Diptarka Gangulee, P.E.

Size: px
Start display at page:

Download "Diptarka Gangulee, P.E."

Transcription

1 Diptarka Gangulee, P.E. Project Manager Mechanical ($80/hr) Mr. Gangulee is the project leader of the Mechanical Engineering Department. In this role, he provides basic mechanical system design guidelines in each project from conceptual stage. He also supervises mechanical engineers and designers. Mr. Gangulee is responsible for final document review, coordination between different disciplines. Education Mr. Gangulee earned a Master of Business Administration from Eastern Michigan University and a Master of Engineering from University of Toledo with concentration in Thermodynamics and Fluid Mechanics. Registration Licensed Professional Engineer in Michigan. Selected Project Experience Health care : U of M Main Hospital and out patient buildings including, Saline, Brighton, canton, Ypsi. Family Practice and several main hospital renovation projects BMT lab relocation (3000s.f), Henry Ford Hospital, Michigan UMH Radiology room B1 D450 UH, Ann Arbor, Michigan UMH Radiology room B1 D442 UH, Ann Arbor, Michigan UMH Radiology room B1 D449 UH, Ann Arbor, Michigan UMH Radiology room TC2302, Ann Arbor, Michigan UMH Vestibular Testing, Ann Arbor, Michigan UMH Radiology room UH B1D438, Ann Arbor, Michigan Hyperbaric chamber, Garden City Hospital, Garden City UMH Photopheresis, Ann Arbor, Michigan UMH Pathology lab, Ann Arbor, Michigan Henry Ford Hospital, Foote Hospital Jackson, Chelsea Com. Hospital - Chelsea, Complete Central Plant Renovation for Riverside Hospital, etc. U of M East Quad Kitchen Ventilation Study U of M MRI building renovation Ave Maria Law School complete mechanical system design, interface with existing control system. GM Proving Ground - Milford : Several plant equipment installation, Vehicle emission test lab and HVAC, Campus Compress Air Development project.

2 GM Romulus Ton Building & Process Chilled Water system Honda Emission Test Cell, Dyno. Room, etc. - Ann Arbor. HVAC, Plumbing and Fire Protection for mission critical application in U of M Hospital including electrical coordination with UPS and gas generator(500 KVA). HVAC system design and drawing for Schools and Commercial and Industrial Facilities. 800 BHP High Pressure dual fuel Boiler Replacement. Dust Collection System Design for Granulators and other laboratory equipment - GE, Honda. HVAC & Plumbing design for Henry Ford Hospital, University of Michigan Hospital, Riverside Hospital. Energy Analysis for Schools, Water Treatment Plants, Hospitals, etc. Examine existing system in O.S.U. Hospital, development for incorporating free cooling and fluid circuiting for better stand by capacity in Chillers, Pumps and cooling tower and subsequent controls to minimize power consumption. Energy study and report preparation - Detroit Public Schools, Dayton Hospital, Honda Test Cell, River View Fire Station and World Bank -Washington. Various Commercial & Institutional Projects including Schools, Commercial Building, etc. UMH Radiology room B1 D450 UH, Ann Arbor, Michigan UMH Radiology room B1 D442 UH, Ann Arbor, Michigan UMH Radiology room B1 D449 UH, Ann Arbor, Michigan UMH Radiology room TC2302, Ann Arbor, Michigan UMH Vestibular Testing, Ann Arbor, Michigan UMH Radiology room UH B1D438, Ann Arbor, Michigan Hyperbaric chamber, Garden City Hospital, Garden City UMH Photopheresis, Ann Arbor, Michigan UMH Pathology lab, Ann Arbor, Michigan Consumer Power Balance of Plant Review to accommodate boiler modification project and subsequent report J H Campbell Unit 3 - CEC Utility support for SCR, Ammonia System including Sonic Horn, Steam, Potable Water, etc. J H Campbell Unit 2 & 3 - CEC Fire protection for Main and Auxiliary transformer D E Karn - CEC Inspection Electrostatic Precipitator, Air Heater - J H Campbell Unit 2 & 3 CEC Ontario Power Generation Canada

3 Ontario Power Generation 4*400 MW Cooling Water & Circulating Water System Certification: Registered Professional Engineer, State of Ohio Registered Professional Engineer, State of Michigan Publication Vortex Control Over Sharp Edged Slender Bodies AIAA Journal Of Aircraft - Volume 32-Number 4 - July-August 95.

