1 CHECKLIST FOR SUBMISSION Construction Productivity Awards - Projects 2015 PROJECT NAME: - Please check by ticking: - The following list of printed documents is enclosed: Nomination Form, duly completed and signed Project write up A complete set of buildable design score calculation worksheets (not applicable for civil engineering projects) A complete set of constructability score calculation worksheets (not applicable for civil engineering projects) Project s Manpower Productivity Data Report generated from the electronic Productivity Submission System (epss) of BCA (not applicable for civil engineering projects) Productivity improvement calculation worksheets A copy of CD-Rom with the following contents is enclosed: Project write-up in Microsoft Word format An isometric drawing showing the assembly of buildable features (in high resolution JPG format) Minimum 2 digital photographs (in high resolution JPG format) to be used for publicity One complete set of construction drawings (Structural and Architectural drawings including beam, column, door and window schedules) Construction/site photographs showing the buildable features, technologies and innovations adopted as well as good practices being implemented (including those listed in the constructability score calculations) (in high resolution JPG format) 1

2 Construction Productivity Awards Projects 2015 PROJECT NAME : - PROPOSING COMPANY : - Company name: Contact person**: Contact no. (O): Contact no. (HP): Fax no.: address: ** This person should be involved in the project and is familiar with the details in this submission. He/She shall be the liaison person for this project. 2

3 THE AWARDS The BCA Construction Productivity Awards - Projects recognise the contribution of project teams towards achieving productivity enhancement in their construction development projects from the design to the end of construction. The Awards aim to: (i) Encourage designers to come up with labour-efficient designs; (ii) Encourage project teams to adopt labour-efficient construction methods; and (iii) Recognise project teams for their excellent project planning and coordination in enhancing productivity. Awards will be given out in nine categories: - [1] Residential Landed Buildings Category [2] [3] Residential Non-landed Buildings Category (for projects with GFA < 25,000m 2 ) Residential Non-landed Buildings Category (for projects with GFA 25,000m 2 ) [4] Commercial and Office Buildings Category [5] Institutional Buildings Category [6] Industrial Buildings Category [7] Mixed Development Buildings Category [8] Additions & Alterations / Upgrading Buildings Category [9] Civil Engineering Projects Category For additions & alterations / upgrading projects, nominations will only be accepted if new floor area is added to the existing buildings. Winning projects will either receive a Platinum Award or a Gold Award. The Awards are not competitive but standard based. An Award will only be conferred if a suitable entry is received. Several Awards may be conferred in each category. A Gold Award will be awarded to a project that has adopted good buildable design qualities and construction methods that reflect ease of construction. A Platinum Award will only be conferred to a project that has displayed exemplary buildable design features and adopted advanced construction technologies that have led to commendable productivity outcome. 3

4 ASSESSMENT Projects submitted for nomination will be assessed by an Assessment Panel appointed by the Building and Construction Authority. The projects will be assessed based on the following criteria: (A) Building Projects (i) Project buildable design score; (ii) Project constructability score; (iii) Simplicity of construction; (iv) Design and construction integration; and (v) Aesthetics (B) Civil Engineering Projects (i) Design for ease of construction; (ii) Construction Technology and Site Management; (iii) Design and construction integration; and (iv) Innovative Designs and/or Products The decision of the Assessment Panel shall be final. The discretion of the Assessment Panel to confer or withhold an award is absolute. No correspondence relating to any decisions will be entertained by the Assessment Panel or BCA. 4

5 ELIGIBILITY All construction projects that obtained TOP between 1 January 2013 and 30 June 2014 are eligible for consideration. Awards (Plaques and Certificates) are given to the respective winning project teams organisations. Organisations which are eligible for the awards are: Organisations of the following as recipients of the Plaques and Certificates Client Qualified Person for Architectural Works Qualified Person for Structural Works Collaborating Architectural Consultant (if any) Collaborating Structural Consultant (if any) Builder (for Build only projects) / Design & Build Contractor / Alternative Design Contractor Conceptual designers (if any) Builder s architect (only for Design & Build and alternative design proposals) Builder s structural engineer (only for Design & Build and alternative design proposals) M & E engineer Collaborating M & E engineer (if any) Any other party in the project team who has contributed significantly to the project s buildability A combined Plaque and Certificate will be given to the organisation if it is involved in the project in two or more disciplines/capacities. 5

6 ENTRY Entries for the awards must be submitted using the prescribed nomination form. The procedure for entry comprises two stages: - Stage 1: The proposing firm makes a nomination using the prescribed form. Other materials which MUST be included in the submission are: 1. A project write-up in ten-page length in print and digital format (Microsoft Word format). Please refer to the attached guide for the write-up. 2. At least one A4 size drawing showing an isometric view of the assembly of buildable features. The drawing is to be submitted in digital colour format (in high resolution JPG). 3. Two digital colour photographs with at least one photograph showing the building in its environment. These photographs are to be submitted in digital format (in high resolution JPG). Additional supplementary images in digital format may also be submitted. 4. One complete set of construction drawings in softcopy which shall include structural and architectural drawings as well as column, beam, door and window schedules. 5. Site/Construction photographs in digital format showing the incorporation of buildable features, the adoption of construction technologies and implementation of good site practices in the project. 6. The project s Manpower Productivity Data Report generated from the electronic Productivity Submission System (epss) of BCA (for building projects only). The nomination form, photographs, project write-up, isometric drawings, construction drawings and manpower productivity data report must reach the secretary of the Assessment Panel NOT LATER THAN 23 January Please submit the nomination form along with the attached checklist. An incomplete submission will not be accepted. Special Notes 1. Each project needs only one Nomination Form which could be submitted by any team member who is directly involved in the project. 2. In deriving the buildable design and constructability scores of a project, all buildings of the project under the same planning permission should be accounted for. A nomination whereby only part of the project is submitted e.g. selected buildings within a project or a particular element/system of a project would be deemed as incomplete and rejected. 3. Nomination Form can be photocopied and used for submission. 4. Information which is required in digital format shall be submitted in a CD-Rom. 5. For manpower productivity data report, please note the following: (a) The builder would have been given access to the epss when the project was captured by the system. (b) The builder must notify BCA under the following circumstances: (i) The project was not captured by the epss and there was no submission of project & manpower data to BCA. (ii) There were errors or incompleteness in the project & manpower data submitted to BCA (e.g. error in constructed floor area or incomplete monthly manpower data). 6

