1 PUBLIC INFORMATION MEETING SUMMARY South Mountain Freeway Study 59th Avenue Alignment Alternative Prepared for: Arizona Department of Transportation Prepared by: HDR Engineering, Inc East Camelback Road, Suite 350 Phoenix, AZ April 2010
2 Contents 1.0 Introduction Public Meeting Materials and Comments Newspaper Display Notices Informational Postcard Doorhanger Newsletter Web Site Public Information Meeting Question-and-answer Session Court Reporters Written Comments Telephone Comments Meeting Survey Results Figure Figure 1. Study Area... 1 Tables Table 1. Publication of newspaper display notices... 2 Table 2. Public comments... 4 Table 3. Court reporter comments... 8 Table 4. Written comments... 9 Table 5. Telephone calls Table 6. Meeting survey results Public Information Meeting Summary ii
3 Appendixes Appendix A... Newspaper Display Notice Appendix B... Informational Postcard Appendix C... Doorhangers Appendix D... Newsletter Appendix E... Public Sign-In Sheet Appendix F... Public Presentation and Display Boards Appendix G... Written Comments Appendix H... Public Meeting Survey Public Information Meeting Summary iii
4 1.0 Introduction The Arizona Department of Transportation (ADOT) and the Federal Highway Administration (FHWA) continue to study the proposed South Mountain Freeway in the Phoenix metropolitan area in Maricopa County, Arizona. The study team is following the federal process defined by the National Environmental Policy Act to complete a Draft Environmental Impact Statement (EIS) for the study. Currently, ADOT is revising the Administrative Draft EIS, and Location and Design Concept Report to include changes to the Maricopa Association of Governments (MAG) Regional Transportation Plan. Figure 1 below illustrates the study area with identified alternatives. In response to declining revenue to support regional projects, the MAG Regional Council voted in October 2009 to approve the revised regional plan. The following changes were included for the South Mountain Freeway: reduce the proposed freeway to eight lanes (from the previous ten-lane concept) shift the Western Section alignment between Lower Buckeye Road and I-10 to connect at 59th Avenue (rather than at 55th Avenue) Figure 1. Study Area Public Information Meeting Summary 1
5 The public information meeting to discuss the 59th Avenue connection occurred on February 10, 2010, with the official comment period ending on February 24, The following summary includes the information and presentation provided during the public meeting, as well as a summary of comments received from participants and responses from the study team. 2.0 Public Meeting Materials and Comments 2.1 Newspaper Display Notices A newspaper display notice announcing the public information meeting was published in four newspapers Arizona Republic (Zone 5 edition), Prensa Hispana, La Voz, and the Arizona Informant. The newspaper display notices are attached (Appendix A). Table 1 shows the dates of publication. Table 1. Publication of newspaper display notices Publication Arizona Republic Zone 5 Prensa Hispana La Voz Arizona Informant Date published January 27, 2010 February 1, 2010 February 3, 2010 January 27, 2010 February 3, 2010 January 29, 2010 February 5, 2010 January 27, 2010 February 3, Informational Postcard The study team prepared and distributed an informational postcard inviting the public to attend the public meeting, held on February 10, 2010, at the Sunridge Elementary School cafeteria, 6244 W. Roosevelt Street, Phoenix. The postcard was mailed on January 28, 2010, to approximately 4,000 individuals on the mailing list. The mailing list included property owners within an area bounded to the north by McDowell Road, to the south by Lower Buckeye Road, to the east by 55th Avenue, and to the west by 63rd Avenue. A copy of the informational postcard is attached (Appendix B). 2.3 Doorhanger Bilingual doorhangers were distributed on February 2, 2010, to specific homes and apartments within the W59 Alternative footprint. Twenty-eight doorhangers were placed at individual homes. Four doorhangers were posted at each of the mailbox areas of both Public Information Meeting Summary 2
6 apartment complexes, Liberty Cove and Southwest Village Apartments. Seventy-five doorhangers were also placed in each of the apartment complex offices. A copy of the doorhanger is attached (Appendix C). 2.4 Newsletter A newsletter was distributed to the entire study area on February 5, Approximately 65,000 were distributed. The newsletter provided an update on the status of the study, alternatives under evaluation in the Draft EIS, and public input opportunities. A copy of the newsletter is attached (Appendix D). 2.5 Web Site The study Web site ( was updated with current information associated with the W59 Alternative and MAG s updated RTP, study schedule, and archived previous study information. The Web site updates were activated on January 27, In addition, the Web site announced the W59 Alternative public information meeting and posted all materials following the meeting. 2.6 Public Information Meeting The meeting provided an overview of the study and the proposed connection of the South Mountain Freeway to Interstate 10 at 59th Avenue and the study and right-of-way processes and schedule. It provided the opportunity for community members to ask questions and provide input. Ninety-three individuals attended the meeting. A copy of the sign-in sheet is attached (Appendix E). The meeting was held on February 10, 2010, at the Sunridge Elementary School cafeteria, at 6244 W. Roosevelt Street in Phoenix, from 6 p.m. to 8 p.m. It included a formal presentation regarding the W59 Alternative recommendation, followed by a question-and-answer session with representatives from ADOT. An open house forum concluded the meeting, where representatives from the study team were present to answer additional questions from the public. Copies of the presentation and display boards are attached (Appendix F). Roll plots identifying the proposed right-of-way necessary for the W59 Alternative and associated improvements were also available for the public to view. Right-of-way maps are available online at: Valley_Freeways/Loop_202/South_Mountain/library.asp#maps. 2.7 Question-and-answer Session After the presentation, meeting attendees were able to provide input on the study information presented as well as provide comments on issues of importance. Written questions and comments received during the meeting on question/comment cards were collected by the team and presented to ADOT representatives for responses. Twentyone comment cards were collected. The questions and responses provided at the meeting are located in Table 2. Public Information Meeting Summary 3
