1 Policy Title-Aquia Data Center Operational Policy & Procedure Policy ID - TSD-ADC001 Version - Version: 1.0 Supersedes Version 1.0 Review Date One (1) year from effective date. Policy & Procedure - Provides guidance and governance for the use of the Aquia Data Center (ADC); installation, removal, and disposal of equipment; physical access controls and security; safety; requests for special services or resources; space requests; power management; cable management; general maintenance and cleanliness of work areas; and other miscellaneous items within the data center. Purpose -To provide a state of the art, professional, clean, reliable, safe, and secure data center, certain practices must be instituted and adhered to. The Aquia Data Center Operations staffs are tasked with the responsibility for ensuring that this policy and procedure will be followed by all who use the facility. Applicability This operational policy and procedure applies to all ITU employees, the various authorized departmental employees who use the data center services, and authorized business partners of ITU including contractors, vendors, and other authorized state agency employees. This policy and procedure addresses topics which include, but are not limited to safety; security; storage, staging, deposal and surplus of equipment; space requests; computer hardware installs and deinstalls; power management; cabling; and other miscellaneous items within the data center. EXCEPTIONS: The Executive Director of Technology Systems Division (TSD) or Director of Technology Support Services (TSS) will be the only individuals authorize to make any exceptions to this operational policy and procedure document.
2 Policy and Procedure: 1. Every effort must be made to assure personal safety in the data center. a. Floor tiles should never be removed. If floor tiles must be removed, the assistance of the operator on duty should be sought; and safety cones and tape must be used around any area left unattended. b. When not being serviced, all computer cabinets and doors will remain closed at all times. c. University electricians or an authorized contractor will perform all modifications to electrical service. All such changes will comply with the TSD 5 day prior notice requirement, and be coordinated with the Data Center Manager (DCM) for submission of the required work order(s). d. No work will be done below the raised floor area without the notification of the DCM or operator on duty. e. No industrial cleaning liquids/fluids will be left in the data center unattended. No highly ammoniated or chlorinated products shall be allowed in the data center. f. No food or drink will be allowed on the main data center floor. 2. Air condition and air quality are essential to the reliable operation of computer equipment and must be maintained within acknowledged data center standards. a. Humidity levels in the Data Center will be maintained at 45% 50%. b. Temperature levels in the Data Center will be maintained at degrees. c. All tile alterations must be reviewed, approved, and coordinated with the DCM. If holes must be cut in the floor panels to accommodate new equipment, the panel shall be removed from the data center to cut the hole. The DCM will assist with any needed floor tile alterations. d. Due to the effect on sub-floor air pressure the number of tiles pulled must be kept to a minimum. All vented floor tiles must be returned to the position from which it was removed. e. No holes shall be left exposed thereby creating unbalanced airflow. No additional vents, grilles or perforated tiles will be added without coordination with the DCM. f. All open slots in racks must be closed on the cold aisle side with a slot blank. g. No changes shall be made to the data center HVAC systems without consultation and approval of the DCM. h. Facilities Management staff will perform or manage all maintenance activities to the HVAC systems, complying with the TSD 5 day prior notice requirement, and coordinating the work with the DCM. 3. Only authorized individuals will be allowed access in the data center. (See Aquia Data Center Access Policies and Procedures). a. Persons possessing authorized data center access may escort other staff or vendors into the data center. i. The visitor or guest must sign in with the operator upon arrival.
3 ii. The person escorting the visitor or guest must remain with them the entire time they are in the data center. There are no exceptions. (See 3b for visitors that need to have access in the data center to perform work which requires additional time beyond a brief visit.) b. All contractors hired to perform work in the data center including electrical, mechanical, and telecommunications contractors shall coordinate their work with the DCM and the operator on duty. i. Managers can request temporary data center access for day workers or long-term contract workers. Advance notice is requested if at all possible. c. The entry doors to the data center must remain closed and locked at all times. d. Authorized persons should only enter the data center to perform tasks that cannot be performed remotely. e. Authorized persons entering or leaving the data center must verify that access doors are closed securely to prevent unauthorized persons from entering or tailgating into the area. f. Tours are permitted with the coordination of the DCM. Advance notice is preferred. All visitors will be required to sign in. 4. All modifications and changes to production systems within the data center shall be scheduled whenever possible following the change management procedures and coordinated with the DCM. ** Test and development equipment/systems shall remain in their designated location and racks. The DCM must be notified of any significant changes in the test/development area which could affect power distribution requirements or air flow prior to the changes being made. a. All significant changes within the data center are subject to review, approval, and documentation by the change management process, the DCM, and the associated/hosted units affected. b. All changes in equipment location, deletions, or additions of equipment within the data center must be entered on the change management calendar (test & development systems excluded from CM) and must be coordinated with the DCM to ensure updating of the data center layout documentation. c. All off-hours work within the data center shall be coordinated with the DCM. Written notification referencing the RFC #, if applicable, will be provided to the DCM stating the date and time when work is to be done and the names of the parties involved in the work. If there is no CM entry, details of the work to be done should be included in the notification. d. No hardware, racks, furniture, shelving, or other materials will be removed or added to the data center without DCM coordination. This is required in order to maintain accurate records of inventory and maintain an orderly and neat environment within the data center. e. All space allocations within the data center are the responsibility of the DCM. All projects requiring additional rack space shall be coordinated with the DCM. f. All equipment must be rack mountable, except for test or development equipment. All open slots within racks must be closed with a slot blank mounted on the cold aisle side of the rack. Exceptions must be approved by the TSS Director. Racks used in the Data Center are designated by TSD. All exceptions must be pre-approved by the TSD Executive Director.
