1 SECTION 2 PURPOSE AND NEED
2 This page intentionally left blank.
3 2.0 PURPOSE AND NEED The Purpose and Need Statement in a National Environmental Policy Act (NEPA) document is a formal statement of the overall goals and objectives of a Proposed Action. The statement documents the justification for the project and provides the basis for evaluating the effectiveness of alternatives. 2.1 BACKGROUND The Ogdensburg International Airport (OGS) is located in the northern portion of the Town of Oswegatchie, St. Lawrence County, New York (see Figure 2-1, Vicinity Map and Figure 2-2, Aerial Map). OGS occupies a 533 acre site less than two miles southeast of the City of Ogdensburg, the St Lawrence River and the Canadian border. The 2013 Airport Master Plan (MPU) identified the service area for OGS as being the North Country region of the State of New York and the southern portion of the Province of Ontario in Canada. Ottawa, the Canadian capital, is located 61 miles from OGS, approximately a one hour drive. OGS is a U.S. Customs Port of Entry for planes entering from outside of the U.S. OGS currently has scheduled passenger service provided by a Federal Aviation Administration (FAA) certified commuter airline, Cape Air, through the Essential Air Service (EAS) program. Cape Air provides non-stop service to Albany International Airport from OGS using a 9-seat Cessna 402 Aircraft under the EAS program. Cape Air operates six (three departures, three arrivals) times per day at OGS. OGS is also used for corporate/business activity, recreational flying, emergency medical evacuation and environmental patrol. OGS was constructed in the 1930s under State Emergency Relief measures and $400,000 was allocated to acquire land, install drainage, and construct a hangar for the single turf runway. In 1965, the Ogdensburg Bridge and Port Authority (OBPA) acquired the Airport from the City of Ogdensburg and assumed responsibility for its operation and development. OGS currently has one (paved) runway, designated as 9-27, which is 5,200 feet long and 150 feet wide with a 40-foot wide full parallel taxiway. Published weight bearing capacity of the runway is 225,000 pounds for aircraft with dual tandem main landing gear. It has a Medium Intensity Approach Light System (MALS) and localizer based instrument approach procedure serving the approach to Runway 27. Satellite guided non-precision approach procedures are published for both runway ends. Existing facilities at OGS include a passenger terminal located on the northwest side of the airfield with access to NYS Route 812 to the west. The passenger terminal is located in one half of a 7,200 square foot large functional metal building, the other half of which is utilized as a hangar for the Cape Air Cessna 402. The passengers lounge has approximately 28 seats. The terminal opens directly to the terminal apron and passenger loading is by means of a portable stairway. Additional details regarding the passenger terminal is provided in Section 3.3. The Airport Rescue and Firefighting (ARFF) building (approximately 2,320 square feet) and a 10-bay T-hangar (approximately 11,500 square feet) are located on the south side of the general aviation apron south of the Runway 9 end. Vehicle parking (33 parking spaces, including two handicapped spaces) is available on the south side of the terminal building. The existing airside and landside facilities are illustrated on Figure 3, Airport Layout Plan. 2-1 Purpose and Need
4 NY S Ro ut e 81 2/ 37 ³ RG E BU HI S TC EN A D EG OG W OF OS Y F T O CI N W TO R unw ay 9-27 YS R ou te K:\Ogdensburg\T RW Extension Design\Draw\GIS\Topo.mxd N 8 te 59-Acre Property ou City/Town Boundary SR Airport Property NY Legend Miles Copyright: 2013 National Geographic Society, i-cubed OGDENSBURG INTERNATIONAL AIRPORT RUNWAY 9-27 IMPROVEMENTS ENVIRONMENTAL ASSESSMENT Date: FIGURE May VICINITY MAP
5 NY S Ro ut e 81 2 /3 7 ³ G UR SB CHIE N AT DE OG WEG F S O O TY OF CI N W TO Runw 2 ay 9-7 N YS R te ou R iv egatchie Os w te ou 2 81 K:\Ogdensburg\T RW Extension Design\Draw\GIS\Aerial.mxd er 68 SR NY Legend Project Area (Approximate) Airport Property 0 59-Acre Property Miles Source: Aerial Imagery from NAIP OGDENSBURG INTERNATIONAL AIRPORT RUNWAY 9-27 IMPROVEMENTS ENVIRONMENTAL ASSESSMENT Date: FIGURE May 2015 AERIAL MAP 2-2
6 This page intentionally left blank.
7 DEVELOPMENT PROJECT PHASING DECLARED DISTANCES Phase 1 ( ) Phase 2 ( ) Phase 3 ( ) 1-1 Acquire Avigation / RPZ Easements (RW 9) & Obstruction Removal (Design) 2-1 Drainage Study 3-1 Construct 10-Bay T-Hangar 1-1A Obstruction Removal (Construction) 2-2 Airport Perimeter/Security Road 3-2 Terminal Auto Parking Expansion (Phase 3) 1-2 Land Acquisition / Road Relocation for Runway Extension 2-3 Replace Runway and Threshold Lights 3-3 Terminal Auto Parking Rehabilitation 1-2A Runway and Parallel Taxiway Extension / Obstruction Removal 2-4 Widen and Replace Taxiway Lights 3-4 Terminal Access Road Rehabilitation 1-3 Terminal Building Expansion (Phase 1) 2-5 Replace Existing 10-Bay T-Hangar 3-5 General Aviation (GA) Apron Maintenance 1-4 Jet A Fuel Facility 2-6 Terminal Building Expansion (Phase 2) 3-6 Runway Maintenance 1-5 Acquire Aircraft Tug and Towbar 2-7 Terminal Auto Parking Expansion (Phase 2) 3-7 GA Auto Parking Rehabilitation 1-6 Terminal Auto Parking Expansion (Phase 1) 2-8 Terminal Apron Expansion 3-8 GA Apron Rehabilitation 1-7 Infrastructure Improvements along SR General Aviation Terminal Building Expansion 3-9 GA Access Road Rehabilitation 1-8 Terminal Apron and Taxiway Exit Rehabilitation 2-10 Conventional Hangar 3-10 GA Taxiway Exit Rehabilitation 1-9 Implement LPV Approaches to RW Parallel Taxiway Rehabilitation 1-10 Infrastructure Improvements SR812 to Terminal Approach End RSA length Runway End ID TORA TODA ASDA LDA Stop end RSA Length 9 6,400' 6,400' 6,000' 6,000' 600' 1,000' 27 6,400' 6,400' 6,000' 6,000' 600' 1,000' Date of Approval Runway End ID Standard RSA Length beyond runway end Width AIRPORT DATA TABLE Airport Data Existing Proposed Airport Elevation (MSL) 297' 304' Airport Reference Point (NAD 83) Lattitude 44 40' 54.63" N 44 40' 56.08" N Longitude 75 27' 55.79" W 75 27' 47.71" W Mean Max Temperature of Hottest Month 75 F 75 F Airport & Terminal Area NAVAIDS LPV, RNAV (GPS), LOC LPV, RNAV (GPS), LOC Magnetic Variation 13 W 13 W Date of Magnetic Variation NPIAS Service Level GA GA State Service Level CS CS Wind Coverage Crosswind Component (10.5kts/13kts/16kts) VFR 96.42% / 98.59% / 99.76% 96.42% / 98.59% / 99.76% IFR 97.39% / 99.08% / 99.89% 97.39% / 99.08% / 99.89% All Weather 97.18% / 98.92% / 99.82% 97.18% / 98.92% / 99.82% Airport Reference Code B-II C-III Design Aircraft Cessna Citation XL Airbus 320 Taxiway Lighting MITL MITL Taxiway Marking Standard Standard Length beyond runway end RUNWAY SAFETY AREA DETERMINATION Width Actual RSA RSA Deficiencies 9 1,000' 500' 600' 500' Yes 27 1,000' 500' 600' 500' Yes Proposed Action Implement Declared Distances Implement Declared Distances Violations to RSA along side No No RSA Determination Date Approved MODIFICATIONS OF DESIGN STANDARDS No. Standard Modified FAA Standards Description Existing Condition Proposed Action RW 9 Extends Off Airport RW 9 800' x 650' 1 ROFA 800' x 1,000' Property Contains NYS Route 812 RW 27 Contains Relocated NYS RW ' x 600' Route 68 LEGEND Existing Description Proposed Runway Centerline Runway Safety Area (RSA) Runway Object Free Area (ROFA) Runway Protection Zone (RPZ) Taxiway Safety Area Building Restriction Line (BRL) Airport Pavement Other Pavement Airport Reference Point Airport Buildings Other Buildings Airport Property Line Other Property Lines Fence Tree Line Wetlands (to be determined) SAC Mark PAC Mark Avigation Easement Proposed Land Acquistion Ground Elevation Contours Date Approved Runway Data RUNWAY DATA TABLE Existing Runway 9/27 Proposed Effective Gradient (%) 0.20% 0.30% Maximum Grade Change 11.77' 18' Wind Coverage (10kts / 13kts / 16kts) 97.18% / 98.92% / 99.82% 97.18% / 98.92% / 99.82% Max. Elevation (MSL) 297' 304' Runway Length 5,200' 6,400' Runway Width 150' 150' Usable Runway Length 5,200' 6,000' (ASDA) Pavement Surface Type Asphalt Asphalt Pavement Strength (lbs) Single Wheel 114, ,000 Dual Wheel 151, ,000 Dual Tandem 255, ,000 Approach Surface Slope 34:1 / 34:1 34:1 / 34:1 Approach Minimums 1 mile 1 ¼ mile Visual Approach Aids PAPI / PAPI, MALS PAPI / PAPI Instrument Approach Aids LPV, GPS / GPS, LOC LPV, GPS / GPS, LOC, LPV Runway Lighting HIRL HIRL Runway Marking NPI NPI Taxiway Lighting