7 Table 2. Public comments Issue Comment Response Addition of future lanes Air quality Alignment shift Community impacts Construction phasing While the study has reduced the number of lanes from ten to eight, can we go back and add to it? Will there be an air quality study along 59th Avenue and added as part of the EIS a? How was it decided to shift from 55th to 59th Avenue? I live at 62nd Drive, how is the freeway going to affect my neighborhood? How will the 59th Avenue and Broadway area be affected? Can you comment on homes west of 59th Avenue and south of I-10 d to Van Buren Street? Would construction start on the northern end or the southern end? Will you start on the 59th Avenue link before there is a final decision on the southeastern section? Technically, yes, we could add those lanes in the future. The original ten-lane concept was essentially establishing a ten-lane footprint and building the lanes that we would build today to the outside. Then, new lanes would be added to the inside. This ended up being a costly solution. For this reason, we have gone back to the original vision for the freeway, which was eight lanes. Yes, absolutely. The EIS is being updated to reflect this change. Because of budget constraints, an evaluation was done to see where costs could be cut. Through this study, a shift from 55th to 59th Avenue was found and agreement was reached between Phoenix, MAG b, and ADOT c that this was a positive change. That might be a better question to ask the engineers at the plots in the back. They can show you with the lines and the drawings what it might look like and what some of the effects you could expect would be. Please see one of the study team members at the roll plots so that they can show you what will happen in this specific area and answer your specific questions. We cannot answer this question right now. This information will come later in the project as part of the implementation plan. The whole thing is one, 22-milelong project, and we cannot start in one place without approval on the whole thing. We will also have to look at factors such as drainage, traffic, etc., to decide where would be the best place to start. No, we have to have a decision on the whole project. The federal government will not allow the project to be broken up. Public Information Meeting Summary 4
8 Table 2. Public comments Issue Comment Response Coordination with adjacent projects Costs DEIS elements Environmental justice Funding How will ADOT work with City of Phoenix Streets Department to enhance current projects under way at Lower Buckeye Road? Has the cost of utilities been calculated along 59th Avenue yet? Have you calculated the costs of relocating the businesses on 59th Avenue? Are smog, traffic, and pollution being studied? Can you explain what Title VI is? What effect does funding have on the timetable? Would deterioration in funding delay the start of the project as well? Answered by a City of Phoenix representative: The City of Phoenix would have to look at what we have in our current transportation plan for all of our streets that we build within the City of Phoenix. Depending on how we are working with and coordinating with ADOT, we would have to look at what improvements, based on the phasing of the construction of the freeway, we would have to include in our transportation plan, for right now. There are projects being done in the southwest area. We would have to look at these to determine the phasing. These are being calculated now. Because this shift was just determined in November, there is a still a lot of information to be collected. We are in the process of doing this now. We are meeting with those business owners, assessing their needs, and working through this process with the right-of-way staff. Yes, they are all included in the Draft EIS, and that is the document that the public will have 3 months to review and provide comments on. Members of the public will also be able to provide comments in a public format a public hearing. Title VI is part of the Civil Rights Act and says that as we consider the impacts of a freeway on a community, we have to be concerned about having a disproportionate impact on neighborhoods that are populated by either low-income people or minorities or other special groups. It s called environmental justice in the study and it is to make sure that we don t just go in and take the cheapest right-of-way, but instead consider all of the impacts and weigh all the factors. If funding improves, things could move faster. If funding continues to deteriorate, the schedule could be lengthened for when the process and project could be completed. Yes, funding would certainly delay construction activities. We are committed to getting the process completed, the environmental document done, and a decision made, but then the challenge is having enough money for construction. Right now, we have the money. Public Information Meeting Summary 5
9 Table 2. Public comments Issue Comment Response GRIC e coordination Impacted businesses Local street access Noise Paradise Parkway Property acquisition Where is the study with regard to the Eastern Section and the GRIC? Was any analysis done of the size of the businesses involved for the business impacts between 59th Avenue and 55th Avenue? How will local streets south of I-10 retain access? Could you address local assess on residential streets west of 59th Avenue, north of Van Buren Street and south of I-10? What does ADOT do to address noise? What about the noise inside the home? How long will the walls be alongside the traffic lanes? How tall will the noise walls be? Could you address the Paradise Parkway, State Route 50? How does ADOT go through the process of buying a house and helping the resident relocate? Just two weeks ago, the GRIC extended an invitation for us to extend our study south of Pecos Road. The tribe is still in opposition to the South Mountain Freeway, on or off the reservation. But, they recognize that construction of the freeway may happen. So they've invited ADOT to study the area south of Pecos Road to examine alternatives. We are in the process right now of meeting with property owners and getting a firm understanding of the impacts for businesses on 59th Avenue. Because this change just occurred in November, we are still working to get the level of detail that we had for 55th Avenue. Any of the local streets that are cut off by the freeway will be reconnected by a frontage road that will be built. Local access will be maintained. Please see study team representatives at the roll plots so that they can show you on the map. Most of the noise comes from tires. ADOT builds noise walls and uses rubberized asphalt. Rubberized asphalt is planned as part of this freeway. Right now we can t say where or if walls will be constructed, but a process is completed to determine this and ADOT will mitigate for noise at 64 decibels. Part of the analysis, once a handle is gotten on the noise values, is the right-of-way close to the homes. If the numbers are high, then ADOT will go into the home and make certain that it s below the criteria. The noise analysis will look at what future noise is predicted with the freeway traffic volumes, not how they are today. They will vary from 10 to 20 feet in height. The Paradise Parkway was discontinued as a project in 1994 by Governor Symington as part of Project SLIM in an effort to balance the Prop 300 Program. This is a very personal situation, not one that can be given a specific answer. If you talk with right-of-way staff in the back, they can talk to you in detail about the property acquisition and relocation process. ADOT will pay fair market value for homes, and there is relocation assistance for residents and others. Public Information Meeting Summary 6
