Georgia Tech Aerospace Server French building Server Room. Server Room Policy Handbook: Scope, Processes and Procedure



Similar documents
MARULENG LOCAL MUNICIPALITY

REVIEWED ICT DATA CENTRE PHYSICAL ACCESS AND ENVIROMENTAL CONTROL POLICY

Data Centers and Mission Critical Facilities Operations Procedures

Policy Title-Aquia Data Center Operational Policy & Procedure. Policy ID - TSD-ADC001. Version - Version: 1.0. Supersedes Version 1.

ISO IEC ( ) INFORMATION SECURITY AUDIT TOOL

CS&T Data Center Hosted Shared Services Policies & Work Rules

Rules of Conduct and Safety

Louisiana State University Information Technology Services (ITS) Frey Computing Services Center Data Center Policy

Data Center Operational Policy

Tenant Managed Services- Basic. Rancho Cordova Data Center. Tenant Guide

How To Write Anu Data Centre

Customer Manual. for colocation customers of M247 Ltd. v Classification: A (Public)

Middleborough Police Electronic Security Narrative

Colocation Center Policies & Procedures

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

Standard Comms Rooms Specification

LABORATORY SAFETY INSPECTION CHECKLIST

Section Summary of Work Contract Security System, Network Infrastructure and UPS Power

Customer Guide to the DATAONE Datacenter

hong kong//china data center specifications tel: fax: internet + intellectual property + intelligence

Safety and Health Office WORKPLACE SAFETY CHECKLIST

Bullet Camera. Installation Guide. Hangzhou Hikvision Digital Technology Co., Ltd.

Cruziointernet 877 Cedar Street, Suite 150 Santa Cruz, CA P: F: cruzio.com

PENN STATE DATA CENTERS POLICY IMPLEMENTATION AND PROCEDURES MANUAL

Aquia Data Center Information Research Computing & Co-Location Guide

LEVEL 3 DATA CENTER ASSESSMENT

Technical specifications. Containerized data centre NTR CDC 40f+

CONSULTANT PROCEDURES & DESIGN GUIDELINES ACCESS CONTROL SYSTEM

DATA CENTRES UNDERSTANDING THE ISSUES TECHNICAL ARTICLE

Colocation. Introduction. Structure of the service. Service Description

OPERATOR - FACILITY ADDRESS - DATE

STONEBRIDGE COMMUNITY FUNDAY

Upgrading the PRS datacentres: space requirement. S. S. Mathur, GM-IT, CRIS

School of Engineering University of Glasgow

CITY UNIVERSITY OF HONG KONG Physical Access Security Standard

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Fire Risk Assessment Safety Checklist

QuickSpecs. Overview. HP Power Distribution Rack. HP Power Distribution Rack. DA North America Version 5 August 22, 2008 Page 1

Co-location service from Bell. Version 1.0 April 10, Updated as of 4/10/2007 1

Australian Government Data Centre Strategy

ASX Australian Liquidity Centre. ASXCoLo

** PROPRIETARY ** SAMPLE COUNTY DATA CENTER PROJECT BUDGET ** PROPRIETARY **

Daker DK 1, 2, 3 kva. Manuel d installation Installation manual. Part. LE05334AC-07/13-01 GF

Compaq Rack Options and Accessories. Monitors and Keyboards

Version: Modified By: Date: Approved By: Date: 1.0 Michael Hawkins October 29, 2013 Dan Bowden November 2013

Five9NS R2100RS Rack Mount Server. Installation Manual

Document Details. 247Time Backup & Disaster Recovery Plan. Author: Document Tracking. Page 1 of 12

How To Power A Bladecenter H Servers

Rack Systems Solutions

Safety Inspection Checklist

STCC Contractor/Vendor Rules and Regulations

Cabinets 101: Configuring A Network Or Server Cabinet

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION SECURITY SYSTEMS

Vertical Display and Storage B SKOPE Gen2: Three Door Chiller

TIA-942 Data Centre Standards Overview WHITE PAPER

Smart-UPS RT External Battery Pack Stack/Rack-Mount 6U

Conserve O Gram. Cold Storage for Photograph Collections Using Individual Freezer Units. Introduction. Types of Freezers. August 2009 Number 14/11

Pre-installation Manual. CONCEPT Processor 305 DW / 405 DW / 505 DW 505 DW XP

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Secure your IT equipment with confidence... secure with NetClosure

How To Move Your Data Center

Data Center Presentation

DataCentre Access Policies & Procedures

Dimensions (HxDxW) Total Cabinet Area 89.96x x 24 in/ 2,285 x 1, x mm 95.47x 48 x 32 in/ 2,425 x 1,219.2 x 812.