MITL MITL Airport Reference Code (ARC) B-II C-III Critical Aircraft Cessna Citation XL Airbus 320 Runway Object Free Area (ROFA) Length Beyond Runway 300' 1,000' Width 500' 800' Runway Safety Area (RSA) Length Beyond Runway 300' 1,000' Width 150' 500' Runway Obstacle Free Zone (OFZ) 400' 400' Runway Protection Zone (RPZ) Length 1,000' 1,700' Inner Width 500' 500' Outer Width 700' 1,010' FAR Part 77 Category C / C C / C Runway End Coordinates (NAD 83) Latitude 44 40' 48.45" N / 44 41' 00.86" N 44 40' 48.45" N / 44 41' 03.72" N Longitude 75 28' 30.71" W / 75 27' 20.87" W 75 28' 30.71" W / 75 27' 04.72" W Runway End Elevations (MSL) 286' / 297' 286' / 304' Touchdown Zone Elevation (TDZE) 286' / 297' 286' / 304' Line of Sight Violations (y / n ) N N Signature Name Title Signature Name Title Signature Name Title FAA's approval of this Airport Layout Plan (ALP) represents acceptance of the general location of future facilities depicted. During the preliminary design phase, the airport owner is required to resubmit for approval the final locations, heights and exterior finish of structures. FAA's concern is obstructions, impact on electronic aids or adverse effects on controller view of aircraft approach and ground movement areas which could adversely affect the safety, efficiency or utility of the airport. FACILITIES TABLE Existing Proposed # Facility Description Top Elevation # Facility Description Top Elevation 1 Terminal Building/Hangar 309' 1 Terminal Building/Hangar 309' 2 Localizer Building 291' 2 Localizer Building 291' 3 Fuel Facility 297' 3 Fuel Facility 297' 4 ARFF Building/FBO 306' 4 ARFF Building/FBO 306' 5 Electrical Building 297' 5 Electrical Building 297' 6 10-Bay T-Hangar 310' 6 10-Bay T-Hangar 310' 7 Conventional Hangar 302' 7 Conventional Hangar 302' 8 Garage 297' 8 Garage 297' 9 MALS Building 291' 9 MALS Building 291' 10 Conventional Hangar 317' Bay T-Hangar 310' 12 Jet A Fuel Facility 297' FAA Approval This Airport Layout Plan Is Hereby Approved Date State Aviation Department Approval This Airport Layout Plan Is Hereby Approved Date Airport Sponsor Approval This Airport Layout Plan Is Hereby Approved Date
8 This page intentionally left blank.
9 In April of 2013, OBPA was approached by representatives of a low cost commercial carrier (LCC) about the possibility of providing service at OGS. The LCC, Allegiant Travel Company (Allegiant Air), specializes in providing sub-daily service from underserved U.S. cities to leisure destinations including, Myrtle Beach, South Carolina, along with multiple destinations in Florida, including Orlando/Sanford and Fort Lauderdale. Negotiations between OBPA and Allegiant Air have proceeded to the point at which agreements have been announced. Allegiant Air agreed to offer financial assistance to OBPA upon issuance of an FAA grant providing funding for the necessary runway improvements. The MPU for OGS had begun in 2011 and was in the final stages at the time of the initial contact from Allegiant Air. As part of the MPU, aviation forecasts were prepared that included forecasts of commercial and regional operations 1 and enplanements 2 to the year The forecasts were approved by FAA prior to any contact between OBPA from Allegiant Air. Subsequent to negotiations between the airline and the OBPA, the MPU aviation forecasts and Airport Layout Plan (ALP) (see Figure 3, Airport Layout Plan) were revised to reflect the business plan by Allegiant Air to operate at OGS. Revised forecasts (see Appendix C) were approved by the FAA in November 2014 (see FAA approval letter in Appendix B). The revised ALP is pending FAA approval. Allegiant Air has been successful serving the high cost Canadian market from U.S. airports near the border, such as Plattsburgh International Airport. The closest U.S. airports to Ottawa that are currently capable of accommodating the A320 aircraft operated by Allegiant Air (and other similar carriers) are Syracuse (NY) International over three hours drive from Ottawa and Plattsburgh International, a three hour drive from Ottawa. Currently, the nearest similar service in upstate NY is at Syracuse-Hancock International, a 2 hour drive south of OGS. This drive traverses areas subject to intense levels of lake effect snow during the winter months, when demand for the service is at its peak. Access to Syracuse is also subject to long and unpredictable delays at the Thousand Islands International Bridge border crossing. As a result, a strong business case exists for providing air service to the Ottawa area and, in general, Canadian market from OGS, if certain improvements could be made to OGS facilities to support the activity. A market study, supporting the case for an LCC, was performed as part of the FAA approved forecast in the Revised Aviation Forecast report (see Appendix C) and is discussed throughout the EA. The aviation forecast demand was revised to accurately reflect the estimate of expected demand over the specified future period associated with an LCC service at OGS. According to an article published in March 2012, Canadians Flocking to U.S. Airports in Search of Cheap Fares, in 2011, there were a record 4.8 million one-way trips made by Canadians to U.S. airports, up 15% from U.S. airport terminals handled more Canadians in 2011 than the total number of passengers who went through Ottawa International Airport. 1 Operation is defined as one landing and one takeoff. 2 Enplanement is defined as the number of passengers boarding an aircraft at an airport. 2-5 Purpose and Need
10 Much of the reason for higher fares at Canadian Airports stems from airport charges. At Ogdensburg there are basic passenger facilities (i.e. there is no passenger loading bridge) and since the flight would be domestic, there are no charges associated with the pre-clearance operation or Customs. Considering the cost for an Ottawa traveler to use Ogdensburg, the only charge associated with crossing the U.S./Canadian border is the bridge toll of $3.50 per vehicle. In addition, in the U.S., security fees are paid by the passenger ($2.50 September 11th Security Fee) as part of their ticket and not passed on to the airline costs like in Canada. Costs were calculated using an Airbus 320 aircraft having a Maximum Take-Off Weight (MTOW) of 77,000 kg (170,000 lbs) with 177 seats operating at 90% load factor. No overnight parking charges (an extra $1, for YOW) were included. Ottawa Charges Landing Fees (77,000 kg at $6.97/1,000 kg) $536 General Terminal Fees ( seats) $1, Police/Security Charges ($2.10 per seat) $ Preclearance Charge ($1.87 per seat) $ Passenger Loading Bridge Charges (per use) $92.36 Total Costs (per aircraft turn) $2, ($15.25 Per Enplaned Passenger) Annual Cost for Four Weekly Departures $507,670 Ogdensburg Charges Airport Use Fees $400 Total Costs (per aircraft turn) $400 ($2.50 Per Enplaned Passenger) Annual Cost for Four Weekly Departures $83,200 Overall the costs for the same aircraft with the same destination are six times greater at Ottawa compared to Ogdensburg. On a per passenger basis (assuming 90% load) the cost per enplaned passenger is $15.25 for YOW compared to $2.50 for OGS. 2-6 Purpose and Need
11 In addition to airport usage fees that are either directly or indirectly passed on to the passenger, one factor that carries a greater decision-influencing weight is the cost of airport parking. This is especially true for leisure passengers who tend to park for longer durations. At Ottawa, the cost to park a vehicle for one week ranges between $75 for the remote economy lot and $147 for garage parking adjacent to the terminal. At Ogdensburg, presently there is no charge for parking, however, it is anticipated that once service commences that the airport will charge for parking. Current estimates on parking include a fee of either $5 per day ($35/week) or a flat weekly rate of $25. Overall, the traveling party would save between $50 and $122 per vehicle ($20-$49 per person on average) in addition to airfare savings from lower costs Lastly, one additional airfare purchasing advantage for Canadians is the favorable exchange rate. While this rate is variable, Canadians have traditionally enjoyed favorable exchange rates with regards to purchasing goods in the US. While closer parity results in softer demand, the exchange rate becomes an additional financial incentive for Canadians to use US airports. Several other Canadian airports are present in the Ottawa area. These are not viable for commercial service under present conditions due to inadequate