4 Mike M. Masic, P.E. Project Manager Electrical ($80/hr) Mr. Masic serves as a Project Manager in Electrical Engineering Department. He also has designed projects ranging from small renovations to complex institutional, commercial and industrial projects. He has been responsible for designing, preparation of technical documents and construction observation which includes lighting, power, lightning protection, Fire Alarm systems and communication systems. His duties includes Project coordination with other disciplines, Lighting calculations (normal and emergency lighting) using computer programs Genesys II and Visual and Preparing calculations point-by-point method for state approval. Short circuit and load flow calculations in building electrical system (using ETAP software) Education Mr. Masic received his Bachelor of Science in Electrical Engineering from Faculty of Electrical Engineering, University of Zagreb, Croatia, Europe. Registration Licensed Professional Engineer in Michigan. Selected Project Experience BMT lab relocation (3000s.f), Henry Ford Hospital, Michigan UMH Radiology room B1 D450 UH, Ann Arbor, Michigan UMH Radiology room B1 D442 UH, Ann Arbor, Michigan UMH Radiology room B1 D449 UH, Ann Arbor, Michigan UMH Radiology room TC2302, Ann Arbor, Michigan UMH Vestibular Testing, Ann Arbor, Michigan UMH Radiology room UH B1D438, Ann Arbor, Michigan Hyperbaric chamber, Garden City Hospital, Garden City UMH Photopheresis, Ann Arbor, Michigan UMH Pathology lab, Ann Arbor, Michigan Huron and Pioneer High renovation- Ann Arbor, Michigan

5 DTE- Alternate Data Center- Ann Arbor, Michigan, Integrated Environment- Ann Arbor, Michigan Design power distribution systems, interior lighting, exterior lighting, emergency systems, grounding, lightning protection system and preparing AutoCAD drawings and specifications Design of service-entrance equipment from primary loop in campus at St. Mary s College. Design emergency generator systems and computer rooms (generator and UPS sizing) St. Peter Church Macomb, Michigan Quicken Loans Generator Livonia, Michigan Delphi Computer Room Troy, Michigan River Bank Lowell, Michigan AAM Medical Department Detroit, Michigan GM Tech Center Portfolio Zone-Phase II & III Warren, Michigan GM Romulus Substation renovations Romulus, Michigan LBPI Airport Toronto, Ontario Air Canada Center Toronto, Ontario Penetanguishene Correction Facility Penetanguishene, Ontario Detroit Science center school addition, University Preparatory Science & Detroit Science Center, new Middle school and new entrance lobby to Detroit Science center, approx. 80,000 sq.ft., Detroit MI University Preparatory Academy Elementary School II, Detroit MI, approx. 75,000 sq.ft., complete MEP construction documents Keidan School Gym Addition, Detroit MI, new Gym approx. 4,000 sq.ft. Keidan School complete MEP renovation, approx. 45,000 sf.ft.

6 Dejan Andrijevic Mechanical Designer ($50/hr) Mr. Andrijevic is working as a Designer for the Mechanical Engineering Department. His primary responsibility includes detail design and drafting mechanical and plumbing system Education Mr. Andrijevic received his Diploma in HVAC and Refrigeration. Selected Project Experience Nissan prototype laboratory approximately 40,000 sq. ft. 800 kw Diesel generator for data center facility - Detroit Edison Mixed use commercial buildings: Mayer Schairer Building Lucky Drug Building Integrated Environment Office Building Pioneer and Huron High Renovation Schuler manufacturing addition of 13,000 sq. ft. shop area St. Mary s Ice Arena and Library UMH Radiology room B1 D450 UH, Ann Arbor, Michigan UMH Radiology room B1 D442 UH, Ann Arbor, Michigan UMH Radiology room B1 D449 UH, Ann Arbor, Michigan UMH Radiology room TC2302, Ann Arbor, Michigan UMH Vestibular Testing, Ann Arbor, Michigan UMH Radiology room UH B1D438, Ann Arbor, Michigan Hyperbaric chamber, Garden City Hospital, Garden City UMH Photopheresis, Ann Arbor, Michigan UMH Pathology lab, Ann Arbor, Michigan Detroit Science center school addition, University Preparatory Science & Detroit Science Center, new Middle school and new entrance lobby to Detroit Science center, approx. 80,000 sq.ft., Detroit MI

7 University Preparatory Academy Elementary School II, Detroit MI, approx. 75,000 sq.ft., complete MEP construction documents Keidan School Gym Addition, Detroit MI, new Gym approx. 4,000 sq.ft. Keidan School complete MEP renovation, approx. 45,000 sf.ft.

8 Snjezana Adamovic Electrical Engineer ($50/hr) Ms. Adamovic serves as a Electrical Engineer in Electrical Engineering Department. She has been responsible for designing, preparation of technical documents and construction observation which includes lighting, power, lightning protection, Fire Alarm systems and communication systems. Ms. Adamovic is also responsible for Breaker failure relay protection using SEL-321 Applying the SEL-321 & 421 relays to Transfer Trip Schemes Applying Mirrored Bits Communications to a Transfer Trip Schemes SF6 Breaker replacement scheme and wiring design (AEP) Digital Fault Recorder replacement scheme and wiring design (AEP) Load Flow and Short Circuit Calculation using ETAP software in commercial building distribution system Education Ms. Adamovic received her Bachelor of Science in Electrical Engineering. Selected Project Experience SF6 Breaker replacement AEP, Ohio Digital Fault Recorder Replacement AEP, Ohio Wayne and Elm Substations Distance relaying, DE, Michigan Monroe, Belle River and St. Claire Applying relay SEL-421 to First Line Relaying, DE, MI Trenton Channel 1 st Line Relaying Warren Digital Fault Recorder, DE, Michigan Riverview 1 st Line Relaying Turbine Vibration Monitoring Control Panel design Monroe Power Plant Technical Enhance Learning Center (York University) Toronto, Ontario Pratt Library (Victoria University) Toronto, Ontario Engineering Lecture Hall (University of Waterloo) Waterloo, Ontario Kensington and Providence (Long Term Care Facilities) Toronto, Ontario

