Disputes and Claims. 3 Processes Dispute Resolution and Administrative Claims Process

Size: px
Start display at page:

Download "Disputes and Claims. 3 Processes Dispute Resolution and Administrative Claims Process"

Transcription

1

2 Disputes and Claims 3 Processes Dispute Resolution and Administrative Claims Process Default Process C&MS Partnering OR PN 108 -Dispute Review Board (DRB) Considered for use on projects over $20 M and/or of a highly technical nature OR PN 109 Dispute Resolution Advisor (DRA) Considered for use on projects between $5M & $20M

3 Dispute Resolution and Administrative Claims Process STEP 1. On-Site Determination Meeting Project Personnel STEP 2. District Dispute Resolution Committee (DDRC) DDRC District Construction Administrator (DCA) Planning & Engineering Administrator (P&EA) District Deputy Director (DDD)

4 Dispute Resolution and Administrative Claims Process STEP 3. Director s Claims Board Notice of Intent to File a Claim Certified Claim (Notarized) DCB DD Construction DD Engineering DCA of another District

5 Claims Resolution History Year Total # of Claims # Heard by DCB # Heard by ADR # Dropped or Settled

6 Claims Resolution History DISTRICT PROJECT DESCRIPTION OUTCOME (09) Qty. Disagreement (304 Base & Asphalt Surface Course) Court of Claims (12) Casing for Wet Holes DCB Accepted (10) Deficient Deck Grid Installation DCB Accepted (12) Centerline Markings DCB Accepted (11) Shop Applied Inorganic Zinc Primer DCB Accepted (12) SWPPP Costs Pending (12) Kelly Bar DCB Accepted (12) Column Repair Pending (10) Utility Delay/ Reinforcing Steel on Beam Flanges District-Resolved (12) Surface Preparation of Bridge Deck District-Resolved (11) Unsound Patches District-Resolved (11) Readjusting Ph. Deck/ Temp. Pavement Final Calcs. District-Resolved

7 2013 CLAIMS Demand vs. Award DEMAND AWARD % TOTAL STEP 3 CLAIMS $568, $80,

8 DISTRICT 2 DISPUTE RESOLUTION ODOT Project SR -2 Edison Bay Bridge Ottawa/ Erie Co.

9 DISTRICT 2 DISPUTE RESOLUTION ODOT Project SR -2 Edison Bay Bridge Ottawa/ Erie Co.

10

11

12

13

14

15

16 Item 519: Number of Square Feet of exposed surface of all completed patches.

17

18 Item 519.irrespective of the depth or thickness of the patch

19

20 Final Acceptance Inspection

21

22

23 Step 1 ODOT Patches do not meet specifications-repair/replace them. Contractor We disagree, would like to move to Step 2

24 Step 2 Contractor Patches being variable depthlends to differences in sounding Sounding with claw hammer is not scientific method to determine patch quality Area around Galvanic Anodes may sound different due to differences in patch material

25 Step 2 Cont d. Vibration from live overhead traffic may have caused bonding issues 61% of all work was performed by force account, but ODOT never requested any changes in methodology during the force account work

26 Step 2 Cont d All patches were sounded at the times the forms were removed ODOT Bridge Manual does not recommend patching spalls over traffic or other safety sensitive areas because of potential debondingcould create a hazard

27 Step 2 ODOT Does not meet specifications Contractor never sounded patches Worried that patches may fall at some point injuring boaters/fisherman

28 Step 3 Preparation Could not verify original plan design Difference of opinion as to original design Difference of opinion of a repair plan Potential repair-fiber Wrap -requires experience Contractor wanted to settle outstanding payment issues and close out project District agreed to perform any future fixes under a new contract

29 Settlement Split the cost of the Pull-Off Test Approximately $10,000 ea. Split the 2-inch Depth issue Approximately $ 4, ea. Contractor agreed to refund $40,000 to the project ODOT agree to modify the contractors C-95 scores related to the patch work Prime Contractor agree to waive his 5% mark-up on the Settlement items.