10 Table 2. Public comments Issue Comment Response Relocation assistance Schedule Traffic Union Pacific Railroad Information about relocation assistance and its availability. Is there a time frame for when construction at I-10 and 59th Avenue may begin? When will the Draft EIS be released? What is the timetable for the project? Will there be increased traffic on I-10 to the Loop 101? Is the freeway elevated over the Union Pacific Railroad? a Environmental Impact Statement b Maricopa Association of Governments c Arizona Department of Transportation d Interstate 10 e Gila River Indian Community This question is best answered by the ADOT right-ofway staff. Officially the program, meaning sort of the schedule, or the budget, shows somewhere in the neighborhood of That is assuming that things keep moving. And that is a difficult question because this project has had its challenges with the schedule. All I can promise is that we are moving as quickly as we can to finish the environmental document, and then get to a final decision. We don t know. We are moving very quickly to try to complete the process. Having recently heard from the GRIC to allow ADOT to extend its study, the study could be delayed should the opportunity arise to study an alternative on GRIC land. At this time, a timetable can not be determined. We are budgeting for 2015 for construction in the Western Section. Yes, when we put the South Mountain Freeway traffic onto I-10, it will slightly increase the traffic volumes on I-10. But, they are going to increase anyway. The purpose of State Route 801 is to try to relieve some of the traffic along I-10. Yes. 2.8 Court Reporters Two court reporters were present at the meeting to record the meeting presentation and the question-and-answer session. They were also available to take comments from meeting attendees before, during, and after the meeting. The court reporters received two public comments. They were both received before the start of the meeting and are included below in Table 3. Public Information Meeting Summary 7
11 Table 3. Court reporter comments Issue Name Comment Business impacts Mike Whittman Rodney Ott Comment on behalf of Jacobson Companies, who operates a cold-storage facility located at 1 North 59th Avenue. They are in opposition of the path of the South Mountain Freeway due to its extenuating effect on their facility. The 7-million cubic foot facility contains 25,000 pallet positions of frozen and chilled food products, which accounts for 30 percent of the public storage-cold storage in the Phoenix area. They have been in the market since 1984 and their lease extends until They also have land to add on an additional 90,000 square feet. They employ 120 associates, which accounts for $2.5 million in annual wages for employees and contributed $162,000 in payroll taxes to the State last year. Because they operate a freezer with 14,000 pounds of ammonia, it is not something that they can easily move. They have estimated that construction costs to replicate this building will exceed $20 million, excluding the cost of land. Moving expenses have been estimated at $2 million. An open invitation to the study team is extended to come and see their operations. An attorney representing SJW Land Company, wanted to voice his support for the comment of Mike Whittman, as SJW is the landlord of the building being spoken of. It would be very expensive, difficult, and counterproductive to tear down that building because it would be almost impossible to move and replicate. 2.9 Written Comments Comment forms were distributed to meeting attendees. Meeting attendees were encouraged to complete and submit these forms to the study team by February 24, One comment form, three letters, and 20 s were received. Written comment forms, letters, and s received and the responses provided are summarized in Table 4. A copy of written comments received is attached (Appendix G). Public Information Meeting Summary 8
12 Table 4. Written comments Topic Comment Response 59th Avenue Alternative 71 st Avenue Alternative Alternatives evaluation Alternative maps What is the likelihood that the 59th Avenue alignment will be chosen? Concerned that the freeway is going to be placed on 71st Avenue and not being considered on 51st or 59th avenues at this time. Why was 55th/59th Alternative chosen over the W101? Request for aerial map showing right-of-way. In October 2009, MAG s a Regional Council voted to approve the revised Regional Transportation Plan, which identifies the 59th Avenue alignment as the Preliminary Preferred Alternative for the Western Section of the South Mountain Freeway. The preferred alternative will be identified in the Draft EIS. b In 2006, ADOT c and the regional authorities designated 55th Avenue as the Preliminary Preferred Alternative. Due to budget constraints, an evaluation was completed to see where costs could be reduced to the Regional Transportation Plan. The 59th Avenue Alternative was recommended as the Preliminary Preferred Alignment following this effort. As part of the NEPA d process, all action alternatives in the Study Area must be included in the documentation as being previously considered. However, the 59th Avenue Alternative is currently identified as the Preliminary Preferred Alternative in the Western Section. The W101 Alternative presented a number of problems: The right-of-way would eliminate a substantial portion of the remaining developable land in Tolleson. Skewed arterial street interchange configurations would be required to connect with planned routes. Resolutions passed by the City/Town Councils of Avondale, Buckeye, Gila Bend, Goodyear, Litchfield Park, Phoenix, and Tolleson supported the W55 Alternative (now closely represented by the W59 Alternative) and opposed the W101 Alternative. The W101 Alternative was never envisioned as the I-10 e connection for the South Mountain Freeway through the past 30 years of freeway planning. As a result, there would need to be substantial investments made to reconstruct the Loop 101/I-10 traffic interchange and to add capacity on Loop 101 to handle the influx of traffic. The W59 Alternative allows traffic to be spilt between eastbound and westbound directions; that separation would be lost with a Loop 101 connection. Mapping is available on the study Web site < Public Information Meeting Summary 9
