TRANSPORTATION. Engineering & Support Services STRUCTURES I HIGHWAYS I PUBLIC INVOLVEMENT

Size: px
Start display at page:

Download "TRANSPORTATION. Engineering & Support Services STRUCTURES I HIGHWAYS I PUBLIC INVOLVEMENT"

Transcription

1 TRANSPORTATION Engineering & Support Services HIGHWAYS I STRUCTURES I PUBLIC INVOLVEMENT

2 OUR COMPANY CLIENT FOCUSED -- SOLUTIONS DRIVEN Now more than ever, we understand the importance of economical and efficient transportation systems. Landmark s results-oriented service helps you meet your project goals, no matter what the challenge. Our innovative design strategies and rigorous QA/QC program ensure client satisfaction, quality work product and cost-saving engineering solutions. We recognize that no two projects are alike, and our team s experience and customer focus ensure that the right approach and level of effort is provided for your project. We have the expertise to recognize the critical issues and develop effective solutions to address the important items, rather than providing a broad-brush application of standard solutions. Our experience with both the Design-Build method of delivery and Inspection Services provides our team firsthand knowledge of the importance of constructability and maintainability of the final product. Working closely with our customers, we make sure that our engineering designs apply the right solution, can be built, and will require low maintenance -- to make best use of your project dollars from beginning to end. WHY SELECT LANDMARK ENGINEERING? u National Experience / Local Service -- Our staff offers extensive technical expertise gained through working for ENR Top 10 engineering firms across the country, while providing the personalized, responsive service that only a local firm can offer. u FDOT Prequalified -- We are prequalified by the Florida Department of Transportation in Highway Design, Structures Design, Signing & Pavement Marking, and Lighting Design (Work Groups 3.1, 3.2, 3.3, 4.1.1, 4.1.2, 4.2.1, 4.2.2, 5.1, 5.4, 7.1, and 7.2). u DBE-Certified -- We are an FDOT- and JTA-certified DBE firm, State of Florida MBE as well as a certified JSEB firm with the City of Jacksonville. u Major Bridge Capabilities -- We are the only DBE-certified firm in North Florida prequalified by the Florida Department of Transportation in both Steel and Concrete Major Bridge Design. We look forward to the opportunity to help you deliver a successful project. EXPERIENCED...TO MEET YOUR STANDARDS RESPONSIVE...TO MEET YOUR COMMITMENTS

3 OUR EXPERIENCED, INNOVATIVE AND RESPONSIVE STAFF CAN PROVIDE THE EXPERTISE YOU NEED TO SUCCESSFULLY COMPLETE YOUR PROJECT. From resurfacing and minor roadway widenings to interchange designs including curved steel and segmental concrete structures, our engineers have the design capabilities to make your project a success. Landmark Engineering provides transportation design services with the highest technical quality and responsive, personalized customer service. HIGHWAY DESIGN We can support your roadway design project at any stage of the process and for any size task or project. STRUCTURES DESIGN We offer extensive structural capabilities ranging from miscellaneous roadway structures to long-span major bridges. PUBLIC INVOLVEMENT We recognize that many projects require more than good engineering to be successfully completed. Our engineers and technicians can provide assistance in roadway design projects from sheet layouts and geometric design to cross sections and quantities. Our services include: * Roadway Resurfacing, Reconstruction and Widening * Limited Access and Interchange Design * Asphalt and Concrete Pavement Design * Maintenance of Traffic * Drainage and Permitting * Signing & Pavement Marking * Highway Lighting * Roadway and Pedestrian Safety Our structural engineers are experienced in a broad range of structural types and can design your project to ensure a cost-effective, constructible structure. Our capabilities include: * Flat Slab and AASHTO Girder Bridges * Steel Box and Plate Girder Bridges * Segmental Concrete Bridges * Box Culverts * Retaining Walls * Bridge Load Rating * Span and Cantilever Overhead Sign Structures * Mastarm and Strain Pole Signal Structures We have the expertise to manage public involvement programs and marketing outreach campaigns from the basics of administrative support to more complex requirements such as developing graphical displays and mailings that the public can clearly understand. Our services include: * Public Meeting Coordination * Graphical displays: Boards & PowerPoint Presentations * Newsletters, Flyers, Brochures & collateral materials * Stakeholder & Mailing List development and maintenance OUR SERVICES

4 KEY PERSONNEL NINA SICKLER, PE PRESIDENT Ms. Sickler has more than 24 years of transportation engineering experience. Her background includes project management for a broad range of multidisciplinary transportation projects throughout Florida, from minor widenings to major, multilevel interchange design. Her structures design expertise includes horizontallycurved steel box girders, AASHTO pre-stressed girder and flat slab bridges, segmental concrete superstructures, and post-tensioned and conventionally reinforced concrete superstructures and substructures. Her highway design experience includes geometric design, signing & marking, maintenance of traffic and lighting design. Ms. Sickler draws upon her extensive experience to ensure clients are provided the quality design and professional experience Landmark is known for. ALAN RAINER, PE CHIEF ROADWAY/DRAINAGE ENGINEER Mr. Rainer has more than 30 years of highway management and design experience. His expertise encompasses a wide range of activities including concept development, horizontal and vertical alignment design, drainage design, signing and pavement marking, utility coordination, maintenance of traffic and cost estimating. Mr. Rainer has successfully managed more than 75 projects throughout Florida and the Southeast. His experience includes design for a variety of projects ranging from 2-lane local collector roads to arterial state roads and major interstates. Mr. Rainer provides innovative leadership to our roadway design team by utilizing his proven project management abilities and design expertise for both complex and simple projects. DUANE MERRELL, PE CHIEF STRUCTURAL ENGINEER Mr. Merrell has more than 35 years experience in the design and analysis of bridge and highway structures. He has served as project manager and senior engineer on bridge replacement, widening and repair projects. His design expertise includes the following structure types: prestressed concrete AASHTO girders; prestressed concrete FIB Girders, prestressed and conventionally reinforced flat slab bridges; prestressed and post-tensioned concrete box girders; and horizontally-curved steel plate girders and steel box girders. He has experience in the design of sheet pile and retaining walls; span & cantilever overhead structures; signal structures; and high-mast lighting. He is also experienced in performing structural inspection, bridge load ratings, fender repairs, joint & railing replacements, deck & beam repairs, and culvert extensions.

5 RAVI KANNAN, PE SR. STRUCTURAL ENGINEER Mr. Kannan has more than 23 years of structural engineering experience in highway and railroad structures. His bridge design expertise includes straight & horizontally-curved steel box and plate girders; AASHTO and FDOT prestressed girder and flat slab bridges, Florida I-Beams and U-Beams with conventionally reinforced cast-in-place concrete decks; concrete double-tee girders; and posttensioned concrete box girders. He has extensive experience in detailing for repair and widening of existing structures and bridge load rating, design of box culverts, overhead sign structures and mast arm and strain pole signal structures. KEVIN FIELDER, PE SR. ROADWAY ENGINEER Kevin Fielder, PE has more than 13 years of experience in the transportation engineering industry. His experience includes project management, design, and plans production on projects including roadway widening, roadway reconstruction and roadway resurfacing; traffic signal installation/rebuild; signing and pavement marking; and interchange and intersection reconfigurations. He is Advanced MOT certified and FDOT certified in Long Range Estimates, and Specifications. CARLOUS BENTLEY SR. ROADWAY DESIGNER Mr. Bentley has more than 18 years expertise on transportation projects, with experience in roadway design, Maintenance of Traffic plans, and signing and pavement marking. His experience includes design and plans production for a variety of projects ranging from 2-lane local collector roads to arterial state roads, limited access highways, major interchanges, and major bridge replacement projects. He his Advanced MOT certified and is very experienced with Digital Delivery for FDOT projects. Mr. Bentley has advanced technical skills specifically in GeoPak and Microstation. JEN VOLZ, AICP PLANNER Ms. Volz is a registered planner with the American Institute of Certified Planners and has more than nine years of professional experience including land use and comprehensive planning; commercial, industrial and residential development; long range planning. Ms. Volz s experience includes representing client interests at public hearings before elected officials, analyzing land development regulations, and leading public outreach workshops and meetings. Public involvement experience includes stakeholder outreach, contact list maintenance, meeting advertisements, PowerPoint presentations, and documentation of public feedback. KEY PERSONNEL

