1 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES LETTER OF RESPONSE Page 1 Advertisement No.: DOT FM Number: Project Name: SR-811 DIXIE HWY./NE 4 th AVE. FROM SR-838/SUNRISE BLVD. TO NE 20 th STREET Consultant s Name: HSQ GROUP INC. Street Address: 1489 W. Palmetto Park Road, Suite 340 City: Boca Raton State: FL Zip: Office Location: Boca Raton Contact person: Nour Shehadeh, PE Phone: Contact nour@hsqgroup.net By submittal of this letter the Consultant certifies that all information provided in the letter is true and accurate. The Consultant further affirms that staff proposed are currently employed by the firm(s) identified, or the Consultant has provided a statement of when staff will become employed by the identified firm(s). Please provide the following information: Proposed approach and understanding of critical issues. Relevant project experience Similar type of work experience. Other content provided by firm. Proposed key personnel and their proposed roles (do not include resumes). Consultants: Please be aware that all font (including in graphics, tables, and captions on photos) must be standard Arial Narrow, 11 point, single line spacing with no modification of font or spacing allowed. ½ clear margin on all sides must be maintained on all pages. It is the Consultant s responsibility, due to font and format restrictions within this form, to work within the constraints of the form and its format. Character styling such as use of color, bold, and italics is allowed. Use of a table is recommended for text boxes. The page layout may be modified to add columns, tables, graphics, and photos. All graphics and photos must be created in a clean, blank word document and the text wrapping square option applied before cutting and pasting into this form. Consultants may add their logo at the top of the first page (directly underneath the header), however, the Consultant shall not extend the form beyond the pages allocated for the Letter to accommodate insertion of the logo. Consultants are not permitted to insert any other information in the header other than the logo. After pasting your letter into this form, highlight all text and ensure the font size of Arial Narrow, 11 point was retained. Once your content is inserted, delete any additional blank pages that are generated by pressing your delete key after the last word in the Letter of Response. Recreation of the form in another software application to modify the form format is not permitted. This form works best when saved with a.docx extension. *Please retain the source document as it may be requested at a later date in the procurement, to verify adherence with aforementioned restrictions. Note: You may begin typing on this page. Dear Ms. Jessica Rubio: HSQ Group Inc. along with its subconsultants is pleased to submit this letter of response: DIXIE HWY TEAM CONTRACT HSQ GROUP INC. 3.1, 3.2, 7.1 DBE Progressive Design & Engineering, Inc. 6.1, 6.2, 7.2, 7.3 DBE Alan Gerwig & Associates, Inc SBE I.F. Rooks & Associates, Inc. 8.3 SBE ACAI 15 DBE RADISE International, LC. 9.1 DBE Keith & Associates, Inc. 8.1, 8.2, 8.4 DBE Project Understanding and Key Issues: The MAIN objective of this project is to provide bike lanes on both sides of the road. Crosswalks/sidewalks will be upgraded to meet current standards. Signalization and street lighting will also be part of the scope. Other scope items will be as listed under the Project Suite for this road. This road is located in the City of Ft. Lauderdale and the City of Wilton Manor.
2 Page 2 Project MAJOR Issue: The major issue for this project is the coordination and approval of the typical section. There are many factors to consider when choosing a typical section, the most important factors are: 1- The coordination with MPO, City of Ft. Lauderdale, City of Wilton Manor, the FDOT and the public at large for the acceptance of the typical section. 2- Impact on existing oak trees that the City of Ft. Lauderdale made very clear that they must be maintained as per Ms. Dian Alarcon, the Transportation Mobility Director. 3- Balance between the width of the bike lane and the impact on the traffic. 4- Economical impact on businesses especially in the segment within Wilton Manor due to possible impact on the existing on street parking. With all those factors in mind we evaluated three typical sections. Each section has pros and cons that can be explored further. Option 1: calls for removing the median, restripe the thru lanes to wide, and provide 7 buffered bike lanes, keep existing trees and existing outside C&G. At intersections, the 7 buffered bike lane will be dropped, the outside lane will become a sharrow lane so that we can provide for LT turn lanes. Option 2: Widen to the outside by 1, keep the median, and restripe the thru lanes to 10 wide. This option will keep the existing trees and will provide a typical 4 bike lane. We understand that this option may not be desirable, however, the widening is minor. Option 3: is depicted on the provided typical section above. Traffic analyses must be conducted to support the removal of one lane in this option. This option will keep the existing trees, provide wider sidewalks, and provide the 7 buffered bike lane. Project approach: The approach to this project is