1 APRIL, 04 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 03 DOLLARS) 3/8/04 July 03- June 04 July 04- June 05 July 05- June 06 July 06- June 07 July 07- June 08 July 08- June 09 July 09- June 00 July 00- June 0 July 0- June 0 July 0- June 03 ($000) Bridge Deck Evaluation (concrete) and Full Depth Replacement (See note 8 below) Study/ 5,00 5,00 0,00 (Deck) ,740 East Approach Project Total,940 Bridge Deck Sealing (concrete) (Deck) 3 Bridge Deck Slab Partial Depth ilitation (Hydrodemolition) (concrete) Project Total 48 8,900 8,900 8,900 6,700 (Deck) ,665 Main Span Approaches Project Total 8,365 4 Bridge Deck Patching Roadway/Approaches (concrete) (Deck) Project Total,08

2 APRIL, 04 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 03 DOLLARS) 3/8/04 July 03- June 04 July 04- June 05 July 05- June 06 July 06- June 07 July 07- June 08 July 08- June 09 July 09- June 00 July 00- June 0 July 0- June 0 July 0- June 03 ($000) Bridge Deck Joint and Header Repairs (concrete) ,50 5 (Deck) Project Total,5 6 ilitation of West Approach Roadway Pavement (asphalt) (See note 7 below) (Roadway) 5 5 Project Total 55 Structure "E" Maintenance and Repairs Study/ ,500, (Deck) Project Total 3,075 8 Removal of loose haunches (combine with appropriate contracts) (concrete) Maint (Deck) 0 Project Total 365

3 APRIL, 04 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 03 DOLLARS) 3/8/04 July 03- June 04 July 04- June 05 July 05- June 06 July 06- June 07 July 07- June 08 July 08- June 09 July 09- June 00 July 00- June 0 July 0- June 0 July 0- June 03 ($000) 9 Concrete repairs on prestressed beams, piers, abutments and anchorages (Contract -) 5 5 (Sub Structure) 8 8 Project Total 59 Placing Protective Concrete Jacketing on West Prot. Cells,09,09 0 (Sub structure) Project Total,99 Painting of steel superstructure Maint. 5,000,866 3,900 6,730 6,730 35,7 (Paint) ,549 East Approach (Contract -) West Approach Project Total 37,776 Steel Superstructure Repairs/Retrofits,00 4,330,400,00,00 9,330 (Steel super structure) East Approach (Contract -) West Approach Project Total 9,959

4 APRIL, 04 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 03 DOLLARS) 3/8/04 July 03- June 04 July 04- June 05 July 05- June 06 July 06- June 07 July 07- June 08 July 08- June 09 July 09- June 00 July 00- June 0 July 0- June 0 July 0- June 03 ($000) 3 Main Cable Unwrapping, Inspection, Testing & Repairs Upgrade 3,74 Needs to be det'd by 08 insp. 3,74 (Steel specialty) Project Total 3,903 4 Tower Link Repairs and Cable Bent Pin Repairs Seismic Vulnerability Study and Upgrade Maint (Steel specialty) 4 Project Total 45 Upgrade Scope of work to be determined by study. 0 5 (Sub structure/ super structure/ bearings) 546 Scope of work to be determined by study. 546 Project Total 546 Bearing Replacements Upgrade,83,83 3,36 3,36, Project Total,67

5 APRIL, 04 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 03 DOLLARS) 3/8/04 July 03- June 04 July 04- June 05 July 05- June 06 July 06- June 07 July 07- June 08 July 08- June 09 July 09- June 00 July 00- June 0 July 0- June 0 July 0- June 03 ($000) 7 Security Assessment, Security Cameras, Fencing and Security Monitoring - Bridge Armoring (See note 6 below) Bridge Armoring to be Implemented as Upgrade 0 soon as funds are available (Safety) 0 Project Total 0 8 FCM Inspections Insp ,57 Project Total 4,57 9 Underwater Inspection Insp ,48 Project Total,48 Archive original design dwgs & shop drawings Upgrade (Admin) 0 Project Total 60 Study/Implementation of Adding a Median Barrier Including Wind Study (See Note 9) Upgrade 6,000 3,500 9,500 (Safety) ,300 Project Total 0,800

