1 MASTER PLAN DRAFT RECOMMENDED PLAN City of Atlanta, Department of Aviation September 19, 2014

2 Draft Recommended Plan This document presents an overview of the findings and recommendations from the Master Plan study for Hartsfield-Jackson Atlanta International Airport (ATL). This Master Plan, undertaken between January 2012 and September 2014, will help to guide future Airport development by providing a plan for accommodating aviation demand for the foreseeable future while preserving the flexibility necessary to respond to evolving changes, both within the industry and those impacting demand characteristics at the Airport. The goal of a master plan is to provide a framework to support future airport development to meet forecast demand in a safe, cost effective, operationally efficient, and flexible manner. The plan s long-term concept should support logical and purposeful development to efficiently meet airport needs, minimize the likelihood of incompatible or conflicting development, and preserve options to allow for prudent development decisionmaking as demand or other conditions dictate or opportunities are presented. Airfield The airfield at Hartsfield-Jackson Atlanta International Airport consists of runways, taxiways, apron areas, deicing pads, navigational aids, non-licensed vehicle roads, and support facilities. The airfield has five parallel runways, configured as two independent sets of dependent pairs (Runways 8L-26R and 8R-26L, and Runways 9L-27R, and 9R-27L) and a single independent Runway all oriented in the east-west direction. Runways 8L-26R, 9R-27L, and operate primarily as arrival runways and are each 9,000 feet in length. Runway 8R- 26L (10,000 feet) and Runway 9L-27R (12,390 feet) serve primarily as departure runways. All runways are designed to accommodate aircraft up to Airplane Design Group (ADG) V (e.g., Boeing 747, Boeing 787, Bowing 777, Airbus A340/A330). Additionally, ADG VI aircraft (Airbus A380) can utilize Runways 9L-27R and 9R-27L under Modifications of Standards approved by FAA as a result of their shoulders being extended to 50 feet in width. In general, the Airport operates with arrivals on Runway and the outer runway of each dependent pair (Runways 8L-26R and 9R-27L); and departures on the inner runway of each pair (Runways 8R- 26L, and 9L-27R). Runway 10-28, the newest runway, was completed in 2006 and has provided a significant increase in arrival capacity. The analysis of the airfield s operation under future demands has identified the need for additional capacity primarily in poor weather conditions near the end of the planning horizon (e.g., 20 years) to mitigate airfield operational delay. Development of a new runway is typically the most effective way of addressing this issue. The Master Plan analyzed the potential development of a new runway at both closely-spaced (CSR) and Draft Recommended Plan [1]

3 [Preliminary Draft for Discussion Purposes Only] Future Redevelopment (102.3 Acres) North Deice Apron A A A3 A5 A7 D A A A A A4 C D C D A A6 Runway 8L-26R 9,000' x 150' H B1 B5 B3 B7 B15 B13 B11 B B B B B V B B 1,200' Runway Extension B2 H B4 B B6 C B10 D Runway 8R-26L 10,000' x 150' E1 H V E5 E3 Domestic Terminal and Concourse A through D Modernization E E F2 H V F3 D C E11 E E13 E C F5 F4 F F E7 E D E10 G Concourse D Holdroom Exp. E E F F Plane Train Turn-Back Concourse C Midpoint Exp. Future Landside Redevelopment Intersection Improvements East Gates Expansion North and South Domestic Parking Decks Future Ground Transportation Facility South Curb Front Capacity Future Redevelopment (89.4 Acres) L L L1 T M2 T M Runway 9L Endaround Taxiway L L L4 L3 L L5 L6 M M M6 M4 D L10 J L12 M14 S D L16 L14 M M M12 U L L L7 M M16 J M18 M20 M Runway 9L-27R 12,390' x 150' P T S N5 N N N N2 P D U N4 J K N13 N N N10 N6 J K Runway 9L-27R Reconstruction N12 Runway 9R-27L 9,000' x 150' R R3 Gate 70 R R7 R11 R R ATCT #2 R R6 R10 SC North Cargo Relocation and Expansion R12 South Cargo Expansion SJ SJ2 ARFF Training Facility Enhancements Future Redevelopment (54.3 Acres) SJ1 SC 6th Runway (7,888') Airport Maintenance Facility Relocation/Consolidation SJ SG SG SG SG SG SG2 SG4 SG12 SG6 SG14 SG16 SG Runway ,000' x 150' Airport Sustainability Initiative SOURCE: City of Atlanta, DOA, April 2012 (basemap); City of Atlanta, DOA, April 2013 (aerial photography); Ricondo & Associates, Inc., September PREPARED BY: Ricondo & Associates, Inc., September, NORTH 0 2,000 ft. Drawing: P:\ATL\Master Plan\05 Alternatives Analysis\01 Consolidated Alternatives\MP Overview_ dwg_Layout: 11x17L_Sep 18, 2014, 9:12am EXHIBIT 1 Draft Recommended Plan

4 widely-spaced (WSR) locations relative to the existing runways. Both runway options involve significant costs and impacts. Given the fact that evolving air traffic control technology could significantly impact the decision on runway location and timing prior to development, specific decisions on runway development are best left until necessitated by demand. Because the CSR option is located primarily on existing Airport property, it is shown in the Recommended Plan to ensure that other Airport development occurs in a manner that would be compatible with the CSR if it were determined to be the preferred runway development at a future date. Runway 9L-27R is the longest runway at 12,390 feet and critical to the operation of long-haul international departures. In order to mitigate operational impacts (aircraft payload restrictions) associated with this runway s closure due to periodic maintenance, eventual reconstruction, or other unforeseen events, extension of Runway 8R-26L to the extent feasible is proposed. An extension of Runway 8R-26L from 10,000 feet to 11,200 feet is included in the Recommended Plan to provide some level of relief during periods of Runway 9L- 27R closure. The Recommended Plan incorporates end-around taxiway development around the Runway 9L end allowing aircraft arriving on Runways 9R-27L and to taxi to the Domestic Terminal area independent of operations on Runway 9L-27R. The Runway 9L end-around taxiway is similar to the Runway 8R end-around taxiway completed in 2007 which has improved departure capacity on Runway 8R-26L by reducing runway crossings by aircraft arriving on Runway 8L-26R. Terminal/Gates The passenger terminal facilities consist of two independent terminal processing facilities for domestic and international passengers, with associated gates and five midfield concourses. The primary processing of domestic passengers occurs at the Domestic Terminal at the west end of the passenger terminal complex. The Domestic Terminal is bifurcated into Domestic Terminal North and Domestic Terminal South. Concourse T is integrated into the Domestic Terminal. International passengers are processed at the new Maynard H. Jackson Jr. International Terminal (International Terminal) at the east side of the passenger terminal complex, which includes Concourse F. In addition to the terminal gates, the processors serve five midfield Concourses A through E via an underground Automated People Mover (PlaneTrain) and pedestrian walkway tunnels. With the opening of the International Terminal in May 2012 and the relocation of international activities to that facility, significant capacity became available in the Domestic Terminal to accommodate future growth. As a result, most of the functional areas in the Domestic Terminal are adequate over the long term to accommodate demand. A few functional areas (security checkpoint queuing, Domestic Terminal North baggage claim, international ticketing) reach capacity in the long term under current operating assumptions. These facilities should be monitored as to the ultimate need for expansion. Additional gate capacity is needed to accommodate demand through the planning horizon. Two general options were considered and analyzed for long-term gate facility expansion: east gate development located east of the International Terminal and connected through an extension of the existing APM system, and south gate development located on the west side of the airfield between Runways 9R-27L and and connected Draft Recommended Plan [3]

