A 38-story design-build steel structure features a staggered-truss frame
|
|
|
- Scott Gray
- 9 years ago
- Views:
Transcription
1 ALADDIN HOTEL A 38-story design-build steel structure features a staggered-truss frame Robert J. McNamara is president of McNamara/Salvia, Inc., in Boston. Among his more notable projects during his more than three-decade and 100+ project career are: Citicorp Center in New York City; Government Service Insurance Systems in Manila (Philappines); International Place in Boston; Torre Banaven in Caracas (Venezuela); and The Westin Hotel in Providence, RI. WITH A BUILDING BOOM UNDERWAY IN LAS VEGAS, IT WAS ONLY A MATTER OF TIME BEFORE AN INNO- VATIVE DEVELOPER TURNED TO THE DESIGN-BUILD APPROACH TO HELP ERECT A NEW HOTEL UNDER A SUPER FAST-TRACK SCHEDULE. The new Aladdin Hotel is a 2,600-room, 38-story tower replacing the old Aladdin Hotel, which was imploded in March In addition, the $1.2 billion mixed-use retail mall and casino utilized a staggered truss frame for the hotel tower portion of the project. The design, provided by structural engineering firm McNamara/Salvia, Inc., of Boston, was developed with the steel fabricator, AISC-member SMI-Owen Steel Company of Columbia, SC. Staggered trusses were utilized to provide column-free space and precast plank provides the floor framing between the trusses. The lateral load resisting system is provided by two braced core structures and four separate bracing bents at the ends of the tower wings. An unusual plan and vertical irregularity of the tower masses presented challenging engineering design p r o b l e m s. Extensive wind tunnel analysis along with complete three-dimensional seismic analysis was performed for the design. The steel staggered truss structure was presented to the owner as an alternative to the traditional pouredin-place concrete tower usually constructed in Las Vegas. With overall system evaluations (including fire protection and finishes) providing definite cost savings and a significant reduction in total construction time, the stag-
2 gered truss system was selected by the owner as the most economical solution for the new hotel structure. BUILDING GEOMETRY OF LOADING The hotel tower is composed of six retail, restaurant and office levels, and 33 levels of guestrooms. The upper five levels are special guestrooms and suite floors. The lower six levels are integrated into the surrounding low-rise complex made up of casinos, retail malls, back of house services and parking structures. The entire project surrounds the historic performing arts center. The site also allows for another 31-story hotel with separate theming from the Aladdin Hotel. The unusual building geometry of the tower necessitated an extensive wind tunnel investigation for overall strength loads and for occupancy comfort. Extensive computer analysis of the tower for seismic effects was also required because of the irregular mass and stiffness distribution. BUILDING FOUNDATIONS Foundations for the tower were originally conceived to be spread footings and mats based on limited sub-surface investigations. After demolition of the old Aladdin Hotel, additional sub-surface investigations revealed the absence of the cemented soil layer found in much of the Las Vegas basin. Without the cemented soil layer the differential settlements between the high-rise and lowrise towers were found to be unacceptable and a caisson foundation system was selected. The caisson system was the first used in Las Vegas for a high rise building. Load tests were performed on caissons to determine the soil design parameters. All loads are carried on the caisson through skin friction to the surrounding soil. Caissons range from 3 to 6 in diameter and are drilled to depths of 50 to 80. Tie beams are used to connect all caissons. Soil structure interaction analysis was utilized for the lateral load design of the foundation caisson systems. TOWER STRUCTURE STAGGERED TRUSSES The staggered truss system, originally developed at MIT in the 1960s in conjunction with William LeMessurier, was utilized and the basic gravity system. Trusses are 9-0 deep with a large corridor opening (9-7 ) in the center panel. The 63-4 span of the staggered trusses provided column free spaces under the tower footprint. Eight-inch precast planks span the typical 31-4 and 22-4 between trusses. Because of the very large sail area of the tower, the wind forces on the structure were large for a structure with a height of 400. The need to eliminate shear walls in the lower levels also presented design problems for the lateral force resisting system.
