1 Call Number: 022 Contract ID: Project(s): IM 1641(025) Letting Date: February 05, 2016 Region(s): Grand Region Counties: Kent County Contract Time: 10/31/16 COMPLETION DATE Contract Description: Bridge rehabilitation including shallow concrete overlay, painting steel bearings, epoxy inject cracks in beams, substructure repair, slope protection repairs, concrete surface coating, approach work, and maintaining traffic on Morse Lake Road, Kent County. ** 603 Fa ** List of Vendors Rank Vendor ID/Name Total Bid Percent Of Low Bid Percent Of Estimate 0 -EST- - Engineer's Estimate $603, % % C. A. Hull Co., Inc. $501, % 83.09% Grand River Construction, Inc. $508, % 84.29% Anlaan Corporation $518, % 85.87% Davis Construction, Inc. $555, % 91.99% Nashville Construction Company $641, % % Page: 1 of 31
2 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc (1) 54, , , , , , Mobilization, Max $54, , , Dr Structure, Rem , Sewer, Rem, Less than 24 inch , Curb and Gutter, Rem , , , Excavation, rth Erosion Control, Inlet Protection, Fabric Drop Erosion Control, Maintenance, Sediment Removal Page: 2 of 31
3 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc Erosion Control, Silt Fence , , , Open-Graded Dr Cse, 6 inch Shoulder, Cl II, LM , Culv, Cl A, CSP, 18 inch , , , _ Culvert Cleanout (1) 2, , _ Wrapping Culvert and Sewer Joints , , , Sewer, Cl A, 12 inch, Tr Det B Page: 3 of 31
4 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc , , , HMA Surface, Rem , , , HMA Approach Ton Joint, Expansion, E Conc Quality Initiative Dlr , , , Conc Pavt, Bridge Approach, Reinf , , , Curb and Gutter, Bridge Approach , , , Guardrail, Type B Page: 4 of 31
5 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc , , , , , , Guardrail Anch, Bridge, Det T , Guardrail, Salv Guardrail Reflector , Pavt Mrkg, Waterborne, 4 inch, White Pavt Mrkg, Waterborne, 4 inch, Yellow , , , , Pavt Mrkg, Waterborne, 6 inch, White , , , , Pavt Mrkg, Waterborne, 6 inch, Yellow Page: 5 of 31
6 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc , Pavt Mrkg, Waterborne, 2nd Application, 4 inch, White Pavt Mrkg, Waterborne, 2nd Application, 4 inch, Yellow , Pavt Mrkg, Waterborne, 2nd Application, 6 inch, White , Pavt Mrkg, Waterborne, 2nd Application, 6 inch, Yellow Rem Curing Compound, for Longit Mrkg, 4 inch Barricade, Type III, High Intensity, Double Sided, Lighted, Furn Page: 6 of 31
7 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc Barricade, Type III, High Intensity, Double Sided, Lighted, Oper , , , , , Conc Barrier Ending, Temp, Detail 2, Furn , Conc Barrier Ending, Temp, Detail 2, Oper Conc Barrier Reflector Replacement , , , , Conc Barrier, Temp, Furn , , , , Conc Barrier, Temp, Oper High Intensity Light, Type B, Furn Page: 7 of 31
8 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc High Intensity Light, Type B, Oper Lighted Arrow, Type C, Furn Lighted Arrow, Type C, Oper (1) 6, , , , Ltg for Night Work (1) 20, , , , , , Minor Traf Devices , , , , , Mobile Attenuator , , , Plastic Drum, High Intensity, Furn Page: 8 of 31
9 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc Plastic Drum, High Intensity, Oper Sign Cover , , , , Sign, Type B, Temp, Prismatic, Furn Sft , , Sign, Type B, Temp, Prismatic, Oper Sft Sign, Type B, Temp, Prismatic, Special, Furn Sft Sign, Type B, Temp, Prismatic, Special, Oper Sft , , , , _ Sign, Portable, Changeable Message, NTCIP-Compliant, Furn Page: 9 of 31
10 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc , _ Sign, Portable, Changeable Message, NTCIP-Compliant, Oper , , Slope Restoration, Type C Monument Box Monument Preservation (1) 11, , , , , , Contractor Staking Staking Plan Errors and Extras, One Person Hr Staking Plan Errors and Extras, Two Person Hr Page: 10 of 31