7 (c) For (b)(ii), arrangements will be made for the builder to re-enter the correct and complete project & manpower data into the epss. (d) The builder can contact Ms Ng Geok Kuan at Tel: ( for the notification. Stage 2: Shortlisted projects shall make a presentation to the Assessment Panel in February / March The Assessment Panel will interview the project team to clarify the design system and the construction methods as well as other details and aspects related to the project. The Assessment Panel will have at its discretion the right to reject any entry which has incomplete documentation or which fails to comply with the above requirements at any stage of the competition. 7

8 TERMS AND CONDITIONS All materials submitted in connection with the entries shall become property of the Building and Construction Authority (the BCA). Award recipients are required to share information on their successful projects with the construction industry. This sharing of information may take the form of presentations, seminars, exhibitions and/or the hosting of company visits. The BCA reserves the right to use any material submitted in connection with the entries in any way deemed fit, without payment of fees or royalties, and regardless of the results of the Award. This includes, but is not limited to, the publication and/or exhibition of photographs, materials and/or names. The Assessment Panel reserves the right to defer judgment on any shortlisted project if at any time during the assessment process, any development or incident arises concerning any party linked to the project, which is likely to result in adverse publicity to the Awards, the BCA and/or the construction industry. The duration of any such deferment shall be at the sole discretion of the Assessment Panel. The BCA reserves the right to withdraw or withhold any award, if in the opinion of the BCA, the conferment of such award might result in any adverse publicity to the Awards, the BCA and/or the construction industry, because of any development or incident concerning any party linked to the recommended award winning project. The duration and extent of any such withdrawal or withholding shall be at the sole discretion of the BCA. ANNOUNCEMENT OF RESULTS Winners will be informed and the results released to the press. All enquiries concerning entries for the BCA CONSTRUCTION PRODUCTIVITY AWARDS PROJECTS 2015 should be addressed to: The Secretariat BCA Construction Productivity Awards Projects Building and Construction Authority 52 Jurong Gateway Road, #11-01 Singapore Attention: Mr James Lu Ming Xuan / Mr Chin Kim Hong james_lu@bca.gov.sg / chin_kim_hong@bca.gov.sg Tel: /

9 BCA Construction Productivity Awards - Projects 2015 This set of Nomination Form is to be completed and returned not later than 23 January 2015 to: The Secretariat BCA Construction Productivity Awards - Projects Building and Construction Authority 52 Jurong Gateway Road, #11-01 Singapore Project title: ENTRY FORM 2. Project title: (in chinese) 3. Category of entry: (please tick one) 4. Type of project: (please tick one) 5. Is this an upgrading/ A & A project: (please tick one) O Residential Landed Buildings Category O Residential Non-landed Buildings Category (for projects with GFA < 25,000m 2 ) O Residential Non-landed Buildings Category (for projects with GFA 25,000m 2 ) O Commercial and Office Buildings Category O Institutional Buildings Category O Industrial Buildings Category O Mixed Development Buildings Category O Additions & Alterations / Upgrading Buildings Category O Civil Engineering Projects Category O Design & Build O Alternative Design O Build Only O No O Yes, please furnish brief description below 9

10 PROJECT TEAM Please state the name of organisations for Tables A, B, C and D. TABLE A: RECIPIENTS OF PLAQUE AND CERTIFICATE Name of Organisation in English Name of Organisation in Chinese Client QP for Architectural Works QP for Structural Works Collaborating Architectural Consultant (if any) Collaborating Structural Consultant (if any) Builder (for Design & Build and Alternative Design projects only) TABLE B: RECIPIENTS OF PLAQUE AND CERTIFICATE Name of Organisation in English Name of Organisation in Chinese 1 Conceptual Design Architect (if any) 1 Conceptual Design Engineer (if any) M&E Consultant Collaborating M&E Consultant (if any) Builder (for Build only projects) 10

11 TABLE C: RECIPIENTS OF PLAQUE AND CERTIFICATE - BUILDER S DESIGNERS (FOR DESIGN & BUILD AND ALTERNATIVE DESIGN ONLY) Architectural Works Structural Works M & E Works Name of Organisation in English Name of Organisation in Chinese TABLE D: RECIPIENTS OF PLAQUE AND CERTIFICATE ANY OTHER PARTIES IN THE PROJECT TEAM WHO HAVE CONTRIBUTED SIGNIFICANTLY TO THE PROJECT S BUILDABILITY 2,3 Role Name of Organisation in English Name of Organisation in Chinese 1 Conceptual Designers are independent designers who have initiated the conceptual design. These entries may be left blank if there are no Conceptual Designers for the project. 2 The party s contributions towards the project should be stated clearly in a separate attachment. Acknowledgement will only be given if the Assessment Panel recommends that substantial contributions to the project s productivity through buildability and technology adoption have been made. 3 BCA will not entertain any request for acknowledgement of any other party s role in the project unless the contributions by the party have been made known and submitted together with this nomination form. 11

