BIM Essential Guide. For BIM Execution Plan
|
|
|
- Dylan Washington
- 9 years ago
- Views:
Transcription
1 BIM Essential Guide For BIM Execution Plan
2 BCA acknowledges the leadership provided by the BIM Steering Committee in support of the production of the BIM Essential Guides The BIM Essential Guides have been drafted by the Centre for Construction IT on behalf of BCA and the BIM Steering Committee. Building and Construction Authority 2013 Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore First published August 2013 While every effort has been made to ensure the accuracy and quality of information contained in this publication, the Building and Construction Authority, its employees, agents or industry partners can take no responsibility for the subsequent use of this information, nor for any errors or omissions that it may contain. Cover image and design courtesy of RSP Architects Planners & Engineers (Pte) Ltd and the BCA Academy of the Built Environment. ii
3 Contents CEO s Message ii 1 INTRODUCTION 1 2 STEP BY STEP QUICK GUIDE 2 3 BIM Execution Plan Template 3 Appendix A BIM Use Case Template 5 Appendix B Typical BIM Elements by Discipline 9 (I) Architectural BIM Elements 9 (II) Structural BIM Elements 10 (III) Civil BIM Elements 11 (IV) ACMV BIM Elements 12 (V) Plumbing and Sanitary BIM Elements 13 (VI) Fire Protection BIM Elements 14 (VII) Electrical BIM Elements 14 Appendix C BIM Modelling Guidelines 16 (I) Overview 17 (II) Quality Assurance 18 (III) Architectural BIM Modelling Guidelines 19 (IV) Structural BIM Modelling Guidelines 23 (V) MEP BIM Modelling Guidelines 27 i
4 CEO s Message Dear readers, Building Information Modelling (BIM) has gained much traction in recent years as digital construction technology that will fundamentally transform the building and construction industry practice in the delivery of an excellent built environment. It is a game changing technology that will improve the construction productivity as well as the level of integration and collaboration across the various disciplines in the construction value chain. It is therefore important for the industry to embrace the technology with clarity. The BIM Essential Guides are part of the industry s efforts to demystify BIM and to give clarity on the requirement of BIM usage at different stages of a project. Under the leadership of the BIM Steering Committee chaired by Er Lee Chuan Seng, Emeritus Chairman, Beca Carter, and comprising of leaders in BIM, the BIM Managers Forum has contributed much time and effort to compile the various best practices to make this Guide possible over a short span of time. We would like to thank them for their contribution. We hope that every BIM user can truly reap the benefits of BIM by integrating it into his/her day-to-day workflow from feasibility study to facility management. We hope that BIM users can use these guides as a platform to jumpstart their BIM adoption, before they leap to greater heights, innovating and transforming their workflow. BIM is a journey. We envisage that it will grow with time and will inspire more advanced and innovative use of BIM. I would like to encourage all BIM practitioners to join in this industry effort to grow this Guide into a wealth of BIM knowledge. Dr John Keung ii
5 1 INTRODUCTION The BIM Essential Guide for BIM Execution Plan (BEP) serves to jump start the development of a BEP for a project. The BEP provides a baseline document, approved by the Employer, to guide the project team in achieving goals set with regards to BIM deliverables throughout the project. The BEP specifies the roles and responsibilities of project members when using Building Information Modelling (BIM) at different stages of a project. It contains details with regards to the BIM deliverables and the process through which the deliverables are created, maintained and shared, in order to meet a set of project goals. Typical content of a BEP includes the following: Project information; Project members; Project goals; BIM use cases for each stages of a project; BIM deliverables for each BIM use case, Model author and users for each BIM deliverables; Model elements, level of details and attributes for each BIM deliverable; Process for BIM creation, maintenance, release and collaboration; Technical Environment; and Others The BEP is usually defined at the start of the project and can be updated to accommodate new project members or new uses of BIM. All updates should be made with the permission of the Employer or his appointed BIM Manager. The BEP can be defined by the client, and made reference by the Principal Agreement via the BIM Conditions (see BIM Conditions Version 2 / Essential Guide to BIM Conditions). 1
6 2 STEP BY STEP QUICK GUIDE Users could follow the following steps to define a BIM Execution Plan (BEP) using the various templates and materials found in the Singapore BIM Guide. STEPS DESCRIPTIONS REFERENCES 1 Fill up Project Information in the BEP Template Section 2 2 Fill up Project Members particular in the BEP Template. Confirm the roles of responsibilities of the following at this point o BIM Manager o BIM Coordinators Singapore BIM Guide 3 Define Project Goals for in the BEP Template 4 Define BIM Use Cases for each project phase in the BIM Use Case (BUC) Template Confirm any Value-added BIM Use Cases at this point 5 Confirm BIM Deliverables for each BIM use case in the BUC Template Fill up Author and Users for each BIM Deliverable in the BUC Template Confirm the authoring software used and file exchange format at this point Confirm the File Naming Convention and Model Structure for the deliverables 6 Select BIM Elements for each BIM Deliverable from the BIM Elements by Discipline Table Confirm the Level of detail and non-geometry attributes for each BIM element at this point 7 Define process for model creation, release and collaboration Confirm the quality checks to be performed by BIM Authors before releasing the deliverable Appendix A Singapore BIM Guide Appendix A Singapore BIM Guide Appendix B Singapore BIM Guide Appendix C Singapore BIM Guide 8 Technical Environment Needs Confirm the list of software for the project Confirm share workspaces and databases (if any) to house and share the BIM deliverables 2
7 3 BIM Execution Plan Template Section A: Project Information This section defines basic project information. 1. Project Title: 2. Project Reference Number: 3. Contract Type / Delivery Method: 4. Brief Project Description & Address: Section B: Project Members Details of BIM Manager Contact Contact Name Title Company Phone BIM Manager List of project members and the respective BIM Coordinators and Modellers contacts. Contact Name Title Company Phone BIM Coordinator Section C: Project Goals Describe how BIM is used to achieve specific project goal at different stages of the project Section D: Project Use Cases and Deliverables List of expected BIM use cases and deliverables for each BIM use (see table in Annex A). Include value added use cases and deliverable 3
8 Section E: Author or Users of BIM Deliverables List the author and users for each BIM Deliverable (see table in Annex A) Determine Authoring Software and File Naming Convention and Model Structure for the Deliverables Section F: Model Elements for Each Project Deliverable List of model elements for each deliverables (see tables in Annex B) Confirm the Level of detail and non-geometry attributes for each BIM element Section G: Process for BIM creation, release and collaboration Define Project Flow (see Annex C) with Schedules for BIM Deliverables Release Define how project team will collaborate and coordinate the respective deliverables (see Annex C) Define quality checks performed by BIM Authors before releasing the deliverables Section H: Technological Infrastructure Needs List of software to be used in the project Identify share workspaces and databases (if any) to house and share the BIM deliverables Section O: Attachments
9 Appendix A BIM Use Case Template Conceptual BIM Use Cases Quality: Model with indicative dimensions, area, volume, location and orientation Essential: Create site BIM models for - Site Analysis - Apply an Outline Planning Permission if necessary Expected Deliverable Site Model Author Arc, Str, MEP, QS, Con, FM, Others Users Arc, Str, MEP, QS, RS, Con, FM, Others Essential: Create and compare BIM massing models for - space, areas and volumes study - design alternative study - presentation to client/design reviews Expected Deliverable Massing Models or other 3D Models (e.g. sketch-up) Value-added (optional): please specify Expected Deliverable Please specify Schematic / Preliminary Quality: Models contain generalized building components and systems with approximate dimensions, area, volume, location, orientation and quantity. Non-geometric properties may be provided. Essential: Develop the selected massing models into architectural model for - regulatory submissions (PP, WP) Expected Deliverable Architectural Model for URA submissions Essential: Develop & maintain structural model based on architectural model for - preliminary structural analysis - permit to commence work application Expected Deliverable Structural Model for BCA submission 5