5 to the Domestic Terminal by a new APM system. Ultimately east gate development was preferred allowing the continued development of passenger processing facilities along the spine of the Airport. The preferred concept for gate expansion includes the development of Concourse G connected to the International Terminal, and satellite Concourses H and I accessible through an extension of the existing PlaneTrain system and pedestrian walkway tunnels. As envisioned these facilities would be oriented northsouth, and occupy the site south of Maynard H. Jackson Jr. Boulevard. Beyond the planning period these concourses could be extended north into the Delta Technical Operations Center site to provide full pier concourses similar to Concourses A through E. Depending on future gate allocation, and decisions regarding centralization of international passenger processing facilities, Concourses G through I could be configured to accommodate both international and domestic passenger activity. With the exception of Concourse D, the existing Concourses A through E provide adequate capacity to accommodate the number of gates on each. Concourse D is narrower that the other concourses and, as a result, deficient in passenger holdroom seating capacity. Addressing this deficiency is included in the Recommended Plan, and could be accomplished either through concourse widening, or development of additional concession nodes and removal of concessions adjacent to existing holdroom areas. To support the development of Concourses G through I, and to accommodate forecast future passenger growth, the PlaneTrain system will require extension to the east to serve the new concourses, and extension to the west to increase capacity. The westward extension of the PlaneTrain will allow for relocation of the train turnback from between the Concourse T and the baggage claim station, to west of the baggage claim station. This relocation will permit the reduction of train headways and a 20 percent increase in carrying capacity in each direction. Landside Landside facilities at the Airport include access roads, parking, and rental car facilities. Additionally, facilities associated with commercial vehicles (taxis, limousines, shared-ride, off-airport parking shuttles, and hotel courtesy vehicles) are also included in this element. Significant improvements to the Domestic Terminal roadway system have recently been implemented through the Inbound Roadways project. With the exception of some minor lane additions likely necessary in the 2031 timeframe, analysis of the Domestic Terminal roadway system suggests it is capable of accommodating traffic throughout the master plan period. Modeling of the International Terminal roadway system identified the signalized intersection of MHJJ Boulevard and Loop Road as a potential capacity concern. The volume of traffic on certain movements, in conjunction with the intersection s long cycle length results in long signal control delay on a number of approaches. Specific operational and facility enhancements for this intersection will be developed through further evaluation of the intersection considering the effects of nearby traffic signals. Draft Recommended Plan [4]

6 Analysis of the terminal curbside capacity identified the Domestic Terminal South departures curb as currently capacity constrained, and the only curbside facility experiencing unacceptable levels of service during the analysis period. Operational and physical improvements are being implemented that will mitigate these capacity issues as well as help to control pedestrian crossing/vehicle interactions. On-Airport public parking for the Domestic Terminal is provided in the North and South Decks; North, South, and West Economy lots; and Park-Ride Lots A, B and C. The North and South Decks currently fill to capacity at some point in over 50 percent of the weeks annually. Furthermore, the condition of these facilities will require their reconstruction/major rehabilitation in the near-term just to maintain them at their current capacity. Consequently, and recognizing the need for additional parking garage capacity, reconstruction of both garages, growing from their current 4-floors to 8-floors, is included in the Recommended Plan. Currently, Airport tenants individually determine whether and how to provide parking for their employees. The DOA has considered the potential to provide parking for employees without employer-provided parking, and potential sites identified. DOA policy decisions will ultimately determine the development of these facilities. The Recommended Plan also provides for the potential relocation of existing commercial ground transportation facilities which may be impacted by future redevelopment in the area of the existing Ground Transportation Center (GTC) and taxi hold lot. Support Support facilities include general aviation, aircraft maintenance and other airline facilities, airport administration and maintenance, cargo facilities, flight kitchens, fuel farms, and ARFF facilities. Support facilities are primarily located along the north boundary of the Airport, east of the International Terminal, and between Runway 9R-27L and Runway Support facility requirements can be related to changes in aviation activity, changing regulatory requirements, or airline decisions regarding flight amenities or fleet maintenance activities provided at an airport. The following support facility expansion needs have been identified for the planning period. Draft Recommended Plan [5]

7 Certain components of Delta Air Lines flight kitchen facilities are inefficient/inadequate today. With the transition of regional jet activity to mainline service currently underway, additional flight kitchen capacity will be needed. Airport maintenance activities are scattered around the Airport in numerous facilities both originally intended for maintenance use and others previously in other uses. Consolidation of maintenance facilities into a single campus will improve operational efficiency to meet future demand. Increasing GSE storage requirements will result from the addition of airline gates and should be programmed as part of new gate development. Cargo facility expansion will be necessary to accommodate long term cargo growth in all categories. Some facility elements (truck staging) are currently inefficient/inadequate and may be addressed sooner. Cargo facilities are current located on the north side of the airfield (integrators and all-cargo), between Runways 9R-27L and (all-cargo), and east of the international terminal (belly). The North Cargo Building which serves FedEx, Southwest, and other non-scheduled all-cargo operators is reaching the end of its useful life and will likely require significant investment or reconstruction. Additionally, the facility has deficient landside area that limits its efficiency. The Recommended Plan includes redevelopment of the North Cargo Area contiguous to the South Cargo Area creating a cargo corridor between Runways 9R-27L and Truck access to this site would be readily available to I-85 to the west. Cargo expansion would also be accommodated in this corridor through redevelopment of the City South Hangar on the east end of the site. Development Plan A high-level development schedule was created that identifies short-range (through 2021) and long-range (2021 through 2031) projects based strictly on the forecast of activity and facility requirements. As a result of changes occurring in the aviation industry both nationally and locally, actual activity is currently tracking slightly lower than the forecasts. As such, projects may shift between short-and long-range categories as actual activity triggers implementation. Additionally, specific DOA strategic initiatives, such as those associated with cargo development, may necessitate development of facilities sooner than forecast based strictly on facility requirements. Short-range projects are currently needed, or have a high likelihood of being needed and implemented within 10 years; while long-range projects are more dependent on demand continuing to grow as depicted in the aviation forecasts. Draft Recommended Plan [6]

