How To Build The Burj Dubai Tower



Similar documents
Brief on the Construction Planning of the Burj Dubai Project, Dubai, UAE

Burj Dubai: World s Tallest Building. Facts & Figures:

Ping An: Insurance and Tall Buildings

The Design and Construction of the World s Tallest Building: The Burj Khalifa, Dubai

Design and Construction Planning of the Burj Khalifa, Dubai, UAE

Tall buildings. Florea Dinu. Lecture 13: 25/02/2014

A 38-story design-build steel structure features a staggered-truss frame

Security in High-Rise Buildings Burj Dubai. Greg Sang Director, Projects Emaar Properties

BURJ KHALIFA, WORLD S TALLEST STRUCTURE Dr.N.Subramanian Consulting Structural Engineer, Maryland, U.S.A.

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

Engineering the World s Tallest Burj Dubai

Engineering the World s Tallest Burj Dubai

Za abeel Energy City Master Plan. Dubai, United Arab Emirates

Structural Systems for Tall Buildings Professor Mahjoub Elnimeiri, PhD Fall Lecture 1

Conceptual design and design examples for multi-storey buildings

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

Buildings Construction Procurement Strategy

800 EMAAR (36227) Marina Plaza

Burj Khalifa Dubai, United Arab Emirates. Booklet available on: Livret disponible sur: Folleto disponible en: Architecture.LEGO.

Burj Dubai: Designing the World s Tallest

Bertrand Goldberg Archive. Inscription. Details. Erie Project. RX23664/ Project Name Building Name AIC Reference Number

Analysis II Façade Redesign: Architectural Precast Panels

Validating the Structural Behavior and Response of Burj Khalifa: Synopsis of the Full Scale Structural Health Monitoring Programs

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)

Certification: Building Plans Examiner. Exam ID: B3

Brock Commons Phase 1 University of British Columbia, Vancouver, Canada

Structural Design of Reinforced Concrete Tall Buildings

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

How To Build A Luxury Apartment Complex In London

Hunter College school of Social Work Thesis Proposal

CE591 Lecture 8: Shear Walls

Building Construction. Structural Systems 1. Load-bearing wall construction 2. Skeleton framing 3. Combination of the two

Specification for Structures to be Built in Disaster Areas

Siting and settlement: The most important way to protect shelter from floods is to build in a place that is unlikely to be flooded.

EAST LYME HIGH SCHOOL

Instructions 1. trigger visit

The Florida Building Code

How To Understand The World Trade Center'S Structural Design

Wind and Tall Buildings Negatives and Positives

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

Peninsula Place, Greenwich, London

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

Commerzbank Head Office. Frankfurt am Main

Seismic Retrofitting for School Buildings in Japan Nonstructual Seismic Retrofitting

Contractor s Statement of Responsibility for Seismic-Force-Resisting Systems This form is to be filled out by the contractor.

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

THE SKYSCRAPER MUSEUM DBQ DOSSIER 2. tools for teaching student guide BOOM & BUST: SKYSCRAPERS & SPECULATION s HISTORICAL CONTEXT TASK

Two IFC and Four Seasons Hotel. David Yau. HKIVM Conference 2008

ETABS. Integrated Building Design Software. Concrete Shear Wall Design Manual. Computers and Structures, Inc. Berkeley, California, USA

Subtropical Cities September Design for Energy Efficiency in Commercial Buildings in Queensland

Cover page. Introduction to the Earthquake Resistance Capacity Assessment and Reinforcement of Taipei Water Department Office Building.

Commercial Residential Model Reviews

Civil Engineering and Architecture (CEA) Detailed Outline

Basic principles of steel structures. Dr. Xianzhong ZHAO

Sample Drawing Package for One and Two Family Dwelling Applications

SOM. Multidisciplinary Design SOM. Kent Jackson Design Director June 2014

C-2 Construction, Inc. - NAICS Codes

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate

Commercial Building Valuation Report

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

[TECHNICAL REPORT I:]

Resource Piling Large Load Tests using a Reaction System

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

Year project completed or estimated year of completion: October 2014

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

PERFORMANCE BASED SEISMIC EVALUATION AND RETROFITTING OF UNSYMMETRICAL MEDIUM RISE BUILDINGS- A CASE STUDY

BUILDING SAFETY UNIT

john jay college of criminal justice

THE STAR, DARLING HOTEL AND SPA PYRMONT, NSW. Associate Director, Taylor Thomson Whitting Ltd, Sydney, Australia