10 BIM Use Cases Essential: Identify main routing and space (plant room & ceiling) clearances for MEP model on top of architectural model for - Preliminary M&E analysis - In preparation for regulatory submission Expected Deliverable Prelim MEP Model Essential: Implement design coordination between the Architectural and Structural Models Expected Deliverables Preliminary Coordination Report Author Arc, Str, MEP, QS, Con, FM, Others Users Arc, Str, MEP, QS, RS, Con, FM, Others Essential: Derive preliminary project cost estimates based on Architectural and Structural BIM Models Suggested Deliverable Preliminary Cost Estimate Value-added (optional): please specify Expected Deliverable Please specify Detailed Quality: Models contain detailed version of generalized building components and systems with accurate dimensions, shape, location, orientation and quantity. Non-geometric properties should be provided. Essential: develop & maintain the Architectural Model for - regulatory submission - tender Expected Deliverable Architectural Model Essential: develop & maintain the Structural Model based official release version of Architectural Model for -, analysis and detailing - In preparation for regulatory submission - In preparation for tender Expected Deliverable Structural Model and Calculation 6
11 BIM Use Cases Essential: Maintain and update the MEP Model, based on the latest Architectural Model -, analysis and detailing - In preparation for regulatory submission - In preparation for tender Expected Deliverable MEP Model and Analysis Essential: Implement design coordination between the Architectural, Structural and MEP Models (before issuing for tender) - Identify element conflicts and interferences - Verify valid headroom and working spaces for building operations and maintenance activities - Penetration conflicts will be addressed Expected Deliverables Clash Detection and Resolution Report Spatial Validation Report Essential: Produce detailed cost estimation and Bill of Quantities (in accordance with the standard method of measurement) based on BIM models. - In preparation for tender Expected Deliverables Detailed Quantity Cost Estimate & BOQ Essential: Tender Preparation Expected Deliverable Tender model and drawings Value-added (optional): please specify Expected Deliverable Please specify Construction Quality: BIM element is modelled with fabrication and assembly details where applicable or useful for construction works; otherwise, details may be represented in 2D CAD drawings to complement the Detailed models Essential: Produce Construction Models from Architectural, Structural and MEP Models. The models will be produced in stages Expected Deliverables Construction Models with Key Services Coordinated Author Arc, Str, MEP, QS, Con, FM, Others Users Arc, Str, MEP, QS, RS, Con, FM, Others 7
12 BIM Use Cases Essential: Produce schedules of materials, areas and quantities from the BIM databases for contractors reference Expected Deliverables Schedules of materials, areas and quantities Essential: Sub-contractors and specialist sub-contractors will generate documents based on the Construction Models Expected Deliverables Shopdrawings Fabrication models and drawings Combined Services Drawings (CSD) Single Services Drawings (SSD) Essential: Contractors should provide the latest record model and drawings to the consultant if the consultant is required to do an amendment submission. Expected Deliverables Record model Record model-generated drawings Other non-bim deliverables Value-added (optional): please specify Expected Deliverable Please specify As-Built Quality: BIM element is similar in level of detail to the Detailed stage, but updated with changes during Construction stage Essential: prepare final As-Built BIM Model to reflect amendments in the Architectural, Structural, MEP models before submitting to the consultants for verification Expected Deliverables Final as-built models for each discipline with the necessary third party certifications Essential: Incorporate operation and maintenance information of major systems and equipment in the BIM model elements for provision to the Facility Manager Expected Deliverables Final as-built models fit for space management, building maintenance and modifications made during occupancy by the FM / Employer Value-added (optional): please specify Expected Deliverable Please specify Author Arc, Str, MEP, QS, Con, FM, Others Users Arc, Str, MEP, QS, RS, Con, FM, Others 8
13 Appendix B Typical BIM Elements by Discipline Kindly tick and write down the attributes of the selected elements on the table. (I) ARCHITECTURAL BIM ELEMENTS Site Model Rooms / Spaces Walls and Curtain Walls Doors, Windows and Louvers Basic structure Roofs Ceilings Floors Element Site infrastructure within site boundary (roads, pavements, car park spaces, access and parking arrangements and surrounding land use) Street fire hydrant (only indication of locations necessary) Surface drainage (only indication of locations necessary) External drainage & underground drainage Hard landscaped areas within site boundary Planter boxes including sub-soil drainage systems Massing of adjacent buildings relevant to project Room spaces, corridors, other spaces, plant and equipment rooms (including designated use) Interior / Exterior walls / Non-structural walls / Blockwork walls (Including finishes to identify if tiled / painted / plastered) Curtain wall with mullions and transoms with true profile and window glazing units including shading devices Interior / Exterior doors Interior / Exterior windows Louvers Beams (based on location and size indicated by the Structural Engineer) Columns (based on location and size indicated by the Structural Engineer) Roofs with overall thickness (including finishes & insulation) Ceilings (without support sub-frames) including module arrangement, material choices and finishes. Hangars and sub-frames for ceilings Horizontal floors Elements or Parameters needed by each non-architectural discipline 9
14 Vertical Circulation Architectural Specialties and Casework Schedules Fixtures and Equipment (with input from interior designers, specialist subcontractors, etc) Sloped floors and ramps Floor finishes details including tiling, carpet, screed only Steps & stairs including risers, threads and railings including headroom clearance requirements Elevator shafts (without fit-out installations by lift contractor) Access ladders and catwalks Precast / Prefab / GRC / Fibreglass facades Railing & parapets, including mesh & metalwork Fixed Building Maintenance Units in their overall bulk form Schedules allowing information to be extracted from elements Loose furniture including desks and computer workstations, casework (carpentry), including upper and lower cabinets Appliances such as in kitchen equipment Toilet fixtures, plumbing faucets these elements may cause BIM models to become too big and unmanageable. (II) STRUCTURAL BIM ELEMENTS Element Elements or Parameters needed by each non-structural discipline Foundations including piles, pile caps, tie / ground beams & footings Diaphragm walls & retaining walls Beams Columns Walls Slabs, including slab on grade and floating slab, recesses, curbs, pads and major penetrations Other types of transfer structure not mentioned above Stairs (steps, risers, threads, landings): all framing members and openings 10
15 Shafts and Pits (and openings) Precast & Prestressed concrete systems: all primary and secondary elements Temporary structures and platforms Concrete reinforcement details (Rebar), imbeds and cast-ins Steel frame structures including bracing systems Base plates, bolts, clip angles, fixings, etc. Connection details of structural steel members these elements may cause BIM models to become too big and unmanageable. (III) CIVIL BIM ELEMENTS Digital Terrain Model (DTM) Geology Report Utilities Model Rainwater & storm water pipe work Underground Public Utilities Others Element 3D surface based on topography that shows site conditions and building locations Include existing walkways, roads, curbs, ramps and parking lots etc Soil investigation report (A BIM Model is not required) All points of connection for existing and new utilities within site boundary Includes outlets, surface channels, slot channels and manholes For drainage only Drains, canals, crossings, retaining walls, and underground harvesting tanks Underground electrical supply cables and sewer lines, IDA (telecom) line and Gas Lines. Elements or Parameters needed by each non-civil discipline Data of Digital Elevation Model to be provided by registered surveyors Data of Geology Report to be provided by geotechnical engineers 11