extremely important and it begins with the understanding of the issues that will be dealt with during design which include the oak trees, reduction of the number of thru lanes and possible impact to on street parking etc. Also the design of this project must be in harmony with the proposed design south of Sunrise Blvd. and north of the 5 point intersection. Due to the fact that this is an MPO project that is within the jurisdiction of the City of Ft. Lauderdale, the City of Wilton Manor and the FDOT, it will require careful coordination so everyone will buy onto the proposed typical section. Our initial approach will be to document the field conditions by detailed field reviews to better understand the impact the typical section will have, which includes: 1- Develop alternative typical section options and establish an evaluation matrix with pros and cons of each and assign scores accordingly to come up with the best option. 2-Coordinate a meeting with the major stakeholders (MPO, City of Ft. Lauderdale, City of Wilton Manor, and FDOT) to discuss and agree on the best option before conducting the public meeting. 3-Document the meetings with the major stakeholders and issue meeting minutes of items discussed and agreed on so it will become binding once the design starts to insure no one can change their mind to avoid impact of the scope, budget and schedule. 4-Conduct a public meeting to insure the acceptance of the project by the public. Once the typical section is approved, the production of the needed plans and documents will follow the normal FDOT procedures. HSQ is proactive and we will bring lessons learned from previous projects to Dixie Hwy. as part of our management approach to insure high quality delivery. For example, reviewing the survey we receive from surveyors MUST be checked in the field to make sure that it reflects field conditions. In SR 933-D6, the survey we received from D6 was missing some invert elevations at inlets. We did not check every individual pipe invert to make sure nothing is missing because the project was a safety project and drainage became an important issue during the development of the project. To avoid impacting the schedule, when we needed the inverts, we sent out the HSQ survey crew to obtain the inverts, even though the survey was the responsibility of D6. HSQ is always proactive in managing its projects. We prepared the Specification Package for SR 430-D5 and directly coordinated with Tallahassee s main office for review and feedback. We worked all the issues out before we submitted to D5 and took care of minor comments immediately, subsequently, we received an from the PM thanking us. Project Team: Our team consists of experienced individuals who have successfully provided services on previous FDOT projects and understand the needs of D4. Project Manager: Nour Shehadeh, P.E. will be the PM and FDOT s primary point of contact, responsible for the overall design/production of the contract. He has over 24 years of experience in roadway design, permitting and
3 Page 3 construction management. Nour has a variety of experience in other areas of design including drainage design, signal design, signing and pavement marking, utility design, coordination and public involvement. Nour served as the PM on SR 430 in D5, PM on SR 933 in D6, and PM sub for SR A1A in D4, which makes him uniquely qualified to manage this project. Key Staff: Shahin Shafiq, P.E with 12 years of experience will lead the roadway design and will be responsible for day-to-day design and production of contract documents. Shahin is highly experienced in roadway design components such as drainage design, permitting, pavement design, signal design and utility coordination. He was the lead design engineer for SR 430, SR 933 and SR A1A as a sub. Navon Wallace, P.E with 8 years of experience will be responsible for the plans production, quantities, LRE and Transport updates. Antonio Quevedo, P.E. who has over 14 years of experience will be responsible for the QC and will not be involved in production activities. He successfully managed the QC for SR 430, SR 933 and SR A1A as a sub. We received our final scores of 3.8 on SR 430, and 3.5 for SR A1A. Jay Huebner, P.E., A.I.C.P has over 16 years of experience in handling public meetings representing both the public and private sectors. Jay has done several public meetings for the City of Ft. Lauderdale and successfully conducted the public meeting for SR 430 which is similar in scope to Dixie Hwy. Subconsultants: Keith& Associates will be responsible for survey and SUE services on this project, they have done several FDOT D4 projects similar to Dixie Hwy. such as SE 3 RD Avenue. The survey effort and SUE will be managed by Lee Powers PMS and Daniel Checchia they have 10 and 18 years of experience respectively. PD&E, Inc. will be responsible for signal and street lighting designs. PD&E has been providing services to D4 for over 10 years with projects similar to Dixie Hwy. such as the District Wide Traffic Operations studies. Rudy Hoyos, P.E. with 26 years of experience and Gary Robeson, P.E with 28 years of experience will be responsible for the street lighting and signal designs respectively. Other subconsultants and their responsibilities are listed in the