PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express

Size: px
Start display at page:

Download "PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express"

Transcription

1 PART II SCHEDULE SECTION TITLE D E Scope of Services Special Terms and Conditions 11

2 SECTION D SCOPE OF SERVICES D.1 OVERVIEW A. The selected firm is referred to herein as either the Consultant or the Contractor. If the firm chooses to use the services of Subconsultant(s), they will be referred to either as the Subconsultant(s) or Subcontractor(s). B. The Consultant shall provide all staff, supervision, materials, supplies, and transportation to complete the Scope of Services to the satisfaction of VRE. C. Funding has been identified and is available for this corridor improvement project through a combination of Federal, State and Local grants. Therefore, the Consultant must comply with Federal, State and Local regulations as they pertain to procurement and construction contracts. The funding sources for each VRE station included in this project may differ by location and phase of development. D. The Consultant shall carry out the Scope of Services by completing all tasks in the areas of project management, basis of design, conceptual designs, National Environmental Policy Act (NEPA) documentation, preliminary designs and project delivery strategies, as well as provide all required submittals as identified in SECTION S.3 SUBMITTALS. D.2 GENERAL REQUIREMENTS A. The future configuration of CSXT s RF&P Subdivision will include three (3) tracks. Therefore, VRE requires an ultimate configuration of two (2) platforms, which will offer platform access to each of the tracks, for all stations located on the RF&P Subdivision, including specifically the five (5) VRE stations identified in the chart below. All platforms shall be designed to 700 feet in length with the capability of being extended to 850 feet at a later date, as part of a separate project. No at-grade pedestrian crossings of tracks will be permitted. B. The Consultant shall be responsible, generally, for the configuration of the following improvements at the five (5) VRE stations, which shall be carried through the NEPA process and preliminary design: 12

3 VRE Stations Improvements 1. Franconia-Springfield Platform widening; two (2) platform extensions 2. Lorton Second platform 3. Rippon Platform extension; second platform 4. Brooke Platform extension; second platform 5. Leeland Road Platform extension; second platform D.3 PROJECT MANAGEMENT A. Schedule and facilitate a project kick-off meeting. B. Conduct a site visit to become familiar with each station and review the project scope with VRE. C. Develop and adhere to a Project Management Plan (PMP), which shall be submitted to and approved by VRE. The PMP shall include, but is not limited to, a detailed explanation of the Consultant s approach to managing delivery of the project including, but not limited to, schedule, risk analysis, cash flow, quality assurance/quality control, safety, document control and scope management. The PMP shall be a living document updated and resubmitted to VRE as needed in response to comments from VRE, as the project progresses and as elements of the Consultant s approach change. D. Attend all project meetings and teleconferences with the VRE design team to obtain design parameters, review the schedule and exchange design ideas. E. Schedule and participate in project management meetings. F. Prepare minutes for project meetings and teleconferences. 13

4 D.4 BASIS OF DESIGN A. Develop a unified basis of design for the five (5) VRE stations based upon the CSXT design standards, VRE Station Design Guidelines and the DC2RVA Basis of Design Report. The Consultant shall strive to preserve the module design approach VRE has applied to its passenger facility designs since its inception, while adhering to regulatory requirements and best industry practices in commuter rail station design. B. Inventory existing sources of station plans, design criteria, standards and basis of design at the VRE offices. C. Compile design criteria and incorporate guidelines, standards, specifications and requirements from VRE, CSXT, the Federal Transit Administration (FTA), Federal Railroad Administration (FRA), Commonwealth of Virginia, Fairfax County, Prince William County, Stafford County, American Railway Engineering and Maintenance-of- Way Association (AREMA), American Public Transportation Association (APTA), National Fire Protective Association (NFPA) and other applicable sources. D. Establish criterion and specifications in conjunction and in coordination with VRE for platform lengths and widths, minimum and maximum canopy coverage, railings, fencing, lighting, safety edges, end of platform treatments, surface walkways, overhead walkways (or tunnels, if applicable), stairways, elevators and other reoccurring station elements deemed necessary by VRE. The specifications for platforms, canopies and other station elements shall be based on the use of sustainable materials that are easy and inexpensive to maintain and/or replace, resilient to weather elements and shall appear fresh and new at all times. The structure of canopies and vertical circulation elements shall not interfere with clearances set forth in the Americans with Disabilities Act (ADA) requirements, CSXT design standards, as well as other applicable standards and guidelines. E. Utilize existing VRE stations as an example to provide inventories and layouts for ancillary station amenities and features, such as active and passive passenger information systems, signage, advertising placards, trash receptacles, lighting, security cameras, ticket vending machines, and communications equipment (standardized and specified). Landscaping is not required and shall not be provided by the Consultant. F. Develop standardized options for canopies on new platforms, integrating new and/or old canopy styles from existing platforms with canopies. 14

