1 Repair Project for April 7, 2009

2 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades Replace Gym Floor Asbestos Abatement

3 HVAC Upgrades and Renovations $6,079,650 High efficiency hot water boilers Variable flow piping distribution Unit ventilator replacement with demand control ventilation Air handling unit replacement with energy saving measures Variable speed drives Premium efficiency motors Demand control ventilation High efficiency cooling equipment Direct digital automatic temperature controls and building energy management system

4 Roof Replacement $2,817,000 Approaching end of useful life Concerned about potential leaks & water damage 148,000 Sq Ft New PVC membrane Additional roof insulation Replace deteriorated roof ladders Existing R-Value : 8.0 Renovated R-Value: 35.0

5 Windows Replacement/Exterior Doors $1,149,000 Thermally broken aluminum frames High performance insulating glass Existing R-Value: 1.0 Renovated R-Value: ,000+ Sq Ft

6 Energy Savings HVAC Upgrades New roof with extra insulation Energy efficient windows & doors Energy management system Total Projected Savings Reduction in energy consumption: 39% Savings per year at current rate: $128,319

7 Science Lab Renovations $1,365,000 Accreditation recommended upgrades Reconfiguration of science labs to modern, safe, accessible CLabs (classroom/lab) Interactive white boards Digital projection & sound systems Increases seating capacity New ventilation system New gas & electric safety systems Accessibility upgrades

8 Science Lab Renovations 1 st Floor

9 Science Lab Renovations 2 nd Floor Approx. 16,900 Sq Ft

10 New Fire Alarm/Electrical $1,149,000 New alarm system to meet code requirements Addressable system Smoke detectors added Halls and classrooms Strobe/speakers added Electrical system upgrades to support HVAC Electrical in Science lab All light fixtures upgraded Receptacles upgraded

11 AAB (Accessibility) Upgrades $1,553,500 Code driven Door knobs replaced by lever handles Toilets & sinks handicapped accessible Chair lift to auditorium stage Automatic door operations for doors not handicapped accessible Elevator controls modified New signage in English & Braille New handicapped ramps for exterior doors

12 Replace Gym Floor $316,800 Current gym floor condition: Original wood floor Sanded and refinished yearly Some warping due to water damage 18,000 Sq Ft

13 Asbestos Abatement $1,573,650 Where What How Much Throughout Vinyl Asbestos Tile 120,000 SF Hard Joint Insulation 2,500 Total Corridors Fireproofing Spray-on 40,000 SF Ceiling Tiles (Fireproofing) 45,000 SF Science Rooms Transite Panels 500 SF Wood Fire Doors 35 Total Boiler Room Boilers Insulation 2 Total Duct Insulation 200 SF Exterior Windows 385 Total

14 Owner s Cost Item Cost Furnishings, Furniture & Equipment $24,000 Advertising $5,000 Architects & Project Management $2,122,700 Construction Contingency $1,310,000 Reproduction/Mailing $40,000 Moving & Storage $10,000 Hazmat Monitoring & Testing $105,000 Total Owner s Cost $3,616,700

15 Cost of the Project What Cost ($) HVAC $6,079,650 Roof $2,817,000 Windows/Exterior Openings $1,149,000 Science Labs $1,365,000 Fire Alarm/Electrical $1,149,000 AAB (Accessibility) Upgrades $1,553,500 Gym Floor $316,800 Asbestos $1,573,650 Subtotal $16,376,500 Owner s Costs $3,616,700 Total $19,993,000

16 Mass School Building Authority (MSBA) Building needs assessment started October 2006 Statement of Interest (SOI) July 2007 Project Approved: March 25, 2009 Guaranteed state funding 49.3% of allowable costs $9,387,236 Town share to be financed: $10,409,559

17 Advantages Improved environment for learning Improved health & safety of facility & occupants Energy savings Remove & replace systems before we need to spend money to fix 40 year old systems 49.3% guaranteed reimbursement up to $9,387,230 Great time to bid

18 Next Steps Related to Financing May 4th: Ballot Question for a Debt Exclusion (simple majority) May 11th: Town Meeting Vote on Debt Authorization (2/3rds majority) May & June: Prepare Bond Offering Prospectus July September: Solicit Bids for the Bonds Board of Selectmen Accepts Low Bid Bonds Issued and Project Funds Received July 09 June 12: Project Completed and Funds Expended MSBA Audits Invoices as Received and Reimburses the Town Monthly

