1 I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012
2 Project Location 2
3 Goal Provide a cost effective pavement rehabilitation that will last for 20 years with minimum disruption to the traveling public Challenges for Pavement Rehabilitation Limited space for Maintenance of Traffic (MOT) Limited times for dual lane closures Limited overhead clearance for existing bridges Drainage Concrete barriers Lane shifts across longitudinal joints in concrete Coordination with adjacent Mega Projects 3
4 Pavement Structure Original Construction, 1960 to concrete pavement, wire mesh reinforcement, 61.5 transverse joint spacing 6 plain aggregate 6 soil cement 20-year design life; design ADT was 22,350 vpd Widening, 1990 to 1993 Original 2 lanes widened to 4 lanes (Route 50 to east of Route 123) 3 lanes widened to 4 lanes (east of Route 123 to I-495) Outside shoulder used as fourth lane during peak demand periods 11 concrete pavement, 15 transverse joint spacing 4 Stabilized open graded drainage layer 6 Cement treated aggregate (CTA) 4
5 Pavement Condition Summary of Condition Data Average CCI of 58 in 2007; range from 13 to 86 36,500 sy of patching mainline; 9,850 sy of patching on ramps/loops/cd roads Distresses concentrated in distinct areas 15% of transverse joints failing in load transfer based on 1995 FWD testing Courtesy: American Concrete Pavement Association Concrete Paving: Pavement Rehabilitation Strategy Selection 5
6 Pavement Condition Old Pavement in Poor Condition Approximately 20% of total pavement area in poor condition Distresses generally at transverse joints Isolated slabs have distress (spalling) throughout 6
7 Pavement Condition Significant Amount of Good Pavement Some pavement is in good condition Some patches in good condition Pavement in good condition between transverse joints 7
8 Challenges for Pavement Rehabilitation Limited Space for Maintenance of Traffic Outside shoulder is currently used as travel lane in peak hours (5:30 am to 11:00 am EB and 2:00 pm to 8:00 pm WB) Inside shoulder is only 2-8 wide No shoulders at some bridge locations; no shoulders on CD road at Nutley Street (retaining walls) Shoulder Lane Minimal Shoulder Shoulder Lane 8
9 Challenges for Pavement Rehabilitation Limited Times for Dual Lane Closures Weekdays 10:00 pm to 5:00 am (EB)/6:00 am (WB) Saturday and Sunday 7:00 pm to 9:00 am HOV Lane 9
10 Vehicles in 15 min Vehicles in 15 min Vehicles in 15 min Vehicles in 15 min Challenges for Pavement Hourly Traffic Volumes Average Volume in 15 minutes at Det 392 Group at MP (EB Friday) Rehabilitation Average Volume in 15 minutes at Det 411 Group at MP (WB Friday) 2,500 6:00 am 7:00 pm 6:00 am 8:00 pm 2,500 2,000 2,000 1,500 1, :00:00 1:00:00 2:00:00 3:00:00 4:00:00 5:00:00 6:00:00 7:00:00 8:00:00 9:00:00 10:00:00 11:00:00 12:00:00 Time 13:00:00 14:00:00 15:00:00 16:00:00 17:00:00 18:00:00 19:00:00 20:00:00 21:00:00 22:00:00 23:00:00 Average Volume in 15 minutes at Det 392 Group at MP (EB Saturday) MEAN_VOL +20% -20% 1,500 1, :00:00 1:00:00 2:00:00 3:00:00 4:00:00 5:00:00 6:00:00 7:00:00 8:00:00 9:00:00 10:00:00 11:00:00 12:00:00 Time 13:00:00 14:00:00 15:00:00 16:00:00 17:00:00 18:00:00 19:00:00 20:00:00 21:00:00 22:00:00 23:00:00 Average Volume in 15 minutes at Det 405 Group at MP (WB Saturday) MEAN_VOL +20% -20% 1,800 1,600 1,400 9:00 am 7:00 pm 10:00 am 7:00 pm 1,800 1,600 1,400 1,200 1,200 1, :00:00 1:00:00 2:00:00 3:00:00 4:00:00 5:00:00 6:00:00 7:00:00 8:00:00 9:00:00 10:00:00 11:00:00 12:00:00 Time 13:00:00 14:00:00 15:00:00 16:00:00 17:00:00 18:00:00 19:00:00 20:00:00 21:00:00 22:00:00 23:00:00 MEAN_VOL +20% -20% 1, :00:00 1:00:00 2:00:00 3:00:00 4:00:00 5:00:00 6:00:00 7:00:00 8:00:00 9:00:00 10:00:00 11:00:00 12:00:00 Time 13:00:00 14:00:00 15:00:00 16:00:00 17:00:00 18:00:00 19:00:00 20:00:00 21:00:00 22:00:00 23:00:00 MEAN_VOL +20% -20% 10
11 Challenges for Pavement Rehabilitation Limited Overhead Clearance for Existing Bridges 13 bridge structures; 7 Less than (2 less than 16-6 ) 16-1 Cedar Lane, WB 11
12 Challenges for Pavement Rehabilitation Drainage Inlets extend into shoulder travel lane Inlet extending into travel lane Shoulder Lane 12
13 Challenges for Pavement Rehabilitation Concrete Barriers Median and WMATA (5 miles locked in ) WMATA Barrier Retaining wall Median Barrier Shoulder Lane 13
14 Challenges for Pavement Rehabilitation Lane shifts across Longitudinal Joints in Concrete Longitudinal joint crossing wheel paths 14
15 Challenges for Pavement Rehabilitation Co-ordination with adjacent Mega Projects I-495 HOT Lanes Dulles Rail 15
16 Project Approach Development Met with industry associations (concrete and asphalt) on May 20, 2008 Received industry suggestions/proposals on June 18, 2008 Provided follow-up comments to industry Follow-up details received from industry on June 23 and June 24, 2008 Performed comparison of alternatives Project was funded and advertised in September, 2010 Delivery mechanism was design-build (pavement repairs specifically identified on RFP plans) Awarded to Fort Myer Construction Company on December 20, 2010 Total Contract Amount - $37.9 million 16
17
18 18
19
20 20
21
22 Scope of Work Existing Median or Metro Barrier, depending on location v y z w x { Travel Lane 1 (HOV) u Travel Lane 2 Travel Lane 3 Aux. Travel Lane 6 ± u Patch badly deteriorated concrete pavement with full-depth concrete patches and seal joints v Patch minor spalling with asphalt w Seal joints, eradicate pavement markings, remove snow plowable raised pavement markers x Place 5/8 Thin Hot Mix Asphalt Concrete Overlay stress absorbing membrane interface layer y 2 SMA-12.5 (PG 76-22, polymer modified) z 1-1/2 SMA-9.5 (PG 76-22, polymer modified) { 3/8 High Friction Surface Course to delineate auxiliary travel lane 22
23 Scope of Work Issues: All existing barriers (both WMATA and median) have 2 reveal; reconstruct/re-face existing barriers but not WMATA barrier due to modifications required for existing drainage inlet throats Existing cross slope on auxiliary travel lane varied up to 8.3%; bring this up to standard (except at tapers beneath existing bridges) Design exception for cross slope up to 12.6% on inside shoulder Taper build-up to zero beneath low clearance bridges; survey and drainage analysis needed Adjust drainage inlets and grates in auxiliary shoulder lane 23
24 Concrete Patching Extremely rough pavement with failed patches and joints Full depth concrete patches 24
25 Concrete Patching Patch minor spalls with asphalt or partial depth patches 25
26 Concrete Patching Total 55,572 sy full-depth (12,004 EB; 36,214 WB; 7,355 on Ramps) 4,697 sy partial depth 26
27 THMACO Pavement surface very rough after concrete patches Spray bar paver Heavy tack 27
28 SMA Overlay 2 SMA-12.5 (76-22) Scratch course for leveling 1.5 SMA-9.5 (76-22) 28
29 Transitions Begin/end of overlay Beneath low clearance bridges Highways for Life section of post-tensioned pavement 29
30 Concrete Jersey Barrier Retrofit 23,600 lf with constant slope barrier Slip-form over existing barrier Drainage inlets required special formwork 30
31 Final Rideability Average IRI (ins/mi.) Lane EB WB Note: project design-build specification required average IRI < 70 ins./mi. with no individual 0.01 mile section >80 ins./mi. 31
32 High Friction Surface Course Delineate part-time shoulder pavement with a different color as a safety improvement 32
33 Delivered Fall 2012 a safer, and smoother, I-66! 33
34 Questions?
SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
More informationCase Studies - Concrete Overlays
Case Studies - Concrete Overlays Lessons Learned - Concrete Overlays Purdue Road School March 6, 2013 Today s Topic 1. Overlays 2. New Full-depth 3. Pervious 4. Roller Compacted 5. Full Depth Patching
More informationPavement Rehabilitation Using Hot Mix Asphalt. - National Perspective -
Pavement Rehabilitation Using Hot Mix Asphalt - National Perspective - Rehabilitation Process Evaluate Existing Pavement and Conditions Evaluate Options Construct Project Monitor Performance Evaluate Existing
More informationCHAPTER 2 LCCA APPROACHES
2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting
More informationRehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements
University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt
More informationKENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
More informationChapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
More informationPavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com
Pavement Patching Repair for AC and PCC Pavement Surfaces Vern Thompson www.crafco.com Overview and Objective New Methods For Pavement Patching-Overview What are they How they are applied New Methods Secti
More informationAPPENDIX B. I. Background Information
APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement
More informationLIMITED SCOPE CONCEPT DEVELOPMENT REPORT
LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County
More informationTransportation Infrastructure Asset Management
2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE hlongfellow@parametrix.com (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory
More informationOHIO ASPHALT PAVING CONFERENCE
OHIO ASPHALT PAVING CONFERENCE 38 th Annual Conference Wednesday, 2/6/2013 Fawcett Center Campus of The Ohio State University 2400 Olentangy River Road Columbus, Ohio 43210 REHAB STRATEGIES FOR LOCAL
More informationMinimizing Reflective Cracking With Applications of the Rolling Dynamic Deflectometer and Overlay Tester
Minimizing Reflective Cracking With Applications of the Rolling Dynamic Deflectometer and Overlay Tester Dar-Hao Chen, 1 Moon Won, 2 Tom Scullion, 3 and John Bilyeu 4 ABSTRACT Since reflective cracking
More informationAdvancements in GPR for a Sustainable Tomorrow
Advancements in GPR for a Sustainable Tomorrow Shawn Lapain, BSc. E., EIT Pavement Specialist Applied Research Associates Inc. 5401 Eglinton Avenue West, Suite 105, Toronto, ON, Canada, M9C 5K6 Tel: 416-621-9555,
More informationCHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS
HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness
More informationRANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity
RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY Transverse Cracking- Extreme Severity Slab Cracking Class II Regular Joint- High Severity Pattern Cracking-High Severity Alligator Cracking- High Severity Shoulder
More informationLIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL
LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL Note to the User To use this manual, the reader must have the life-cycle cost analysis software program RealCost, Version 2.2 California Edition. The program
More informationGrinding equipment that causes raveling, aggregate fractures or disturbance to the joints shall not be permitted.
Guide Specification: Diamond Grinding for City Streets Publication Date: May 24, 2010 SCOPE City streets are defined as roadways with a closed drainage system along with numerous structures such as manholes,
More informationRehabilitation for Concrete Pavements
Rehabilitation for Concrete Pavements www.asphaltalliance.com Overview Effective rehab for PCC Break PCC into small segments Overlay with Hot Mix Asphalt Road-userfriendly Rubblize and pave in off-peak
More informationSafe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
More information700 Life-Cycle Cost Analysis... 700-1
Table of Contents 700 Life-Cycle Cost Analysis... 700-1 701 Introduction... 700-1 701.1 Discount Rate... 700-1 702 Initial Construction... 700-1 703 Future Rehabilitation... 700-1 703.1 Introduction...
More informationCAPITAL PREVENTIVE MAINTENANCE
CAPITAL PREVENTIVE MAINTENANCE 2003 EDITION April 8, 2010 CONSTRUCTION AND TECHNOLOGY DIVISION Attention Manual Holders This manual is to remain with the assigned user. If the user relocates within the
More informationExpected Service Life and Performance Characteristics of HMA Pavements in LTPP
Expected Service Life and Performance Characteristics of HMA Pavements in LTPP Expected Service Life and Performance Characteristics of HMA Pavements in LTPP Submitted to: Asphalt Pavement Alliance Prepared
More informationIH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
More informationPaving Capitalization Work Categories and Treatments
Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods
More informationCID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
More informationImpacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements
Impacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements Author: Harry Sturm, P. Eng. Stantec Consulting Ltd. 16-77 Mississauga Road Mississauga, ON L5N 7G2 Phone: (95) 817-296
More informationDRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job
MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments
More informationCONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.
CONCRETE REPAIR GUIDELINES Concrete repairs can be broken down into four basic types, plus special repairs and planing. Note: It is recommended that investigation into soundness of pavement be performed
More informationTransportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
More informationCost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE
Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE A partnership of the Virginia Department of Transportation and the
More informationChapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
More informationGuidelines. Motorcycle and Bicycle Work Zone Safety
Guidelines on Motorcycle and Bicycle Work Zone Safety This document describes work zone conditions that can cause safety concerns for motorcyclists and bicyclists. The document offers recommended practices
More information11 p.m. to. Tuesday, June. will remain open. 14. closed
June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access
More informationPavement Surface Evaluation and Rating. Manual RATING RATING RATING PASER RATING. Concrete Roads
Pavement Surface Evaluation and Rating PASER Manual Concrete Roads RATING 10 RATING 7 RATING 4 RATING 1 Contents Introduction 2 Rigid pavement performance 2 Pavement conditions and defects 3 Evaluation
More informationAPPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
More informationConcrete Pavement Rehabilitation Techniques and Canadian Based Case Studies
Concrete Pavement Rehabilitation Techniques and Canadian Based Case Studies Rico Fung, P.Eng., LEED AP, Director, Markets & Technical Affairs Tim Smith, P.Eng., Director, Transportation & Public Works
More informationProject Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -
Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route
More informationNevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced
More informationSeptember 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900
September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation
More informationNOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
More informationGuide for Design and Construction of New Jointed Plain Concrete Pavements (JPCPs)
DIVISION OF DESIGN Office of Pavement Design Pavement Design & Analysis Branch Guide for Design and Construction of New Jointed Plain Concrete Pavements (JPCPs) January 9, 2008 i TABLE OF CONTENTS 1.0
More informationLIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL
LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL State of California Department of Transportation Division of Maintenance Pavement Program LCCA Procedures Manual August 213 DISCLAIMER This manual is intended
More informationHow Pavement Preservation is Incorporated Into our Asset Management Program A City Perspective
How Pavement Preservation is Incorporated Into our Asset Management Program A City Perspective Morgan Jones City of Markham PPRA Fall Meeting October, 2015 Overview Background on Markham s Pavement Management
More informationPavement Management Office
Department of Transportation and Public Works Puerto Rico Pavement Management Office PAVEMENT PRESERVATION SEPPP 1 GOALS AND OBJECTIVES PRHTA has been collecting data for more than twenty (20) years with
More informationChapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
More informationSD95-16-G2. SD Department of Transportation Office of Research. Rural Road Design, Maintenance, and Rehabilitation Guide
SD95-16-G2 SD Department of Transportation Office of Research Rural Road Design, Maintenance, and Rehabilitation Guide Prepared by ERES Consultants, Inc. 505 West University Champaign, IL 61820-3915 September
More informationProposed Revision to Bridge Design & Drafting Manual
INTEROFFICE MEMO TECHNICAL SERVICES Bridge Engineering Section Office Phone: (503) 986-4200 Fax Number: (503) 986-3407 DATE: February 5, 2014 TO: Scott Liesinger Bridge Design Standards Engineer FROM:
More informationWhy Maintain Your Asphalt?
Asphalt Maintenance Why Maintain Your Asphalt? Asphalt pavement is basically sand, gravel and glue. The glue used to keep the sand and gravel together is asphalt, a heavy by-product of oil refining. While
More informationCITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON
Council Meeting Date: August 11, 2014 Agenda Item: 7(c) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Motion Authorizing the City Manager to Execute a Contract with Transmap Corporation
More informationDISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST
State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage
More informationRoad Asset Management
Road Asset Management Raja Shekharan, Ph.D., P.E. Virginia Department of Transportation National Workshop on Modern Trends in Pavement Engineering IISc, Bangalore July 15, 2011 Transportation Asset Management
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationHow To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
More informationRecovering from the 2010 Nashville Flood
Recovering from the 2010 Nashville Flood Pavement Management as a Tool in Long Term Disaster Recovery Donald Reid, Metro Nashville Public Works Jacob Walter, Applied Research Associates What Happened?
More informationPRIORITIZATION PROCESSES
PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take
More informationJointed Plain Concrete Pavement (JPCP) Preservation and Rehabilitation Design Guide
CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF DESIGN Office of Pavement Design Pavement Design & Analysis Branch Jointed Plain Concrete Pavement (JPCP) Preservation and Rehabilitation Design Guide
More informationPreservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia
Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia International Concrete Repair Institute Spring Convention Reno, Nevada March 20, 2014 Michael Sprinkel, PE.,
More informationAsphaltic Wedge Paving
OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local
More informationInformational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
More informationAASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E.