6 APRIL, 04 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 03 DOLLARS) 3/8/04 July 03- June 04 July 04- June 05 July 05- June 06 July 06- June 07 July 07- June 08 July 08- June 09 July 09- June 00 July 00- June 0 July 0- June 0 July 0- June 03 ($000) Rocker Bearing Repairs/Resetting Repair (Bearings) 43 Project Total 6 3 Update As-Built and As-Inspected Load Ratings Variable Message Signs Upgrade Maint Project Total 50 Upgrade (Safety) 5 Road and Facility Infrastructure Upgrades Project Total 437 Upgrade , Project Total,600

7 APRIL, 04 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 03 DOLLARS) 3/8/04 July 03- June 04 July 04- June 05 July 05- June 06 July 06- June 07 July 07- June 08 July 08- June 09 July 09- June 00 July 00- June 0 July 0- June 0 July 0- June 03 ($000) 6 Miscellaneous Maint & Repairs Maint Project Total 50 EST'D EXPENDITURE BY FISCAL YEAR 8,449 7,838 9,409 3,505 7,004 5,65 3,798 6,56 7,64 3,64 33,409 MOUNT HOPE S BOTH BRIDGES,456 6, ,09 4,993 7, $37,38 9,906 34,358 9,84 7,54 3,997 3,443 4,3 7,0 8,35 4,09 70,647 NOTES: All estimates are preliminary budget estimates based on available information and indicate the approximate magnitude of anticipated cost. Projects identified under maintenance category are for the preservation of structural integrity. 3 Projects identified under upgrade are for bridge system preservation, updating to current standards and for improvement in level of service. 4 Detail project scoping will be performed on a project basis. 5 costs for all projects have been typically projected as 0% of the estimated construction cost. 6 - Full Depth Costs Future expected costs to be determined by study and results of hydro-demolition partial depth replacement For Maintaining Structual Integrity Upgrade/Improvement For Meeting Standards/Safety - High, Medium, 3 Low Boston ENR BCI July 0: December 0:

Rehabilitation Options. Replacement Options. Option 1 - $3,400 million Option 1 - $5,200 million. Option 2 - $6,400 million. Option 2 - $6,400 million

Rehabilitation Options. Replacement Options. Option 1 - $3,400 million Option 1 - $5,200 million. Option 2 - $6,400 million. Option 2 - $6,400 million Alternatives Analysis for ilitation and of the Tappan Zee Bridge 8 Cost Criteria 8.1 Introduction This chapter presents details of the three cost criteria, Capital Cost, Maintenance and Operating Cost

More information

Paving Capitalization Work Categories and Treatments

Paving Capitalization Work Categories and Treatments Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods

More information

CITY OF TRAIL MEMORANDUM

CITY OF TRAIL MEMORANDUM 0 C CITY OF TRAIL MEMORANDUM DATE: TO: FROM: SUBJECT: March 24, 2011 FILE NO. 5400-02 DAVID PEREHJJDOFF, CHIEF ADM1NTSTRATIVE OFFICER WARREN PROULX, ENGINEERING TECHMCIAN OLD TRAIL BRIDGE With the interest

More information

2013 Virginia Concrete Conference Joint Maintenance and Best Practices in Deck Joint Replacement

2013 Virginia Concrete Conference Joint Maintenance and Best Practices in Deck Joint Replacement 2013 Virginia Concrete Conference Joint Maintenance and Best Practices in Deck Joint Replacement Jeff Milton Bridge Preservation Specialist Structure and Bridge Division March 8, 2013 Presentation Outline

More information

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway: Texas Depadment of Transpo,tation Bridge Condition Survey Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway: Irving Street Facility Name: Lone Wolf Bridge Structure Number: B00315-031

More information

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement. 2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project

More information

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs - Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

1,045 m length of the Deh Cho Bridge

1,045 m length of the Deh Cho Bridge Innovative Design Features: Lightweight truss: The principles of lightweight design led to a saving of 25% in the use of structural steel. State of the art deck system: Designed as a four-way slab, it