SEISMIC CAPACITY OF EXISTING RC SCHOOL BUILDINGS IN OTA CITY, TOKYO, JAPAN

PLANT LOCATION AND LAYOUT

Lightning Protection Introduction

MOCK-UP TEST REPORT. Rendered to: TUBELITE, INC. PROJECT: 200 Series Curtain Wall Mock-Up

2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS

Olilo's AEC Design Services. SrinSoft Inc, Partners of

Liberal Arts & Science Building

Think Of Us First! When It s Time to Distribute Your Plans

SEISMIC ANALYSIS AND RETROFITTING OF R.C.C STRUCTURE

Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar,

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California Prepared By

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

Designer s NOTEBOOK DESIGN ECONOMY, PART 3

Models and Methods in Applied Sciences

SECTION 3 ONM & J STRUCTURAL ANALYSIS

Text Box 1 Important Actions, Questions and Constraints to Consider on Standards and Vulnerability

Rehabilitation of a 1985 Steel Moment- Frame Building

Page & Turnbull imagining change in historic environments through design, research, and technology

The Role of Acoustics in Curtain Wall Design:

Sapa Building System, first time at BAU

Elevating Your House. Introduction CHAPTER 5

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

BUILDING CONSTRUCTION

Guernsey s Structural Engineering Experience

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

First 14-storey wood building in the world at Bergen in Norway Premier bâtiment en bois à 14 niveaux au monde à Bergen en Norvège

Transcription:

Burj Dubai Tower History Rising Burj Dubai Tower History Rising 2003 All rights reserved. 1

Burj Dubai Tower History Rising Burj Dubai Tower Introduction Architecture Structure Sustainability Issues Construction Progress Discussion 2003 All rights reserved. 2

Burj Dubai Tower Team Burj Dubai Tower Introduction Architecture Structure IVTA Sustainability Issues Construction Progress Discussion 3

World s Tallest Buildings Design Concept Desert flower patterns Traditional Islamic Architecture Arabic Geometry Singer Bld 1908 Met Life 1909 Woolworth Bld 1913 Trump Bld 1930 Chrysler Bld 1930 Empire State 1931 World Trade 1972 Sears Tower 1974 Petronas Towers 1998 Taipei 101 2004 Burj Dubai 2009 Span of 100 years 4

Why Build the Burj Dubai Tower? Why Build the Burj Dubai Tower? 5

Burj Dubai Tower Burj Dubai Estate Masterplan Doha St Sheikh Zayed Road 6

#p Burj Presenatation to Dubai HCT 14-Apr-08 Mixed Use Programme 13-Apr-08. B1 Level Total Tower Area: 279,000 m2 Total Podium Area: 186,000 m2 Tower Usage: 172 Hotel Guestrooms 492 Hotel Residences 354 Residences 232 Luxury residences Total Units 1250 37 Boutique offices 4 Communication Floors 1 Observatory 3,000 Parking Spaces Communication Boutique Offices Luxury Residential Residential Hotel Residences Hotel 7

Ground Level Level 3 8

Hotel Residential Floor Plan Level 9 Tier 0 Residential Floor Plan Level 64 Tier 6 9

Luxury Residential Boutique Office Boutique Office Boutique Office Floor Plan Level 99 Tier 9 Floor Plan Level 113 Tier 10 Sky Lobby / Entry to Club Level 123 Tier 10 Floor Plan Level 139 Tier 12 10

Office & Viewing Platform Lifts Fire & Life Safety Diagram Area of Refuge 138 Office Transfer & Viewing Platform at L138 Area of Refuge 111 Communication Boutique Offices Luxury Residential Residential Hotel Residences Hotel Area of Refuge 76 Area of Refuge 42 11

Cladding Wind Tunnel Cladding Pressure Tap Test at RWDI Stainless Steel Spandrels Polished Stainless Steel High-performance Insulated Glazing Anodized Aluminium Extruded Aluminium Mullions Tower Cladding Mock-up 12

Wind Tunnel Cladding Pressure Diagram Cladding Installation 13

Cladding Installation Burj Dubai Tower Introduction Architecture Structure Sustainability Issues Construction Progress Discussion 14