4 g. All power and network cables must be labeled for easy identification. Any changes which affect the accuracy of this information must be provided to the DCM and all labels must be updated. Labeling will be provided on the outside of racks displaying rack location and electrical circuit information 5. Decommissioned equipment must be removed from the data center in a timely manner. a. All removal of decommissioned equipment shall be coordinated with the DCM and operator on duty for proper documentation of data center assets and for security purposes. (see also d:) b. All decommissioned equipment must be removed from the Data Center in a timely manner, preferably within 60 days. c. All decommissioned cabling, including voice, data and fiber shall be removed immediately. Decommissioned cables shall be defined as cables that are abandoned and are no longer actively used in the data center. d. When equipment is removed from the data center, all pertinent documentation must be updated. This includes assets management, CMDB, and any support matrix that references decommissioned equipment. 6. Electrical Power in the Data Center will comply with accepted electrical standards and local electrical codes for data centers. a. Only qualified Facilities Management personnel shall open or change any power panel or power distribution unit. b. Modifications in the data center power design and/or the addition of power outlets must be coordinated with the DCM for installation. The DCM is the only person authorized to request a work order for electrical modifications within the data center. c. Cleaning equipment or tools used to perform work in the data center shall only be plugged into wall outlets located on the outer walls around the data center. (Computer rack power outlets (s) are not to be used!) Data center staff will provide extension cords or power strips if requested. d. Power requirements for equipment shall be provided to the DCM before installation. The DCM will verify availability of power and coordinate the documentation of the equipment location and power requirements in the data center layout. e. Only the power distribution units (s) located in the equipment racks are to be used to provide power for racked equipment. i. The only exceptions to this rule are: 1. In cases of emergency installations where equipment must be brought into service before a permanent power source can be installed. If used in this manner, a temporary power strip must be tagged and dated. Plans for permanent power must be made with the DCM. f. No radios or other non-computer related equipment should be plugged into any dedicated circuit or computer rack power outlets (s). Wall outlets are available for these instances on the outer walls around the data center. 7. All equipment should be labeled in the front and rear panels with identification information.
5 a. Wherever possible, all equipment will have a label affixed identifying the power distribution unit and the main power panel to which it is attached. At a minimum all equipment power cables should be labeled with this information. Labeling will be provided on the outside of racks displaying rack location and electrical circuit information b. All power cables will be labeled and identified for its specific use and identified by its amperage, voltage, and type of connector if possible. c. All device-to-device cables installed within the data center will be labeled to identify their use and/or purpose. This label must be at both ends. 8. Management of equipment, peripherals, associated cabling, and general work processes in the data center shall be performed in such a manner as to facilitate an optimum data center operation, maximizing resources effectively, and providing a professionally maintained data center environment. a. New equipment destined for the data center will be unpacked outside the data center prior to its placement in the data center environment. i. The staging/storage area adjacent to the data center is provided for this purpose. ii. No boxed or loose equipment or other related materials are to be stored on the main data center floor. All materials are to be housed in the staging/storage area or other location until placed into service. Any materials left on the data center floor will be removed by Operations staff and placed in an appropriate area until required. b. Whenever possible, all equipment deliveries to the data center shall be coordinated with the operator on duty or the DCM to ensure proper receipt and storage. Each unit will be responsible for notification and/or acceptance of their equipment. c. To insure appropriate use of data center space, placement of new racks will be coordinated by the DCM with the guidance of the TSS, ES&M, and NET Directors. d. Equipment owners are responsible for the installations of their equipment in the data center. All installs must be coordinated with the DCM for documentation purposes. e. ITU TSD Network Engineering & Technology staffs manage connectivity requirements and install data/telecommunications cabling in the overhead conveyance system (wiring tray). No other cabling or material will be run in the tray system without prior approval of the Director, Network Engineering & Technology. f. All cable runs will be run in an orderly manner and dressed out for a professional appearance. Cables should be labeled appropriately to provide easy identification. No cables should run diagonally in the sub-floor without prior approval. Electrical and computer cables may run perpendicularly. When cables cross paths, it should be in a perpendicular manner. g. All cabling within racks shall be neatly organized, tied, and labeled appropriately, allowing rack doors to close. h. All doors to racks/computer cabinets shall be kept closed when equipment is not being serviced. i. After completing installation or service on equipment, all tools and materials must be removed from the data center floor and the area left clean of any trash or debris.