More information

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee

More information

EXPANDING THE USE OF PRECAST CONCRETE IN TEXAS BRIDGES

EXPANDING THE USE OF PRECAST CONCRETE IN TEXAS BRIDGES EXPANDING THE USE OF PRECAST CONCRETE IN TEXAS BRIDGES Graham Bettis, P.E. TxDOT Bridge Division Construction & Maintenance Just the Facts Total Number of On-System Bridges (Excluding Culverts): 21,686

More information

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE Danijel Tenžera, Krešimir Futivić, Boris Ukrainczyk Summary Bridge structures deteriorate with years of use and exposure to adverse environmental

More information

Bridge Type Selection

Bridge Type Selection Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION

GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION Issam ElKhatib, P.Eng., Dennis Baxter, P.Eng. Totten Sims Hubicki Associates, Canada Abstract The rehabilitation history of the Garden City Skyway Bridge

More information

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 4. STRUCTURAL ANALYSIS AND EVALUATION The analysis of bridges and structures is a mixture of science and engineering judgment. In most cases, use simple models with

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E. Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Short Span Bridge Design Alternatives

Short Span Bridge Design Alternatives Conference Short Span Bridge Design Alternatives By: Jack Elston, P.E., Steve Megginson, P.E., S.E. AGENDA Introduction Bridge Planning Alternatives Design Comparisons Summary 2 Introduction Pragmatic

More information

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed

More information

NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION BUREAU OF BRIDGE DESIGN BRIDGE DETAILS - REVISION HISTORY

NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION BUREAU OF BRIDGE DESIGN BRIDGE DETAILS - REVISION HISTORY 1 of 10 10/1/2015 Revised note #3 to: Joint (behind backwall, brush Expansion joint opening shall be adjusted to curb) temperature anticipated just prior to pouring deck blockout. Final setting in the

More information

Marketing Bridge Preservation UTAH Perspective

Marketing Bridge Preservation UTAH Perspective Marketing Bridge Preservation UTAH Perspective Southeast Bridge Preservation Conference Orlando, Florida April 2010 David Eixenberger, SE, MBA Utah Branch Manager T.Y. Lin International Special Thanks

More information

WSDOT Bridge Elements

WSDOT Bridge Elements Chapter 4 WSDOT Bridge Elements 4.01 List of WSDOT Elements by Number 12 Concrete Deck............................... 4-14 13 Bridge Deck Surface........................... 4-14 14 Fully Supported Concrete

More information

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE Proceedings of the International Symposium on Engineering Lessons Learned from the 2011 Great East Japan Earthquake, March 1-4, 2012, Tokyo, Japan REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Asset Management Plan Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 4 3.0 State of County of Simcoe s Infrastructure... 7 4.0 Levels of Service... 14 5.0 Asset

More information

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 To: From: Date: Subject: Mr. Thomas Gibson, City of St. Petersburg Jeffrey D. Malyszek, PE and Deborah C.

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES

OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES ROAD PAVEMENTS FORUM TWENTY-FIFTH MEETING 7 May 2013 OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES Michael Roux (CSIR Built Environment) Acknowledgements SANRAL Team Members:

More information

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 RICK SCOTT GOVERNOR Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 JIM BOXOLD SECRETARY Tips for Professional Services Prequalification Resume Submission In an effort

More information

AASHTOWare BrDR 6.8 Miscellanous Tutorial How BrDR Computes the Effective Flange Width

AASHTOWare BrDR 6.8 Miscellanous Tutorial How BrDR Computes the Effective Flange Width AASHTOWare BrDR 6.8 Miscellanous Tutorial How BrDR Computes the Effective Flange Width Std Effective Flange Width BrD/BrR/BrDR computes Std effective flange width based on AASHTO Standard Specifications

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

Bridge Management System: an Italian Experience SAGGI

Bridge Management System: an Italian Experience SAGGI Bridge Management System: an Italian Experience SAGGI Fare clic per modificare lo stile del sottotitolo dello schema International Bridge Forum, Kings College, Cambridge, UK, 13th-16th September 2009 Bridges

More information

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

REQUEST TO QUALIFY (RTQ) INFORMATION FOR

REQUEST TO QUALIFY (RTQ) INFORMATION FOR I. INTRODUCTION: REQUEST TO QUALIFY (RTQ) INFORMATION FOR GEORGE WASHINGTON BRIDGE REPLACEMENT OF THE PIP HELIX RAMP AND REHABILITATION OF UPPER LEVEL SPANS OVER NJ ANCHORAGE AND HUDSON TERRACE CONTRACT