Structural System Description Structural Overview Steel Braced Frame Spire/Communication Reinforced Concrete Core Wall System Hotel/Residential/Office Plan Y-shaped floor plan is ideal for residential program Maximizes window perimeter to floor plate area Is inherently stable Buttressed core Three wings arranged around central core Each wing supports other two Setbacks occur at each wing in a spiraling pattern Reduces vortex shedding by changing building shape 24 times Modular system = no transfers Plan Pile Supported Raft Foundation All high performance concrete construction Reinforced concrete core walls linked to exterior columns More rigid structure = less motion 15

Buttressed Core Core & Buttresses 16

Core Walls Vortex Shedding Setback Level Setback Level Deformed Shape (exaggerated) Outrigger Wall at Mechanical Wing B Core Wall Elevation 17

Wind Tunnel Testing at RWDI Movement of the Tower Aeroelastic Test Application unusual geometry significant motion-induced forces Buildings move under wind or seismic loading Computer models are used to calculate this movement Acceleration Summary: Acceleration (mg) Usage Output accelerations overall base overturning moment estimated equivalent lateral forces aerodynamic damping 24.4 Top Office 9.9 Observation Deck 6.9 Top Residential Return Period = 10 years Damping Ratio = 1.5% 18

Movement of the Tower Movement of the Tower Buildings move under wind or seismic loading Computer models are used to calculate this movement Acceleration Summary: Acceleration (mg) Usage 24.4 Top Office 9.9 Observation Deck 6.9 Top Residential Return Period = 10 years Damping Ratio = 1.5% 19

Seismic Risk Comparison of Seismic Spectra Spectral Acceleration, g 0.50 0.40 0.30 0.20 Period of Podium UBC Zone 2A Type Sc UBC Zone 1 Type Sc Burj Dubai Tower Site Specific - Irvine Burj Dubai Mall Site Specific - Azm Period of Tower 0.10 Min Acceleration 0.00 0 1 2 3 4 5 6 7 8 9 10 Period (seconds) 20

Tower Foundation Foundation Settlement: Tower 1500 Diameter RC Bored Pile (48m) Structure Above 3700 Deep Raft Foundation 21

Foundation Settlement: Tower & Podium Steel Spire Top of tower is a steel spire Communications systems, etc Spire constructed above L156 (top of concrete) 10 15 25 40 70+ stories of steel structure Area of construction activities ~ 1.5 to 2 times a tennis court 5 22

Steel Spire Spire Erection Sequence Building Eiffel Tower on Tennis Court, which is on the top of Taipei 101!!! 23

Concrete Facts Materials & Sustainabiltiy Cement and aggregates locally sourced High-strength concrete, minimises cement usage and concrete volumes Concrete Facts High-Strength Concrete A brittle material Failure is sudden, catastrophic and explosive 24

Concrete Facts Concrete Facts Material Quantities 330,000 m³ of concrete Concrete pumped to 629 m - a world record 40,000 tonnes of rebar 4,000 tonnes of structural steelwork 7,500 people 25

Burj Dubai Tower Sustainability Issues Cladding Introduction Architecture Structure Sustainability Issues Construction Progress High-performance Insulated Glazing Shading coefficient 0.18 Normal clear glass 0.5 DM maximum 0.33 U-value 1.8 DM maximum 2.1 Discussion 2003 All rights reserved. 26

Sustainability Issues Transportation Dedicated tram lines connected to Metro 8,000 people per hour Sustainability Issues Storm Water Drainage Filtered before discharge into DEWA system Lakes act as storm water surge storage 27

Sustainability Issues Burj Dubai Tower Air Conditioning & District Cooling 3 dedicated distinct cooling plants Highly efficient Environmentally friendly refrigerants used in AC Variable speed pumps only pump the amount of water required Introduction Architecture Structure Sustainability Issues Construction Progress Discussion 28

Construction Construction Oct 2005: Core at Level 10 Apr 2006: Core at Level 40 Jan 2007: Core at Level 99 Aug 2007: Core at Level 146 Mar 2008: Core at Level 160, Spire Started Jun 2009: Practical Completion 29

Aug 2004 Aug 2004 30

May 2005 May 2005 31

Jan 2008 Jan 2008 32

View from 630 m - April 2008 Dubai - Can Do 1985 2005 1985 2005 2005 1985 2005 33

Burj Dubai Tower Introduction Burj Dubai Tower History Rising Jan 2008 Architecture Structure Construction Discussion 34

Burj Dubai Tower History Rising 2003 All rights reserved. 35