30 Best Practices All parties wished they would ve paid more attention to thoroughly sounding the original patches as they were completed in the first season. Clarity of plan notes and what s included in the bid item for payment

31 Thank You

32 DISTRICT 10 DISPUTE RESOLUTION Project: (HOC ) District Step 2 Dispute Resolution

33 Claim Pile Encasement Background: This project included the replacement of a three span continuous slab on capped pile abutments and piers. To protect against scour, the district Bridge Engineer and Designers prefer to encase new piles with polyethylene pipe and Class C concrete, and tried to express this by inserting a plan note. The Dispute involves whether the Contractor has the option to galvanize the piles in lieu of the encasement.

34 Claim Pile Encasement

35 Claim Pile Encasement Contractor s Position: The contractor contended that the Standard Drawing CPP-1-08 called out on the plans allows the option of galvanizing or concrete encasing the piles. The contractor also pointed out that the plan note mentioned galvanizing in it. In the Contractor s opinion, the note reiterates the option of galvanizing in lieu of encasement.

36

37 Claim Pile Encasement District s Position: The District contended that the note does instruct the contractor to encase the piles. The District also contended that this same scenario happened on a previous project where the Area Engineer told the contractor in the future it was always going to be the District s preference to encase the piles. The District instructed CGCC to encase the piles after they were ordered with galvanizing.

38 Claim Pile Encasement Findings: The DDRC agreed that there is some confusion in the note shown in the plans because it included language taken directly from the Standard Drawing which includes how galvanizing will be paid for. The DDRC awarded Complete General Construction Company $13, The costs were not in dispute.

39 Claim Pile Encasement

40 Claim Downtime for H-Pile Decision Background: During construction of a three span continuous slab, the contractor damaged an HP10 x 42 pile while trying to achieve refusal, which the Department describes as penetrating bedrock for several inches as to a minimum resistance of 20 blows per inch. When the contractor tried to achieve this, the top of the piles began to deform. There was some downtime while the Department made a decision regarding the blow count, and remaining piles.

41 Claim Downtime for H-Pile Decision Contractor s Position: The contractor contended that it lost work time waiting on a decision from the Department to continue driving piling after piles were damaged. During the pile driving operation the Department stopped work after the first pile became damaged before reaching the required 20 blows per inch. There was some confusion as to whether the Department actually allowed the contractor to reduce the required blows, and a call was made to Central Office to see if that was an option. It took approximately three hours to get an answer back to the project. The contractor requested compensation for down time during this three hours of $

42 Claim Downtime for H-Pile Decision District s Position: The district believed by spec that it was up to the contractor to size the hammer to appropriately drive the piling to refusal without damage. It was the belief of the district that the hammer used was too large for the relatively small piles. The district also took the position that by spec the contractor is required to stop the pile driving operation when damage occurs.

43 Claim Downtime for H-Pile Decision Findings: The DDRC found that the project was correct when it stopped work after seeing the damage to the pile, and that the district was diligent in the response to help come up with a solution once the damage occurred. The DDRC ruled that the District did not owe damages in this case, Complete General accepted the ruling.

44 DISTRICT 12 DISPUTE RESOLUTION District 12 Presenters: Pat McCafferty, Area Engineer Greg Kronstain, District Construction Administrator

45 Step One Dispute Resolution Project Contractor -The Great Lakes Construction Company. Project Details Bridge Reconstruction on 3 Structures over RTA and NS tracks. Active project that is 55% complete.