More information

Overhang Bracket Loading. Deck Issues: Design Perspective

Overhang Bracket Loading. Deck Issues: Design Perspective Deck Issues: Design Perspective Overhang Bracket Loading Deck overhangs and screed rails are generally supported on cantilever brackets during the deck pour These brackets produce an overturning couple

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

ESI Consultants, Ltd. PROJECT EXPERIENCE

ESI Consultants, Ltd. PROJECT EXPERIENCE CRAWFORD COUNTY, ILLINOIS NBIS Program Manager and Bridge Inspection services provided for 123 structures throughout Crawford County. Routine Maintenance/Safety Inspection of existing bridges was performed

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to

More information

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015 I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General

More information

INDOT Bridge Asset Engineers

INDOT Bridge Asset Engineers Common Bridge Maintenance Issues Pete White, P.E. Greenfield District Bridge Asset Engineer, INDOT February 16, 2016 INDOT Bridge Asset Engineers LaPorte (Northwest) - Steve Benczik, P.E. (Outgoing) Mark

More information

Four-Span PS Concrete Beam AASHTO Type III Continuous Spans Input

Four-Span PS Concrete Beam AASHTO Type III Continuous Spans Input Four-Span PS Concrete Beam AASHTO Type III Continuous Spans Input As-Built Model Only November, 2011 VDOT VERSION 6.2 1 DETAILED EXAMPLE FOUR-SPAN PS CONCRETE BEAM AASHTO TYPE III CONTINUOUS SPANS INPUT

More information

Structural Condition and Replacement Memorandum

Structural Condition and Replacement Memorandum Structural Condition and Replacement Memorandum Prepared by: D. Morales, MSA Design & Consulting Checked by: C. Subrizi, MSA Design & Consulting Reviewed by: Roupen Donikian, PB Submitted by: Gary Kennerley,

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

Inspection Data for Bridge Asset Management

Inspection Data for Bridge Asset Management Inspection Data for Bridge Asset Management New York State DOT approach and Practice George A. Christian, P.E. New York State Department of Transportation Vermont AOT Bridge Maintenance and Preservation

More information

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can

More information

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County

More information

US 51 Ohio River Bridge Engineering and Environmental Study

US 51 Ohio River Bridge Engineering and Environmental Study US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents

More information

Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12)

Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12) Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12) Design Criteria AASHTO LRFD Bridge Design Specifications, 6th Edition; Structures Detailing Manual (SDM); Structures Design Guidelines (SDG)

More information

Owner Controlled Insurance Program (OCIP) Overview

Owner Controlled Insurance Program (OCIP) Overview Owner Controlled Insurance Program (OCIP) Overview Prepared for Caltrans Oakland Touchdown Outreach Presented by: Willis One Bush Street, Suite 900 San Francisco CA 94104 (415) 981-1141 WHAT IS AN OCIP

More information

Design Summit Innovations in Design, New Technologies & Process Delivery Changes!

Design Summit Innovations in Design, New Technologies & Process Delivery Changes! Strengthening a Concrete Slab Bridge Using Carbon Fiber Reinforced Polymer (CFRP) Composites Presentation to: NJDOT Design Summit 2009 By: Thomas G. Zink, P.E. Structurally Deficient What Does it Mean?

More information

61G General Responsibility. Engineer of Record Engineer of Record Chapter G15-30, F.A.C.

