BIM Essential Guide. For C & S Consultants



Similar documents
BIM Essential Guide. For BIM Adoption in an Organization

How To Build A Luxury Apartment Complex In London

Geotechnical Building Works (GBW) Submission Requirements

Requirements for Building Application Submission

CHAPTER 2 QUANTITY TAKE-OFF

Page & Turnbull imagining change in historic environments through design, research, and technology

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

Safe & Sound Bridge Terminology

Scope of EN Clarification Document

Quality Control and Quality Assurance Guide

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Olilo's AEC Design Services. SrinSoft Inc, Partners of

BIM Essential Guide. For BIM Execution Plan

Technical Assignment 2 TABLE OF CONTENTS

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

A GUIDEBOOK TO THE CHANGES IN BUILDING CONTROL 2007/2008. Building and Construction Authority

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Practice Note

COMPANY ESTIMATOR BID DAY PHONE NO.

Residential Prototype III. Multi-Story. The Multi-Story. Your connection to ideas + answers. Prepared by: AISC Steel Solutions Center

Machine Foundation Design

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

EAST LYME HIGH SCHOOL

Hunter College school of Social Work Thesis Proposal

SECTION SHEETING, SHORING AND BRACING

Sample Drawing Package for One and Two Family Dwelling Applications

Certification: Building Plans Examiner. Exam ID: B3

Residential Deck Safety, Construction, and Repair

INSTALLATION. General. Important Note. Design. Transport

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 ( N, E)

Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Residential Inspection Guidelines

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

WORK SCOPE. Domains in which we work:

HOUSE BUILDING DIGEST

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

Virginia Approach Spans

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

WI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE

PROJECT COST ESTIMATES & FEASIBILITIES

DEADLINES FOR PROJECTS REQUIRING MANDATORY BIM (BUILDING INFORMATION MODELLING) E-SUBMISSION FOR REGULATORY APPROVAL

The ACR : Advanced Design Features for a Short Construction Schedule

CHECKLIST FOR SUBMISSION Construction Productivity Awards - Projects 2015

KIEWIT CM/GC Enabling/Utilities

Code of Standard Practice for Timber Frame Structures

Discussion on Products under the Scope of EN and proposed CEN/TR to clarify the scope

Chapter 3 Pre-Installation, Foundations and Piers

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Singapore, 31 July 2013 The Building and Construction Authority (BCA) has organised a new competition to encourage more innovative ideas on mobile

Professional Engineers Providing Structural Engineering Services In Buildings

Seattle Public Schools Building Excellence IV Projects Under Construction

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

Buildings Construction Procurement Strategy

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

BUILDING SAFETY UNIT

d e n v e r a r t m u s e u m

6 RETROFITTING POST & PIER HOUSES

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Construction Technologies Career Field Pathways and Course Structure

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

The unit costs are based on the trend line of the 3 low bids for the average quantity.

Beginning on Friday, Jan 22, and on subsequent investigations, the following issues were identified:

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Lighthouse Engineering, L.L.C.

PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS

What s New in Autodesk Revit 2014

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

9.3 Two-way Slabs (Part I)

METHOD OF STATEMENT FOR STATIC LOADING TEST

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

We shape a safe, high quality, sustainable and friendly built environment.

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

PDmB, Inc. Definitions

Building Control Guidance Note

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

Execution Plan Template Design Modeling

POST AND FRAME STRUCTURES (Pole Barns)

Hanson Building Products. precast basement solutions

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Basic Requirements for Residential Plan Review _

Transcription:

BIM Essential Guide For C & S Consultants

BCA acknowledges the leadership provided by the BIM Steering Committee in support of the production of the BIM Essential Guides The BIM Essential Guides have been drafted by the Centre for Construction IT on behalf of BCA and the BIM Steering Committee. Building and Construction Authority 2013 Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore 059110 www.bca.gov.sg First published August 2013 While every effort has been made to ensure the accuracy and quality of information contained in this publication, the Building and Construction Authority, its employees, agents or industry partners can take no responsibility for the subsequent use of this information, nor for any errors or omissions that it may contain. Cover image and design courtesy of RSP Architects Planners & Engineers (Pte) Ltd and the BCA Academy of the Built Environment. ii