5 G. Provide renderings, plans, cross-sections, elevations and other details, as needed, to facilitate evaluation of generic canopy concepts. All five (5) stations have a peaked roof canopy reflecting the original VRE station design. More recent station designs have single cantilever canopies for side platforms and gull-wing canopies for island platforms in order to provide a more open platform environment and minimize or eliminate maintenance issues associated with gutters and downspouts. Additionally, the Consultant shall take into consideration that drainage of canopy rooftops and platforms into the right-of-way is discouraged. H. Produce a standardized design for an accessible, grade-separated pedestrian connection between the two (2) platforms for all stations except Franconia-Springfield. No change to the current pedestrian crossing is anticipated at the Franconia-Springfield Station. Bridge towers shall accommodate one (1) elevator and an enclosed stair tower on each side. The design must include the specifications for the materials to be used to construct the crossings, stairways and towers, as well as to house the vertical transport elements. The Consultant shall provide renderings, plans, cross-sections, elevations and other details to scale as needed to facilitate evaluation of generic crossing designs. I. Provide samples of recommended materials to VRE upon request. J. Consolidate and summarize the basis of design findings in a draft Basis of Design Report for submission to VRE. K. Revise the Basis of Design Report as needed during the course of the project. D.5 CONCEPTUAL DESIGNS A. Produce conceptual site designs for each of the five (5) stations that illustrate the arrangement and massing of key station elements (e.g., platforms, canopies, grade-separated pedestrian crossings, pedestrian walkways, etc.) in conformance with the requirements established in SECTION D.2A. and to a level of design sufficient to support environmental screening at each station as required by NEPA. (It is anticipated to average no more than a five percent (5%) level of design). 15

6 B. Produce conceptual site designs to ensure the immediate improvements developed under this Contract do not preclude future expansion when needed. All conceptual designs shall accommodate a future third track in a location to be designated by VRE and consistent with third track locations as developed by the DC2RVA team. Because several years may elapse before the 700 foot platforms are extended, conceptual design shall take into consideration strategies to cost effectively construct future expansions with little or no effect on train operations or passenger circulation. C. Provide plans, cross-sections, elevations and other details as needed to facilitate evaluation of conceptual design at each station. D. Conduct a topographic survey. E. Initiate utility coordination and include utility locations in the initial survey. F. Develop concept plans in coordination with VRE (up to four (4) concepts) for the expansion of each existing platform to accommodate ten (10) car train sets, to add a second platform to accommodate ten (10) car train sets and for a grade separation between the two (2) platforms. G. Prepare a rough order of magnitude cost estimate for each concept. H. Coordinate permitting requirements with the local jurisdictions. I. Perform environmental screening and wetland delineation, as necessary, to document existing conditions and identify potential impacts. J. Address preliminary site drainage and present grading plans to VRE. K. Coordinate with VRE s Information Technology (IT), Facilities and Operations departments. L. Coordinate with VRE s System Safety and Security department to develop an approach to achieve Crime Prevention Through Environmental Design (CPTED) certification and station safety certifications. M. Support at least one (1) Public Information Meeting for each station in proximity to the station. N. Provide 3D color renderings (at least two (2) views per station). 16

