1 SCOTTSDALE TRANSPORTATION COMMISSION REPORT To: Transportation Commission From: Paul Basha, Transportation Director Meeting Date: September 19, 2013 Subject: SR-101 Pima Freeway Improvements ITEM IN BRIEF Action: Information Purpose: Representatives of the Arizona Department of Transportation (ADOT) and their consultants will present the plans for the addition of one-lane-per-direction for SR-101. Information: Ms. Jennifer Grentz, ADOT Community Relations Project Manager, Mr. Ron McCally, ADOT Project Manager, Mr. Avi Schmerer, URS Design Consultant, and Mr. Ahmad Omais, Kimley- Horn Design Consultant, will be providing the presentation. The project involves lane additions for the 11-mile segment from SR-202 to Shea Boulevard; 1.5 miles of which is within the city limits of Scottsdale. The construction is anticipated to occur from summer 2014 to Restrictions of freeway travel lanes will result in periodic traffic volume increases on Scottsdale streets primarily Hayden Road. Staff Contact: Paul Basha, (480) ,
2 Loop 101: General Purpose Lane Widening Shea to the Loop 202 Scottsdale Transportation Commission September 19, 2013 ADOT Project No. 101L MA 041 H8484; Federal Aid No. ID 101 B(NFA) ADOT Project No. 101L MA 046 H8499; Federal Aid No. ID 101 B(NFA) 1
3 Welcome and Agenda Project Team Project Overview Project History Project Purpose Project Schedule Improvements Current Activity Traffic Management Additional Projects in Corridor Public Outreach Q&A 2
4 Project Representatives Jennifer Grentz Community Relations Project Manager Ron McCally Project Manger Avi Schmerer URS Design Consultant Ahmad Omais Kimley Horn and Associates Design Consultant 3
5 Project Overview Project spans 11 miles (1.3 miles in City of Scottsdale) Project is from Shea Boulevard to SR 202L Interchange New general purpose lanes will be constructed 4
6 Project History Regional Transportation Plan (November 2004, Proposition 400) Public Outreach (2008 Public Information Meetings, 2011 Commission) Design Concept Report ( ) FDCR 2010 Environmental Document (2010, CE) Final Design ( ) 5
7 Project Purpose Improve freeway capacity Reduce congestion of future traffic volumes Improve traffic flow at Loop 202 to northbound Loop 101 Implement Regional Transportation Plan 6
8 Project Schedule Final Design October 2013 Bid Advertisement Spring 2014 Construction Late summer
9 Project Improvements Add one general purpose lane in the SB direction from Shea Boulevard to McKellips Road Add one general purpose lane in the NB direction from Shea Boulevard to McDowell Road Add two general purpose lanes in the NB direction from McDowell Road to the SR101L/SR202L TI entrance ramp Add auxiliary lanes in each direction between Indian Bend Road and McDonald Drive Rubberized asphalt will be used on the widened roadway surfaces. 8
10 Project Highlights Typical Improvements Chaparral Road TI Improvements Relocation of Catch Basins Addition of Storm Drains Landform Graphics Maintain Existing Theme 9
11 Current Activity Stage IV Design (95%) Roadway Structural Design Drainage Design Landscape Design Traffic Analysis and Design Lighting Freeway Management System Utilities Environmental 10
12 Transportation Management Plan Lays out a set of strategies for managing the work zone impacts to project. Provides for safe mobility for traveling public and construction workers Compliments temporary traffic control plan Addresses traffic operations and public information. 11
13 12
14 13
15 14
16 15
17 Additional Projects in Corridor Loop 202 General Purpose Lanes (Loop 101 to Gilbert Road) and HOV Lanes (Gilbert Road to Broadway Road) FY 2015 Construction Loop 101 General Purpose Lanes (SR 51 to Princess Drive) RTPFP Phase IV ( ) Design and Construction Loop 101 General Purpose Lanes (Shea Blvd. to Princess Drive) RTPFP Phase IV ( ) Design and Construction Loop 101/Princess Drive Traffic Interchange Preliminary Engineering/Environmental Study
18 Public Outreach for Design Phase Three public meetings Project postcard and flyer distribution for City of Scottsdale and SRPMIC residences, business and schools, within the impacted project area Website updates Targeted business outreach Continue coordination with City of Scottsdale and SRPMIC PIO staff Conduct additional stakeholder meetings, if requested 17
19 Loop 101: Shea Boulevard to Loop 202 For more information visit azdot.gov/loop101pima, or call Thank you! 18
Transportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection
DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST
State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage
I-25 / Rio Bravo Interchange
I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange SECOND
EARLY ACQUISITIONS ASSOCIATED WITH THE I-10 EXPANSION STUDY. Paula Gibson, ADOT Chief R/W Agent Dave Edwards, R/W Project Coordinator
EARLY ACQUISITIONS ASSOCIATED WITH THE I-10 EXPANSION STUDY Paula Gibson, ADOT Chief R/W Agent Dave Edwards, R/W Project Coordinator This presentation will cover 3 primary aspects of the project: An overview