Contents CEO s Message iv ACKNOWLEDGEMENTS v OBJECTIVES 1 Suggested BIM Deliverables 2 Concept Design Stage 3 Understanding ClientRequirements and Design Parameters 3 Schematic Design Stage 4 Preliminary Structural Model 4 Structural Analysis 10 Analytical Model for Foundation Design 10 Analytical Model for Superstructure & Member Design 11 Detailed Design Stage 14 Substructure Modelling Guidelines 14 Superstructure Modelling Guidelines 15 Civil Defence Shelter Modelling Guidelines 22 Expected Output for ST & CD Submissions 23 Collaboration with Other Disciplines 25 Collaboration with Architects 25 Collaboration with Civil Engineers /Registered Surveyors 26 Collaboration with Mechanical, Electrical & Plumbing (MEP) 26 Collaboration with Contractor/Fabricator/Precaster 28 Collaboration with Quantity Surveyors & Facility Managers 28 Others 29 Model version control 29 iii

CEO s Message Dear readers, Building Information Modelling (BIM) has gained much traction in recent years as digital construction technology that will fundamentally transform the building and construction industry practice in the delivery of an excellent built environment. It is a game changing technology that will improve the construction productivity as well as the level of integration and collaboration across the various disciplines in the construction value chain. It is therefore important for the industry to embrace the technology with clarity. The BIM Essential Guides are part of the industry s efforts to demystify BIM and to give clarity on the requirement of BIM usage at different stages of a project. Under the leadership of the BIM Steering Committee chaired by Er Lee Chuan Seng, Emeritus Chairman, Beca Carter, and comprising of leaders in BIM, the BIM Managers Forum has contributed much time and effort to compile the various best practices to make this Guide possible over a short span of time. We would like to thank them for their contribution. We hope that every BIM user can truly reap the benefits of BIM by integrating it into his/her day-to-day workflow from feasibility study to facility management. We hope that BIM users can use these guides as a platform to jumpstart their BIM adoption, before they leap to greater heights, innovating and transforming their workflow. BIM is a journey. We envisage that it will grow with time and will inspire more advanced and innovative use of BIM. I would like to encourage all BIM practitioners to join in this industry effort to grow this Guide into a wealth of BIM knowledge. Dr John Keung iv

ACKNOWLEDGEMENTS BCA would like to acknowledgement the contributions of the following organizations which had provided their valuable inputs in the development of this guide: TY Lin Singapore Arup Singapore AECOM Singapore P & T Consultants ST Architects & Engineers Pte Ltd KTP Consultants RSP Architects and Engineers BECA Carter &Ferner Singapore Ong&Ong Consultants SH Ng Consultants Centre for Construction IT Carrie Chan RupinderWilkhu Corinne Lim Ivy Tay Wan Fook Sing Serene Lim Ho Sing Yee Christina Koh Anthony Chuaheyia AyingaranThevathasan Sonny Andalis Image Credits: Foundation Elements Foundation Elements and Typical Connections Hybrid Structural Detailing Hybrid Structural Detailing Structural BIM Model Structural BIM Model Secondary Structural Elements Model TYLin Singapore RSP Engineers LSW Consulting Engineers JTC Consultants AECOM P&T Consultants CityTech Consultants v

OBJECTIVES The objective of this Essential Guide is to assist C&S (Civil & Structural) to develop models in their BIM project, including New Construction and A&A Projects. It is a graphical guide that shows the possible use-cases of BIM for various Design Stages of the project. This is a general document that covers a few typical buildings and not an extensive document that covers all scenarios that might arise based on specific projects. Users are allowed to edit/change accordingly to suit their needs. This Essential Guide is not based on any particular BIM software and does not cover any explanation or steps on its usage. For help and guide for your specific BIM software, please refer to your software user manual. Based on the project requirement, type and time line choose the BIM use and implement in the project. 1