7 O. Provide two (2) full-size (24 x 36 ) and two (2) half-size (11 x 17 ) hard copies of the plans for each station, as well as a CD/DVD or other electronic storage device of the concept plans for each station. P. Consolidate and summarize the conceptual design findings in the Conceptual Design Report. D.6 NEPA DOCUMENTATION A. Following VRE s approval of the conceptual design for each station, develop and provide documentation as required by NEPA for the proposed improvements at each station and assist VRE in coordinating the review and approval of the NEPA documentation with FTA and other agencies as determined necessary. The Consultant shall not coordinate directly with FTA. B. Prepare the appropriate NEPA documentation and recommend mitigation, if required. It is likely that the class of action will be a Categorical Exclusion (CE). C. Consolidate and summarize the environmental findings in the NEPA documentation. D.7 PRELIMINARY DESIGNS A. Produce preliminary designs for the station improvements specified in SECTION D.2B., following VRE s approval of the conceptual design for each station. The preliminary design for each station shall proceed to a level of design sufficient to support cost estimates and design documents needed to enter into final design. (It is anticipated to average no less than a thirty percent (30%) level of design). B. Provide renderings, plans, cross-sections, elevations and other details to scale for each station as needed to facilitate evaluation of the preliminary designs. C. Produce required documentation for compliance with ADA requirements for level boarding for each station. The Consultant shall assist VRE with coordination with FTA and/or FRA until such documentation is approved. The Consultant shall not coordinate directly with FTA or FRA. 17

8 D. Include within the preliminary design of the station elements, platforms and canopies new or, if needed, upgrades to passenger information displays, security cameras, lighting and electrical components, and possibly ticket vending machines. E. Prepare analyses and conformance reports for each station as required under NFPA 130. F. Conduct FTA/FRA required safety and security certifications throughout the design process, coordinate with VRE s Safety and Security Department and report on compliance through conceptual and preliminary design. G. Ensure the design complies with CSXT and VRE design and quality standards and is coordinated with CSXT through VRE. When complete, engineering and environmental review of the station designs must be sufficient to advertise for final design. H. Conduct a geotechnical investigation and provide VRE with a draft report including foundation recommendations for review. I. Perform topographic surveys to address project needs including property limits, track geometry, top of rail elevations, existing structures/features, and utility location and identification. J. Coordinate with CSXT through VRE or directly with CSXT to obtain Right-of-Entry permits as necessary. The Consultant shall also coordinate with Fairfax, Prince William and Stafford Counties, as appropriate, for permitting and site plan approval requirements. K. Advance a single design concept for each existing platform extension, and second platform where appropriate, to accommodate eight (8) car train sets and a grade separated crossing with elevators and stairways between the platforms. L. Produce site plans for review with the appropriate county. M. Revise cost estimates. N. Coordinate permitting requirements with the local jurisdictions (site plan and building permit). O. Finalize the geotechnical report. P. Finalize the survey. 18

9 Q. Coordinate preliminary utility relocation. R. Support VRE s coordination with CSXT and initiation of a Force Account estimate for design reviews and flagging during preliminary design and design field work. S. Continue coordination with VRE s IT, Facilities and Operations departments. T. Continue coordination with VRE s System Safety and Security department. U. Support at least one (1) Public Information Meeting for each station in proximity to the station. V. Provide 3D color renderings (at least two (2) views per station). W. Provide two (2) full-size (22 x 34 ) and two (2) half-size (11 x 17 ) hard copies of the plans for each station, as well as a CD/DVD or other electronic storage device of the design package for each station. X. Consolidate and summarize the preliminary design findings in the Preliminary Design Report. D.8 PROJECT DELIVERY STRATEGIES A. Develop and evaluate recommendations for project implementation (final design and construction of the corridor improvement project), either collectively or on a station-by-station basis, including, but not limited to, design-bid-build, design-build and construction manager at risk or construction management/general contractor strategies. B. Document and summarize considerations and recommendations for alternative project delivery strategies in the Final Report. 19

Concept Design Synopsis

Concept Design Synopsis Washington Headquarters Services Facilities Services Directorate The Pentagon Electric Upgrade (Substation No. 2) Concept Design Synopsis September 4, 2014 Prepared for Consultations with VA SHPO, ACHP,

More information

ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001)

ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) INTRODUCTION To supplement and expand its understanding of available fixed guideway transit system vehicle

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

Polk Commerce Centre CRA Spine Road Alignment Study

Polk Commerce Centre CRA Spine Road Alignment Study Polk Commerce Centre CRA Spine Road Alignment Study Florida Polytech Pace Road (LIMIT) Berkley Road Williams DRI Proposed Alignment Polk Commerce Centre CRA Boundary Braddock Road (LIMIT) Lake Myrtle Sports

