REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY
|
|
- Merry Bryan
- 8 years ago
- Views:
Transcription
1 NOTES REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY Presenter: Summary: Tony Sherrad, FDOT Project Manager The Cortez Bridge in Manatee County, which connects the City of Bradenton Beach with the mainland, was constructed in the 1950s and will require extensive rehabilitation or replacement. The Florida Department of Transportation (FDOT) is currently conducting a Project Development and Environment (PD&E) Study of various alternatives. This item will be a presentation on the PD&E Study effort to date. Attachments: Recommended Action: 1) Alternatives Analysis Matrix 2) Bridge Height Comparison 3) Questionnaire 4) FDOT s Cortez Bridge Informational Pamphlet Possible Comments to the FDOT TAC Meeting Agenda Item Prepared By: David Hutchinson AGENDA ITEM #III-3
2 Cortez Bridge Project Development and Environment (PD&E) Study Sarasota/Manatee Metropolitan Planning Organization Technical Advisory Committee October 13, 2014
3 Location Map
4 Purpose of Study Address deteriorating structural condition Superstructure - deck deficiencies, concrete beam deficiencies/cracks, movable span steel rusting, beam supports (steel bearings) rusting Substructure - bridge support (piling) deterioration/cracks, seawall & fender deficiencies Address substandard design features Lack of shoulders: inoperable vehicle impedes traffic flow Traffic railing: not crash-tested Curbs: safety hazard Will not add traffic capacity Constrained to 2 lanes Address existing bridge, not new corridor
5 Bridge Condition
6 Bridge Condition Piles and Bents not designed for vessel impact Superstructure/Deck not designed to withstand storm surge and could become dislodged from the substructure
7 Alternatives No build (repair) Continued repairs and routine maintenance to keep bridge safe and operable for up to an additional ten years (2035) following current ten-year repair project Replace beams and deck on six spans in worst condition; existing piles and pile caps remain Keeps same functionally obsolete, substandard roadway width Requires closure of the bridge for nine weeks and detour via Anna Maria Bridge or Ringling Bridge Bridge will need to be replaced by 2035
8 Alternatives Rehabilitation Major repairs to extend life of bridge for an additional 25 years (2050) following current ten-year repair project Replacement of all concrete beams and deck to address condition and improve reliability; existing piles and pile caps remain Keeps same functionally obsolete, substandard roadway width Temporary bridge will maintain traffic ($14.6M) Bridge will need to be replaced by 2050
9 Alternatives Bridge Replacement Long-term solution with 75-year life (2100) following the current ten-year repair project Only two-lane bridge studied; within study limits, Cortez Road classified as constrained by Sarasota/Manatee MPO; no plans to add lanes Modern typical cross section Two 12-foot lanes Two 10-foot shoulders for bicyclists and disabled vehicles Eight-foot sidewalks on both sides
10 Proposed Typical Section
11 Replacement bridge alignments North (9 feet from existing bridge) South (15 feet from existing bridge) Center (eliminated due to long detour or $14.6 million temporary bridge) Alignment
12 Replacement designs Bridge Heights Low-level drawbridge (21-foot vertical clearance) Mid-level drawbridge (45-foot vertical clearance) Allows about 50% of boats that currently require the bridge to open to pass without opening the bridge High-level fixed bridge (65-foot vertical clearance) Allows 98 percent of boats that currently use channel to pass under the bridge
13 Bridge Deck Elevations
14 Alternatives Matrix
15 Alternatives Public Meeting August 28, people attended 57 comment sheets returned Repair 11% Rehabilitation 23% Replacement 72% Low-level drawbridge 16% Mid-level drawbridge 33% High-level fixed bridge 21% Other 19% (New bridge to Longboat Key)
16 Review public comments Refine viable build alternatives What s Next? Conduct thorough analysis of environmental effects Document findings in several reports Coordinate with local government entities (preferences)
17 What s Next? Public hearing spring 2015 Present recommended and no build (repair) alternatives Submit recommended alternative to FHWA for approval Study completion summer 2015 Design funded FY 2016 ROW (if needed) and construction - unfunded