Suggested BIM Deliverables STAGE SUGGESTED BIM DELIVERABLES (STRUCTURAL ONLY) 1. Preparation & Conceptual Design 2. Schematic Design a. Soil profile & foundation options b. Material use: concrete, steel, aluminium, etc c. Construction method: in-situ, precast, prefab, etc. d. Design code to be used: ACI, BS, EN, etc. a. Preliminary Model based on Architectural Massing models b. Design Criteria / Brief, Framing Options & Alternate Design c. Preliminary structural analytical model d. Preliminary Design Coordination Report b/w Architectural & Structural models e. Preliminary cost estimate for Structural models 3. Detailed Design a. Final Structural Model to produce ST & CD submission drawings b. Final structural analytical model and calculation report c. Clash detection & resolution report b/w Architectural, Structural & MEP d. Spatial Validation Report e. Detailed cost estimate, BOQ, tender docs prepared by QS 4. Construction a. Design Validation Report (depth of piles, temporary structures, site restrictions, etc.) b. RFI Resolution & Constructability Report c. Contractor Model to produce Shop & Fabrication Drawings (rebar & steel) d. Single Services Drawings (SSD) & Combined Services Drawings (CSD) e. Detailed schedule of materials & quantities 5. As Built a. As constructed drawings from Consultant b. Verification checks using laser scanners, survey data, etc 6. Facility Management a. As built Structural Model from Contractor Note: Regulatory BIM e-submissions are excluded from the above list because the timing of submission may vary due to individual project requirements. 2

Concept Design Stage UNDERSTANDING CLIENT REQUIREMENTS AND DESIGN PARAMETERS Both the client and the engineer should reach an understanding on the purpose of BIM to fulfil Client s Requirements. Example of some questions that can be asked to understand the Client s Requirements. What are the overall goals in this BIM project? What are the specific goals that have to be achieved by BIM in this BIM project? What are the possible ways to achieve the specific BIM goals? Is the client aware and agreeable that the design team may use a different way to achieve the specific BIM goals? Suggested BIM Deliverables: 1) Prepare design criteria and project brief 2) Study soil report and explore foundation options. The Qualified Person (QP) the Professional Engineer (PE) shall identify what type of foundation best suit existing soil conditions. 3) Identify material (concrete; steel; timber; aluminium; glass) and grade to be used 4) Identify construction method: in-situ, precast, prefab etc. 5) Identify the code of practice (BS or EN) for structural design 6) Identify the extent of civil/external works but not limited to: road alignment; water supply; sewer and drainage; existing utilities survey; earthworks like soil excavation or backfill and electrical and communication supply enclosures The preliminary Structural BIM Model could be referenced from the Architectural BIM model and serves as a preparation for the Detailed Design stage. Before starting the actual modelling, it is recommended to go through proper planning and preparation. There are no BIM models under this stage. 3

Schematic Design Stage PRELIMINARY STRUCTURAL MODEL The Preliminary Structural Model (PSM) shall be based from the equivalent Architectural BIM model and serves as a reference for the next evolution of into Detailed Design stage. Before starting the actual modelling, it is recommended to go through proper planning and preparation by completing the BIM Execution Plan or BEP. The PSM is suggested to include the following: 1) Initial sizes of all load bearing elements with indicative dimensions. Load bearing elements are defined as supporting a load of the structure above including its own weight shall be modelled. The QP/PE can exclude/ignore all non-load bearing elements like: Doors & Windows Dry Walls Furniture Curtain Systems like glass or precast cladding Roof excluding Trusses Planter Boxes and Drains Prefabricated Bathroom Units (PBU) Bay Windows, Parapets and Ledges Staircase Railings MEP Pipes, Ducts, Cable Trays, Fixtures, Terminals and Fittings Fig. 1: Load Bearing Elements Only 4