61G General Responsibility. Engineer of Record Engineer of Record Chapter G15-30, F.A.C. 61G15-31.001 General Responsibility. The Engineer of Record engineer of record for a structure is responsible for all structural aspects of the design of the structure including the design of all of the

More information

MISSION OF THE CORPORATION

MISSION OF THE CORPORATION MISSION OF THE CORPORATION To provide the public with a safe and efficient transit across the Jacques Cartier, the Champlain and the Honoré-Mercier Bridges, along the Bonaventure Autoroute and through

More information

PRELIMINARY SEISMIC CONSIDERATIONS FOR PULASKI SKYWAY REHABILITATION PROJECT. Xiaohua H. Cheng 1

PRELIMINARY SEISMIC CONSIDERATIONS FOR PULASKI SKYWAY REHABILITATION PROJECT. Xiaohua H. Cheng 1 PRELIMINARY SEISMIC CONSIDERATIONS FOR PULASKI SKYWAY REHABILITATION PROJECT Abstract Xiaohua H. Cheng 1 The 3.5 mile (5.63 km) long Pulaski Skyway is located in northern New Jersey, serving as a major

More information

STRENGTHENING OF JIAMUSI PRE-STRESSED CONCRETE HIGHWAY BRIDGE BY USING EXTERNAL POST-TENSIONING TECHNOLOGY IN CHINA

STRENGTHENING OF JIAMUSI PRE-STRESSED CONCRETE HIGHWAY BRIDGE BY USING EXTERNAL POST-TENSIONING TECHNOLOGY IN CHINA STRENGTHENING OF JIAMUSI PRE-STRESSED CONCRETE HIGHWAY BRIDGE BY USING EXTERNAL POST-TENSIONING TECHNOLOGY IN CHINA Ali Fadhil Naser and Wang Zonglin School of Transportation Science and Engineering, Bridge

More information

REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW

REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW 2005 New York City Bridge Conference September 12-13, 2005 REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW The Novoarbatsky Bridge across the Moskva River had been built in 1957 Plan of the bridge Steel

More information

Modernisation and widening interventions of bridge structures on the Adriatic highway in Italy

Modernisation and widening interventions of bridge structures on the Adriatic highway in Italy Modernisation and widening interventions of bridge structures on the Adriatic highway in Italy Lucio FERRETTI TORRICELLI Chief Engineer SPEA Ingegneria Europea Milan, Italy lucio.ferretti@spea.autostrade.it

More information

Tabulation of Bids. Grand Region

Tabulation of Bids. Grand Region Call Number: 022 Contract ID: 41024-118885 Project(s): IM 1641(025) Letting Date: February 05, 2016 Region(s): Grand Region Counties: Kent County Contract Time: 10/31/16 COMPLETION DATE Contract Description:

More information

Alberta Transportation Bridge Inspection & Maintenance System (Web 2005) 00747-1 Bridge. Bridge Inspection. Assistant Name Assistant Class

Alberta Transportation Bridge Inspection & Maintenance System (Web 2005) 00747-1 Bridge. Bridge Inspection. Assistant Name Assistant Class Bridge File Number Year Built/Year Supstr 00747-1 Bridge 1964/1964 Bridge or Town Name SUNNYSLOPE Located Over Located On 582:04 C1 33.896 Water Body Cl./Year Navigabil. Cl./Year Legal Land Location KNEEHILLS

More information

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long

More information

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA 1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:

More information

REHABILITATION PACKAGE 1-a

REHABILITATION PACKAGE 1-a 1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened

More information

Performance-based Evaluation of the Seismic Response of Bridges with Foundations Designed to Uplift

Performance-based Evaluation of the Seismic Response of Bridges with Foundations Designed to Uplift Performance-based Evaluation of the Seismic Response of Bridges with Foundations Designed to Uplift Marios Panagiotou Assistant Professor, University of California, Berkeley Acknowledgments Pacific Earthquake

More information

AASHTO Bridge Element Inspection Guide Manual

AASHTO Bridge Element Inspection Guide Manual AASHTO Bridge Element Inspection Guide Manual 1 st Edition, 2010 (COVER DESIGN to be done by AASHTO Publications) XXX by the American Association of State Highway and Transportation Officials. All rights

More information

SECTION 206 EXCAVATION FOR STRUCTURES

SECTION 206 EXCAVATION FOR STRUCTURES SECTION 206 EXCAVATION FOR STRUCTURES 206.1 Description. This work shall consist of the necessary excavation for the foundations of all structures, removal and disposal of all excavated material, backfilling

More information

DIAMOND REALTY MANAGEMENT 42 Johnson Road, Latham, NY 12110-5610 (518) 783-5000 Fax: (518) 785-1476 www.drm.net

DIAMOND REALTY MANAGEMENT 42 Johnson Road, Latham, NY 12110-5610 (518) 783-5000 Fax: (518) 785-1476 www.drm.net DIAMOND REALTY MANAGEMENT 42 Johnson Road, Latham, NY 12110-5610 (518) 783-5000 Fax: (518) 785-1476 www.drm.net CONTENTS: DEFERRED CAPITAL IMPROVEMENTS A CASE FOR RESERVES RESERVE PLANNING WHY HAVE A PROFESSIONAL

More information

Project Report. Junichiro NIWA Fellow, Professor, Civil Engineering Department, Tokyo Institute of Technology

Project Report. Junichiro NIWA Fellow, Professor, Civil Engineering Department, Tokyo Institute of Technology Project Report World's first PC-steel composite cable-stayed bridge using corrugated steel plate webs for PC girders Yahagigawa Bridge on the Second Tomei Expressway Junichiro NIWA Fellow, Professor, Civil

More information

PONTIS BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES OKLAHOMA DEPARTMENT OF TRANSPORTATION BRIDGE DIVISION

PONTIS BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES OKLAHOMA DEPARTMENT OF TRANSPORTATION BRIDGE DIVISION PONTIS BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES OKLAHOMA DEPARTMENT OF TRANSPORTATION BRIDGE DIVISION SEPTEMBER 2014 EDITION with June 2015 Changes DECKS OR SLABS TABLE OF CONTENTS Unit Reinforced

More information

Seismic Retrofit of Bridges - A Short Course

Seismic Retrofit of Bridges - A Short Course Seismic Retrofit of Bridges - A Short Course Presented by Ian Buckle Geoffrey Martin, and Richard Nutt MULTIDISCIPLINARY CENTER FOR EARTHQUAKE ENGINEERING RESEARCH Tilting of pier 12, Ejian bridge, Chi-chi

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

West Point Bridge Designer Tutorial

West Point Bridge Designer Tutorial 1 West Point Bridge Designer Tutorial West Point Bridge Designer will introduce you to engineering through an authentic, hands-on design experience. This software provides you with the tools to model,

More information

Figure 3 Pipe Cracking

Figure 3 Pipe Cracking The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.

More information

(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line

(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line Report by the First Joint Survey Team of the JSCE Concrete and Structural Engineering Committees on the damage caused by the Great East Japan Earthquake April 5, 2011 (First Report) 1. Survey team members

More information

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA LOAD TESTING OF SOME NEW BRIDGES IN LATVIA Edmunds Akimovs, Civ.Eng., Bridge Engineer, Consulting Company Inzenierbuve, Address: Azenes st. 20, Riga, LV1048, Latvia. E-mail: eakimovs@inzenierbuve.lv Ainars

More information

ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT

ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE Pei-Chang Huang 1, Graduate Research Assistant / MS Candidate Yao T. Hsu 2, Ph.D., PE, Associate

More information

J. David Rogers Natural Hazards Mitigation Center University of Missouri-Rolla

J. David Rogers Natural Hazards Mitigation Center University of Missouri-Rolla New Challenges for Army Combat Engineers: Bomb Damage Assessment, Fire Damage Assessment, Evaluation of Diminished Capacity, and Developing New Strategies for Short, Medium and Long-term Mitigation/Repair

More information

Engineered Bridge System

Engineered Bridge System Engineered Bridge System With a growing selection of prototype bridge styles and accessories, the Cornerstone Engineered Bridge System makes it easy to plan and build an authentic HO Scale bridge from

More information

The Fort Edmonton Footbridge Project

The Fort Edmonton Footbridge Project The Fort Edmonton Footbridge Project The Fort Edmonton Footbridge is a signature pedestrian suspension bridge located in SW Edmonton. The Fort Edmonton Footbridge project provides a river crossing and

More information

BRIDGE INSPECTION PROCEDURE MANUAL. Timber Elements

BRIDGE INSPECTION PROCEDURE MANUAL. Timber Elements BRIDGE INSPECTION PROCEDURE MANUAL Timber Elements Timber Truss Elements Timber Elements of Timber Trusses Element Description Units TPCH TSTT Timber Truss - Principal/Top Chord/Bottom Chord This element