8 SHORT-RANGE DEVELOPMENT PLAN The following projects are currently anticipated to be needed through Runway 9L Endaround Use of the Runway 9L Endaround Taxiway will permit B757 and shorter aircraft arrivals on Runways 27L and 28 the ability to taxi unimpeded around the Runway 9L end with aircraft departing from Runway 27R flying over the taxiing aircraft. Use of this taxiway will improve Runway 27R departure capacity, enhance airfield safety, and reduce taxi-out emissions. Implementation of the 9L Endaround results in the loss of the Park-Ride Reserve Lot (1,333 spaces) and Park-Ride Lots A and B (4,006 spaces). Draft Recommended Plan [7]

9 Runway 26L Extension Extension of Runway 26L by 1,200 feet will increase available departure length for 26L departures by 1,200 feet and 8R departures by a lesser amount (approximately 600 feet). Additionally, the extension will reduce the number of Cross Complex departures (aircraft that would normally depart from Runway 26L but depart from Runway 27R due to Runway 27R having longer length). Extension of the runway will require relocation/bridging of Airport Loop Road and the NLVR, as well as potentially affect the International Terminal s commercial vehicle hold lot. Draft Recommended Plan [8]

10 Safety Area, Airfield Access, and Other Improvements Several non-standard runway safety areas, airfield vehicular signage, and other conditions have been reviewed for potential correction. Runway and taxiway closures will be required during implementation of proposed improvements. Draft Recommended Plan [9]

11 Concourse D Holdrooms Expansion The Master Plan facility requirements identified holdroom size deficiencies on Concourse D primarily resulting from the narrow concourse width. Options to remedy this deficiency include widening of the concourse and/or the development of nodes for consolidating non-holdroom space. West Build Out: Quarter Points: Draft Recommended Plan [10]

12 PlaneTrain Turnback Relocation The Master Plan analysis has identified capacity shortfalls in the PlaneTrain system in the 10- to 20-year timeframe. Moving the Domestic Terminal turnback location to the west side of the baggage claim station was determined to be the preferred option for expanding PlaneTrain capacity. This development will require construction in the area beneath the MARTA station, Ground Transportation Center, and SkyTrain Terminal station. An estimated 14 additional APM cars would be required to realize the additional capacity resulting from the turnback relocation. Draft Recommended Plan [11]

13 Renewal and Replacement Projects The Domestic Terminal, Concourse T, and Concourses A-D opened in their respective original configurations in the early 1980s. Concourse E was added in 1994 and the International Terminal opened in While the majority of these facilities have undergone major renovation and/or rehabilitation in the last 30 years, they will continue to be subject to on-going work during the planning horizon. This initial list contains on-going projects, those that are planned to begin shortly, and projects expected to be undertaken based on similar past projects. EDS Recapitalization Runway 9L-27R Reconstruction Annual Taxiway Reconstruction and Repairs Program City North Ramp Reconstruction Annual Non-AOA Roadways Reconstruction Program Annual Sanitary Sewer Program PlaneTrain Capital Asset Replacement Program SkyTrain Capital Asset Replacement Program Domestic Terminal through Concourse D Modernization Program International Terminal Parking Structures Maintenance Program Domestic Terminal Parking Structures Maintenance Program Fire Training Facility Capital Asset Replacement Program ARFF Stations Maintenance Program Other DOA Outbuildings Maintenance Program Central Utility Plants Maintenance Program Aerial Roadway/Airfield Maintenance Program Airfield Marking/Signage Replacement Program Sustainability Projects Aircraft Parking Position Reconstruction Program DOA and Federal Agencies Offices Optimization Roofs Replacement Program Roadway Signage Replacement Program CPTC Infrastructure Replacement Program Airfield Infrastructure Renewal Program Facility Modifications Dictated by Changes in Federal Policy Other specific airline projects Draft Recommended Plan [12]

14 South Departure Curb The Master Plan identified Domestic Terminal South inner departure curb capacity issues beginning in the near-term. Operational concepts are currently being investigated to mitigate these issues, with the potential that longer term fixes could include development of elevated walkways connecting the Domestic Terminal to the parking decks when they are redeveloped eliminating pedestrian/vehicle interactions. Impacts would include temporary lane closures and the need for driver notifications. Draft Recommended Plan [13]

15 Domestic Terminal Area Parking Development The Master Plan facility requirements have identified capacity constraints in the existing Domestic Terminal parking facilities, with those being primarily the North and South parking decks. Additionally, the North and South decks are nearing the end of their useful life, requiring both decks be reconstructed. Also, parking lost due to other projects (primarily the Runway 9L endaround taxiway) must be replaced. Implementation would result in temporary loss of structure and surface parking, pedestrian detours, and temporary lane closures. Employee Parking Department of Aviation policy decisions regarding the desire to provide employee parking for concessionaires, airline, and governmental agencies may dictate the need to develop on-site employee parking. No project impacts have been identified. Draft Recommended Plan [14]

16 South Cargo Expansion/Reconfiguration The Master Plan identified the potential need for additional cargo capacity for all-cargo/freighter carriers in the mid- to long-term. Should the closely-spaced runway be implemented, its construction will impact existing Cargo Buildings A and D requiring reconfiguration of these two buildings. Reconfiguration concepts have been developed that consider use of the City South Hangar site for additional cargo facilities. Implementation would require the demolition of City South Hangar and displacement of employee parking facilities. Flight Kitchens The Master Plan has identified flight kitchen capacity issues in the near to mid-term. No project impacts have identified. Draft Recommended Plan [15]

17 LONG RANGE DEVELOPMENT PLAN The following projects are currently anticipated to be needed between 2021 and North Cargo Relocation and Expansion Facility age and layout inefficiencies of the North Cargo building will necessitate reconstruction during the mid- to long-term. In order to mitigate the impacts of reconstruction of these operating facilities, consideration of redevelopment of the north cargo facilities at a site south of Runway 9R-27L is proposed. The existing North Cargo site would be redeveloped at a future date, potentially accommodating facilities impacted by east gate development. North Cargo Relocation and Expansion at this site would impact support facilities including DOA Safety and Training, K-9 Training, and Gate Gourmet International. A number of FAA facilities would also be affected. Airport Maintenance The Master Plan identified the need to consolidate airport maintenance facilities that are currently accommodated in a number of locations around the Airport, some of which would be impacted by the closely-spaced runway and east gate development. No project impacts have been identified. Draft Recommended Plan [16]