2) Foundation elements like the following but not limited to: Bored Piles Spread/Isolated Footing Retaining & Diaphragm Walls Continuous Bored Piles (CBP) Walls Mat Slabs or Raft Foundation Soil Stabilization like Jet Grouting Columns and Micro Piles Fig. 2: Foundation Elements (Image courtesy of RSP) Fig. 3: Continuous Bored Pile (CBP) wall and Mat Foundation (Image courtesy of TYLin) 5

3) Digital Terrain Model (DTM) showing existing soil conditions and properties; soil contour and profile. Fig. 4: Digital Terrain Model (Image courtesy of CCIT) 4) Design Object Library (DOL) of commonly used elements including unique objects like precast, post-tension and built up steel sections cut from plates. Fig. 5: Structural Objects-Columns and Trusses (Image courtesy of CCIT) 6

5) Modelling of primary load bearing elements: Structural Columns Structural Girders Structural Floors (Suspended, Composite and Precast) Structural Walls Structural Foundations (Grade Beams, Piles & Pile Caps) Tunnel Structures greater than 6.0 meters in depth and 1.0 in diameter Structural Trusses Crane and Hoisting Structures Civil Defence (CD) Shelter Bridge Piers Fig. 6: Capitaland Bedok Mixed Development Model (Image courtesy of AECOM) All objects shall be accurately classified into its correct construction material and category. For example, columns can either be made of reinforced 7

concrete or steel. Category refers to the classification system employed by the BIM authoring tool. Fig. 7: Eco Sanctuary Superstructure Model (Image courtesy of P&T Consultants) For example, avoid defining a column into a wall category. Downstream application like quantity take off and time scheduling are dependent on the defined categories of objects. 6) Modelling Fig. of 8: secondary URA Combined load Services bearing Tunnel elements: (Image courtesy of Parsons Brinckerhoff) 8

Structural Joist Structural Purlin Structural Bracing Staircase (Landing Beams; Stringers and Slabs) Plinth or Equipment Pads Ramps Fig. 9: HDB Lift Upgrading Program (Image courtesy of CityTech Consultants ) Fig. 10: Staircase Elements (Image courtesy of CCIT) 9

Structural Analysis ANALYTICAL MODEL FOR FOUNDATION DESIGN Structural drawings are graphical representations of design calculations to the agreed code of practice as per BCA regulations. During the transition stage both the withdrawn British Standards (BS) and upcoming Euro codes (EN) are accepted. 1. Boundary conditions shall be properly defined in the BIM authoring tool for fixed, pinned and user defined supports like springs. Supports can be point for columns, line for wall footings and area for mat foundation and slab on grade. Fig. 11: Support/Boundary Conditions (Point, Line & Area) 2. Soil springs for piles, earth retaining structures shall be properly modelled based on the existing soil condition as described in the geotechnical report. Fig. 12: Soil Spring Supports 10

ANALYTICAL MODEL FOR SUPERSTRUCTURE & MEMBER DESIGN BCA encourages QP to synchronize the physical models generated by BIM authoring software with the structural analytical models created simultaneously used for member design. 1. All beams shall be modelled span to span to satisfy criteria for unsupported length in the analytical models Fig.?: Soil Spring Supports Fig. 13: Framing Elements span to span (Image courtesy of CSC) 2. All columns shall be modelled by level to satisfy criteria for slenderness ratio in the analytical models Fig. 14: Columns by Storey (Image courtesy of CSC & CCIT) 11

3. Slabs shall be modelled for every panel bounded by beams for proper load transfer. Consideration shall be taken for difference in elevation like drops and mezzanine floors. If slabs are modelled as single elements, care shall be exercised when converting to analytical models to make sure loads are decomposed to tributary magnitudes for triangular and trapezoidal load distributions. Fig. 15: Floor Slab Load Distribution (Image courtesy of CCIT) Fig. 16: Floor Slab Panel by Panel (Image courtesy of CCIT) 12