6 KEY PROJECTS Roadway Resurfacing & Safety Improvements Roadway/ Drainage S&PM/ Lighting Major Bridge Minor Bridge Misc. Struct. Design- Build SR 50 Resurfacing FDOT - D5 Medhat Hassan 2014 Project Value: Est. $2.4M Project consists of milling and resurfacing 2 miles of a 5-lane urban section with on-street parking and sidewalks. Project also includes correcting ADA deficiencies, 12 signalized and 16 un-signalized intersections, and extensive utility coordination. SR 16 Resurfacing FDOT - D2 John Thrasher Project Value: $4.2M Project includes the reconstruction of SR 16 from Green Acres Rd to San Marco Ave in St. Johns County. Includes roadway, MOT, signing & marking, ADA upgrades, drainage and signalization. Edgewood Avenue Safety Improvements FDOT - D2 Will Lyons Project Value: $1.8M This 0.49 mile project consists of modifications to existing 850 bridge over CSX and NS railroad tracks to provide sidewalk on both sides of the roadway. Project includes roadway, drainage, structures, lighting, signing & marking and MOT. 9th Street Resurfacing FDOT - D2 Amy Williams Project Value: $1M This design-build project included the milling and resurfacing of 9th Street from the St. Johns County Line to Osceola Avenue in Duval County. The project also included signing & marking, MOT, signalization and repair of an existing storm sewer line utilizing a non-destructive pipe lining (CIPP). Blackrock Rd Intersection Improvements FDOT - D2 Will Lyons Project Value: $850K This project included reconstruction, turn lane widening, and resurfacing of Blackrock Rd at SR 200. Additional improvements include new mast arm signals in all four quadrants and relocation of JEA water/sanitary force mains. 8th & 14th Street Resurfacing FDOT - D2 Jeff Daugharty Project Value: $400K Improvements consisted of asphalt overlay, signing and marking and drainage modifications. The bridge rail and approach guardrail at the Egans Creek Bridge were also upgraded. SR 9A (I-295 East Bypass) Signing Project FDOT - D2 Myrna Widmer Project Value: $4M Project includes the design of 400 new and replacement sign structures. Landmark s responsibilities included roadway, signing, and structures design, field data collection, and MOT. COSA A1A Safety City of St. Augustine Mark Knight Project Value: $1M Design-Build safety project along A1A includes roadway resurfacing, sidewalks, signalization, signing & pavement marking, roadway lighting and a trolley shelter. FDOT LAP funding. D2 Districtwide Safety Contract FDOT - D2 Scott Lent Project Value: $4M Safety improvements for a range of projects: including arterial studies, ped. improvements, bike safety, intersection improvements, & access mgmt. review. Landmark s tasks include: roadway design, conceptual drainage, sidewalk, signing & marking,. Doctors Lake Drive Pedestrian Improvements FDOT - D2 Jeff Daugharty 2011 Project Value: $200K This design-build project included a pedestrian bridge, sidewalk, drainage, signing and marking, signalization and MOT on Doctors Lake Drive in Clay County. Project Feature Landmark Responsibility

7 KEY PROJECTS Major Roadway & Limited Access Highway Roadway/ Drainage S&PM/ Lighting Major Bridge Minor Bridge Misc. Struct. Design- Build I-75 Resurfacing FDOT - D2 Michael Carter Project Value: $11.3M This project consists of 8 miles of milling & resurfacing I-75 in Alachua County. Project includes, roadway, drainage, structures, signing & marking, MOT and Detour plans, guardrail and bridge mounted signs. I-95 at CR210 Interchange Improvements FDOT - D2 Scott Carter (of Prosser Hallock) Project Value: $7M Project added 1.5 miles of dual exit lanes to I-95 SB at CR 210, widened the existing ramp to five lanes and the entrance ramps to two lanes, and reconstructed CR 210 to 10 lanes. Included signal interconnection, SJRWMD permits, wetland mitigation, OH trusses and bridge-mounted signs. I-95 Concrete Rehab from Greenland Road to JTB Blvd. FDOT - D2 Mike Carter Project Value: $22M This 6 mile interstate project consists of concrete pavement slab replacement, bridge approach expansion joint rehabilitation, signing & marking, guardrail and overhead sign replacement. I-295 Widening from I-95 N. Interchange to Dames Point Bridge FDOT - D2 Eric Shimer Project Value: $60M This 13.5 mile project consists of widening I-295 from 6 to 8 lanes, with possibility of future managed lanes. Project includes roadway, drainage, lighting, structures, signing & marking, guardrail and overhead signs. I-95 Widening from International Golf Pkwy. to Duval County Line FDOT - D2 Jeff Daugharty Project Value: $35M This 8.6 mile project consists of widening I-95 from 6 to 8 lanes from International Golf Parkway to the Duval County line. Project includes roadway, drainage, lighting, structures, signing & marking, guardrail and overhead signs. I-95/JTB Interchange Improvements JTA John Davis Project Value: $5M This design-build project included improvements to the I-95 ramps at SR 202 (J. Turner Butler Blvd.) in Jacksonville, FL. The on and off ramps were lengthened and widened to provide peak hour relief from I-95 to and from SR 202. Atlantic/University Blvd. Intersection Improvements Jacksonville Transportation Authority Larry Wehner Project Value: $13M This project involved traffic operational, safety and access management improvements at the Intersection of Atlantic Blvd and University Blvd. Project elements included urban roadway design, drainage & permitting, signing & marking, signalization, mastarm and sign structure design. SR 224 (Kingsley Ave) Intersection Improvements FDOT - D2 Nelson Bedenbaugh Project Value: $375K Landmark provided design services for two projects on SR 224 which included the construction of a 12 ft eastbound right turn lane on SR 224 beginning at Plainfield Ave to the intersection with US 17 as well as resurfacing and re-striping, signalization and mastarm design. Project Feature Landmark Responsibility