Louisiana Case Study: Implementation of CRM Binder in PG specification. AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E. My Story Background Approach Phase I Evaluation:
More informationPerformance of Edge Drains in Concrete Pavements in California
Performance of Edge Drains in Concrete Pavements in California Biplab B. Bhattacharya, 1 Michael P. Zola, 2 Shreenath Rao, 3 Karl Smith, 4 Craig Hannenian 5 ABSTRACT The California Department of Transportation
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationDelineation. Section 4 Longitudinal markings
Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections
More informationReflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES
Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Page 1 Table of Contents WHAT IS REFLECTEX TM?... 2 STORAGE AND HANDLING... 3 SITE PREPARATION... 3 PREPARATION OF EXISTING
More informationBest Practices for RAP Management. 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI
Best Practices for RAP Management 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI Outline Current RAP usage and practices Motivations for using
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More information3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
More informationCaltrans non-standard Special Provisions Pervious Concrete. David Akers Feb 28, 2012
Caltrans non-standard Special Provisions Pervious Concrete David Akers Feb 28, 2012 Section Paragraph Content 19 RSS 19-5.03B Changes title of the section 19-5.03B USAGE NOTES FOR PERVIOUS CONCRETE AND
More informationFLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
More informationUSE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS. Paul W. Wilke, P.E. Applied Research Associates, Inc.
USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS Paul W. Wilke, P.E. Applied Research Associates, Inc. August 11, 2014 Words: 3,280 Figures: 3 Tables: 0 Photographs: 3 ABSTRACT
More informationSuperseded. The average time for a normal repair after a crash is approximately 1.5 to 2 hours for a 3- person crew.
To: Subject: Purpose: All HQ Directors: Operations, Planning and Major Projects All Regional Directors All Regional Managers, Engineering All Regional Traffic Engineers All District Managers Transportation
More informationConstruction of Quality Hot Mix Asphalt Pavements
59 th Annual Asphalt Paving Conference Outline Best Practices for Pavement Construction Placement Best Practices Surface Prep Project planning Understanding the paver Factors affecting the screed Screed
More informationConcrete Pavement Rehabilitation: Repairing Florida One Slab At A Time
: Repairing Florida One Slab At A Time 2012 FTBA Conference Andre Sutherland, P.E. FDOT District 2 Jacksonville Construction Contents Describe Scope Characteristics Sequence of operation for slab removal
More informationTraffic volumes adopted for pavement designs are based on the parameters contained in Section 7 of this report.
11. Pavements 11.1 Pavement design Preliminary pavement designs have been developed for the highway travel lanes (through carriageways), the inner and outer shoulders, on and off ramps and service roads.
More informationBill Eshbaugh, P.E. Eastern Federal Lands Highway Division October 26, 2007
Improving and Maintaining the Alignment between Pavement Condition Rating and Maintenance and Rehabilitation Recommendations Bill Eshbaugh, P.E. Eastern Federal Lands Highway Division October 26, 2007
More informationHIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS
More information5 ALTERNATIVE SOLUTIONS AND EVALUATION
Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable
More informationConcrete Pavement Rehabilitation
Concrete Pavement Rehabilitation Rehabilitating Concrete Pavements using CPR 3 Restoration Resurfacing Reconstruction By Tim Smith Director Transportation & Public Works Cement Association of Canada, April
More informationPavement Management Program
Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1
More informationI-15 Ontario PCC Rehabilitation Project
I-15 Ontario PCC Rehabilitation Project CPTP Conference April 24, 2009 Jonathan den Hartog / Caltrans E.B. Lee / UC Berkeley David Lim / Caltrans David Thomas / Parsons I-15 Ontario Rehabilitation Project:
More informationFY 2009 Economic Stimulus List
FY 2009 Economic Stimulus List The Projects in this List are "Ready to Advertise" within 30-90 days of a Bills Enactment Pavement Preservation Projects Region County PIN Project Location Concept Estimate
More informationFINAL REPORT EVALUATION OF CONCRETE SLAB FRACTURING TECHNIQUES IN MITIGATING REFLECTIVE CRACKING THROUGH ASPHALT OVERLAYS
FINAL REPORT EVALUATION OF CONCRETE SLAB FRACTURING TECHNIQUES IN MITIGATING REFLECTIVE CRACKING THROUGH ASPHALT OVERLAYS Thomas E. Freeman, P.E. Senior Research Scientist Virginia Transportation Research
More informationPorous Pavement Alternatives Cost Analysis
Porous Pavement Alternatives Cost Analysis Prepared by Century West Engineering for Metro This cost analysis compares the construction costs of six different types of pavement for three different scenarios.