18 New Runway 10L-28R (Closely-Spaced) The Master Plan has identified the need for additional aircraft delay reduction within the 20-year planning period. Development of Runway 10L-28R would be expected to provide incremental operational capacity by eliminating mixed use of existing Runway in high demand periods and allowing independent arrival/departure operations on this runway pair. Additionally, some limited benefits would be expected under existing air traffic rules in instrument conditions, with potentially more benefits realized under future FAA NextGen initiatives. Impacts are anticipated to existing facilities, including Riverdale Road, Tech Campus, Airport Maintenance, South Cargo, and a number of off-airport properties and facilities. Draft Recommended Plan [17]

19 East Gate Development Development of new gates on a site east of the International Terminal has been identified as the preferred approach. Depending on the development concept selected, several facility relocations will be required prior to gate development. These could include the Delta cargo facilities, flight kitchens, GSE maintenance, and various DOA/AATC airfield maintenance facilities. Terminal Facility Capacity Domestic Security Screening Queue North Baggage Claim International Check-in Post Security Concessions The Master Plan identified several terminal facility components that might experience capacity issues in the long-term, but that are highly dependent on passenger characteristics, airline policies, state of technology, and TSA requirements that could change in the future. These facilities should be monitored to determine the ultimate need for expansion. Draft Recommended Plan [18]

20

Airport Master Plan Demand/Capacity Analysis and Facility Requirements Summary

Airport Master Plan Demand/Capacity Analysis and Facility Requirements Summary Hartsfield-Jackson Atlanta International Airport Airport Demand/Capacity Analysis and Facility Requirements Summary PREPARED FOR: City of Atlanta, Department of Aviation PREPARED BY: RICONDO & ASSOCIATES,

More information

LONG-TERM INFRASTRUCTURE DEVELOPMENT PLAN

LONG-TERM INFRASTRUCTURE DEVELOPMENT PLAN Louis Armstrong New Orleans International Airport LONG-TERM INFRASTRUCTURE DEVELOPMENT PLAN April 2013 TABLE OF CONTENTS 03. INTRODUCTION 04. PURPOSE AND NEED 06. ALTERNATIVES ANALYSIS 10. KEY ELEMENTS

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities A new terminal opened in September 2005 at the Southwest Florida International Airport (RSW), replacing the 17-gate original terminal that opened in 1983. The $438 million Midfield

More information

MASTER PLAN PREPARATION

MASTER PLAN PREPARATION Located in the East Valley of the Phoenix Metropolitan Area, Phoenix-Mesa Gateway Airport is a former military airfield that has successfully made the transition to a full service commercial passenger

More information

Existing Facilities. Current and Forecast Demand

Existing Facilities. Current and Forecast Demand Existing Facilities JIA is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual Service Volume (ASV) of the runway

More information

The Port of Oakland executed various settlement

The Port of Oakland executed various settlement Executive Summary 1 The executive summary provides a brief summary of the master plan for Oakland International Airport (OAK). It has the following sections: Background and Overview Background The Port

More information

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016. Public Notice of Application for Authority to Impose and Use Passenger Facility Charges (PFCs) at EWR, LGA, JFK and SWF and Amendment to Approved PFC Applications at EWR, LGA, and JFK The Port Authority

More information

What is a Sustainable Airport Master Plan?

What is a Sustainable Airport Master Plan? What is a Sustainable Airport Master Plan? In 2014, the Port of Seattle launched a Sustainable RAPID GROWTH IN RECENT YEARS Airport Master Plan to identify how to best serve Washington s growing air transport

More information

Los Angeles International Airport North Airfield Assessment

Los Angeles International Airport North Airfield Assessment Appendix H-3 LAX SPECIFIC PLAN AMENDMENT STUDY REPORT Los Angeles International Airport North Airfield Assessment May 2007 Prepared for: Los Angeles World Airports One World Way Los Angeles, California

More information

Emerging Challenges in the Master Planning Process Airport Master Plans: Standing the Test of Time. Doug Trezise Ricondo & Associates, Inc.

Emerging Challenges in the Master Planning Process Airport Master Plans: Standing the Test of Time. Doug Trezise Ricondo & Associates, Inc. Emerging Challenges in the Master Planning Process Airport Master Plans: Standing the Test of Time Doug Trezise Ricondo & Associates, Inc. Outline Industry Changes Passenger Characteristics Comprehensive

More information

COMMERCIAL AND GENERAL AVIATION

COMMERCIAL AND GENERAL AVIATION Existing Facilities Melbourne International Airport is served by three runways and a number of airside and landside facilities. The runways include Runway 05/23 (3,001 feet long by 75 feet wide), Runway

More information

INTRODUCTION 1. OVERVIEW

INTRODUCTION 1. OVERVIEW INTRODUCTION 1. OVERVIEW This study provides a comprehensive look at the facilities of the Newport News/Williamsburg International Airport (PHF). It describes infrastructure plans that meet future aviation

More information

Welcome! To the. Public Open House

Welcome! To the. Public Open House Welcome To the Public Open House What is an Environmental Assessment? An Environmental Assessment (EA) is a concise document used to describe a proposed action s anticipated environmental impacts. The

More information

COMMERCIAL AND GENERAL AVIATION

COMMERCIAL AND GENERAL AVIATION Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 7L/25R (10,500 feet long by 150 feet wide),

More information

Construction Management Association of America San Diego Chapter

Construction Management Association of America San Diego Chapter Construction Management Association of America San Diego Chapter An Overview of 2015-2019 Capital Improvement Program Presented by: Iraj Ghaemi, P.E., Director Facilities Development November 13, 2014

More information

Master Plan Study Update OKI Regional Planning Forum February 24, 2012. Get here. Get there. Get home.