12 Date of Tender Award 1 Tender Sum ($) PROJECT PARTICULARS & STATISTICS 2 Final Contract Sum ($) 3 Gross Floor Area (GFA), m 2 4 Total Constructed Area (TCA), m 2 5 Total Length and Width, m (For civil engineering project only, where applicable) Number of Units (For residential project only) Project Buildable Design Score (for building project only) Project Constructability Score (for building project only) CONQUAS Score Safety Awards (e.g. MOM ASPA, WSHBPA etc) Fatality Project AFR Project Safety De-merit Points Stop Work by MOM Note: - 6 COP COP Tender Sum refers to the cost at which the project was awarded at the time of tender. 2 Final Contract Sum refers to the cost of foundation works including piling, structural works, architectural works, M&E works, fixtures & fittings and related external works and facilities. Development charges, consultancy fees and other government charges are to be excluded. 3 Gross Floor Area (GFA) refers to areas as defined by URA. 4 Total constructed area (TCA) refers to the total constructed structural floor area used in the buildable design score calculation worksheets. It should include basement, superstructure, environmental deck, roof and other areas used in the calculation. 5 Total length and width refers to the total length and width constructed for civil engineering projects such as roads, tunnels, bridges etc. 6 Project buildable design score is to be computed based on both the Code of Practice on Buildability Apr 2011 and Code of Practice on Buildability 2013 Edition. The softcopies of the calculation worksheets can be downloaded from BCA website. 12

13 a. Project Duration Piling 1 Basement 1 Superstructure Total duration (Nos. of month) From (month and year) To (month and year) 1 The duration of the works shall include the completion of architectural and M&E works. Note: For Civil Engineering project, basement refers to works carried out below ground while superstructure refers to works carried out above ground. b. Project Cost Architectural Works Piling Basement Superstructure NA Structural Works M&E Works NA External Works NA NA Preliminaries 2 Total Cost 2 The summation of the total costs for piling, basement and superstructure works MUST be the same as the Final Contract Sum, which is documented in page 12. Note: For Civil Engineering project, basement refers to works carried out below ground while superstructure refers to works carried out above ground. c. Constructed Area (in m 2 ) For Building Projects only Substructure Superstructure 3 Basement 3 Environmental Deck (if any) 3 Superstructure (excluding roof) 3 Roof 3 Others (please specify) 3 The summation of the constructed areas for basement, environmental deck, superstructure, roof and/or others MUST be the same as the Total Constructed Area (TCA), which is documented in page 12 and in the calculation of the Buildable Design Score in the calculation worksheets. 13

14 d. Manpower (i) Basement works / works carried out below ground Man-days (one man-day equals 8 working hours) 1 Including site precast 2,3 Excluding site precast Site Management Team Structural Works Architectural Works M&E Works Total Manpower used for Basement / Underground Works (excluding site management team) (ii) Superstructure works / works carried out above ground Man-days (one man-day equals 8 working hours) 1 Including site precast 2,3 Excluding site precast Site Management Team Structural Works Architectural Works M&E Works Total Manpower used for Superstructure / Above Ground Works (excluding site management team) (iii) External Site Works : man-days 14

15 e. Precast level - volume of precast concrete over total concrete used (if applicable) % of overall precast used in project : (i) % of site precast : (ii) % of off-site precast : f. Cycle Time Per Floor (if applicable) For Building Projects only (i) (ii) (iii) Maximum cycle time per typical floor : Minimum cycle time per typical floor : Average cycle time per typical floor : (iv) Typical floor area (m 2 ) : g. Performance 1 Buildable Design Score 2 Constructability Score 3 Productivity (m 2 /manday) 4 Productivity (excluding site precast) (m 2 /manday) 5 Cost ($/m 2 of TCA & $/m2 of GFA) 6 Time Saving (month) MYE Usage Entitlement Actual Usage (i) (ii) Note: - 1 Applicable only to building projects. The Buildable Design Score must be derived by calculations using the buildable design score worksheets. 2 Applicable only to building projects. The Constructability Score must be derived by calculations using the constructability score worksheets. 3 Applicable only to building projects. The productivity of the project should be calculated using the Total Constructed Area (TCA) divided by Total man-days (manpower used for basement, superstructure works & external works but excluding site management team). 4 Applicable only to building projects where there is site precasting. The productivity of the project should exclude the manpower used for site production of precast components. The figure is also calculated using the Total Constructed Area (TCA) divided by Total man-days (manpower used for basement, superstructure works & external works but excluding site management team). 5 Applicable only to building projects. The Cost should be calculated using the Final Contract Sum (cost of foundation including piling, basement, superstructure works, architectural works, M&E works and external works) divided by the Total Constructed Area (TCA) for (i) and Gross Floor Area (GFA) for (ii). 6 The savings from a shorter project duration which have been made possible by the incorporation of buildable designs, technology adoption and innovation as compared to the project duration if conventional construction methods were used. 15

16 PROPOSAL We have read and understood the Nomination Form and we wish to enter the above project for the BCA Construction Productivity Awards Projects We declare that the information provided in the Nomination Form is correct to the best of our knowledge. We also declare that the building / civil engineering works were carried out in accordance to the design as shown in the drawings submitted and that the computation of the Buildable Design Score and Constructability Score are as stated in the Buildable Design Score Calculation and Constructability Score Calculation Worksheets respectively and as attached. Architect s Firm Signature and official stamp Name : Designation : Company Name : Company address : Tel No: Fax No: address: Structural Engineer s Firm Name : Signature and official stamp Designation : Company Name : Company address : Tel No: Fax No: address: Builder s Firm Signature and official stamp Name : Designation : Company Name : Company address : Tel No: Fax No: address: Client s Firm Signature and official stamp Name : Designation : Company Name : Company address : Tel No: Fax No: address: 16