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

CHAPTER 12 Revised January 1, 2013 SIGNING AND SEALIN OF PROFESSIONAL SURVEY DELIVERABLES

CHAPTER 12 Revised January 1, 2013 SIGNING AND SEALIN OF PROFESSIONAL SURVEY DELIVERABLES CHAPTER 12 Revised January 1, 2013 SIGNING AND SEALIN OF PROFESSIONAL SURVEY DELIVERABLES Chapter Contents Sec. 12.01 Sec. 12.02 Sec. 12.03 Sec. 12.04 Sec. 12.05 Sec. 12.06 Introduction Business & Legal

More information

SYSTEMWIDE REQUIREMENTS

SYSTEMWIDE REQUIREMENTS SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a

More information

Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO

Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO Transit Agency Profile and Reason for Selection of Transit Agency Overview The Regional Transportation District (RTD) in Denver is one

More information

Engineering Standard

Engineering Standard Public Transport Services Engineering Standard Stations - Bicycle Facilities PART 129013 AR-PW-PM-SPE-00129013 (D073) Document Control Document Status Document Amendment Record Revision Change Description

More information

IV. INDUSTRIAL TRACK DESIGN

IV. INDUSTRIAL TRACK DESIGN IV. INDUSTRIAL TRACK DESIGN 4.01 GENERAL The following sections govern the criteria to be used in the designing of industry tracks served, or to be served, by the Railway Company. Any deviation from these

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way Public Works Department Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way October 2015 HillsboroughCounty.org HILLSBOROUGH COUNTY Office of the County

More information

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two. Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts Design and Development Guidelines Request for Qualifications and Expressions of Interest with Preliminary Development Plans Part

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

Alternatives Presentation Meeting Middlebury WCRS(23)

Alternatives Presentation Meeting Middlebury WCRS(23) Alternatives Presentation Meeting Middlebury WCRS(23) Main Street (VT 30/TH 2 Bridge 102) and Merchants Row (TH 8 Bridge 2) over Vermont Railway June 4, 2013 Twilight Hall Auditorium, Middlebury College

More information

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Commercial, Professional Office, and Public Facility Developments Purpose This Guide offers examples to clarify and explain the

More information

S-11: Tacoma Link Extension to Tacoma Community College

S-11: Tacoma Link Extension to Tacoma Community College Project Number S-11 Subarea Pierce Primary Mode Light Rail Facility Type Corridor Length 3.65 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT

More information

Revised Work Scope Dated April 23 rd, 2015

Revised Work Scope Dated April 23 rd, 2015 Revised Work Scope Dated April 23 rd, 2015 2.4 SCOPE OF SERVICES The following combines the Scope of Services included in RFQ No. 671 dated March 12, 2015 and the Invitation to Interview letter dated March

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR 1. ANY MAP OR PLAN THAT SHOWS: Property Lines. NJSA 45:8-28(e), NJAC 13:40-1.3, 13:40-5.1 Locations of Existing Buildings

More information

FAIRFAX WATER OCCOQUAN RESERVOIR SHORELINE EASEMENT POLICY. February 17, 2011

FAIRFAX WATER OCCOQUAN RESERVOIR SHORELINE EASEMENT POLICY. February 17, 2011 FAIRFAX WATER OCCOQUAN RESERVOIR SHORELINE EASEMENT POLICY February 17, 2011 I. Purpose The Occoquan Reservoir (the "Reservoir"), located in Fairfax and Prince William Counties, Virginia, was constructed

More information

FloridaNOTAllAboard RESOLUTION NO. 28-15

FloridaNOTAllAboard RESOLUTION NO. 28-15 RESOLUTION NO. 28-15 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DELRAY BEACH, FLORIDA, EXPRESSING CONCERN WHETHER ALL ABOARD FLORIDA WILL HAVE AN ADVERSE IMPACT ON THE CITY; STATING THAT THE CITY

More information

REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013

REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013 REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013 CENTRAL NEW YORK REGIONAL PLANNING AND DEVELOPMENT BOARD 126 NORTH SALINA

More information

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter.