Master Plan Study Update OKI Regional Planning Forum February 24, 2012. Get here. Get there. Get home. Master Plan Study Update OKI Regional Planning Forum February 24, 2012 1 Agenda Master Plan Process Forecast Review Terminal Area Alternatives Discussion Next Steps 2 Forecast Discussion Baseline Forecast

More information

Statement of Work (SOW) RFQI No. 1-15-C005

Statement of Work (SOW) RFQI No. 1-15-C005 Statement of Work (SOW) RFQI No. Architectural / Engineering (A/E) Design Services FOR TERMINAL B/C LONG -TERM REDEVELOPMENT PROGRAM AT Ronald Reagan Washington National Airport METROPOLITAN WASHINGTON

More information

Strategic Business Plan

Strategic Business Plan Williams Gateway Airport Authority Strategic Business Plan Fiscal Years 2011-2015 Adopted May 24, 2010 by the Phoenix-Mesa Gateway Airport Authority Board of Directors Page 2 TABLE OF CONTENTS Purpose...4

More information

2006 Report Card for Pennsylvania s Infrastructure

2006 Report Card for Pennsylvania s Infrastructure AVIATION C- 2006 Report Card for Pennsylvania s Infrastructure Philadelphia International Airport (PHL) is currently one of the fastest growing airports in the world. It is also one of the most delay-prone

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGES

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGES NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGES Pinellas County is providing an opportunity for public comment until January 22, 2016 related to our proposed new Impose and

More information

Total aircraft operations (take offs and landings) were down 5.1% to 19,232 compared to July 2012 and down 4.9% to 119,205 calendar year to date.

Total aircraft operations (take offs and landings) were down 5.1% to 19,232 compared to July 2012 and down 4.9% to 119,205 calendar year to date. PORTLAND INTERNATIONAL AIRPORT UPDATE TO: FROM: PDX Community Advisory Committee Vince Granato, Chief Operating Officer DATE: September 18, 2013 BUSINESS UPDATE Airport Activity: PDX just completed the

More information

Manhattan Regional Airport Terminal Area Master Plan Executive Summary 2011

Manhattan Regional Airport Terminal Area Master Plan Executive Summary 2011 Manhattan Regional Airport Terminal Area Master Plan Executive Summary 2011 Manhattan Regional Airport Terminal Area Master Plan Executive Summary 2011 This Executive Summary encapsulates the key findings

More information

ITEM NO: 7c_supp. DATE OF MEETING: March 24, 2015 SEA-TAC AIR CARGO. March 24, 2015

ITEM NO: 7c_supp. DATE OF MEETING: March 24, 2015 SEA-TAC AIR CARGO. March 24, 2015 ITEM NO: 7c_supp. DATE OF MEETING: March 24, 2015 SEA-TAC AIR CARGO March 24, 2015 Briefing overview Sea-Tac air cargo overview Historical trends Air cargo business development Existing facilities Capital

More information

Master Plan Update. Public Information Meeting George Bush Intercontinental Airport. February 17, 2015

Master Plan Update. Public Information Meeting George Bush Intercontinental Airport. February 17, 2015 Master Plan Update George Bush Intercontinental Airport February 17, 2015 Agenda Introduction Requirements Recommendations Airfield Passenger Terminal Roadways Environmental considerations Next steps 2

More information

> Current Operations & Business Context. Bankstown Airport Master Plan 2004/05. Bankstown Airport / Master Plan > 29

> Current Operations & Business Context. Bankstown Airport Master Plan 2004/05. Bankstown Airport / Master Plan > 29 Bankstown Airport Master Plan 2004/05 Bankstown Airport / Master Plan > 29 8.1 Bankstown Airport s Role in the Sydney Basin Bankstown Airport is the premier GA airport in NSW. In addition to servicing

More information

Bozeman Yellowstone International Airport Media Guide

Bozeman Yellowstone International Airport Media Guide Bozeman Yellowstone International Airport Media Guide www.bozemanairport.com 1 Bozeman Yellowstone International Airport Media Guide The goal of public relations staff at the Bozeman Yellowstone International

More information

RFP039-11 - Presentation / Question and Answer Session to: Gwinnett County Officials on Briscoe Field. Tuesday, May 1, 2012

RFP039-11 - Presentation / Question and Answer Session to: Gwinnett County Officials on Briscoe Field. Tuesday, May 1, 2012 RFP039-11 - Presentation / Question and Answer Session to: Gwinnett County Officials on Briscoe Field Tuesday, May 1, 2012 RP039-11 May 1, 2012 Interview Questions Questions posed to Propeller Airports

More information

LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN

LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN Lubbock Preston Smith International Airport has prepared this Emergency Contingency Plan pursuant to 42301 of the FAA Modernization

More information

S-2a. Supplemental On-Airport Surface Transportation Technical Report

S-2a. Supplemental On-Airport Surface Transportation Technical Report Technical Report LAX Master Plan Supplement to the Draft EIS/EIR S-2a. Supplemental On-Airport Surface Transportation Technical Report June 2003 Prepared for: Los Angeles World Airports U.S. Department

More information

Hartsfield-Jackson Atlanta International Airport s

Hartsfield-Jackson Atlanta International Airport s Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,

More information

CHARLESTON INTERNATIONAL AIRPORT IRREGULAR OPERATIONS (IROP)/AIRPORT TARMAC DELAY CONTINGENCY PLAN

CHARLESTON INTERNATIONAL AIRPORT IRREGULAR OPERATIONS (IROP)/AIRPORT TARMAC DELAY CONTINGENCY PLAN CHARLESTON INTERNATIONAL AIRPORT IRREGULAR OPERATIONS (IROP)/AIRPORT TARMAC DELAY CONTINGENCY PLAN Paul Campbell Director of Airports 843.767.7000 pcampbell@chs airport.com IRREGULAR OPERATIONS (IROP)/AIRPORT

More information

The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect

The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect Form follows PerFormance FKI Headquarters Tower Exterior Wall FKI Headquarters Tower Exterior Wall Energy Collection FKI Headquarters

More information

Welcome. Pemberton Regional Airport Planning Continuum. and opportunities for dialogue 2005 2006 2007 2008 2009... PEMBERTON REGIONAL AIRPORT

Welcome. Pemberton Regional Airport Planning Continuum. and opportunities for dialogue 2005 2006 2007 2008 2009... PEMBERTON REGIONAL AIRPORT Welcome. The Village of Pemberton is initiating a community process on the future potential of the Pemberton Regional Airport and wants to hear from you! The purpose of this engagement is to: Communicate

More information

SAN FRANCISCO INTERNATIONAL AIRPORT REUBEN HALILI TERMINAL 1 PROGRAM MANAGER

SAN FRANCISCO INTERNATIONAL AIRPORT REUBEN HALILI TERMINAL 1 PROGRAM MANAGER SAN FRANCISCO INTERNATIONAL AIRPORT REUBEN HALILI TERMINAL 1 PROGRAM MANAGER Center for Innovation in the Design and Construction Industry (CIDCI) Forum September 20, 2013 Annual Enplanements (in thousands)

More information

* Purchase and installation of over 200 charging stations for airline-owned and operated electric Ground Support Equipment (egse)

* Purchase and installation of over 200 charging stations for airline-owned and operated electric Ground Support Equipment (egse) In an effort to reduce air emissions and save on fuel costs, PHL sought funding through the FAA s Voluntary Airport Low Emissions (VALE) program to cover 75% of the costs of the following projects, resulting

More information

2013 Strategic Business Plan

2013 Strategic Business Plan 2013 Strategic Business Plan November 2013 Table of Contents 1. Introduction 1.1 Background 3 1.2 Purpose and Scope 6 1.3 Acknowledgement 7 2. Strategic Vision 2.1 H.C.A.A Mission, Vision and Goals 8 3.