19 Questions & Answers

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

HOUSTON ELEMENTARY SCHOOL

HOUSTON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools

Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools Article 11 Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools MSBA Accelerated Repair Program Program targets replacement of roofs, windows, doors, and boilers Goal is to

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 PROPERTY DESCRIPTION PROPERTY INSPECTED: INSPECTION ADDRESS: 4722 Baltimore Avenue

More information

PEABODY ELEMENTARY SCHOOL

PEABODY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1880 BUILDING AREA 37,800 SF CURRENT PROGRAM CAPACITY 210 ENROLLMENT 2008 165 WARD 6 PROPOSED PROGRAM CAPACITY 220 Site Plan PEABODY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL?

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? 1. BASIC FACTS: The current Abington High School building is 111,831

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room

AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room AGENDA BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room 1. Call to order at 6:30 p.m. 2. Review of Three Year Life Safety Recommendations from EGM Architects 3. Review of

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

Asbestos Procedures. Asbestos Products

Asbestos Procedures. Asbestos Products Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia

More information

NORTH PENN HIGH SCHOOL RENOVATIONS

NORTH PENN HIGH SCHOOL RENOVATIONS NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,

More information

DETAILED SCOPE OF WORK FOR THE NETCONG ELEMENTARY SCHOOL. The Netcong Board of Education Netcong, Morris County New Jersey. Roof Replacement Project

DETAILED SCOPE OF WORK FOR THE NETCONG ELEMENTARY SCHOOL. The Netcong Board of Education Netcong, Morris County New Jersey. Roof Replacement Project DETAILED SCOPE OF WORK FOR THE NETCONG ELEMENTARY SCHOOL The Netcong Board of Education Netcong, Morris County New Jersey Roof Replacement Project Health and Safety Renovation Projects Roof Replacement

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) What is a referendum? New Jersey school districts hold public referendum votes to seek approval

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025)

DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) Year One $995,000.00 Polk electronic marquee Annapolis roof needs half of building replaced Phase One District

More information

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or 9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org Construction Permitting Guidelines for Businesses Moving into Existing Buildings in Culver City If your business is moving into an existing

More information

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system

More information

Project Name Year Paid Cost

Project Name Year Paid Cost Project Name Year Paid Cost CFO 202 Renovations 2006 $ 391,964.00 Jones Hall asbestos Abatement 2006 $ 35,650.00 Hubbard Hall Electrical 2006 $ 940,352.00 Hubbard Hall Theater 2006 $ 1,786,297.01 Old Main

More information

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

Facility Assessment for. 11801 East Main Street, Huntley, IL

Facility Assessment for. 11801 East Main Street, Huntley, IL Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks

More information

CAPITAL EXPENDITURES

CAPITAL EXPENDITURES CAPITAL EXPENDITURES 1 CAPITAL EXPENDITURES CAPITAL EXPENDITURES PLANNING On March 1, 2010 the AmherstPelham Regional School committee adopted a policy for developing a formal capital needs planning process.

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

Gymnasium. Building Data. Number of Stairs: 3

Gymnasium. Building Data. Number of Stairs: 3 Gymnasium Building Data Year Built: 1939 Total Floor Area: 14,611 SF Number of Stairs: 3 Elevator: IBC Classification none III-B, Non-Sprinklered General Description Building consists primarily of a main

More information

School Facilities Referendum Recommendations

School Facilities Referendum Recommendations Haddonfield Public School District LONG RANGE PLANNING COMMITTEE School Facilities Referendum Recommendations NOVEMBER 19, 2015 School Facilities Referendum Recommendations Tonight s goals Presentation

More information

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley

More information

Frequently Asked Questions

Frequently Asked Questions Byron Area Schools Frequently Asked Questions Bond Proposal How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete

More information

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State

More information

Cedarfield Plantation

Cedarfield Plantation July 31, 2015 Dear Members: The purpose of this mailer is to inform and encourage all homeowners to vote on one of two options for repair/renovations for our pool house. On Saturday, July 25, 2015, and

More information

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023 School Board Proposed Capital Improvements Program Fiscal Years 2014-2023 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-6 Capital Projects Description Pages 7-14 SCHOOL BOARD PROPOSED CAPITAL