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter. SCHEDULE OF CONSULTANT S SERVICES Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter. Project (Insert name and description

More information

Exhibit C: Scope of Work and Schedule of Deliverables

Exhibit C: Scope of Work and Schedule of Deliverables Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza

More information

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

COASTAL APPLICATION FOR A MAJOR SITING PERMIT Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center

More information

Cost Reduction Opportunities

Cost Reduction Opportunities Cost Reduction Opportunities 9 December 2015 Presentation to MassDOT Board of Directors & MBTA Fiscal and Management Control Board Arup 2 A global, integrated, multidisciplinary firm of professionals 13,000

More information

DALLAS COUNTY, IOWA CHAPTER 48 SMALL WIND ENERGY CONVERSION SYSTEMS ORDINANCE FOR THE UNINCOPORATED AREA OF DALLAS COUNTY, IOWA

DALLAS COUNTY, IOWA CHAPTER 48 SMALL WIND ENERGY CONVERSION SYSTEMS ORDINANCE FOR THE UNINCOPORATED AREA OF DALLAS COUNTY, IOWA TITLE V PROPERTY AND LAND USE SMALL WIND ENERGY CONVERSION SYSTEMS ORDINANCE FOR THE UNINCOPORATED AREA OF DALLAS COUNTY, IOWA 48.01 INTENT 48.05 APPLICATION REQUIRED 48.02 DEFINITIONS 48.06 APPEALS 48.03

More information

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.110 - Industrial Suburban District ( IS ) Figure REFERENCE Typical Buildings in the IS District Figure REFERENCE Site Plan of a typical development in the IS District Sections: 16.20.110.1 Composition

More information

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL August 2008 TABLE OF CONTENTS Section 1 - Introduction... 3 1.1 Defining Plan Quality...

More information

City of Red Wing REQUEST FOR QUALIFICATIONS. Levee Park - Riverboat & Transient Boat Dockage, Park and Promenade Improvements Professional Services

City of Red Wing REQUEST FOR QUALIFICATIONS. Levee Park - Riverboat & Transient Boat Dockage, Park and Promenade Improvements Professional Services City of Red Wing REQUEST FOR QUALIFICATIONS Levee Park - Riverboat & Transient Boat Dockage, Park and Promenade Improvements Professional Services RFQ Release Date: November 2, 2015 Statement of Qualifications

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Engineering Design Services for the Preliminary (Design) Engineering 1. Imlay City Road Imlay City Road at Wilder Road (signal modernization), Lapeer Township 2. Imlay City Road Imlay

More information

The Gateway Program and Hudson Tunnel Project

The Gateway Program and Hudson Tunnel Project The Gateway Program and Hudson Tunnel Project Presented to: NJ State Senate Oversight Committee Stephen Gardner Executive Vice President NEC Business Development August 10, 2015 1 The Need for Gateway

More information

City of Sherwood, Oregon Request for Proposals For Consultant Services Woodhaven Park - Phase 2 Design Plan

City of Sherwood, Oregon Request for Proposals For Consultant Services Woodhaven Park - Phase 2 Design Plan City of Sherwood, Oregon Request for Proposals For Consultant Services Woodhaven Park - Phase 2 Design Plan General Information The City of Sherwood owns, operates, and manages several public parks and

More information

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Background and Goals for the Project

Background and Goals for the Project City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering

More information

Contract No. E22PS02 DOCUMENT CONTROL PLAN (DCP) For PRELIMINARY ENGINEERING AND DESIGN/BUIILD PROCUREMENT

Contract No. E22PS02 DOCUMENT CONTROL PLAN (DCP) For PRELIMINARY ENGINEERING AND DESIGN/BUIILD PROCUREMENT Contract No. E22PS02 (DCP) For PRELIMINARY ENGINEERING AND DESIGN/BUIILD PROCUREMENT Prepared By: Paul Eckler Date Project Controls Lead Karen Arpino-Shaffer Deputy Program Manager Date Michael J. McBride,

More information

APPENDIX G. California Coastal Commission & Conservancy Accessibility Standards

APPENDIX G. California Coastal Commission & Conservancy Accessibility Standards APPENDIX G California Coastal Commission & Conservancy Accessibility Standards STANDARDS AND RECOMMENDATIONS FOR ACCESSWAY LOCATION AND DEVELOPMENT These standards provide guidelines for the location,