More information

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting January 6, 2015

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting January 6, 2015 PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting January 6, 2015 DATE: TO: FROM: Michael Ehl, Director Airport Operations Wayne Grotheer, Director Aviation Project Management

More information

BROWARD COUNTY AVIATION DEPARTMENT NORTH PERRY AIRPORT. MINIMUM STANDARDS for COMMERCIAL AERONAUTICAL ACTIVITES

BROWARD COUNTY AVIATION DEPARTMENT NORTH PERRY AIRPORT. MINIMUM STANDARDS for COMMERCIAL AERONAUTICAL ACTIVITES BROWARD COUNTY AVIATION DEPARTMENT NORTH PERRY AIRPORT MINIMUM STANDARDS for COMMERCIAL AERONAUTICAL ACTIVITES I. STATEMENT OF PURPOSE A. These Minimum Standards are published pursuant to Chapter 2, "Airports

More information

Sixteenth Meeting of the Cross Polar Trans East Air Traffic Management Providers Work Group (CPWG/16) (Ottawa, Canada 3-6 December 2013)

Sixteenth Meeting of the Cross Polar Trans East Air Traffic Management Providers Work Group (CPWG/16) (Ottawa, Canada 3-6 December 2013) CPWG/16 IP/19 03/12/13 Sixteenth Meeting of the Cross Polar Trans East Air Traffic Management Providers Work Group (CPWG/16) Agenda Item 5: Status on CPWG/15 Actions (Ottawa, Canada 3-6 December 2013)

More information

UUv1 BOARD OF AIRPORT COMMISSIONERS REPORT TO THE

UUv1 BOARD OF AIRPORT COMMISSIONERS REPORT TO THE twitvnn Approval -COY UUv1 Approved by: Dave Jones Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS p rt1p"roperty and Concession Services Meeting Date: 7/20/2016 Reviewed by. Debbie

More information

10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter

10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter 10 Aviation Element 10.1 Introduction 10.1.1 Purpose of Chapter This chapter provides the aviation element of the RFATS 2035 Long Range Transportation Plan. It describes the existing conditions and trends

More information

AIRPORT PLANNING & DEVELOPMENT CONSULTING. Aviation and Airport Consultants With Global Reach & Perspective

AIRPORT PLANNING & DEVELOPMENT CONSULTING. Aviation and Airport Consultants With Global Reach & Perspective AIRPORT PLANNING & DEVELOPMENT CONSULTING Aviation and Airport Consultants With Global Reach & Perspective Aviotec International is a professional consulting services firm offering aviation and airport

More information

Department of Aviation Fiscal Year 2014 Budget Book

Department of Aviation Fiscal Year 2014 Budget Book Department of Aviation Fiscal Year 2014 Budget Book Department of Accounting and Finance Table of Contents Table of Contents General Manager s Message... 1 Executive Summary... 3 Airport Overview... 3

More information

WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010

WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010 WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010 TABLE OF CONTENTS WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN

More information

WATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION

WATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION WATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION 1. PURPOSE. This Advisory Circular (AC) provides guidance for the selection of a water source and standards for the design

More information

Charlotte County Airport

Charlotte County Airport Charlotte County Airport Origin Originally acquired by Charlotte County in early 1940s County leased the property to the US Army during WWII Army improvements were deeded back to the County as Surplus

More information

COLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary

COLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary COLUMBUS REGIONAL AIRPORT AUTHORITY Economic Impact Study Update Executive Summary November 2012 INTRODUCTION Hearing a plane overhead is an everyday occurrence. But how many people stop to think that

More information

3.0 FACILITY REQUIREMENTS

3.0 FACILITY REQUIREMENTS 3.0 FACILITY REQUIREMENTS This chapter identifies the facility requirements necessary to meet existing and forecast airport requirements, satisfy FAA design standards, and improve safety. The facility

More information

Parsons Aviation People and power to move the world.

Parsons Aviation People and power to move the world. Parsons Aviation People and power to move the world. No boundaries. It s been almost a century since the first commercial flight, yet the ascent from land to sky still has the power to astound. Parsons,

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 INTRODUCTION CHAPTER 3 ALTERNATIVES CONSIDERED The existing Afton Airport parallel taxiway, with its approximate 4,360 foot length, only accommodates one half of the runway s length, and is too short

More information

OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES

OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES Revised June, 2012 1 OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES TABLE OF CONTENTS

More information

Economic Impact of The Charleston International Airport Complex

Economic Impact of The Charleston International Airport Complex Economic Impact of The Charleston International Airport Complex Conducted by: Center for Business Research Charleston Metro Chamber of Commerce PO Box 975, Charleston SC 940 January 05 Economic Impact

More information

Analytics That Allow You To See Beyond The Cloud. By Alex Huang, Ph.D., Head of Aviation Analytics Services, The Weather Company, an IBM Business

Analytics That Allow You To See Beyond The Cloud. By Alex Huang, Ph.D., Head of Aviation Analytics Services, The Weather Company, an IBM Business Analytics That Allow You To See Beyond The Cloud By Alex Huang, Ph.D., Head of Aviation Analytics Services, The Weather Company, an IBM Business Table of Contents 3 Ways Predictive Airport Analytics Could

More information

Abraham Lincoln Capital Airport Springfield, Illinois

Abraham Lincoln Capital Airport Springfield, Illinois Abraham Lincoln Capital Airport Springfield, Illinois A braham Lincoln Capital Airport in Springfield, Illinois, is home to the Airport Commerce Park. Owned and operated by the Springfield Airport Authority,

More information

CRQ MASTER PLAN Public Workshop #2 CRQ MASTER PLAN Public Workshop #2

CRQ MASTER PLAN Public Workshop #2 CRQ MASTER PLAN Public Workshop #2 CRQ MASTER PLAN May 7, 2014 Overview/Agenda Welcome & Introductions Where we are Facility Requirements Optimum Targets Remaining within existing property limits Format of Workshop Station 1: Master Plan