46 Step One Dispute Resolution

47 Step One Dispute Resolution Contractor s Disputes 1. Daily movement of concrete barrier wall 2. Flagging traffic into parking lot 3. Noise ordinance shutdown 4. RTA delay de-energizing catenary lines 5. RTA delay reattaching catenary lines

48 Step One Dispute Resolution for Barrier Wall Relocation and Flagging Costs Plan Location of Barrier Wall

49 Step One Dispute Resolution for Barrier Wall Relocation and Flagging Costs Contractor s Position - Excavation work required daily movement of barrier wall - Flagger required to maintain access to church parking lot

50 Step One Dispute Resolution for Barrier Wall Relocation and Flagging Costs Plan Excavation Limits

51 Step One Dispute Resolution for Barrier Wall Relocation and Flagging Costs Daily Movement of Barrier Wall w/ Flagger to Maintain Access to Church Parking Lot.

52 Step One Dispute Resolution for Barrier Wall Relocation and Flagging Costs Project Engineer s Position - Sheeting required to complete work as shown on plans and to maintain access to parking lot

53 Step One Dispute Resolution for Barrier Wall Relocation and Flagging Costs

54 Step One Dispute Resolution for Barrier Wall Relocation and Flagging Costs Area Engineer looked at the plans and went to site and talk to both parties

55 Step One Dispute Resolution for Barrier Wall Relocation and Flagging Costs D12 s Decision Sheeting not required. ODOT agreed to pay for one remobilizing of barrier wall. ODOT agreed to pay for additional asphalt to widen apron. ODOT agreed to pay for additional concrete base replacement. ODOT agreed to move waterline to avoid relocated barrier and additional pavement removal

56 Step One Dispute Resolution for Barrier Wall Relocation and Flagging Costs Placed Temporary Asphalt to Widen Apron

57 Step One Dispute Resolution for Barrier Wall Relocation and Flagging Costs New Concrete Pavement Required under Asphalt

58 Step One Dispute Resolution for Barrier Wall Relocation and Flagging Costs Waterline moved to stay within relocated barrier wall.

59 Step One Dispute Resolution for Noise Ordinance Contractor s Dispute 3. Noise ordinance shutdown

60 Step One Dispute Resolution for Contractor s Position Noise Ordinance - City notified contractor after the night crew had started to work. - Incurred extra costs leaving the project before putting in a full night of work.

61 Step One Dispute Resolution for Noise Ordinance Project Engineer s Position - Plan note did not allow night work.

62 Step One Dispute Resolution for Noise Ordinance Area Engineer looked at the plans and talked on the phone to both parties

63 Step One Dispute Resolution for Noise Ordinance D12 s Decision - Request for compensation denied. - Future night work would require a noise waiver from the City

64 Step One Dispute Resolution for RTA Delays (During Weekend Shutdown) Contractor s Dispute 4. RTA delay de-energizing catenary lines 5. RTA delay reattaching catenary lines

65 Step One Dispute Resolution for RTA Delays (During Weekend Shutdown) Contractor s Position - Incurred extra costs waiting for RTA to turn off the power to the catenary lines. - Incurred extra costs while RTA decided if the temporary protective structure (supporting the catenary lines) could be removed.

66 Step One Dispute Resolution for RTA Delays (During Weekend Shutdown) Project Engineer s Position - RTA s Special Provisions do not guarantee outages or the time they will occur.

67 Step One Dispute Resolution for RTA Delays (During Weekend Shutdown) Area Engineer looked at the plans, special provisions, and talked on the phone to both parties.

68 Step One Dispute Resolution for RTA Delays (During Weekend Shutdown) D12 s Decision - Request for compensation denied for RTA s delay to turn off the power to the catenaries, but compensation granted for the delay while waiting for the RTA decision of the canopy removal.