More information

Design-Build Process for Project Managers

Design-Build Process for Project Managers Vermont Agency of Transportation Design-Build Process for Project Managers This document provides guidance on the preliminary engineering and procurement process and roles and responsibilities of key personnel

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS ADVERTISEMENT FOR BIDS Bids will be received at the office of the Niles City School District, 100 West Avenue, Niles, Ohio, 44446 until 12:00 PM on Friday, March 22, 2013 and will be opened and read immediately

More information

CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT

CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS EAST VALLEY ADULT RESOURCES TENANT IMPROVEMENT Project Funding by the United States Department of Housing and Urban Development Through

More information

CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS

CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS On-Call Consultant List for Mechanical Engineering Services TABLE OF CONTENTS REQUEST FOR QUALIFICATIONS PAGE NO. SECTION I PROJECT

More information

763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule

763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule 763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule Description: This work shall reflect a Contractor s anticipated work plan for constructing the project using a Critical Path Method Project

More information

Work Breakdown Structure Element Dictionary. Final Design

Work Breakdown Structure Element Dictionary. Final Design Initiation FD 4.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope. The lead office develops these project parameters

More information

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.

More information

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations

More information

PART V PROPOSAL REQUIREMENTS

PART V PROPOSAL REQUIREMENTS PART V PROPOSAL REQUIREMENTS SECTION TITLE K L M Proposal Content Cost Information Submission of Proposal 40 SECTION K PROPOSAL CONTENT K.1 GENERAL REQUIREMENTS A. The requirements included in this Section

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations? Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview Purpose of Subdivision/ Land Development Ordinances (SALDO) Municipalities Planning Code Process Design

More information

NEW BLUE LINE CONNECTIONS

NEW BLUE LINE CONNECTIONS Washington Metropolitan Area Transit Authority NEW BLUE LINE CONNECTIONS 3/31/2014 A Major Capital Project of Momentum s Metro 2025 Program In support of its new strategic plan, Metro has considered the

More information

Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01

Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01 Notice of Public Hearing Docket B13-01 PROGRAM OF PROJECTS FOR FEDERAL FISCAL YEAR 2013 FUNDS AUTHORIZED UNDER THE MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY ACT (MAP-21) AND THE PASSENGER RAIL INVESTMENT

More information

SITE SAFETY LOGISTIC PLAN

SITE SAFETY LOGISTIC PLAN SITE SAFETY LOGISTIC PLAN SHEET #1 Title Sheet Site Safety Logistic Plan For Project name & Address as it appears on the NB permit Or as it appears in the BIS system, with Borough Also include the following;

More information

Wilmington to Newark Commuter Rail Improvement Project

Wilmington to Newark Commuter Rail Improvement Project Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion

More information

VERTICAL SPEED CONTROL DEVICES

VERTICAL SPEED CONTROL DEVICES H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements

More information

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital June 21, 2007 The Grossmont Healthcare District (GHD) will accept proposals for Architectural and Engineering

More information

Executive Director s Recommendation Commission Meeting: July 11, 2013

Executive Director s Recommendation Commission Meeting: July 11, 2013 Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United

More information

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road. SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information

More information

City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES

City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES I. PURPOSE OF REQUEST. The City of Edgewood is requesting statements of qualifications from professional consulting firms licensed

More information

FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT

FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT Technical Memorandum and Concept of Operations Prepared for: Prepared by: March

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

Railway Crossing Information System

Railway Crossing Information System Railway Crossing Information System ITS Canada Presentation June 2, 2014 Ian Steele, P.Eng Agenda Click to edit Master title style RBRC Program Project Background Concept of Operations Design Process Design

More information

PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013

PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013 PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013 Leegate LLC and Stanley Martin Companies, LLC, owner and applicant, (the Applicant ) of certain property described as Loudoun County Tax

More information

Implementing the Transportation Alternatives Program for the National Capital Region

Implementing the Transportation Alternatives Program for the National Capital Region Implementing the Transportation Alternatives Program for the National Capital Region Safe Routes to School Regional Meeting October 29, 2013 Sarah Crawford National Capital Region Transportation Planning

More information

Planning Railway Safety in Canada

Planning Railway Safety in Canada Planning Railway Safety in Canada Mike Lowenger Vice President, Operations and Regulatory Affairs Railway Association of Canada July 10, 2014 ABOUT THE RAC 50+ members Represents virtually all railways