facilities and would require substantial capital investment to be made suitable for commercial service. In addition, LCC service at these airports would not address the fundamental cost advantage offered by U.S. airports. See Chapter 3 for additional discussion. OGS is the closest U.S. airport to Ottawa. However, enplanements are significantly less than other U.S. border airports due to the lack of suitable air and landside facilities to accommodate the existing demand of an LCC as demonstrated in the Revised Aviation Forecast (see Appendix C).Characteristics of U.S. airports and the nearest Canadian city can be seen in Table 2-1, Table 2-1 Characteristics of U.S. Border Airports U.S. Airport Nearest Canadian City Distance from Canadian City (miles) Airlines Percent Canadian Enplanements (2011) Ogdensburg (OGS) Ottawa 61 Cape Air N/A Burlington (BTV) Montreal 87 Niagara Falls International (IAG) Plattsburgh (PBG) Montreal 68 Bellingham (BLI) Vancouver 50 Allegiant Air, Delta, JetBlue, Porter, United, US Airways 52% Toronto 97 Allegiant Air, Spirit 85% Allegiant Air, PenAir, Spirit Alaska, Allegiant Air, Frontier Note: Airlines in bold are considered Low Cost Carriers Sources: Google Maps (maps.google.com), Airport websites (as of September 2, 2014), Why are Canadians Driving to U.S. Airports: The Issue for Canada (Canadian Airports Council Leakage Working Group Air Policy Committee). 75% 62% 2-7 Purpose and Need
12 Ogdensburg rg International Airport OGS is the closest losest U.S. airport to Ottawa, approximately a 60 minute drive, and is conveniently accessible via Ontario HWY 416 and NY NYS Route 812. A drive time analysis for OGS is shown below.. Additionally, the Canada travel route is illustrated on Figure 2-3. Drive ive time analysis map for Ogdensburg International Airport. 2-8 Purpose and Need
13 K:\Ogdensburg\T RW Extension Design\Draw\GIS\TravelCorridor.mxd ³ Ogdensburg Prescott Bridge Ogdensburg International Airport Miles Service Layer Credits: Sources: Esri, HERE, DeLorme, USGS, OGDENSBURG INTERNATIONAL AIRPORT RUNWAY 9-27 IMPROVEMENTS ENVIRONMENTAL ASSESSMENT Date: FIGURE October TRAVEL CORRIDOR
14 Over the past decade, commercial service airports near the U.S./Canadian border have seen tremendous growth in passenger enplanements as Canadian travelers have sought lower airfares to leisure destinations. However, despite this growth, there is currently no U.S. airport providing leisure oriented service within three hours of Ottawa, Ontario, the fourth largest city in Canada. In total there are over a dozen U.S. airports that accommodate at least 10,000 originating Canadian passengers annually. Specifically looking at the top three Canadian markets by census metropolitan area population, the following demand can be summarized: Table 2-2 Enplanements by Canadians at U.S. Border Airports Canadian City Metro Area Population (millions) Enplanements at U.S. Border Airport(s) US Enplanements/Metro Area Population Toronto , Montreal , Ottawa , Vancouver , Note: 2011 Data Sources: Airport websites (as of September 2, 2014), Why are Canadians Driving to U.S. Airports: The Issue for Canada (Canadian Airports Council Leakage Working Group Air Policy Committee). Using the ratio of U.S. enplanements to metro area population shown in Table 2.2, the 1.2 million person Ottawa market equates to 110,000 to 210,000 enplanements annually at U.S. airports. When considering the number of Canadian enplanements solely at airports in communities similar to Ogdensburg, including Niagara Falls, Plattsburgh, and Bellingham, the enplanement value is reduced to between 15,000 and 155,000 enplanements annually. Even airports such as Bangor, ME, which offers twice weekly service to Florida markets, serves an estimated 67,000 annual Canadian passengers (enplaned and deplaned) with no Canadian metropolitan area within 3 hours of the airport, of which the largest is only 1/5 the size of Ottawa. The Ottawa metropolitan area does not include the Canadian cities of Kingston, Cornwall, Brockville, and Prescott, which contribute another 200,000 people to the potential service area. As stated previously, the latest MPU forecasts have undergone revisions, including updating the baseline data year (Base Year) +1, +2, +7 and +12 years to be 2016, 2017, 2018, 2023 and 2028 respectively. The forecast depicts growth using step increases in services to more accurately reflect the expected enplanement growth. Based on new information, the beginning of Allegiant Air service was assumed to be 2016 rather than Current commitments from the air carrier are for three weekly departures by an Airbus A320 aircraft. With a seating capacity of 177 passengers and a passenger load factor 3 of 90%, 24,851 annual enplanements 3 A load factor is generally used to assess how efficiently a transport provider "fills seats" and generates fare revenue Purpose and Need
15 are forecast for The aviation activity that would result from the Proposed Action is presented in Table 2.3 below. Table 2.3 Ogdensburg International Airport - Forecast of Airport Operations Base Level 2016 Yr. Base Yr.+1yr Base Yr.+2yrs Base Yr.+7yrs Base Yr.+12yrs Passenger Enplanements 1 Air Carrier 24,851 24,851 24,851 33,134 49,702 Commuter 7,098 7,098 7,098 7,098 7,098 TOTAL 31,949 31,949 31,949 40,232 56,800 Operations 2 Itinerant Air Carrier Commuter/Air Taxi 2,184 2,184 2,184 2,184 2,184 Total Commercial Operations 2,496 2,496 2,496 2,600 2,808 General Aviation 1,350 1,395 1,548 1,728 2,268 Military Local General Aviation ,032 1,152 1,416 TOTAL OPERATIONS 4,771 4,846 5,101 5,505 6,517 Instrument Operations 1,384 1,405 1,479 1,596 1,890 Peak Hour Operations Source: McFarland Johnson Enplanement is defined as the number of passengers boarding an aircraft at an airport. 2 Operation is defined as 1 landing and 1 take off. 3 Peak hour operations are defined as the estimate of the peak hour of the average day of the busiest month. The forecast of enplanements for OGS reflects the trends seen at dozens of airports across the U.S./Canadian border. In New York, Niagara Falls has grown from essentially no commercial service to over 80,000 annual enplanements since Plattsburgh International Airport has grown to approximately 150,000 annual enplanements since the 2008 opening of the passenger terminal. The marked growth at these two airports is due to their proximity to Montreal and Toronto, the 2 largest cities in Canada. Similarly on the west coast, Bellingham, Washington has grown to over 300,000 annual enplanements due in part to proximity to Vancouver, BC, the third largest Canadian metropolitan area. Dozens of airports in Montana, Michigan, North Dakota, Maine and Vermont serve hundreds of thousands of Canadians on an annual basis. Ottawa is the fourth largest Canadian metropolitan area, and the nearest small-hub U.S. airport is Syracuse, NY, over three hours away. As Ogdensburg is less than one hour away from Ottawa, it serves as one of the closest U.S. commercial service airport to any Canadian city. The forecast presented assumes infrastructure improvements that would allow Ogdensburg to serve low-cost carriers on a less than daily basis in similar patterns to those seem at other U.S. border airports Purpose and Need
16 2.1.1 Role of OGS in the Regional Economy The presence of OGS and its currently limited air service provided by Cape Air, benefits the region in terms of time-saved and costs-avoided for air travel, such as ticket surcharges and long term parking, for both Canadian and U.S. residents. Direct flights are currently available to Albany, NY, which save passengers an estimated four and seven hours drive time respectively. In addition, Cape Air offers one stop trip to Boston. In addition to the current scheduled service, corporate and institutional organization use of OGS is a key component of the OGS business that generates landing fees. OGS business users include Bank of America, EMS Services of New York, Bombardier Aerospace, Wausau Paper Corporation and St. Lawrence University. St. Lawrence University has expressed the need for additional flights to accommodate student travel to Albany and Boston and other important regional centers, such as Syracuse and Buffalo, NY. In addition, the potential to increase business jet activity at OGS exists due to the approved expansion of Foreign Trade Zone 118. Recently, the Foreign Trade Zone 118, which allows special exemptions from U.S. Customs procedures for international trade, was expanded to all of St. Lawrence County, thus increasing