3 TOWER STRUCTURE LATERAL LOAD SYSTEM The staggered truss system with the wide corridor openings in the center panels was not stiff enough to resist the lateral loads. The arrangement of the trusses would also require moment frames in the long direction of the building. The conventional systems used for staggered truss buildings of 30 stories would not work for the 38-story tower. A primary lateral force resisting system was designed to provide the necessary stiffness and strength to the entire structure. Each major elevator core was wrapped in bracing or moment frames to provide two central boxes. A braced frame at the end of each tower wing supplemented these boxes. Conceptually, these bents were located at the ends of each wing to control the overall torsional behavior of the tower. Changes of vertical planes in the lateral system were accommodated through a major diaphragm transfer at the sixth level to accommodate architectural planning requirements in the non-guest rooms. WIND TUNNEL RESULTS Viewing the plan layout of the tower, the shape resembles an airfoil, albeit a crude one. Wind tunnel studies were carried out at RWDI in Ontario, Canada, and the results proved to be very interesting. The overall gross forces specified by the UBC Code with the Clark County Department of Buildings modification of the maximum wind velocity of 75 mph, closely matched those measured in the wind tunnel. The significant finding from the wind tunnel was that the center of force was located approximately 100 from the center of the stiffness resulting in large twisting forces on the structure. The end bents were able to resist these eccentricities and at the same time limit the rotational component of the floor acceleration to within
4 acceptable levels for hotel occupancy structures. A total of 24 different loading conditions were generated by the wind tunnel engineers to envelop the wind effects on the tower. SEISMIC ANALYSIS ZONE 2B Clark County Department of Buildings requires all structures in Las Vegas to be designed for UBC Zone 2B. This represents a peak ground acceleration of 0.2g. A complete spectrum analysis for the three-dimensional structure was performed. An interesting balance between the wind-governed design for the high tower and the seismic-governed lowtower resulted. The structural analysis of the tower itself was an interesting study using several models to envelop the design values. Gravity analysis governed the simple span staggered trusses. However, for lateral loads, the diaphragm action of the plank and the subtle nature of the staggered trusses must be simulated. Couple this analysis complication with the 24 load combinations from the wind tunnel and eight seismic spectrum directions, a significant database for member design was generated. Further complicating the issue was the fact that all major seismic connections were designed for unreduced seismic forces much larger than those developed for the member design envelope (the 3Rw/8 effect). The plank floor system was analyzed utilizing finite element analysis to assure elastic behavior at seismic levels. DESIGN-BUILD INTERACTION Throughout the development of the contract documents for submittal to the Clark County Department of Building, we worked very closely with SMI- Owen Steel Company engineers to develop a truly optimized design from a cost point of view. Items such as truss geometry and member sizes, connections, lateral system geometry, and column splice locations; stiffeners
5 versus no stiffeners were all discussed jointly with SMI-Owen Steel Company to obtain the least cost structure. Speed of erection was paramount importance to SMI-Owen Steel Company, prompting their recommendation of a four-tier column splice arrangement. All moment frame columns were selected on the basis of connection and erection ease. With this combined team effort and daily communication with the SMI-Owen Steel Company field team, the project is rising on Las Vegas Boulevard much faster than any other previous structure. Early opening in Las Vegas is an extremely valuable aspect of this structure. Salvia, Inc. design-build team and the project owner. This paper is part of the 1999 North American Steel Construction Conference session: Shallow Floor Framing For Residential Buildings. CONCLUSION The utilization of the steel staggered truss system on the Aladdin tower allowed the ultrafast track project delivery to be executed. Significant owner initiated changes, late in the development of the total project, could be accommodated because of the steel structure. Many of the program-driven options would not have been possible with a traditional concrete system. Essential to the successful completion of this project was the close cooperation provided by the SMI-Owen Steel Company/McNamara/
4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.
Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls
How To Build The Burj Dubai Tower
Burj Dubai Tower History Rising Burj Dubai Tower History Rising 2003 All rights reserved. 1 Burj Dubai Tower History Rising Burj Dubai Tower Introduction Architecture Structure Sustainability Issues Construction
Hunter College school of Social Work Thesis Proposal
Fall 2009 Hunter College school of Social Work Thesis Proposal To analyze how energy efficiency can be implemented using facade and green roof redesign. It ties structural engineering concepts with existing
COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP
COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP 30 x45 bay provides maximum tenant flexibility and increases leasing marketability By David E. Eckmann AIA, S.E. P.E. SURGING DEMANDS FOR RENTABLE OFFICE
ASSESSMENT AND RETROFITTING OF EXISTING RC BUILDINGS IN VIETNAM IN TERMS OF EARTHQUAKE RESISTANCES
GEM-SEA Workshop on Seismic Vulnerability of Buildings Nanyang Technological University, Singapore 1 st July 2013 ASSESSMENT AND RETROFITTING OF EXISTING RC BUILDINGS IN VIETNAM IN TERMS OF EARTHQUAKE
Residential Prototype III. Multi-Story. The Multi-Story. Your connection to ideas + answers. Prepared by: AISC Steel Solutions Center
Multi-Story Residential Prototype III The Multi-Story Residential Prototype III Prepared by: AISC Steel Solutions Center What s this? This package tells the story of a fictitious project with an imaginary
SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:
SEISMIC DESIGN Various building codes consider the following categories for the analysis and design for earthquake loading: 1. Seismic Performance Category (SPC), varies from A to E, depending on how the
MULTI-RESIDENTIAL BUILDING SOLUTIONS
MULTI-RESIDENTIAL BUILDING SOLUTIONS OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since
Conceptual design and design examples for multi-storey buildings
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Conceptual design and design examples for multi-storey buildings Dr.-Ing. Christian Müller Dipl.-Ing. Matthias Oppe RWTH Aachen Overview
Chapter 6 ROOF-CEILING SYSTEMS
Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;
Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14
Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318
What is Seismic Retrofitting?
What is Seismic Retrofitting? SEISMIC RETROFITTING A Seismic Retrofit provides existing structures with more resistance to seismic activity due to earthquakes. In buildings, this process typically includes
Designer s NOTEBOOK DESIGN ECONOMY, PART 3
Designer s NOTEBOOK DESIGN ECONOMY, PART 3 Design Economy Article XII (Part 3) PCI s Architectural Precast Concrete Services Committee offers insight on the architectural precast manufacturing process
How To Understand The World Trade Center'S Structural Design
Emerging Technologies in Structural Engineering Proc. of the 9 th Arab Structural Engineering Conf., Nov. 29 Dec. 1, 2003, Abu Dhabi, UAE WORLD TRADE CENTER COLLAPSE, FIELD INVESTIGATIONS AND ANALYSES
Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE
Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE To satisfy the performance goals of the NEHRP Recommended Seismic Provisions, a number of characteristics are important to the
1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona
for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety
Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26
2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,
SECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
The Collapse of Building 7 by Arthur Scheuerman December 8, 06
The Collapse of Building 7 by Arthur Scheuerman December 8, 06 WTC s Building 7 was a 47-story office building completed in 1987 by Silverstein Properties on land owned by the Port Authority. It was built
PERFORMANCE BASED SEISMIC EVALUATION AND RETROFITTING OF UNSYMMETRICAL MEDIUM RISE BUILDINGS- A CASE STUDY
Paper No. 682 PERFORMANCE BASED SEISMIC EVALUATION AND RETROFITTING OF UNSYMMETRICAL MEDIUM RISE BUILDINGS- A CASE STUDY Jimmy Chandra, Pennung Warnitchai, Deepak Rayamajhi, Naveed Anwar and Shuaib Ahmad
US 51 Ohio River Bridge Engineering and Environmental Study
US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents
Specification for Structures to be Built in Disaster Areas
Ministry of Public Works and Settlement Government of Republic of Turkey Specification for Structures to be Built in Disaster Areas PART III - EARTHQUAKE DISASTER PREVENTION (Chapter 5 through Chapter
Brock Commons Phase 1 University of British Columbia, Vancouver, Canada
Construction Underway on World s Tallest Timber Tower Construction of the 18 storey Brock Commons Student Residence at the University of British Columbia in Vancouver, Canada got underway in November 2015.
Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges
7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience
CE591 Lecture 8: Shear Walls
CE591 Lecture 8: Shear Walls Introduction History, examples Benefits Disadvantages Plate Girder Analogy Behavior of Special Plate Shear Walls (SPSW) Design of SPSW Important considerations Special Plate
Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By
Project Structural Conditions Survey and Seismic Vulnerability Assessment For SFCC Civic Center Campus 750 Eddy Street San Francisco, California 94109 Prepared For San Francisco Community College District
Rigid and Braced Frames
Rigid Frames Rigid and raced Frames Rigid frames are identified b the lack of pinned joints within the frame. The joints are rigid and resist rotation. The ma be supported b pins or fied supports. The
FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples
FOUNDATION DESIGN Proportioning elements for: Transfer of seismic forces Strength and stiffness Shallow and deep foundations Elastic and plastic analysis Foundation Design 14-1 Load Path and Transfer to
CH. 2 LOADS ON BUILDINGS
CH. 2 LOADS ON BUILDINGS GRAVITY LOADS Dead loads Vertical loads due to weight of building and any permanent equipment Dead loads of structural elements cannot be readily determined b/c weight depends
Expected Performance Rating System
Expected Performance Rating System In researching seismic rating systems to determine how to best classify the facilities within the Portland Public School system, we searched out what was used by other
College of Computing, Engineering & Construction Building Construction Management Course Descriptions
CATALOG 2010-2011 Undergraduate Information College of Computing, Engineering & Construction Building Construction Management Course Descriptions BCN101: Construction & Culture: A Built Environment An
THE STAR, DARLING HOTEL AND SPA PYRMONT, NSW. Associate Director, Taylor Thomson Whitting Ltd, Sydney, Australia
THE STAR, DARLING HOTEL AND SPA PYRMONT, NSW H Nguyen BE (Hons), CPEng MIEAUST NPER Associate Director, Taylor Thomson Whitting Ltd, Sydney, Australia ABSTRACT The redevelopment at The Star in Sydney includes
SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems:
Reading Assignment SLAB DESIGN Chapter 9 of Text and, Chapter 13 of ACI318-02 Introduction ACI318 Code provides two design procedures for slab systems: 13.6.1 Direct Design Method (DDM) For slab systems
9.3 Two-way Slabs (Part I)
9.3 Two-way Slabs (Part I) This section covers the following topics. Introduction Analysis and Design Features in Modeling and Analysis Distribution of Moments to Strips 9.3.1 Introduction The slabs are
PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)
APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL FIRE RESTORATION PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of
Technical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet
National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination
Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)
DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT
DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT Troy Oliver 1, Mark Rea 2 ABSTRACT: This paper provides an overview of the work undertaken in the design of multiple buildings for one of
DESIGN DRIFT REQUIREMENTS FOR LONG-PERIOD STRUCTURES
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 3292 DESIGN DRIFT REQUIREMENTS FOR LONG-PERIOD STRUCTURES Gary R. Searer 1 and Sigmund A. Freeman 2 SUMMARY
DESIGNING STRUCTURES IN EXPANSIVE CLAY
DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers
FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012
FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 Building and Housing has published technical guidance for foundation repairs and reconstruction for residential properties in green zone Foundation Technical
IH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
How To Build A Luxury Apartment Complex In London
Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking
EARTHQUAKE DESIGN OF BUILDINGS
GAP.2.0.9 A Publication of Global Asset Protection Services LLC EARTHQUAKE DESIGN OF BUILDINGS INTRODUCTION Buildings in many areas of the world are susceptible to damage from moderate to severe earthquakes.
Rehabilitation of a 1985 Steel Moment- Frame Building
Rehabilitation of a 1985 Steel Moment- Frame Building Gregg Haskell, a) M.EERI A 1985 steel moment frame is seismically upgraded using passive energy dissipation, without adding stiffness to the system.