17 GUIDELINES FOR THE PROJECT WRITE-UP A write-up of the project in ten-page length MUST be submitted using the guidelines below: A. Building Projects a. Description of project b. Structural buildable features To illustrate how the structural design concept including the adoption of any innovative designs for this project had facilitated ease of construction at site. c. Architectural buildable features To demonstrate how the architectural design concept for this project had facilitated easy construction on site and how buildability and aesthetics were achieved without compromising one another. d. M & E buildable features To highlight M & E buildable features such as integrated M & E systems or modular systems being adopted in the project which are over and above the conventional M & E design/works. e. Constructability To emphasise on the construction technologies and methods as well as the use of advanced plant and equipment that had helped the project to achieve higher productivity. In particular, to highlight innovative ideas in construction methodology which had allowed the project to achieve results beyond the norm. This could be in the form of a new or improved construction approach adopted in the project, use of mechanisation or the use of innovative system, product or material. To illustrate also how construction management solutions had benefited the project in terms of productivity and buildability. Consideration for site constraints such as access and safety management should also be highlighted. f. Simplicity for Construction To demonstrate how the use of simple yet efficient connection details or other simplification in designs had helped to allow for integration amongst the different building systems (structural, architectural and M&E design/details) and ease their construction. g. Design and Construction Integration To illustrate that the design and construction works had adopted a process whereby the architect, structural engineer, M&E engineer and builder had collaborated and coordinated to achieve a high buildability and constructability for the project. To highlight how the planning process and involvement of all parties in the early stage had helped the project in its delivery and to demonstrate that all building systems were interdependent and that the result of each set of decisions had a cascading impact on other design and construction decisions. 17

18 h. Aesthetics To demonstrate how the design solution had embraced buildability as an integral and synergistic element of the architecture that is both aesthetically delightful and contextually sensitive to people and place. In particular, to highlight special features of the project. For additions & alterations / upgrading projects, the design team should also emphasise how the old and new features for the building had blended with one another, and highlight features that increase convenience to the users after the additions & alterations / upgrading works. i. Why project deserves an award Description in not more than 200 to 300 words on how the project has provided benefits to the following areas: - General public and / or home buyer The industry Exceptional performance in productivity, cost saving, low MYE (man-year entitlement) usage and quality Aesthetics Any other benefits j. Conclusion B. Civil Engineering Projects a. Description of project b. Design for Ease of Construction To demonstrate how the project had taken into consideration buildable design to facilitate ease of construction at site that lead to the project being built efficiently. c. Construction Technology and Site Management To illustrate how the incorporation of construction technology and management solutions had benefited the project in terms of productivity and constructability as well as overcoming site challenges e.g. simplification of connection details, ease of handling and such other areas in architectural, structural or M&E design/detail. Consideration for site constraints such as access and safety management should also be highlighted. d. Design and Construction Integration To illustrate that the design and construction works had adopted a process whereby the design consultants and builder had collaborated and co-ordinated to achieve a high buildability and constructability for the project. To highlight how the planning process and involvement of all parties in the early stage had helped the project in its delivery and to demonstrate that all building systems are inter-dependent and that the result of each set of decisions has a cascading impact on other design and construction decisions. 18

19 e. Innovative Designs and/or Products Nomination Form for CPA - Projects To highlight technical innovation in design and/or use of innovative products that had allowed the project to achieve results beyond the norm and yet were cost effective. This could be in the form of a new or improved design concept/approach adopted in the project, design for effective mechanisation or the use of innovative system, product or material. f. Why project deserves an award Description in not more than 200 to 300 words on how the project has provided benefits to the following areas: - General public The industry Exceptional performance in productivity, cost saving, low MYE (man-year entitlement) usage and quality Any other benefits g. Conclusion 19

20 Buildable Design Score Calculation Worksheets Please download softcopies of the Buildable Design Score calculation worksheets for computing the project s score based on (i) (ii) COP 2011 version; and COP 2013 version. 20

21 Constructability Score Calculation Worksheets Please download a softcopy of the Constructability Score calculation worksheet for computing the project s score 21

22 Productivity Improvement Calculation Worksheets (Please photocopy extra copies of the worksheet if necessary) 22

23 Description of work: Conventional Method Description of work: New Improved Method Assumptions made: Assumptions made: Manpower required (no. of workers) = Time required (manhours) = Work done (m, m 2 or m 3 ) = Manpower required (no. of workers) = Time required (manhours) = Work done (m, m 2 or m 3 ) = Productivity (m, m 2 or m 3 per manhour) = Productivity (m, m 2 or m 3 per manhour) = Savings: No of workers = Time = Productivity improvement (%) = Material Cost = Labour Cost = Prelim Cost = Total Cost = Material Cost = Labour Cost = Prelim Cost = Total Cost = Cost Difference = 23

24 Description of how the new improved method contributes to good finishing quality and higher CONQUAS score: 24

25 Example on filling up the Productivity Improvement Calculation Worksheet: Conventional Method New Improved Method Description of work: Erecting internal wall partition using plastered brick wall Description of work: Erecting internal wall partition using drywall Assumptions made: (a) Use of 100mm thick brick wall (b) Floor to floor height 3.0m (c) Work include erection of bricks and plastering Assumptions made: (a) Use of 19mm thick gypsum board with a panel width of about 1200mm (b) Floor to floor height 3.0m (c) Work include setting up of frame, installation of acoustic insulation wool stuffing and gypsum board Manpower required (no. of workers) = 3 Time required (manhours) = 4.0 Work done (m, m 2 or m 3 ) = m 2 Manpower required (no. of workers) = 2 Time required (manhours) = 1.7 Work done (m, m 2 or m 3 ) = m 2 Productivity (m, m 2 or m 3 per manhour) = m 2 / 4.0 manhour = = 0.88 m 2 /manhour Productivity (m, m 2 or m 3 per manhour) = m 2 / 1.7 manhour = 3.11 m 2 /manhour Savings: No of workers = 1 Time = ( ) = 2.3 manhour Productivity improvement (%) = [( )/ 0.88] X 100% = 253% 25

26 Material Cost = A 1 Labour Cost = A 2 Prelim Cost = A 3 Material Cost = B 1 Labour Cost = B 2 Prelim Cost = B 3 Total Cost = A Total Total Cost = B Total Cost Difference = [(B Total - A Total )/ A Total ] X100% Description of how the new improved method contributes to good finishing quality and higher CONQUAS score: The dry wall has better finishing quality. Its smooth and clean surface is ready to receive the final finish and has minimum defects as compared to brick wall. In general, the drywall results in a higher internal wall score in CONQUAS of about 15 points as compared to brick wall. 26