16 (IV) ACMV Equipment ACMV Distribution Mechanical Piping Others ACMV BIM ELEMENTS Element Air Handling unit Chiller unit Variable refrigerant unit Cooling Tower Split-type indoor & outdoor air conditioning units Exhaust or extract air fans Fresh air fans Other fans such as jet fans Heat Exchanges for projects with District Cooling Exhaust air ducts (excluding hangars) Fresh air ducts (excluding hangars) Supply air ducts (excluding hangars) Return air ducts (excluding hangars) Transfer air ducts (excluding hangars) Diffusers, air-boots, air grilles, air filters, registers Fire dampers, motorized dampers, volume control dampers, CO 2 sensors, CO sensors Chilled water supply pipes including connections, fittings & valves Chilled water return pipes including connections, fittings & valves Condensate drain pipes including connections, fittings & valves Switch boards, control, BMS & DDC panels, BMS control & monitoring modules Fan Coil unit Engineering Smoke Extract System (e.g. smoke curtains, ductless fans) Elements or Parameters needed by each non-acmv discipline 12
17 (V) PLUMBING AND SANITARY BIM ELEMENTS Element Pipe supports and brackets Elements or Parameters needed by each non-plumbing and Sanitary discipline Pumps Control panels, monitoring and control sensors Plumbing BIM Elements only Fresh water piping, fittings, valves including hot & cold water pipe work with all plumbing equipment, sinks Water meters Storage, water holding tanks Pressure Vessels Underground Public Utilities for water supply Underground Public Utilities for drainage Grey water systems Pool filtration equipment Sanitary BIM Elements only Foul drainage, kitchen waste pipe work including floor drains, open trapped gullies, sealed trapped gullies and clean outs, vents and manholes Grease and sand traps Sump and sewage pits these elements may cause BIM models to become too big and unmanageable. 13
18 (VI) FIRE PROTECTION BIM ELEMENTS Element System piping, droppers, fittings, valves and sprinkler heads, sprinkler inlets, sprinkler control valve set, subsidiary valves, flow switches Elements or Parameters needed by each non-fire Protection discipline Pipe supports and brackets Fire alarm gongs & break glass unit Fire sprinkler pumps Sprinkler tanks Hydrants and hose reels (location of street fire hydrant determined by architects) Gas piping for suppression systems Heat or smoke detectors, control panels, monitoring and control sensors, pump panels, check meter positions Fire extinguishers Fire shutters & hoods above Smoke Curtains these elements may cause BIM models to become too big and unmanageable. (VII) ELECTRICAL BIM ELEMENTS Element Cable trays, trunking & cable containment, electrical risers, conduit, bus duct, power feeds Outlets, panels, wall switches, circuiting to devices, security devices, card access and plug moulds (socket points) Elements or Parameters needed by each non-electrical discipline HV & LV switch boards, switchgear, MCCB boards, MCB boards Transformers Light fittings & fixtures & housings for light fixtures 14
19 Conduit associated with access, data communication, security systems and electrical equipment Telecom equipment and computer racks Generators and exhaust flues including acoustic treatments Diesel tanks & fuel pipes Security system including CCTV camera, smart card system, door monitoring system Car park control system, barrier gates Equipment and associated installations maintained by public utility companies (including manholes / drawpits for the Power Grid) Earthing and lightning protection system Lifts, PA systems, BMS equipments including display panels (e.g. power consumption display) these elements may cause BIM models to become too big and unmanageable. Gas BIM Elements Element Gas piping and supply Elements or Parameters needed by each non-gas discipline 15
20 Appendix C BIM Modelling Guidelines The following guidelines recommend how BIM elements should be modelled in different disciplines at different project stages. It does not state who is the Model Author required to model the BIM elements. Modelling guidelines for Facility Management will be addressed in the future version of the Guide. (i) (ii) (iii) (iv) (v) Overview Quality Assurance Architectural BIM Modelling Guidelines Structural BIM Modelling Guidelines MEP BIM Modelling Guidelines a. ACMV b. Plumbing and Sanitary c. Fire Protection d. Electrical 16
21 (I) OVERVIEW Disciplines Stages Conceptual Preliminary Architectural Topo, Massing, Site Elements, Site Boundary, Levels, Location, Orientation Building elements with nominal dimensions and details Structural MEP Intended Use (optional) (optional) Site planning, Location of the building(s) on the site, Starting situation for renovation project, Investigation, Visualization, options, Investment analysis, Preliminary energy simulation, Alternate spatial designs, Scope management, Investment calculation, Energy simulation, Finalised spatial requirements for structures and MEP systems, Visualisation Load-bearing structures, Proposed structural system & basic structure MEP Schematics Definition of building elements, Comparison of building element and structural alternatives, Management of quantity information, Preliminary dimensioning of structures, MEP Analysis, Visualisation Detailed Building elements with actual dimensions and details Frame structures, Joints, Foundations, Joining to foundations, Penetrations & Reservations Connections Service areas of MEP systems, Central units, Ducts, Pipe work, Terminal devices, Switchboards, Cable routes, Lighting fixtures, Penetrations & Reservations Dimensioning of structures to the precision required for tenders, Definition of MEP systems, Quantity take-off, Penetration & Reservation design, Energy simulation, Visualisation. Combined Services Construction Model used to extract construction information Model used to extract construction information Model used to extract construction information Detailed Information for construction, Prefabricated element design, Production planning As-Built Updated detail model as per actual site conditions Updated detail model as per actual site conditions Updated detail model as per actual site conditions Information to be handed over for FM (maintenance & repairs; space & occupancy management) 17
22 (II) QUALITY ASSURANCE Architectural Detailed BIM - BIM in agreed version - BIM includes defined stories - Building elements & spaces modelled separately in each story - BIM includes required building elements - Building elements modelled using correct objects - Building elements include types - No excess building elements - No overlapping or doubled building elements - No significant clashes between objects - No conflicts between structures in architectural and structural BIM - BIM includes GFA spaces objects - Space areas match space program - BIM includes spatial reservations for MEP - Space height defined (including suspended ceilings) - Shape and size of spaces matches with walls - Spaces do not overlap - All spaces have unique IDs Structural Detailed BIM - BIM in agreed version - BIM includes defined stories - Building elements defined separately in each story - BIM includes required building elements - Building elements modelled using correct objects - Building element types are as agreed - No excess building elements - No overlapping or doubled building elements - No significant clashes between objects - No conflicts between structures in architectural and structural BIM - No conflicts between penetrations in architectural and structural BIM - Columns and beams converge - MEP penetrations & reservations included in structures MEP Detailed BIM - BIM in agreed version - BIM includes defined stories - Components defined separately in each story - BIM includes required components - Components modelled using correct objects - Components belong to a correct system - System colours are defined systematically - System colours are defined systematically - No excess components - No overlapping or doubled components - No significant clashes between components - No clashes between MEP disciplines - No clashes between M&E and electrical BIM - Components fit into their spatial reservations - No clashes between M&E, architectural and structural BIM Merged model at Preliminary, Detailed, Construction and As- Built stages - All agreed models available - Models represent the same design version - Models are located in the correct coordinate system - No conflicts between vertical shafts and MEP systems - No conflicts between horizontal reservations and MEP - No conflicts between suspended ceilings and MEP - Penetrations of columns OK - Penetrations of beams OK - Penetrations of slabs OK 18