More information

Experts in Rail Maintenance and Infrastructure

Experts in Rail Maintenance and Infrastructure Experts in Rail Maintenance and Infrastructure It is with great people and pride, rooted in a culture of safety, D that Transdev delivers systems, technologies, and business processes to strengthen rail

More information

GENERAL. This manual addresses five local programs that are funded under the current Highway Act:

GENERAL. This manual addresses five local programs that are funded under the current Highway Act: OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal

More information

CHECKLIST FOR TELECOMMUNICATION TOWER CO-LOCATION APPLICATIONS. Conditional Use Permit Approved by Board of Supervisors Date of approval:

CHECKLIST FOR TELECOMMUNICATION TOWER CO-LOCATION APPLICATIONS. Conditional Use Permit Approved by Board of Supervisors Date of approval: CHECKLIST FOR TELECOMMUNICATION TOWER CO-LOCATION APPLICATIONS Conditional Use Permit Approved by Board of Supervisors Date of approval: Site Plan Approval: Date of approval: Fees: $4,000 Licensed Co-location

More information

REQUEST FOR ARCHITECTURAL SERVICES (RFS)

REQUEST FOR ARCHITECTURAL SERVICES (RFS) REQUEST FOR ARCHITECTURAL SERVICES (RFS) For the Development of three parcels into affordable housing: Highland Ave Site, 9 Manahan Street in Chelmsford and 173 Carlisle Rd. in Westford CHOICE Inc., an

More information

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are

More information

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RFP #2016-02 REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES FOR SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RELEASE DATE: January 29, 2016 DUE DATE: February

More information

REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT

REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Table of Contents I. Events Calendar. 1 II. Introduction.. 2 III. Inquires.

More information

Outdoor Cafés & Sidewalk Cafés

Outdoor Cafés & Sidewalk Cafés Application for: Outdoor Cafés & Sidewalk Cafés Cite October 26, 2010 City of Park Ridge 505 Butler Place Park Ridge, IL 60068 Community Preservation and Development Department Environmental Health Division

More information

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT CLASS 1 COLLOCATION New Commercial Communication Structure Substantial Modification Please check one of the following: CLASS 2 COLLOCATION OTHER

More information

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement

More information

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property 73-101. Public lettings; how conducted. Whenever the State of Nebraska, or any department or any agency thereof,

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

Recommendation. Final Action

Recommendation. Final Action MOTION NO. M2015-90 Amend Contract for Construction Management Services for the Sounder Point Defiance Bypass, Tacoma Trestle Track and Signal, and Sounder Yard Expansion Projects MEETING: DATE: TYPE OF

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

City of Ashland Downtown Central Business District. Downtown Revitalization Grant Program APPLICATION PACKAGE

City of Ashland Downtown Central Business District. Downtown Revitalization Grant Program APPLICATION PACKAGE City of Ashland Downtown Central Business District Downtown Revitalization Grant Program APPLICATION PACKAGE The following includes the Downtown Revitalization Grant Program Description and Grant Application

More information

Executive Director s Recommendation Commission Meeting: March 5, 2015

Executive Director s Recommendation Commission Meeting: March 5, 2015 Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States

More information

05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246

05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246 CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246 Summary of Duties: Performs professional civil engineering work in researching,

More information

RESIDENTIAL DRIVEWAYS

RESIDENTIAL DRIVEWAYS RESIDENTIAL DRIVEWAYS If you have specific questions or want to confirm your plans, our staff is available to assist in person, by telephone, or by e-mail. City of St. Petersburg Division of Development

More information

For Office Use: Filing Date: Case Number: Zoning District:

For Office Use: Filing Date: Case Number: Zoning District: City of Syracuse Zoning Administration Application for Off-Premises Advertising Sign Review by the Planning Commission City Hall Commons * Room 101 * 201 E. Washington Street * Syracuse, NY 13202-1426

More information

Transit, Rail, Program, Project & Construction Management Experience

Transit, Rail, Program, Project & Construction Management Experience Point of Contact Peter M. Cipolla Vice President, Rail & Transit Mobile: 925.219.5235 Email: peter.cipolla@hatchmott.com Project Management Oversight Services Introduction & Background Hatch Mott MacDonald