4. The analytical model created in parallel with the physical models in a BIM authoring software must be fully connected before exporting to 3rd party structural analysis engines. If necessary provide rigid links to connect offset analytical lines to each other. Fig. 17: Beam analytical lines corrected to reflect unsupported length (Image courtesy of CCIT) Fig. 18: Tapered wall analytical lines corrected (Image courtesy of CCIT) 13

Detailed Design Stage SUBSTRUCTURE MODELLING GUIDELINES Temporary works or earth retaining and stabilizing structures (ERSS) but not limited to: 1) Diaphragm & Earth Retaining Structures 2) Walers 3) Cofferdams 4) Piling Platform 5) Trenches and Excavations less than 6.0 in depth 6) Temporary slopes and Stockpiles These structures generally are not required to be modelled unless the structure is intended to be permanently installed and not be disassembled upon completion of the construction. Fig. 19: Temporary Structures (Image courtesy of CCIT) 14

SUPERSTRUCTURE MODELLING GUIDELINES 1. Structural connections can be done in either 3D or 2D details. Connections can be reinforcing bars for concrete; bolts and welds for steel or steel members. For rebar connections: a. Rebar schedules for beam, column, walls and slabs are allowed. Fig. 20: Structural Beam Schedule (Image courtesy of JTC) Fig. 21: Structural Slab & Column Schedule (Image courtesy of RSP) 15

b. Hybrid approach. Element profile generated from BIM objects supplemented with 2D annotations like rebar, dimensions, spacing and curtailment. Fig. 22: Structural Beam Detail (Image courtesy of LSW) Fig. 23: Structural Slab Detail (Image courtesy of JTC) 16

c. 3D rebars is encouraged if featured is available. BIM tools like Tekla Structures, Graitec Advance Concrete, Bentley ProConcrete are able to generate 3D structural connections generated from BIM models. Fig. 24: Structural Beam 3D Rebar (Image courtesy of CCIT) Fig. 25: Structural Staircase and Column 3D Rebar (Image courtesy of CCIT) 17

d. Specialty works like precast rebar and post tension tendons can be submitted as 2D drawings provided by the specialty consultant/contractor. Fig. 26: Revit Precast & Post-Tension Elements (Image courtesy of CCIT) Fig. 27: Nemetschek Allplan Precast Elements (Image courtesy of CCIT) 18

For steel connections: a. Pre-qualified steel connections in 2D CAD can be used using drafting or detailed view. Fig. 28: Structural Steel Connections (Image courtesy of RSP) b. 3D steel connections. If available, it is recommended to use 3D connections showing bolt, weld and composite connections. Suggested details include all openings/penetrations, shear studs, metal deck, and bracing. Fig. 29: Structural Steel Connections 1 (Image courtesy of CCIT) 19

Fig. 30: Structural Steel Connections 2 (Image courtesy of CCIT) Fig. 31: Structural Steel Connections 3 (Image courtesy of CCIT) 20

2. Temporary works like formwork, false work, propping, facade retention, needing, edge protection, temporary bridges, site hoarding & signage, site fencing, scaffolding, tower cranes, loading bays and shoring is not required to be modelled except for structures intended to be permanently installed and not dismantled after construction. 3. Construction/erection sequence is not required to be modelled unless required by the client for special projects. 4. Specialty works like curtain walls, CD shelters, tensile fabric roof etc. can be supplemented with 2D CAD drawings inserted as drafting or detailed views. However, load bearing elements of specialty works shall be modelled. 5. Openings intended for electrical, mechanical, plumbing penetrations are not required to be modelled. However for major penetrations (1/3 of beam depth and or column width; 1.5m for walls and suspended slabs) subject to discretion of the QP/PE, openings for beams, columns, walls and slabs shall be considered. 6. Mechanical and electrical equipments like FCU, antennas, escalator, lifts etc. are not required to be modelled. However, its respective weight shall be considered for loading and equipment pads that support its weight and mitigate vibrations induced while in operation. 7. Structural analytical attributes like member releases, supports conditions, spring coefficients, material grades, loads and load combinations shall be considered if the BIM model is synchronized to create structural analysis and design. 8. Addition and alteration works, only affected members are required to be modelled. 21