18 Cortez Bridge Project Development and Environment (PD&E) Study Questions?
19 Cortez Bridge Preferences Comments Repair Rehab Replace Low Mid High Other Survey #1 (Cortez Fishing Festival) 168 N/A 55% 36% 33% 24% 34% 2% February 16/17, 2013 Survey #2 (Public Kickoff Meeting) 851 N/A 51% 43% 33% 19% 38% 4% April 30 - Sept. 26, 2013 Alternatives Public Meeting 57 11% 23% 72% 16% 33% 21% 19% August 28 - Sept. 8, 2014 TOTAL 1,076 N/A 50% 43% 32% 21% 36% 5%
20 Alternatives Analysis Matrix Attachment #1 North Alignment South Alignment No-Build (Repair) (1) Rehabilitation (2) Low-Level Drawbridge Mid-Level Drawbridge High-Level Fixed Low-Level Drawbridge Mid-Level Drawbridge High-Level Fixed Navigational Clearance at Fender When Bridge is in Closed Position: 17.5 ft 17.5 ft 21 ft 45 ft 65 ft 21 ft 45 ft 65 ft Life of Alternative (years) Right-of-Way Impacts Parcels Impacted Relocations Additional Submerged Lands (ac) Natural, Environmental and Physical Resource Involvement Species/Habitat (Potential Impacts) None None Low Low Low Low Low Low Potential Contamination Sites (high/medium risk) 0/0 0/0 0/1 0/1 0/1 0/2 0/2 0/2 Wetlands (ac) Seagrasses (ac) Archaeological and Historic Sites Potential Noise Sensitive Sites Potential Section 4(f) Sites Projected 2036 Average Travel Delay (EB/WB) (sec/veh) 58.2/ / / /24.0 0/0 58.2/ /24.0 0/0 Bridge Closure Required (days) Estimated Utility Impacts Bright House Networks Manatee None None Impacted Impacted Impacted None None None Florida Power & Light None None Impacted Impacted Impacted Minor Minor Minor Verizon Florida Inc. None Minor Impacted Impacted Impacted Impacted Impacted Impacted Manatee Co. Transportation Dept. None None Impacted Impacted Impacted Impacted Impacted Impacted Manatee Co. Utility Operations None Minor Impacted Impacted Impacted None None None TECO-Peoples Gas-Sarasota None None None None None None None None Estimated Capital Costs (2014 Dollars) Design (10% of Construction) $811,279 $3,012,596 $7,778,916 $8,022,264 $4,859,712 $7,781,424 $8,024,773 $4,857,233 Roadway Right-of-Way $0 $0 $16,000 $16,000 $2,748,000 $16,000 $16,000 $2,675,000 Wetland & Seagrass Mitigation (3) $0 $0 $107,572 $107,572 $107,572 $178,261 $178,261 $177,001 Roadway Construction $0 $330,830 $1,695,886 $1,695,886 $2,653,975 $1,720,973 $1,720,973 $2,629,187 Bridge Construction $8,112,792 $29,795,130 $76,093,270 $78,526,755 $45,943,146 $76,093,270 $78,526,755 $45,943,146 CEI (10% of Construction) $811,279 $3,012,506 $7,778,916 $8,022,264 $4,859,712 $7,781,424 $8,024,773 $4,857,233 Total Cost $9,735,350 $36,151,152 $93,470,559 $96,390,741 $61,172,117 $93,571,352 $96,491,534 $61,138,800 Life of Alternative (years) (1): Repairs include replacement of all concrete beams, deck and traffic railing on six spans; installing cathodic protection pile jackets, repairing the concrete (sealing cracks, patching spalls, etc.) in the piles, pile caps, deck, beams, and traffic railing; repairing the fender system; repairing the bascule span operational machinery; upgrading the bascule span electrical systems; paint; and repairing the bascule span aluminum and steel in order to extend the service life 10 years. Costs do not include annual maintenance and operating costs. (2): Rehabilitation includes replacement of all concrete beams, deck, and traffic railing; movable span aluminum and steel repairs; replacement of mechanical and electrical systems; new fenders; and a temporary bridge. Does not include annual operating and maintenance costs over 25 years of $6.2M or $247,000 per year for concrete repairs to piles and bulkheads; sealing cracks; neoprene pad replacement; paint; 60 pile jackets, and 10 crutch bents when needed. (3): Wetland and seagrass mitigation includes additional mitigation for Essential Fish Habitat, and assumes seagrass mitigation construction concurrent for this project and Anna Maria Island Bridge.