More informationOhio Department of Transportation Prebid Questions
Project No. 093005 Sale Date - 12/9/2009 Question Submitted: 11/10/2009 Are all underdrains to be replaced in both resurface and full depth areas? Where are the underdrains to be placed? In areas where
More informationCHAPTER 5 DIAMOND GRINDING AND GROOVING
Disclaimer The contents of this guide reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official
More informationPlanning Level Cost Estimation Tool. User s Manual
Planning Level Cost Estimation Tool User s Manual Atlanta Regional Commission Submitted By: User s Manual Table of Contents 1. INTRODUCTION... 1 2. OBJECTIVE... 1 3. FRAMEWORK OF THE TOOL... 2 4. HOW TO
More informationSession 7: Retrofitted Edge Drains 7.1
Session 7: Retrofitted Edge Drains 7.1 Learning Outcomes 1. List benefits of drainage 2. List components of edge drain systems 3. Describe recommended installation procedures 4. Identify typical construction
More informationSPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt
More informationPavement Management System Overview
TABLE OF CONTENTS The Home Screen... 3 The Gutter... 4 Icons... 4 Quick Links... 5 Miscellaneous... 6 PMS Menus... 7 Setup Menu... 7 Construction Setup... 7 1. Material Codes... 8 2. Standard Sections...
More informationStorm Drainage Systems 11.9-1
Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of
More informationRehabilitation by cracking and seating of concrete pavement optimized by FWD analysis
Rehabilitation by cracking and seating of concrete pavement optimized by FWD analysis H. C. Korsgaard & J. P. Pedersen Carl Bro Pavement Consultants, Kokbjerg 5, DK6000 Kolding M. Rasmussen Copenhagen
More informationPavement Design. Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION. 1005 Terminal Way, Suite 125 Reno, Nevada 89502
Pavement Design Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION ENGINEERS,, INC. I 1005 Terminal Way, Suite 125 Reno, Nevada 89502 Topics Introduction Design Factors Pavement Types Fundamentals
More informationMontana Department of Transportation Research Programs June 2015 EXPERIMENTAL PROJECTS PROGRAM
Montana Department of Transportation Research Programs June 2015 EXPERIMENTAL PROJECTS PROGRAM EVALUATION OF VARIOUS BITUMINOUS CONCRETE PAVEMENT SURFACE TREATMENTS Location: Project Name: Project Numbers:
More informationCOST EFFECTIVE ROAD MAINTENANCE MARCH 2015
COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 According to the University of New Hampshire technology transfer Center the goal of a Road Surface Management Plan should be the following: Maximize Return on
More informationJoint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs
Long Life Concrete Pavement Joint Performance Joint Rehabilitation Gary Fick, Trinity Construction Management Services, Inc. Representing the National CP Tech Center Driving Forces for Concrete Pavement
More informationSection 500 Rigid Pavement
Table of Contents 1. Reinforced or Plain Cement Concrete Pavements, Reinforced or Plain Cement Concrete Pavement (RPS), and Protective Coating for Cement Concrete Pavement... 500-1 2. Pavement Relief Joint...
More information1What purpose do guard
g u a r d F c a b A l e Q f re q u e n t l y a s k e d q u e s t i o n s 1What purpose do guard cables serve? Cross-Median Fatalities The purpose of high-tension guard cable is to prevent vehicles that,
More informationDISTRESS IDENTIFICATION MANUAL. for the Long-Term Pavement Performance Program
DISTRESS IDENTIFICATION MANUAL for the Long-Term Pavement Performance Program PUBLICATION NO. FHWA-RD-03-031 JUNE 2003 In 1987, the Strategic Highway Research Program began the largest and most comprehensive
More informationLIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS
LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS HEIN, David K., P.Eng. Applied Research Associates, Inc., 5401 Eglinton Avenue West, Suite 105, Toronto, ON, CANA- DA, M9C 5K6. Tel: 416-621-9555
More information