23 (III) ARCHITECTURAL BIM MODELLING GUIDELINES General Architectural Guidelines: 1) Architectural modelling is carried out in the following stages: Conceptual, Preliminary, Detailed, Construction and As-Built. The types of models produced at each stage depend on the BIM deliverables required. 2) If the design has precast or prefab design then those elements can be placed as Objects. 3) The building elements must be created using the correct tools (Wall tool, Slab tool, etc.). If the features of BIM authoring tool are not sufficient for modelling the element, the required building elements must be created using other appropriate objects. In that case, define the "Type" of the element correctly. 4) 2D can be used to complement the BIM model when the elements are smaller than the agreed size, e.g. Elements smaller than 100mm do not need to be modelled. 5) 2D standard details can be used to complement the BIM model. 6) Building Elements must be modelled separately for each storey. 7) Required Parameters: Type, Material, ID, Size. Type is required for the Quantity Take-off. 8) If more than one tool is used to model certain elements then the elements should be grouped and identified correctly by "Type", e.g. Slabs and Beams can be used to model the Road. The elements must be grouped as one and define the "Type" as a "Road" 9) Structural elements should be modelled based on the information (e.g. Size) from Structural Engineers. The alternative is to link or work in a shared model with the Structural Engineers. Conceptual Preliminary Note: Conceptual Topo (Existing Site) Topo (Proposed Site) Massing (Buildings) General Requirement Existing site's contour and location should be modelled based on the land surveyor's information (spot levels, northing and easting). Renovation Projects (A&A): If the existing buildings were not in BIM, then 2D drawings of the existing building can be used to complement the BIM model. Proposed site's cuts and fills of earth should be shown with a proposed site Element Shape, Location and Orientation of building in site should be modelled using massing element. Name/identify the Mass element clearly, e.g. BLK 1, PODIUM etc. Site elements like Trees, Boundary, Roads, IC, etc can be drawn in 2D. If the actual dimension is not available then model using the nominal dimension or expected dimension. Examples - Door opening modelled without considering the fittings. Follow BIM e- Submission guidelines for the content and colour code of existing/proposed site. Output: Concept model that shows site arrangements and building geometries to share with the project members. Output: Authorities submission (URA). Refer to BCA BIM e- Submission requirement and 19
24 model is further developed into Preliminary model (Massing of the selected design should be converted to real building elements like Wall, Slab, Door, Window, etc...) Wall - Walls modelled without considering the different layers thickness. Note: Since the designers has the libraries and templates with element settings, they can model the actual size Model all the Walls (Brick, Dry wall, Glass, Concrete, wood, etc...) from Finish Floor Level to soffit of Slab/Beam above. When the Wall spans across different heights, if the BIM authoring tool permits model as a single Wall with varying height then model as one Wall. Alternative is to model as multiple Walls. Guidelines. Use BIM e- Submission Template. Output: Model for coordination with Engineers. Slab / Floor Door Window Column Distinguish the internal and external Walls by "Type" parameter. Top of Slab = Finished Floor Level When there is a slope in the Slab or the Slab has a special shape and the BIM authoring tool does not have the functionality to create such Slabs, then create the slab geometry using other tools and define the Type as a slab. Place the Door object with nominal dimensions and parameters required for Preliminary. Place the Window object with nominal dimensions and parameters required for Preliminary. Model the Columns on the desired locations from Structural Floor Level to Structural Floor Level for the Preliminary co-ordination with Structural Engineer. Columns must be modelled by their outer dimensions, taking into consideration the thickness of the finish and structure. Roof Others Space group (Zone or Space Create objects for Columns with special shapes and cross sections. Model using the Roof or Slab object and define the "Type" as Roof. The supporting structures can be modelled with general objects or beams. If there is a need to model more elements than what is specified in the Preliminary based on the project, refer to the Detailed stage. Model those elements with the information available at this stage. Note: Similar to individual space/room object 20
25 or Room object) Examples - Apartment, Fire Compartment, Departments, GFA Boundary, etc Individual Space (Space or Room object) Follow BIM e-submission guidelines for the details required for the Agencies requirement and display them accordingly in the plans Space height = floor height from FFL to the soffit of slab above or the suspended ceiling above. One space may belong to more than one space groups. Area/Volume will be automatically calculated from the space geometry. Follow BIM e-submission guidelines for the details required by the Agency and display them accordingly in the plans. Give a unique ID that can be used to locate the correct space when there is a need. Name the space based on the function of the room, e.g. Office, Lobby, etc... Follow the BIM e-submission guidelines for various agencies requirement on the space requirements. Category can be used to group the spaces like Commercial, Residential, etc... Detailed Note: Preliminary model is further developed into Detailed model General Requirement Wall Load-bearing wall Model all the elements using the actual/accurate dimension and correct materials. Update the Walls created in the preliminary design with the parameters required for Detailed, e.g. Add different Layer thickness, Fire Rating, etc Load bearing walls includes Core Walls/Shear Walls. Similar to Wall except if the Walls are between Floors then model from Structural Floor Level to Structural Floor Level of Slab below. Output: Authorities submission. Refer to BCA BIM e-submission requirement and Guidelines. Use BIM e- Submission Template. Output: Model for coordination with Engineers. Slab / Floor Update the Slabs created in the Preliminary with the parameters required for Detailed, e.g. Add different Layer thickness, Fire Rating, etc Output: Tender Documents Door Update the Doors placed in the Preliminary with the parameters required for Detailed, e.g. Fitting information. It is good to identify the functional difference (Types), e.g. "Fire Door" Window / Louver Update the Windows placed in the preliminary design with the parameters required for Detailed 21
26 , e.g. Fitting information. Column Beam Update the Columns created in the Preliminary based on the Location and Size information from the Structural Engineer. Model the Beams based on the Location and Size information from the Structural Engineer. Create objects for Beams with special shapes and cross sections. Staircase / Step / Ramp Create objects for Staircases, Steps and Ramps with special shapes when it is not available in the BIM authoring tool. If required then the Landings and Stair Platforms can be modelled as Slabs. In that case define their "Type" accordingly. Curtain Wall Model the Curtain Wall to the full height and not necessary to break it storey by storey. Most BIM Authoring tools enable users to insert Doors and Windows into parts of the Curtain Wall. Balcony Canopy Model using either as an Objects or use Walls, Floors, Beams and Railings. Check the specific elements for their modelling guideline. Roof Update the Roofs created in the preliminary design with the parameters required for Detailed. E.g. Add different Layer thickness, etc Skylight Hatch Model using objects and define the "Type" accordingly. Furniture Balustrade / Railings Project-specific objects Suspended ceiling If the BIM authoring tool do not have a ceiling tool then modelled using a slab tool or object, and define the "Type" as a Ceiling. Space Refer to Preliminary Civil defence shelter, Service platforms, Structures of passageways, Service ducts, Others Model using Wall, Floor, Column, Roof, Opening, Objects, Door, Space etc. Check the specific elements for their modelling guideline. Construction Refer to Detailed model Model the portions of the buildings that are affected as a result of updates from the Detailed models by the other disciplines and variations/rfis in Output: Construction model. 22