The Need for Traffic Incident Management
The Need for Traffic Incident Management With traffic incidents responsible for approximately 50-60% of the congestion delays motorists encounter on the nation s roadways every day, increased roadway capacity
FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005
FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of
Maryland Invests $845 Million in New Highway and Bridge Projects
Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD
SR-18 Corridor Improvements in Wood County
Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park
FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST
FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST August 2003 Background: The Federal Highway Administration (FHWA) has retained all approval rights to the control
INDOT 2000-2025 Long Range Plan
Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850
Illinois Tollway and Chicago Department of Transportation Construction Networking Event. March 13, 2015
Illinois Tollway and Chicago Department of Transportation Construction Networking Event March 13, 2015 Today s Agenda Welcome Illinois Tollway projects Chicago Department of Transportation (CDOT) projects
Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County
Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing
Monitoring Program Results and Next Steps
8 Monitoring Program Results and Next Steps The improving economy and greater levels of employment observed in 2014 have generally resulted in higher demands on the transportation network. This is apparent
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road) Industry Briefing - 13 February 2013 Bruce Highway Upgrade (Cooroy to Curra) The Bruce Highway Upgrade (Cooroy to
RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)
TPC Agenda Item 6A Mailout - 10/16/15 RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) OCTOBER AMENDMENTS Amendment
ARIZONA-SONORA BORDER MASTER PLAN
Introduction Travel between the State of Arizona in the United States and the State of Sonora in Mexico at the international border has increased over the last ten years. There are nine specific land ports
Light Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
8+ %!0"% 8+1!%"'$%,$"$
8+ 8+ %!0"% The next step in developing recommendations for improvements to Grand Avenue was to identify, develop and evaluate alternatives to address the issues and needs identified in the previous chapter.
PRIORITIZATION PROCESSES
PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take
US-95 Northwest Corridor Project Management Plan
T G YO N N HI O N N WA S NW CORRIDOR ROA D US-95 Northwest Corridor Project Management Plan C AV E ENU L E TO KY A April 2009 TABLE OF CONTENTS 1.0 Project Description and Scope of Work -----------------------------------------------------
John Hoang P.E. ADOT Traffic Engineering Group Phoenix Design Section
John Hoang P.E. ADOT Traffic Engineering Group Phoenix Design Section 1 Saw-cut groove in conjunction with (removable) temporary tape application Why should we saw-cut & use temp. tape? Would it be cost
IH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
Chapter 3 - GPS Data Collection Description and Validation
Chapter 3 - GPS Data Collection Description and Validation The first step toward the analysis of accuracy and reliability of AVI system was to identify a suitable benchmark for measuring AVI system performance.
in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works
Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty
PUBLIC INFORMATION MEETING SUMMARY
PUBLIC INFORMATION MEETING SUMMARY South Mountain Freeway Study 59th Avenue Alignment Alternative Prepared for: Arizona Department of Transportation Prepared by: HDR Engineering, Inc. 3200 East Camelback
PROPOSED REHABILITATION SAN CARLOS IRRIGATION PROJECT FACILITIES. Pinal County, Arizona. Scoping Information and Opportunity to Comment
PROPOSED REHABILITATION SAN CARLOS IRRIGATION PROJECT FACILITIES Pinal County, Arizona Scoping Information and Opportunity to Comment U.S. Department of the Interior Bureau of Reclamation Phoenix Area
General Obligation Bond Projects FYE 2013-2018
General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
Update on Previous Related Transportation Enhancement Grants
ROUND 16 ROUND 16 Update on Previous Related Transportation Enhancement Grants Pima County and City of Tucson staff are implementing the Pima County-Tucson Safe Routes to Schools Pilot Program. This program
FY 2009 Economic Stimulus List
FY 2009 Economic Stimulus List The Projects in this List are "Ready to Advertise" within 30-90 days of a Bills Enactment Pavement Preservation Projects Region County PIN Project Location Concept Estimate
Improving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
Draft Transportation Management Plan for Via Verdi Repair Project
for Via Verdi Repair Project prepared for City of Richmond This report was prepared by: This report was reviewed by: Ryan McClain, P.E. Fehr & Peers TABLE OF CONTENTS 1.0 INTRODUCTION & PROJECT DESCRIPTION...