13 Table 4. Written comments Topic Comment Response Business impacts E1 Alternative I own and operate the Waffle House at I-10 and 59th Avenue. Any updates as to how long we may be in business would be appreciated. Does ADOT have information on the size of the businesses affected, number of employees, and repercussions of business relocations? A cold storage facility is located within the 59th Avenue preliminary preferred alignment. The business owner and leaser of the property are both concerned as this would be a very expensive and extensive facility to relocate and would result in the loss of more than 100 jobs. How far north into the Ahwatukee Foothills along Pecos Road will the E1 Alternative go? Or, should an alternative be identified on the GRIC f, how far south will it be? Would there be an entry/exit ramp on West Chandler Boulevard heading north? Would West Chandler Boulevard hook up with the Chandler Boulevard north on Foothills Parkway? The business will be kept informed as the study progresses and contacted by ADOT Right-of-Way should the business be impacted. ADOT is in the process of conducting value level assessments on properties located along the 59th Avenue alignment. The purpose of this appraisal process is to ascertain the right-of-way costs and relocation efforts necessary for ADOT s planning and budgeting purposes. ADOT is in the process of conducting value level assessments on properties located along the 59th Avenue alignment The purpose of this appraisal process is to ascertain the right-of-way costs and relocation efforts necessary for ADOT s planning and budgeting purposes. Information regarding ADOT s Relocation and Acquisition process was provided. The property owner and lease were encouraged to contact ADOT Right-of- Way for further information regarding their specific parcels. The northern boundary varies throughout the corridor. Between I-10 and 27th Street, the proposed freeway would remain south of all the existing development. Between 27th and 15th streets, it would remain south of Liberty Lane. Land between 17th Avenue and Chandler Boulevard would be south of Cedarwood Lane. West of Chandler Boulevard, the right-of-way would affect homes south of Cedarwood Lane. An alignment has not been identified or located at this time on GRIC land. Only recently have they submitted a letter expressing their desire to assist in the study of potential alignments on their land. However, the official position of the GRIC is opposition to construction of the South Mountain Freeway on their land. The closest exit would be 17th Avenue. Access to areas to the west of 17th Avenue will be available via Chandler Boulevard. Public Information Meeting Summary 10
14 Table 4. Written comments Topic Comment Response E1 Alternative (continued) GRIC coordination Method of property valuation Public involvement Would prefer to see the E1 Alternative through the GRIC and, if opposed, to the Pecos Road alignment. Why is an alternative located on the GRIC not included in the study? Concern that ADOT has no intention to slow the study down and that this may lead to a missed opportunity with the GRIC and the use of their land for the eastern alignment. What method of valuation would be used to establish the price? Request for the meeting materials in advance of the meeting. Question concerning when public comments must be received with regard to the meeting. Other Eastern Section alignments were studied but eliminated due to substantial impacts or their inability to satisfy the purpose and need of the proposed action. While ADOT and FHWA g have been coordinating with the GRIC, the official position of the GRIC is opposition to construction of the South Mountain Freeway on their land. ADOT and FHWA have been coordinating with the GRIC since While they have recently agreed to assist in the study of potential alignments, an alignment has not been identified or located at this time. In addition, the official position of the GRIC is opposition to construction of the South Mountain Freeway on their land. ADOT is following federal guidelines and a critical point will come when the Draft EIS is ready to be sent for legal review. If the GRIC communicates that they will allow an alignment on their land before legal review, then the document would be required to include an evaluation of this alternative. If such an announcement were to come afterwards, a supplemental EIS may be required to consider the impacts of any alternative alignments that the GRIC finds acceptable. ADOT would pay fair market value for businesses and residential properties. Materials were provided via following the meeting. A response was sent via notifying that public comments were due February 24, Public Information Meeting Summary 11
15 Table 4. Written comments Topic Comment Response Riggs Road Schedule Would like for this truck bypass to be considered along the Riggs Road, Beltline, and 51st Avenue corridor. This land has the right-of-way and needed land through the GRIC. This would keep the road away from South Mountain Park, Ahwatukee schools, and neighborhoods. What would be the approximate timeline in terms of the department acquiring the land through eminent domain? What is the department s timeline for finalizing a plan? The primary purpose of the study is not to create a truck bypass, it is to improve traffic mobility in the region by increasing capacity and providing alternatives to allow traffic to bypass already congested routes. The Riggs Road Alternative was studied along with approximately 30 other alternatives suggested by the public. While the Riggs Road Alternative would serve regional mobility needs, particularly of those living in the Maricopa area, meeting this travel demand would not address any specifically identified planning goals for an integrated regional transportation network. The Regional Transportation Plan identifies the proposed freeway as a critical link in the Regional Freeway System, both in completing it and in optimizing overall system performance as well as that of specific existing links such as Loop 202 (Santan Freeway). The Riggs Road Alternative would not complete the loop system as part of Loop 202, thereby causing substantial outof-direction travel for motorists. The alternative would not be prudent and feasible because it would not meet the traffic needs of the project and, therefore, was eliminated from further consideration. Additionally, nearly two-thirds of this alternative would be on GRIC land. The GRIC s official position of opposition to a South Mountain Freeway alignment on its land has not changed. The property acquisition and relocation assistance process could begin immediately after the Record of Decision. ADOT would begin working as early as possible with any owners of designated businesses to be displaced and would help the business develop a relocation plan, assist the displaced business to locate potential replacement properties, and provide benefits to the extent allowed by law to cover actual, reasonable moving costs and related expenses. At this time, the study team is working to complete the Draft EIS. Following federal approval for public release of the Draft EIS, a public hearing will be held with an associated 90-day public comment period. Public comments will then be evaluated by the study team and the Final EIS will be developed. This document will be released for a 60-day public review. These comments will then be evaluated and a final decision on the proposed freeway will be made (Record of Decision). While the schedule is still somewhat in flux, a final decision on the project is expected no sooner than Public Information Meeting Summary 12