69 Dispute Resolution District 12- Project

70 DisputeResolution Resolution of Disp , prior to Step 2 Project , Willow Avenue Lift Bridge Location-City of Cleveland Contractor- The Ruhlin Company Sub-Contractor- Perram Electric Project Bid Cost- $3.9M

71 Willow Avenue Lift Bridge

72 Willow Avenue Lift Bridge

73 DisputeResolution City of Cleveland project The project work- Replacing the lift span deck and stringers Rehabilitation of the electrical and mechanical systems Other related bridge repairs

74 DisputeResolution Dispute Description-Damage to the Automatic Transfer Switch (ATS) occurred during the rehabilitation of the electrical system. The Contractor agreed to replace the ATS at their cost in the original location. Estimated cost $9927. However, there was a differing interpretation of National Electrical Code (NEC) regarding the installation of this new equipment

75 Dispute Resolution Existing ATS New ATS

76 DisputeResolution Contractor Position- Replacing ATS in existing location is in compliance with C&MS Would restore property damage to a condition similar or equal to that existing before the damage - Would meet requirements of NEC

77 DisputeResolution National Electrical Code- Article Space About Electrical Equipment Requires sufficient access and working space to be provided and maintained to permit ready and safe operation and maintenance for panels. Access was only available by ladder

78 DisputeResolution Electrical Schematic

79 DisputeResolution Contractor was directed to relocate ATS No agreement on NEC requirement ODOT agreed that the project did receive a considerable betterment

80 DisputeResolution New Location Actual Cost = $26,177 w/out markups = $21,605 Existing Location Est d. Cost = $9,927 w/out markups = $8,461 Difference = $13,144 labor diff. markup = $1,214 Total settlement = $14,358

81 DisputeResolution Summary- This settlement is an example of: Good communication between the Contractor and ODOT Working together for a resolution

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.

More information

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway: Texas Depadment of Transpo,tation Bridge Condition Survey Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway: Irving Street Facility Name: Lone Wolf Bridge Structure Number: B00315-031

More information

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 To: From: Date: Subject: Mr. Thomas Gibson, City of St. Petersburg Jeffrey D. Malyszek, PE and Deborah C.

More information

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR 1.0 SCOPE OF

More information

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E. Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double

More information

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective FHWA NATIONAL GEOTECHNICAL PROGRAM www.fhwa.dot.gov/engineering/geotech Why Geotechnical Instrumentation? Provide warning

More information

Paving Capitalization Work Categories and Treatments

Paving Capitalization Work Categories and Treatments Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units

Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units Thomas Kline Director- Concrete Repair Solutions STRUCTURAL TECHNOLOGIES, LLC Houston, Texas USA November

More information

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing. CONCRETE REPAIR GUIDELINES Concrete repairs can be broken down into four basic types, plus special repairs and planing. Note: It is recommended that investigation into soundness of pavement be performed

More information

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement. 2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

Contract Administration

Contract Administration Chapter 5 Contract Administration Section 3 Change Orders 5-301 General 5-302 Change Order Policy 5-303 Purpose of Change Orders 5-304 Initiation of Change Orders 5-305 Preliminary Considerations 5-306

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

ALBEMARLE COUNTY SERVICE AUTHORITY

ALBEMARLE COUNTY SERVICE AUTHORITY ALBEMARLE COUNTY SERVICE AUTHORITY AGENDA ITEM EXECUTIVE SUMMARY AGENDA TITLE: All Saints Anglican Church Request Turn Lane Project STAFF CONTACT(S)/PREPARER: Gary O Connell, Executive Director Jeremy

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900

September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900 September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation

More information

Failing Coastal Wood Infrastructure on the Great Lakes

Failing Coastal Wood Infrastructure on the Great Lakes University of Wisconsin Sea Grant Institute Contact Gene Clark grclark@aqua.wisc.edu 715-392-3246 Failing Coastal Wood Infrastructure on the Great Lakes Gene Clark/UW Sea Grant Institute Introduction Many

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

Elevating Your House. Introduction CHAPTER 5

Elevating Your House. Introduction CHAPTER 5 CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,

More information

DISPUTE RESOLUTION AND ADMINISTRATIVE CLAIM PROCESS

DISPUTE RESOLUTION AND ADMINISTRATIVE CLAIM PROCESS City of Cincinnati Proposal Note 025 10/15/2004 DISPUTE RESOLUTION AND ADMINISTRATIVE CLAIM PROCESS The Contractor must follow this process in order to resolve disputes on the project and to seek additional