The Analysis of Open Web Steel Joists in Existing Buildings
PDHonline Course S117 (1 PDH) The Analysis of Open Web Steel Joists in Existing Buildings Instructor: D. Matthew Stuart, P.E., S.E., F.ASCE, F.SEI, SECB, MgtEng 2013 PDH Online PDH Center 5272 Meadow Estates
Professional Engineers Providing Structural Engineering Services In Buildings
GUIDELINE Professional Engineers Providing Structural Engineering Services In Buildings 1995 Published by Association of Professional Engineers of Ontario Revised 12/11/98 CONTENTS INTRODUCTION...3 PART
GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER
GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER Professional Experience: Pride and Passion in the Art of Structural Engineering since 1979. Professional Registration: Professional
Earthquakes and Data Centers
7x24 Exchange Fall Symposium September 11, 2013 Hilton Bellevue Andrew W. Taylor, Ph.D., S.E., FACI Earthquake Hazards 2 September 11, 2013 1 Cascadia Earthquake Sources Figure Credit: Craig Weaver, Pacific
Commercial Building Valuation Report
INSURED University of Houston - Victoria Effective Date: Expiration Date: Cost as of: 09/2010 BUILDING 1 217 - University Center 77901 Location Adjustments Climatic Region: High Wind Region: Seismic Zone:
Guidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
Guernsey s Structural Engineering Experience
Guernsey s Structural Engineering Experience Foundation Settlement Issues: Trinity Valley Electric Cooperative, Kaufman, TX: Analyzed their headquarters facility for issues with soil movement that was
How To Design A Post Tensioned Deck For A Building
SAMUEL ÁVILA STRUCTURAL OPTION FACULTY CONSULTANT: THOMAS BOOTHBY UNIVERSITY OF CENTRAL FLORIDA S ACADEMIC VILLAGES ORLANDO, FL THESIS PROPOSAL EXECUTIVE SUMMARY DECEMBER 12, 2005 Introduction: The University
TECHNICAL NOTE. Design of Diagonal Strap Bracing Lateral Force Resisting Systems for the 2006 IBC. On Cold-Formed Steel Construction INTRODUCTION
TECHNICAL NOTE On Cold-Formed Steel Construction 1201 15th Street, NW, Suite 320 W ashington, DC 20005 (202) 785-2022 $5.00 Design of Diagonal Strap Bracing Lateral Force Resisting Systems for the 2006
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 3279 SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP Yuming DING 1, Bruce HAMERSLEY 2 SUMMARY Vancouver
Seismic Retrofit of Existing Buildings: Innovative Alternatives
Seismic Retrofit of Existing Buildings: Innovative Alternatives Moe Cheung and Simon Foo Public Works & Government Services Canada Hull, Quebec, Canada Jacques Granadino Public Works & Government Services
Commercial Building Valuation Report
INSURED State Office of Risk Management Effective Date: 300 W 15th Street Expiration Date: Austin, TX 78701 Cost as of: 12/2013 BUILDING 1 Athletics/PCI - 206 3302 N. Ben Wilson Victoria, TX 77901 Location
Structural Systems for Tall Buildings Professor Mahjoub Elnimeiri, PhD Fall 2009 - Lecture 1
Structural Systems for Tall Buildings Professor Mahjoub Elnimeiri, PhD Fall 2009 - Lecture 1 What is structure? Structure/Architecture Interaction State of Art of Tall Buildings (from modern era to present)
Detailing of Reinforcment in Concrete Structures
Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For
Module 5 (Lectures 17 to 19) MAT FOUNDATIONS
Module 5 (Lectures 17 to 19) MAT FOUNDATIONS Topics 17.1 INTRODUCTION Rectangular Combined Footing: Trapezoidal Combined Footings: Cantilever Footing: Mat foundation: 17.2 COMMON TYPES OF MAT FOUNDATIONS
Timber Frame Construction
Timber Frame Construction Introduction Design and Detailing What is timber? Failure modes History of timber frame construction Forms of timber frame construction Live and dead loads Wind loads Roof construction
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
Residential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
[TECHNICAL REPORT I:]
[Helios Plaza] Houston, Texas Structural Option Adviser: Dr. Linda Hanagan [TECHNICAL REPORT I:] Structural Concepts & Existing Conditions Table of Contents Executive Summary... 2 Introduction... 3 Structural
Contractor s Statement of Responsibility for Seismic-Force-Resisting Systems This form is to be filled out by the contractor.