table on page 1 of this LOI. Public Involvement (CAP): We already identified the major stakeholders along this cooridor which include, Agape Church of God, North Side Elementary School, Ft. Lauderdale High School, Children Village, businesses in additon to MPO, City of Ft. Lauderdale and the City of Wilton Manor and FDOT. We will work closely with the District s PIO to effectively communicate the project s objectives via public workshops. We have sucsessfully conducted the CAP for SR 430-D5 by providing needed documents such as project flyers, letters to elected officials, public officials, as well as the affected owners and businesses. HSQ prepared the advertisment for the local newspapers, the powerpoint presentation and conducted the public meeting. We collected all concerns in writing and immeditely acted on the request of the community, especially the Blind Community, by revising the plans to include an APS system at intersections. Pedestrian consideration: Tow midblock crossings will be added in the project. An evaluation/study of the location of the crossings will be prepared for justification. Our subconsultant PD&E will handle this task. If the typical section is to keep 4-lanes then a signalized/mast arm will be considered for the safety of pedestrians. However, if the typical section is to have 2-lanes, then Rapid Flashing Beacon with in ground RPM will be considered to make the crossing clearley visabile. PD&E holds the patten for in ground RMP, they have installed many of these for different FDOT districts. Traffic Control Plan: We will minimize disruption to traffic and provide a safe working environment. Maintenance of Traffic will be prepared in accordance with PPM Volume 1, Chapter 10 and Design Standard No Widening will be performed using Standards 612 and 613, as well as 615 and 616 at intersections, maintaining traffic on at least one lane in each direction. Lane closures will be limited to non-peak hours as determined by the lane closure analysis and will not be allowed during reduced-speed zone hours in the vicinity of North Side Elementary School and Ft. Lauderdale High School. Pedestrian traffic will be maintained according to Standard 660. For signing and pavement marking, traffic will be maintained using Standards 611 through 616, and 619 for moving operations. Utility Coordination:The primary objective of the utility coordination process is to resolve all known utility conflicts, resulting in the economical and timely completion of transportation projects. We successfully conducted the utility coordination for SR A1A-D4 and SR 430-D5. We are aware of all the UAOs within the project limits. Pavement Design/Signing and Pavement Marking: Pavement design is anticipated for this project and will be per the Pavement Design Manual. Signing and pavement marking plans will be prepared to incorporate the proposed modifications. Drainage design and permitting: Minor drainage work may be required depending of the typical section. We have done the drainage modification and permitting on SR A1A for the Sunrise segment up to the Intercostal which was part of SR A1A project. Due to the nature of the roadway work for Dixie Hwy., No permit is required from SFWMD according to Mr. Carlos de Rojas, this project is covered under exemptions in Section (10) the construction of pedestrian paths for pedestrians and bicycles. Project Management: Budget Control: HSQ will make sure that all team members understand the project scope as intended and design accordingly to avoid any redo and thereby eliminating design cost overrun. HSQ will also adhere to the scope and avoid adding any design elements that will increase construction costs. Schedule Control: The schedule will be monitored closely, so that any potential delay can be addressed immediately. Our Team will dedicate all resources needed to maintain the schedule from any delays. The HSQ Team will be kept informed of all critical dates and deadlines well in advance of any submittal to ensure delivery on time. I encourage you to contact the following references: Mr. Anson Sonnett, P.E. D4 (954) Mr. Jerald Marks D5 (386) , Mr. Danny Iglesias, P.E. D6 (305) Our team is highly experienced with projects of this nature. Nour Shehadeh, P.E.
4 Page 4 Prequalification of Prime Consultant and any proposed Subconsultants by advertised type(s) of work: Project Advertised Major & Minor Work Types Consultant Name DBE SB UU Prime HSQ GROUP INC. ALAN GERWIG & ASSOCIATES, INC. PROGRESSIVE DESIGN & ENGINEERING, INC. KEITH & ASSOCIATES, INC. Subconsultants SB = Small Business UU = Under-utilized work type; subconsultant is fulfilling an under-utilized work type My firm has submitted a Bid Opportunity List through the Equal Opportunity Compliance System for this project.
5 Page 5 Prequalification of Prime Consultant and any proposed Subconsultants by advertised type(s) of work: Project Advertised Major & Minor Work Types Consultant Name DBE SB UU Prime I.F. ROOKS & ASSOCIATES INC. KEITH & ASSOCIATES, INC. RADISE INTERNATIONAL, LC ACAI Subconsultants SB = Small Business UU = Under-utilized work type; subconsultant is fulfilling an under-utilized work type My firm has submitted a Bid Opportunity List through the Equal Opportunity Compliance System for this project.