9 Detroit Science center school addition, University Preparatory Science & Detroit Science Center, new Middle school and new entrance lobby to Detroit Science center, approx. 80,000 sq.ft., Detroit MI University Preparatory Academy Elementary School II, Detroit MI, approx. 75,000 sq.ft., complete MEP construction documents Keidan School Gym Addition, Detroit MI, new Gym approx. 4,000 sq.ft. Keidan School complete MEP renovation, approx. 45,000 sf.ft.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0. Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M

More information

Columbia University Master Planning & Optimization

Columbia University Master Planning & Optimization Columbia University Master Planning & Optimization February 20, 2014 Mr. Frank Martino Vice President, Operations 1 Agenda Columbia University Campus District Energy Overview Evolution of Columbia s District

More information

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, 2014. C arastro & A ssociates, C&A# 5747

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, 2014. C arastro & A ssociates, C&A# 5747 POLK STATE COLLEGE WINTER HAVEN, FLORIDA CHILLER PLANT EVALUATION APRIL 2, 2014 C&A# 5747 C arastro & A ssociates, c o n s u l t i n g e n g i n e e r s inc. 2609 W. De Leon Street, Tampa, Florida 33609

More information

MEETING AGENDA. Project Administrator:

MEETING AGENDA. Project Administrator: MEETING AGENDA Project Administrator: To: Ann Green M. Baker, SLCS C. Bullinger, SLCS R. Clark, SLCS Board C. Cox, SLCS S. Dotinga, Granger J. Graham, SLCS J. Gusick, SLCS, Board C. Hanshaw, SLCS Board

More information

NEW JERSEY CENTER OF EXCELLENCE

NEW JERSEY CENTER OF EXCELLENCE Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves

More information

THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON

THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON Energy Security on a Barrier Island Presented to CHP 2012 October 16, 2012 Agenda About UTMB Galveston Hurricane Ike Where We Were September 12,

More information

COOK PHYSICAL SCIENCE BUILDING RENOVATIONS. Engineering & Architectural Services CONCEPT DESIGN MAY 11, 2012. BVH Project No.

COOK PHYSICAL SCIENCE BUILDING RENOVATIONS. Engineering & Architectural Services CONCEPT DESIGN MAY 11, 2012. BVH Project No. COOK PHYSICAL SCIENCE BUILDING RENOVATIONS Civil Structural Mechanical Electrical Technology Engineering & Architectural Services CONCEPT DESIGN Commissioning 50 Griffin Road South Bloomfield, CT 06002

More information

School District Design and Project Management For Rochester, NY

School District Design and Project Management For Rochester, NY The following is a list of projects completed by Engineered Solutions or its President Eric Sheffer, P.E.: Medium Voltage Design and project management for replacement of 1500KVA double ended substation

More information

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,

More information

University of Maryland s Gossett Field House College Park, MD

University of Maryland s Gossett Field House College Park, MD Presentation Outline Project Background Existing Mechanical System Mechanical Redesign Structural Redesign Electrical Redesign Conclusions & Recommendations Acknowledgements Questions Project Team Owner:

More information

Energy Systems Engineering Technician & Technologist Diploma Program (ESET) ESET Program Description

Energy Systems Engineering Technician & Technologist Diploma Program (ESET) ESET Program Description Energy Systems Engineering Technician & Technologist Diploma Program (ESET) 2012 Program Information Guide and Frequently Asked Questions May 2012 ESET Program Description The Energy Systems Engineering

More information

Renewable Solid Fuel Boiler Project

Renewable Solid Fuel Boiler Project 22nd Annual IDEA Campus Energy Conference Northern Michigan University Renewable Solid Fuel Boiler Project Presented By: Robert Ryan, P.E. Northern Michigan University Randy Russell, P.E. HDR Cummins &

More information

BUILDING RENOVATION TECHNICIAN PROGRAM (T110)

BUILDING RENOVATION TECHNICIAN PROGRAM (T110) BUILDING RENOVATION TECHNICIAN PROGRAM (T110) PROGRAM NAME COURSE CODE SCHOOL CENTRE LOCATION DURATION Building Renovation Technician T110 Construction Engineering Technology Casa Loma Campus 2 years (4