CIVIL DEFENCE SHELTER MODELLING GUIDELINES 1. Model elements of the building with CD shelter structure including all concrete & steel members for shelter protection shall be provided (trellis, canopy, ledge, down hang beams, tie beams, shielding walls etc.) 2. Household shelters, storey shelters and staircase storey shelter have to be modelled. 3. Public/transit shelters like MRT are required to be modelled. 4. Transfer structures (beams, slabs & walls) supporting household shelter shall be modelled. Please take note that the use of transfer beam is allowed for household shelter only. 5. All ventilation sleeves openings regardless of size shall be modelled for CD shelter structures. 22

EXPECTED OUTPUT FOR ST & CD SUBMISSIONS 4.1 Structural (ST) Submissions Typical ST e-submission Package 1. Architectural Drawings (for reference) 2. Structural Drawings -General Assemblies (Floor Plan, Elevation, Section, etc) -Schedules (Beam, Column, Slab etc) -Detail Drawings (connections & rebars) 3. Calculations Report -Foundation Design -Global Frame Analysis -Element Design & Sizing -Connections Design (rebars & steel joints) -Manual Calculations Submission Drawings (2D) Calculation Report (2D) Submission Drawings (2D) Calculation Report (2D) BIM Model (3D) BIM Model (3D) Analysis Native File Fig.?: Current and Future BIM e-submission (Image courtesy of CCIT) 23

4.2 Civil Defence (CD) Shelter Submissions Typical CD e-submission Package 1. Storey Shelter Drawings -Floor Plan -Elevation Views -Section Views 2. Typical Connection Rebar Details 3. Typical Structural Penetrations/Openings -Detail of Embedment -Detail of Construction Joints 24

Collaboration with Other Disciplines COLLABORATION WITH ARCHITECTS INPUT FROM OTHER DISCIPLINE Architecture Grids Grids Structure Floor Levels (SFL) not FFL Column position Ceiling Height Walls position Lift position Cladding Room size usage Landscaping (with soil depth / planter sizes, locations) Surface drainage Floor openings Sloped floors / ramps Precast / GRC facades Large hanging lighting features Building maintenance system (e.g. Gondola) DELIVERABLES / OUTPUT FROM C&S MODEL Structure Floor Levels (SFL) Structure Columns Structural Beams Structural Slab Structural Walls Structural Walls Structural Connections Load Case Lad Combinations Structural beams, slabs Structural beams / slabs with drops Structural slabs with openings Structural slabs Structural columns / walls / connections Structural slab Structural supports for BMS system (e.g. Gondola plinths) 25

COLLABORATION WITH CIVIL ENGINEERS /REGISTERED SURVEYORS INPUT FROM OTHER DISCIPLINE Civil Site Plan Site Plan Adjacent Road Adjacent Road Adjacent Properties Boundary Lines Architecture Grids Soil Report Existing Utilities (gas, electrical, water, drainage, sewer, etc) Digital Terrain Model Levels DELIVERABLES / OUTPUT FROM C&S MODEL Adjacent Properties Boundary Lines Architecture & Structure Grids Building Layout Rotate to True North Structural Foundations Structural Foundations Structural Foundations Earthwork volumes COLLABORATION WITH MECHANICAL, ELECTRICAL & PLUMBING (MEP) Mechanical INPUT FROM OTHER DISCIPLINE Penetrations / Openings Layout & Number DELIVERABLES / OUTPUT FROM C&S MODEL Std Detail Drawings for Transfer Structures / Check of structural capacities Lift - same as above - Escalator - same as above - Mechanical Ventilation - same as above - Air Conditioning - same as above - Equipment Weight & Layout Equipment Pads / Plinths Pipe loaded weight, supports, brackets Diesel tank location / size Structural supports / connections Structural support / excavation 26