6 Page 6 Prequalification of Prime Consultant and any proposed Subconsultants by advertised type(s) of work: Project Advertised Major & Minor Work Types Consultant Name Prime DBE SB UU Subconsultants SB = Small Business UU = Under-utilized work type; subconsultant is fulfilling an under-utilized work type My firm has submitted a Bid Opportunity List through the Equal Opportunity Compliance System for this project.
DOT FM Number: 40906144201 & 42427144B01
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES LETTER OF RESPONSE 375-030-22 Page 1 Advertisement No.: 15465 DOT FM Number: 40906144201 & 42427144B01 Project Name: District Four Right
More informationCity: Fort Lauderdale State: FL Zip: 33309
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES LETTER OF RESPONSE 375-030-22 Page 1 Advertisement No.: 16427 DOT FM Number: 431513-2-1201 Project Name: Districtwide Planning & Environmental
More informationCity: Orlando State: Florida Zip: 32804
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES LETTER OF RESPONSE 375-030-22 11/14 Page 1 Advertisement No.: 15820 DOT FM Number: TBD Project Name: Turnpike-Wide Miscellaneous Design
More informationConsultant s Name: F.R. Aleman & Associates, Inc. Street Address: 10305 NW 41 Street, Suite 200. City: Miami State: FL Zip: 33178
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES LETTER OF RESPONSE 375-030-22 Page 1 Advertisement No.: 16118 DOT FM Number: 20201511208 Project Name: Districtwide Statistics - Data
More informationProject Name: All Electronic Tolling (AET) Design Services. Consultant s Name: The Heimburg Group, Inc.
Page 1 Advertisement No.: 15831 DOT FM Number: 437301-1-32-01 Project Name: All Electronic Tolling (AET) Design Services Consultant s Name: The Heimburg Group, Inc. Street Address: 5461 W Waters Avenue,
More informationCity: Tampa State: Florida Zip: 33619
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES LETTER OF RESPONSE 375-030-22 Page 1 Advertisement No.: 16107 DOT FM Number: 43719412201, 43719412202 Project Name: Environmental Management
More informationAdvertisement No.: 15554 DOT FM Number: 43067813201 (Submitted 7/17/14) Project Name: SR 5 (US 1) from South Street to Magnolia
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES LETTER OF RESPONSE 375-030-22 Page 1 Advertisement No.: 15554 DOT FM Number: 43067813201 (Submitted 7/17/14) Project Name: SR 5 (US 1)
More informationProject Name: Natural Disaster Monitoring/Construction Engineering & Inspection. Consultant s Name: Target Engineering Group, Inc.
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES EXPANDED LETTER OF RESPONSE 375-030-23 Page 1 Advertisement No.: 16546 DOT FM Number: TBD Project Name: Natural Disaster Monitoring/Construction
More informationEXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309
EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR 1.0 SCOPE OF
More informationTraffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay
Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Peter Hsu, P.E. FDOT District Seven Safety Office Presentation Overview FDOT Traffic Safety Focus Areas
More informationChapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
More informationNorth Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014
North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts
More informationFLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 2 1109 S. Marion Avenue, Mail Station 2015 Lake City, Florida 32025-5874
ADVERTISEMENT FOR LETTERS OF INTEREST FOR A DESIGN BUILD PROJECT (PROCUREMENT METHOD SHORTLISTING OF PROPOSERS WITH TECHNICAL AND PRICE EVALUATION BY ADJUSTED SCORE) PROCUREMENT NUMBER: E2N44 Financial
More informationAPPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
More informationFlorida DOT District Four / Ad No. 15414 May 15, 2014 Attn: Jessica Rubio / D4.profserv@dot.state.fl.us
Florida DOT District Four / Ad No. 15414 May 15, 2014 Attn: Jessica Rubio / D4.profserv@dot.state.fl.us Dear Ms. Rubio: Quality Assurance, Experience, Promptness, Loyalty, Dedication, Commitment and Team
More informationDESIGN ASSISTANCE APPLICATION
DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015
More informationMulti Modal Roadway Transportation Impact Fees and Asset Value
January 2010 SB 360 Article Series: Factors to be Considered in Transitioning from a Road Impact Fee to a Mobility Fee Contributing Authors: Steven A. Tindale, P.E., AICP Robert P. Wallace, P.E., AICP
More informationGreg Stuart, Executive Director, Broward MPO
Diana Alarcon, Director, Transportation & Mobility Dept. Darlene Pfeiffer, CAPP, Business Manager Renee Cross, AICP, LEED AP, Principal Planner Kevin Walford, Transportation Planner Greg Stuart, Executive
More informationIn 2005, the City of Pasadena, CA, USA, with the support of consultants,
Creating a Citywide Safe Routes to School Program: Pasadena, CA, USA s Step-by-Step Approach In 2005, the City of Pasadena, CA, USA, initiated development of a comprehensive Safe Routes to School Program.
