landscapes,

More information

Contra Costa Community College District Business Procedure 20.01 PARKING AND TRAFFIC REGULATIONS

Contra Costa Community College District Business Procedure 20.01 PARKING AND TRAFFIC REGULATIONS Contra Costa Community College District Business Procedure 20.01 PARKING AND TRAFFIC REGULATIONS The District provides facilities for vehicles for the sole purpose of conducting college business. The District

More information

THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST

THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST THE LEONARDO BUILDING - Designed to meet BREEAM Excellent 2011 & EPC B Rating GATWICK AIRPORT proposed