27 Note: Work together with the contractors and sub contractors to develop the Detailed model into Construction model the design. As-Built Refer to Construction model When the building is complete, the consultant should check the Detailed to correspond with the final implementation (As-Built) based on the information from the Contractor. Output: Model that can be used for space management, building maintenance and modifications made during occupancy by the FM / Employer. (IV) STRUCTURAL BIM MODELLING GUIDELINES General Structural Guidelines: 1) The structural consultant produces both an analysis model and a physical model (Structural BIM) with actual member size and position. The model will be used for documentation. These documents cover the Structural BIM only. 2) Structural modelling is carried out in the following stages: Conceptual, Preliminary, Detail, Construction and As-Built. The types of models produced at each stage depend on the BIM deliverables required. 3) If the design has precast or prefab design. The part can be designed and modelled by a specialist and incorporated/linked into the model for reference. 4) Structural BIM covers all load-bearing concrete, wood and steel structures, as well as non-loadbearing concrete structures. The basic building elements used are Wall, Slab, Beam, Column and Lattice. The building elements must be created using the correct tools (Wall tool, Slab tool, etc.). If the features of BIM authoring tool are not sufficient for modelling the element, the required building elements must be created using other appropriate objects. In that case, define the "Type" of the element correctly. 5) The model can be phased and divided for various ST submissions as per the project planning/individual firm's practice. 6) Rebar and Joint details can be done in Detailed Stage based on the capability of the BIM authoring tool. 7) 2D or 2D standard details can be used to complement the BIM model when the elements are smaller than the agreed size, e.g. Elements Smaller than 100mm do not need to be modelled. 8) 2D can be used for loading plans. 9) 2D can be used for the column schedule when the BIM authoring tool has limitations. The shape and cutting of each column should be included in the schedule. 23
28 10) Building Elements must be modelled separately for each storey 11) Required Parameters: Type, Material, ID, Size. Type is required for the Quantity Take-off. 12) If more than one tool is used to model certain elements then the elements should be grouped and identified correctly by "Type". E.g. Individual beams can be used to model the roof truss the elements must be grouped as one and define the "Type" as a "Truss" Conceptual Existing Buildings (As- Built Condition) for Addition & Alternations. The Structural Consultants expertise may required when assessing and modelling existing structures, in particular the load-bearing structural system. The scope of Structural BIM model will be agreed upon on a project-specific basis. Output: Structural Model of Existing Building or portions thereof. Preliminary Note: Preliminary model will be based on Architectural Conceptual model. It will be developed further based on the coordination during Preliminary stage. New Buildings General Requirement If the existing Buildings were not in BIM then 2D drawings of existing building can be used to complement the BIM model. The Structural Consultants expertise may be required in special cases in the assessment of the alternatives massing model from Architect and propose framing systems. Structural BIM model is optional at this stage. Model the elements using the nominal dimension or expected dimension based on precision available at Preliminary stage. Model the elements that are critical and required for Preliminary co-ordination (based on projects requirement) Connections/Joints and Members can be detailed in the Detailed stage or Construction stage, depending on the project delivery (traditional or D&B). Output: Structural concept alternatives. Input: Geotechnical information/model, Architectural Conceptual Model for intended use (for load assumptions) and geometry of the building (to determine the framing system) Note: The location of load bearing elements and the elevation of the floor will be based on the info from the Architect. Output: ST submission. Refer to BCA's BIM e- Submission requirement and Guidelines. Use BIM e- Submission Template. Output: Model for coordination with Architects and MEP Engineers 24
29 Piling (Pile Cap and Pile) Diaphragm / Retaining Wall Raft Foundation Pad / Isolated Foundation Strip Foundation Slab / Roof Slab If the BIM authoring tool has relevant objects to represent the foundation elements then place them in the correct level and with the relevant parameter. Alternative is to use Slab, Column and Wall to represent foundation elements. Group them and define the "Type" correctly. Top of Slab = Structural Floor Level Multiple Slabs need to be placed if the levels, thickness, span direction and material are different. The soffit of the structural slab should be shown. When the design is not confirmed the elements can be modelled as reference to use in the Preliminary coordination with the Architects and MEP Engineers. Beam Truss Column Wall When there is a slope in the Slab or the Slab with a special shape and the BIM authoring tool does not have the functionality to create such Slabs, then create the slab geometry using other tools and define the Type as a slab. Top of Beam = As per design (Up stand Beam or Down hang Beam) Create objects for Beams with special shapes and cross sections, e.g. Tapering and haunch. Model with multiple elements and group them as a truss. Note: Some BIM authoring tools have a function to automate this process. Model from the Structural Floor level to Structural Floor Level of Slab below. Create objects for Columns with special shapes and cross sections. All Load bearing Walls and concrete Walls (non-load bearing) need to be modelled, e.g. Core Walls, Shear Walls, Retaining Walls, Diaphragm Walls. If the Walls are between floors then model from Structural Floor Level to Structural Floor Level of Slab below else the Walls need to model to the correct levels. Staircase, Step and Ramps When the Wall spans across different heights, if the BIM authoring tool permits model as a single Wall with varying height then model as one Wall. Alternative is to model multiple Walls. Model only the structure part of the Staircase, Steps and Ramps. 25
30 Create objects for Staircases, Steps and Ramps with special shapes when it is not available in the BIM authoring tool. Opening If required then the landings and Stair platforms can be modelled as Slabs. In that case define their "Type" accordingly. Model the structural Opening for the Doors, Windows and Ventilations based on location and size information from the Architects. Model the structural Opening for the MEP elements like Ducts based on the location and size information from the MEP Engineers. Model the Floor openings based on location and Size from the Architects and MEP Engineers. Detailed Note: Preliminary model is further developed into Detailed model Special Structure Civil defence shelter, Tunnel, Link Way, External structures, Balcony, Canopy, Swimming pool, Temporary structures, Others General Requirement Model using Wall, Slab, Column, Beam and Opening or placed as an Object and assign the "Type" accordingly. Check the specific elements for their modelling guideline. Model all the elements using the actual/accurate dimension. Model all the model elements that are critical and required for the co-ordination (based on projects requirement) Detail the Connections/Joints and Members based on the BIM authoring tool's capability. The details can be imported as 2D, which is generated automatically by design tools that can link with BIM authoring tool. Divide the project/building as per various ST's or as per agreed Project Plan. Proceed with the modelling according to the schedule. When the design is not confirmed the elements can be modelled as reference to use in the Preliminary coordination with the Architects and MEP Engineers. Output: ST Submissions. Refer to BCA's BIM e- Submission requirement and Guidelines. Use BIM e- Submission Template. Output: Tender Drawings. Output: Model for coordination with Architects and MEP Engineers. Refer to Preliminary Develop the Preliminary design with more confirmed parameters like Location, Size and Material. Update the correct Type definition that helps detailed The detail can be done only for the agreed portion of the building 26