More informationSTATUS. DESCRIPTION New Road Construction 6 to 8 lanes Flexible Pavement Reconstruction CST 2016/17 CST 2014/15. Resurfacing CST 2014/15
4338801 Gateway Express/118 th Ave N/CR 296 (Future 690) from US 19 (SR 55) to E of 28 th St N 4271421 SR 586 (Curlew Rd) from E of Countrybrook Dr to W of Countryside Blvd 4306601 Alt US 19 (SR 595) from
More informationImproving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
More informationAdvertisement Number: 14461 DOT Financial Management Number: 43368846201. City: Coral Gables State: FL Zip: 33134
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES EXPANDED LETTER OF RESPONSE 375-030-23 Page 1 of 7 Advertisement Number: 14461 DOT Financial Management Number: 43368846201 Project Name:
More informationAppendix. Change Management Plan. Communication Plan. QA/QC Plan. Transition and Closure Plan C-1
Appendix C Change Management Plan Communication Plan QA/QC Plan Transition and Closure Plan C-1 CHANGE MANAGEMENT PLAN Whether the effects of changes are positive or negative, managing change is an important
More informationEPA Technical Assistance for Sustainable Communities Building Blocks
EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,
More informationWilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016
Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016 Date of Release: September 14, 2015 Pre application
More informationSEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
More informationBackground and Goals for the Project
City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering
More informationCapacity Deficiency Project Application Jackson MPO Surface Transportation Program
Capacity Deficiency Project Application Jackson MPO Surface Transportation Program The following information must be completed for all Capacity Deficiency proposed Jackson MPO STP projects. MPO staff will
More informationProtected Bicycle Lanes in NYC
Protected Bicycle Lanes in NYC New York City Department of Transportation Polly Trottenberg, Commissioner September 2014 NEW YORK CITY DEPARTMENT OF TRANSPORTATION 1 Overview Since 2007, the New York City
More informationHighway Safety Evaluation. What Is Out There
Highway Safety Evaluation What Is Out There Workshop Series Wed. Nov. 6 Wed. Nov. 13 Wed. Nov. 20 Wed. Dec 4 Wed. Dec. 11 Wed. Dec. 18 Wed. Jan. 8 Wed. Jan. 15 Wed. Jan. 22 Wed. Jan. 29 Highway Safety
More informationMAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850
More informationComprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis
Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;
More informationFDOT DISTRICT 5 ITS DECISION SUPPORT SYSTEM & ATMS SOFTWARE DEVELOPMENT (CONCEPT STUDY)
December 11, 2014 EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). 436328-1-22-01 FDOT DISTRICT 5 ITS DECISION SUPPORT SYSTEM & ATMS SOFTWARE DEVELOPMENT (CONCEPT STUDY) TABLE OF CONTENTS TABLE
More informationLOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL
LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL August 2008 TABLE OF CONTENTS Section 1 - Introduction... 3 1.1 Defining Plan Quality...
More informationENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
More informationDeveloping Street Standards That Allow Flexibility
Developing Street Standards That Allow Flexibility ABSTRACT GWEN OWENS City of Sacramento 927 10th Street Sacramento, CA 95814 gowens@sacto.org The City of Sacramento, California, recently updated its
More informationClean, Green, Fun! Cady Way. Trail
Clean, Green, Fun! Cady Way Trail Seminole County Burkett Osceola 426 Mizell Sylvan 426 Ward Memorial Cady Way 436 426 551 Nan Waunatta Martha Mira Pearl George Virginia Berry Irma Winter Pines Golf Course
More informationDesigning Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division
Keith et P. Skilton Local Programs Engineer FHWA NJ Division 840 Bear Tavern Road, Suite 310 West Trenton, NJ 08628 Phone: 609-637-4203 Fax: 609-538-4919 keith.skilton@dot.gov Note: Pictures may depict
More informationExecutive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
More informationPROJECT MANAGEMENT HANDBOOK, PART 1 - ISSUES COMMON TO ALL PROJECT MANAGERS. Table of Contents. Introduction... 2. Why Do We Need Schedules?...