27 List of Construction Trades/ Systems that requires filling up the Productivity Improvement Calculation Worksheet 1 : No. Conventional Method New Improved Method 1 Erecting external access using traditional external scaffold 2 Erecting formwork using traditional timber or metal formwork (for horizontal formwork) 3 Erecting formwork using traditional timber or metal formwork (for vertical formwork) 4 Concreting using normal concrete (for horizontal components) 5 Concreting using normal concrete (for vertical components) 6 Concreting using crane and bucket method (for horizontal components) 7 Concreting using crane and bucket method (for vertical components) 8 Deep basement construction using struts Erecting external access using self-climbing or crane lifted perimeter scaffold Erecting formwork using system formwork (for horizontal formwork) 2 Erecting formwork using system formwork (for vertical formwork) 3 Concreting using self compacting concrete (for horizontal components) 4 Concreting using self compacting concrete (for vertical components) 5 Concreting using concrete pump [& hydraulic stationary placing boom, if applicable] (for horizontal components) 4 Concreting using concrete pump [& hydraulic stationary placing boom, if applicable] (for vertical components) 5 Strut free deep basement construction 9 Cast in-situ construction Full precast construction 10 Cast in-situ construction Semi precast construction 6 11 Erecting internal wall partition using plastered brick wall 12 Ceramic wall tiling (or homogeneous wall tiling or marble wall tiling) using cement grout Erecting internal wall partition using drywall Ceramic wall tiling (or homogeneous wall tiling or marble wall tiling) using adhesive 7 27

28 No. Conventional Method New Improved Method 13 Ceramic floor tiling (or homogeneous floor tiling or marble floor tiling) using cement grout Ceramic floor tiling (or homogeneous floor tiling or marble floor tiling) using adhesive 7 14 Painting using roller method Painting using spray method 15 Constructing toilets using conventional method 16 Erecting air-con ducting using ducts that are formed and insulated on site 17 Use of copper pipes for domestic water system 18 Use of traditional scaffold for architectural, mechanical, electrical & plumbing works Constructing toilets using Prefabricated Bathroom Units (PBU) 8 Erecting air-con ducting using ducts that are prefab &/or pre-insulated 9 Use of flexible pipes for domestic water system Use of scissors/ personnel/ boom lifts for architectural, mechanical, electrical & plumbing works Notes: (1) The list is not exhaustive and applicants may fill in construction trades/ systems not listed in the table. (2) System formwork (for horizontal formwork) could include table formwork, panelled aluminium or plastic moulded formwork. Please specify the supplier (or builder) of the system formwork in the worksheet. (3) System formwork (for vertical formwork) could include steel formwork, panelled aluminium or plastic moulded formwork. Please specify the supplier (or builder) of the system formwork in the worksheet. (4) Please specify the type of horizontal component that was casted in the worksheet e.g. slab. (5) Please specify the type of vertical component that was casted in the worksheet e.g. wall. (6) Semi precast construction refers to partial precasting of some components together with cast in-situ construction of other components e.g. cast in-situ flat plate system with precast column or façade panel. Please specify the type of formwork used for the cast in-situ construction in the worksheet. (7) Please specify the type of wall or floor tiling in the worksheet. (8) Please specify the type of PBU in the worksheet e.g. volumetric bathroom unit (Steel wall panel with concrete slab) or volumetric bathroom unit (Concrete wall and slab). (9) Prefab air-con ducting refers to ducts that are prefabricated into rectangular or circular shape and then delivered to site. Ducts that are prefabricated into L-shape will not be considered as prefab air-con ducting. 28

BUILDING AND CONSTRUCTION AUTHORITY

BUILDING AND CONSTRUCTION AUTHORITY BCA CONSTRUCTION EXCELLENCE AWARDS 2016 BUILDING AND CONSTRUCTION AUTHORITY THE AWARDS The BCA Construction Excellence Awards accord recognition to construction projects that have demonstrated the highest

More information

CODE OF PRACTICE ON. Buildable Design September 2005

CODE OF PRACTICE ON. Buildable Design September 2005 CODE OF PRACTICE ON Buildable Design September 2005 The Code of Practice on Buildable Design is published by the Building and Construction Authority. Building and Construction Authority, September 2005

More information

Hanson Building Products. precast basement solutions

Hanson Building Products. precast basement solutions Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete

More information

Buildable Design Appraisal System

Buildable Design Appraisal System Guideline BCA Technology Development Division Guide to the Buildable Design Appraisal System!" The Guide to the Buildable Design Appraisal System is electronically published by the Technology Development

More information

PROJECT COST ESTIMATES & FEASIBILITIES

PROJECT COST ESTIMATES & FEASIBILITIES PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed

More information

Guidelines on Prior Approval (PA) Application to recruit Foreign Workers (Construction)

Guidelines on Prior Approval (PA) Application to recruit Foreign Workers (Construction) Work Pass Division 18 Havelock Road Singapore 059764 Tel: 6438 5122 http://www.mom.gov.sg mom_wpd@mom.gov.sg Guidelines on Prior Approval (PA) Application to recruit Foreign Workers (Construction) Please

More information

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP) CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP) Work Groups Composition and Weightings of Sub-indices CURRENT AS AT 1 JANUARY 2013 Issued by the CPAP Committee Distributed by the Association of South African

More information

CHAPTER 2 QUANTITY TAKE-OFF

CHAPTER 2 QUANTITY TAKE-OFF CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE FOR COMPANIES EMPLOYING FIVE OR LESS EMPLOYEES

CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE FOR COMPANIES EMPLOYING FIVE OR LESS EMPLOYEES CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE FOR COMPANIES EMPLOYING FIVE OR LESS EMPLOYEES GENERAL INFORMATION Company Name: Company Address: Telephone No. Fax No. Mobile No. Email Address Year Company

More information

QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE

QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE DEPATMENT OF PUBLIC WOKS EPUBLIC OF SOUTH AFICA BUILDING COST DATABASE AUGUST 2012 DEPATMENT OF PUBLIC WOKS EPUBLIC OF SOUTH AFICA BUILDING COST DATABASE POJECT DATA SHEET NOTE Bills of Quantities Stage

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

How To Build A Luxury Apartment Complex In London

How To Build A Luxury Apartment Complex In London Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking

More information

Learning Effect of Interior Finishing and Building Services Works for Multi-Dwelling Complex Project

Learning Effect of Interior Finishing and Building Services Works for Multi-Dwelling Complex Project The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Learning Effect of Interior Finishing and Building Services Works for Multi-Dwelling Complex Project

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Issue of the Guidelines on Prevention of Water Seepage in New Buildings graphic: Buildings Department Your REF 來 函 檔 號 :. OUR REF 本 處 檔 號 :.BD GR/1-55/173 FAX 圖 文 傳 真 :..28400451 TEL 電 話 :..2626 1717 www.info.gov.hk/bd To : All Authorized Persons 7 March 2005 Registered Structural

More information

Owner Builder permit. Owner builder application. Company application. Lease agreements. Owner builder course. Build better.

Owner Builder permit. Owner builder application. Company application. Lease agreements. Owner builder course. Build better. Build better. Owner Builder permit Under the Queensland Building and Construction Commission Act 1991 you must obtain an Owner Builder permit before carrying out building work with a value of $11,000 or

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

HOME INSURANCE ASSESSMENT

HOME INSURANCE ASSESSMENT m pl e HOME INSURANCE ASSESSMENT Sa Street Address, Suburb File. 0000 Date. December 2014 Street Address, Suburb Page 1 of 8 File. 0000 Date. December 2014 Client Name Street Address Suburb HOME INSURANCE

More information

C-2 Construction, Inc. - NAICS Codes

C-2 Construction, Inc. - NAICS Codes C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

INCIDENCE AND LEVY OF TAX ON WORKS CONTRACTORS, BUILDERS & COLLABORATORS

INCIDENCE AND LEVY OF TAX ON WORKS CONTRACTORS, BUILDERS & COLLABORATORS [Parveen Mahajan, Advocate Vat Consultant] www.delhivatconsultants.in Phone: 09811067944 Email Id: parv.mahajan@gmail.com INCIDENCE AND LEVY OF TAX ON WORKS CONTRACTORS, BUILDERS & COLLABORATORS S.No.

More information

Sports Buildings: budget costs for the Flood Relief Fund

Sports Buildings: budget costs for the Flood Relief Fund Sports Buildings: budget costs for the Flood Relief Fund The list below provides typical costs for flood insurance works, typically required by sports clubs or facilities. The list is not exhaustive but

More information

Think Of Us First! When It s Time to Distribute Your Plans

Think Of Us First! When It s Time to Distribute Your Plans Think Of Us First! When It s Time to Distribute Your Plans CONSTRUCTION NOTEBOOK WILL LIST YOUR PLANS AND SPECS FREE CALL TODAY FOR DETAILS 702-876-8660 Why use Experience We have over 60 years of experience

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below

More information

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities At Macau International Airport (RFQ-198) Section 6 Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA

More information

City of Fort Smith Building Permit Process Frequently Asked Questions

City of Fort Smith Building Permit Process Frequently Asked Questions Question: W ho must obtain a building permit? City of Fort Smith Building Permit Process Frequently Asked Questions Answer: This answer is the same for residential or commercial building. Any owner or

More information

RECOMMENDED MODEL AGREEMENTS BETWEEN HOUSING CONSUMERS AND HOME BUILDERS FOR THE CONSTRUCTION OF A HOME

RECOMMENDED MODEL AGREEMENTS BETWEEN HOUSING CONSUMERS AND HOME BUILDERS FOR THE CONSTRUCTION OF A HOME National Home Builders Registration Council RECOMMENDED MODEL AGREEMENTS BETWEEN HOUSING CONSUMERS AND HOME BUILDERS FOR THE CONSTRUCTION OF A HOME (14 October 2002) 1 Requirements of the Housing Consumers

More information

HANLO The WELCOME HOME Experience.!! Simply better homes!!

HANLO The WELCOME HOME Experience.!! Simply better homes!! HANLO The WELCOME HOME Experience!! Simply better homes!! The Mission Our mission is to provide individual, sustainable and affordable homes to self builders and developers that can be built fast, efficient

More information

technology UICK progressive sustainable any design, any shape, any colour, anywhere you like!

technology UICK progressive sustainable any design, any shape, any colour, anywhere you like! uality using advanced building technology UICK uality innovative progressive sustainable any design, any shape, any colour, anywhere you like! 2 NicheQ is an award winning progressive and innovative builder

More information

MAKE CHECK PAYABLE TO MIAMI-DADE COUNTY

MAKE CHECK PAYABLE TO MIAMI-DADE COUNTY APPLICATION FOR PERSONAL CERTIFICATION APPLICATION FEES PERSONAL APPLICATION FEES JOURNEYMAN AND MAINTENANCEMAN. $ 240.00 MASTER AND INSTALLER...... $ 315.00 BUILDING/BUILDING SPECIALTIES PERSONAL CERTIFICATE.

More information

Water Leak 1: Intrusion Policy

Water Leak 1: Intrusion Policy Water Leak 1: Intrusion Policy {Non-Casualty) 1. Determine Source of Leak Roof Leak- 11 See roof leak" Pressured Pipe leak- 11 See pressured pipe leak" Water Intrusion- See 11 see Water Intrusion leak"

More information

MASTER BUILDERS ASSOCIATION

MASTER BUILDERS ASSOCIATION MASTER BUILDERS ASSOCIATION New South Wales 2015 EXCELLENCE IN CONSTRUCTION AWARDS ENTRY FORM Closing Date: Friday 12 June 2015 2015 EXCELLENCE IN CONSTRUCTION AWARDS ENTRANT DETAILS Are you an MBA member?