More information

HILLSBOROUGH COUNTY AVIATION AUTHORITY FINANCIAL STATEMENTS, OTHER FINANCIAL INFORMATION AND COMPLIANCE REPORTS

HILLSBOROUGH COUNTY AVIATION AUTHORITY FINANCIAL STATEMENTS, OTHER FINANCIAL INFORMATION AND COMPLIANCE REPORTS FINANCIAL STATEMENTS, OTHER FINANCIAL INFORMATION AND COMPLIANCE REPORTS YEARS ENDED SEPTEMBER 30, 2015 AND 2014 TABLE OF CONTENTS YEARS ENDED SEPTEMBER 30, 2015 AND 2014 INDEPENDENT AUDITORS REPORT 1

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Info NEWS MEDIA GUIDE

Info NEWS MEDIA GUIDE Info Office of Public Affairs Miami-Dade Aviation Department P.O. Box 592075 Miami, Florida 33159 Phone: (305) 876-7017 Fax: (305) 869-1270 www.iflymia.com NEWS MEDIA GUIDE Table of Contents Introduction.............................

More information

LaGuardia Airport Central Terminal Building Replacement Project

LaGuardia Airport Central Terminal Building Replacement Project LaGuardia Airport Central Terminal Building Replacement Project Project Briefing Book for RFQ #31224 October 26, 2012 1 The information contained herein has been provided as general information only. The

More information

Under Section: II Required Services: Under Section: III Leased Premises:

Under Section: II Required Services: Under Section: III Leased Premises: May 14, 2012 The following are submitted in response to questions and for clarification. Under Section: II Required Services: 4. Maintenance, repair, and servicing of aircraft: Please clarify that the

More information

Welcome from Aviation General Manager Louis E. Miller

Welcome from Aviation General Manager Louis E. Miller Welcome from Aviation General Manager Louis E. Miller Welcome to Hartsfield-Jackson Atlanta International Airport, the world s busiest airport, with nearly 90 million passengers annually. You could not

More information

Airline Fleet Planning Models. 16.75J/1.234J Airline Management Dr. Peter P. Belobaba April 10, 2006

Airline Fleet Planning Models. 16.75J/1.234J Airline Management Dr. Peter P. Belobaba April 10, 2006 Airline Fleet Planning Models 16.75J/1.234J Airline Management Dr. Peter P. Belobaba April 10, 2006 Lecture Outline Fleet Planning as part of Strategic Planning Process Airline Evaluation Process Approaches

More information

McCarran International Airport

McCarran International Airport McCarran International Airport Background Within Southern Nevada s tourism-based economy, perhaps no single element of the region s tourism infrastructure is more critical than McCarran International Airport

More information

CHAPTER 7 - FINANCIAL PLAN

CHAPTER 7 - FINANCIAL PLAN 7.01 General CHAPTER 7 - FINANCIAL PLAN This chapter presents a financial plan to assist with future capital improvements and provide a guide for implementing the development of Cuyahoga County Airport.

More information

CHAPTER 8 - FINANCIAL PLAN

CHAPTER 8 - FINANCIAL PLAN 8.01 General CHAPTER 8 - FINANCIAL PLAN This chapter presents a financial plan to support capital improvement decisions and to serve as a guide for orderly development of Erie International Airport. It

More information

Air Support services are centred on four core practice areas, as indicated below and briefly described later on.

Air Support services are centred on four core practice areas, as indicated below and briefly described later on. Mission Statement Air Support is an aviation engineering and consulting company operating in the Italian, European, Africa end South America markets. Air Support is specialized in providing key aviation

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Transportation Management at Suvarnabhumi Airport

Transportation Management at Suvarnabhumi Airport Transportation Management at Suvarnabhumi Airport Public Transportation Center AOT. has expressed its concerns on Transportation services by setting up Public Transportation center as a business unit to

More information

2012-2016 Draft Plan of Finance

2012-2016 Draft Plan of Finance A. Introduction 2012-2016 Draft Plan of Finance In 2011, the Port continued to navigate through the economic uncertainty and volatility that has plagued both the national and global economies. High unemployment

More information

CONTE NTS 1. INTRODUCTION

CONTE NTS 1. INTRODUCTION In association with HNTB Corporation Alcantar & Associates, LLC Cephas, Inc. David Evans and Associates, Inc. DKS Associates NEXTOR Parametrix Synergy Consultants, Inc. Zimmer Gunsul Frasca Architects,

More information

8 CELL PHONE LOT. 8.1 Background. 8.2 Previous Studies. 8.3 Facility Size/Configuration

8 CELL PHONE LOT. 8.1 Background. 8.2 Previous Studies. 8.3 Facility Size/Configuration 8 CELL PHONE LOT 8.1 Background Cell phone lots provide short term parking in which drivers (or meeters) wait for a cellular call from an arriving passenger prior to approaching the deplaning curbside

More information

"AAAC" shall mean the Airline Airport Affairs Committee.

AAAC shall mean the Airline Airport Affairs Committee. RATES AND CHARGES FOR THE USE OF TERMINAL FACILITIES AT LOS ANGELES INTERNATIONAL AIRPORT PURSUANT TO THE LOS ANGELES INTERNATIONAL AIRPORT PASSENGER TERMINAL TARIFF, AS IT MAY BE AMENDED FROM TIME TO

More information

Five Year Capital Plan

Five Year Capital Plan Five Year Capital Plan Fiscal Year 2010/11 Fiscal Year 2014/15 Business and Finance Division Five-Year Capital Plan Fiscal Year 2010-11 Fiscal Year 2014-15 3 Table of Contents 1. Executive Summary...1

More information

All questions regarding the operation and policies of the Airport should be directed to the Airport Public Affairs Department:

All questions regarding the operation and policies of the Airport should be directed to the Airport Public Affairs Department: APPENDIX E - NEWS MEDIA PROCEDURES All questions regarding the operation and policies of the Airport should be directed to the Airport Public Affairs Department: Division of Aviation Philadelphia International

More information

Nanaimo Airport Business Plan Summary June 2007 EXECUTIVE SUMMARY

Nanaimo Airport Business Plan Summary June 2007 EXECUTIVE SUMMARY Introduction EXECUTIVE SUMMARY The Nanaimo Airport Commission (NAC) engaged Jacobs Consultancy Canada Inc. (JC) to develop a Business Plan for the airport. The Business Plan incorporates the findings of