8 KEY PROJECTS Conventional Bridge & Miscellaneous Structures Roadway/ Drainage S&PM/ Lighting Major Bridge Minor Bridge Misc. Struct. Design- Build CR 259 over Ward Creek FDOT District 3 Robert. F. Henry (HNTB) 2014 Project Value: Est. $3.2M Replacement of a structurally deficient off-system bridge with concrete structures and associated work including roadway design, permitting, drainage design, and utilities. Princess Place Bridge Replacement Flagler County Amy Kennedy River Road & Duncan Community Rd Bridges FDOT - D3 Tommy Johns Project Value: $800K Project Value: $4.4M This FDOT D5 LAP project for the Princess Place Preserve involved the replacement of the bridge over Styles Creek with a new covered timber bridge with pedestrian walkway. Replacement of two off-system structurally deficient timber bridges with concrete structures and bulkhead wall along with all associated roadway, drainage, permitting, and utility work. HICSA Structure Inspection & Rehabilitation Harbor Island Community Services Association Steve Wigh Project Value: $1.0M Inspection and rehabilitation design of precast concrete structure supporting Harbour Island Boulevard in Tampa, FL. Includes evaluation of epoxy and FRP repair methods, cathodic protection, joint replacement, concrete overlay replacement, MOT, and drainage improvements. Kings Road Bridge Rehabilitation City of Neptune Beach Leon Smith Project Value: $4.4M This FDOT D2 LAP project in Neptune Beach, FL involved rehabilitation of an off-system timber bridge utilizing FRP beam strengthening and pile jackets. Also included bulkhead wall replacement, approach slab, roadway and guardrail upgrades. SFWMD Bridge Inspection Program Civil Services, Inc. Chris Morse Inspection & repair recommendations for 28 off-system bridges for the South Florida Water Management District. Included rehabilitation of concrete, steel, and timber bridges, bulkhead walls, and guardrail improvements. SR 85 Reconstruction FDOT - D3 Tommy Johns Project Value: $8.2M This 4.7 mile project in Okaloosa County involved roadway reconstruction and drainage structure replacement which required design of critical sheet pile walls. Included replacement of overlay and expansion joints at bridges over Five Mile Bayou and Garners Bayou. Georgia Pacific Bridge Replacement Clline Construction Hap Cameron 2010 Project Value: $500K Replacement of existing bridge at Georgia Pacific Mill in Palatka, FL included design of 40 ft prestressed flat slab bridge to accommodate HL-93 loading as well as structural and guardrail requirements for special construction vehicles. Project Feature Landmark Responsibility

9 KEY PROJECTS Major and Complex Bridge Structures Roadway/ Drainage S&PM/ Lighting Major Bridge Minor Bridge Misc. Struct. Design- Build I-10 Widening US 301 to Branan Field Chaffee FDOT - D2 Will Lyons Project Value: $100M This project involves the widening of I-10 from US 301 to Branan Field Chaffee Road. Project includes design of 8 bridges: two sets of dual bridges at I-10 over US 301 and I-10 over CSX, two ramp bridges at US 301 over CSX, I-10 over an abandoned RR Corridor, and CR 217 over I-10. I-10/US 301 Interchange PD&E Study FDOT - D2 Brandi Vittur Project Value:$3.7M Rehabilitation/Replacement evaluation of dual bridges on I-10 over CSX Railroad in Duval County to address significant deck and girder deterioration. Included analysis and recommendations for deck repair, steel girder strengthening, complex MOT, and Railroad Coordination. I-95 Pearl Harbor Memorial Bridge Connecticut DOT James Platosh Project Value: $600M Landmark assisted in plans development for both steel-box and concrete segmental alternatives on this I-95 signature bridge over the Quinnipiac River. This is the first extradosed or modified cable-stay bridge constructed in the US. A Landmark representative provided construction coordination between designers, contractors and ConnDOT. Audubon Bridge Replacement Louisiana Department of Transportation Greg Shafer Project Value: $350M This project included the design and construction of a high-level bridge crossing, 12 miles of new roadway, MOT, drainage and traffic signals. Landmark Engineering provided engineering and project management services. SR 23/Plantation Oaks Blvd Overpass FDOT - D2 Amy Williams Project Value: $7.2M This design-build project to replace the at grade intersection located at State Road 23 and Plantation Oaks Boulevard with an overpass included the reconstruction of approximately 0.64 miles of roadway and the construction of two new bridges, pedestrian facilities and roadway lighting. SR 200 Widening FDOT - D2 Will Lyons Project Value: $26.2M This project included reconstruction of approximately 6 miles of State Road 200 (A1A) from Stratton Road to Griffin Road from an existing two lane road to a four lane road. In addition to the reconstruction of the roadway, the two existing bridges (over Mills Creek and over Boggy Creek) were replaced. Project Feature Landmark Responsibility

10 QUALIFICATIONS

11 QUALIFICATIONS

12 Project Value: $3.7 Million Location: Duval County, Florida Client: Florida Department of Transportation Reference: Brandi Vittur Phone: (800) PROJECT // I-10/US 301 INTERCHANGE PD&E Evaluation of significant modifications to interchange at I-10 and US 301 Requires upgrades to roadway geometry to meet vertical clearance and sight distance criteria Evaluation of Interchange Modifications Including Coordination with Major CSX Rail Yard MOT must accommodate high traffic volumes with heavy truck traffic Includes replacement of dual bridges on I-10 over CSX rail yard and addition of two ramp bridges over the existing rail yard

13 Interstate 10 Widening including reconstruction of I-10/US 301 Interchange Project Value: $100 Million Location: Duval County, Florida Client: Florida Department of Transportation Reference: Will Lyons Phone: (800) PROJECT // I-10 WIDENING FROM US 301 TO BRANAN FIELD CHAFFEE This project involves the widening of I-10 from US 301 to Branan Field Chaffee Road from 4 to 6 lanes and accommodating future 8 lanes, possible managed lanes Includes the major reconstruction of the I-10/US 301 Interchange Includes 8 bridges: two sets of dual bridges at I-10 over US 301 and I-10 over CSX rail yard, two ramp bridges over CSX rail yard, I-10 over an abandoned railroad, and CR 217 over I-10

14 Project Value: $600 Million Location: New Haven, Connecticut Client: Connecticut Department of Transportation PROJECT // I-95 PEARL HARBOR MEMORIAL BRIDGE Landmark assisted in plans development for both steelbox and concrete segmental alternatives on this I-95 signature bridge over the Quinnipiac River. First Extradosed or modified cable-stay bridge constructed in the US This is the first extradosed or modified cable-stay bridge constructed in the US. A Landmark on-site representative provided construction coordination between designers, contractors and ConnDOT.

15 Project Value: $7.2 Million Location: Clay County, Florida Client: Florida Department of Transportation Reference: Amy Williams Phone: (800) PROJECT // NAME PROJECT // SR 23/PLANTATION OAKS BLVD DESIGN-BUILD Design-build project to replace the at grade intersection located at State Road 23 and Plantation Oaks Boulevard New overpass included the reconstruction of approximately 0.64 miles of roadway and the construction of two new bridges, pedestrian facilities and roadway lighting. Design-Build project to construct new overpass over Limited Access facility The main structure that passes over SR 23 is a two span, two lane, 244 long concrete bridge The second bridge is a single span, two lane, 53 long concrete structure that passes over Park Road Project schedule was accelerated as part of the American Recovery and Reinvestment Act of 2009 (ARRA).