6 j. All equipment & furniture within the data center (desks,chairs,tables,racks,cabinets,etc.) are the responsibility of the DCM and are not to be removed from the data center. Compliance All users of the Aquia Data Center facilities have a responsibility to comply with this policy and procedure. Additional rules or restrictions that fall outside this current policy and procedure may be applied as required by Technology Support Services in order to maintain a safe, secure, and professional environment. Should that be necessary, those new rules or restrictions will be incorporated into this document. Failure to comply could result in disciplinary action or the loss of access to the facilities and services of the Aquia Data Center. Effective June 4, To be reviewed and updated annually. PRIMARY CONTACT PERSON: Howard Davis, ITU Data Center Manager Telephone: [email protected] Effective Date: 06/04/2010 Last Review/Update: _01/23/2012
7 CABINET 38 ¾ X 18 ½ A B FLOOR GRID = 24" TILES REAR EMERGENCY DOOR OPENS OUT UNIT# 1-6 UNIT# 1-7 UNIT# 1-8 UNIT# 1-9 UNIT# 1-10 A B C D SUPPORT BEAMS 10 X 10 MGR S OFFICE C D E 24" X 39" CAB J E F G H I J CAB I CAB H CAB G CAB F AQUIA CORE 2 AQUIA CORE 1 NET SERVER 3 NET SERVER 2 1B1 1B2 1B3 3 SOUTH 5 1B5 1B4 6 SOUTH 7 7 SOUTH 7 6 SOUTH 6 6 SOUTH 5 7 SOUTH 6 7 SOUTH 5 NETWORK ES & M OPERATIONS F G H I J K L M CAB E CAB D NET SERVER 1 NETWORK MGR. 2 SOUTH 2 3 SOUTH 4 3 SOUTH 3 3 SOUTH 2 4 SOUTH 4 4 SOUTH 3 4 SOUTH 2 7 SOUTH 4 7 SOUTH 3 7 SOUTH 2 8 SOUTH 4 8 SOUTH 3 8 SOUTH 2 SSG K L M N CAB C COPPER S 1 SOUTH 1 2 SOUTH 1 3 SOUTH 1 4 SOUTH 1 7 SOUTH 1 8 SOUTH 1 N O P Q R CORE 2 CAB B ROW 1 SOUTH CAB A CORE 1 ROW 1 NORTH ROW 0 SOUTH ROW 2 SOUTH ROW 2 NORTH ROW 3 SOUTH ROW 3 NORTH ROW 4 SOUTH ROW 4 NORTH ROW 5 SOUTH ROW 5 NORTH COPPER FIBER OPTICS COPPER ROW 6 SOUTH ROW 6 NORTH ROW 7 SOUTH ROW 7 NORTH ROW 8 SOUTH ROW 8 NORTH NETWORK TEST RACK O P Q R S T U V FIBER OPTIC PATCH S 3PAR ROW 0 NORTH 1 NORTH 1 1 NORTH 2 1 NORTH 3 1 NORTH 4 2 NORTH 1 2 NORTH 2 2 NORTH 3 2 NORTH 4 ORTRONICS NETWORK RACKS (FIBER OPTICS and COPPER) 7 NORTH 4 K BEAM SUPPORT 8 NORTH 1 WINDOW CONSOLE DESK 4' X 36 ¾ FILE CONSOLE CABINET 3' X 19 ½ CABINET DESK 38 ¾ X 18 ½ 4' X 36 ¾ OPERATIONS CONSOLE COMMAND CENTER DESK 4' X 36 ¾ S T U V W 1 NORTH 5 2 NORTH 5 4 NORTH 5 7 NORTH 5 W X 1 NORTH 6 2 NORTH 6 4 NORTH 6 7 NORTH 6 TABLE 5' X 3' X Y 1 NORTH 7 2 NORTH 7 4 NORTH 7 7 NORTH 7 WINDOW Y Z AA AB 1A1 1A2 1A3 1A5 1A4 MAIN ENTRANCE TO Z AA AB AC AC AD AE AF SHAFT UNIT# 1-1 UNIT# 1-2 UNIT# 1-3 UNIT# 1-4 UNIT# 1-5 OFFICE OFFICE AD AE AF LEE
Data Center Operational Policy
POLICY NAME: Data Center Operational Policy Effective Date: Policy Owner: Policy Number: Related Policies: Purpose: Scope: Policy Statement: Definitions: Responsibilities: The policy will become effective
Aquia Data Center Information Research Computing & Co-Location Guide
Aquia Data Center Information Research Computing & Co-Location Guide Information Technology Unit Technology Systems Division Co-location The Information Technology Unit (ITU) is pleased to announce a Data
Data Centers and Mission Critical Facilities Operations Procedures
Planning & Facilities Data Centers and Mission Critical Facilities Operations Procedures Attachment A (Referenced in UW Information Technology Data Centers and Mission Critical Facilities Operations Policy)
Louisiana State University Information Technology Services (ITS) Frey Computing Services Center Data Center Policy