More information

Aerodrome Advisory Circular

Aerodrome Advisory Circular Aerodrome Advisory Circular AC(AD) NO-13 Integration of International Aviation Security (AVSEC) Measures into Designs and Constructions of New Facilities and alterations to Existing Facilities. CIVIL AVIATION

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

Atlanta City Council Finance Committee February 13, 2013

Atlanta City Council Finance Committee February 13, 2013 Atlanta City Council Finance Committee February 13, 2013 1 Presentation Studies/Analysis Phase I Master Plan Analysis of Entire GWCC Campus Phase II Master Plan Develop a solution for renovation of existing

More information

Nate Smith Executive Vice President DFW International Airport DALLAS/FORT WORTH INTERNATIONAL AIRPORT

Nate Smith Executive Vice President DFW International Airport DALLAS/FORT WORTH INTERNATIONAL AIRPORT Nate Smith Executive Vice President DFW International Airport DALLAS/FORT WORTH INTERNATIONAL AIRPORT DFW Airport: Connecting the World In four decades of existence, DFW has grown into a global super

More information

Snohomish County Airport Paine Field

Snohomish County Airport Paine Field Snohomish County Airport Paine Field PUGET SOUND REGIONAL COUNCIL AND THE REGIONAL AIRPORT SYSTEM The Puget Sound Regional Council (PSRC) is the planning agency for the central Puget Sound region, which

More information

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,

More information

Runway Scheduling Limits Summer 2017

Runway Scheduling Limits Summer 2017 Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT AIRPORT ADVISORY COMMITTEE. Minutes from the April 3, 2008 meeting Piedmont Conference Room 8:00 a.m.

CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT AIRPORT ADVISORY COMMITTEE. Minutes from the April 3, 2008 meeting Piedmont Conference Room 8:00 a.m. CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT AIRPORT ADVISORY COMMITTEE Minutes from the April 3, 2008 meeting Piedmont Conference Room 8:00 a.m. Present Stan Campbell, Chair Diane Carter, Vice Chair Charlie

More information

LOGAN TERMINAL B SUBSTATION UPGRADE

LOGAN TERMINAL B SUBSTATION UPGRADE AIRPORTS LOGAN TERMINAL E AND HEATING PLANT 5 KV AND 15 KV UPGRADES D 2015 Design replacement of two double-ended substations, HVAC upgrades for six substations, upgrades to 400 hertz gate power central

More information

Basic Airport Security Awareness

Basic Airport Security Awareness Basic Airport Security Awareness Mineta San Jose International Airport Training Standards Program Division of Employee Services, Safety & Training Mineta San Jose International Airport Key Points: The

More information

MINNEAPOLIS-ST. PAUL INTERNATIONAL AIRPORT. Lindbergh Terminal Information & Maps

MINNEAPOLIS-ST. PAUL INTERNATIONAL AIRPORT. Lindbergh Terminal Information & Maps MINNEAPOLIS-ST. PAUL INTERNATIONAL AIRPORT Lindbergh Terminal Information & Maps Travelers Assistance/Information Travelers Assistance volunteers provide services to the traveling public and information

More information

Planned Procurement Opportunities Report. August 2014

Planned Procurement Opportunities Report. August 2014 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report August 2014 Prepared by the Procurement Department Planned Procurement Opportunities Report - August 2014 Overview The Planned

More information

Date: 10/10/2014 Initiated by: AAS-100

Date: 10/10/2014 Initiated by: AAS-100 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Pavement Management Program (PMP) Date: 10/10/2014 Initiated by: AAS-100 AC No: 150/5380-7B Change:

More information

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY 3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported

More information

The Authority is required to develop a Strategic Business Plan document after each approved Master Plan.

The Authority is required to develop a Strategic Business Plan document after each approved Master Plan. The Authority is required to develop a Strategic Business Plan document after each approved Master Plan. The Board approved the 2012 Master Plan at the April 2013 Board meeting. The 2013 Strategic Business

More information

Federal Aviation Administration Report on NextGen Performance Metrics Pursuant to FAA Modernization and Reform Act of 2012, H.R. 658, Section 214 2013 Introduction The Next Generation Air Transportation

More information

SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014

SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014 SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014 Traffic Management Plan TABLE OF CONTENTS 1 INTRODUCTION... 1 2 OBJECTIVES... 1 3 APPLICABLE

More information

Application For General Liability Coverage

Application For General Liability Coverage HOLMAN INSURANCE BROKERS LTD. Application For General Liability Coverage Instructions Please read carefully This application form deals with all areas of operations that may require this type of coverage.

More information

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER JUNE 7, 2013 SUBMITTED TO: BOSTON REDEVELOPMENT AUTHORITY ONE CITY HALL SQUARE BOSTON, MA 02201

More information

Terminal - Ashgabat. International Airport. Turkmenistan

Terminal - Ashgabat. International Airport. Turkmenistan Terminal - Ashgabat International Airport Turkmenistan Terminal Ashgabat International Airport Location Location A new passenger terminal building (PTB) and related facilities such as aprons, roads and

More information

Massport, Delta & Terminal A. Presented by Betsy Taylor May 21, 2007

Massport, Delta & Terminal A. Presented by Betsy Taylor May 21, 2007 Massport, Delta & Terminal A Presented by Betsy Taylor May 21, 2007 Topics of the Day Overview of Logan Airport Logan s Physical Challenge Original Project The Revised Lease Financial Structure Logan is

More information

Media Guidelines 2016

Media Guidelines 2016 Media Guidelines 2016 Eugene Airport Media Guide The Goal of public relations staff at the Eugene Airport is to provide all local, state and regional media with accurate and timely information. This media

More information

PROJECT PROPOSAL FOR THE SUPPLY AND OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND

PROJECT PROPOSAL FOR THE SUPPLY AND OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND PROJECT PROPOSAL FOR THE SUPPLY AND INSTALLATION OF A RADAR SYSTEM, CONSTRUCTION OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND PRESIDENTIAL LOUNGE AT BANJUL INTERNATIONAL

More information

Airline Schedule Development

Airline Schedule Development Airline Schedule Development 16.75J/1.234J Airline Management Dr. Peter Belobaba February 22, 2006 Airline Schedule Development 1. Schedule Development Process Airline supply terminology Sequential approach

More information

TERMINAL 2 ANNUAL REPORT 2006/07

TERMINAL 2 ANNUAL REPORT 2006/07 TERMINAL 2 To meet future increases in passenger throughput, in 2006/07 we began the phased opening of a new passenger terminal. A few minutes walk from the existing passenger terminal, Terminal 2 (T2)

More information