16 Table 4. Written comments Topic Comment Response Have these plans been approved? If so, what is the projected start date? How will this affect my property (Southwest Village Apartments)? Specific property concerns Study changes Support of freeway Transcript availability Can you confirm whether my property is within the right-of-way? Commenter provided address. Question with regard to whether parcel is within the right-of-way. Commenter provided parcel number. Is my property within the right-of-way? Commenter provided address. In 1997, Pecos Road was to be extended via a parkway to 55th Avenue and I-10. Then, the public was told it would instead be a ten-lane bypass. Now, due to cash shortages, the public is being told eight lanes instead of ten lanes. This needs to be done on GRIC land. Commenter is in full support of the freeway, but has been waiting since 1994 and doesn t believe that he will see it completed in his lifetime. The public was directed to court reporters to make comments when will the transcript be made available? Since inquiry was regarding a specific property, was forwarded to ADOT Right-of-Way for response. The parkway concept, along with others, were studied by ADOT and the study team. However, it was determined that the parkway concept would not meet the projected traffic demand and operational concerns. ADOT and FHWA have been coordinating with the GRIC since While they have recently agreed to assist in the study of potential alignments, an alignment has not been identified or located at this time. The formal tribal position is opposition to construction of the proposed freeway on GRIC land. Finally, the purpose of this study is not to serve as a bypass, but rather to serve the regional mobility needs within the Phoenix metropolitan area. No response was requested for this comment. The content of the transcript has been incorporated into this document. In addition, the following comment methods were provided at the W59 public meeting: comment forms, questions cards, court reporters, and speaking to the study team. The public was also encouraged to send comments via , telephone, fax, and letter. The court reporters documented only two comments in addition to the questions answered during the question-and- answer session. The comments will also be summarized in Chapter 6 of the Draft EIS. Public Information Meeting Summary 13
17 Table 4. Written comments Topic Comment Response Truck traffic Why is there no indication of the amount of usage by 16 wheelers? Is the omission of truck traffic intentional? a Maricopa Association of Governments b Environmental Impact Statement c Arizona Department of Transportation d National Environmental Policy Act e Interstate 10 f Gila River Indian Community g Federal Highway Administration MAG s regional travel demand model forecasts approximately 10 percent truck traffic on the South Mountain Freeway in This percentage is similar to the current conditions on I-10 between Loop 101 and Interstate 17 and US 60. This aspect will be discussed in detail in the Draft EIS Telephone Comments Telephone contact information was included on the project Web site and all informational materials. Twenty-six calls were received by telephone during the comment period. These calls are summarized in Table 5 below. Table 5. Telephone calls Topic Comment Response Concern for high school on 59th Avenue Court report Opposition to the E1 Alternative Caller was interested in more detail with regard to the alignments and where the on- and off-ramps would be located. He was concerned about the proximity to the high school on 59th Avenue between Dobbins and Baseline roads. Caller attended the public meeting and was requesting when the court reporter document would be available. Caller commented that they were sad to see that something that was voted on in the late 1980s was still being pushed through, even with all the opposition of the location. Wanted it on the record that she and her husband were opposed to the location of the freeway on Pecos Road. Caller was advised that detailed maps were not available at this time, but that they would be ready and posted to the Web site in March. Caller was notified that the document had not yet been received by ADOT a, but that all of the information gathered in their report would be included in the Public Meeting Summary. Comment noted. Public Information Meeting Summary 14
18 Table 5. Telephone calls Topic Comment Response Opposition to the W101 Alternative Public comments Public Involvement Schedule Specific property concerns Caller thought that the W101 Alternative had been legally fought and removed from the study as an alternative. She does not want this alignment that would destroy Tolleson. Caller was requesting information as to when public comments were due in regard to the public meeting. Caller requested to be notified of the next meeting date. Caller requested information about the date and time of the next public meeting. Caller was inquiring about the anticipated construction and completion schedule for the freeway Caller owns a home that may be slated for acquisition. He has a question about a critical issue regarding his home. Caller requested more detail about the freeway location and its proximity to Liberty Cove Apartments. Specifically, caller was interested in where the alignment would be located in the area of Roosevelt and 59th Avenue. Caller requested detailed drawings of the new proposed changes to review before the public meeting. Caller lives in Laveen and had questions as to where the freeway would be in relation to her home. Caller wanted information as to whether his business was within the right-of-way. Caller lives on 59th Avenue and Lower Buckeye Road. She had questions about hardship and the acquisition process. Caller was notified that the W101 Alternative must remain part of the study and carried forward to meet NEPA b compliance. As part of the NEPA process, all action alternatives in the Study Area must be included in the documentation as being previously considered. However, the 59th Avenue Alternative is currently identified as the Preliminary Preferred Alternative in the Western Section. Caller was notified that comments were to be submitted by February 24, Caller was notified that the W59 meeting was being held on February 10, Caller was notified about the date, time, and location of the W59 public meeting. Caller was notified that construction was budgeted for 2015, but that there was no date for completion due to the fact that the build/nobuild decision had not been made. Since inquiry was regarding a specific property, was forwarded to ADOT Right-of-Way for response. Public Information Meeting Summary 15