11 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc Staking Plan Errors and Extras, Three Person Hr Section Totals: $228, $218, $278, Section ID/Descr: 2 - Bridge Work , , _ Flowable Fill HMA Patch, Rem (1) 5, , Bridge Ltg, Furn and Rem (S05 of 41024) Bridge Ltg, Oper and Maintain Page: 11 of 31
12 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc. Section ID/Descr: 2 - Bridge Work , , , , Conc, Grade D , , , Expansion Joint Device , , False Decking Sft , , , , Reinforcement, Steel, Epoxy Coated Lb _ Expansive Waterstop Joint Waterproofing Sft (1) 13, , , , , , Conc Surface Coating (S05 of 41024) Page: 12 of 31
13 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc. Section ID/Descr: 2 - Bridge Work , , , Scarifying , , Hand Chipping, Other Than Deck Cft , , , Patch, Forming Sft , , , Conc, Bridge Deck Ovly , , , Bridge Deck Surface Construction , , , Adhesive Anchoring of Horizontal Bar, 3/4 inch Adhesive Anchoring of Vertical Bar, 1/2 inch Page: 13 of 31
14 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc. Section ID/Descr: 2 - Bridge Work (1) 10, , , , , , Structures, Rehabilitation, Rem Portions (S05 of 41024) , , , Deck Joint, Rem , , , Hydrodemolition, First Pass Hydrodemolition, Second Pass Flushing Cracks, Water , , , Structural Crack, Repr , , , Patching Conc, C-L Page: 14 of 31
15 (0) Engineer's Estimate (1) C. A. Hull Co., Inc. (2) Grand River Construction, Inc. Section ID/Descr: 2 - Bridge Work , , , Embedded Galvanic Anode (1) 1, , , , , , Steel Structure, Cleaning, Partial, Type 4 (S05 of 41024) (1) , , Steel Structure, Coating, Partial, Type 4 (S05 of 41024) , , , Slope Paving Header , , , Slope Paving, Conc Section Totals: $374, $283, $230, Page: 15 of 31
16 Contract Item Totals: $603, $501, $508, Contract Grand Totals: $603, $501, $508, ( ) indicates item is bid as Lump Sum Page: 16 of 31
17 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company (1) 54, , , , , , Mobilization, Max $54, , , , Dr Structure, Rem , Sewer, Rem, Less than 24 inch , Curb and Gutter, Rem , , , Excavation, rth Erosion Control, Inlet Protection, Fabric Drop Erosion Control, Maintenance, Sediment Removal Page: 17 of 31
18 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company Erosion Control, Silt Fence , , , Open-Graded Dr Cse, 6 inch Shoulder, Cl II, LM , , , Culv, Cl A, CSP, 18 inch , , , _ Culvert Cleanout (1) _ Wrapping Culvert and Sewer Joints , , , Sewer, Cl A, 12 inch, Tr Det B Page: 18 of 31
19 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company , , HMA Surface, Rem , , , HMA Approach Ton Joint, Expansion, E Conc Quality Initiative Dlr , , , Conc Pavt, Bridge Approach, Reinf , , , Curb and Gutter, Bridge Approach , , , Guardrail, Type B Page: 19 of 31
20 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company , , , , , , Guardrail Anch, Bridge, Det T Guardrail, Salv Guardrail Reflector , Pavt Mrkg, Waterborne, 4 inch, White Pavt Mrkg, Waterborne, 4 inch, Yellow , , , , Pavt Mrkg, Waterborne, 6 inch, White , , , , Pavt Mrkg, Waterborne, 6 inch, Yellow Page: 20 of 31
21 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company , Pavt Mrkg, Waterborne, 2nd Application, 4 inch, White Pavt Mrkg, Waterborne, 2nd Application, 4 inch, Yellow , Pavt Mrkg, Waterborne, 2nd Application, 6 inch, White , Pavt Mrkg, Waterborne, 2nd Application, 6 inch, Yellow Rem Curing Compound, for Longit Mrkg, 4 inch Barricade, Type III, High Intensity, Double Sided, Lighted, Furn Page: 21 of 31
22 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company Barricade, Type III, High Intensity, Double Sided, Lighted, Oper , , , , , , Conc Barrier Ending, Temp, Detail 2, Furn , , , Conc Barrier Ending, Temp, Detail 2, Oper Conc Barrier Reflector Replacement , , , , Conc Barrier, Temp, Furn , , , , Conc Barrier, Temp, Oper High Intensity Light, Type B, Furn Page: 22 of 31