More information

1 OF 7. there will be few "surprises" as the work progresses.

1 OF 7. there will be few surprises as the work progresses. 1 OF 7 FP-G1.94 GUIDELINES FOR SUCCESSFUL SUPERVISION OF SCHOOL DISTRICT CAPITAL CONSTRUCTION PROJECTS There is no doubt that the successful completion of any capital construction project is the result

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

CAPPELEN MEMORIAL BRIDGE REHABILITATION

CAPPELEN MEMORIAL BRIDGE REHABILITATION CAPPELEN MEMORIAL BRIDGE REHABILITATION Owner: Hennepin County Engineering: HNTB with Olson-Nesvold Engineering (ONE) and others Section 106 Historical Committee: Hennepin County, MnDOT Cultural Resources

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced

More information

Emergency repair of Bridge B421

Emergency repair of Bridge B421 Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs - Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route

More information

2010-2011 Contractor of the Year

2010-2011 Contractor of the Year U.S. Army Corps of Engineers: Little Calumet River Stage VII Steel Sheet Piling Installation Hammond, Indiana Thatcher worked two rigs concurrently one on the north side and one on the south. The United

More information

Developing Critical Path Method Scheduling (CPM)

Developing Critical Path Method Scheduling (CPM) Developing Critical Path Method Scheduling (CPM) Pretest 1. An activity which is on critical path has a planned duration of 5 days. What is the total float for the activity? a. 0 b. 1 c. 2 d. 3 Pretest

More information

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

GLOSSARY OF TERMINOLOGY

GLOSSARY OF TERMINOLOGY GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.

More information

7C. Consideration of approving a cost-sharing plan for sanitary sewer repairs at 413 West Broadway (PID 155-010-049080) (MT/SB)

7C. Consideration of approving a cost-sharing plan for sanitary sewer repairs at 413 West Broadway (PID 155-010-049080) (MT/SB) City Council Agenda: 02/09/14 7C. Consideration of approving a cost-sharing plan for sanitary sewer repairs at 413 West Broadway (PID 155-010-049080) (MT/SB) A. REFERENCE AND BACKGROUND: City Council is

More information

SECTION 02401 SHEETING, SHORING AND BRACING

SECTION 02401 SHEETING, SHORING AND BRACING SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State

More information

Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia

Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia International Concrete Repair Institute Spring Convention Reno, Nevada March 20, 2014 Michael Sprinkel, PE.,

More information

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION

GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION Issam ElKhatib, P.Eng., Dennis Baxter, P.Eng. Totten Sims Hubicki Associates, Canada Abstract The rehabilitation history of the Garden City Skyway Bridge

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

A. This Section includes rubberized asphalt sheet membrane waterproofing systems. SECTION 07110 SHEET MEMBRANE WATERPROOFING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

ATLAS RESISTANCE Pier Foundation Systems

ATLAS RESISTANCE Pier Foundation Systems ATLAS RESISTANCE Pier Foundation Systems Foundation Repair Systems for Civil Construction Applications: Residential, Commercial, Industrial Atlas Resistance Piers have been used to restore and/or stabilize

More information

FLOOD DAMAGE PREVENTION ORDINANCE

FLOOD DAMAGE PREVENTION ORDINANCE FLOOD DAMAGE PREVENTION ORDINANCE SECTION 1.0 STATUTORY AUTHORIZATION, FINDINGS FO FACT, PURPOSE, AND OBJECTIVES 1.1 STATUTORY AUTHORIZATION The Legislature of the State of Washington has in RCW delegated

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

Pavement Management Implementation: Success Stories for Maryland Counties

Pavement Management Implementation: Success Stories for Maryland Counties Pavement Management Implementation: Success Stories for Maryland Counties September 25, 2015 Aaron D. Gerber, P.E. How Does Your Organization Manage Pavement Assets? By Experience/Past Practice? By Customer

More information

Hartsfield-Jackson Atlanta International Airport s

Hartsfield-Jackson Atlanta International Airport s Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,