21 Attachment #2 Bridge Height Comparison
22 Attachment #3 E3./0F-:-<;,-6:4<-=-2;7G84;;.6-/31=6,/5-=-2;G/0:A./0:1H-;/F--901:;C I/G:-5-:A,4G9,1AB- D-641, D-8491:1;4;1/2 J1A:-5-:A,4G9,1AB- D-6:4<-=-2; K1B8:-5-:31L-A9,1AB- QUESTIONNAIRE M--2</0,4B-./0,</==-2;F,-B4,A12B;81F6,/N-<;O ' () * $!"#$% & '
23 WHAT HAPPENS NEXT? Following the alternatives public meeting, FDOT will review comments received and, together with engineering neering and environmental analyses, refine the viable build alternatives. We will complete a thorough analysis of potential environmental effects and document findings in several reports. We will also continue coordination n with local government entities. FDOT will present the recommended alternative and the no-build/repair alternative at a formal public hearing where we will solicit people s comments. The hearing is tentatively scheduled for spring Following the hearing, we will submit the recommended alternative for approval to the Federal Highway Administration, the lead federal agency for the study. PUBLIC INVOLVEMENT Public involvement is a very important part of this PD&E study. FDOT uses several ways to provide information to and receive information from public officials, agencies and interested people. They include newsletters and presentations to neighborhoods, small groups and organizations. Following development of options, we hold an alternatives public meeting. A formal public hearing is conducted to present the recommended alternative and the no-build/repair alternative. A project website is available for you to share comments with FDOT and the study team. Please review the study schedule below for future public involvement events. WORK PROGRAM SCHEDULE Following completion of the PD&E study, whether the no-build/repair, the rehabilitation, or the replacement option is selected, the design phase (preparation of construction plans) is funded in fiscal year 2016 of FDOT s Five-Year Work Program. Right-of-way acquisition (if needed) and construction phases are not currently funded in the program, which runs through mid STUDY SCHEDULE Notice to Proceed Public Involvement Data Collection Design Concepts Engineering and Environmental Analysis Select Recommended Alternative Draft/Final Project Documents Draft/Final Project Document/FHWA Review Location and Design Concept Acceptance (LDCA) JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG LEGEND: = NEWSLETTER = PUBLIC MEETING = PUBLIC HEARING STAY INFORMED We urge you to participate in this study and invite your comments and questions. If you would like to add a name and/or address to the PD&E study mailing list, please contact: Tony Sherrard Project Manager Florida Department of Transportation 801 North Broadway Avenue P.O. Box 1249 Bartow, FL antone.sherrard@dot.state.fl.us CORTEZ BRIDGE N STUDY LIMITS Gulf of Mexico 789 9th St. N. 7th St. N. Gulf Dr. N. 6th St. N. Cortez Rd. 2nd ds St. N. 1st St. N. Bridge St. Anna Maria Sound 684 Cortez Bridge Bradenton Beach City Pier Gulf Intracoastal I Waterway 27th St. t. W. Sarasota Bay WELCOME The Florida Department of Transportation (FDOT), District One, welcomes you to the alternatives public meeting that is part of the Project Development and Environment (PD&E) Study of State Road (SR) 684 (Cortez Road) from SR 789 (Gulf Drive) to 123rd Street West in Manatee County. The one-mile long study includes Cortez Bridge over the Gulf Intracoastal Waterway. This meeting is an open house format where you can view the video presentation that explains the various alternatives, review the project displays, and ask questions and provide comments to FDOT representatives in a one-on-one setting. You can complete a comment sheet today or take it home, complete and mail it to the FDOT by September 8, You also can go to the study website to submit comments. Your comments will assist the Department in determining viable alternatives to consider during the remainder of the PD&E study. BRIDGE ALTERNATIVES ANALYSIS ONGOING In January 2013, FDOT began the PD&E study of Cortez Bridge on Cortez Road, a designated hurricane evacuation route. The engineering and environment study determines whether the bridge is repaired, rehabilitated or replaced. If replacement is selected, the type of structure is identified. We are looking at low-level drawbridge, mid-level drawbridge and high-level fixed bridge designs. Only two-lane alternatives are studied because Cortez Road, within the study limits, is a constrained roadway according to the Sarasota/Manatee Metropolitan Planning Organization. This means there are no long-term plans to widen Cortez Road within the study limits th St. W Financial Project Number: th St. W. 124th St. Ct. W. 124th St. W. 123rd St. Ct. W. 123rd St t. W. 123rd St. W. Cortez Village Meeting Handout - August 28, st St. Ct. W. STUDY LIMITS The purpose of the project is to address the deteriorating structural condition and substandard features of the bridge, not to add traffic capacity. Therefore, no additional lanes are proposed, and no improvements outside the existing corridor were considered. Attachment # th Ave. W th St. W. 119th St. W. Cortez Rd.