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

Disputes and Claims. 3 Processes Dispute Resolution and Administrative Claims Process

Disputes and Claims. 3 Processes Dispute Resolution and Administrative Claims Process Disputes and Claims 3 Processes Dispute Resolution and Administrative Claims Process Default Process C&MS 108.02 Partnering OR PN 108 -Dispute Review Board (DRB) Considered for use on projects over $20

More information

Bridge Manual - Part I - May CHAPTER 6 SHOP DRAWINGS, CONSTRUCTION PROCEDURES, AND OTHER SUBMISSIONS

Bridge Manual - Part I - May CHAPTER 6 SHOP DRAWINGS, CONSTRUCTION PROCEDURES, AND OTHER SUBMISSIONS Bridge Manual - Part I - May 005 6-1 CHAPTER 6 SHOP DRAWINGS, CONSTRUCTION PROCEDURES, AND OTHER SUBMISSIONS 6.1 APPROVAL PROCESS 6.1.1 General The official MassHighway procedure for submission of and

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

16. ASSET MANAGEMENT POLICY

16. ASSET MANAGEMENT POLICY 16. ASSET MANAGEMENT POLICY Asset Management Policy Document No.: WT-HRM-16.00 Approved By: Council Issue No.: 1.00 Approved On: 10 June 2014 Responsibility: Infrastructure Services Department Review Date:

More information

8.2 Continuous Beams (Part I)

8.2 Continuous Beams (Part I) 8.2 Continuous Beams (Part I) This section covers the following topics. Analysis Incorporation of Moment due to Reactions Pressure Line due to Prestressing Force Introduction Beams are made continuous

More information

Optimum proportions for the design of suspension bridge

Optimum proportions for the design of suspension bridge Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering

More information

CSXT Emergency Response for May 2010 Flood Repairs

CSXT Emergency Response for May 2010 Flood Repairs CSXT Emergency Response for May 2010 Flood Repairs 11 th Annual Geohazards Forum Chattanooga, Tennessee Christopher Ramsey, PE AMEC Project Overview Record rainfalls affecting greater Nashville. Some areas

More information

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)

More information

Guide to Bridge Standard Drawings. March 2016 Bridge Division

Guide to Bridge Standard Drawings. March 2016 Bridge Division Guide to Bridge March 2016 Bridge Division Table of Contents About this Guide... 3 Pretensioned Concrete I-Beam Bridge... 5 Pretensioned Concrete I-Girder Bridge... 6 Pretensioned Concrete Slab Beam Bridge...

More information

Historic Bridge Alternatives Analysis Layout

Historic Bridge Alternatives Analysis Layout Section 4(f) of the USDOT Act of 1966 (Title 49, USC, Section 303) requires special considerations be made regarding the use of any publicly owned park, recreation area, wildlife/waterfowl refuge or historic

More information

WASHINGTON STATE s BRIDGE SEISMIC RETROFIT PROGRAM

WASHINGTON STATE s BRIDGE SEISMIC RETROFIT PROGRAM WASHINGTON STATE s BRIDGE SEISMIC RETROFIT PROGRAM Abstract Earthquakes pose a serious risk to life and infrastructure in Washington State, particularly the Puget Sound region. Recognizing the earthquake

More information

Granger Bay Boulevard and Green Point Roundabout

Granger Bay Boulevard and Green Point Roundabout Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access

More information

CHAPTER 4 FIELD INSPECTION, DATA COLLECTING, REPORT WRITING AND REPORT REVIEW

CHAPTER 4 FIELD INSPECTION, DATA COLLECTING, REPORT WRITING AND REPORT REVIEW Bridge Inspection Handbook 4-1 CHAPTER 4 FIELD INSPECTION, DATA COLLECTING, REPORT WRITING AND REPORT REVIEW 4.1 INTRODUCTION In this chapter, MassDOT policies and procedures for performing bridge inspections

More information

Fifteen years experience of design, production and assembling of prestressed Bridge decks in Timber

Fifteen years experience of design, production and assembling of prestressed Bridge decks in Timber Fifteen years experience of design, production and assembling of pre-stressed Bridge decks in Timber P. Jacobsson 1 Fifteen years experience of design, production and assembling of prestressed Bridge decks

More information