31 quantity take-off. based on the projects need. Construction Note: Work together with the contractors and sub contractors to develop the Detailed model into Construction model As-Built Refer to Detailed model Refer to Construction model Model the portions of the buildings that are affected as a result of updates from the Detailed models by the other disciplines and variations/rfis in the design. Deepening of structures should be detailed in shopdrawings, if necessary. When the building is complete, the consultant should check the Detailed to correspond with the final implementation (As-Built) based on the information from the Contractor. Output: Construction model. Output: Model that can be used for operation, building maintenance and modifications made during occupancy by the FM / Employer. (V) MEP BIM MODELLING GUIDELINES a. ACMV System distribution lines Use line diagrams to show the entire system Conceptual distribution Space objects Include equipment symbols in the line diagrams. Use box objects to represent spaces required for MEP systems Output: Schematic diagrams Preliminary Zone Objects, Air Handling Unit, Chiller Unit Variable refrigerant flow unit, Cooling tower, Exhaust air ducts, Fresh air ducts, Supply air ducts, Return air ducts, Add names and colours to the space objects. Zone the spaces that have common design requirements with colour legends on plans. Model each element using the correct BIM generic object Each element should have an approximate size. Show only the main routes of the systems. All ducts and pipes should be connected to the Output: Preliminary Model Shows main distribution into different zones Engineers should verify the space 27
32 Transfer air ducts, equipments. allocated by the Architect. Chilled water supply pipes, Fasteners and hangers are not required. Chilled water return pipes, In-line accessories, e.g. valves, fire dampers, Condensate drain pipes volume controls and air filters are not required. Detailed Main elements of Preliminary Fire dampers, Motorized dampers, Volume control dampers Split-type indoor & outdoor air conditioning units Exhaust or extract air fans Fresh air fans Other fans such as jet fans Diffusers, air-boots, air grilles, air filters, registers Use CP83 symbols. Use CP83 symbols and colour standards Model each element using object correspond to actual component with actual size, material, type code and performance criteria. Include insulation to reflect actual size for coordination purpose. System routing should be connected with fittings. Unavailable BIM objects that are modelled using different objects should be identified accordingly, e.g. use proper names and colours. Downward slopes of the pipes should be modelled realistically. Output: Detailed model for e- Submission and Tender For BIM e- Submission, please also refer to submission guidelines Services should be coordinated with architecture model Fan Coil unit Switch boards, Control, BMS & DDC panels BMS control & monitoring modules Required fittings allowances, cross-over spaces and maintenance spaces should be considered. Fasteners and hangers are not necessary. Commercial product libraries can be used to the extent allowed by the modelling software. Fire rating should be included in the fire damper objects. Pipe Accessories should follow the CP83 symbols in plan views. Proposed position of mechanical components base on calculation or analysis e.g. air terminals, FCU should be approved by the architect. Construction The elements are the same as Detailed stage. For design coordination, documents such as coordinated services plans, sections, elevations, etc. should be derived from the model. Model the portions of the building that need more attention. All changes made by contractor & approved by Output: Model with construction details 28
33 consultants should be clearly indicated. Objects not found in BIM tool can be represented by a box with proper identification and attributes such as equipment name, capacity, etc. Levels of the elements comprising the system from finish floor line or at the certain reference in the model should be clearly annotated. For construction coordination, documents such as coordinated services plans, sections, elevations, etc. should be derived from the model. Contractor to develop the detailed BIM into Construction BIM. As-Built The elements are the same as Construction phase. Fasteners can be modelled if necessary. When the building is complete, the consultant should check the Detailed to correspond with the final implementation (As- Built) based on the information from the Contractor. Output: Model that can be used for space management, building maintenance and modifications made during occupancy by the FM / Employer. b. Plumbing & Sanitary System distribution lines Use line diagrams to show the entire system Conceptual distribution Space objects Include equipment symbols in the line diagrams. Use box objects to represent spaces required for MEP systems Output: Schematic diagram Preliminary Zone objects, Plumbing equipments Plumbing fixtures Sump and sewage pits Storage, water holding tanks, Add names and colours to the space objects. Zone the spaces that have common design requirements with colour legends on plans. Model each element using the correct BIM generic object Each element should have an approximate size. Output: Preliminary Model Shows main distribution into different zones 29
34 pressure vessels Show only the main routes of the systems. Water meters chambers Manholes, outlets, surface and slot channels All main pipes should be connected to the equipments. Fasteners and hangers are not required. In-line accessories e.g. valves, filters, water meters are not required. Engineers should verify the space allocated by the Architect. Detailed Main elements of Preliminary Fresh water piping, Fittings, Valves, including hot and cold water pipes Rainwater and storm water pipes Foul drainage and kitchen waste pipe work including Floor drains, Open trapped gullies, Sealed trapped gullies, Clean outs, Vents Use CP83 symbols. Use CP83 symbols and colour standards Model each element using object correspond to actual component with actual size, material, type code and performance criteria. Include insulation to reflect actual size for coordination purpose. System routing should be connected with fittings. Unavailable BIM objects that are modelled using different objects should be identified accordingly, e.g. use proper names and colours. Downward slopes of the pipes should be modelled realistically. Output: Detailed model for e- Submission and Tender For BIM e- Submission, please also refer to submission guidelines Services should be coordinated with architecture model Control panels, Monitoring and control sensors Required fittings allowances, cross-over spaces and maintenance spaces should be considered. Fasteners and hangers are not necessary. Underground public utilities for water supply Commercial product libraries can be used to the extent allowed by the modelling software. Underground public utilities for drainage Pipe Accessories should follow the CP83 symbols in plan views. Construction The elements are the same as Detailed stage. For design coordination, documents such as coordinated services plans, sections, elevations, etc. should be derived from the model. Model the portions of the building that need more attention. All changes made by contractor & approved by consultants should be clearly indicated. Output: Model with construction details 30
35 Objects not found in BIM tool can be represented by a box with proper identification and attributes such as equipment name, capacity, etc. Levels of the elements comprising the system from finish floor line or at the certain reference in the model should be clearly annotated. For construction coordination, documents such as coordinated services plans, sections, elevations, etc. should be derived from the model. Contractor to develop the detailed BIM into Construction BIM. As-Built The elements are the same as Construction phase. Fasteners can be modelled if necessary. When the building is complete, the consultant should check the Detailed to correspond with the final implementation (As- Built) based on the information from the Contractor. Output: Model that can be used for space management, building maintenance and modifications made during occupancy by the FM / Employer. c. Fire Protection System distribution lines Use line diagrams to show the entire system Conceptual distribution Space objects Include equipment symbols in the line diagrams. Use box objects to represent spaces required for MEP systems Output: Schematic diagrams Preliminary Zone Objects Add names and colours to the space objects. Zone the spaces that have common design requirements with colour legends on plans. Output: Preliminary Model Detailed Main elements of Preliminary Use CP83 symbols and colour standards Shows main distribution into different zones Output: Detailed model 31