More information

ODOT and KCC - Contract Completion Date Expired

ODOT and KCC - Contract Completion Date Expired FULTON ROAD BRIDGE PROJECT Asbestos Containing Material Delay Claim DRB FINDINGS AND RECOMMENDATIONS I. BACKGROUND AND SUMMARY LEVEL DESCRIPTION OF CLAIM A. Project Description The Project Work includes

More information

Baton Rouge Foundation Repair

Baton Rouge Foundation Repair Baton Rouge Foundation Repair 13822 Florida Blvd Bldg 3 Baton Rouge, LA 70819 Baton Rouge Foundation Repair offers services to correct the settlement of both Slab foundations and Pier & Beam foundations

More information

Document No 62/04/03 Issue Date: 16 December 2004 FLOOD DAMAGE REPAIRS TO LOCAL ROADS SPECIAL FUNDING ASSISTANCE PROCEDURE MANUAL

Document No 62/04/03 Issue Date: 16 December 2004 FLOOD DAMAGE REPAIRS TO LOCAL ROADS SPECIAL FUNDING ASSISTANCE PROCEDURE MANUAL Document No 62/04/03 Issue Date: 16 December 2004 FLOOD DAMAGE REPAIRS TO LOCAL ROADS SPECIAL FUNDING ASSISTANCE PROCEDURE MANUAL This document is owned and authorised by the Manager Budget and Program

More information

Photo 2. View showing flour mill, machine shed, veranda and saw mill + storage shed.

Photo 2. View showing flour mill, machine shed, veranda and saw mill + storage shed. May 7,2015 KSANDER & ASSOCIATES CONSULTING PROFESSIONAL ENGINEERS 130 HUINTER STREET, UNIT 103, PETERBOROUGH, ONTARIO K9H2K8 TELEPHONE (705) 743-9221 FAX 743-0904 Ontario Region Conservation Authority

More information

ADDENDUM NO. 2. DATE: September 14, 2015 INVITATION FOR BID: IFB J160004535 Fire Station #22 Roof Replacement Project DATED: August 25, 2015

ADDENDUM NO. 2. DATE: September 14, 2015 INVITATION FOR BID: IFB J160004535 Fire Station #22 Roof Replacement Project DATED: August 25, 2015 ADDENDUM NO. 2 DATE: September 14, 2015 INVITATION FOR BID: IFB J160004535 Fire Station #22 Roof Replacement Project DATED: August 25, 2015 RECEIPT DATE: September 30, 2015 (CHANGED) OPENING DATE: October

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS

CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS I "i,, I, 1 " CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS CHAPTER 10 PERMIT PROCEDURES A N D BONDING REQUIREMENTS FOR CONTRACTORS, Section I -, INDEX :, - % I I,,J Topic b 101

More information

RESOLVING DISPUTES WITH YOUR CONTRACTOR

RESOLVING DISPUTES WITH YOUR CONTRACTOR RESOLVING DISPUTES WITH YOUR CONTRACTOR Information for Filing a Complaint Oregon Construction Contractors Board PO Box 14140 Salem, OR 97309-5052 Phone: 503-934-2247 Fax: 503-373-2007 www.oregon.gov/ccb

More information

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month , as published in July 2008 Opflow Question of the Month Thanks to: Mike Grahek, Los Angeles Department of Water, Los Angeles, California Ahmad Havivian, Black & Veatch, Gaithersburg, Maryland David Kroon,

More information

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,

More information

2006 ICRI Baltimore Washington Chapter Outstanding Repair Project Award George Washington University Ross Hall Façade Restoration

2006 ICRI Baltimore Washington Chapter Outstanding Repair Project Award George Washington University Ross Hall Façade Restoration 2006 ICRI Baltimore Washington Chapter Outstanding Repair Project Award George Washington University Ross Hall Façade Restoration 2006 ICRI Baltimore Washington Chapter Outstanding Repair Project Award