More information

FY 2012 MILITARY CONSTRUCTION PROJECT DATA MW EA MW EA EA LS

FY 2012 MILITARY CONSTRUCTION PROJECT DATA MW EA MW EA EA LS 1. COMPONENT UNCLASSIFIED Ft. Belvoir, VA 4. PROJECT TITLE Technology Center Third Floor Fit-Out 5. PROGRAM ELEMENT 6. CATEGORY CODE 131 7. PROJECT NUMBER -013 8. PROJECT COST ($000) $54,625 9. COST ESTIMATES

More information

How To Improve A School In Ancient Ginghamshire

How To Improve A School In Ancient Ginghamshire Projects Index Facility Study and Five Year Capital Improvements Plan 2012-2016... 2 Energy Conservation Program, House Bill 264... 3 New Rosemore Middle School... 4 Medical/Dental Addition, Lorain Correctional

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

Mail: P.O. Box 16511, Jackson, MS 39236-6511 Phone: 601.362.6478 Fax: 601.981.0575

Mail: P.O. Box 16511, Jackson, MS 39236-6511 Phone: 601.362.6478 Fax: 601.981.0575 Mail: P.O. Box 16511, Jackson, MS 39236-6511 Phone: 601.362.6478 Fax: 601.981.0575 Gentlemen: Atherton Consulting Engineers, Inc. is a mechanical engineering firm committed to quality design that yields

More information

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G 100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the

More information

GREEN DATA CENTER DESIGN

GREEN DATA CENTER DESIGN Jeffrey Menig Global Facilities Facility Engineering The application of multiple available technologies resulting in improved energy optimization without significantly increasing capital investment. A

More information

Heating & Cooling Efficiency

Heating & Cooling Efficiency Heating & Cooling Efficiency Advantages of Geothermal HVAC Efficiency Keith Swilley Gulf Power Company Why Gulf Power Promotes Energy Efficiency? Customer Satisfaction Education Help Customers Make Smart

More information

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

Performing Arts Research/Lab Campus Life Athletics Student Housing Academics Campus Infrastructure Food Services

Performing Arts Research/Lab Campus Life Athletics Student Housing Academics Campus Infrastructure Food Services Performing Arts Research/Lab Campus Life Athletics Student Housing Academics Campus Infrastructure Food Services York State College Pittsburgh www.ba-inc.com Barton Education has provided MEP design services

More information

Fleet Optimization through Process Information. Sumanth K. Makunur 2/13/13

Fleet Optimization through Process Information. Sumanth K. Makunur 2/13/13 Fleet Optimization through Process Information Sumanth K. Makunur 2/13/13 DTE Energy Process Controls & Technology Fleet Optimization. through Process Controls & Technology The Process Technology Enablers

More information

Michigan Higher Education Programs: Construction Trades / Energy Efficiency / Clean Technology 1

Michigan Higher Education Programs: Construction Trades / Energy Efficiency / Clean Technology 1 Michigan Higher Education Programs: Construction Trades / Energy Efficiency / Clean Technology 1 Buildings and Construction -Energy Efficiency Northwestern Michigan Construction Technology Extended Educational

More information

UTILITIES AND ENERGY MANAGEMENT

UTILITIES AND ENERGY MANAGEMENT UTILITIES AND ENERGY MANAGEMENT University of Texas at Austin increases investment in co-generation to achieve greater utility reliability and economy. ENVIRONMENTAL BENEFITS AND ENERGY SAVINGS Power plant

More information

UMass Medical School Power Plant Expansion Presentation for the Northeast Clean Heat and Power Initiative. March 24, 2015

UMass Medical School Power Plant Expansion Presentation for the Northeast Clean Heat and Power Initiative. March 24, 2015 UMass Medical School Power Plant Expansion Presentation for the Northeast Clean Heat and Power Initiative March 24, 2015 John Baker Associate Vice Chancellor, Facilities Management Joseph Collins Chief

More information

5200, 5250, 5300 AUTO CLUB DRIVE A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS

5200, 5250, 5300 AUTO CLUB DRIVE A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS 5200, 5250, 5300 AUTO CLUB DRIVE DEARBORN, MICHIGAN Ideal location minutes from Detroit Metro Airport, four expressways and hours from entire Midwest and

More information

FACILITIES / SYSTEMS REQUIRING ASSESSMENT

FACILITIES / SYSTEMS REQUIRING ASSESSMENT M7-360 (SSPF) SYSTEMS B. FAN COIL UNIT C. A/C (LIEBERT) D. PUMPS 1. CHILLED WATER PUMP 2. HOT WATER PUMP E. REFRIGERATOR F. EXHAUST FAN G. FAN SUPPLY H. HUMIDIFIER, STEAM I. SHOWER AIR A. CRANES 1. CRANE

More information

GLOBACON 05 HVAC Systems for Cogen

GLOBACON 05 HVAC Systems for Cogen GLOBACON 05 HVAC Systems for Cogen Track 2, Session 2B Advanced HVAC and Building Systems Date: March 24th, 2005 Gearoid Foley President Integrated CHP Systems Corp. Integrated CHP Systems Corp. Electricity