19 Table 5. Telephone calls Topic Comment Response Caller lives in the Maracay Bridalwood subdivision right off 59th Avenue. She wanted more information as to how she might be impacted. Specific property concerns (continued) Study history Support for the freeway Toll road Caller would like if the area that she lives in will be affected by the project. Caller owns property (parcel # D) that at one time was in the South Mountain Freeway corridor. Would like to know if this parcel is still within the proposed corridor. Caller represents Southwest Villages property and would like more information on how this will impact on his property. A second caller on behalf of Southwest Villages property and would like more information on how this will impact this property and when the next public meeting would be held. Caller wanted to know if the study team had access to master plan map that was done for this freeway in the 1960s. He commented that most of the freeways had been done very logically in the Valley. Not concerned about the eastern portion being located on Pecos Road or on GRIC c land. He is not in favor of the 59th Avenue Alternative due to the power lines, buildings, and necessary right-of-way. He is concerned with the traffic interchange at 91st Avenue. He believes that the Loop 101 Alternative would be the best Western Section alignment. Caller wanted his support for the freeway on record. He believes that we need the freeway. Caller was requesting information about the tolls and whether they would be the same along the freeway. a Arizona Department of Transportation b National Environmental Policy Act c Gila River Indian Community Since inquiry was regarding a specific property, was forwarded to ADOT Right-of-Way for response. Caller was notified that at this time, there were no further public meetings scheduled. Since the call was in regard to right-of-way, she was given contact information for ADOT Right-of-Way for more information. Caller was notified about the restrictions thus far in studying on the GRIC land. The study team evaluated over 30 public alternatives when developing the build alternatives in both the Western and Eastern Sections. Comment noted. Caller was notified that the South Mountain Freeway was not currently under consideration as a toll road. Public Information Meeting Summary 16
20 2.11 Meeting Survey Results A meeting survey was distributed at the public information meeting. The survey contained four questions and a space to provide contact information. A summary of the responses to each question is provided below in Table 6 and attached in Appendix H. Table 6. Meeting survey results Question 1 How did you hear about this public information meeting? Question 2 Are there any other ways that you would like to be notified of the meetings? Question 3 Did you have any problems hearing the presentation or understanding the material? Question 4 On a scale of 1 to 5, did this meeting help you understand the project? Newspaper notice No. Postcard Door hanger Word of mouth Other By mail Responses Through post office Responses No, it was really clear from doorhangers, pamphlets, and the mail. No, very clear. Responses (2) 5 extremely helpful (2) 4 very helpful Public Information Meeting Summary 17
the interchange of business
the interchange of business project overview PV303 is a master planned business park designed to meet the growing demand for commercial and industrial opportunities in the greater Phoenix area. Located
3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
Q. What do you think the most important transportation issues are in this area with regard to east-west travel?
The following are the comments received in a survey of homeowner and neighborhood representatives conducted prior to the three Open Houses on August 2nd and 3rd, 2000. The opinions are presented as part
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
Draft Transportation Management Plan for Via Verdi Repair Project
for Via Verdi Repair Project prepared for City of Richmond This report was prepared by: This report was reviewed by: Ryan McClain, P.E. Fehr & Peers TABLE OF CONTENTS 1.0 INTRODUCTION & PROJECT DESCRIPTION...
8+ %!0"% 8+1!%"'$%,$"$
8+ 8+ %!0"% The next step in developing recommendations for improvements to Grand Avenue was to identify, develop and evaluate alternatives to address the issues and needs identified in the previous chapter.
Strategic Economic Development Assets: Infrastructure in the East Valley
: Infrastructure in the East Valley Presented by: February 2013 1 INFRASTRUCTURE Moving People, Goods and Services In today s global economy, success belongs to the well-connected, especially in the movement
REGIONAL TRANSPORTATION SAFETY INFORMATION MANAGEMENT SYSTEM (RTSIMS) Phase II UPWP Project: 600-0180-09 Task Order SA09-1 Goal
REGIONAL TRANSPORTATION SAFETY INFORMATION MANAGEMENT SYSTEM (RTSIMS) Phase II UPWP Project: 600-0180-09 Task Order SA09-1 Goal The overall goal of the RTSIMS project is to develop an information management
Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
Chapter 5 Financial Plan
The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to
DESIGN ASSISTANCE APPLICATION
DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015
The Need for Traffic Incident Management
The Need for Traffic Incident Management With traffic incidents responsible for approximately 50-60% of the congestion delays motorists encounter on the nation s roadways every day, increased roadway capacity
Section 6 Traffic Analysis
Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis
Light Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
KYTC, District 2 Chief District Engineer KYTC, District 2 Planning Supervisor & LPA Coordinator. KYTC, Central Office Planning
MINUTES Field Visit for Local Officials and Stakeholders Bluegrass Crossings Regional Business Centre Improved Access Road Study Ritatsu Manufacturing (Board Room) Beaver Dam, Kentucky June 11, 2014 1:30
Section 8.1 ADVANCE ACQUISITION
Section 8.1 ADVANCE ACQUISITION PURPOSE... 8-1-1 AUTHORITY... 8-1-1 SCOPE... 8-1-1 REFERENCES... 8-1-1 TRAINING... 8-1-1 FORMS... 8-1-1 DEFINITIONS... 8-1-2 8.1.1 Advance Acquisition Procedures... 8-1-2
Economic and Real Estate Consulting MEMORANDUM
Economic and Real Estate Consulting MEMORANDUM To: From: Ms. Maria Laughner Business & Real Estate Development Manager City of Peoria Rick Merritt Danny Court Date: August 12, 2011 Re: Peoria Digital Billboard
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Elba Liquefaction Company, L.L.C. Southern LNG Company, L.L.C. Elba Express Company, L.L.C. Docket No. PF13-3-000 NOTICE OF INTENT TO PREPARE
Executive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
Examples of Transportation Plan Goals, Objectives and Performance Measures
Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.
Marion County Public Works
Marion County Public Works Federally Funded Transportation Program Title VI Annual Accomplishment Report Fiscal Year 2014/15 Marion County Public Works Department Introduction The Marion County Department
STATE HIGHWAY 360. PUBLIC HEARING Thursday, October 17, 2013 FROM: E. SUBLETT ROAD/ W. CAMP WISDOM ROAD TO: US 287
STATE HIGHWAY 360 PUBLIC HEARING Thursday, October 17, 2013 FROM: E. SUBLETT ROAD/ W. CAMP WISDOM ROAD TO: US 287 TIMBERVIEW HIGH SCHOOL, ARLINGTON, TEXAS Project Vicinity Proposed Project Length: Approximately
SR-18 Corridor Improvements in Wood County
Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park
DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM
DESIGN PUBLIC HEARING August 10, 2015 AT WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM FOR THE PROPOSED Rehabilitation & Stormwater Improvements
345 kv Brazos Valley Connection Project FAQs
345 kv Brazos Valley Connection Project FAQs Overview 1. Who is CenterPoint Energy Houston Electric, LLC? CenterPoint Energy Houston Electric, LLC (CenterPoint Energy) is an electric utility that maintains
Corridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
AGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
SCOTTSDALE TRANSPORTATION COMMISSION REPORT
SCOTTSDALE TRANSPORTATION COMMISSION REPORT To: Transportation Commission From: Paul Basha, Transportation Director Meeting Date: September 19, 2013 Subject: SR-101 Pima Freeway Improvements ITEM IN BRIEF
TH 23 Access Management Study Richmond to Paynesville
TH 23 Access Management Study Richmond to Paynesville Prepared For: Minnesota Department of Transportation District 8 Prepared By: Short Elliott Hendrickson Inc. July 2015 Table of Contents I. Introduction...
FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005
FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of
GREENSBORO - HIGH POINT ROAD (SR 1486 / 4121)
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION GREENSBORO - HIGH POINT ROAD (SR 1486 / 4121) FROM PROPOSED US 311 BYPASS TO HILLTOP ROAD (SR 1424) TIP PROJECT U-2412 WBS Element 34802 Federal Project Number
West Valley Collaborative
West Valley Collaborative Three organizations which serve the West Valley are working collaboratively toward promoting the goals of the Arizona We Want 2.0. We look upon this report as a starting point.
US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing
US 281 AT PREMONT PUBLIC HEARING Hearing Purpose The purpose of tonight s Public Hearing is for the public to: Learn about the status of the proposed project Review the purpose and need for the project
AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
FILE NO.: Z-9020 NAME: Hometown Tax Service Short-form PD-O LOCATION: Located at 3008 West 12 th Street DEVELOPER: Mark Green 65 Westfield Loop Little Rock, AR 72210 SURVEYOR: Kittler-Roberts Group, LLP
Section ALTERNATIVES. 3. Alternatives
Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of
North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014
North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts
First American Title Insurance Company
INFORMATION The Title Insurance Commitment is a legal contract between you and the company. It is issued to show the basis on which we will issue a Title Insurance Policy to you. The Policy will insure
SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
INDOT 2000-2025 Long Range Plan
Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process
Local Government Requirements: A Handbook for CHILD CARE PROVIDERS
Local Government Requirements: A Handbook for CHILD CARE PROVIDERS KEY QUESTIONS to ASK YOUR MUNICIPAL/REGIONAL DISTRICT OFFICE: Do local land-use laws allow me to operate a child care facility on my chosen
Chapter Thirty-five ACCESS CONTROL/ ACCESS MANAGEMENT BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Thirty-five ACCESS CONTROL/ ACCESS MANAGEMENT BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Thirty-five ACCESS CONTROL/ACCESS MANAGEMENT Table of Contents Section Page 35-1 GENERAL CONCEPTS...
ZELL COMMERCIAL REAL ESTATE SERVICES Announces Recently Completed Retail Transactions
ZELL COMMERCIAL REAL ESTATE SERVICES Announces Recently Completed Retail Transactions 5343 NORTH 16TH STREET, SUITE 290, PHOENIX, AZ, 85016 (602) 248-0600 www.zellcre.com ZELL COMMERCIAL REAL ESTATE SERVICES,
Preliminary Report Review of Pending DUI Cases Maricopa County Justice Courts
Preliminary Report Review of Pending DUI Cases Maricopa County Justice Courts Prepared by the Administrative Office of the Courts Issued April 9, 2002 Table of Contents Executive Summary...1 DUI Pending
City of Phoenix. False Alarm Reduction Plan
City of Phoenix False Alarm Reduction Plan Phoenix Police Department Herman Goldstein Award Submission SUMMARY Phoenix is a fast growing city with new hamlets springing up almost over night. These communities
REQUEST FOR PROPOSAL. Consulting Services for a Thomas Street Corridor Master Plan
REQUEST FOR PROPOSAL Consulting Services for a Thomas Street Corridor Master Plan INTRODUCTION The city of Wausau is seeking a qualified planning, development, design, and engineering consultant to develop
Update on Previous Related Transportation Enhancement Grants
ROUND 16 ROUND 16 Update on Previous Related Transportation Enhancement Grants Pima County and City of Tucson staff are implementing the Pima County-Tucson Safe Routes to Schools Pilot Program. This program
COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant
COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY Project Name: ZMA 2013-00004 Hollymead Town Center Block VI Planning Commission Public Hearing: July 29, 2014 Staff: Claudette Grant Board of Supervisors
I-94 Rehabilitation Project
INTERSTATE 94 I-94 Rehabilitation Project FHWA-MI-EIS-01-01-F December 2004 Final Environmental Impact Statement and Section 4(f) Evaluation Executive Summary PREFACE The National Environmental Policy
CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT
CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT MEETING DATE: SEPTEMBER 8, 2015 ITEM NUMBER: 1 SUBJECT: PROPOSED GENERAL PLAN LAND USE ALTERNATIVE FOR THE YEAR 2015-2025 GENERAL PLAN
PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE
APPENDIX F PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE Table of Contents The Setting Background Planning Objectives Neighborhood Protection The Concept Plan Exhibits Cottonwood Mall Site 1
Transportation Policy and Design Strategies. Freight Intensive. Level of Freight Presence
Appendix G Transportation Policy and Design Strategies CONTEXT SENSITIVE SOLUTIONS To address the need to describe freight systems which account for the population distress which may result, an analysis
5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES
5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.
CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS
2. Section 2 TWO CHAPTERTWO 2.1 ALTERNATIVES DEVELOPMENT PROCESS This EIS has been prepared in compliance with the Council on Environmental Quality (CEQ) regulations for implementing NEPA (40 CFR 1500-1508).
When ODOT Needs Your Property
When ODOT Needs Your Property Foreword The State of Ohio is engaged in a continuous program of improving its transportation systems. Often this improvement process involves the purchase of land so that
Truck Diversion Forecasts. DRAFT Executive Summary
Truck Diversion Forecasts DRAFT Executive Summary February 2008 The Texas Department of Transportation Transportation Planning and Programming Division La Entrada Al Pacifico Feasibility Study Truck Diversion
HIGHLANDS NEIGHBORHOOD STUDY AREA PARKING ANALYSIS
HIGHLANDS NEIGHBORHOOD STUDY AREA PARKING ANALYSIS Prepared for: City and County of Denver Department of Public Works, Engineering Division Traffic Engineering Services Parking Operations 201 W. Colfax
Planning Commission Staff Report
10 Planning Commission Staff Report TO: FROM: THROUGH: PLANNING COMMISSION AMY TEMES, SENIOR PLANNER (480) 503-6729, [email protected] CATHERINE LORBEER, AICP, PRINCIPAL PLANNER (480) 503-6016 [email protected]
Highway 138 Corridor Solutions Study Roseburg, Oregon. Technical Memorandum #4: Concept Development and Screening DRAFT
Highway 138 Corridor Solutions Study Roseburg, Oregon Technical Memorandum #4: DRAFT Prepared for Oregon Department of Transportation, Region 3 3500 NW Stewart Parkway Roseburg, Oregon 97470 Prepared by
Background and Goals for the Project
City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering
Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP
Lone Star Regional Rail Project - Update Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP August 20, 2015 Lone Star Regional Rail Project - Update Presentation
Land Protection Planning for the National Wildlife Refuge System
March 2012 Planning Information Brochure 1 Land Protection Planning for the National Wildlife Refuge System The following questions are often asked when the U.S. Fish and Wildlife Service (Service) begins
EARLY ACQUISITIONS ASSOCIATED WITH THE I-10 EXPANSION STUDY. Paula Gibson, ADOT Chief R/W Agent Dave Edwards, R/W Project Coordinator
EARLY ACQUISITIONS ASSOCIATED WITH THE I-10 EXPANSION STUDY Paula Gibson, ADOT Chief R/W Agent Dave Edwards, R/W Project Coordinator This presentation will cover 3 primary aspects of the project: An overview
Staff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No. 16-000526-PLAN February 23, 2016
Staff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No. 16-000526-PLAN February 23, 2016 1101 Bull Street One West Park Avenue 1107 Bull Street
RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)
TPC Agenda Item 6A Mailout - 10/16/15 RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) OCTOBER AMENDMENTS Amendment
FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request
FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,
Brookdale Site. CB6 Update April 1, 2015
Brookdale Site CB6 Update April 1, 2015 Summary Timeline / Process How does DSNY operate now? Garage project and frequently asked questions Project facts Impact to emergency vehicle access Traffic congestion
Improving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
EXHIBIT A Accessible Truck Routes Map
EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT
IH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
Mercer County Multi-Modal Transportation Plan Year 2025 Travel Demand Model
Mercer County Multi-Modal Transportation Plan Year 2025 Travel Demand Model Prepared For West Virginia Department of Transportation Transportation Planning Division Building 5, Room 824 1900 Kanawha Blvd.
NORTH EAST PLANNING COMMISSION North East Town Hall Meeting Room 106 South Main Street, North East, Maryland 21901 Wednesday, March 7, 2012 7:00 p.m.
NORTH EAST PLANNING COMMISSION North East Town Hall Meeting Room 106 South Main Street, North East, Maryland 21901 Wednesday, March 7, 2012 7:00 p.m. Chairman Brian Morgan called the meeting to order at
Implementation Strategy
Implementation Strategy 6 The following implementation strategy defines strategic points of intervention for complete streets programming, including visioning, goal-setting, local agency plans, coordination
CITY OF BUCKEYE REGULAR COUNCIL MEETING JULY 7, 2015 MOTIONS
PLEASE SILENCE ALL ELECTRONIC COMMUNICATION DEVICES. THANK YOU. NOTICE OF POSSIBLE QUORUM OF THE CITY OF BUCKEYE PLANNING AND ZONING COMMISSION OR OTHER COUNCIL APPOINTED BOARD: PLEASE NOTE THAT THERE
Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE
Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of
Informational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
Southern California International Gateway Project Description
Southern California International Gateway Project Description Introduction This Supplemental Notice of Preparation and Initial Study is to inform Responsible, Trustee Agencies, and the public that the
CHAPTER 3: ALTERNATIVES
CHAPTER 3: ALTERNATIVES Substantive changes to Chapter 3 since the publication of the SDEIS Section 3.1.1.3 Provides footnote to explain ongoing cost reductions for the Modified Selected Alternative that