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

MEMORANDUM. General: Foundation:

MEMORANDUM. General: Foundation: MEMORANDUM State of Alaska Department of Transportation and Public Facilities Central Region - Division of Construction and Operations Public Facilities Branch TO: Jennifer Murrel DATE: August 19, 2010

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088

More information

This report presents the findings and recommendations of the assessment of energy use and

This report presents the findings and recommendations of the assessment of energy use and This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY

More information

MASTER FACILITIES PLAN

MASTER FACILITIES PLAN OFFICE OF PUBLIC EDUCATION FACILITIES MODERNIZATION DC PUBLIC SCHOOLS 2010 MASTER FACILITIES PLAN DISTRICT OF COLUMBIA MAYOR ADRIAN M. FENTY SHARPE HEALTH SCHOOL Special Education HAMILTON CENTER SCHOOL

More information

Project Management Division

Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins

More information

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency

More information

Vari Inspection Services

Vari Inspection Services Cover Page Vari Inspection Services Property Inspection Report Inspection prepared for: Sample Real Estate Agent: None - Date of Inspection: 5/13/2015 Inspector: Tony Vari License # HI8047 23110 STRD 54

More information

The picture is from http://www.easywaystogogreen.com/health-and-wellness/howasbestos-can-affect-homeowners/

The picture is from http://www.easywaystogogreen.com/health-and-wellness/howasbestos-can-affect-homeowners/ The picture is from http://www.easywaystogogreen.com/health-and-wellness/howasbestos-can-affect-homeowners/ Brochure for Public Info. - Risks of Asbestos General info from Health Canada Another picture

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

Building Description Project Description Estimated Cost Notes Total Deferred

Building Description Project Description Estimated Cost Notes Total Deferred Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY 12839 (518) 747-5426 /

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY 12839 (518) 747-5426 / John E. Barton Mayor Ellen M. Brayman Clerk/Treasurer VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY 12839 (518) 747-5426 / Trustees: James Gallagher Robert Cook Michael Horrigan Thomas VanAernem

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

RESOLUTION NO. 2003-04-13

RESOLUTION NO. 2003-04-13 RESOLUTION NO. 2003-04-13 RESOLUTION OF THE BOARD OF TRUSTEES OF THE CITRUS COMMUNITY COLLEGE DISTRICT ORDERING AN ELECTION, AND ESTABLISHING SPECIFICATIONS OF THE ELECTION ORDER WHEREAS, the Board of

More information

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park

More information

1 Buffalo Street ID: Grant: $81,000. Total Project: $1,350,000. Before. After

1 Buffalo Street ID: Grant: $81,000. Total Project: $1,350,000. Before. After 1 Buffalo Street Grant: $81,000 Total Project: $1,350,000 Complete Exterior and Interior Renovation of four connected buildings; including new facades along two streets, new roofs, electrical, mechanical

More information

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy BPC Green Builders Green building for new and existing homes Health Comfort Energy Mechanical Systems Installed HVAC Systems Primary energy source large, roof mounted, solar thermal array (AET flat plate)

More information

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1 School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations

More information

VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS

VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS January 7, 2014 0 BASIS OF ESTIMATE The estimate is based on the drawings and documents received

More information

OFFICE SPACE FOR LEASE THE WEST MALL TORONTO, ON

OFFICE SPACE FOR LEASE THE WEST MALL TORONTO, ON BO N $1 US.2 0 P CO M SF M /A I NN SIO UM N OFFICE SPACE FOR LEASE Up to 40,000 sf contiguous available Building under new ownership and management Currently undergoing building upgrades For more information,

More information

WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES

WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES California Institute of Technology WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

Newtown and Holland Middle Schools Construction Project Bid Review

Newtown and Holland Middle Schools Construction Project Bid Review Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31,

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

Project Close Out Summary

Project Close Out Summary Project Close Out Summary 1. Final Cleaning and Inspection 2. Testing and Certification 3. Demonstration of Systems and Equipment 4. Inspections by Authorities Having Jurisdiction 5. O&M Manuals and As

More information

BUILDING SAFETY UNIT

BUILDING SAFETY UNIT POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential

More information

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

Bond Priorities. Repairs and Maintenance. School Safety. Capacity Replace old windows, boilers, heating and air conditioning system. Improve accessibility for disabled persons. Keyless entry lock systems, redesign of school entrance, and wireless access throughout building.