16 Project Value: $11.3 Million Location: Alachua County, Florida Client: Florida Department of Transportation Reference: Michael Carter Phone: (386) PROJECT // I-75 RESURFACING, ALACHUA COUNTY This 8.0 mile project consists of milling & resurfacing I-75 in Alachua County Requires cross slope correction to improve drainage and reduce wet weather accidents Includes addition of guardrail in areas where front slopes exceed design criteria; Thrie-beam sections need to be placed on inside shoulder side of bridge over Santa Fe River. Includes extension of several concrete box culverts that have a crash history. MOT plan includes details of milling & resurfacing operation by phase and includes Detour plan for the CR 236 interchange during milling & resurfacing operations for the on/off ramps 8 miles of I-75 Milling & Resurfacing D2, Alachua County

17 Project Value: $4.2 Million Location: St. Johns County, Florida Client: Florida Department of Transportation Reference: John Thrasher Phone: (800) PROJECT // NAME PROJECT // SR 16 RECONSTRUCTION Rural Reconstruction of SR 16 including bridge joint replacement design This project involves the resurfacing of approximately 5 miles of SR 16 from Green Acres Road to San Marco Avenue. Design includes roadway design, ADA upgrades, maintenance of traffic, signing and marking, drainage and signalization Included coordination with Florida East Coast Railroad and joint replacement design at the San Sebastian River Bridge. Landmark accelerated design efforts for additional scope items added at 90% phase to prevent delays for FDOT A retaining wall was designed for the sidewalk to be built behind existing piers to provide sidewalk connectivity on both sides of I-95 for pedestrian access between two large outlet malls, hotels & restaurants.

18 Replacement of two structurally deficient timber bridges over creeks in District 3 Project Value: $4.4 Million Location: Washington County, Florida Client: Florida Department of Transportation Reference: Tommy Johns Phone: (866) PROJECT // RIVER ROAD & DUNCAN COMMUNITY ROAD BRIDGES This project involves the replacement of two off-system, structurally deficient bridges over creeks New structures are concrete flat slab bridges with barrier walls, meeting current safety standards Project included permitting with the Northwest Florida Water Management District Public involvement meetings were held for each project

19 Project Value: $650K Location: Duval County, Florida Client: City of Neptune Beach Reference: Leon Smith Phone: (904) PROJECT // NAME PROJECT // KINGS ROAD BRIDGE REHABILITATION Project included rehabilitation of structurally deficient Kings Road Bridge over Hopkins Creek, sheet pile bulkhead walls, approach slab and approach roadway guardrail Utilizing practical design concepts, Landmark was able to prepare a fiber reinforced polymer (frp) repair design to extend the bridge life, meet current safety standards and stay within the client s limited $350K construction budget Innovative solutions to meet a limited budget for a critical project After discovering the original bridge was built without securing a Sovereign Submerged Lands Lease, Landmark coordinated with DEP and SJRWMD to expedite & obtain a lease agreement without affecting bid date commitments

20 Project Value: $4 Million Location: Duval County, Florida Client: Florida Department of Transportation Reference: Renee Brinkley Phone: (800) PROJECT // SR 115 RESURFACING 3R resurfacing of a three-mile section of urban arterial roadway within northwest Jacksonville. The project included upgrading existing safety features (guardrail, crash cushions, etc.) to meet current safety standards, as well as developing a pavement design to extend the service life of the existing pavement. The existing super-elevation rates for all curves were evaluated, as well as the pavement cross-slope on the tangent sections of the roadway Landmark Engineering developed the signing and marking plans for the project including guide sign panel design Landmark evaluated and made repair recommendations for spalling and cracking at the damaged headwalls of two box culverts, a single box under SR115 near Dawson Street and a double box under SR115 near Pullman Ave. District 2 Urban Arterial 3R Project

21 Project Value: $4 Million Location: Duval County, Florida Client: Florida Department of Transportation Reference: Myrna Widmer Phone: (800) PROJECT // NAME PROJECT // SR 9A (I-295 EAST BELTWAY) SIGNING Project involved signing design for over 25 miles of limited access highway, 400+ sign panels and overlays, and structural design and evaluation of 63 new and existing overhead sign structures Project included limited access MOT design and overhead sign lighting Landmark s practical design allowed re-use of 52 of the 53 existing overhead sign structures which saved the FDOT approximately $2.5M Landmark received an excellent overall constructability grade of 4.0 and MOT constructability grade of 4.5 Received maintenance of traffic constructability grade of 4.5

22 Project Value: $1.8 Million Location: Duval County, Florida Client: Florida Department of Transportation Reference: Will Lyons Phone: (800) PROJECT // EDGEWOOD AVENUE BRIDGE MODIFICATIONS This project consists of modifications to existing 850 bridge over CSX and Norfolk Southern railroad tracks to provide sidewalk on both sides of the roadway SR 111 (Edgewood Ave.) Pedestrian Safety Project Landmark developed an innovative approach to provide a 5 ft sidewalk within the existing bridge footprint by relocating the existing parapet toward the travel lanes, taking advantage of the available bridge shoulder width. Design Variance Request Packages prepared for Bridge Width and Bridge Sidewalk Width

23 Design team received 4.6 overall grade on project Project Value: $3.7 Million Location: Duval County, Florida Client: Florida Department of Transportation Reference: Scott Lent Phone: (800) PROJECT // NAME PROJECT // DISTRICT 2 DISTRICTWIDE SAFETY STUDIES Project includes safety improvement studies, preliminary design and Long Range Estimate development Specific project tasks included arterial studies, pedestrian improvements, bicycle safety, intersection improvements, railroad crossing safety and access management review. Projects included Old St. Augustine Road at I-95, JTB & Kernan Boulevard, I-95 at Airport Road, SR 134 at Firestone Road and Safe Routes To School (Sidewalk) projects.

24 Project Value: $450K Location: St. Johns County, Florida Client: City of St. Augustine Reference: Mark Knight Phone: (904) PROJECT // DOWNTOWN ST. AUGUSTINE HERITAGE SIGNING Landmark Engineering developed the final design plans and bid documents for this LAP Design-Build project. Landmark worked with FDOT Traffic Operations and sign fabricators to develop new designs and reduced total cost by 50%, allowing a more complete wayfinding system, while still providing aesthetic elements desired for the historic area. Aesthetic sign design developed to meet limited budget for District 2 LAP Project Landmark provided on-site management during the construction phase to quickly resolve issues in the field and expedite the construction schedule

25 Pedestrian and safety improvements along A1A in Historic Downtown St. Augustine Project Value: $1 Million Location: St. Johns County, Florida Client: St. Johns County, Florida Reference: Mark Knight Phone: (904) PROJECT // NAME PROJECT // A1A SAFETY DESIGN-BUILD Project involves safety improvements along A1A in historic St. Augustine, America s Oldest City, to be completed before the City s 450th birthday celebration in 2015 Includes roadway resurfacing, sidewalks, brick paver crosswalks signalization (three new mast arms), signing and pavement marking, roadway lighting and trolley shelter Constructed 8 wide coquina concrete sidewalk for 1500 LF along the Castillo de San Marcos National Monument property Close coordination was provided by our PM with the City s archaeologist, FDOT, National Park Service and businesses Landmark PM was on-site during construction to ensure safety due to numerous lane closures pedestrian traffic volume

26 Project Value: $1 Million Location: Duval County, Florida Client: Florida Department of Transportation Reference: Amy Williams Phone: (800) Non-destructive and innovative CIPP pipe lining used to save FDOT contract time and construction cost PROJECT // 9TH STREET DESIGN-BUILD This design-build project included the milling and resurfacing of 9th Street from the St. Johns County line to Osceola Avenue in Duval County. The project also included signing & marking, MOT, and signalization. Existing storm sewer line was repaired utilizing a nondestructive pipe lining (CIPP).

27 Design-Build Project received CPPR score of 102 Project Value: $850K Location: Nassau County, Florida Client: Florida Department of Transportation Reference: Will Lyons Phone: (800) PROJECT // SR 200/BLACKROCK ROAD INTERSECTION DESIGN-BUILD This project included reconstruction, turn lane widening, and resurfacing of Blackrock Road at SR 200. New mast arm traffic signals in all four quadrants of the intersection were constructed JEA water and sanitary force mains were relocated north of SR 200 along the west side of Blackrock Road.