23 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company High Intensity Light, Type B, Oper Lighted Arrow, Type C, Furn Lighted Arrow, Type C, Oper (1) , , Ltg for Night Work (1) 55, , , , , , Minor Traf Devices , , , , , , Mobile Attenuator , , , Plastic Drum, High Intensity, Furn Page: 23 of 31
24 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company Plastic Drum, High Intensity, Oper Sign Cover , , , , Sign, Type B, Temp, Prismatic, Furn Sft , Sign, Type B, Temp, Prismatic, Oper Sft Sign, Type B, Temp, Prismatic, Special, Furn Sft Sign, Type B, Temp, Prismatic, Special, Oper Sft , , , _ Sign, Portable, Changeable Message, NTCIP-Compliant, Furn Page: 24 of 31
25 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company _ Sign, Portable, Changeable Message, NTCIP-Compliant, Oper , Slope Restoration, Type C Monument Box Monument Preservation (1) 6, , , , , , Contractor Staking Staking Plan Errors and Extras, One Person Hr Staking Plan Errors and Extras, Two Person Hr Page: 25 of 31
26 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company Staking Plan Errors and Extras, Three Person Hr Section Totals: $215, $305, $183, Section ID/Descr: 2 - Bridge Work , , _ Flowable Fill , , HMA Patch, Rem (1) 2, , , , , , Bridge Ltg, Furn and Rem (S05 of 41024) , , Bridge Ltg, Oper and Maintain Page: 26 of 31
27 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company Section ID/Descr: 2 - Bridge Work , , , , , Conc, Grade D , , , Expansion Joint Device , False Decking Sft , , , , Reinforcement, Steel, Epoxy Coated Lb _ Expansive Waterstop Joint Waterproofing Sft (1) 9, , , , , , Conc Surface Coating (S05 of 41024) Page: 27 of 31
28 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company Section ID/Descr: 2 - Bridge Work , , , Scarifying , , Hand Chipping, Other Than Deck Cft , , Patch, Forming Sft , , , Conc, Bridge Deck Ovly , , , Bridge Deck Surface Construction , , , Adhesive Anchoring of Horizontal Bar, 3/4 inch Adhesive Anchoring of Vertical Bar, 1/2 inch Page: 28 of 31
29 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company Section ID/Descr: 2 - Bridge Work (1) 15, , , , , , Structures, Rehabilitation, Rem Portions (S05 of 41024) , , , Deck Joint, Rem , , , Hydrodemolition, First Pass , , Hydrodemolition, Second Pass Flushing Cracks, Water , , , Structural Crack, Repr , , , , Patching Conc, C-L Page: 29 of 31
30 (3) Anlaan Corporation (4) Davis Construction, Inc. (5) Nashville Construction Company Section ID/Descr: 2 - Bridge Work , , Embedded Galvanic Anode (1) 12, , , , , , Steel Structure, Cleaning, Partial, Type 4 (S05 of 41024) (1) 4, , , , , , Steel Structure, Coating, Partial, Type 4 (S05 of 41024) , , , Slope Paving Header , , , Slope Paving, Conc Section Totals: $302, $249, $457, Page: 30 of 31
31 Contract Item Totals: $518, $555, $641, Contract Grand Totals: $518, $555, $641, ( ) indicates item is bid as Lump Sum Page: 31 of 31
NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
More informationTabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14
Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:
More informationSection 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
More informationSection 812. TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION ZONE OPERATIONS
Section 812. TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION ZONE OPERATIONS 812.01. Description. This work consists of protecting, regulating, warning, guiding, and maintaining traffic through and around the
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More informationWILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationThe unit costs are based on the trend line of the 3 low bids for the average quantity.
Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally
More informationPaving Capitalization Work Categories and Treatments
Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods
More informationDate. Resubmit this form during the year if there are changes in your company ownership or financial standing.
COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
More informationCHAPTER 14: GUARDRAIL and BARRIERS
CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards
More information11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions
11 Guardrail W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use Modified Guardrail End Treatments and Transitions Footings and Anchors Impact Attenuators Measurement and Payment
More informationSECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
More informationChapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
More informationFDOT Specifications List
FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...
More informationMinimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
More informationDeveloping Critical Path Method Scheduling (CPM)
Developing Critical Path Method Scheduling (CPM) Pretest 1. An activity which is on critical path has a planned duration of 5 days. What is the total float for the activity? a. 0 b. 1 c. 2 d. 3 Pretest
More informationADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT
ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering
More informationSECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK
13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More informationSECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
More informationCONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015
CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015 The Code of Federal Regulations (CFR) Title 23, part 112, and 23 CFR
More information2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS
2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the
More informationConcrete Repair. Applications and Procedures
Concrete Repair Applications and Procedures Objectives Identify what surface preparation is needed Identify typical modes of failure and testing methods How to choose the correct material for the repair
More informationFDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES
NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and
More informationBMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
More informationSeptember 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900
September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationCity of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions
More informationHow To Build A Road In A Townhouse
FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and
More informationA. Structures Quantity Item Price Cost @ $3,500 EA
PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,
More informationRehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double
More informationBridge Structural Rehabilitation Using FRP Laminates
Bridge Structural Rehabilitation Using FRP Laminates South Santiam River Quartzville Road, Linn County Linn County Road Department 2011 Cooperative Partnerships Making Linn County a Better Place to Live
More informationLos Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationDisputes and Claims. 3 Processes Dispute Resolution and Administrative Claims Process
Disputes and Claims 3 Processes Dispute Resolution and Administrative Claims Process Default Process C&MS 108.02 Partnering OR PN 108 -Dispute Review Board (DRB) Considered for use on projects over $20
More informationChapter 5: Drainage, Ditches, and Culverts
Chapter 5: Drainage, Ditches, and Culverts chapter contents Characteristics of Good Drainage 82 Elements of Good Surface Drainage 82 Crown 82 Shoulders 82 Slope 82 Ditches 83 Culverts 83 Inlets 83 Optimal
More informationSTANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
More informationTABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
More informationTHIS PAGE IS INTENTIONALLY LEFT BLANK
THIS PAGE IS INTENTIONALLY LEFT BLANK HA COMMONWEALTH OF MASSACHUSETTS Addendum No. 1, March 24, 2016 CONTRACT DOCUMENTS AND SPECIAL PROVISIONS PROPOSAL NO. 607545-92992 P.V. = $3,887,000.00 PLANS NO FOR
More informationCity of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
More informationTransportation Infrastructure Asset Management
2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE hlongfellow@parametrix.com (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory
More informationKENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationSafe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
More informationTruss Bridges of Kentucky
ACEC Partnering Conference 2012 Truss Bridges of Kentucky 1899 Amanda Abner Rebecca Turner 1893 Truss Bridges of Kentucky Truss Bridges of Kentucky Vincennes Bridge Company Champion Bridge Company Empire
More informationStructures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.