More information

The following terms should be understood prior to review of the Services Policy:

The following terms should be understood prior to review of the Services Policy: 1.0 BACKGROUND AND PURPOSE The Department of Facilities Management (FM) at the Colorado School of Mines has developed a Services policy to define for the campus community the types of services provided

More information

Building Energy Systems. - HVAC: Heating, Distribution -

Building Energy Systems. - HVAC: Heating, Distribution - * Some of the images used in these slides are taken from the internet for instructional purposes only Building Energy Systems - HVAC: Heating, Distribution - Bryan Eisenhower Associate Director Center

More information

POWER GENERATION: GAS TURBINES, CO- GENERATION, COMBINED CYCLE PLANTS, WIND POWER GENERATION, AND SOLAR POWER:

POWER GENERATION: GAS TURBINES, CO- GENERATION, COMBINED CYCLE PLANTS, WIND POWER GENERATION, AND SOLAR POWER: POWER GENERATION: GAS TURBINES, CO- GENERATION, COMBINED CYCLE PLANTS, WIND POWER GENERATION, AND SOLAR POWER: Computer Simulation, Selection, Applications, Operation, Maintenance, Performance Monitoring,

More information

Geothermal Heat Pumps: A Pathway to Zero Net Energy (ZNE) for Schools, Homes and Businesses

Geothermal Heat Pumps: A Pathway to Zero Net Energy (ZNE) for Schools, Homes and Businesses Lisa Meline, P.E. Meline Engineering Corp. lisa@meline.com Office: 916.366.3458 Geothermal Heat Pumps: A Pathway to Zero Net Energy (ZNE) for Schools, Homes and Businesses Session C: Institutional Applications

More information

Princeton University Microgrid

Princeton University Microgrid Princeton University Microgrid IDEA evolvingenergy Conference Toronto, Canada 28th 30th October 2014 Edward Ted Borer, PE etborer@princeton.edu Overview Campus Energy Demands Energy Plant Equipment Combined

More information

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle

More information

RENOVATION OF SCHOOL #171 SPORT COMPLEX

RENOVATION OF SCHOOL #171 SPORT COMPLEX RENOVATION OF SCHOOL #171 SPORT COMPLEX ADDRESS: NUTSUBIDZE PLATO III M/R TBILISI GEORGIA LTD SAKPROEKTI DESIGNED BY P. SAKHANBERIDZE N. SACHALELI G. MANDARIA N SITUATION PLAN NUTSUBIDZE PLATO III M/R

More information

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The

More information

FIRE EXTINGUISHER DORM #1 SYMPHONY

FIRE EXTINGUISHER DORM #1 SYMPHONY FIRE EXTINGUISHER DORM #1 SYMPHONY 101 ABC (Dry Chem) Basement (Downbeat Café Pool Tables) 102 ABC (Dry Chem) Hall Men s room (Downbeat Café) 103 ABC (Dry Chem) Hallway across chiller (Downbeat Café) 104

More information

Federal Tax Credits for Energy Efficiency

Federal Tax Credits for Energy Efficiency Page 1 of 5 Federal Tax Credits for Energy Efficiency UPDATED July 14, 2009 Quick link to this page: energystar.gov/taxcredits Federal Tax Credits for Energy Efficiency includes: Tax Credits for Consumers

More information

Schedule B to By-law 33-2009 Part A Fees Payable for Permits

Schedule B to By-law 33-2009 Part A Fees Payable for Permits Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or

More information

Building Description Project Description Estimated Cost Notes Total Deferred

Building Description Project Description Estimated Cost Notes Total Deferred Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field

More information

Mechanical-Electrical Technology MECHANICAL-ELECTRICAL TECHNOLOGY. 304 2015-16 Sacramento City College Catalog

Mechanical-Electrical Technology MECHANICAL-ELECTRICAL TECHNOLOGY. 304 2015-16 Sacramento City College Catalog MET Degree: A.S. Certificates of Achievement: Commercial Building Energy Auditing and Commissioning Specialist Mechanical Systems Technician Commercial Building Energy Auditing and Commissioning Specialist

More information

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...

More information

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations MECHANICAL SYSTEMS DESIGN STANDARDS Appendix A RECOMMENDED HVAC SYSTEMS BY TYPE OF SPACE Matt Higgins Valentin Lucero

More information

Center for Energy Education Laboratory

Center for Energy Education Laboratory Paper ID #7072 Center for Energy Education Laboratory Dr. Robert Gilbert, Sinclair Community College Robert B. Gilbert, Ph.D., LEED AP, BA, is an Associate Professor of Energy Management Technology, and

More information

Metrics That Matter: Pam Greenley MIT EHS Associate Director greenley@mit.edu. Steve Lanou MIT Deputy Director, Sustainability slanou@mit.