24 NO-BUILD/REPAIR ALTERNATIVE The FDOT is currently doing a short term repair project, which began in May 2014, to keep Cortez Bridge safe and operable for up to ten years, or until While no one can precisely predict how long repairs will last, the no-build/repair alternative includes continued repairs and routine maintenance of Cortez Bridge to keep it safe and operable for up to an additional ten years following the current ten-year repair project, or until After the 10-year repair, the bridge would need to be replaced. The nobuild/repair alternative would not prevent the need to potentially restrict heavy vehicles meaning that heavy trucks such as commercial delivery or moving trucks could be restricted. Repairs include replacement of the beams and deck on the six spans in the worst condition to address beam deficiencies. The existing piles and pile caps will remain. The no-build/repair project would require closure of the bridge for nine weeks and a detour via Anna Maria Bridge or Ringling Bridge to maintain traffic during construction. The no-build/repair alternative will keep the same functionally obsolete, substandard roadway width. The roadway width is not sufficient to provide any shoulders and the brush curbs do not meet current safety standards. Despite repairs, the existing bridge would continue to deteriorate. Furthermore, the bridge would remain susceptible to damage from ship impact and storm surge due to its substandard foundations and low profile, respectively. The no-build/repair alternative will remain viable throughout the analysis and evaluation process. REHABILITATION ALTERNATIVE The rehabilitation alternative includes performing major repairs to the fixed and moveable portions of the bridge. While no one can precisely predict how long these repairs will last, the rehabilitation alternative is intended to extend the service life of the bridge for up to an additional 25 years following the current ten-year repair project, or until After the 25-year rehabilitation life, the bridge will need to be replaced. The rehabilitation alternative was evaluated after FDOT conducted an extensive inspection and testing program. Rehabilitation includes the complete replacement of all the beams and deck to address their condition and improve their reliability. The existing piles and pile caps will remain. However, the rehabilitation alternative would keep the same functionally obsolete, substandard roadway width. The original piles and foundation would remain and would continue to be affected by the extremely corrosive saltwater environment. Additional repairs would be required periodically on the piles and other structural components to maintain structural adequacy. While the rehabilitation alternative would extend the service life of the bridge by up to 25 years, the foundation, piles, and pile caps will have exceeded their design life by over 60% in those 25 years. The bridge piles would continue to deteriorate, and the bridge would continue to be susceptible to damage from ship impact and storm surge, damage that, if severe, could close the bridge for several weeks. The rehabilitation alternative will keep the same functionally obsolete, sub-standard roadway width and brush curbs since widening to accommodate additional shoulder areas is not viable due to the existing structural capacity and the capacity of the electrical and mechanical systems of the movable span. A temporary bridge is required to maintain traffic during construction, but the potential to restrict heavy vehicles would be avoided. The temporary bridge will also result in additional temporary construction and environmental impacts. BUILD ALTERNATIVES The replacement alternatives provide a long-term solution designed to last up to 75 years following the current ten-year repair project, or until FDOT is studying low-level and mid-level drawbridges and high-level fixed replacement alternatives. Evaluation of all build alternatives included a center alignment, a north alignment, and a south alignment. The project length is not significantly different for the alignments; therefore, construction costs will not be significantly different between the north and south alignments. The north alignment is about 9 feet north of the existing bridge, and the south alignment is about 15 feet south of the existing bridge. Since the center alignment requires a long detour or $14.9 million temporary bridge, FDOT dropped it from further consideration. The existing vertical clearance of the Cortez Bridge is 17½ feet at the Intracoastal Waterway. The U.S. Coast Guard establishes minimum navigational guide clearances at this location. They are a 21-foot vertical clearance for a new drawbridge and a 65-foot vertical clearance for a new fixed bridge. The horizontal guide clearance for all bridge replacements is 90 feet perpendicular between fenders. However, FDOT is considering a 100-foot wide channel, which is a 10-foot increase over the existing condition, to match the clearance at Ringling Bridge and the proposed Anna Maria Bridge. FDOT developed the following conceptual bridge designs: Low-level drawbridge, similar to the existing bridge, with 21-foot vertical clearance when the bridge is closed. Mid-level drawbridge with 45-foot vertical clearance when the bridge is closed. This clearance allows 50% of boats that currently require the bridge to open to pass underneath without requiring the bridge to open, reducing delays for vehicles and vessels. High-level fixed structure with 65-foot vertical clearance allows 98 percent of all vessels that currently use the channel to pass under the bridge, resulting in no delays. All bridge replacement alternatives use the existing bridge to maintain traffic during