28 Location: Duval, Clay and Nassau Counties, Florida Client: Florida Department of Transportation Reference: Will Lyons Phone: (800) Landmark served as PRIME designer on 10 FDOT District 2 Design-Build Projects with an average CPPR of 102 PROJECT // DISTRICT 2 ARRA DESIGN-BUILD PROJECTS Doctors Lake Sidewalk Design-Build This design-build project included a pedestrian bridge, sidewalk, drainage, signing and marking, and MOT on Doctors Lake Drive in Clay County. Contact: Jeff Daugharty Project Value: $200K 8th & 14th Street Design-Build Improvements consisted of asphalt overlay along with signing and marking and drainage modifications. The bridge rail and approach guardrail at the Egans Creek Bridge were also upgraded for safety. Contact: Jeff Daugharty Project Value: $400K

29 CR 214 over I-95 Design-Build This design-build project included replacement of the CR 214 bridge rail over I-95. The project also included guardrail design, maintenance of traffic design and utility coordination. Contact: Craig Teal Project Value: $120K Kingsley Avenue Design-Build Projects Landmark provided design services for two projects on Kingsley Avenue which included the construction of a 12 ft eastbound right turn lane on SR 224 beginning at Plainfield Avenue to the intersection with US 17 as well as resurfacing and re-striping the roadway, signalization modification and mastarm design. Contact: Nelson Bedenbaugh Project Value: $375K Cahoon Road This project included the milling and resurfacing of Cahoon Road from Devoe Street to north of Cannon Street in Duval County and the addition of new 5 ft wide sidewalk to meet current FDOT and ADA standards. Contact: Jeff Daugharty Project Value: $200K

30 Project Value: $13 Million Location: Duval County, Florida Client: Jacksonville Transportation Authority Reference: Neil Nance Phone: (904) PROJECT // ATLANTIC/UNIVERSITY BLVD INTERSECTION IMPROVEMENTS This project involved traffic operational, safety and access management improvements at the intersection of Atlantic Boulevard and University Boulevard in Jacksonville. Project elements included urban roadway design, drainage & permitting, signing & marking, signalization, mastarm and sign structure design, turn lane additions, utility coordination, maintenance of traffic, and public involvement Urban Interchange Improvement project in Jacksonville, FL

31 Limited Access Interchange Improvements Project Value: $7 Million Location: St. Johns County, Florida Client: Florida Department of Transportation Reference: Scott Carter, Prosser Hallock Phone: (904) PROJECT // I-95 AT CR 210 INTERCHANGE IMPROVEMENTS Project included ramp and operational improvements to the interchange at I-95 and CR 210 in St. Johns County Landmark staff performed bridge widening design for a previous project at this interchange Added 1.5 miles of dual exit lanes to I-95 Southbound at CR 210, widened existing ramp to five lanes, widened entrance ramps to two lanes, and reconstructed CR 210 under I-95 to 10 lanes. Included roadway design, signing and marking, structures design, signal interconnection, ponds, SJRWMD permits, wetland mitigation, OH sign trusses, bridge-mounted signs, and contamination assessments and IOAR for FHWA & FDOT.

32 Evaluation and repair recommendations for 28 Off-System Bridges Client: South Florida Water Management District Reference: Chris Morse, Civil Services Phone: (904) PROJECT // SFWMD BRIDGE INSPECTION PROGRAM Inspection, repair recommendations and load rating for 28 off-system bridges in South Florida Structure types included: box culverts, precast deck panels, AASHTO girders, structural steel plate girders and W-shapes, steel deck grating and precast double-tee girders Structures were load rated to obtain inventory and operating ratings for AASHTO and Florida legal live loads to determine safe load carrying capacities Structural details and construction cost estimates were developed when rehabilitation or strengthening was required

33 Ms. Sickler is a registered Florida PE with more than 24 years of transportation engineering experience. Her professional background includes project management, design, and inspection for a broad range of projects. Her highway design experience includes geometric design, quantities, signing & marking, and lighting design, with projects ranging from minor resurfacing projects to major interchanges. Her bridge design experience includes horizontally-curved steel box girders, segmental concrete and conventional AASHTO and Florida I-Beam (FIB) girders. She is certified in Advanced Work Zone Traffic Control and trained in LRE, Specifications, and Storm Water Erosion and Sedimentation Control. Nina Sickler, PE President Representative Projects: I-10 Widening from US 301 to Branan Field Chaffee Road, FDOT District Project Principal Ms. Sickler is leading structural engineering services for the widening of I-10 from 4 to 6 lanes, accommodating future 8 lanes & possible managed lanes. Project includes the major reconstruction of the I-10/US 301 Interchange and 8 other bridges: two sets of dual bridges at I-10 over US 301 and I-10 over CSX, two ramp bridges over CSX, I-10 over an abandoned Railroad, and CR 217 over I-10. SR 9A Signing, FDOT District Project Manager Ms. Sickler served as project manager for this 25 mile, limited access highway signing project. The design effort included more than 400 sign panels and overlays, 10 new cantilever and overhead span sign structures, multi-post designs, the analysis of 53 existing sign structures for new sign panel configurations, maintenance of traffic, and overhead sign lighting. Designs were in accordance with MUTCD, FDOT Elder Road User Program and District Two Master Guide Sign Plan. Bridge Replacements Group Washington County, FDOT District Project Manager and Engineer of Record This project involves the replacement of two off system existing timber bridges on rural roadways over creeks. Project includes bridge and roadway design, drainage and hydraulics, permitting, MOT with detour, survey, signing & marking and public involvement. Atlantic and University Boulevards Intersection Improvement, JTA Project Manager and Engineer of Record This project includes evaluation and development of overpass and flyover interchange configurations as well as at-grade intersection improvements at an existing urban intersection in Duval County. Ms. Sickler s responsibilities included: development of continuous steel box, continuous cast-in-place concrete box, and prestressed concrete superstructure alternatives for overpass options, with spans ranging from 80 to 250 ft, evaluation and design of mastarm and cantilever sign structures, signing & marking and lighting design, and public involvement. Years of Experience 24 Years Professional Registration Florida Professional Engineer #52405 Education Bachelor of Civil Engineering Georgia Institute of Technology, 1991 Certification Advanced Work Zone Traffic Control Specifications Package Preparation Stormwater Management Inspector Long Range Estimates Professional Affiliations American Society of Highway Engineers Fla. Institute of Consulting Engineers Florida Engineering Society Additional Skills MathCAD Microstation GeoPak ALADAN ATLAS FB-Multipier BARS SALOD STAAD GTSTRUDL MS Office