Metrics That Matter: Pam Greenley MIT EHS Associate Director greenley@mit.edu. Steve Lanou MIT Deputy Director, Sustainability slanou@mit. Metrics That Matter: Energy Efficiency in Laboratories Pam Greenley MIT EHS Associate Director greenley@mit.edu Steve Lanou MIT Deputy Director, Sustainability slanou@mit.edu Today Measuring progress of

More information

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

Minimizing Impact of Electric Utility Outages with Backup Generation

Minimizing Impact of Electric Utility Outages with Backup Generation Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility

More information

Chris Clement 701 Bayou Lane Thibodaux, LA 70301 985.446.7320

Chris Clement 701 Bayou Lane Thibodaux, LA 70301 985.446.7320 Chris Clement 701 Bayou Lane Thibodaux, LA 70301 985.446.7320 Position: Facility Assistant Maintenance Manager B Date: May 17, 2010 - present 70% OF TIME- is spent on following duties. Assist the Facility

More information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES

More information

LOGAN TERMINAL B SUBSTATION UPGRADE

LOGAN TERMINAL B SUBSTATION UPGRADE AIRPORTS LOGAN TERMINAL E AND HEATING PLANT 5 KV AND 15 KV UPGRADES D 2015 Design replacement of two double-ended substations, HVAC upgrades for six substations, upgrades to 400 hertz gate power central

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

Tech Park. An Innovation Factory

Tech Park. An Innovation Factory South Charleston Tech Park An Innovation Factory The west Virginia Regional Technology Park, formerly the Union Carbide Technical Center, has seen the development of thousands of chemical patents over

More information

Gas Fired Water Heater Installation

Gas Fired Water Heater Installation Michigan Department of Energy, Labor & Economic Growth Bureau of Construction Codes P.O. Box 30254 Lansing, Michigan 48909 (517) 241-9302 Bureau of Construction Codes Technical Bulletin Publication Number

More information

Data Center CH1. Elk Grove Village, IL

Data Center CH1. Elk Grove Village, IL Data Center CH1 Elk Grove Village, IL powerful/ efficient /reliable solutions > Data Center CH1 ABOUT DUPONT FABROS TECHOLOGY (DFT) DFT is a leading owner, developer, operator and manager of wholesale

More information

Geothermal Ice Arenas

Geothermal Ice Arenas Geothermal Ice Arenas For more information, call: Ltd. 41 St. Paul Blvd. West St. Paul, MB R2P 2W5 Ph: (204) 255-5959 Fax: (204) 255-7365 Email: edlohrenz@shaw.ca Website: www.icekubeheat.com ICE Ice KUBE

More information

RESUME Christopher Arndt, RCDD Systems Engineer. Office / Research and Development Labs

RESUME Christopher Arndt, RCDD Systems Engineer. Office / Research and Development Labs RESUME, RCDD Systems Engineer RELEVANT PROJECTS General Motors Corporation Sprint/Nextel DTW North Terminal Redevelopment YEARS OF EXPERIENCE Twelve PROFESSIONAL SOCIETIES BICSI (Building Industry Consulting

More information

Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response

Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response Overcoming Financial Barriers to Energy Efficiency April 6, 2010 Overview PG&E and Energy Efficiency CA Energy Efficiency Regulatory & Policy Roadmap Financing Options for Efficiency & Demand Response

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

One of the many issues facing cities, towns and campuses throughout. Making Connections in Miami: Cover Story

One of the many issues facing cities, towns and campuses throughout. Making Connections in Miami: Cover Story Cover Story Making Connections in Miami: County improves plants, integrates cooling loops One of the many issues facing cities, towns and campuses throughout North America is the challenge of replacing

More information

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

Example Retrocommissioning Measure: Opening Throttled Discharge Valves Opening Throttled Discharge Valves This 21-story building, constructed in 1997, is located in Oregon and contains 589,000 gross square feet of mostly office occupancy. The HVAC system includes six large

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Planned and Emergency Utility Outage Guidelines

Planned and Emergency Utility Outage Guidelines Revised: April 4, 2014 GUIDELINES: PURPOSE: The purpose of these guidelines is to define roles and responsibilities in requesting, coordinating scheduling, and executing utility outages and restoration

More information

apv heat exchanger APV ParaFlow Plate Heat Exchangers

apv heat exchanger APV ParaFlow Plate Heat Exchangers apv heat exchanger APV ParaFlow Plate Heat Exchangers For HVAC Applications SPX offers an extensive portfolio of plate heat exchanges covering many industrial applications. Regularly SPX heat exchangers

More information

Classification and Qualification STANDARDS

Classification and Qualification STANDARDS Classification and Qualification STANDARDS HVAC Series Classification Title Class Code Date Established Date Revised Operating Engineer Building Service Engineer Air Conditioning/Refrigeration Mechanic

More information

228 S. Mariposa Ave. Los Angeles, CA 90004

228 S. Mariposa Ave. Los Angeles, CA 90004 EXCLUSIVE MULTI-FAMILY OFFERING Derrick Vartanian Vice President Investments 310.774.3783 Derrick@mvpcre.comcom DRE# 01816119 Offered at $2,525,000 Property Description: MVPartners of KW Commercial is