construction and include the removal of the existing bridge once traffic shifts to a new bridge. There are currently no plans to leave any portion of the existing bridge intact for recreational or any other use. VIABLE REPLACEMENT ALTERNATIVES In order to quantify the costs and potential effects associated with the alternatives, FDOT is analyzing the no-build/repair alternative, rehabilitation, and build alternatives that include two alignments and three bridge replacement heights. An alternatives matrix is displayed with results of the analysis, and aerial photographs with the alternatives are displayed for your review. Representations of the bridge heights are also displayed. HOW THE BRIDGE WILL LOOK If the bridge replacement option is selected, the new bridge includes two 12-foot lanes and two 10-foot shoulders, which can accommodate bicyclists and disabled vehicles. Eight-foot sidewalks are included on both sides of the bridge. The design speed is 40 miles per hour. 9 ½ 8 SIDEWALK 1-6 BARRIER WALL 10 SHOULDER 12 C L ½ 32-3 ½ 10 SHOULDER 8 SIDEWALK 1-6 BARRIER WALL 9 ½ 9 ½ Drawbridge C L 1-6 BARRIER WALL 1-6 BARRIER WALL SIDEWALK SHOULDER 32-3 ½ 32-3 ½ SHOULDER SIDEWALK 64-7 TUNNEL ALTERNATIVE FDOT considered a tunnel alternative. The estimated construction cost for a tunnel is approximately $161 million, not including additional costs for right-of-way, or annual operations and maintenance. Based on this estimate, the tunnel alternative cost far exceeds the cost of any of the bridge replacement or rehabilitation alternatives. The study team also considered environmental effects resulting from the tunnel alternative. Possible effects to the natural environment caused by dredging and the high cost of a tunnel, among other factors, resulted in elimination of the alternative from further consideration. ENVIRONMENTAL EFFECTS The study evaluates potential environmental effects associated with the proposed build alternatives. Detailed analyses of wetlands, floodplains, threatened and endangered species, water quality, hazardous materials, recreational sites, noise, air quality, historic structures, and archaeological sites are an important part of this study. Based on our studies to date, we do not expect significant effects associated with the proposed build alternatives. 9 ½
25 PQRS [Z\]^_Z` TUVWXYZ cwxde TaXbZ fz_z PQRS
Veterans Memorial Bridge (Orange Avenue) PD&E Study
Veterans Memorial Bridge (Orange Avenue) PD&E Study From City Island Parkway to South Peninsula Drive FDOT FPID# 242172-128-01 Volusia County Project# P-5351-1 Project Limits End Project City Island Veterans
More information3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
More informationPublic Information & Public Scoping Meeting
Public Information & Public Scoping Meeting William F. Cribari Memorial Bridge Route 136 over the Saugatuck River Review of Rehabilitation Study Report Public Scoping for the gathering and analysis of
More informationSafe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
More informationRed Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013
Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement
More informationRehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double
More information2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.
2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project
More information5 ALTERNATIVE SOLUTIONS AND EVALUATION
Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable
More informationCONCEPTUAL REHABILITATION ALTERNATIVE
Appendix D While federal law requires preservation/rehabilitation of historic bridges be considered, there is no standard procedure to determine when rehabilitation is appropriate and when replacement
More information3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
More informationInformational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
More informationAsset Maintenance Bridge Emergency Response
FDOT Districts 1 & 7 Structures and Facilities Office Asset Maintenance Bridge Emergency Response Bridge No. 100300 Gandy Boulevard (US 92) over Tampa Bay, FL Jose Pepe Garcia, P.E., Florida DOT David
More informationAGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
More informationAlternatives Presentation Meeting Middlebury WCRS(23)
Alternatives Presentation Meeting Middlebury WCRS(23) Main Street (VT 30/TH 2 Bridge 102) and Merchants Row (TH 8 Bridge 2) over Vermont Railway June 4, 2013 Twilight Hall Auditorium, Middlebury College
More informationAlberta Transportation Bridge Inspection & Maintenance System (Web 2005) 00747-1 Bridge. Bridge Inspection. Assistant Name Assistant Class
Bridge File Number Year Built/Year Supstr 00747-1 Bridge 1964/1964 Bridge or Town Name SUNNYSLOPE Located Over Located On 582:04 C1 33.896 Water Body Cl./Year Navigabil. Cl./Year Legal Land Location KNEEHILLS
More informationProject R-4467 PROJECT DESCRIPTION PROJECT SCHEDULE PURPOSE OF THIS MEETING WHAT WILL BE DONE WITH THE COMMENTS? FOR MORE INFORMATION:
Workshop #3 Aug ust 2012 PROJECT DESCRIPTION The North Carolina Department of Transportation (NCDOT) proposes to maintain a direct highway connection between Hertford and Winfall along or close to US 17
More informationAlternatives Evaluation Overview
Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative
More informationREHABILITATION PACKAGE 1-a
1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened
More informationOpen House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D
Open House Public Meeting for the State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D May 7, 2015 Old Glen Jean Bank Glean Jean, WV 4:00-7:00 PM www.transportation.wv.gov PROJECT
More informationThe Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.