the opportunities for foreign businesses. Based upon the recently approved FAA forecast and the existing use by local corporations and institutional organizations, planes currently using OGS include: BeechJet 400, Cessna Citation, Hawker 800, Challenger 600 and Lear 55. Upon completion of the Proposed Action, the following planes would be able to use OGS due to the improved infrastructure: Airbus 320, Boeing 737, Embraer 175/190, and Gulfstream V (all variants). OGS provides both direct and indirect economic benefits to the region. The 2011 NYSDOT Airport Economics Impacts Study documents that the Airport employs 53 people, both full and part-time and has $5.4 million in direct impacts and $7.4 million including indirect impacts. Appendix A of that report states that the impacts are based on survey data and 2009 annual enplanement data. The FAA Terminal Area Forecast reports that OGS had 1,456 annual enplanements in These were by a regional carrier with direct flights only to Albany, NY. Table 2-4 details these direct and indirect economic impacts to the region at that time. Table 2-4: Ogdensburg International Airport Economic Impact (2011) Type Direct Indirect Total Employment Income $2,880,700 $683,600 $3,564,300 Output $5,440,600 $2,005,000 $7,445,600 State and Local Taxes $427,500 Source: New York Statewide Airport Economic Impacts Study (May 2011, pg. 67) It is anticipated that the proposed project would provide economic benefits to the Ogdensburg area through increased visitor spending and employment. Anecdotal evidence from other U.S. airports suggests that Canadian travelers often arrive in the U.S. hours in advance of their flight to mitigate potential border crossing delays. These travelers often shop and dine in close 2-12 Purpose and Need
17 proximity to the airport as a result of their early arrival. Some travelers may travel to the airport vicinity the night before resulting in demand for additional hotel rooms near the airport. Plattsburgh and Niagara Falls International Airports have seen a notable expansion in the nearby hospitality industry as enplanements have risen, with a corresponding increase in employment and tax revenue. 2.2 PURPOSE The overall purpose of the Proposed Action is to provide safe operating conditions and appropriate facilities and infrastructure for a LCC to operate from OGS to other destinations within the U.S. In the short-term, these destinations are expected to include cities such as Myrtle Beach, Orlando and Ft. Lauderdale. The facilities would be sized to accommodate subdaily service provided by the Airbus A320, a 177 passenger aircraft. The purpose of the Proposed Action is as follows: To meet the forecast demand of an increase in passenger enplanements and utilization of Airbus 320 at the airport in a manner that comports with FAA safety standards and guidance as well as all other federal and local requirements. 2.3 NEED The overall need for the Proposed Action is to meet demand for LCC service within the catchment area as identified above in Section 2.1, Background. The need for the Proposed Action is described in detail below with each project element discussed separately Runway 9-27 Extension The proposed LCC aircraft, A320, is categorized by FAA as being in Approach Category C and Design Group III. It has a wingspan of 117 feet, approach speed of 139 knots, and maximum takeoff weight (MTOW) of 172,000 pounds (dual tandem main gear). Key FAA design standards for facilities serving this aircraft are as follows: Minimum runway length available for all operations (as determined by proposed operator) of 6,000 feet Runway width of 150 feet Taxiway width of 50 feet Runway-Taxiway separation of 400 feet Runway Safety Area (RSA) 500 feet wide extending 600 feet prior to the approach end of the runway and 1,000 feet beyond the departure end. To meet these criteria, the Proposed Action includes the following actions: Runway 9-27 would be extended from its current length of 5,200 feet to 6,400 feet. 6,000 feet of runway length would be available for operations in each direction. The last 400 ft for each end cannot be used in performance calculations as it is reserved to compensate for the lack of a 1,000 ft RSA beyond the runway end, however, the pavement is usable for starting of the takeoff run from the opposite end. The practice of 2-13 Purpose and Need
18 compensating for non-standard safety areas by deducting the deficiency from the runway length is achieved through the application of declared distances. Declared distances are a means of obtaining a standard safety area by reducing the usable runway length. The last 400 feet at the departure end of the runway would be considered to be part of the RSA and declared unavailable for meeting either the Accelerated Stop Distance Available (ASDA) or Landing Distance Available (LDA) requirements of the aircraft. Runway width and strength would remain the same. To meet length requirements for departure end RSA and ROFA on both runway ends declared distances would be used. The distances available for the four takeoff and landing operations on the runway would be published. The aircraft operator would be responsible for determining if the specific requirements of the aircraft would be met. There are four declared distances and they are as follows: Take Off Run Available (TORA): The distance available to an aircraft during the takeoff prior to lift-off (generally the length of the paved runway). RSA is not required at the end of TORA. Take Off Distance Available (TODA): The distance available for an aircraft taking off to clear a 50-foot object (generally the length of the runway unless a special clearway is declared). RSA is not required at the end of TODA. ASDA: The distance available for an aircraft taking off to reach lift-off speed and then come to a complete stop. This standard applies to commercial carriers such as the proposed user. RSA and ROFA are required at the end of the ASDA. LDA: The distance available for landing, from the landing threshold to the departure end of the runway (unless a special stopway is declared). RSA and ROFA are required at the end of LDA. Taxiway A would be extended to the new runway end and widened for its entire length from its current 40-foot width to 50 feet. The approach light systems serving the Runway 27 approach would be relocated to the new runway end. Publication of a non-precision approach procedure to the new runway end with approach minimums comparable to those currently in place. Runway End Identifier Lights (REIL) would be installed on the Runway 27 end to provide identification of the end of the runway. A 3,000 linear foot (LF) section of NYS Route 68 would be relocated around the extended runway end. The roadway design would meet NYSDOT and U.S. Federal Highway Administration (FHWA) design standards for the roadway s function classification. Recent acquisition of the 59-acre parcel by OBPA would facilitate the roadway relocation design and prevent the need to acquire property on the north side of the proposed roadway relocation. OBPA ownership of the 59-acre parcel assures that land use and object height control land within the Runway Protection Zone (RPZ) and the Federal Aviation Regulation (FAR) Part 77 approach surfaces for Runway 27 is provided. FAA Advisory Circular (AC) 150/ A, Airport Design, identifies several land uses that are incompatible with an airport s RPZ. In general, the RPZ should be clear of places of public assembly, including residences, schools, religious institutions, hospitals, and industrial buildings, recreational areas, transportation facilities (including roads), fuel and hazardous materials storage facilities, wastewater treatment facilities, and above-ground utility infrastructure. Acceptable land uses within the RPZ include agriculture meeting the minimum specified buffers, irrigation channels that do not attract birds, airport service roads, underground facilities, and unstaffed navigational aids and facilities. Roadways and parking lots have long been discouraged, but tolerated within RPZ. In recent years, however, FAA has become increasingly interested in controlling land use within the 2-14 Purpose and Need