More information

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours: Current state of plant Functioning as a peak and emergency centre Statistics Accumulated operating hours: D1-2-3-6-7: 43000 to 48000 hrs D4-5: 53000 to 57000 hrs D8: 33000 hrs Layout of the plant Index:

More information

Better Buildings NW Ohio & Property Assessed Clean Energy Financing (PACE) Overview

Better Buildings NW Ohio & Property Assessed Clean Energy Financing (PACE) Overview Better Buildings NW Ohio & Property Assessed Clean Energy Financing (PACE) Overview Facilitating Business Cost Savings, Energy Reductions & Alternative Energy Implementations May 2013 Kevin P. Moyer, Executive

More information

2015 CAMPUS STATEMENT

2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK UNIVERSITY AT STONY BROOK 2015 CAMPUS STATEMENT The University at Stony Brook got its start in 1957 at a temporary location on the Planting Fields estate in Oyster Bay, Long

More information

University of Iowa Power Plant

University of Iowa Power Plant University of Iowa Power Plant Contents Purpose... 2 History... 3 Cogeneration... 6 Boilers... 7 Environmental Impact... 10 Steam Turbine Generators... 12 Modernization... 14 Biomass Fuel Initiative...

More information

1301 Fannin. Houston Data Center & Office Facility

1301 Fannin. Houston Data Center & Office Facility 1301 Fannin & Office Facility 1301 FANNIN Building Features Building Location Building Typical Floor plans Systems Infrastructure Amenities BUILDING FEATURES YEAR BUILT/RENOVATED: 1984/2009 TOTAL LEASE

More information

BCSE Briefing: Driving US Economic Growth and Jobs. Chris Perrault, Vice President January 26, 2011

BCSE Briefing: Driving US Economic Growth and Jobs. Chris Perrault, Vice President January 26, 2011 BCSE Briefing: Driving US Economic Growth and Jobs Chris Perrault, Vice President January 26, 2011 Key Messages Job growth opportunities from energy efficiency and related technologies (smart grid, etc.)

More information

21.1 Functions, Basic Configuration, and Interfaces

21.1 Functions, Basic Configuration, and Interfaces 21 (6.2.M) Site Services Building 21.1 Functions, Basic Configuration, and Interfaces 21.1.1 Functions The primary functions performed by the site services building are to house, support, provide a suitable

More information

Energy Systems Integration

Energy Systems Integration Energy Systems Integration Dr. Martha Symko-Davies Director of Partnerships, ESI March 2015 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy,

More information

Training Engineers for Managing Intelligent HVAC Systems in Modern Office Buildings

Training Engineers for Managing Intelligent HVAC Systems in Modern Office Buildings Training Engineers for Managing Intelligent HVAC Systems in Modern Office Buildings Bethany Robinson, Matthew Knowles, and Jian-Qiao Sun, University of California, Merced ABSTRACT In today s changing climate

More information

Case Studies Multi Energy Absorption Chillers on CHP & Renewables for Campus Cooling. Piyush Patel Thermax Ltd.

Case Studies Multi Energy Absorption Chillers on CHP & Renewables for Campus Cooling. Piyush Patel Thermax Ltd. Case Studies Multi Energy Absorption Chillers on CHP & Renewables for Campus Cooling Piyush Patel Thermax Ltd. Topics Covered CHP and Campuses Ways to get Cooling from CHP Advantages of multi energy absorption

More information

2011-13 Biennium. Location City: Seattle County: King Legislative District: 043

2011-13 Biennium. Location City: Seattle County: King Legislative District: 043 Report Number: CBS0O2 Date Run: 9/21/2011 3:14PM Project Number: 30000372 Project Title: UW Minor Capital Repairs Description Starting Fiscal Year: 2012 Project Class: Preservation Agency Priority: 1 The

More information

OFFICE SPACE FOR LEASE THE WEST MALL TORONTO, ON

OFFICE SPACE FOR LEASE THE WEST MALL TORONTO, ON BO N $1 US.2 0 P CO M SF M /A I NN SIO UM N OFFICE SPACE FOR LEASE Up to 40,000 sf contiguous available Building under new ownership and management Currently undergoing building upgrades For more information,

More information

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus. DATA CENTER The current Campus Data Center is located within historic Founders Hall which is in a less-than ideal location for a variety of reasons, but is typical of an existing campus IT infrastructure

More information

Sample - Existing Building Commissioning Plan

Sample - Existing Building Commissioning Plan Sample - Existing Building Commissioning Plan Version: Draft for Review Final Approved: Owner Site Address: Primary Site Contact Name and Telephone Number: Date Building Description The site consists of

More information

The KUT Partnership Project Profile

The KUT Partnership Project Profile The KUT Partnership Project Profile Building Engineering Services And Environmental Consulting Engineers Since 1954 First Floor, 2E Berol House, 25 Ashley Road, London N17 9LJ. T: +44 ( 0 ) 2 0 8348 5171.

More information

San Francisco State University Campus Master Plan. Chapter 10. Campus Infrastructure

San Francisco State University Campus Master Plan. Chapter 10. Campus Infrastructure San Francisco State University Campus Master Plan Chapter 10. 10. The master plan projects the infrastructure needs of the campus for the planning horizon, to the year 2020. The following discussion focuses

More information

Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code

Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code Julia Gauthier, LEED AP BD+C Jeanne Huntsman, AIA, LEED Green Associate The Weidt Group Raising the Bar Special statements

More information

Repair Project for April 7, 2009

Repair Project for April 7, 2009 Repair Project for April 7, 2009 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades

More information

PRE-QUALIFICATION ANNOUNCEMENT

PRE-QUALIFICATION ANNOUNCEMENT Warsaw March 9, 2011 PRE-QUALIFICATION ANNOUNCEMENT The contracting authority 00-526 Warsaw, ul. Krucza 24/26, Poland Website: www.elektrowniapolnoc.pl Contact person: Mr. Marek Obuchowicz E-mail: info@elektrowniapolnoc.pl

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

CRIMINAL JUSTICE AGENCIES

CRIMINAL JUSTICE AGENCIES CRIMINAL JUSTICE AGENCIES PROBATION/PAROLE/CORRECTIONS Macomb County Sheriff Jail Administration Michigan Department of Corrections Demarse Training Academy Oakland County Community Corrections Attn: Julie

More information

Iron Hill Corporate Center Newark, DE

Iron Hill Corporate Center Newark, DE Iron Hill Corporate Center Newark, DE Delaware s Premier Suburban Office Park Contact: John Kaczowka (302) 661-6709 or Brian Hopkins (302) 661-6712 Total Project Size 463,085 RSF Red Wing Built in 1988

More information

OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa

OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa OPTIMIZING CONDENSER WATER FLOW RATES W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa T.A. Brown, P.E. Thermal Energy Corporation Houston, Texas ABSTRACT Most chillers are designed for a

More information

Surgical Emergency Outpatient Surgical Treatment/Diagnostic Nursing Patient Support Services Medical Offices General Support Services Assisted Living

Surgical Emergency Outpatient Surgical Treatment/Diagnostic Nursing Patient Support Services Medical Offices General Support Services Assisted Living Surgical Emergency Outpatient Surgical Treatment/Diagnostic Nursing Patient Support Services Medical Offices General Support Services Assisted Living York State College Pittsburgh www.ba-inc.com Barton

More information

Department of Administration DATA CENTER Two Phase Approach Located at the State Defense Building

Department of Administration DATA CENTER Two Phase Approach Located at the State Defense Building DATA CENTER Two Phase Approach Located at the State Defense Building July 17, 2015 Compiled by: Office of Facilities and Property Management 800 SW Jackson, Suite 600 Topeka, Kansas 66612-1216 i I. Programming

More information

How To Save Money On Energy Efficiency

How To Save Money On Energy Efficiency National Association of Energy Service Companies The ESCO Industry in the U.S. Nina Kogan Lockhart Senior Program Manager, NAESCO National Association of Energy Service Companies NAESCO represents the

More information

New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings

New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings Gary E Finger Ombudsman April 2013 NJ Clean Energy Program Background Introduced

More information

South Central Service Center

South Central Service Center South Central Service Center Bradley N. Plank, P.E. Senior Engineer, Mechanical & Metallurgical Arlington, Texas 972-489-0601 bplank@uis-usa.com EDUCATION: Ohio State University, Columbus, Ohio Bachelor

More information

BELLE VUE MANCHESTER DATA CENTRE

BELLE VUE MANCHESTER DATA CENTRE www.iracknet.com 0843 557 5712 bellevue@iracknet.com www.iracknet.com BELLE VUE MANCHESTER DATA CENTRE 02 BELLE VUE MANCHESTER HIGHLY ADVANCED DATA CENTRE PURPOSE BUILT TO DELIVER UNRIVALLED FLEXIBILITY

More information

Electrical Engineering

Electrical Engineering Electrical Engineering Trust our people. R eady is a professional engineering firm with highlyqualified electrical and controls personnel focused on providing solutions to meet your specific needs. Ready

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Wholesale Data Center Suites Available Now

Wholesale Data Center Suites Available Now Wholesale Data Center Suites Available Now FROM 2,500 to 100,000 Sq Ft A secure, fortified Mission Critical data center facility located in Innovation Park, Charlotte, NC Scalable data center suites available

More information

University of Missouri Power Plant Combined Heat and Power Upgrades Columbia, Missouri

University of Missouri Power Plant Combined Heat and Power Upgrades Columbia, Missouri University of Missouri Power Plant Combined Heat and Power Upgrades Columbia, Missouri Sustainable Energy Expansion Project at Mizzou Agenda Introductions Adam Ross, P.E. Sega Inc. Gregg Coffin, P.E. MU

More information