The Rehabilitation Alternative Huey P. Long Bridge Case Study Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. March 22, 2010 Replacement vs. Rehabilitation Project Background Introduction
More informationHistoric Bridge Alternatives Analysis Layout
Section 4(f) of the USDOT Act of 1966 (Title 49, USC, Section 303) requires special considerations be made regarding the use of any publicly owned park, recreation area, wildlife/waterfowl refuge or historic
More informationPRESENTATION AND DISCUSSION ON THE 2040 LONG RANGE TRANSPORTATION PLAN
Agenda Item 3 MEC 2/11/15 PRESENTATION AND DISCUSSION ON THE 2040 LONG RANGE TRANSPORTATION PLAN RECOMMENDED ACTION: Presentation and discussion on the 2040 Long Range Transportation Plan schedule, the
More informationProject Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -
Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route
More informationAT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
More informationMPO Staff Report MPO Technical Advisory Committee: March 13, 2013 MPO Executive Board: March 20, 2013
MPO Staff Report MPO Technical Advisory Committee: March 13, 2013 MPO Executive Board: March 20, 2013 RECOMMENDED ACTION: Matter of MnDOT Kennedy Bridge Study and NDDOT Sorlie Bridge Phase I Report Matter
More information~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:
Texas Depadment of Transpo,tation Bridge Condition Survey Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway: Irving Street Facility Name: Lone Wolf Bridge Structure Number: B00315-031
More informationPaving Capitalization Work Categories and Treatments
Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods
More informationSTATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL
STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting Coastal
More informationS.R. 37 Pavement Rehabilitation Project. Wednesday, March 5, 2014 Orange County Community Center 6:30 p.m.
S.R. 37 Pavement Rehabilitation Project Wednesday, March 5, 2014 Orange County Community Center 6:30 p.m. Welcome Purpose and explanation of public meeting Public meeting format Visit our sign-in table
More informationI-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015
I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General
More informationNew Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012
New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012 Host: Falcolm E. Hull, Vice President/Technical Expert, ARCADIS, U.S. Inc. Attending: Cherie Coffman, Coastal Projection
More informationAnalysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
More informationStructural Condition and Replacement Memorandum
Structural Condition and Replacement Memorandum Prepared by: D. Morales, MSA Design & Consulting Checked by: C. Subrizi, MSA Design & Consulting Reviewed by: Roupen Donikian, PB Submitted by: Gary Kennerley,
More informationImproving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
More informationKOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or
More informationSR-18 Corridor Improvements in Wood County
Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park
More informationPolk Commerce Centre CRA Spine Road Alignment Study
Polk Commerce Centre CRA Spine Road Alignment Study Florida Polytech Pace Road (LIMIT) Berkley Road Williams DRI Proposed Alignment Polk Commerce Centre CRA Boundary Braddock Road (LIMIT) Lake Myrtle Sports
More informationSewalls Falls Road Bridge. Cultural Resource Meeting April 4, 2013
Sewalls Falls Road Bridge Cultural Resource Meeting April 4, 2013 Meeting Purpose Review of the project process to date Project replacement vs. rehabilitation Review of recent public process Review of
More informationMEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525
1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 To: From: Date: Subject: Mr. Thomas Gibson, City of St. Petersburg Jeffrey D. Malyszek, PE and Deborah C.
More information511 Tampa Bay. www.511tampabay.com WINNER. 2005 Best of ITS Award Best Public Private Partnership Awarded by ITS America on May 2, 2005
Tampa Bay SunGuide District Seven s Future in Intelligent Transportation Systems Presented at: FACERS June 22, 2005 Tampa, FL Tampa Bay SunGuide Freeway 511 System Management System Covers 750 miles of
More informationPlanned Procurement Opportunities Report. February 2015
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report February 2015 Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and
More informationSEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
More informationEnhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
More informationSurface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
More informationUS 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing
US 281 AT PREMONT PUBLIC HEARING Hearing Purpose The purpose of tonight s Public Hearing is for the public to: Learn about the status of the proposed project Review the purpose and need for the project
More informationPresentation to Community Task Force July 9, 2007
Alternative Evaluation Results Presentation to Community Task Force July 9, 2007 Outline of Presentation Overview of alternative evaluation Alternative evaluation methodology Process and assumptions General
More informationNEVADA TRANSPORTATION BY THE NUMBERS:
NEVADA TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility APRIL 2013 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationFloridaNOTAllAboard RESOLUTION NO. 28-15
RESOLUTION NO. 28-15 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DELRAY BEACH, FLORIDA, EXPRESSING CONCERN WHETHER ALL ABOARD FLORIDA WILL HAVE AN ADVERSE IMPACT ON THE CITY; STATING THAT THE CITY
More informationQueens Midtown Tunnel Repair, Restoration, Rehabilitation Projects. Manhattan Community Board 6 Transportation Committee - June 2, 2014
Queens Midtown Tunnel Repair, Restoration, Rehabilitation Projects Manhattan Community Board 6 Transportation Committee - June 2, 2014 Opened to traffic in 1940 Two parallel tubes (North & South), each
More informationChapter 5 RISK MANAGEMENT ANALYSIS CHAPTER 5 RISK MANAGEMENT ANALYSIS PAGE 49
Chapter 5 RISK MANAGEMENT ANALYSIS CHAPTER 5 RISK MANAGEMENT ANALYSIS PAGE 49 This page intentionally left blank. PAGE 50 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN RISK MANAGEMENT ANALYSIS
More informationHow To Improve Road Quality
A Customer Service Level Approach for Maine DOT s Asset Management System Jeffrey L. Zavitski, B.A. Senior Implementation Specialist Deighton Associates Limited Chip Getchell, P.E. Director, Work Plan
More informationAPPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
More informationUS 51 Ohio River Bridge Engineering and Environmental Study
US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents
More informationScreening Transportation Assets for Vulnerability
Screening Transportation Assets for Vulnerability Impacts of Climate Change and Variability on Transportation Systems & Infrastructure (Gulf Coast Study, Phase 2) FHWA Office of Planning Environment and
More informationVirginia Approach Spans
Virginia Concrete Conference 2009 Woodrow Virginia Approach Spans David Tackoor, HNTB Formerly of URS Corp for Potomac Crossing Consultants Woodrow 1 Second Severn Crossing 2 Medway Crossing (Channel Tunnel
More informationHow To Modernize And Maintain Roads, Highways And Bridges In Maine
MAINE TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility OCTOBER 2012 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationProposal For a Trivia Bid and Interview
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report May 2015 Prepared by the Procurement Department Planned Procurement Opportunities Report - May 2015 Overview The Planned
More informationEvaluating the Condition of Seawalls/Bulkheads
Volume 2 Evaluating the Condition of Seawalls/Bulkheads By: Coastal Systems International, Inc. Typical bulkhead under construction Seawalls and bulkheads (walls) provide shoreline stabilization for many
More informationPlanned Procurement Opportunities Report. June 2015
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report June 2015 Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted
More informationCHAPTER 2 ENVIRONMENTAL CLASS OF ACTION DETERMINATION
CHAPTER 2 ENVIRONMENTAL CLASS OF ACTION DETERMINATION TABLE OF CONTENTS 2-1 OVERVIEW...2-1 2-2 PROCEDURE...2-5 2-2.1 Determination of Federal Action...2-5 2-2.2 Categorical Exclusions...2-6 2-2.2.1 FHWA
More informationIH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
More informationPUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 AT ACTON TOWN HALL FAULKNER ROOM 472 MAIN STREET ACTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ASSABET RIVER RAIL TRAIL (ARRT) IN THE TOWNS OF ACTON
More informationLRTP Ref. Detailed Project Description. FDOT funding in prior yearfm 43336319401 Source. Cruise Terminal B & C for new service 20,000 11,000
Project SP6410510 Cruise Terminal H Terminal H Rehabilitation 13,500 7,500 6410510 Update terminal facility to handle new service. FDOT funding in prior yearfm 43336319401 Proposed (in $000s) - - CST PORT
More information2014 Surface Transportation Program Island Sub-region RTPO Technical Advisory Committee Recommendations. Amount Requested
2014 Surface Transportation Program Island Sub-region RTPO Technical Advisory Committee Recommendations Name Overlay s Applicant Amount Requested Recommended Funding Amount Coupeville, Langley $411,661
More informationChaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
More informationWelcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU
Purpose of Tonight s Meeting Informational Open House to discuss two City projects: Fairchild Street Subway Phase I Engineering: Immediate need to replace subway Bowman Avenue Feasibility Study Future
More informationCHAPTER 2 LCCA APPROACHES
2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting
More informationFederal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000
1 of 8 12/27/2013 8:21 AM U.S. Department of Transportation Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000 MAP-21 - Moving Ahead for Progress in the 21st Century
More informationBridge Rehabilitation Alternatives
Kennedy Bridge Planning Study Technical Memorandum: Bridge Rehabilitation Alternatives MnDOT S.P. No. 6018-02 Prepared for: Minnesota Department of Transportation DRAFT April 28, 2014 Prepared by: Report
More informationSurface Transportation Program (STP)
Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface
More informationCHAPTER 4 FIELD INSPECTION, DATA COLLECTING, REPORT WRITING AND REPORT REVIEW
Bridge Inspection Handbook 4-1 CHAPTER 4 FIELD INSPECTION, DATA COLLECTING, REPORT WRITING AND REPORT REVIEW 4.1 INTRODUCTION In this chapter, MassDOT policies and procedures for performing bridge inspections
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationTruss Bridges of Kentucky
ACEC Partnering Conference 2012 Truss Bridges of Kentucky 1899 Amanda Abner Rebecca Turner 1893 Truss Bridges of Kentucky Truss Bridges of Kentucky Vincennes Bridge Company Champion Bridge Company Empire
More informationSECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
More informationFederal Guidelines for STP-U Funding
MPC 5.f Attachment 1 STP-U Eligibility Guidelines Page 1 of 5 Federal Guidelines for STP-U Funding SURFACE TRANSPORTATION PROGRAM (STP) ELIGIBLE EXPENDITURES PERIOD AVAILABLE: FY + 3 Years FUND: Highway
More informationPENNSYLVANIA TRANSPORTATION BY THE NUMBERS:
PENNSYLVANIA TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility MAY 2013 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationBRIDGE DESIGN MANUAL
BRIDGE DESIGN MANUAL 2003 Edition (U.S. Customary Units) State of Connecticut Department of Transportation Revisions: 7/04, 11/04, 1/05, 3/05, 1/09, 3/09, 2/11 PREFACE The Connecticut Department of Transportation
More informationLIMITED SCOPE CONCEPT DEVELOPMENT REPORT
LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County
More informationPlanned Procurement Opportunities Report. April 2015
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report April 2015 Prepared by the Procurement Department Planned Procurement Opportunities Report - April 2015 Overview The Planned
More informationEarth Retaining Structures
Earth Retaining Structures and Asset Management Earth Retaining Structures and Asset Management A Critical Component Tool in Maintaining Public Safety Earth Retaining Structures (ERS) are often an overlooked
More informationColorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding
C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM
More informationComprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis
Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;
More informationSouth Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures
South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures Prepared for: Prepared by: June 2013 TABLE OF CONTENTS 1. Introduction... 1 1.1 Baseline Understanding...
More informationExecutive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO
Executive Summary The Miami-Dade County Metropolitan Planning Organization (MPO) has prepared a Truck Route System Plan for Miami-Dade County. The MPO and its consultants have worked closely with the MPO
More informationThe Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
More informationLight Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
More informationKENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
More informationGENERAL. This manual addresses five local programs that are funded under the current Highway Act:
OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal
More informationHow To Manage The County Of Simcoe'S Infrastructure
Asset Management Plan Asset Management Plan Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 4 3.0 State of County of Simcoe s Infrastructure... 7 4.0 Levels of Service... 14 5.0 Asset
More informationCHAPTER 20 Project Development Cost Estimates Table of Contents
Chapter 20 Project Development Cost Estimates Table of Contents CHAPTER 20 Project Development Cost Estimates Table of Contents CHAPTER 20 Project Development Cost Estimates... 20-3 SECTION 1 Project Cost
More informationCity of Indian Rocks Beach, Florida NFIP Number 125117
City of Indian Rocks Beach, Florida NFIP Number 125117 Floodplain Management Plan / Local Mitigation Strategy Annual Report - September 2015 Introduction The City of Indian Rocks Beach has been an active
More informationMethodology to Identify Preservation Priority Bridges
Methodology to Identify Preservation Priority Bridges Louisiana Historic Bridge Inventory Task 8 Prepared for Louisiana Department of Transportation and Development Prepared by www.meadhunt.com November
More informationSITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:
SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller
More informationMaine-New Hampshire Connections Study. Public Informational Meeting September 24, 2009
Maine-New Hampshire Connections Study Public Informational Meeting September 24, 2009 1 Meeting Overview Welcome Update on Stimulus Application/BICA 10 minutes Study Schedule Update - 5 minutes Traffic
More informationHow To Check For Scour At A Bridge
Case Studies Bridge Scour Inspection and Repair Edward P. Foltyn, P.E. Senior Hydraulic Engineer ODOT Bridge Unit 2013 PNW Bridge Inspectors Conference April 2013 REFERENCES Stream Stability at Highway
More informationRESOLUTION NO. 1539 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY LAKE, PIERCE COUNTY, WASHINGTON, APPROVING THE 192 ND CORRIDOR STUDY AND DIRECTING THE MAYOR TO PROCEED WITH PARTIAL DESIGN AND
More informationRoss River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis
DNA project managers planners architects engineers David Nairne + Associates Ltd Suite 250 171 W Esplanade North Vancouver British Columbia Canada V7M 3J9 T 604 984 3503 F 604 984 0627 E dna@ davidnairne.com
More informationIntroduction & Welcome
Proposed SM Wright Freeway Redevelopment Dallas District Halff Associates Baker Consulting Associates April 28, 2009 Introduction & Welcome Alva Baker Baker Consulting Associates Page 1 Project Overview
More informationFiscal Year 2013-2014 Annual Report
Service Authority for Freeways and Expressways Fiscal Year 2013-2014 Annual Report Prepared by The Transportation Agency for Monterey County http://www.tamcmonterey.org 1 Background Overview Purpose of
More information