Lift Pit Depth & Hoisting Hook Weight of chillers volume and retaining system (if underground tank) Structural details (pile cut off levels, slab to take hoisting hook load) Design live loads Electrical Penetrations / Openings Std Detail Drawings for Transfer Structures Equipment Weight Equipment Pads Cable Trays & Hangers Light Fixtures Underground Cables Lightning protection layout Cable Trays & Hanger Supports Lighting Fixture Supports Cable Structural columns / slabs to embed lightning protector Plumbing Penetrations / Openings Std Detail Drawings for Transfer Structures Equipment Weight Equipment Pads Sprinkler positions Potable & Sewer Lines Pipe loaded weight, supports, brackets Water tanks (sprinkler tank, fire tank etc) Rainwater harvesting tanks / piping (if any) Balancing tank for swimming pools (if any) Grease ejector / Ejector / Sump pits Floor traps Sprinkler Supports Pipe Supports Structural supports / connections Structural supports - same as above - - same as above - Pit details Structural slabs with openings 27

COLLABORATION WITH CONTRACTOR/FABRICATOR/PRECASTER INPUT FROM OTHER DISCIPLINE DELIVERABLES / OUTPUT FROM C&S MODEL Contractor 4D Time Structural Model - none - 5D Cost Structural Model - same as above - Existing Underground Utilities Revise structural foundations Existing Soil Conditions - same as above - Formworks Structural BIM Model Fabricators Steel Shop Drawings Centreline of elements Member Forces Member Sizes Support Conditions Bolt Connections Weld Connections Precasters Precast / Post Tension Shop Drawings Centreline of elements Member Forces Member Sizes Support Conditions Tendon Profile Rebar Details Corbel Details COLLABORATION WITH QUANTITY SURVEYORS & FACILITY MANAGERS INPUT FROM OTHER DISCIPLINE DELIVERABLES / OUTPUT FROM C&S MODEL QS Bill of Materials (BOM) Element Classification Unit Cost Analysis Project Costing Fabricators Link to BMS Material Test Result Material Specifications As Built Drawings 28

Others MODEL VERSION CONTROL As the project progresses, consequently is the model change. Model will change according to specific requirements needed in every stage. Few factors of having numerous model versions are as follows: Design Change Authority Submission and Re-submission Model Update Remote Office Locations Different model versions are certain. Managing these versions is the possible option that we may implement to avoid having it. Few recommendations listed below will help all project members to avoid confusion. Organized Folder Structure To implemented office-wide. Saving the specific file on their corresponding location will be helpful for all, and will also reduce the time spent in searching. To avoid duplicating files on their own PC to avoid confusion when working. Backup, Superseded or similar folder name where all backups/ outdated files are located. Archive, Published or similar folder name where all copies of issued files are located. Working, WIP or similar folder name where only one working model (varies on project setup) is located. Keeping One Working Model Project Server to serve as a central location of model, where every team member can access and work. Tekla BIM Server, Revit Server or similar will allow two or more teams located in remote office locations to update their changes to one central file simultaneously. NOTE: RECOMMENDATIONS ARE NOT APPLICABLE TO ALL. THESE VARY DEPENDING ON PROJECT AND OFFICE REQUIREMENTS. 29

This guide is part of the BIM Essential Guide Series BIM Essential Guide For Architectural Consultants For C&S Consultants For M&E Consultants For Contractor Quick Start for BIM Execution Plan Quick Start for BIM Adoption within an Organization FOR EACH BIM PROJECT WITHIN EACH DISCIPLINE ACROSS MULTIPLE DISCIPLINES FOR EACH ORGANIZATION ALL DISCIPLINES For more information and feedback on the BIM Essential Guide Series, please visit the following blog: bimsg.wordpress.com Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore 059110 www.bca.gov.sg 1