19 RPZ. This interest has been reflected in recent changes in FAA policy as expressed in AC 150/ A, and in an FAA Memorandum Interim Guidance on Land Uses within a Runway Protection Zone, dated September 27, The memo grandfathers to some extent the use of runways with pre-existing roadways or parking lots within RPZ, but places additional restrictions on the construction of new or extended runways that result in the inclusion of roadways within RPZ. Current guidance in the September 27, 2012 memo requires coordination with National Airport Planning and Environmental Division APP-400 when proposed runway projects will result in roadways or parking areas within a proposed RPZ. Obstruction (tree) removal both on and off airport property would occur to provide an unobstructed Approach Surface for a non-precision approach procedure to Runway 27. Obstruction removal in the approach area of Runway 9 is ongoing and is not part of this action. The Proposed Action would require revision and approval of the ALP. The ALP for the MPU is pending FAA approval Passenger Terminal Improvements Passenger terminal improvements proposed are those needed to accommodate the number of enplanements forecast for Based on FAA planning guidelines to accommodate these passengers in a safe manner, and meet security requirements, it has been determined that approximately 6,800 additional square feet would be needed to accommodate 180 people in the secure gate boarding area, and an equivalent number of disembarking passengers in the baggage claim area. The proposed project consists of the following major elements to meet the overall purpose: Expand the 4,000-square foot passenger terminal within the existing building and a 3,600 square foot expansion of the existing building to provide a total area of approximately 10,800 square feet. Provide two (2) ticket counters (increase of one). Expand baggage and claim facilities, passenger waiting areas, concession areas, passenger circulation, and building support spaces. Construct a parking area with 478 additional vehicle parking spaces. The methodology for calculating parking demand is described in Chapter 3 Alternatives. Upgrade support facilities including: o Utilities; o Stormwater management; and o Airport security. Expand and rehabilitate the existing terminal apron ramp to accommodate an A320 and aircraft deicing Airport and Airline Operation Amendments Also, included in the Proposed Action is the proposed Amendment of Allegiant Travel Company Operations Specifications to Allow Scheduled Passenger Jet Service at Ogdensburg International Airport (hereinafter referred to as OPSPEC ) pursuant to 14 CFR Part 119 and amendment to the OGS operating certificate pursuant to 14 CFR Part 139 (hereinafter referred 2-15 Purpose and Need
20 to as OPCERT ). Although this does not involve any construction, FAA approval of both operating amendments is a Federal Action and must be evaluated in accordance with NEPA. In order to provide the scheduled passenger service and meet the demand for the commercial service within the catchment area, Allegiant Air needs to modify its operating specifications and receive FAA approval. The need for the Proposed Action is to meet demand for commercial service within the area, as identified by Allegiant Air, the Revised Aviation Forecast and the MPU. The U.S. government deregulated the airline industry with Public Law , known as the Airline Deregulation Act of A consequence of that Act allowed airlines unrestricted choice as to which airports they serve. Other than to ensure safety, neither the Airport Sponsor, (the OBPA) nor the Federal Government controls where, when, and how airlines provide their service. Allegiant Air has submitted a letter of intent to operate at OGS and an agreement is in place between OBPA and Allegiant Air. Allegiant Air must receive approval from FAA for modifications to its operating specifications that allow it to operate commercial scheduled service to and from OGS. In addition to amending the OPSPEC, the FAA must issue approval of an amendment to the FAR Part 139 operating certificate for OGS. Per the FAA Airport Certification Program Handbook, a change from a Class II operating certificate to a Class I operating certificate is required to serve scheduled commercial air service operations by large aircraft. FAA must review the change in the OGS operating certificate to ensure that it meets all safety standards. 2.4 SUMMARY OGS is an important economic engine for St. Lawrence County. The Proposed Action would provide northern New York residents, the North Country, and Canadian passengers in the Ottawa, Ontario metropolitan area with low cost air service to southern destinations, within a reasonable drive time. Improvements to the OGS facilities will provide the opportunity to dramatically improve the level of air service to the community by adding low cost scheduled service to vacation destinations. The facilities needed to provide this improved air service consist of a runway, terminal and parking facilities able to support operations by Allegiant Air s Airbus A320 aircraft. In addition, issuance of the proposed Amendment of Allegiant Travel Company Operations Specifications to Allow Scheduled Passenger Jet Service at OGS using the A320 aircraft pursuant to 14 CFR 119 and approval of an amendment to the FAR Part 139 operating certificate for OGS is required to provide the proposed commercial service Purpose and Need
Appendix E FAA ALP Sheet Checklist
Appendix E FAA ALP Sheet Checklist AC 150/5070-6B (incl. Chg. 1, 5/1/07) Airport Layout Plan Drawing Set The following list provides general guidelines in preparing the Airport Layout Plan set. The individual
More informationMASTER PLAN PREPARATION
Located in the East Valley of the Phoenix Metropolitan Area, Phoenix-Mesa Gateway Airport is a former military airfield that has successfully made the transition to a full service commercial passenger
More informationHow To Know The History Of The Airport
Pekin Municipal Airport (C1) John C. Kriegsman Air Field: Fact Sheet General aviation airport included in the National Plan of Integrated Airport Systems (NPIAS) Federally funded at an estimated $6,81,412
More informationCurrent and Forecast Demand
Existing Facilities A new terminal opened in September 2005 at the Southwest Florida International Airport (RSW), replacing the 17-gate original terminal that opened in 1983. The $438 million Midfield
More information3.0 FACILITY REQUIREMENTS
3.0 FACILITY REQUIREMENTS This chapter identifies the facility requirements necessary to meet existing and forecast airport requirements, satisfy FAA design standards, and improve safety. The facility
More informationThe total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.
Public Notice of Application for Authority to Impose and Use Passenger Facility Charges (PFCs) at EWR, LGA, JFK and SWF and Amendment to Approved PFC Applications at EWR, LGA, and JFK The Port Authority
More informationCOMMERCIAL AND GENERAL AVIATION
Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 7L/25R (10,500 feet long by 150 feet wide),
More informationWATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010
WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010 TABLE OF CONTENTS WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN
More informationMary C. Frederick, RCE PMP Division Chief. Caltrans Division of Aeronautics 1
Mary C. Frederick, RCE PMP Division Chief Caltrans Division of Aeronautics 1 Aeronautics Mission Assist in the development and preservation of a safe and environmentally compatible air transportation system
More informationSnohomish County Airport Paine Field
Snohomish County Airport Paine Field PUGET SOUND REGIONAL COUNCIL AND THE REGIONAL AIRPORT SYSTEM The Puget Sound Regional Council (PSRC) is the planning agency for the central Puget Sound region, which
More informationExisting Facilities. Current and Forecast Demand
Existing Facilities JIA is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual Service Volume (ASV) of the runway
More informationCOMMERCIAL AND GENERAL AVIATION
Existing Facilities Melbourne International Airport is served by three runways and a number of airside and landside facilities. The runways include Runway 05/23 (3,001 feet long by 75 feet wide), Runway
More informationgoals and objectives objectives for the SCASP were:
1 executive summary 1 The South Carolina Airports System Plan (SCASP) of 2008 is to gain knowledge and understanding of the needs and requirements of South Carolina airports. The purpose of this project
More informationMICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan 2014-2018
MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics Airport Capital Improvement Plan 20142018 Prepared for: West Michigan Regional Airport Holland, Michigan August 2013 Contact: Mr.