CHAPTER 15 - Scheduling Table of Contents Topic Page Introduction..... 2 Why Do We Need Schedules?.... 2 How Do We Use Schedules?...... 3 Responsibilities for Scheduling...... 3 The Basics of Scheduling........
More informationComputer Literacy Syllabus Class time: Mondays 5:00 7:00 p.m. Class location: 955 W. Main Street, Mt. Vernon, KY 40456
Computer Literacy Syllabus Class time: Mondays 5:00 7:00 p.m. Class location: 955 W. Main Street, Mt. Vernon, KY 40456 INSTRUCTOR: Jamie A. McFerron OFFICE: 245 Richmond Street Mt. Vernon, KY 40456 PHONE:
More informationLOUISIANA LOCAL ROAD SAFETY PROGRAM. Local Road Safety Improvement Projects
LOUISIANA LOCAL ROAD SAFETY PROGRAM Local Road Safety Improvement Projects Louisiana Local Road Safety Program Project Application 2015 Louisiana Department of Transportation and Development 2015 APPLICATION
More informationRESOLUTION NO. 1539 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY LAKE, PIERCE COUNTY, WASHINGTON, APPROVING THE 192 ND CORRIDOR STUDY AND DIRECTING THE MAYOR TO PROCEED WITH PARTIAL DESIGN AND
More informationRoadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
More informationOcoee, FL May 13, 2016 Advertisement No. 1
BID SOLICITATION NOTICE Turnpike FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS Ocoee, FL May 13, 2016 Advertisement No. 1 All bids must be completed using Expedite Bid software
More informationSAN ANTONIO CATEGORY 7 RECAP FY 2011
CATEGORY 7 RECAP FY 2011 A + B = C D + E = F C + F = G G - H = I A B C D E F G H I FY Balance Carryover from FY 10 FY 11 (includes all adjustments) Total Available of Funds Funds Obligated On Projects
More informationSURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS
SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS October 2015 Background The Surface Transportation Program (STP) was originally established as Section 133 of
More informationGeneral Obligation Bond Projects FYE 2013-2018
General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation
More informationGoals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
More informationCITY OF PLACERVILLE ENGINEERING DIVISION
CITY OF PLACERVILLE ENGINEERING DIVISION REQUEST FOR PROPOSALS for STORM DRAIN GIS MAPPING PROJECT (CIP #40703) Proposals due by: June 9, 2014 at 5:00 pm Request for Consultant Proposals Page 1 of 8 TABLE
More informationDowntown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
More informationDIGITAL DESIGN APPLICATIONS Word Exam REVIEW
DIGITAL DESIGN APPLICATIONS Word Exam REVIEW Directions: Complete the following word processing document, and know how to use proper formatting techniques on it. 1. Before keying in the text in the box
More informationContext Sensitive Design for Urban Transportation in West Philadelphia
Context Sensitive Design for Urban Transportation in West Philadelphia Transportation Research Board 85 th Annual Meeting 24 January 2006 Jeffrey M. Casello University of Waterloo Robert Wright City of
More informationPROJECT MANAGEMENT HANDBOOK, PART 1 - ISSUES COMMON TO ALL PROJECT MANAGERS
CHAPTER 11 - Project Continuity Contents Introduction... 2 Phase Hand-Offs... 3 Project Feedback... 9 Project Management Team Approach... 10 Page 1 of 15 Introduction A primary objective of all Project
More informationAPPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
More informationTRAFFIC IMPACT ANALYSIS (TIA)
GUIDELINES FOR TRAFFIC IMPACT ANALYSIS (TIA) FOR REZONING APPLICATIONS AND OTHER DEVELOPMENT APPROVALS REQUIRING TRANSPORTATION IMPACT ANALYSIS IN SUMTER COUNTY, FLORIDA July 17, 2007 PURPOSE AND APPLICABILITY
More informationREQUEST FOR PROPOSALS GENERAL PLANNING CONSULTANT SERVICES RFP #16-01 http://www.pinellascounty.org/mpo/gpcrfp.htm
REQUEST FOR PROPOSALS GENERAL PLANNING CONSULTANT SERVICES RFP #16-01 http://www.pinellascounty.org/mpo/gpcrfp.htm 1. Purpose The Pinellas Planning Council (PPC) and Pinellas County Metropolitan Planning
More informationPage 1 of 6 FLOOD INVESTIGATION INVENTORY SHEET Flood Investigation # 1510082007722 Entry Date: 10/8/2007 2:39:57 PM Revised Date: 7/13/2015 3:11:20 PM Completed By: Hiren Patel, PBS&J SECTION I: LOCATION
More informationRequest for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital
Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital June 21, 2007 The Grossmont Healthcare District (GHD) will accept proposals for Architectural and Engineering
More informationStatewide Scheduling Engineers Meeting August 8-9, 2006 Turkey Lake Plaza