Independent Contractor Policy

South Asia s First Uptime Institute Certified TIER-IV IDC in Mumbai delivering % guaranteed uptime

Data Center Rack Systems Key to Business-Critical Continuity. A White Paper from the Experts in Business-Critical Continuity TM

Data Center Management

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.

Data Center Access Policies and Procedures

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

ANNEXURE 07: CHECK-LIST FOR OFF-SITE STORAGE FACILITIES

C790 Series. Maintenance Guide

38. ACCESS CONTROL AND ELECTRONIC SECURITY SYSTEM

Rittal Liquid Cooling Series

W850. Maintenance Guide

aseries A13B Mini Bullet Camera User Manual

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service

Contents Error! Bookmark not defined. Error! Bookmark not defined. Error! Bookmark not defined.

Arapahoe County Residential Water Heater Installation and Inspection Guide

Rack Installation. Unpacking the System. Choosing a Setup Location. General Server Precautions. Barracuda Appliances

University of Pittsburgh Safety Manual. EH&S Guideline Number: ASBESTOS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Quality Assurance Calendar Maintenance Responsible Party Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

How To Install A Power Supply (Uplast) With A Battery Pack

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

2013 VTech Printed in China US

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE

Transcription:

Georgia Tech Aerospace Server French building Server Room Server Room Policy Handbook: Scope, Processes and Procedure

Version History Version/Status Release Date Comments 1.1/Draft 1.2 1.3 1.4 1.5 1.6

1 INTRODUCTION 1.1 Purpose The purpose of this document is to define the policies and procedures relating to the operation of Aerospace Engineering Server Room areas. 1.2 Scope Security Safety measures and procedures. Emergency measures and procedures Access procedures. System hosting facilities. Change and configuration management. Environmental control, reporting and maintenance. Monitoring facilities. 1.3 Definitions 2 SECURITY 2.1 Background The vulnerability of business critical information systems and the data they contain within the Server Room make the site a high value asset which requires a high degree of protection. A range of security measures are therefore in place to protect employees, information and physical assets, along with the reputation of the University and interested third parties with equipment in the Server Room. 2.2 Entry Systems and Access Policy Security policy applies to full and part time employees, contractors, vendors, consultants and externally employed people who require Server Room access. Access is controlled via RFID card readers and all doors are fitted with sensors to detect unauthorized or prolonged opening. Staff and visitors must not adjust or otherwise tamper with door fittings. Any suspected faults with doors, lights or any security equipment should be reported to a member of the Server Room staff immediately. 2.3 Shift engineer Contractor Access out of hours 2.4 Webcam surveillance A webcam with motion sensing monitors and records personnel entering the French server room.

3 SAFETY 3.1 Overview The French server room can be potentially dangerous are so visitors are cautioned to use care when working in the French server room. Floor panels and electrical lines may be exposed or open for certain operational reasons and visitors and staff should exercise caution when working in the French server room. 3.2 Signs and Information Safety signs and information are posted at access points to the Server Room. General notices are also posted around the Server Room providing detailed information on first aid, emergency contacts and general Health and Safety issues. 3.3 Contact Information - Emergency and out of hours contact details. Information on emergency and out-of-hours maintenance contacts is posted at all entrances to the Server Room. - First Aid contact information. A list of first aid contacts is posted throughout the Server Room. Help can also be obtained by contacting any member of Server Room staff. - Fire safety. Any fire safety concerns should be raised with a member of Server Room staff who will deal with the matter with the involvement of GT Fire Staff as necessary. 3.4 Health and Safety Considerations There are a number of Health and Safety considerations when working in the Server Room, namely: - Heavy Lifting. No one should attempt to lift heavy equipment without suitable help. Server Room staff are available to assist when moving heavy items, and suitable transport equipment is provided to assist. Please request help via the Operations Bridge. - Working at Height. No one should attempt to lift equipment in and out of racks unaided. Staff are on hand to move equipment in and out of racks, particularly where height makes the task more dangerous. - Lone Working. Anyone working in the Server Room for prolonged periods should let staff know of their presence. Users are advised to take regular breaks from working to avoid adverse effects from temperature and noise levels in particular. - Lasers. Equipment that includes lasers, such as fiber channel switches, should be clearly identified using appropriate labels. Labels can be obtained from Server Room staff if required. To reduce any risk caps should be placed on laser-emitting devices not in use; otherwise such equipment should be removed all together. - Floor Tile removal. When taking up raised floor tiles, areas must be cordoned off using the flexible safety barriers provided. If work is expected to take a significant period of time then Server Room staff must also be made aware to allow them to inform others. 3.5 Emergency Exits and Fire Alarm Procedures Two exits are available for emergencies, the main double doors as well as one single door where access is available to electrical transformers that feed the Server room.