More informationLos Angeles International Airport North Airfield Assessment
Appendix H-3 LAX SPECIFIC PLAN AMENDMENT STUDY REPORT Los Angeles International Airport North Airfield Assessment May 2007 Prepared for: Los Angeles World Airports One World Way Los Angeles, California
More information10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter
10 Aviation Element 10.1 Introduction 10.1.1 Purpose of Chapter This chapter provides the aviation element of the RFATS 2035 Long Range Transportation Plan. It describes the existing conditions and trends
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
3.0 INTRODUCTION CHAPTER 3 ALTERNATIVES CONSIDERED The existing Afton Airport parallel taxiway, with its approximate 4,360 foot length, only accommodates one half of the runway s length, and is too short
More informationCuyahoga County Airport - A Guide to Funding Capital Improvements
7.01 General CHAPTER 7 - FINANCIAL PLAN This chapter presents a financial plan to assist with future capital improvements and provide a guide for implementing the development of Cuyahoga County Airport.
More information1: PURPOSE AND NEED 1-1 1.1 INTRODUCTION 1-1 1.2 PURPOSE OF THIS ENVIRONMENTAL ASSESSMENT 1-1 1.3 PROPOSED ACTION 1-4 1.
Table of Contents TABLE OF CONTENTS for a New Runway at Ridgeland Airport Chapter and Section Page CHAPTER 1: PURPOSE AND NEED 1-1 1.1 INTRODUCTION 1-1 1.2 PURPOSE OF THIS ENVIRONMENTAL ASSESSMENT 1-1
More information3.1 Introduction. Ronald Reagan Washington National Airport
III. 3.1 Introduction FAA Order 1050.1E 1 and FAA Order 5050.4B 2 establish the FAA s policies and procedures for compliance with NEPA and the implementing regulations issued by the CEQ (40 CFR Parts 1500-1508).
More information2006 Report Card for Pennsylvania s Infrastructure
AVIATION C- 2006 Report Card for Pennsylvania s Infrastructure Philadelphia International Airport (PHL) is currently one of the fastest growing airports in the world. It is also one of the most delay-prone
More informationTP 308 IMPACT STUDY TORONTO BILLY BISHOP/TORONTO CITY AIRPORT. for
TP 308 IMPACT STUDY TORONTO BILLY BISHOP/TORONTO CITY AIRPORT for May, 2013 TABLE OF CONTENTS Report TAB 1 Map1: Runway 08-26 Extension TAB 2 Maps 2 & 3: Runway 08-26 Obstacle Assessment TAB 3 Canada Air
More informationCapacity Analysis and Facility Requirements
Capacity Analysis and Facility Requirements Introduction The capacity analysis for is composed of two distinct elements: the ability of airport facilities to accommodate existing and projected aircraft
More informationCOLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary
COLUMBUS REGIONAL AIRPORT AUTHORITY Economic Impact Study Update Executive Summary November 2012 INTRODUCTION Hearing a plane overhead is an everyday occurrence. But how many people stop to think that
More information3.1 Aerodrome information to be provided for a certified aerodrome
CHAPTER 3:AERODROME DATA 3.1 Aerodrome information to be provided for a certified aerodrome 3.1.1 Aerodrome chart. An aerodrome chart will contain the following information: a) layout of runways, taxiways
More informationPasco Tri-Cities Airport Master Plan Update
Pasco Tri-Cities Airport Master Plan Update Tri-Cities Airport Port of Pasco Pasco, Washington Prepared by In association with Mead & Hunt, Inc. 201 NE Park Plaza Drive, Suite 167 Vancouver, WA 98684 (360)
More informationAPPENDIX B. Farmville Airport Access and Land Use Study. Individual Land Use Policy Reviews August 2008
Introduction APPENDIX B Individual Land Use Policy Reviews August 2008 A land use policy review was undertaken to understand the land use and other inter-related policy issues that may influence the Farmville
More informationCharter Services. Frequently Asked Questions
Charter Services Frequently Asked Questions What advantages does chartering a private airplane have over traveling with the commercial airlines? Chartering a private aircraft provides you with numerous
More informationNanaimo Airport Business Plan Summary June 2007 EXECUTIVE SUMMARY
Introduction EXECUTIVE SUMMARY The Nanaimo Airport Commission (NAC) engaged Jacobs Consultancy Canada Inc. (JC) to develop a Business Plan for the airport. The Business Plan incorporates the findings of
More informationCHAPTER 8 - FINANCIAL PLAN
8.01 General CHAPTER 8 - FINANCIAL PLAN This chapter presents a financial plan to support capital improvement decisions and to serve as a guide for orderly development of Erie International Airport. It
More informationWelcome! To the. Public Open House
Welcome To the Public Open House What is an Environmental Assessment? An Environmental Assessment (EA) is a concise document used to describe a proposed action s anticipated environmental impacts. The
More information> Current Operations & Business Context. Bankstown Airport Master Plan 2004/05. Bankstown Airport / Master Plan > 29
Bankstown Airport Master Plan 2004/05 Bankstown Airport / Master Plan > 29 8.1 Bankstown Airport s Role in the Sydney Basin Bankstown Airport is the premier GA airport in NSW. In addition to servicing
More informationCOASTAL DEVELOPMENT PERMIT
COASTAL DEVELOPMENT PERMIT ZONE CODE SECTIONS 12.20.2 prior to LCP certification. The MASTER LAND USE APPLICATION INSTRUCTION SHEET 500' RADIUS should also be followed, except that a 100-foot radius map
More informationOperations at Coulter Airfield
Operations at Coulter Airfield Outline Background Assets Budget Options Questions/Direction Vision (January 2010) 1. Maximize Economic Viability of Coulter Field as an Asset to the City Strategic Issue
More informationAnnual & Hourly Cost Detail
CL604 vs Legacy 600 Annual & Hourly Cost Detail Bombardier Challenger 604 GENERAL PARAMETERS Min Crew / Max Passengers 2 / 9 Seats Full Range (NM / SM) 3862.24 / 4441.58 Normal Cruise Speed (KTS / MPH)
More informationAIR TRAFFIC INITIAL ENVIRONMENTAL REVIEW
AIR TRAFFIC INITIAL ENVIRONMENTAL REVIEW Operational Test Period #2 to Evaluate the Feasibility of Changing Runway Configurations at Two Times during the Day at Boston-Logan Airport FAA Order 7400.2 Appendix
More informationEconomic Impact of The Charleston International Airport Complex
Economic Impact of The Charleston International Airport Complex Conducted by: Center for Business Research Charleston Metro Chamber of Commerce PO Box 975, Charleston SC 940 January 05 Economic Impact
More informationStrategic Business Plan
Williams Gateway Airport Authority Strategic Business Plan Fiscal Years 2011-2015 Adopted May 24, 2010 by the Phoenix-Mesa Gateway Airport Authority Board of Directors Page 2 TABLE OF CONTENTS Purpose...4
More informationAirport Safety Management Systems and New Technologies
Airport Safety Management Systems and New Technologies Presented to: By: Eduardo Angeles, FAA Associate Administrator for Airports Date: Overview Safety Management Systems (SMS) Runway Incursions and Excursion
More informationCHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT
CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT 7.1.1 Definition of Resource Airspace management is defined as directing, controlling, and handling flight operations in the volume of air that overlies the
More information100% SucceSSfull at Stopping overruns
100% SucceSSfull at Stopping overruns CouRTeSY of YeAGer AIRpoRT Yeager Airport, Charleston, WV, January 19, 2010 CRJ 200 safely arrested, saving 34 lives ESCO AEROSAFETY & TECHNOLOGY Emergency Arresting
More informationSUPPLEMENTAL ENVIRONMENTAL ASSESSMENT
SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT Proposed Runway Extension and Associated Airport Improvement Projects ATLANTA SOUTH REGIONAL AIRPORT Prepared for: Henry County Board of Commissioners Prepared by:
More informationPart 150: Records of Approval
Part 150: Records of Approval Boca Raton Airport, Florida Approved on 6/28/02 The approvals listed herein include approvals of actions that the airport recommends be taken by the Federal Aviation Administration
More informationWHICH AIR TRAFFIC CONTROLLER TO CONTACT
WHICH AIR TRAFFIC CONTROLLER TO CONTACT 1. Introduction This article is written in order to explain to all beginners in the IVAO network the basics for any pilot to contact the correct air traffic controller.