36 Sprinkler pipework Fire sprinkler pumps Sprinkler heads SIB (Sub-Indicator Board) Sprinkler control valve sets (Main stop valve, Subsidiary valve with indicator, Alarm valve, Water motor alarm/gong, Test and drain valve, Pressure gauges and Direct read water flow meter.) Model each element using object correspond to actual component with actual size, material, type code and performance criteria. Include insulation to reflect actual size for coordination purpose. The types, finish, temperature rating and orifice sizes should be indicated. Unavailable BIM objects that are modelled using different objects should be identified accordingly, e.g. use proper names and colours. System routing should be connected with fittings. for e- Submission and Tender For BIM e- Submission, please also refer to submission guidelines Services should be coordinated with architecture model Hydrants and hose reels, including street fire hydrant system Fire alarm gongs, Break glass unit Fire shutters and hoods above Required fittings allowances, cross-over spaces and maintenance spaces should be considered. Fasteners and hangers are not necessary. Commercial product libraries can be used to the extent allowed by the modelling software. Pipe Accessories should follow the CP83 symbols in plan views. Engineers should verify the space allocated by the Architect. Gas piping for suppression systems Heat or smoke detectors, Control panels, Monitoring and control sensors, Pump panels, Check meter positions Size of breeching inlet cabinet For design coordination, documents such as coordinated services plans, sections, elevations, etc. should be derived from the model. Breeching inlet Breeching inlet cabinet Construction Fire extinguishers The elements are the same as Detailed stage. Model the portions of the building that need more attention. All changes made by contractor & approved by consultants should be clearly indicated. Output: Model with construction details Objects not found in BIM tool can be represented by a box with proper identification Contractor to develop the detailed 32
37 and attributes such as equipment name, capacity, etc. Levels of the elements comprising the system from finish floor line or at the certain reference in the model should be clearly annotated. For construction coordination, documents such as coordinated services plans, sections, elevations, etc. should be derived from the model. Fasteners can be modelled if necessary. BIM into Construction BIM. As-Built The elements are the same as Construction phase. When the building is complete, the consultant should check the Detailed to correspond with the final implementation (As- Built) based on the information from the Contractor. Output: Model that can be used for space management, building maintenance and modifications made during occupancy by the FM / Employer. d. Electrical System distribution lines Use line diagrams to show the entire system Output: Conceptual distribution Schematic diagrams Include equipment symbols in the line diagrams. Space objects Use box objects to represent spaces required for MEP systems Preliminary Zone Objects, Transformers HV & LV switch boards, Switchgear, MCCB boards, Add names and colours to the space objects. Zone the spaces that have common design requirements with colour legends on plans. Model each element using the correct BIM generic object Each element should have an approximate size. Output: Preliminary Model Shows main distribution into different zones 33
38 MCB boards Cable trays, Trunking & cable containment Electrical risers Show only the main routes of the systems. All cable trays, conduits and trunkings should be connected to the equipments. Wires, fasteners and hangers are not required. Detailed Generators and exhaust flues, including acoustic treatments Diesel tanks & fuel pipes Telecom equipment and computer racks Main elements of Preliminary Light fittings, Fixtures, Housings for light fixtures Conduit, Bus duct, Power feeds Concealed and cast-in-place conduits Outlets, Panels Wall switches, Circuiting to devices, Security devices, Card access, Plug moulds (socket points) Conduit associated with access, data communication, security systems and electrical equipment In-line accessories e.g. valves, fire dampers, volume controls and air filters are not required. Use CP83 symbols. Use CP83 symbols and colour standards Model each element using object correspond to actual component with actual size, material, type code and performance criteria. Include insulation to reflect actual size for coordination purpose. System routing should be connected with fittings. Unavailable BIM objects that modelled using different objects should be identified accordingly, e.g., use proper names and colours. Required fittings allowances, cross-over spaces and maintenance spaces should be considered. Fasteners and hangers are not necessary. Commercial product libraries can be used to the extent allowed by the modelling software. Electrical devices e.g. switches, power outlets, telephone and TV outlets should follow the CP83 symbols in plan views. Output: Detailed model for e- Submission and Tender For BIM e- Submission, please also refer to submission guidelines Services should be coordinated with architecture model Engineers should verify the space allocated by the architect Security system including CCTV camera, smart card system, door monitoring system For design coordination, documents such as coordinated services plans, sections, elevations, etc. should be derived from the model. Car park control system, Barrier gates 34
39 Equipment and associated installations maintained by public utility companies Construction The elements are the same as Detailed stage. Model the portions of the building that need more attention. All changes made by contractor & approved by consultants should be clearly indicated. Objects not found in BIM tool can be represented by a box with proper identification and attributes such as equipment name, capacity, etc. Levels of the elements comprising the system from finish floor line or at the certain reference in the model should be clearly annotated. Output: Model with construction details Contractor to develop the detailed BIM into Construction BIM. For construction coordination, documents such as coordinated services plans, sections, elevations, etc. should be derived from the model. Fasteners can be modelled if necessary. As-Built The elements are the same as Construction phase. When the building is complete, the consultant should check the Detailed to correspond with the final implementation (As- Built) based on the information from the Contractor. Output: Model that can be used for space management, building maintenance and modifications made during occupancy by the FM / Employer. 35
40 This guide is part of the BIM Essential Guide Series BIM Essential Guide For Architectural Consultants For C&S Consultants For M&E Consultants For Contractor For BIM Execution Plan For BIM Adoption in an Organization FOR EACH BIM PROJECT WITHIN EACH DISCIPLINE ACROSS MULTIPLE DISCIPLINES FOR EACH ORGANIZATION ALL DISCIPLINES For more information and feedback on the BIM Essential Guide Series, please visit the following blog: bimsg.wordpress.com Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore
2012 BIM Guidelines and Standards (Rev. 00) University at Albany
A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested
BIM Essential Guide. For BIM Adoption in an Organization
BIM Essential Guide For BIM Adoption in an Organization BCA acknowledges the leadership provided by the BIM Steering Committee in support of the production of the BIM Essential Guides The BIM Essential
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
Certification: Building Plans Examiner. Exam ID: B3
Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building
Design Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist
#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the
Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE
Autodesk Revit LEARNING PATH FUNDAMENTALS Duration: 3 days Cost: R5 500 (excl VAT) Revit MEP Duration: 3 days Cost: R5 500 (excl VAT) Revit Structure Duration: 3 days Cost: R5 500 (excl VAT) REVIT ADVANCED
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
PLAN SUBMITTAL INFORMATION
PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
Does Wall Township require an inspection by the building department on resale of a home?
Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,
PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW
CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW PRELIMINARY BUILDING REVIEW two sets of the following: Architectural/engineering design development drawings indicating size of the building,
RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002
RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 INDEX New Build Flat and Pitched Roofs Rainwater Goods Porches to Existing Buildings / Covered Links etc, Between Buildings Floors /
Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications
BIM Essential Guide. For C & S Consultants
BIM Essential Guide For C & S Consultants BCA acknowledges the leadership provided by the BIM Steering Committee in support of the production of the BIM Essential Guides The BIM Essential Guides have been
SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
Requirements for Building Application Submission
THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: [email protected] To: Architects, Designers
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
BUILDING SAFETY UNIT
POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential
SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete
SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT 1. CONSTRUCTION: Foundation Super Structure Internal Walls External Walls Roof Retaining Walls RCC footing RCC Framed Structure confirming with zone II seismic
MECHANICAL TRADE SCOPE OF WORK GUIDELINES
MECHANICAL TRADE SCOPE OF WORK GUIDELINES OTTAWA REGION 2009 Comprised of Piping Trade, Ventilation (HVAC) Trade, Fire Protection Trade Endorsed by the following organizations Ottawa Construction Association
City of Oviedo Commercial Shell Building Permit Application Guidelines
City of Oviedo Commercial Shell Building Permit Application Guidelines All permit application packages must be complete prior to acceptance. A complete application package shall include the following:
Building Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
ST. MONICA FOOD PANTRY HOUSTON, TEXAS
PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,
Sample Drawing Package for One and Two Family Dwelling Applications
Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx
REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
Olilo's AEC Design Services. SrinSoft Inc, Partners of
Olilo's AEC Design Services SrinSoft Inc, Partners of Olilo provides design services that include design and analysis, cost estimation, 3D modeling, 2D drafting, conversion from 2D to 2D, quantity take-off,
H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh
Accessory Apartment Construction Guide For Single Detached Dwelling and Semi-Detached Dwellings that have been in existence for at least five (5) years Notes: Buildings that are less than five (5) years
www.citiesinspection.com October 5, 2015 Dear Client,
www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.
Construction Technologies Career Field Pathways and Course Structure
Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry
ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015
ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18,
Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling
Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations
LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -
The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior
When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR
Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com
Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809
- 5 - Table1. Maximum Compartment Volumes
- 5 - Part II - SPECIFIC REQUIREMENTS 5. Compartmentation 5.1 Every building should be divided into compartments by walls and floors to inhibit the spread of fire. 5.2 Compartment walls, compartment floors,
Electrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
Element D Services Plumbing
Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.
Capital Expenditure. The common definition of capital expenditure is
Capital Expenditure Under standard accounting practices local authorities are required to account for revenue expenditure and capital expenditure differently. Capital expenditure is defined in the Local
Gramercy Place Condo Association, Inc.
Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is
NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST
It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist
Civil Engineering and Architecture (CEA) Detailed Outline
Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of
Element D Services Plumbing
PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL
Turnkey Projects, Conversions, Restorations & Property Management. Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE
Turnkey Projects, Conversions, Restorations & Property Management Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE Reg. Office: Karlu Galea Street, Victoria, Gozo Malta. T. 2155 6600 M. 9943 4391
B-1 Buildings & Service Maintenance
B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance SAFETY, HEALTH AND ENVIRONMENTAL POLICY: B-1 DATE OF ISSUE: AUGUST 1994. BUILDINGS AND SERVICES MAINTENANCE 1. Introduction It is
Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA
Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA Boggarm S. Setty, P.E., Fellow ASHRAE Setty & Associates, Ltd. 3040 Williams Drive, Suite 600, Fairfax,
PROJECT REQUIREMENT, PR 20 VIRTUAL DESIGN & CONSTRUCTION (VDC), BUILDING INFORMATION MODEL (BIM)
PROJECT REQUIREMENT, PR 20 VIRTUAL DESIGN & CONSTRUCTION (VDC), BUILDING INFORMATION MODEL (BIM) A. GENERAL: 1. Summary: Design/Builder will employ VDC and BIM tools to facilitate the construction, coordination,
L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.
L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -
Nominal Life Expectancy for Building Components
Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes
PROJECT COST ESTIMATES & FEASIBILITIES
PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed
Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2
Pollution CO CO 2 Carbonaceo us soot H 2 S, NOX, SO2 The National Building Code (NBC) contains set of minimum provisions, designed to protect the safety of the public with regard to structural sufficiency,
Residential Inspection Guidelines
Residential Inspection Guidelines 201 Pre-Pour Foundation Dimensions Building Location Certificate - if required in the building consent Construction and Advice Notes Check the building dimensions against
Building Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor
Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,
4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.
Building Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities
Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks
STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:
STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE: 61-30.801 Standards of Practice, General. (1) Home inspections performed to these Standards of Practice are intended to provide the client with information
Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School
Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The
Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year
Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service
Inspection Report Atlanta Strip Mall Commercial Building Property Address:
Page 1 of 25 Inspection Report Atlanta Strip Mall Property Address: Smyrna GA 30082 Page 2 of 25 South East Building Consultants Ray Thoroman Serving the entire State of Georgia 6 678-410-3005 Page 3 of
Cost Estimating Simplified
Cost Estimating Simplified Cost Estimating Simplified. 2003. This material has been created by Nick Butcher and Linda Demmers and provided through the Libris Design Project [http://www.librisdesign.org/],
FIRE-FIGHTING DESIGN BRIEF REPORT
P a g e 1 SECTION 04 (Doc.No.A/DBR 001) FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 2 1.0 SCOPE 2.0 STANDARDS AND CODES 3.0 TYPES OF SYSTEM PROPOSED 4.0 FIRE HYDRANT SYSTEM 5.0 AUTOMATIC SPRINKLER SYSTEM
Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling
PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling October 2014 contents General Information
Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1)
1. ADDITION & ALTERATION TO THE MAIN WAREHOUSE 1.1 ELECTRICAL WORKS 1.1.1 The Contractor shall provide into the AFT1 building with 2 x 1000Amp power supply to be terminated with a main isolator. The power
SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES
1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee
Self-Home Inspection Checklist
To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:
CHAPTER 2 QUANTITY TAKE-OFF
CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate
Fire Pump Plan Review March 2010
Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:
State of Connecticut Department of Public Health RADON PROGRAM
State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon
Excerpts from the Canadian National Building Code (NBC)
Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more
Renovation instructions
1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following
ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY
ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY HOWARD COUNTY MARYLAND ARCHITECTURAL DESIGN ACADEMY Architectural Design 1 Introduction / Overview of Course This course will introduce the basic principles
How to report a repair
How to report a repair for repairs to your home? We are committed to making sure your home is in a good state of repair. To meet our legal responsibilities we will: Keep the exterior (eg roof, walls, doors,
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This
Holz Choices & Specifications
March 21, 2011 0. SALES AND DESIGN 1. UTILITIES AND PERMITS Holz Choices & Specifications 2. EXCAVATION AND LOT PREPARATION Job Beginning date of Monday May 2 nd, 2011 ALTERNATE: Garage walls as drawn
KIEWIT CM/GC Enabling/Utilities
South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 [email protected] General
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression
Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders
INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids
CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST
CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all
COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)
COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
HVAC Processes. Lecture 7
HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
Development Services Guidelines
Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look
Aurora Mall. Aurora (Denver), Colorado
is the largest superregional mall in the city of Aurora, and it s only getting bigger and better. The mall is currently undergoing a significant interior and exterior renovation, scheduled for completion
Bureau Veritas Contact Information
Bureau Veritas Contact Information Permit Submittal The permit documents and fees will be submitted to the city. Submittal documents should be complete to expedite plan review and permit issuance. Please
Alpha System ADAPTABLE KEWAUNEE LABORATORY FURNITURE. encouraging new discovery
Alpha System ADAPTABLE LABORATORY FURNITURE KEWAUNEE encouraging new discovery Alpha 6 partition modules with Kemresin worktops. Minneapolis, Minnesota Alpha 6 partition modules with Alpha overhead service