3.6 Fire detection and Fire extinguishers The Server room is fitted with basic fire detection coverage. Fire extinguishers are located at certain points within the room. 3.7 Electrical Safety Server room users should exercise caution when working with/around electrical circuits. Additionally no users should make modifications or repairs to electrical circuits themselves. If a problem is detected please advise the server room staff. 4 Server ROOM USE 4.1 Hours of Operation The Server Room operates on a continuous basis, typically there are no staff located onsite but remote monitoring is performed. 4.2 Available Facilities - Storage. Storage space is at a premium. Storage shelves and racks are provided to hold spares and consumables such as patch leads and power strips. Those with hosted systems should generally consider other locations to keep spares and equipment outside of racks wherever possible. 4.3 Equipment Delivery At the end of the hall opposite the server room entry doors, goods may be brought through the exterior double doors of the French building by anyone with buzzcard access. 4.4 Environmental Restrictions and Considerations - Racks. A maximum height of 42u is in place for racks in the Server Room, to ensure adequate clearance between racks and overhead network cable tray work. It also recommended that racks be 800mm wide and 1000mm deep where possible, as this makes internal cabling easier to install and manage. - Heat load. For hosted systems the cooling capacity of the room is sized for 4Kw of cooling per rack space. 4.5 Control of Equipment and Spares Equipment left outside racks must be clearly labeled with the name of the owner, a contact telephone number and a date indicating how long it is required. Unlabeled items, or any which exceed their removal date will be removed. 4.6 Console equipment (monitor, keyboard and mouse) A mobile console marked French Server Room is provided for connection to systems for local working. Any other similar equipment, such as that belonging to and marked French Server room or Aerospace must not be moved or used by others. Anyone having difficulty locating

such equipment should contact staff for assistance. To avoid blocking aisles after using a mobile console please unplug and return to a storage location next to the wall, between air conditioning units, ready for use by others. 4.7 Prohibited Items The following items are prohibited from the Server Room: Combustible materials such as paper and cardboard (except reference manuals as needed) Food and drink Tobacco products Explosives and weapons Hazardous materials Alcohol, illegal drugs and other intoxicants Electro-magnetic devices that could cause interference with Server and telecom equipment Radioactive materials Photographic or recording equipment (other than backup media) 5 SYSTEM HOSTING SERVICE 5.1 What the Server Room Provides The Server Room aims to provide a secure, controlled environment suitable for locating rackmountable Server systems. 5.2 Accessible Areas Administrators and owners of hosted systems can access the main entrance with Buzzcard after they have been added to the access list by the Server room staff. 5.3 Equipment Requirements Equipment allowed in the French server room should conform to the following: Rack mountable hardware Equipment must be able to operate on 230V User will be responsible for cost of wiring from PDU to equipment. Minimum processor Quad core. Advice on power, racking, etc can be obtained at any time from staff. 5.4 Emergency Procedures See GT standard policies 6 ENVIRONMENT 6.1 Air Conditioning Under floor air conditioning is provided throughout the room. This delivers up to certain maximum Kw of cooling per rack in accordance with the design specification.

6.3 Power Provision 208VAC power is provided up to the two PDU (Power distribution units). It is the responsibility of the user to provide funding for the final connection between the equipment and the hardware. Please contact the staff for help with configuration for specific systems.

6.4 Networking Users will be responsible for providing funding for the final run of network wiring (patch cable) between the hardware and the network switches located within the Server room. 6.5 UPS Provision Anyone wishing to place systems in the Server Room should consider UPS provision requirements. Please consult with Server Room staff before purchasing small UPS units to ensure they can be housed appropriately. All UPS units should be rack mountable with suitable racking kits supplied. 6.6 Environment Control Cooling controlled via the chill water air conditioning equipment located in the server room. Only members of maintenance staff are allowed to alter settings on any such equipment. 6.7 Environment monitoring A number of monitors are in place to report on issues affecting the environment. These include: - Hard wired temperature alarms - Plant monitoring via the building management system reports on any issues to maintenance. 6.8 Dust prevention In order to minimize dust generation packing or unpacking of equipment should take place outside the room. Items should be unpacked prior to introduction into the Server room. 6.9 Waste Disposal and Cleaning Cardboard and other items that can generate dust and are easily combustible should remain outside Server rooms. Waste bins are available in the sever room. Larger items should be disposed of immediately at the large roll-off waste container outside the French building. 6.10 Out-of-hours / Emergency Maintenance AE IT monitors email during off hours on a best effort basis.