More informationComing To An Airport Near You
Airport GIS Data & ealp Coming To An Airport Near You Kevin Shirer, AAE Project Manager Association of California Airports; September 2009 Today s Presentation & Expectations Take away Basic knowledge
More informationExecutive Director s Recommendation Commission Meeting: March 5, 2015
Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States
More informationDEPARTMENT OF INFRASTRUCTURE AND TRANSPORTATION
DEPARTMENT OF INFRASTRUCTURE AND TRANSPORTATION MANITOBA AIRPORT ASSISTANCE PROGRAM PROGRAM GUIDELINES THE MANITOBA AIRPORT ASSISTANCE PROGRAM Grants for airport operations and maintenance are available
More informationOCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES
OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES Revised June, 2012 1 OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES TABLE OF CONTENTS
More informationDeveloping and Maintaining Your Airport Property Map Lessons from St. Louis
Developing and Maintaining Your Airport Property Map Dana Ryan, St Louis Airport Authority Todd Madison, Central Region, FAA Chuck Reitter, Reitter Consulting, LLC Craig Bowles, St. Louis Airport Authority
More informationLONG-TERM INFRASTRUCTURE DEVELOPMENT PLAN
Louis Armstrong New Orleans International Airport LONG-TERM INFRASTRUCTURE DEVELOPMENT PLAN April 2013 TABLE OF CONTENTS 03. INTRODUCTION 04. PURPOSE AND NEED 06. ALTERNATIVES ANALYSIS 10. KEY ELEMENTS
More informationConstruction Management Association of America San Diego Chapter
Construction Management Association of America San Diego Chapter An Overview of 2015-2019 Capital Improvement Program Presented by: Iraj Ghaemi, P.E., Director Facilities Development November 13, 2014
More informationSixteenth Meeting of the Cross Polar Trans East Air Traffic Management Providers Work Group (CPWG/16) (Ottawa, Canada 3-6 December 2013)
CPWG/16 IP/19 03/12/13 Sixteenth Meeting of the Cross Polar Trans East Air Traffic Management Providers Work Group (CPWG/16) Agenda Item 5: Status on CPWG/15 Actions (Ottawa, Canada 3-6 December 2013)
More informationThe Port of Oakland executed various settlement
Executive Summary 1 The executive summary provides a brief summary of the master plan for Oakland International Airport (OAK). It has the following sections: Background and Overview Background The Port
More information(3) CATEGORY III means a permanent heliport facility. (4) COMMISSION means the City of Austin Airport Advisory Commission.
13-1-171 DEFINITIONS. (A) Terms not otherwise defined in this article have the meaning prescribed by applicable aviation law, including Federal Aviation Administration Advisory Circular 150/5390-2A (Heliport
More informationCustomer Service Plan
Customer Service Plan Concesionaria Vuela Compañía de Aviación, S.A.P.I. de C.V., d/b/a Volaris, seeks to reach our Customers satisfaction and offer them a unique flight experience. This is the reason
More informationWalt Disney World Walt Disney World Walt Disney World Walt Disney World Walt Disney World Walt Disney World Walt Disney World
Disney s Magical Express is a complimentary service that includes round-trip motor coach transportation and baggage handling between Orlando International Airport and Walt Disney World Resort for guests
More information14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:
14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation
More informationPlan of Construction Operations (PCO)
REQUEST FOR PROPOSAL APPENDIX G Plan of Construction Operations 13 006 A Taxi A Expansionn CLIENT: TradePort International Corporation, Operators of John C. Munro Hamilton International Airport (YHM) April
More informationAirport and Aviation Funding Programs
Chapter 7 Airport and Aviation Funding Programs Airports and aviation projects across the nation benefit from many funding sources including the federal, state, and local units of government. Some improvement
More informationThe Economic Impact of Commercial Airports in 2010
The Economic Impact of Commercial Airports in 2010 January 2012 Prepared for: Airports Council International North America Prepared by: CDM Smith 8805 Governor s Hill Drive Cincinnati, Ohio 45249 Table
More informationWe look forward to the meeting, which will also address the next steps in the study process.
Airport & Aviation Consultants November 26, 2013 Mr. Randall Malik Ms. Michelle Hannah Executive Director Project Manager Cuero Development Corporation TxDOT Aviation Division 212 East Main Street 125
More informationAlternatives RIAC 5.1 INTRODUCTION 5.2 WORKING ASSUMPTIONS
CHAPTER 5 Runway/Taxiway Alternatives 5.1 INTRODUCTION This chapter presents the development and analysis of different layouts and configurations of both Runway 10-28 and its related taxiways. A primary
More informationAir Medical Transport Planning Good planning can save lives. Planning for air medical transport
Chapter 1 2 15 Air Medical Transport Planning Good planning can save lives. Planning for air medical transport is important to maximize efficiency and safety; it helps create the best care for patients.
More informationOregon s Land Use Planning & Air Space Analysis (FAA 7560-1)
Oregon s Land Use Planning & Air Space Analysis (FAA 7560-1) 836.035 Effect of statute on airport zoning. ORS 836.005 to 836.120, 836.200, 836.205, 836.215, 836.220 and 836.240 do not limit any right,
More informationAPPENDIX E: 2012 Forecasting Report for RCA
APPENDIX E: 2012 FORECASTING REPORT FOR RCA D 1 APPENDIX E: 2012 Forecasting Report for RCA RAVALLI COUNTY AIRPORT ENVIRONMENTAL ASSESSMENT TABLE OF CONTENTS i Table of Contents Table of Contents...
More informationAIRPORTS ARE FOR PEOPLE WHO DON T FLY
AIRPORTS ARE FOR PEOPLE WHO DON T FLY How can an airport be for people who don t fly? They create jobs and wealth, save lives, helping to enforce the laws of the land and lower the cost of many products.
More informationU.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy. SUBJ: OpSpec A021, Helicopter Air Ambulance (HAA) Operations
NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.A021 Effective Date: XX/XX/XX Cancellation Date: XX/XX/XX SUBJ: OpSpec A021, Helicopter Air Ambulance (HAA)
More informationApplication For General Liability Coverage
HOLMAN INSURANCE BROKERS LTD. Application For General Liability Coverage Instructions Please read carefully This application form deals with all areas of operations that may require this type of coverage.