Louisiana State University Information Technology Services (ITS) Frey Computing Services Center Data Center Policy Access: If you have been granted a Frey Access Card with currently approved access to
Tenant Managed Services- Basic. Rancho Cordova Data Center. Tenant Guide 2014-08
- Basic Rancho Cordova Data Center Tenant Guide 2014-08 TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 PURPOSE... 3 2 COMPUTER ROOM GUIDELINES... 4 2.1 GENERAL SITE GUIDELINES... 4 2.2 CABINET GUIDELINES...
Georgia Tech Aerospace Server French building Server Room. Server Room Policy Handbook: Scope, Processes and Procedure
Georgia Tech Aerospace Server French building Server Room Server Room Policy Handbook: Scope, Processes and Procedure Version History Version/Status Release Date Comments 1.1/Draft 1.2 1.3 1.4 1.5 1.6
Co-location service from Bell. Version 1.0 April 10, 2007. Updated as of 4/10/2007 1
Co-location service from Bell Version 1.0 April 10, 2007 Updated as of 4/10/2007 1 Contents 1. Introduction... 3 2. Service features... 3 3. Installation guidelines... 4 3a. Equipment installation in racks...
Data Center Standards Making Progress on Many Fronts. Jonathan Jew J&M Consultants, Inc [email protected]
Data Center Standards Making Progress on Many Fronts Jonathan Jew J&M Consultants, Inc [email protected] J&M Consultants - 2008 Speaker Jonathan Jew Co-chair TIA TR-42.1.1 Data Center working group ANSI/TIA-942
CS&T Data Center Hosted Shared Services Policies & Work Rules
CS&T Data Center Hosted Shared Services Policies & Work Rules Last Modified 07-08-2014 1 Personal Accountability Failure to comply with the following procedures is grounds for immediate removal from the
Customer Guide to the DATAONE Datacenter
Customer Guide to the DATAONE Datacenter User guide for Private Suite or Colocation Customer Version 1.0 July 2012 CONTENTS 1 Welcome... 3 2 Getting started... 4 2.1 CONTACTING US... 4 2.2 OBTAINING SECURITY
PENN STATE DATA CENTERS POLICY IMPLEMENTATION AND PROCEDURES MANUAL
PENN STATE DATA CENTERS POLICY IMPLEMENTATION AND PROCEDURES MANUAL Page 1 of 19 Contents Data Center Access Control... 3 Access Authorization Procedure... 6 Visitor and Vendor Access... 8 Equipment Ordering
Organizing and Managing Equipment Rooms
Organizing and Managing Equipment Rooms How you organize and maintain your equipment room can be just as important as maintaining the operating systems on the boxes themselves. Although many companies
APC APPLICATION NOTE #112
#112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.
TIA-942 Data Centre Standards Overview WHITE PAPER
TIA-942 Data Centre Standards Overview WHITE PAPER TIA-942 Data Centre Standards Overview For the past 20 years, cabling standards have been the cornerstone of ensuring proper design, installation, and
Service Level Agreement (SLA)
Service Level Agreement (SLA) Between [Add your department and acronym ()] Technology Systems Division (TSD) Information Technology Unit (ITU) and XYZ For XYZ Service Document Version History Version #
How To Write Anu Data Centre
AUSTRALIAN NATIONAL UNIVERSITY DATA CENTRE STANDARDS ANU ITS Data Centre Operations Version: 1.1 Date: 18 th March 2014 Status: Final Type: Internal Prepared By: David Hardwicke and Geoff Barlow Document
RACKMOUNT SOLUTIONS. 1/7/2013 AcoustiQuiet /UCoustic User Guide. The AcoustiQuiet /UCoustic User Guide provides useful
RACKMOUNT SOLUTIONS 1/7/2013 AcoustiQuiet /UCoustic User Guide The AcoustiQuiet /UCoustic User Guide provides useful hints, tips and advice to help maximize the thermal and acoustic properties of the cabinets.
Element D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer
120V & 208V ELECTRICAL SERVICE ORDER FORM
NAME OF EVENT: American International Motorcycle Expo 2015 BOOTH #: 120V & 208V ELECTRICAL SERVICE ORDER FORM **TO COMPLETE THIS ORDER YOU MUST INCLUDE AN OCCC METHOD OF PAYMENT FORM IN YOUR ORDER SUBMISSION**
Presenters Brett Weiss, Gabe Martinez, Brian Kroeger.
1 Presenters Brett Weiss, Gabe Martinez, Brian Kroeger. Topics to be covered: Cable identification Purpose of the various cable types Installation techniques Building Infrastructure Overview of networking
Office of the Government Chief Information Officer. Green Data Centre Practices
Office of the Government Chief Information Officer Green Data Centre Practices Version : 2.0 April 2013 The Government of the Hong Kong Special Administrative Region The contents of this document remain
Creating Order from Chaos in Data Centers and Server Rooms
Creating from in Data Centers and Server Rooms By Dennis Bouley White Paper #119 Executive Summary Data center professionals can rid themselves of messy racks, sub-standard under floor air distribution,
Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER
Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Lylette Macdonald, RCDD Legrand Ortronics BICSI Baltimore 2011 Agenda: Discuss passive thermal management at the Rack
SAME JETC May 22-25, 2012. St. Louis, Missouri IMPORTANT
18a Electrical Terms and Conditions IMPORTANT Please read the list of work below. If you require any of this work to be performed in your booth space, it must be performed by a show electrician. This work
ADC-APC Integrated Cisco Data Center Solutions
Advanced Infrastructure Solution for Cisco Data Center 3.0 Ordering Guide ADC-APC Integrated Cisco Data Center Solutions The evolution of data centers is happening before our eyes. This is due to the
Data Center Cabling Design Trends
Data Center Cabling Design Trends BICSI Regional Meeting Maurice Zetena Fiber Connect Infrastructure Trends Infrastructure Trends Any to All Trunk Cabling Trends: Data Center Infrastructure Media Choice:
Rules of Conduct and Safety
Rules of Conduct and Safety ETISALAT DATA CENTER RULES - V2.4 Contents Definitions... 2 Introduction... 3 Safety Instructions... 3 Upon entering the Data Center... 3 Privacy Notice / Camera Surveillance...
LEVEL 3 DATA CENTER ASSESSMENT
Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments
Creating Order from Chaos in Data Centers and Server Rooms
Creating from in Data Centers and Server Rooms White Paper 119 Revision 1 by Dennis Bouley > Executive summary Data center professionals can rid themselves of messy racks, sub-standard under floor air
Benefits of. Air Flow Management. Data Center
Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment
A1.5 Classroom Standards
A1.5 Classroom Standards Note: The following standards have been developed and adopted by KU's Instructional and Mediated Spaces Committee (IMSAC), which includes representatives from DCM, Instructional
Terminating 25-Pair Cable and 4-Pair Cross Connects
Terminating 25-Pair Cable and 4-Pair Cross Connects Estimated Time: 90 minutes Number of Teams: 2 Number of Team Members: one to four This Lab has four major parts that will be addressed separately. 1.