34 Alan Rainer, PE Chief Roadway Engineer Mr. Rainer has more than 30 years of experience in civil engineering and transportation as a project engineer and project manager. He has performed and managed a broad range of highway design tasks, including concept development, horizontal and vertical alignment design, drainage design, signing and marking plans, right-of-way calculations, quantity takeoffs, utility coordination, maintenance of traffic plans, and cost estimating. He is thoroughly familiar with the Florida Department of Transportation plan development processes, design standards, and specifications. Years of Experience 30 Years Professional Registration Florida Professional Engineer #45708 Education Bachelor of Civil Engineering Auburn University, 1985 Certification Specifications Package Preparation Long Range Estimates Professional Affiliations American Society of Highway Engineers National Society of Professional Engineers Florida Engineering Society Additional Skills Additional Skills Microstation GeoPak ICPR MS Project MS Office Representative Projects: SR 50 Resurfacing, FDOT District Project Manager This project consists of milling and resurfacing approximately 2 miles of 5-lane urban section with on-street parking and sidewalks on both sides. The project also includes reconstructing over 50 curb ramps to correct ADA deficiencies, 12 signalized intersections and 16 un-signalized intersections, and extensive utility coordination. COSA A1A Design-Build, City of St. Augustine Engineer of Record & Construction Manager The project consists of designing and constructing improvements on A1A at Castillo de San Marco Fort. Project includes: intersection improvements, roadway milling/resurfacing, MOT, signalization including new mast arms, signing and pavement marking, roadway lighting, trolley stop, and pedestrian facility improvements. Project is located in a constrained urban corridor with significant utility coordination. SR 16, FDOT District Engineer of Record Project includes the reconstruction of SR 16 from Green Acres Rd to San Marco Ave. Mr. Rainer serves as Engineer of Record for the milling and resurfacing section from Lewis Speedway to San Marco Ave, and the maintenance of traffic plans for the entire project. SR 128, FDOT District Project Manager and Engineer of Record Mr. Rainer served as project manager and EOR for an approximately 1.4 mile milling and resurfacing project for a five-lane urban roadway. He managed the design including preparation of the typical section package, pavement design package, and preliminary and final plans. He also provided QA/QC on the project and addressed construction issues.

35 Mr. Merrell, PE has more than 35 years of engineering experience in structural design including limited access interchange, overpass and ramp structures. He has served as project manager and project engineer on bridge replacement, widening and repair projects throughout Florida and the Southeast. His experience also includes overhead sign support structures, strain pole and mast arm structures, box culverts, retaining walls and sound walls. He is thoroughly familiar with the FDOT plan development processes, design standards, and specifications. Duane Merrell, PE Chief Structural Engineer Representative Projects: I-10 Widening from US 301 to Branan Field Chaffee Road, FDOT District Project Engineer Mr. Merrell is providing structural engineering services to widen I-10 from 4 to 6 lanes, accommodating future 8 lanes & possible managed lanes. Project includes the major reconstruction of the I-10/US 301 Interchange and 8 other bridges: two sets of dual bridges at I-10 over US 301 and I-10 over CSX, two ramp bridges over CSX, I-10 over an abandoned Railroad, and CR 217 over I-10. Princess Place Bridge Replacement, Flagler County 2012 Engineer of Record This project for the Princess Place Preserve involved the replacement of the bridge over Styles Creek with a new covered timber bridge, with pedestrian walkway. Mr. Merrell served as the Engineer of Record for the design of the concrete pile substructure. SR 243 (JIA South Access Road), FDOT District Engineer of Record This project involved the design of a low level bridge carrying the JIA South Access Road over Pickett Branch. Also included were the designs of three overhead cantilever sign trusses and one bridge mounted sign. I-95 at SR 200, FDOT District Engineer of Record This project called for the design of three bridges on SR 200 as part of a four-lane widening project between Callahan, Florida and I-95. Structural design work included the replacement of the existing bridge over Mills Creek, the widening of the existing bridge over Boggy Creek, and construction of a new parallel bridge to carry the eastbound lanes of SR 200 over Boggy Creek. Years of Experience 35 Years Professional Registration Florida Professional Engineer #36843 Education Bachelor of Civil Engineering University of Michigan 1979 Professional Affiliations American Society of Highway Engineers Fla. Institute of Consulting Engineers Florida Engineering Society Additional Skills Microstation GeoPak Mathcad FBPier Bars MS Office

36 Ravi Kannan, PE Sr. Structural Engineer Mr. Kannan, PE is a registered professional engineer with 23 years of structural engineering experience. His bridge design experience includes AASHTO and FDOT prestressed girder and flat slab bridges, horizontally-curved steel box and plate girders and conventionally reinforced concrete superstructure and substructure design. He has experience in detailing for repair and widening of existing structures, bridge load rating as well as design of box culverts, overhead sign structures and mast arm and strain pole signal structures. He also has bascule bridge design experience including analysis of waterway piers for ship impact. Years of Experience 23 Years Professional Registration Florida Professional Engineer #48054 Education Master of Engineering, Univ. of Florida 1991 Bachelor of Engineering, National University of Singapore, 1985 Additional Skills MDX Mathcad GTSTRUDL FBPier ACOE Sheet Pile Wall FDOT Mathcad Programs Atlas BARS Microstation LPILE ADAPT MS Office Representative Projects: I-10 Widening from US 301 to Branan Field Chaffee Road, FDOT District Project Engineer Mr. Kannan is providing structural engineering services to widen I-10 from 4 to 6 lanes, accommodating future 8 lanes & possible managed lanes. Project includes the major reconstruction of the I-10/US 301 Interchange and 8 other bridges: two sets of dual bridges at I-10 over US 301 and I-10 over CSX, two ramp bridges over CSX, I-10 over an abandoned Railroad, and CR 217 over I-10. Bridge Replacements Group Washington County, FDOT District Project Engineer This project involves the replacement of two off system existing structurally deficient, lowlevel timber bridges on rural roadways over creeks. Project includes design of two flat slab concrete bridges, 144 ft total bridge length each with four 36 foot spans. Kernan Boulevard Interchange at Beach Boulevard, JTA Structural Engineer This project consisted of a 515 ft curved three span bridge utilizing steel plate girders with post-tensioned Integral Pier Caps on prestressed pile footings, which were designed and load rated for this project. Mr. Kannan s responsibilities included the substructure and superstructure design and load rating of the curved three span bridge. SR 9B Over I-95, FDOT District Structural Engineer Mr. Kannan served as structural engineer for this interchange construction project consisting of curved steel box superstructures on individual columns with max span of 250 feet. As part of the interchange over I-95, his responsibilities included the substructure and superstructure design and load rating of a curved two-span bridge, using structural steel tub girders.

37 Kevin Fielder, PE has more than 13 years of experience in the transportation engineering industry. His experience includes project management, design, and plans production on projects including roadway widening, roadway reconstruction and roadway resurfacing; traffic signal installation/rebuild; signing and pavement marking; and interchange and intersection reconfigurations. He is Advanced MOT certified and FDOT certified in Long Range Estimates, and Specifications. Kevin Fielder, PE Sr. Roadway Engineer Representative Projects: SR 50 Resurfacing, FDOT District Project Engineer This project consists of milling and resurfacing approximately 2 miles of 5-lane urban section with on-street parking and sidewalks on both sides. The project also includes reconstructing over 50 curb ramps to correct ADA deficiencies, 12 signalized intersections and 16 un-signalized intersections, and extensive utility coordination. CR 259 Bridge over Ward Creek Replacement, FDOT District Project Engineer The project involves the replacement of a structurally deficient 135 long, 9-span, cast-inplace concrete bridge with a new concrete structure along with all associated roadway, drainage, permitting, and utility work. The replacement bridge will be a 160 long, 3-span bridge comprised of prestressed slab beams with a concrete topping. Approximately 800 of roadway will be reconstructed to accommodate a higher required bridge elevation and to provide 11 lanes and 6 shoulders with guardrail. A temporary on-site diversion will be utilized to convey traffic during construction of new bridge on the existing alignment. Design Build TOPICS Push-Button Contract II, FDOT District Project Manager Served as project manager for the Districtwide Design Build Push Button contract for Traffic Operations Projects to Increase Capacity and Safety (TOPICS) as well as engineer of record for several individual design tasks. Responsible for client coordination, project scheduling, plans production, staff management, and sub-consultant management. The value of the three year, including design and construction, was $30M. Years of Experience 13 Years Professional Registration Florida Professional Engineer #70867 Education BSCET, Civil Engineering Technology, Southern Polytechnic State University, 2003 MSCE, Transportation, University of Tennessee, 2004 Certifications FDOT Specifications Advanced MOT FDOT Long Range Estimates Additional Skills Microstation GeoPak AutoCAD Civil 3D Trns*Port Primavera MS Office SR 128 Resurfacing, FDOT District Project Manager and Engineer of Record Mr. Fielder served as design engineer for this 1.4 mile, five-lane urban milling and resurfacing project. The project includes roadway design, ADA improvements, MOT, signing and marking and signalization. He was responsible for roadway design, plans production, temporary traffic control, utility coordination, specifications preparation, and electronic submittal.

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement. 2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project

More information

Alternatives Presentation Meeting Middlebury WCRS(23)

Alternatives Presentation Meeting Middlebury WCRS(23) Alternatives Presentation Meeting Middlebury WCRS(23) Main Street (VT 30/TH 2 Bridge 102) and Merchants Row (TH 8 Bridge 2) over Vermont Railway June 4, 2013 Twilight Hall Auditorium, Middlebury College

More information

REHABILITATION PACKAGE 1-a

REHABILITATION PACKAGE 1-a 1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened

More information

REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY

REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY NOTES REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY Presenter: Summary: Tony Sherrad, FDOT Project Manager The Cortez Bridge in Manatee County,

More information

CONCEPTUAL REHABILITATION ALTERNATIVE

CONCEPTUAL REHABILITATION ALTERNATIVE Appendix D While federal law requires preservation/rehabilitation of historic bridges be considered, there is no standard procedure to determine when rehabilitation is appropriate and when replacement

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

Veterans Memorial Bridge (Orange Avenue) PD&E Study

Veterans Memorial Bridge (Orange Avenue) PD&E Study Veterans Memorial Bridge (Orange Avenue) PD&E Study From City Island Parkway to South Peninsula Drive FDOT FPID# 242172-128-01 Volusia County Project# P-5351-1 Project Limits End Project City Island Veterans

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE

More information

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for

More information

PROJECT RELATED INFORMATION PACKAGE Proposal for: FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 5 DISTRICTWIDE QUALITY ASSURANCE/PLANS REVIEWS

PROJECT RELATED INFORMATION PACKAGE Proposal for: FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 5 DISTRICTWIDE QUALITY ASSURANCE/PLANS REVIEWS PROJECT RELATED INFORMATION PACKAGE Proposal for: FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 5 DISTRICTWIDE QUALITY ASSURANCE/PLANS REVIEWS FINANCIAL PROJECT NO.: 417074-1-32-03 FAP NO. N/A 5/27/14

More information

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015 I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General

More information

How To Improve Safety

How To Improve Safety Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,

More information

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County

More information

ARCHITECT - ENGINEER QUALIFICATIONS

ARCHITECT - ENGINEER QUALIFICATIONS ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State): 2. PUBLIC NOTICE DATE: 3. SOLICITATION OR PROJECT NUMBER: B.

More information

Public Information & Public Scoping Meeting

Public Information & Public Scoping Meeting Public Information & Public Scoping Meeting William F. Cribari Memorial Bridge Route 136 over the Saugatuck River Review of Rehabilitation Study Report Public Scoping for the gathering and analysis of

More information

EXHIBIT A Accessible Truck Routes Map

EXHIBIT A Accessible Truck Routes Map EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT

More information

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013 Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement

More information

Bridge Type Selection

Bridge Type Selection Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when

More information

Advertisement No.: 15554 DOT FM Number: 43067813201 (Submitted 7/17/14) Project Name: SR 5 (US 1) from South Street to Magnolia

Advertisement No.: 15554 DOT FM Number: 43067813201 (Submitted 7/17/14) Project Name: SR 5 (US 1) from South Street to Magnolia STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES LETTER OF RESPONSE 375-030-22 Page 1 Advertisement No.: 15554 DOT FM Number: 43067813201 (Submitted 7/17/14) Project Name: SR 5 (US 1)

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or

More information

Maryland Invests $845 Million in New Highway and Bridge Projects

Maryland Invests $845 Million in New Highway and Bridge Projects Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance

MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance SUMMARY: Mr. Chaudhry, a decisive, innovative leader with a demonstrated

More information

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014 PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014 Agenda Introduction G.A. & F.C. Wagman History Process used to prepare 3D models Estimating

More information

Value Engineering vs. Alternate Designs in Bridge Bidding

Value Engineering vs. Alternate Designs in Bridge Bidding Value Engineering vs. Alternate Designs in Bridge Bidding Compares the advantages and disadvantages of alternate designs and value engineering in bidding of bridges as experienced in the State of Florida.

More information

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Improving Access in Florida International University Biscayne Bay Campus Executive Summary EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared

More information

Transportation Management Plan Template

Transportation Management Plan Template DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County

More information

Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay

Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Peter Hsu, P.E. FDOT District Seven Safety Office Presentation Overview FDOT Traffic Safety Focus Areas

More information

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E. Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008

More information

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement)

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement) VDOT Project s from 4/1/13-6/30/14 (by advertisement) Description UPC Project Manager Phone RTE 85 - BRIDGE SYSTEM PRESERVATION (Richmond District-wide) BOYD ST - RECONSTR BETWEEN 2ND & 3RD ST & IMPR DRAINAGE

More information

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage

More information

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D Open House Public Meeting for the State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D May 7, 2015 Old Glen Jean Bank Glean Jean, WV 4:00-7:00 PM www.transportation.wv.gov PROJECT

More information

Surface Transportation Program (STP)

Surface Transportation Program (STP) Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

Alternatives Evaluation Overview

Alternatives Evaluation Overview Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative

More information

SR-18 Corridor Improvements in Wood County

SR-18 Corridor Improvements in Wood County Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Lucas County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

S.R. 37 Pavement Rehabilitation Project. Wednesday, March 5, 2014 Orange County Community Center 6:30 p.m.

S.R. 37 Pavement Rehabilitation Project. Wednesday, March 5, 2014 Orange County Community Center 6:30 p.m. S.R. 37 Pavement Rehabilitation Project Wednesday, March 5, 2014 Orange County Community Center 6:30 p.m. Welcome Purpose and explanation of public meeting Public meeting format Visit our sign-in table

More information

BRIDGE DESIGN MANUAL

BRIDGE DESIGN MANUAL BRIDGE DESIGN MANUAL 2003 Edition (U.S. Customary Units) State of Connecticut Department of Transportation Revisions: 7/04, 11/04, 1/05, 3/05, 1/09, 3/09, 2/11 PREFACE The Connecticut Department of Transportation

More information

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: October 03, 2007 TIME OF LETTING: 10:00 AM EASTERN DST Sealed proposals for certain highway improvements as described

More information

Paving Capitalization Work Categories and Treatments

Paving Capitalization Work Categories and Treatments Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods

More information

I-66 Pavement Rehabilitation

I-66 Pavement Rehabilitation I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal

More information

District Three Design newsletter

District Three Design newsletter Florida Department of Transportation newsletter Inside this issue: Editor s Desk Highway Safety Manual Implementation Design Spotlight Plans Processing, Specifications & LAP Supplemental Agreement Report