More information

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS 1009.1 Stairway width. The width of stairways shall be determined as specified in Section 1005.1, but such width shall not be less than 44

More information

University of Northern Iowa Design Documents Standards. October 2014

University of Northern Iowa Design Documents Standards. October 2014 University of Northern Iowa Design Documents Standards October 2014 2014 UNI BUILDING AND DESIGN STANDARDS 1.1 CONTRACT DOCUMENT FORMAT 1.1.1 The Electronic Word Programs used for the Project manual shall

More information

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached ADDENDUM #1 RFP: 500 16 Design Build Maintenance & Operations Complex The following changes to the Request for Proposal and clarifications are provided based on questions received and must be added/considered

More information

TOWN BOARD OF THE TOWN OF NORTH SALEM WESTCHESTER COUNTY, NEW YORK LOCAL LAW # OF THE YEAR 2012

TOWN BOARD OF THE TOWN OF NORTH SALEM WESTCHESTER COUNTY, NEW YORK LOCAL LAW # OF THE YEAR 2012 TOWN BOARD OF THE TOWN OF NORTH SALEM WESTCHESTER COUNTY, NEW YORK LOCAL LAW # OF THE YEAR 2012 CHAPTER 250, ZONING ORDINANCE AMENDMENTS - PD-CCRC DISTRICT Section 1. Purpose: The purpose of this Local

More information

Street Audit Tool: Web 2.0 Tools

Street Audit Tool: Web 2.0 Tools Name: Email: Instructions: Auditor Information (1) Use all three tools for your assessment (2) If the tool can not determine the criteria, check (3) Indicate the tools used (4) Rate the effectiveness of

More information

DESIGN-BUILD PROCUREMENT AND ADMINISTRATION GUIDE

DESIGN-BUILD PROCUREMENT AND ADMINISTRATION GUIDE ARIZONA DEPARTMENT OF TRANSPORTATION INTERMODAL TRANSPORTATION DIVISION DESIGN-BUILD PROCUREMENT AND ADMINISTRATION GUIDE 3rd Edition December 2007 Published by: ADOT Construction Group 206 S. 17 th Ave.,

More information

Environmental Impact Statement for the Washington Union Station Expansion Project

Environmental Impact Statement for the Washington Union Station Expansion Project This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

Program guidance that details the eligibility, criteria and application process. Ferry Boat Program. Ohio Department of Transportation

Program guidance that details the eligibility, criteria and application process. Ferry Boat Program. Ohio Department of Transportation Program guidance that details the eligibility, criteria and application process. Ferry Boat Program Ohio Department of Transportation TABLE OF CONTENTS Program Overview Program Administration.........2

More information

3.09 Public Safety and Security

3.09 Public Safety and Security 3.09 Public Safety and Security Summary This section describes the existing public safety and security resources in the Longmont corridor and estimates the effect of the proposed alternatives on transit

More information

REQUEST FOR STATEMENT OF INTEREST AND QUALIFICATIONS (SOIQ) FOR ARCHITECTURAL SERVICES Provo City School District

REQUEST FOR STATEMENT OF INTEREST AND QUALIFICATIONS (SOIQ) FOR ARCHITECTURAL SERVICES Provo City School District Introduction: REQUEST FOR STATEMENT OF INTEREST AND QUALIFICATIONS (SOIQ) FOR ARCHITECTURAL SERVICES Provo City School District Pursuant to Utah Code Ann. 63G-6-701, it is the policy of the Provo City

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

A Review of Transit Technology Specifications

A Review of Transit Technology Specifications . Transit Technologies Worksheet A Review of Transit Technology Specifications 1 2 3 4 5 6 1. Heavy Rail Transit 2. Commuter Rail Transit 3. Light Rail Transit 4. Modern Streetcar 5. Heritage Trolley 6.

More information

Preliminary Plan Application and Checklist

Preliminary Plan Application and Checklist ALL APPLICATIONS ARE DUE AT 12:00 NOON ON THE FILING DATE Office Use Only PRELIMINARY / REVISED PRELIMINARY PLAN $300.00 Fee Paid: $ Date Paid: ALL FIELDS HIGHLIGHTED IN RED ARE REQUIRED FIELDS Case No.:

More information