Specifying an IT Cabling System
Specifying an IT Cabling System This guide will help you produce a specification for an IT cabling system that meets your organisation s needs and gives you value for money. You will be able to give your
Section 010103 Summary of Work Contract 11-03 Security System, Network Infrastructure and UPS Power
Section 010103 Security System, Network Infrastructure and UPS Power Part 1 General 1.1 Summary (Non-inclusive) A. Section Includes: Construction operations required by Contract Documents, defines aspects
Data Center Rack Systems Key to Business-Critical Continuity. A White Paper from the Experts in Business-Critical Continuity TM
Data Center Rack Systems Key to Business-Critical Continuity A White Paper from the Experts in Business-Critical Continuity TM Executive Summary At one time, data center rack enclosures and related equipment
Cabinets 101: Configuring A Network Or Server Cabinet
Cabinets 101: Configuring A Network Or Server Cabinet North, South and Central America White Paper May 2012 www.commscope.com Contents Background Information 3 What is a network or server cabinet? 3 What
Rack Installation Instructions
Rack Installation Instructions Guidelines This publication provides information about how to install your server into a standard rack cabinet using the rail kit shipped with your server. If you no longer
ANSI/TIA-942 Telecommunications Infrastructure Standard for Data Centers
ANSI/TIA-942 Telecommunications Infrastructure Standard for Data Centers Jonathan Jew [email protected] J&M Consultants, Inc Co-chair TIA TR-42.1.1 data center working group Co-chair BICSI data centers standards
2301.1 Scope: Communications and Electronic Systems addressed in this section include:
Chapter 23 COMMUNICATIONS / ELECTRONIC SYSTEMS SECTION 2301 - GENERAL 2301.1 Scope: Communications and Electronic Systems addressed in this section include: 1. Fire Alarm System 2. Telecommunication and
DESIGN GUIDELINES. Local Area Network
DESIGN GUIDELINES Local Area Network The total oversight and management responsibilities for information assurance (IA) and protection of DoDEA s critical infrastructure fall under the purview of the DoDEA
Data Centers and Mission Critical Facilities Access and Physical Security Procedures
Planning & Facilities Data Centers and Mission Critical Facilities Access and Physical Security Procedures Attachment B (Referenced in UW Information Technology Data Centers and Mission Critical Facilities
Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers
Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers Deploying a Vertical Exhaust System www.panduit.com WP-09 September 2009 Introduction Business management applications and rich
InstaPATCH ZERO Solution Guide
SYSTIMAX Solutions InstaPATCH ZERO Solution Guide Rapid Server Deployment and Change Management North, South and Central Americas 1 As data centers face ever-increasing IT demands, growth demands and evolving
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION The heat load in data centers is increasing rapidly, the adaptation of a cooling strategy is often necessary. Many data centers and server rooms use
DATAMENA COLOCATION SERVICE SCHEDULE
DATAMENA COLOCATION SERVICE SCHEDULE This Schedule is applicable to a Service Order for datamena Colocation Service(s) which has been submitted by Customer, and accepted by Supplier, in accordance with
in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.
DATA CENTER The current Campus Data Center is located within historic Founders Hall which is in a less-than ideal location for a variety of reasons, but is typical of an existing campus IT infrastructure
Rack Installation. Unpacking the System. Choosing a Setup Location. General Server Precautions. Barracuda Appliances
This set of instructions applies to racking and rail kit installation for 6XX and above. The Rack Mounting Instructions section below provides information on installing the SC825 chassis into a rack unit
Dealing with Thermal Issues in Data Center Universal Aisle Containment
Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe [email protected] AGENDA Business Drivers Challenges
Data Center Access Policies and Procedures
Data Center Access Policies and Procedures Version 2.0 Tuesday, April 6, 2010 1 Table of Contents UITS Data Center Access Policies and Procedures!3 Introduction!3. Overview!3 Data Center Access!3 Data
ANSI/TIA-942 Telecommunications Infrastructure Standards for Data Centers
ANSI/TIA-942 Telecommunications Infrastructure Standards for Data Centers Jonathan Jew jew@j-and and-m.com J&M Consultants, Inc Co-chair TIA TR-42.1.1 data center committee Co-chair BICSI data centers
About the HotWire 7900 10-Slot Standalone Shelf
TM HotWire Model 7900 10-Slot Standalone Shelf Installation Instructions Document Number 7900-A2-GN10-10 About the HotWire 7900 10-Slot Standalone Shelf The HotWire 7900 10-Slot Standalone Shelf is designed
SECTION 25110 TELECOMMUNICATION ROOMS
PART 1 - GENERAL 1.1 SUMMARY A. SCOPE SECTION 25110 TELECOMMUNICATION ROOMS 1. This section includes the minimum installation requirements for equipment and cabling infrastructure in Telecommunication
In Row Cooling Options for High Density IT Applications
In Row Cooling Options for High Density IT Applications By Ramzi Y. Namek, PE, LEED AP, BD+C; Director of Engineering 1 Users wishing to deploy high density IT racks have several In Row Cooling solutions
by Metagyre, Inc. September 27, 2010
NewCo Data Center Assessment by September 27, 2010 Metagyre Account Manager Contact Paul Thompson 1249 NW Arcadia Ct. Suite 300 Poulsbo, WA 98370 voice - 360 697-3386 fax 360 697-6676 [email protected]
HP UPS R1500 Generation 3
HP UPS R1500 Generation 3 Installation Instructions Part Number 650952-001 NOTE: The rating label on the device provides the class (A or B) of the equipment. Class B devices have a Federal Communications
WHITE PAPER. Creating the Green Data Center. Simple Measures to Reduce Energy Consumption
WHITE PAPER Creating the Green Data Center Simple Measures to Reduce Energy Consumption Introduction Energy Awareness Driving Decisions in the DataCenter The continued thirst for energy is a recurring
Statement of Work. - 1 - Server Migration & Cable Management. Installation Services. Table of Contents. 1.0 Executive Summary. 2.0 Features & Benefits
Installation Services Statement of Work - 1 - Server Migration & Server Migration & Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0 Details of Service
FVSU-33201301 REPAIR & UPGRADE FIBER OPTIC 280000-1 SECTION 280000 FIRE ALARM SYSTEM CONNECTIVITY
FVSU-33201301 REPAIR & UPGRADE FIBER OPTIC 280000-1 SECTION 280000 FIRE ALARM SYSTEM CONNECTIVITY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Fire-alarm control unit. 2. Addressable interface
ELECTRICAL SAFETY. The standard unit for measuring electrical current.
ELECTRICAL SAFETY Introduction The following sections provide general safety guidelines and procedures for electrical safety. This chapter covers the following topics: TOPIC PAGE General Electrical Safety
TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE
TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE The University of Arizona has implemented a Keyless Access and Security System program to provide a cost effective, efficient, and maintainable means
About the BitStorm 6051 POTS Splitter
BitStorm 6051 Installation Instructions Document Number 6051-A2-GZ40-10 July 2002 About the BitStorm 6051 The BitStorm system enables simultaneous high-speed digital data access and analog voice service
OPERATIONS MANUAL DATA CENTER COLOCATION
Section I: Introduction and Service Description. OPERATIONS MANUAL DATA CENTER COLOCATION Company means MCI Communications Services, Inc., d/b/a Verizon Business Services, or any affiliated entity designated
Portable Air Conditioner
Portable Air Conditioner Owner's Manual Model:3 in 1 12,000 Btu/h Series 3 Please read this owner s manual carefully before operation and retain it for future reference. CONTENTS 1. SUMMARY...1 2. PORTABLE
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table
Version: Modified By: Date: Approved By: Date: 1.0 Michael Hawkins October 29, 2013 Dan Bowden November 2013
Version: Modified By: Date: Approved By: Date: 1.0 Michael Hawkins October 29, 2013 Dan Bowden November 2013 Rule 4-004L Payment Card Industry (PCI) Physical Security (proposed) 01.1 Purpose The purpose
Dennis Fire Department Fire Prevention Mark Dellner Fire Chief
Dennis Fire Department Fire Prevention Mark Dellner Fire Chief FIRE SAFETY INSPECTION GUIDELINES FOR COMMERCIAL PROPERTIES (MA Fire Prevention Regulations 527 CMR, MGL Chapter 148) FIRE PREVENTION CHECKLIST-
Great Lakes Data Room Case Study
Great Lakes Data Room Case Study WeRackYourWorld.com Problem: During a warm summer period in 2008, Great Lakes experienced a network outage due to a switch failure in the network enclosure. After an equipment
LABORATORY SAFETY INSPECTION CHECKLIST
LABORATORY SAFETY INSPECTION CHECKLIST As part of EH&S's laboratory safety survey program, we have compiled a list of the most common safety problems. This is not a list of every possible hazard, but can
ELECTRICAL ORDER FORM
ELECTRICAL ORDER FORM E M EVENT: Spring Home/Garden Show FACILITY: Del Mar Fairgrounds FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS 120 VOLT POWER DELIVERY The cost
Energy-efficient & scalable data center infrastructure design
Seminar am 30. September 2010 in Wetzlar Nachhaltigkeit durch UPI (Unified Physical Infrastructure) Vortrag von Stefan Fammler: Energieeffiziente Strategien im Rechenzentrum Energy-efficient & scalable
IT FACILITY STANDARD NO. 5 DATA CENTER & IT FACILITY ACCESS
Function Affected: IT Facilities including data centers and network rooms (BDFs and IDFs) Issued Date: 06/01/15 Issue Superseded: 12/15/13 Number of Pages: 6 I. Background The UCSF data centers and network
Dimensions (HxDxW) Total Cabinet Area 89.96x 39.69 x 24 in/ 2,285 x 1,008.17 x 612.77 mm 95.47x 48 x 32 in/ 2,425 x 1,219.2 x 812.