More information

Built to Last. Built for Beauty. Good. Solid. Logix. TM

Built to Last. Built for Beauty. Good. Solid. Logix. TM Built to Last. Built for Beauty. Good. Solid. Logix. TM Quality, Value and Service Introducing LOGIX Insulated Concrete Forms. Based on the simple concept of interlocking blocks, LOGIX ICF gives you a

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

MEMORANDUM. General: Foundation:

MEMORANDUM. General: Foundation: MEMORANDUM State of Alaska Department of Transportation and Public Facilities Central Region - Division of Construction and Operations Public Facilities Branch TO: Jennifer Murrel DATE: August 19, 2010

More information

A Guide to... Home Renovation Incentive (HRI)

A Guide to... Home Renovation Incentive (HRI) A Guide to... Home Renovation Incentive (HRI) About this guide This guide will tell you what you need to know if you are organising to have construction work done on your house and would like to avail

More information

A&E A&E. ProSurance TM. Application Form INSURANCE FOR ARCHITECTS & ENGINEERS

A&E A&E. ProSurance TM. Application Form INSURANCE FOR ARCHITECTS & ENGINEERS A&E INSURANCE FOR ARCHITECTS & ENGINEERS ProSurance TM A&E Application Form This is an application for an errors and omissions package policy designed specifically for architects and engineers. As well

More information

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Design Development Quality Management Phase Checklist Project Phase Checklist Series Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA

More information

ANNEX A. Page 4 of 30

ANNEX A. Page 4 of 30 ANNEX A CPA Advocates The Construction Productivity Award (CPA) Advocates recognises outstanding developers, consultants, builders and subcontractors for their achievements in improving productivity at

More information

CHECKLIST OF DOCUMENTS NEEDED DO NOT FAX, BRING ALL DOCUMENTS WITH THIS APPLICATION THREE CONTRACTOR AFFIDAVITS OF WORK EXPERIENCE.

CHECKLIST OF DOCUMENTS NEEDED DO NOT FAX, BRING ALL DOCUMENTS WITH THIS APPLICATION THREE CONTRACTOR AFFIDAVITS OF WORK EXPERIENCE. CHECKLIST OF DOCUMENTS NEEDED DO NOT FAX, BRING ALL DOCUMENTS WITH THIS APPLICATION THREE CONTRACTOR AFFIDAVITS OF WORK EXPERIENCE. (NO LETTERS) CERTIFICATE OF LIABILITY INSURANCE FROM THE INSURANCE COMPANY

More information

Standards Committee T echnical Technical Conference

Standards Committee T echnical Technical Conference Standards Committee Technical Conference Agenda Overview of claims costs Years 0 2 claims and resolutions Years 3 10 claims What are we commonly seeing now? An example of what we might see in future? Summary

More information

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap Tile Backing Will not deteriorate in water Easy to score and snap Resistant to mould and mildew Knauf Aquapanel Interior Cement board for wet areas Knauf Aquapanel Interior Cement Board Drywall for Wet

More information

Concrete Waterproofing Systems. Integral Protection. www.tritonsystems.co.uk

Concrete Waterproofing Systems. Integral Protection. www.tritonsystems.co.uk Concrete Waterproofing Systems Integral Protection n Type B Integral Protection in accordance with BS 8102 (2009) n Unique chemical admix for waterproofing and protection of concrete n A complete and permanent

More information

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION Table of Contents Executive Summary... 1 Introduction... 1 Installing

More information

Advantages and Disadvantages of Timber Frame Construction

Advantages and Disadvantages of Timber Frame Construction Appendix 1: Table A1.1 Advantages and Disadvantages of Timber Frame Construction Advantages of Timber Frame Construction Quick erection times Reduced site labour Reduced time to weather the structure Earlier

More information

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form

More information

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012 2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,

More information

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything

More information

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr. 117 S. Market St. Benton, AR 72015 * 501-315-2626 * Fax 501-315-0024 October 30, 2014 Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR Re: Report of Findings,, Benton, Arkansas, Dear Mr. Vick: This

More information

PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS

PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS Jan 2012 CONTENTS GENERAL... 1 1 Background... 1 2 Qualifications and Expectations of Structural Engineers... 1

More information

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW Parcel Number: Owner s Name: Co-Owner s Name: Owner s Mailing Address: Owner Phone Number: FIRM Panel: Lowest Floor Elevation (excluding garage):

More information

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME 7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME) Cost Guide < 1 > MARKET SUMMARY OVERVIEW Low interest rates and competitive construction pricing makes now a great time to renovate or build a new home. Interest rates are at historic lows and can be fixed

More information

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling

More information

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall TOWN of NEW BOSTON Bid Package Refurbishment and Upgrade of Basement of the New Boston Town Hall Your bid Envelope must be marked with Basement Upgrade at Town Hall and the due date and time. If you send

More information

NATIONAL INSTITUTE OF BIOLOGICALS

NATIONAL INSTITUTE OF BIOLOGICALS Short Term Notice Inviting Quotations Quotations No. S.1-36/07/NIB/Engg. (Civil) Invitation to short term quotations for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in

More information

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS Rebuilding or repairing your home/business after the storm? Adding on, renovating, or remodeling your home/business? Here s information YOU need

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri Determination 2009/103 The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri 1. The matters to be determined 1.1 This is a determination under Part 3 Subpart 1 of the

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

Requirements for Building Application Submission

Requirements for Building Application Submission THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: phyplskb@caribsurf.com To: Architects, Designers

More information

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span formwork formwork Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span has grown to become one of the major players in the scaffolding and

More information

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE SITEWORKS FOUNDATIONS & SURFACE BED Site to be cleared and leveled. Builder s rubble to be carted away. As per Engineer s design, with USB green waterproofing.