SPECIAL INSPECTION PROCEDURE IBC CHAPTER 17 2012 EDITION When Required All projects that require a SC licensed Architect or Engineer per SC Architectural and Engineering registration law. Overview The
POST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST
CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all
Analysis II Façade Redesign: Architectural Precast Panels
Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Overview: This analysis covers the comparison of the current EIFS façade and my proposed
Steel joists and joist girders are
THE STEEL CONFERENCE Hints on Using Joists Efficiently By Tim Holtermann, S.E., P.E.; Drew Potts, P.E.; Bob Sellers, P.E.; and Walt Worthley, P.E. Proper coordination between structural engineers and joist
Tall Building Form Generation by Parametric Design Process
ctbuh.org/papers Title: Authors: Subject: Keywords: Tall Building Form Generation by Parametric Design Process Mahjoub Elnimeiri, Professor, Illinois Institute of Technology Sang Min Park, PhD Candidate,
Offshore Wind Turbine Support Structures
1 Wind Power R&D Seminar Deep Sea Offshore Wind Royal Garden Hotel, Trondheim, Norway January 21, 2011 Effect of Foundation Modeling Methodology on the Dynamic Response of Offshore Wind Turbine Support
TGRWA. Structural Engineers. Tylk Gustafson Reckers Wilson Andrews, LLC
Tylk Gustafson Reckers Wilson Andrews, LLC 600 West Van Buren Street Suite 900 Chicago, Illinois 60607 Phone 312.341.0055 Fax 312.341.9966 www.tgrwa.com Tylk Gustafson Reckers Wilson Andrews, LLC was formed
Structural Design of Reinforced Concrete Tall Buildings
Structural Design of Reinforced Concrete Tall Buildings Ali Sherif S. Rizk Author Ali Sherif S. Rizk, Director of Structural Engineering Department, Dar Al-Handasah Consultants (Shair and Partners) Dar
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,
CHALLENGING CONVENTIONS
CHALLENGING CONVENTIONS How Innovation, Risk and Resilience Creates Better Buildings and Greater Cost Efficiency Jade Kirk BE(Hons), MIPENZ, IntPE, CPEng, QSNdip Managing Director Kirk Roberts Consulting
Code of Standard Practice for Timber Frame Structures
TFEC 2-2013 Code of Standard Practice for Timber Frame Structures August 2013 Preface This Code is intended to represent a reasonable consensus of what constitutes ordinary and acceptable practice within
Tall buildings. Florea Dinu. Lecture 13: 25/02/2014
Tall buildings Florea Dinu Lecture 13: 25/02/2014 European Erasmus Mundus Master Course Sustainable Constructions under Natural 520121-1-2011-1-CZ-ERA MUNDUS-EMMC Part II Multistorey buildings Tall buildings,
EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS
in the Euro-Mediterranean Area EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS By Prof. Amr Ezzat Salama Chairman of Housing, Building National Center Cairo, Egypt Former Minister of High Education
8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS
8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS MARICA DELLA BELLA and DIEGO CIAN Precompressi Centro Nord S.p.A., Italy SUMMARY: Secondary roofing elements, complementary to the
Conceptual Design and Analysis in Autodesk Revit Architecture 2011
AUTODESK REVIT ARCHITECTURE 2011 Conceptual Design and Analysis in Autodesk Revit Architecture 2011 In this white paper, CASE Design, a design technology consultancy based in New York City, describes how
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
Engineering for Stability in Bridge Construction: A New Manual and Training Course by FHWA/NHI
Engineering for Stability in Bridge Construction: A New Manual and Training Course by FHWA/NHI AASHTO SCOBS T-14 Meeting Saratoga Springs, NY April 20, 2015 Brian Kozy, PhD, P.E. Federal Highway Administration
Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County
Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means
Wisconsin Building Products Evaluation
Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation
Technical Assignment 2 TABLE OF CONTENTS
2 TABLE OF CONTENTS Executive Summary...3 Introduction..5 Gravity Loads......6 Design Codes......7 Materials..8 Existing Structural System.. 10 Existing Floor System 15 Alternate Floor Framing Systems...17
INTRODUCTION TO LIMIT STATES
4 INTRODUCTION TO LIMIT STATES 1.0 INTRODUCTION A Civil Engineering Designer has to ensure that the structures and facilities he designs are (i) fit for their purpose (ii) safe and (iii) economical and
Seismic Isolated Hospital Design Practice in Turkey: Erzurum Medical Campus
Seismic Isolated Hospital Design Practice in Turkey: Erzurum Medical Campus J. Kubin, D. Kubin, A. Özmen, O.B. Şadan, E. Eroğlu Prota Engineering Design and Consultancy Services Inc. H. Sucuoğlu, S. Akkar
QUALITY ASSURANCE FOR STRUCTURAL ENGINEERING FIRMS
QUALITY ASSURANCE FOR STRUCTURAL ENGINEERING FIRMS CLIFFORD SCHWINGER Clifford Schwinger Clifford Schwinger, P.E. is Vice President and Quality Assurance Manager at The Harman Group. Mr. Schwinger received
Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites
Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites Worked example to accompany MBIE Guidance on the seismic design of retaining
INSTALLATION. General. Important Note. Design. Transport
General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected
Seismic Risk Prioritization of RC Public Buildings
Seismic Risk Prioritization of RC Public Buildings In Turkey H. Sucuoğlu & A. Yakut Middle East Technical University, Ankara, Turkey J. Kubin & A. Özmen Prota Inc, Ankara, Turkey SUMMARY Over the past