1 Compaq 10000 Series Racks The 10000 series racks are a family of 1000mm deep racks which are available in 22U, 36U, 42U and 47U 600mm widths. Compaq 10000 Series Racks provides a common, integrated platform
Choosing Close-Coupled IT Cooling Solutions
W H I T E P A P E R Choosing Close-Coupled IT Cooling Solutions Smart Strategies for Small to Mid-Size Data Centers Executive Summary As high-density IT equipment becomes the new normal, the amount of
INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1
City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included
Access Server Rack Cabinet Compatibility Guide
Access Server Rack Cabinet Compatibility Guide A Guide to the Selection and Evaluation of Access Server Rack Cabinets for Compatibility and Use with Third Party Server Chassis Kalkenstraat 91-93 B-8800
Dear Exhibitors, We appreciate your order! Sincerely, Edlen Electrical Exhibition Services ELECTRICAL ORDER FORM
ELECTRICAL ORDER FORM Phone: (213) 765-4676 Fax: (213) 765-4679 EVENT: Virtual Reality LA FACILITY: Los Angeles Convention Center DATES: August 29, 2015 EVENT #: 085097LA Dear Exhibitors, Please note that
Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment
Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment By Peter Hannaford White Paper #42 Revision 1 Executive Summary High-density servers present a significant cooling challenge.
Rack installation instructions
Rack installation instructions Review the documentation that comes with the rack cabinet for safety and cabling information. Before you install the server in a rack cabinet, review the following guidelines:
APC APPLICATION NOTE #92
#92 Best Practices for Designing Data Centers with the InfraStruXure InRow RC By John Niemann Abstract The InfraStruXure InRow RC is designed to provide cooling at the row and rack level of a data center
Information and Communication Technology Network Cabling Infrastructure Standard
Approved on Dec-2005 by Eugene Formato Manager, Communications Services Last Amended Aug-2009 by Jarren Beveridge Network Engineer, Communications Services Scheduled for Review Jan-2010 Information and
DataCentre Access Policies & Procedures
DataCentre Access Policies & Procedures Contents Purpose... 3 Overview... 3 DataCentre Access... 3 DataCentre Access Levels... 4 Periodic Review & Termination of Access... 5 DataCentre Access Log... 5
INSTALLATION & USER INSTRUCTIONS
INSTALLATION & USER INSTRUCTIONS LED ELECTRIC FIRE Focal Point Fires plc. Christchurch, Dorset BH23 2BT Tel: 0202 499330 Fax: 0202 499326 www.focalpointfires.co.uk e : [email protected] MODELS
Telecommunications Infrastructure Standard for Data Centers. 802.3 Tutorial
Telecommunications Infrastructure Standard for Data Centers 802.3 Tutorial Prepared by: Jonathan Jew - J&M Consultants and Chris DiMinico - MC Communications - Co-chairs TR42.1.1 TR42: Data Center Standard
NeuStar Ultra Services Physical Security Overview
NeuStar Ultra Services Physical Security Overview Mission-critical network operations must have the highest standards of quality, security and reliability. NeuStar Ultra Services currently locates its
Data Center Cooling. 1-800-693-0351 www.dpstele.com. A guide from: Your partners in UPS Monitoring Systems
Data Center Cooling A guide from: Your partners in UPS Monitoring Systems The air in your server room, especially nearest the processors in your equipment, will rise to dangerous temperatures quickly if
Telecommunications Infrastructure Standard for Data Centers ANSI/TIA-942
Telecommunications Infrastructure Standard for Data Centers ANSI/TIA-942 Chris DiMinico [email protected] MC Communications Data Center Standards ANSI/TIA-942 Telecommunications Infrastructure Standard
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems
AU-110 racking guide NBXPN: 023
AU-110 racking guide NBXPN: 023 1. Overview NIMBOXX AU-110 Rack Installation This guide provides setup instructions for installing your NIMBOXX AU-110 in a rack. Following these steps in the order given
Virtual Data Centre Design A blueprint for success
Virtual Data Centre Design A blueprint for success IT has become the back bone of every business. Advances in computing have resulted in economies of scale, allowing large companies to integrate business
Data Center Components Overview
Data Center Components Overview Power Power Outside Transformer Takes grid power and transforms it from 113KV to 480V Utility (grid) power Supply of high voltage power to the Data Center Electrical Room
How To Buy Anixter Data Center
Products. Technology. Services. Delivered Globally. DATA CENTER SOLUTIONS: MULTI-TENANT, SERVICE PROVIDER, CLOUD THE ANIXTER DIFFERENCE Anixter has the knowledge and products to make your multi-tenant
Exhibitor Guidelines for Booth Display Rules and Regulations
Exhibitor Guidelines for Booth Display Rules and Regulations NACE strives to provide each exhibitor with a reasonable sight line from the aisle. To help accomplish this, the following Guidelines for Booth
Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary
Statement Of Work Professional Services Data Center Power and Cooling Assessment Data Center Power and Cooling Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features