More informationTownship of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
More informationSPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt
More informationFY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
More informationGuidelines for Fiber Optic Cable Permits
Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: NOVAFairfaxPermits@VDOT.Virginia.gov 14685 Avion Parkway
More informationSECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
More informationResidential Building Permits Information
City of Bonham Building Department 514 Chestnut St. Bonham, Texas 75418 OFFICE: (903) 583-7555 FAX: (903)583-5761 Residential Building Permits Information Application for Permits: To apply for a permit,
More informationSection 500 Rigid Pavement
Table of Contents 1. Reinforced or Plain Cement Concrete Pavements, Reinforced or Plain Cement Concrete Pavement (RPS), and Protective Coating for Cement Concrete Pavement... 500-1 2. Pavement Relief Joint...
More information738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)
POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay
More informationSTANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationSECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationHerbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections
NAICS Code Work Description Work Item 115310 - Support Activities for Forestry 221310 Water Supply and Irrigation Systems 221320 - Sewage Treatment Facilities 236118 Residential Remodelers 236220 Commercial
More informationSPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment...
SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING TABLE OF CONTENTS 16.1 General...16-1 16.2 Materials...16-1 16.3 Equipment...16-1 16.4 Installation...16-2 16.4.1 Traffic Restrictions...16-2
More informationBRIDGE REHABILITATION. Maintaining and Repairing Existing Structures
BRIDGE REHABILITATION Maintaining and Repairing Existing Structures Types of Bridge Rehabilitation Bridge Deck Overlays Bridge Deck Widening or Replacement Making Bridge Decks Continuous and/or Composite
More informationCID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
More informationUniversity of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage
University of Missouri Hospitals and Clinics Structural Repair and Protection of Post-tensioned Parking Garage 1 University of Missouri Project The University of Missouri Health Care Patient and Visitor
More informationStormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
More informationC. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.
SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers
More informationFoundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
More informationSection 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS
TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationUNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design
Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)
More informationSECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
More informationAlberta Transportation Bridge Inspection & Maintenance System (Web 2005) 00747-1 Bridge. Bridge Inspection. Assistant Name Assistant Class
Bridge File Number Year Built/Year Supstr 00747-1 Bridge 1964/1964 Bridge or Town Name SUNNYSLOPE Located Over Located On 582:04 C1 33.896 Water Body Cl./Year Navigabil. Cl./Year Legal Land Location KNEEHILLS
More informationVILLAS OF TRADITIONS AT GREY OAKS
Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard
More informationSection 600 Incidental Construction
Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...
More informationSECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
More informationLocal Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationLOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS
Concrete Repairs LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. The work will occur within the City of Lowell
More informationFY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
More informationHIGH TENSION CABLE BARRIER
Special Provision September 11, 2006 SECTION 02845 S HIGH TENSION CABLE BARRIER PART 1 GENERAL 1.1 SECTION INCLUDES A. Cable barrier materials and installation procedures. 1.2 RELATED SECTIONS A. Section
More informationPERMEABLE INTERLOCKING CONCRETE PAVEMENT
[NOTE TO SPECIFICATION WRITER: This guide specification for the use of permeable interlocking concrete pavers for pedestrian and vehicular traffic application was developed based on the use of an open-graded
More informationChapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
More informationSE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
More informationSEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard
More informationTable 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
More informationAIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
More informationWATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
More information3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
More informationStorm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
More informationCITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03
CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT
More informationAPPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
More informationRHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY NEWPORT/PELL BRIDGE APRIL 1, 2014 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 2013 DOLLARS)
APRIL, 04 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 03 DOLLARS) 3/8/04 July 03- June 04 July 04- June 05 July 05- June 06 July 06- June 07 July 07- June 08 July 08- June 09 July 09- June 00 July 00- June
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary