- Hugo Kelley
- 8 years ago
- Views:
Transcription
1 John Hoang P.E. ADOT Traffic Engineering Group Phoenix Design Section 1
2 Saw-cut groove in conjunction with (removable) temporary tape application Why should we saw-cut & use temp. tape? Would it be cost effective? 2
3 Major Reasons Minimize the damage of the pavement surface. Reduce the confusion for motorists. Cost saving compared to resurface the entire roadway. 3
4 Issue: Many scarred areas after HOV lane was built. Solution: Resurface the entire roadway. 4
5 Experimentation 3 temporary tape manufacturers: (3M, Advance Traffic Markings & Brite-line) 2 different types of tests performed Longitudinal (parallel to direction of travel) 5
6 Transverse (accelerated test that is perpendicular to the direction of travel). (Purpose: Testing temp. tape at the extreme condition to find out if it s able to withstand the heavy traffic and still easy to be removed). Testing periods: 6 months & 12 months 6
7 Removal In the summer after about 6 months All 3 different tapes come off relatively easy. Time to remove each 10 skip is between sec. In the winter after about 12 months All 3 different tapes are much harder to remove. Time to remove each 10 skip is increased to between sec. (Tape manufacturers recommended not to have temporary tape down >12 months). It would take about 10 minutes to remove a 300 long segment of temporary tape with some breakage involved. Note: All temporary tape removals are done by hand. The best hand we had out there.? 7
8 Leading by example 8
9 Implementation Saw-cut groove method in conjunction with the temporary tape application were implemented on the 101L and 202L HOV Design Builds. 9
10 Where to use continuous temporary tape and paint When temporarily shifting striping during construction Temporary tape shallbe used if installed on future travel lane pavement. Paint can be used in the gore and shoulder areas. 10
11 Solid temporary tape on future travel lane & paint in shoulder area. 11
12 After TCB s are installed with saw-cut groove and temporary tape are in placed Before Construction During Construction 12
13 During construction The temporary condition lasts between 9-18 months depending on the project. Speed Limit is lowered to 55 MPH throughout the construction area. Solid temporary tape is required for the transitional areas of both entrance and exit. 13
14 Transitional Areas using temporary tapes On Entrance On Exit 14
15 Obliteration Obliteration Equipment Types: Saw-cut Hydro-blast (water-blast) Per ADOT specification, all obliteration equipment shall have built-in vacuum recovery system. Operator& Inspector are the keys to asuccessful obliteration process. Operator: Adjust speed, nozzle size, water pressure Inspector: Make sure no excessive damage to pavement surface per ADOT specification. 15
16 A few different types of saw-cutting equipment were used Goal: To smoothly saw-cut permanent pavement markings. Note: Saw-cut equipment must have diamond blades. (see ADOT specifications for more details). 16
17 Saw-cut Groove Dimensions: Depth of saw-cut Depth is between 80 mils 120 mils (thickness of a nickel). 17
18 Width of saw-cut Width is about 7 +/-.25 and 13 +/-.25 for skip line and gore stripe respectively. 18
19 Length of saw-cut Approximately the length of a skip line (10 ). 19
20 There are 2 hydro-blasting machines that are most often used in Arizona. Stripe Hog Water Blasting Technologies 20
21 Star Jet -NLB Corp 21
22 Stripe Hog and Star Jet are at work together 22
23 Obliteration Time & Cost Comparison: It takes between 30 sec to 60 sec to saw-cuta 10 skip. It takes between 15 sec to 30 sec to hydro-blasta 10 skip. It costs about $.05 more per lineal foot ($.50 per 10 skip) to saw-cut compared to hydro-blast. (Saw-cut groove has much, much smoother surface for future permanent tape installation compared to H2O-blast). It costs about 3 times more to use the temporary tapes compared to temporary paint. (Temporary tape is much more reflective compared to temporary paint so added safety may be increased using tape). It costs about 10 times more to resurface the entire roadway compared to using saw-cut/temporary tape. 23
24 After Construction After the completion of the HOV lane construction, all lanes are shifted back to the original locations, 3M-380 Stamark permanent tape will be installed within the saw-cut grooves. 24
25 HOV lane is built and opened. Permanent tapes are installed in the saw-cut areas. No scarring is visible. 25
26 Completed Projects Comparison Withoutsaw-cut grooves and temporary tape Withsaw-cut grooves and temporary tape 26
27 Lessons learned Temporary tapes come off following immediate rainfall and/or too much water on the pavement. Option: P-50 adhesive may be an used if delaying tape installation is not choice. (Temporary tape manufacturers recommend a 24 hour window of moisture free before & after installation of tape). 27
28 Lessons learned cont Black paint over existing pavement markings. (ADOT specification states that painting over existing striping does not constitute pavement marking obliteration). 28
29 Lessons learned cont Excessive obliteration by ceramic blades instead of diamond blades. (Creating hazardous condition for motorcyclists). 29
30 Lessons learned cont Pavement was not free of debris when temporary tapes were installed. (ADOT Specification states that the pavement surface must be free from debris before any pavement marking installation). 30
31 Lessons learned cont Continuous auxiliary lane obliteration. (should only obliterate the 3 stripe and not touch/damage the 12 gap). 31
32 Questions? John Hoang ADOT Traffic Engineering Group
33 More pictures Diamond Blades Not much water was collected in the saw-cut groove 33
34 Star Jet Obliterating Head Stripe Hog Obliterating Heads 34
35 Preferred aux. lane removal Not preferred aux. lane removal 35
36 Close up saw-cut shot Close up water-blast shot 36
37 Pavement Marking Removal Video Clip 37
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
More informationLane Shutdowns and Mobile Operations
PERFORMANCE ACTIVITY 408 TREE REMOVAL WORK DESCRIPTION 1 WORK DESCRIPTION 2 Fallen Tree Standing Tree 408 TREE REMOVAL ACTIVITY DESCRIPTION Cut and remove tree as necessary. WORK DESCRIPTION 1 Fallen Tree
More informationScope. General. General. Accident Investigation. Public Hazard Control 10/15/2012
By: Eddie D. Bell Scope Items covered under this ANSI standard. Flaggers Pedestrians General Responsibility: The contractor shall implement this standard as appropriate according to the size and potential
More informationGrinding equipment that causes raveling, aggregate fractures or disturbance to the joints shall not be permitted.
Guide Specification: Diamond Grinding for City Streets Publication Date: May 24, 2010 SCOPE City streets are defined as roadways with a closed drainage system along with numerous structures such as manholes,
More information2015 Fall Asphalt Conference VDOT 2016 Traffic Engineering Specification Revisions and Work Zone Reminders
2015 Fall Asphalt Conference VDOT 2016 Traffic Engineering Specification Revisions and Work Zone Reminders Harry A. Campbell, P. E., Central Office, Traffic Engineering Division - October 6, 2015 2016
More informationMarch 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS
March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High
More informationConcrete Pavement Rehabilitation: Repairing Florida One Slab At A Time
: Repairing Florida One Slab At A Time 2012 FTBA Conference Andre Sutherland, P.E. FDOT District 2 Jacksonville Construction Contents Describe Scope Characteristics Sequence of operation for slab removal
More informationSHOULDER RUMBLE STRIPS: A METHOD TO ALERT "DRIFTING" DRIVERS. Neal E. Wood, P.E. Bridge Engineer (Retired)
SHOULDER RUMBLE STRIPS: A METHOD TO ALERT "DRIFTING" DRIVERS Neal E. Wood, P.E. Bridge Engineer (Retired) Pennsylvania Turnpike Commission Post Office Box 67676 Harrisburg, Pennsylvania 17106-7676 January
More informationOver the Edge and Back. What to do if you drive off the pavement edge. AAA Foundation for Traffic Safety
Over the Edge and Back What to do if you drive off the pavement edge Pavement edge drop-off Pavement edge drop-off is a common safety hazard, and is particularly dangerous if the difference in height between
More informationSeptember 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900
September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation
More informationPavement Markings. Street markings can be used to designate parking spaces, and painted curbs can be used to supplement parking restriction signing.
Pavement Markings Pavement markings can be a very cost-effective roadway improvement in terms of reducing crashes and providing guidance to drivers, especially at night. Part 3 of the MUTCD defines the
More informationNAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
More informationThe Need for Traffic Incident Management
The Need for Traffic Incident Management With traffic incidents responsible for approximately 50-60% of the congestion delays motorists encounter on the nation s roadways every day, increased roadway capacity
More informationDelineation. Section 15 - Raised pavement markers
Delineation Section 15 - Raised pavement markers The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections
More informationQUALITY ASSURANCE FOR MOBILE RETROREFLECTIVITY UNITS
State of Florida Department of Transportation QUALITY ASSURANCE FOR MOBILE RETROREFLECTIVITY UNITS FDOT Office State Materials Office Authors Patrick Upshaw Joshua Sevearance Hyung Lee Date of Publication
More information700 Life-Cycle Cost Analysis... 700-1
Table of Contents 700 Life-Cycle Cost Analysis... 700-1 701 Introduction... 700-1 701.1 Discount Rate... 700-1 702 Initial Construction... 700-1 703 Future Rehabilitation... 700-1 703.1 Introduction...
More informationAPPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
More informationChapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
More informationINDIANA DEPARTMENT OF TRANSPORTATION OFFICE OF MATERIALS MANAGEMENT. MEASUREMENT OF RETRO-REFLECTIVE PAVEMENT MARKING MATERIALS ITM No.
Revised 3/14/14 INDIANA DEPARTMENT OF TRANSPORTATION OFFICE OF MATERIALS MANAGEMENT MEASUREMENT OF RETRO-REFLECTIVE PAVEMENT MARKING MATERIALS ITM No. 931-14T 1.0 SCOPE. 1.1 This test method covers the
More informationJoint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs
Long Life Concrete Pavement Joint Performance Joint Rehabilitation Gary Fick, Trinity Construction Management Services, Inc. Representing the National CP Tech Center Driving Forces for Concrete Pavement
More informationDelineation. Section 4 Longitudinal markings
Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections
More informationConstruction of Quality Hot Mix Asphalt Pavements
59 th Annual Asphalt Paving Conference Outline Best Practices for Pavement Construction Placement Best Practices Surface Prep Project planning Understanding the paver Factors affecting the screed Screed
More informationBEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
More informationSCOTTSDALE TRANSPORTATION COMMISSION REPORT
SCOTTSDALE TRANSPORTATION COMMISSION REPORT To: Transportation Commission From: Paul Basha, Transportation Director Meeting Date: September 19, 2013 Subject: SR-101 Pima Freeway Improvements ITEM IN BRIEF
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR HOT- MIX ASPHALT (HMA) BINDER AND SURFACE COURSE
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR HOT- MIX ASPHALT (HMA) BINDER AND SURFACE COURSE While its use is not required, this checklist has been prepared to
More informationChapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
More informationGuidelines. Motorcycle and Bicycle Work Zone Safety
Guidelines on Motorcycle and Bicycle Work Zone Safety This document describes work zone conditions that can cause safety concerns for motorcyclists and bicyclists. The document offers recommended practices
More informationHow To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
More informationINTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS
INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues
More informationHow To Design A Crash Investigation Site
CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where
More informationI-66 Pavement Rehabilitation
I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationFHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005
FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of
More information4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing
Chapter 4 Bases 4-02 Gravel Base GEN 4-02.1 General Instructions Gravel Base is typically used in the construction of the roadway section and provides support for the pavement. For the pavement to provide
More informationInformational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
More informationCHAPTER 5 DIAMOND GRINDING AND GROOVING
Disclaimer The contents of this guide reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official
More informationIncident Management Response Plan Hampton Roads Highway Incident Management Committee
Incident Management Response Plan Hampton Roads Highway Incident Management Committee Multi-Jurisdictional Memorandum of Understanding Highway Incident Management Plan This memorandum of understanding
More informationTROPIC LIGHTNING CHECKRIDE PERFORMANCE MEASURE
TROPIC LIGHTNING CHECKRIDE PERFORMANCE MEASURES V4.0 TASK 1: PERSONAL PROTECTIVE EQUIPMENT PERFORMANCE MEASURE DOT Approved Helmet Proper Reflective Equipment Full Fingered Gloves Proper Eye Protection
More informationThe Nation's Most Advanced Game Crossing System By Norris Dodd, Arizona Game and Fish Department (AZGFD) and Joe Wise, Solar Traffic Controls
IMSA Journal Issue: March/April 2007 The Nation's Most Advanced Game Crossing System By Norris Dodd, Arizona Game and Fish Department (AZGFD) and Joe Wise, Solar Traffic Controls On December 11, 2006,
More informationCHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS
HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationKENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
More informationAPPENDIX B. I. Background Information
APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement
More informationCAL FIRE/San Luis Obispo County Fire Fire Prevention Bureau
CAL FIRE/San Luis Obispo County Fire Fire Prevention Bureau g GUIDELINE FOR SAFETY REQUIREMENTS FOR HAUNTED HOUSES PURPOSE This guide is intended to provide safety standards and regulations for the construction
More informationROAD SIGNS IN JAPAN PARKING SIGNS. No Parking or Stopping Anytime SIZE & WEIGHT LIMIT SIGNS SPEED LIMIT SIGNS
ROAD SIGNS IN JAPAN Stop Slow & all Do Not Enter & Motorcycles Road Large Sized Trucks & Special Duty Road All Except Two Wheeled Light Except Bicycles Large Passenger No Right Turn No Passing No U-Turn
More informationCONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.
CONCRETE REPAIR GUIDELINES Concrete repairs can be broken down into four basic types, plus special repairs and planing. Note: It is recommended that investigation into soundness of pavement be performed
More informationAPE T CFRP Aslan 500
Carbon Fiber Reinforced Polymer (CFRP) Tape is used for structural strengthening of concrete, masonry or timber elements using the technique known as Near Surface Mount or NSM strengthening. Use of CFRP
More informationTransportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
More informationCHAPTER 8: VISUAL AIDS PROVIDED BY AERODROME MARKINGS, MARKERS, SIGNALS AND SIGNS. Section 8.1: General
CHAPTER 8: VISUAL AIDS PROVIDED BY AERODROME MARKINGS, MARKERS, SIGNALS AND SIGNS Section 8.1: General 8.1.1 Introduction 8.1.1.1 This Chapter specifies the standards for Markers, Markings, Signals and
More informationSECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
More informationTransportation Infrastructure Asset Management
2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE hlongfellow@parametrix.com (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory
More information2014 TRANSPORTATION SAFETY SUMMIT LOUISIANA STATE POLICE & LADOTD TIM INITIATIVE
2014 TRANSPORTATION SAFETY SUMMIT LOUISIANA STATE POLICE & LADOTD TIM INITIATIVE PROJECT SUMMARY & PRESENTATION LAW ENFORCEMENT FIRE EMS TRANSPORTATION TOWING & RECOVERY COMMUNICATIONS What is Traffic
More informationReflective Safety Products. Home Automotive Commercial
Reflective Safety Products Home Automotive Commercial Driveway Markers 2673 2689 2707 2706 2708 2661 2662 2690 12" Foot Spike 36" 46" 2673 12 Mini-Marker 6-Pack 2689, 2707 36 Driveway Marker 2706, 2708
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationExpected Service Life and Performance Characteristics of HMA Pavements in LTPP
Expected Service Life and Performance Characteristics of HMA Pavements in LTPP Expected Service Life and Performance Characteristics of HMA Pavements in LTPP Submitted to: Asphalt Pavement Alliance Prepared
More informationAll Purpose Cleaner. Carpet Care. Specialty Cleaner
3 9 All Purpose Cleaner Carpet Care Specialty Cleaner The Clean Carpet manual will guide you through proven procedures to ensure you get the job done right. In addition to initial training, the laminated
More informationFull recovery. The current state of American infrastructure. As economy improves, I-74 span to handle the masses CITY STREETS
CITY STREETS Full recovery As economy improves, I-74 span to handle the masses By Thomas Murphy, Ph.D., P.E., S.E., and David J. Morrill, P.E., S.E. Contributing Authors The current state of American infrastructure
More information1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
More informationSPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
More informationRehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements
University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt
More informationCHAPTER 2B. REGULATORY SIGNS
December 2000 Page 2B-1 CHAPTER 2B. REGULATORY SIGNS Section 2B.01 Application of Regulatory Signs Regulatory signs shall be used to inform road users of selected traffic laws or regulations and indicate
More informationGuide to the Texas A&M Transportation Institute Mobile Retroreflectometer Certification Program
Guide to the Texas A&M Transportation Institute Mobile Retroreflectometer Certification Program Program Conducted by Texas A&M Transportation Institute In Cooperation with the Texas Department of Transportation
More information1What purpose do guard
g u a r d F c a b A l e Q f re q u e n t l y a s k e d q u e s t i o n s 1What purpose do guard cables serve? Cross-Median Fatalities The purpose of high-tension guard cable is to prevent vehicles that,
More informationHanna delivers the technical and marketing expertise needed to produce a car wash that meets the car wash customer's expectations.
Planning a Car Wash Planning begins with examining customer preferences. A review of the latest consumer survey data (including the 2001 ICA Study of Consumer Carwashing Attitudes and Habits) indicates
More information2.9 WINDOW & DOOR BUCKS
2.9 WINDOW & DOOR BUCKS Bucks provide attachment surfaces for windows and doors while holding back concrete from these openings during concrete placement. Mark the center and edges of openings as you place
More informationOperating Instructions
CS101 CarSense Vehicle Motion Detector Operating Instructions CAUTIONS AND WARNINGS Never use the CS101 as a safety reversing or presence detection system. The CS101 requires that a vehicle be moving for
More informationTypes of Data. Features. Getting Started. Integrated Roadway Asset Management System
3-2014 GIS-based Asset Management System Optimize Maintenance Manage Signs Analyze Safety Roadsoft is a roadway management system for collecting, storing, and analyzing data associated with transportation
More informationHVAC Vents & Diffusers
2 HVAC Vents & Diffusers Drywall, Stone, & Wood Applications TRUFIG can be installed in a variety of finishes and surfaces. This guide will detail the install of HVAC vents and diffusers in drywall, stone,
More informationNORTH CAROLINA NUG UPDATES FOR SUCCESSFUL TIM TEAMS. Traffic Incident Management Workshop June 19th, 2012
NORTH CAROLINA NUG UPDATES FOR SUCCESSFUL TIM TEAMS Traffic Incident Management Workshop June 19th, 2012 OUTLINE FEMA PARKING GUIDELINES DVD / CARD RESPONDER VISIBILITY ACCIDENT INVESTIGATION SITES SAFE,
More informationPavement Surface Evaluation and Rating. Manual RATING RATING RATING PASER RATING. Concrete Roads
Pavement Surface Evaluation and Rating PASER Manual Concrete Roads RATING 10 RATING 7 RATING 4 RATING 1 Contents Introduction 2 Rigid pavement performance 2 Pavement conditions and defects 3 Evaluation
More informationEstimating Winter Weather Road Restoration Time using Outsourced Traffic Data: Three Case Studies in Maryland
Estimating Winter Weather Road Restoration Time using Outsourced Traffic Data: Three Case Studies in Maryland August 2014, NRITS Branson, MO Elham Sharifi Stanley E. Young Thomas H. Jacobs Steven M. Rochon
More informationTITLE 13. LAW AND PUBLIC SAFETY, CHAPTER 18 SUBCHAPTER 1. PERMITS FOR OVERDIMENSIONAL OR OVERWEIGHT VEHICLES
NOTE: This is a courtesy copy of N.J.A.C. 13:18-1. The official version can be found in the New Jersey Administrative Code. Should there be any discrepancies between this text and the official version,
More informationADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
More informationAdvances in retroreflective technologies for road signage, vehicle visibility and pavement markings, delivering safer roads for all
Advances in retroreflective technologies for road signage, vehicle visibility and pavement markings, delivering safer roads for all Abstract: King, A. 3M Traffic Safety Systems Division This paper provides
More informationGuide Specifications for Maple Flooring Systems
Guide Specifications for Maple Flooring Systems MFMA Guide Specification for Resilient Pre-Engineered Fixed Panel System Purpose This Guide Specification is designed to assist in the production of actual
More informationSTORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
More informationPavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage
Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 5.3: Condition
More informationConstruction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
More informationBRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:
412.1 DESCRIPTION BRIDGE FIELD PAINTING, REPAINTING, 412 This specification contains the requirements for the removal, containment, and disposal of existing paint on steel surfaces, preparing the steel
More informationREQUEST FOR QUOTE. Material $ Labor/Installation $ tax $ Total $ Material $ Labor/Installation $ tax $ Total $
REQUEST FOR QUOTE Specifications- Knightdale Station Park Naming Rights Exterior Signage General Conditions 1. Delivery of signs to be within 6 weeks of order confirmation. 2. Shop drawings are required
More informationA Guide to Accident Prevention on Motorcycles
A Guide to Accident Prevention on Motorcycles SEE me now? Always ride with your dipped headlight on DAY AND NIGHT Avoiding the 5 most common motorcycle accidents... 1 Collisions at Junctions... These can
More informationCENTRELINE REMOVAL TRIAL
Road Space Management Directorate Surface Transport Transport for London 4 th Floor, Palestra 197 Blackfriars Road London SE1 8NJ www.tfl.gov.uk CENTRELINE REMOVAL TRIAL Issue Date Prepared by Reviewed
More informationDIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS
304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.
More information7.2 Warrants and Planning Considerations
Chapter 7 Interchanges 7.1 Introduction As discussed in Chapter 6, it is important that designers consider the needs and activities of the pedestrians, cyclists, and motorists to comprehensively plan for
More informationINITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY
INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY Allison Daniello Ben Powell Nicholas Schaeffer Aaliyah McClinton Yusuf Mehta Rowan University United States Kimberly
More informationConstruction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October
More informationPublic Involvement Meeting Handout
Public Involvement Meeting Handout WIS 93 Detloff Drive to WIS 95 Trempealeau County Project ID 7130-01-72 June 18, 2014 5:00 P.M. 401 W. Main Street Arcadia WI Purpose of the meeting The Wisconsin Department
More informationBill Eshbaugh, P.E. Eastern Federal Lands Highway Division October 26, 2007
Improving and Maintaining the Alignment between Pavement Condition Rating and Maintenance and Rehabilitation Recommendations Bill Eshbaugh, P.E. Eastern Federal Lands Highway Division October 26, 2007
More informationGuide to the (Non-Residential) California Green Building Standards Code. Including changes effective July 1, 2012
Guide to the (Non-Residential) California Green Building Standards Code An educational publication by the California Building Standards Commission Third Edition January 2012 CALGreen Section: 5.710.6.2
More informationTEACHING TOMORROW S INDUSTRY LEADERS TODAY. Manufacturing Small Parts on Machining Centers
TEACHING TOMORROW S INDUSTRY LEADERS TODAY Tech Tip # 14 July 2007 Written by: Phil Rasey, Stiles Education s Machining Center Specialist Audience: Introductory Machine \ Process: CNC Machining Centers
More informationSUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES
BOARD OF COUNTY COMMISSIONERS ST. MARY S COUNTY LEONARDTOWN, MARYLAND SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES APRIL, 1991 AMENDED: JUNE, 2002 DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION
More informationTechnical Regulations 2015-2016
F1 in Schools - 2014 World Finals Technical Regulations Technical Regulations 2015-2016 2013 - F1 in Schools Ltd. Page 1 of 27 3 September 2015 CONTENTS PREFACE SUMMARY OF MAIN REVISIONS FROM 2013 REGULATIONS...
More informationHow to Install Hardwood Flooring Over a Sub Floor
How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product
More informationF1 in Schools - 2015 World Finals Technical Regulations
2013 - F1 in Schools Ltd. Page 1 of 24 25 March 2015 Front Cover Colossus F1 2014 World Champions F1 Car, Robert May's School, Hampshire, England Amendments made on [Date] are indicated thus (using red
More informationHOW TO PREPARE FOR YOUR MARYLAND NONCOMMERCIAL CLASS C DRIVER S TEST
` HOW TO PREPARE FOR YOUR MARYLAND NONCOMMERCIAL CLASS C DRIVER S TEST A portion of your noncommercial driving test will be conducted on a closed course to test your basic control of the vehicle, and a
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007
Sheet 1 of 8 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY 805.1 DESCRIPTION Provide, erect, maintain
More informationTexas Virtual Driver Education Course Syllabus
Texas Virtual Driver Education Course Syllabus By Amarillo Independent School District INTRODUCTION: 46:04 Welcome/Tutorial 5 minutes Virtual Drive Notice 1 minute Audio/Computer Requirements 3 minutes
More informationINSTRUMENTATION AND FIELD TESTING OF WHITETOPPING PAVEMENTS IN COLORADO AND REVISION OF THE TWT DESIGN PROCEDURE
Report No. CDOT-DTD-R-2002-3 Interim Report INSTRUMENTATION AND FIELD TESTING OF WHITETOPPING PAVEMENTS IN COLORADO AND REVISION OF THE TWT DESIGN PROCEDURE Chung Wu Matthew Sheehan Construction Report
More informationSTANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD
STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD TABLE OF CONTENTS 1.00 2.00 3.00 4.00 GENERAL REQUIREMENTS MATERIALS DESIGN LAYOUT STANDARD PLATES Page No. 1 1 3 5 STANDARD
More informationFALL PROTECTION- Part 2 SELF INSPECTION CHECKLIST
OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: FALL PROTECTION- Part 2 Instructions: This checklist covers fall protection systems criteria