More information

RESOLUTION NO. 1539 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY LAKE, PIERCE COUNTY, WASHINGTON, APPROVING THE 192 ND CORRIDOR STUDY AND DIRECTING THE MAYOR TO PROCEED WITH PARTIAL DESIGN AND

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee

More information

Assessing Paved Trails for Compliance with Standards and Best Practices

Assessing Paved Trails for Compliance with Standards and Best Practices Assessing Paved Trails for Compliance with Standards and Best Practices Session Presenters: Kristin Maravilla, Planner/Designer Masters in Landscape Architecture (UC Berkeley) Masters in City and Regional

More information

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 4. STRUCTURAL ANALYSIS AND EVALUATION The analysis of bridges and structures is a mixture of science and engineering judgment. In most cases, use simple models with

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. The Rehabilitation Alternative Huey P. Long Bridge Case Study Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. March 22, 2010 Replacement vs. Rehabilitation Project Background Introduction

More information

QUALIFICATION, SELECTION AND PERFORMANCE EVALUATION REQUIREMENTS FOR PROFESSIONAL CONSULTANTS TO PERFORM WORK FOR DOT

QUALIFICATION, SELECTION AND PERFORMANCE EVALUATION REQUIREMENTS FOR PROFESSIONAL CONSULTANTS TO PERFORM WORK FOR DOT QUALIFICATION, SELECTION AND PERFORMANCE EVALUATION REQUIREMENTS FOR PROFESSIONAL CONSULTANTS TO PERFORM WORK FOR DOT 14-75.0022 Consultant Qualification Process. 14-75.003 Minimum Technical Qualification

More information

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs - Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route

More information

Consultant s Name: HSQ GROUP INC. Street Address: 1489 W. Palmetto Park Road, Suite 340. City: Boca Raton State: FL Zip: 33486

Consultant s Name: HSQ GROUP INC. Street Address: 1489 W. Palmetto Park Road, Suite 340. City: Boca Raton State: FL Zip: 33486 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PROFESSIONAL SERVICES LETTER OF RESPONSE 375-030-22 Page 1 Advertisement No.: 16444 DOT FM Number: 43165713201 Project Name: SR-811 DIXIE HWY./NE 4 th AVE.

More information

GENERAL EXPERIENCE OF FIRM

GENERAL EXPERIENCE OF FIRM 12200 NW Ambassador Drive, Suite 205 Kansas City, MO 64163 816-298-6465 www.garverusa.com November 15, 2013 Missouri 105 West Capitol Avenue Jefferson City, MO 65102 via email to MaryAnn.Jacobs@modot.mo.gov

More information

Alternatives Design Report. Draft

Alternatives Design Report. Draft Draft 3/4/2014 TABLE OF CONTENTS I Introduction... 1 A. HISTORY... 1 B. PROJECT BACKGROUND... 1 II. ALTERNATIVES DEVELOPMENT... 8 A. ALTERNATE 1 NO BUILD... 8 B. ALTERNATE 2 IMPROVE ROADWAY ON EXISTING

More information

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section: . Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based

More information

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM

More information

Safety Engineering Policy Memorandum

Safety Engineering Policy Memorandum Safety Engineering Policy Memorandum SAFETY 2-13 Automated Traffic Law Enforcement Systems: Red Light Running (RLR) Camera Enforcement Systems and Automated Railroad Grade Crossing (RGC) Enforcement Systems

More information

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS October 2015 Background The Surface Transportation Program (STP) was originally established as Section 133 of

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are

More information

PRIORITIZATION PROCESSES

PRIORITIZATION PROCESSES PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take

More information

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014 North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts

More information

Background and Goals for the Project

Background and Goals for the Project City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering

More information

QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS

QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS QUALITY ASSURANCE and QUALITY CONTROL PROCESS GUIDE for PROJECT MANAGERS MDOT Trunkline Projects January 2005 TABLE OF CONTENTS Discussion.. 2 Scope Verification Meeting..... 3 Overview 3 Procedure...

More information

CAPPELEN MEMORIAL BRIDGE REHABILITATION

CAPPELEN MEMORIAL BRIDGE REHABILITATION CAPPELEN MEMORIAL BRIDGE REHABILITATION Owner: Hennepin County Engineering: HNTB with Olson-Nesvold Engineering (ONE) and others Section 106 Historical Committee: Hennepin County, MnDOT Cultural Resources

More information

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

REQUEST TO QUALIFY (RTQ) INFORMATION FOR

REQUEST TO QUALIFY (RTQ) INFORMATION FOR I. INTRODUCTION: REQUEST TO QUALIFY (RTQ) INFORMATION FOR GEORGE WASHINGTON BRIDGE REPLACEMENT OF THE PIP HELIX RAMP AND REHABILITATION OF UPPER LEVEL SPANS OVER NJ ANCHORAGE AND HUDSON TERRACE CONTRACT

More information

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING TEC has performed many GPS/GIS inventory projects and studies for the Ohio Department of Transportation (ODOT), Counties, and municipalities.

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

Marion County Public Works

Marion County Public Works Marion County Public Works Federally Funded Transportation Program Title VI Annual Accomplishment Report Fiscal Year 2014/15 Marion County Public Works Department Introduction The Marion County Department

More information

Pavement Management Program

Pavement Management Program Pavement Management Program 2013 Street Maintenance Program Executive Summary 1/15/2013 Presented by Mark Thiel Assistant Director Public Works Program Overview Start of current program 2005 812.5 Lane

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS 2015 ENGINEERING DESIGN SERVICES AND CONSTRUCTION FORECAST CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS 2079 EAST 9 TH STREET, CLEVELAND, OH 44115 216-348-3800

More information

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO Executive Summary The Miami-Dade County Metropolitan Planning Organization (MPO) has prepared a Truck Route System Plan for Miami-Dade County. The MPO and its consultants have worked closely with the MPO

More information

Section ALTERNATIVES. 3. Alternatives

Section ALTERNATIVES. 3. Alternatives Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of

More information

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850

More information

RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity

RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY Transverse Cracking- Extreme Severity Slab Cracking Class II Regular Joint- High Severity Pattern Cracking-High Severity Alligator Cracking- High Severity Shoulder

More information

STATUS. DESCRIPTION New Road Construction 6 to 8 lanes Flexible Pavement Reconstruction CST 2016/17 CST 2014/15. Resurfacing CST 2014/15

STATUS. DESCRIPTION New Road Construction 6 to 8 lanes Flexible Pavement Reconstruction CST 2016/17 CST 2014/15. Resurfacing CST 2014/15 4338801 Gateway Express/118 th Ave N/CR 296 (Future 690) from US 19 (SR 55) to E of 28 th St N 4271421 SR 586 (Curlew Rd) from E of Countrybrook Dr to W of Countryside Blvd 4306601 Alt US 19 (SR 595) from

More information

Scope of Work Construction Inspection and Materials Testing Services

Scope of Work Construction Inspection and Materials Testing Services Glenwood Resident Engineer 202 Centennial Drive Glenwood Springs, CO 81601 Scope of Work Construction Inspection and Materials Testing Services Estimated Start Date: November 1, 2015 Region 3 Project:

More information

Bond Release Process for New Subdivision Developments in Fairfax County

Bond Release Process for New Subdivision Developments in Fairfax County Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document

More information

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM DESIGN PUBLIC HEARING August 10, 2015 AT WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM FOR THE PROPOSED Rehabilitation & Stormwater Improvements

More information