Statewide Scheduling Engineers Meeting August 8-9, 2006 Turkey Lake Plaza Attendees: Richard Massey(SCO), Brenda Haygood(D-2), Jimmy Miller(D-3), Robert McCracken(PBS&J-D-3), Abel Sierra(D-5), Luis Lopez(D-6),
More informationWorking with Tables: How to use tables in OpenOffice.org Writer
Working with Tables: How to use tables in OpenOffice.org Writer Title: Working with Tables: How to use tables in OpenOffice.org Writer Version: 1.0 First edition: January 2005 First English edition: January
More informationPROJECT MANAGEMENT HANDBOOK, PART 2 - PHASE SPECIFIC PROJECT MANAGEMENT ISSUES
CHAPTER 5 - Construction Project Management Contents Introduction... 2 Construction Contract Management... 2 CEI Contracts... 3 Community Awareness Plan... 7 Alternative Contracting Methods... 8 Warranty
More informationManage Deliverables - Construction Step 6. July 12, 2012
Manage Deliverables - Construction Step 6 July 12, 2012 Project Management Concept Step 1: Needs Development Step 2: Scope Development Step 3: Procurement of Design Team Step 4: Design Step 5: Bid/Procurement
More information2014 Workforce Alliance, Inc. Relocation/Rebranding
2014 Workforce Alliance, Inc. Relocation/Rebranding About Us Workforce Alliance, Inc. is chartered by the state of Florida to work with Palm Beach County businesses to provide job placement, recruitment
More informationBIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY 2014. John Cock, Principal/Planner Alta Planning + Design
BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY 2014 John Cock, Principal/Planner Alta Planning + Design Alta Planning + Design Creating active communities where bicycling and walking are safe, healthy,
More informationTraffic Incident Management On-Call Services. Request for Proposal. Iowa Department of Transportation
Traffic Incident Management On-Call Services Request for Proposal Iowa Department of Transportation Introduction The Iowa Department of Transportation (Iowa DOT) is interested in contracting with Intelligent
More informationLETTERS, LABELS & EMAIL
22 LETTERS, LABELS & EMAIL Now that we have explored the Contacts and Contact Lists sections of the program, you have seen how to enter your contacts and group contacts on lists. You are ready to generate
More informationUtility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way
Public Works Department Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way October 2015 HillsboroughCounty.org HILLSBOROUGH COUNTY Office of the County
More informationRequest for Proposal CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR (CM/GC) SERVICES. For. City of Cripple Creek
Request for Proposal CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR (CM/GC) SERVICES For City of Cripple Creek Bennett Avenue Street Improvements and Enhancements January 13, 2014 City of Cripple Creek Request
More informationRoad Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016
Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016 Overview of RRSS Bond Scope and Budget (including accountability
More informationAlternatives Evaluation Overview
Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative
More information2009-3. The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network
2009-3 The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network July 2009 This Goods Movement Challenges and Opportunities Report was prepared jointly
More informationComment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
More informationMarion County Public Works
Marion County Public Works Federally Funded Transportation Program Title VI Annual Accomplishment Report Fiscal Year 2014/15 Marion County Public Works Department Introduction The Marion County Department
More information9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,
More informationFIRST ANNUAL REGIONAL CONFERENCE IN CORPUS CHRISTI
VOLUME 4 November 2010 2010 STITE Officers: P.E. Pape-Dawson Engineers,! ""#$! %&' Pate Engineers %' %!(!!)! *%' %! '! Committee Chairs: Membership: Mike Garza, Pate Engineers. Website: City of San Antonio
More informationFDOT Roadway Design and 3D Modeling
State of Florida Department of Transportation FDOT Roadway Design and 3D Modeling CE-11-0138, CE-11-0139, and CE-11-0140 User Training Manual October 30, 2014 ENGINEERING / CADD SYSTEMS OFFICE TALLAHASSEE,
More informationDistrict Three Design newsletter
Florida Department of Transportation newsletter Inside this issue: Editor s Desk Highway Safety Manual Implementation Design Spotlight Plans Processing, Specifications & LAP Supplemental Agreement Report