AZTech TRAFFIC MANAGEMENT AND OPERATIONS PERFORMANCE INDICATORS BOOK 2013
AZTech TRAFFIC MANAGEMENT AND OPERATIONS PERFORMANCE INDICATORS BOOK 2013 Phoenix Metropolitan Region ArARTERIALS FREEWAYS ARTERIALS SAFETY INCIDENT MANAGEMENT TRAVELER INFORMATION TRANSIT Developed by
Public Involvement Meeting Handout
Public Involvement Meeting Handout WIS 93 Detloff Drive to WIS 95 Trempealeau County Project ID 7130-01-72 June 18, 2014 5:00 P.M. 401 W. Main Street Arcadia WI Purpose of the meeting The Wisconsin Department
Northwest Light Rail Extension Pre-Construction/Final Design. Public Meeting November 27 & 29, 2012
Northwest Light Rail Extension Pre-Construction/Final Design Public Meeting November 27 & 29, 2012 6:00 6:30 p.m. Open House 6:30 7:00 p.m. Presentation 7:00 8:00 p.m. Open House 2 Project Overview Carla
Arizona Department of Transportation
Fund Transfers FY 09 Savings: $34,025,100 FY 10 Savings: $50,797,200 This option would transfer monies out of the following funds and into the General Fund in FY 2009 and FY 2010. The option combines 2
Statewide Traffic Flow Data: Probe Vehicle Study for Iowa DOT
Statewide Traffic Flow Data: Probe Vehicle Study for Iowa DOT Erik Minge, PE SRF Consulting Group, Inc. May 25, 2011 Types of Mobile Probe Data Cellular Telephone-Based Methods! Angle of arrival (E911)!
Economic and Real Estate Consulting MEMORANDUM
Economic and Real Estate Consulting MEMORANDUM To: From: Ms. Maria Laughner Business & Real Estate Development Manager City of Peoria Rick Merritt Danny Court Date: August 12, 2011 Re: Peoria Digital Billboard
Capital Action Plan Status Thru Dec 2015
Freeway Projects: I-5, Pico to Vista Hermosa $113.0 Jun-09 Dec-11 Jun-11 Oct-13 Feb-14 Oct-14 Dec-14 Aug-18 Project C $91.9 Jun-09 Oct-11 Jun-11 Oct-13 May-14 Sep-14 Dec-14 Aug-18 I-5, Vista Hermosa to
Eastern RTMC. www.dot.state.pa.us
Eastern RTMC Regional Traffic Management Centers Agenda District 6 0 TIMS Program Overview Freeway and Arterial ITS Deployments Ongoing/Upcoming Projects Future Concepts TIMS Program Timeline 1993 TMC
the interchange of business
the interchange of business project overview PV303 is a master planned business park designed to meet the growing demand for commercial and industrial opportunities in the greater Phoenix area. Located
TRANSPORTATION MANAGEMENT PLAN
TRANSPORTATION MANAGEMENT PLAN EMPIRE/BURBANK AND RAILROAD TRACKS PROJECT 07-LA-05 PM 29.4/31.6 State of California Department of Transportation District 7 Contract Number: EA 1218w1 Prepared by: Daisy
Surface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
Transportation Improvement Program FY 2006-2008
Transportation Improvement Program FY 2006-2008 Hidalgo County Metropolitan Planning Organization Adopted By Policy Committee: March 24, 2005 Public Meeting Date: March 1, 2005 Public Meeting Date: April
Pima Regional Remote Sensing Program
Pima Regional Remote Sensing Program Activity Orthophoto GIS Mapping and Analysis Implementing Agency Pima Association of Governments (Tucson, Arizona area Metropolitan Planning Organization) Summary Through
KEEPING NEVADA CONNECTED: Future Mobility in the Silver State
KEEPING NEVADA CONNECTED: Future Mobility in the Silver State MARCH 2014 202-466-6706 www.tripnet.org Founded in 1971, TRIP, of Washington, DC is a nonprofit organization that researches, evaluates and
Multi Modal Roadway Transportation Impact Fees and Asset Value
January 2010 SB 360 Article Series: Factors to be Considered in Transitioning from a Road Impact Fee to a Mobility Fee Contributing Authors: Steven A. Tindale, P.E., AICP Robert P. Wallace, P.E., AICP
How To Build A City Of Virginia Beach Arena
City of Virginia Beach Arena Infrastructure Preliminary Conceptual Cost Estimates Doug Smith, Deputy City Manager Carl Tewksbury, Kimley-Horn City Council Briefing July 8, 2014 July 8, 2014 Presentation
Belmont Street Bridge Rehabilitation Project