More information

Construction and Demolition Waste

Construction and Demolition Waste Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers ADV-19 Buildings Department Practice Note

More information

TD AMERITRADE Park Omaha

TD AMERITRADE Park Omaha TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment

More information

Regulations for the 25% State Commercial Tax Credit Program Prepared by the Division of Historic Preservation

Regulations for the 25% State Commercial Tax Credit Program Prepared by the Division of Historic Preservation Regulations for the 25% State Commercial Tax Credit Program Prepared by the Division of Historic Preservation A. DEFINITIONS These Regulations provide guidelines for the application process and the Administration

More information

MASTER BUILDERS ASSOCIATION

MASTER BUILDERS ASSOCIATION MASTER BUILDERS ASSOCIATION New South Wales 2015 EXCELLENCE IN HOUSING AWARDS ENTRY FORM Closing Date: Friday 20 March 2015 2015 EXCELLENCE IN HOUSING AWARDS AN ELECTRONIC VERSION OF THIS ENTRY FORM IS

More information

SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS

SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS SITE C SHOPPING CENTRE, KHAYELITSHA PROJECT NO 2369 Project Specification Refer all queries to: John Meiring Tel: +27 21 425 0065 REVISION P01 E-mail:

More information

STEEL BUILDINGS IN EUROPE. Multi-Storey Steel Buildings Part 2: Concept Design

STEEL BUILDINGS IN EUROPE. Multi-Storey Steel Buildings Part 2: Concept Design STEEL BUILDINGS IN EUROPE Multi-Storey Steel Buildings Part 2: Concept Design. Multi-Storey Steel Buildings Part 2: Concept Design 2 - ii FOREWORD This publication is a second part of a design guide,

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

A GUIDEBOOK TO THE CHANGES IN BUILDING CONTROL 2007/2008. Building and Construction Authority

A GUIDEBOOK TO THE CHANGES IN BUILDING CONTROL 2007/2008. Building and Construction Authority A GUIDEBOOK TO THE CHANGES IN BUILDING CONTROL 2007/2008 Building and Construction Authority For reference, this is the version as of 31 Mar 2009 Copyright @ 2009 Building and Construction Authority, Singapore.

More information

City of St. Charles Basement Finish or Remodel

City of St. Charles Basement Finish or Remodel City of St. Charles Basement Finish or Remodel Building & Code Enforcement Division 2 East Main Street St. Charles IL 60174 630.377.4406 (Office) 630.443.4638 (Fax) http://www.stcharlesil.gov Please direct

More information

Guide for Homeowners

Guide for Homeowners Guide for Homeowners Getting Construction Work Done Safely New responsibilities for homeowners under Safety, Health and Welfare at Work (Construction) Regulations 2013 Our vision: A country where worker

More information

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013 The following guide is a general list of Builders Mutual s appetite for business classes residential and commercial WorkSafe workers compensation and Builders Best general liability (including trade contractors),

More information

Product description NCC Data Center

Product description NCC Data Center Product description NCC Data Center Concept General As one of the largest actors in the Nordic construction industry, NCC Construction plays a leading role in shaping the future of our society. After building

More information

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

CITY OF SELMA, TEXAS Inspection Checklist: Commercial Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides

More information

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses. The Townhouses Park View Place A A Compass House A T T T Royal Wharf Gardens Endeavour House T A A Thameside House T Sienna House A A A A T Apartments Townhouses River Thames Compass House Compass House

More information

2009 IECC Update. Scope. Content. International Energy Conservation Code

2009 IECC Update. Scope. Content. International Energy Conservation Code 2009 IECC Update International Energy Conservation Code Scope The code applies to both residential and commercial buildings. In the code, the United States is divided into eight climate zones which are

More information

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

Knock Down Rebuild. Building Process Building process - knock down rebuild 1 Knock Down Rebuild Building Process Building process - knock down rebuild 1 Building Process Your action Our action REMINDER Pre site Step 1 New Home Selection Congratulations. This marks the start of

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

CONSTRUCTION SUMMARY OF THE PEREIRA HOUSE AT MADOL, VERNA GOA.

CONSTRUCTION SUMMARY OF THE PEREIRA HOUSE AT MADOL, VERNA GOA. CONSTRUCTION SUMMARY OF THE PEREIRA HOUSE AT MADOL, VERNA GOA. On our visit to the house of Conceicao Pereira s house we decided to make many changes that were needed to improve the living conditions of

More information

CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name:

CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name: STATE OF CALIFORNIA RESIDENTIAL ALTERATIONS - RE-ROOF CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name: CALIFORNIA ENERGY COMMISSION CF-1R-ALT-01-E (Page 1 of 2) Date Prepared: A.

More information

SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP

SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP CONTENTS 1. Site address... 3 2. Background... 4 3. Scope of work... 4 4. General conditions... 5 4.1 Materials,

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

Geotechnical Building Works (GBW) Submission Requirements

Geotechnical Building Works (GBW) Submission Requirements Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.

More information

Pre-Drywall Inspection Report

Pre-Drywall Inspection Report SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion

More information

Frequently Asked Questions

Frequently Asked Questions Warren County, Tennessee Building & Environmental Codes Department 201 Locust Street, Suite 6 McMinnville, TN, 37110 931.474.2633 Frequently Asked Questions What building codes are the Warren County Building

More information

Buildings Department Practice Note for Registered Contractors 69. Minor Works Contractors Registration

Buildings Department Practice Note for Registered Contractors 69. Minor Works Contractors Registration Buildings Department Practice Note for Registered Contractors 69 Minor Works Contractors Registration Certain building works are designated as minor works subject to the control under the Minor Works Control

More information