More information

Board of Regents Meeting June 16-17, 2005 Agenda Item #11 Arizona State University EXECUTIVE SUMMARY Page 1 of 5

Board of Regents Meeting June 16-17, 2005 Agenda Item #11 Arizona State University EXECUTIVE SUMMARY Page 1 of 5 EXECUTIVE SUMMARY Page 1 of 5 ACTION ITEM: Academic Renovations and Deferred Maintenance Phase I, Revised Revised Project Implementation Approval, (ASU). ISSUE: ASU requests Revised Revised Project Implementation

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA

More information

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015 Stage 1 DA.01 Fencing and cameras deployed Baseline - 3-5 years for Stage 1 for purposes of this study costs are described for a 3 year period $45,000 $0 Stage 1 DA.02 Secure all building doors and access

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

February 4, 2016. Estimate

February 4, 2016. Estimate Wrentham, MA February 4, 2016 Architect: Turowski2 Architecture, Inc. P.O. Box 1290 313 Wareham Road Marion, MA 02738 (508) 758-9777 Cost Estimator: Miyakoda Consulting 300 Black Mallard Road Bridgewater,

More information

#10: WARRANTY OF HABITABILITY

#10: WARRANTY OF HABITABILITY LANDLORD/TENANT ANSWER IN PERSON FACT SHEET (CIV-LT-91) #10: WARRANTY OF HABITABILITY Defense # 10 says: "There are conditions in the apartment which need to be repaired and/or services which the Petitioner

More information

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

Inspection Report Atlanta Strip Mall Commercial Building Property Address: Page 1 of 25 Inspection Report Atlanta Strip Mall Property Address: Smyrna GA 30082 Page 2 of 25 South East Building Consultants Ray Thoroman Serving the entire State of Georgia 6 678-410-3005 Page 3 of

More information

CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT. January 2014. Project Management Division

CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT. January 2014. Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT RIGHT: the proposed conceptual profile of the new Joe Redington Sr. JR/SR High School January 2014 Project Management Division New Knik Area Middle/High

More information

Inspection Tech. (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg

Inspection Tech. (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg Inspection Tech (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg Inspection Tech Home Inspection Report Prepared For: Mr. & Mrs. Homebuyer Property

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Saxe Middle School Auditorium Renovation February 4, 2015

Saxe Middle School Auditorium Renovation February 4, 2015 Saxe Middle School Auditorium Renovation February 4, 2015 OVERVIEW OF PRESENTATION Renovation of Saxe Auditorium State & Federal Testing requirements Town Hires Tighe & Bond to perform testing Summary

More information

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011 Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction

More information

Capital Projects Request. Capital Improvements Planning Committee Recommendation to the Board of Selectmen February 25, 2010

Capital Projects Request. Capital Improvements Planning Committee Recommendation to the Board of Selectmen February 25, 2010 Capital Projects Request Capital Improvements Planning Committee Recommendation to the Board of Selectmen February 25, 2010 Outline Role of CIPC History of deferred maintenance Compilation of Gen Gov &

More information

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following: ADDENDUM NO. 2 TO REQUEST FOR QUALIFICATIONS FOR NEW DEVELOPMENT OF OAKLAND UNIFIED SCHOOL DISTRICT PROPERTIES, INCLUDING THE PARCELS HOUSING THE PAUL ROBESON ADMINISTRATION BUILDING AND DEWEY HIGH SCHOOL

More information

Property Services information sheet - number 3. Asbestos. December 2008 rev 1. You may have materials that contain asbestos in your house.

Property Services information sheet - number 3. Asbestos. December 2008 rev 1. You may have materials that contain asbestos in your house. Property Services information sheet - number 3 Asbestos December 2008 rev 1 You may have materials that contain asbestos in your house. A. What is asbestos B. What do you do if you have asbestos in your

More information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

Fund 30020 Infrastructure Replacement and Upgrades

Fund 30020 Infrastructure Replacement and Upgrades Focus Fund 30020 supports the long term needs of the County s capital assets to maximize the life of County facilities, avoid their obsolescence, and provide for planned repairs, improvements and restorations

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

Building Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance

Building Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance Building Energy Codes 101 October 23, 2013 Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance OVERVIEW 1. Introduction 2. Energy Code Development 3. Adoption Process 4. Elements

More information