More information

WSDOT Bridge Elements

WSDOT Bridge Elements Chapter 4 WSDOT Bridge Elements 4.01 List of WSDOT Elements by Number 12 Concrete Deck............................... 4-14 13 Bridge Deck Surface........................... 4-14 14 Fully Supported Concrete

More information

For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project

For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project DOCUMENTS For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project February 11, 2013 OWNER Sandy Suburban Improvement District 8855 South 700 West Sandy, UT 84070

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT Project Description and Scope The City and County of Broomfield, Colorado (Broomfield) hereby solicits this Request for Qualifications (RFQ) to prequalify and shortlist up to five (5) foundation repair

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

How To Get A Street Opening Permit In Belham

How To Get A Street Opening Permit In Belham TOWN OF BELLINGHAM STREET OPENING SPECIFICATION December 2004 - Revisions I. GENERAL A. Definitions and Abbreviations: Town Street shall mean a Town owned right of way or public travel way that the Town

More information

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee

More information

Structural Audit of Buildings

Structural Audit of Buildings International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 4 (2014), pp. 411-416 Research India Publications http://www.ripublication.com/ijcer.htm Structural Audit of Buildings

More information

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall TOWN of NEW BOSTON Bid Package Refurbishment and Upgrade of Basement of the New Boston Town Hall Your bid Envelope must be marked with Basement Upgrade at Town Hall and the due date and time. If you send

More information

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address: City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit

More information

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-A412 Water Connection Repair

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-A412 Water Connection Repair Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-A412 Water Connection Repair 1. Objective: 1.1. To repair the water connection in a timely and efficient manner, minimizing

More information

Repair and Strengthening of Bridge Substructures

Repair and Strengthening of Bridge Substructures Marquette University e-publications@marquette Master's Theses (2009 -) Dissertations, Theses, and Professional Projects Repair and Strengthening of Bridge Substructures Steven W. Ainge Marquette University

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

Asphaltic Wedge Paving

Asphaltic Wedge Paving OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments

More information

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software. DESCRIPTION: '108-01, Start and Progress of Work, is hereby amended to require that the Contractor furnish and participate in a computerized CPM (critical path method) network scheduling system. The purpose

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

Pro-Lift Steel Pile Foundation Repair

Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair System Pro-lift steel piles are designed for the stresses of Texas soils. They can have multiple steel walls, depending on the

More information

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC.

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. Drilling since 1916 2215 Belknap Place Phone (210) 824-3800 San Antonio, TX 78212-1904 Fax (210) 824-9525 www.duderstadtfoundation.com ABOUT THE COVER: Drilled

More information

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are

More information

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial

More information

QUESTIONS & ANSWERS LOG

QUESTIONS & ANSWERS LOG QUESTIONS & ANSWERS LOG AUTHORIZATION OF EXTRA WORK (AEW) Q: Is an Authorization of Extra Work form required for all increases in quantities, even for an FCP? A: An Authorization of Extra Work (AEW) form

More information

Proposed Revision to Bridge Design & Drafting Manual

Proposed Revision to Bridge Design & Drafting Manual INTEROFFICE MEMO TECHNICAL SERVICES Bridge Engineering Section Office Phone: (503) 986-4200 Fax Number: (503) 986-3407 DATE: February 5, 2014 TO: Scott Liesinger Bridge Design Standards Engineer FROM:

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

Attachment 5 Electrical Engineering

Attachment 5 Electrical Engineering A. Phase 1, Preliminary Design: The CONSULTANT shall: Attachment 5 Electrical Engineering 1. Ascertain the requirements for each project through a meeting with the Capital Projects Division Manager or

More information

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report CITY OF COOS BAY CITY COUNCIL Agenda Staff Report MEETING DATE August 4, 2015 AGENDA ITEM NUMBER TO: Mayor Shoji and City Councilors FROM: Aaron Real, Engineering Technician THROUGH: Jim Hossley, Public

More information