Belmont Street Bridge Rehabilitation Project Christian Gospel Church Worcester 43 Belmont Street Worcester MA February 20, 2015 7:00PM Agenda Introductions Project site and overview Project history Construction
Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain
Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37
ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama
ENGINEERING REPORT College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama Prepared for: The City of Auburn Prepared by: 3644 Vann Road Suite 100 Birmingham,
Consultant s Name: HSQ GROUP INC. Street Address: 1489 W. Palmetto Park Road, Suite 340. City: Boca Raton State: FL Zip: 33486
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES LETTER OF RESPONSE 375-030-22 Page 1 Advertisement No.: 16444 DOT FM Number: 43165713201 Project Name: SR-811 DIXIE HWY./NE 4 th AVE.
Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -
Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route
LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL
LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL Note to the User To use this manual, the reader must have the life-cycle cost analysis software program RealCost, Version 2.2 California Edition. The program
Introduction & Welcome
Proposed SM Wright Freeway Redevelopment Dallas District Halff Associates Baker Consulting Associates April 28, 2009 Introduction & Welcome Alva Baker Baker Consulting Associates Page 1 Project Overview
Central Regional Traffic Management Center
Central Regional Traffic Management Center The Shift to Operations Rich Deen, RTMC Manager, District 8-0 October 5, 2009 ASHE Meeting Where we came from? Circa 1986 Someone in PENNDOT- We can t build our
DANIEL T. SMITH, Jr. President EDUCATION Bachelor of Science, Engineering and Applied Science, Yale University, 1967 Master of Science, Transportation Planning, University of California, Berkeley, 1968
MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE EXPRESSWAY AUTHORITY (MDX)
XA10016 10016 SR 112 Toll System Conversion LeJeune Road I-95 4.1 Toll System Conversion 4,811 1,723 Activity - - DSB MDX 3,088 0 0 0 0 XA10017 10017 SR 836 Toll System Conversion NW 137th Avenue I-95
Project Name: All Electronic Tolling (AET) Design Services. Consultant s Name: The Heimburg Group, Inc.
Page 1 Advertisement No.: 15831 DOT FM Number: 437301-1-32-01 Project Name: All Electronic Tolling (AET) Design Services Consultant s Name: The Heimburg Group, Inc. Street Address: 5461 W Waters Avenue,
LBJ Express Project (LBJ Managed Lanes Project)
(LBJ Managed Lanes Project) LBJ Through the Years LBJ Through the Years LBJ Through the Years History 1987 LBJ Corridor Study Begins 1987 2004 Extensive Planning - 200+ Public Meetings June 2004 LBJ Coalition
Corridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
Appendix J Transportation Management Plan Report. Traffic Operational Analysis Report
Appendix J Transportation Management Plan Report Traffic Operational Analysis Report Transportation Management Plan Report VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC PRELIMINARY TRANSPORTATION
Exhibit A Scope of Work
Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW
Dallas ICM Conception to Implementation
Dallas ICM Conception to Implementation Transit ITS Best Practices Workshop November 13-14, 2013 Agenda Background Conception Procurement -Deployment Q&A Background-DFW Region 5 th most congested region
14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:
14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation
The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.
3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation
This section summarizes the relevant transportation policies, laws, and regulations that apply to the proposed project.
6. Transportation 6.1 OVERVIEW This chapter describes the existing transportation conditions in the Southwest Fresno Specific Plan Area. This includes the existing roadway, transit, bicycle, and pedestrian