More informationProgram guidance that details the eligibility, criteria and application process. Ferry Boat Program. Ohio Department of Transportation
Program guidance that details the eligibility, criteria and application process. Ferry Boat Program Ohio Department of Transportation TABLE OF CONTENTS Program Overview Program Administration.........2
More informationChicopee, Massachusetts. Proposal under the Small Community Air Service Development Program. Docket DOT-OST-2011-0119
CEF Westover Metropolitan Airport -- Chicopee, Massachusetts Proposal under the Small Community Air Service Development Program Docket DOT-OST-2011-0119 Dun & Bradstreet DUNS Number: 066980194 Tax Identification
More informationCHAPTER 4. HOSPITAL HELIPORTS
AC 150/5390-2B September 30, 2004 CHAPTER 4. HOSPITAL HELIPORTS 400. GENERAL. Helicopters have proven to be an effective means of transporting injured persons from the scene of an accident to a hospital
More informationAerodrome Advisory Circular
Aerodrome Advisory Circular AC(AD) NO-13 Integration of International Aviation Security (AVSEC) Measures into Designs and Constructions of New Facilities and alterations to Existing Facilities. CIVIL AVIATION
More information2. LIABILITY COVERAGE OPTIONS AND LIMITS DESIRED (please complete using N/A when not applicable)
Aerospace New York - 1 WFC 200 Liberty Street. 3 rd Fl New York, NY 10281 USA Tel: 212-915-7000 Fax: 203-569-5290 www.xlaerospace.com Airport General Liability Insurance Application Please complete all
More informationDeploying Regional Jets to Add New Spokes to a Hub. Ian Savage* and Burgess Scott Northwestern University
Deploying Regional Jets to Add New Spokes to a Hub by Ian Savage* and Burgess Scott Northwestern University Correspondence Address Professor Ian Savage Department of Economics Northwestern University 2001
More informationPerformance Goals and Objectives:
Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,
More informationMASTER PLAN DRAFT RECOMMENDED PLAN
MASTER PLAN DRAFT RECOMMENDED PLAN City of Atlanta, Department of Aviation September 19, 2014 Draft Recommended Plan This document presents an overview of the findings and recommendations from the Master
More informationBackground on Airspace
Background on Airspace There are six classifications of airspace in the United States; A, B, C, D, E, and G. Class A is the most restrictive and Class G the least restrictive. They can be categorized as:
More informationCAAP 89W-1(0) Guidelines on provision of obstacle information for take-off flight planning purposes
Civil Aviation Advisory Publication This publication is only advisory. It gives the preferred method for complying with the Civil Aviation Regulations (CAR 1988). It is not the only method, but experience
More informationCRQ MASTER PLAN Public Workshop #2 CRQ MASTER PLAN Public Workshop #2
CRQ MASTER PLAN May 7, 2014 Overview/Agenda Welcome & Introductions Where we are Facility Requirements Optimum Targets Remaining within existing property limits Format of Workshop Station 1: Master Plan
More informationSEA LAND AIR LEARNING TO FLY AT
LEARNING TO FLY AT SEA LAND AIR Sea Land Air Flight Centre (SLA) is a new generation aviation service provider that offers you a unique experience of flight training and aircraft rental. Our mission is
More informationMassachusetts Statewide Airport System Plan. Technical Report
Massachusetts Statewide Airport System Plan Technical Report TABLE OF CONTENTS CHAPTER ONE: AIRPORT SYSTEM VISION, GOALS AND PERFORMANCE MEASURES INTRODUCTION... 1-1 STUDY OVERVIEW... 1-1 Study Approach
More informationSurface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
More informationKey Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
More informationGreenville Downtown Airport Aviation & Non-Aviation Parcels Available Greenville, South Carolina
7 Parcels for Lease 2.5-18 Acres The Greenville Downtown Airport. It s where aviation business lands. The information contained herein has been given to us by the owner of the property or other sources
More informationARMA HOUSTON TRAVEL EXPENSE GUIDELINES
ARMA HOUSTON TRAVEL EXPENSE GUIDELINES Claiming reimbursement of expenses 1. Expense reimbursement forms for all expenses are required to be submitted within 45 days of the date the expense was incurred.
More information9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,
More informationPresentation to Morse Study Area Taskforce. Executive Airport Area Compatibility Plan and One-Mile Zoning Reviews March 1, 2011
Presentation to Morse Study Area Taskforce Executive Airport Area Compatibility Plan and One-Mile Zoning Reviews March 1, 2011 151st Street and Pflumm Road: In the cities of Olathe and Overland Park. Its
More informationPUBLIC TRANSPORTATION
PUBLIC TRANSPORTATION Bus Service: The T Vanpooling Mobility-Impaired Transportation Services (MITS) Air Transportation D/FW Airport Service Trinity Railway Express: Rail to and Points in Between The Intermodal
More informationAN AIRCRAFT TAXI SIMULATION MODEL FOR THE UNITED PARCEL SERVICE LOUISVILLE AIR PARK. W. Swain Ottman Angela C. Ford Gregory R.
Proceedings of the 1999 Winter Simulation Conference P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, eds. AN AIRCRAFT TAXI SIMULATION MODEL FOR THE UNITED PARCEL SERVICE LOUISVILLE AIR
More informationTransportation. McKinley County Map of Roads. Trucking. Federal Express RAC Transport United Parcel Service Yellow Freight Line
Transportation Gallup is accessible by truck, rail and bus transportation. Its location makes it accessible to major market centers such as Albuquerque (138 miles), Phoenix (295 miles), Las Vegas (444
More informationEGTR ELSTREE EGTR AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGTR AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
UNITED KINGDOM AIP AD 2.EGTR-1 8 Jan 2015 EGTR ELSTREE EGTR AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGTR ELSTREE EGTR AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site
More informationDEVELOPMENT STANDARDS FOR FACILITIES & IMPROVEMENTS. The Virginia Tech/Montgomery Regional Airport Authority November 19, 2002
DEVELOPMENT STANDARDS FOR FACILITIES & IMPROVEMENTS The Virginia Tech/Montgomery Regional Airport Authority November 19, 2002 These Standards shall reflect all pre-existing agreements Adopted March 12,
More informationHospital Heliport Inspection Basics
Hospital Heliport Inspection Basics Eric Peltier Aviation Representative Office of Aeronautics 222 E Plato Blvd St. Paul, MN 55107 651 234 7184 eric.peltier@state.mn.us Sources FAA AC 150/5390 2C Heliport
More informationTable of Contents for Model Airport Affected Area Regulations
Table of Contents for Model Airport Affected Area Regulations Section I. General Provisions A. Title...1 B. Authority...1 C. Purpose and Intent...1 D. Designation of Airport Affected Area...1 E. Jurisdiction...2
More informationForecasting Summary Report: North Central Texas General Aviation Airport Activity. February 2012
Forecasting Summary Report: North Central Texas General Aviation Airport Activity February 2012 FORECASTING SUMMARY REPORT TABLE OF CONTENTS A. GLOSSARY... 3 B. PURPOSE... 4 C. BACKGROUND... 6 D. DATA
More informationPricing Framework July 2012
Pricing Framework July 2012 Contact us: Service and Pricing Team Airways New Zealand PO Box 294 Wellington New Zealand servicefeedback@airways.co.nz www.airways.co.nz Contents 1 Introduction 4 1.1 The
More informationThe Economic Impacts of the Pullman Moscow Airport and Realignment Project
The Economic Impacts of the Pullman Moscow Airport and Realignment Project And Contribution to the Regional Economy Sponsored by Pullman Moscow Regional Airport DATE March 3, 2016 PRODUCED BY Steven Peterson
More informationTHE COLUMBIA METROPOLITAN AIRPORT EXAMPLE
Statement of Dan Mann, AAE Executive Director, Columbia Metropolitan Airport Before the Committee on Transportation and Infrastructure Subcommittee on Aviation U.S. House of Representatives April 30, 2014
More information2. AIRPORT INVENTORY 2.1. LOCATION 2.2. HISTORY OF THE AIRPORT
2. A review of existing facilities and conditions provides the baseline for evaluation of the improvements determined necessary to implement future safety and capacity improvements at the airport. This
More informationPilot Professionalism It Isn t Just For The Big Guys
Pilot Professionalism It Isn t Just For The Big Guys Earl F Weener Board Member American Bonanza Society Convention & Trade Show Buffalo, NY September 25, 2010 Pilot Professionalism - NTSB Interest Lack
More information