More informationCreating Web Pages with HTML Simplified. 3rd Edition
Brochure More information from http://www.researchandmarkets.com/reports/2248215/ Creating Web Pages with HTML Simplified. 3rd Edition Description: Are you new to computers? Does new technology make you
More informationACTIVITY CENTRE ZONE MAPPING STYLE GUIDE. Guidelines for producing Framework Plans and Precinct Maps for the Activity Centre Zone
ACTIVITY CENTRE ZONE MAPPING STYLE GUIDE Guidelines for producing Framework Plans and Precinct Maps for the Activity Centre Zone Contents Introduction... 3 Preparing maps the basics... 4 Map purpose...4
More informationMass Email. General Use
Mass Email The Q Mass Email application allows users to compose and mass email students and/or their contacts. The application will mass send emails based on the selected Sender and creation of a Recipients
More informationSCOTTSDALE TRANSPORTATION COMMISSION REPORT
SCOTTSDALE TRANSPORTATION COMMISSION REPORT To: Transportation Commission From: Paul Basha, Transportation Director Meeting Date: September 19, 2013 Subject: SR-101 Pima Freeway Improvements ITEM IN BRIEF
More informationRESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)
TPC Agenda Item 6A Mailout - 10/16/15 RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) OCTOBER AMENDMENTS Amendment
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationCITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
More informationCorridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
More informationBEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
More informationStatewide Survey on Bicycle and Pedestrian Facilities
Statewide Survey on Bicycle and Pedestrian Facilities Prepared for: Florida Department of Transportation Safety Office Project Number: PS-05-08-07 Project Manager: Pat Pieratte Prepared by: Center for
More informationPEDESTRIAN LAWS OF NORTH CAROLINA
PEDESTRIAN LAWS OF NORTH CAROLINA Under North Carolina law, pedestrians have the right of way at all intersections and driveways. However, pedestrians must act responsibly, using pedestrian signals where
More informationCHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB
More information21101 &?I I2 P 3: 2 I. kz COZY c:oi*;: iiss:en. DOCEET COEi1 f3.x..
I l1111111 I AI Il1 l1ul I 111l Il 1111 0000072925 Sta m RR-026358-07-0222 j7 i O lo: THE COMMISSION From: Safety Division Date: June 12,2007 21101 &?I I2 P 3: 2 I kz COZY c:oi*;: iiss:en DOCEET COEi1
More informationGREATER ORLANDO AVIATION AUTHORITY NOTICE OF PROFESSIONAL SERVICES W-00340-0IA SOUTH CELL LOT ORLANDO INTERNATIONAL AIRPORT SUBMISSION REQUIREMENTS
GREATER ORLANDO AVIATION AUTHORITY NOTICE OF PROFESSIONAL SERVICES W-00340-0IA SOUTH CELL LOT ORLANDO INTERNATIONAL AIRPORT SUBMISSION REQUIREMENTS For scope of services and information regarding the Pre-Submittal
More informationMicrosoft Word 1A: Business Letters: Format, Text Wrap, Insert Text Box, Logo
Microsoft Word 1A: Business Letters: Format, Text Wrap, Insert Text Box, Logo Format of a Business Letter: Although there are different formats to use when preparing a business letter, you should always
More informationFlorida Department of Transportation
Florida Department of Transportation CHARLIE CRIST GOVERNOR June 1, 2009 1109 South Marion Avenue Lake City, Fl 32025 STEPHANIE C. KOPELOUSOS SECRETARY To: Prospective Bidders Addendum No: 1, E2N08, Financial
More informationBelmont Street Bridge Rehabilitation Project
Belmont Street Bridge Rehabilitation Project Christian Gospel Church Worcester 43 Belmont Street Worcester MA February 20, 2015 7:00PM Agenda Introductions Project site and overview Project history Construction
More informationTopic 2 11/28/2012 Blocks & Street Network
TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in
More informationSection 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES
Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge
More information2016 MDOT Bridge Competition Guidelines Grades 11 and 12
2016 MDOT Bridge Competition Guidelines Grades 11 and 12 The Transportation and Civil Engineering (TRAC) Program THE PURPOSE OF TRAC: The TRAC program is an inventive way of introducing students to the
More informationKENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
More informationHARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015
HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing
More information