What Is Rehabilitation?



Similar documents
Appendix C. Municipal Planning and Site Restoration Considerations

How To Plan A Buffer Zone

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Restoration Planning and Development of a Restoration Bank

Angora Fire Restoration Activities June 24, Presented by: Judy Clot Forest Health Enhancement Program

1.7.0 Floodplain Modification Criteria


Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

Mud in the Water. Oklahoma Academic Standards. Objective. Background. Resources Needed. Activities

Nipigon Bay. Area of Concern Status of Beneficial Use Impairments September 2010

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council. July 8, 2014

COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL

The Teton Creek Restoration Project Summary:

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA

Background Information: The Mamquam River Floodplain Restoration Project

Fisheries and Oceans Canada-Saskatchewan District 2011 Post-Flood Shoreline Restoration and Stabilization Protocol

Mine Plan of Operations Reclamation Bond Checklist

RESTORATION & REVITALIZATION

Colorado Natural Heritage Program

Backyard Buffers that Work for People and Nature by Restoring Ecological Function

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Sims Bayou Federal Flood Damage Reduction Project

720 Contour Grading. General. References. Resources. Definitions

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

SECTION SITE PREPARATION

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

SUSTAINABLE URBAN DRAINAGE SYSTEMS

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation

Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods.

Waterway Technote Drains

Town of Richmond Hill Community Stewardship Program

Experienced Planning and Design

Natural surface water on earth includes lakes, ponds, streams, rivers, estuaries, seas and oceans.

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

Stormwater Wetland Design and Construction Mitigation Duke Bitsko. Construction Activities, Schedule and Sequence Tom Ritchie

Wildlifer 2013 Managing Wildlife on Private Lands

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline

Resource Management Accomplishments FY 2014

A Global View of Ecological Restoration and the Role of SER International

OSU Extension FACT SHEET

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

Waterway Technote Planning

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Wildlife Habitat Conservation and Management Program

Subsidence Mitigation Through Rice Cultivation Research Project Goals:

Cellular Antenna Proposal Form

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

LOW INTEREST LOANS FOR AGRICULTURAL CONSERVATION

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Fireline Rehabilitation on Donnelly Flats fire (B222) Summary: 7/1/99 R.R. Jandt

understanding Sustainable Landscaping & Tree Preservation Standards

Bowmanville Marsh Habitat Restoration and Public Access Project

Increasing water availability through juniper control.

Appendix C. Re-vegetation and Rehabilitation Sub-Plan

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

18 voting members 44 stakeholders 114 list. Senators: Wyden & Merkley Representative DeFazio

Ponds- Planning, Design, Construction

HFQLG Project Evaluation Form

4. Environmental Impacts Assessment and Remediation Targets

Unit Price Averages Reports

Chapter 11 Site Rehabilitation and Stabilization

SECTION 5. Sediment Control Measures

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation

Pamela Birak, Jordan Lake State Park, Chatham County, NC

STATE LEVEL AGREEMENT BETWEEN THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

Halton Region Planning & Public Works Committee Meeting July 8, 2015

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives

Outlet stabilization structure

EFB / Online Wetland Restoration Techniques Class Syllabus

Summary of Pre- and Post-Project Vegetation Survey Results

UGIP Technical Committee Key Principles of Grazing Management

As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing

LEARNING PAPER. Watershed Development and Integration in Southern Malawi. Christopher Michael Reichert, Consultant PURPOSE. Author or date here

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Transcription:

Location of Aggregate Operations Ready Mix Plant Locations Aggregate Locations Cement Terminal Locations What Is Rehabilitation? Rehabilitation is the treatment of land from which aggregate has been excavated so that the use or condition of the land: 160 is restored to its former use or condition, or is changed to another use or condition that is or will be compatible with the use of adjacent land. Disturbed Area vs. Rehabilitated Area CBM Aggregates Properties The site plans for aggregate operations outline the specific requirements for rehabilitation. While the Operational Standards contained in the Aggregate Resources of Ontario Provincial Standards set out minimum rehabilitation requirements, CBM strives to achieve higher quality rehabilitation to encourage biodiversity and promote after uses that blend with the surrounding landscape. CBM's award winning efforts in aggregate rehabilitation are evidence of the company's commitment to good land stewardship. Acres 80 Disturbed Rehabilitated With good planning, as aggregate is removed areas can be progressively rehabilitated. Planned stripping and replacement of topsoil, subsoil and overburden materials allows CBM to establish vegetation in as much area as possible, and a start can be made 0 2001 2002 2003 2004 2005 2006 Year From 2001 to 2006 on CBM aggregate properties, the amount of land stripped for extraction was increased 66% and the amount of land rehabilitated increased by 576%. towards developing the site for a particular after use. During final rehabilitation, all equipment, stockpiles and buildings (in most cases) are removed and there may be additional tree planting or shoreline planting.

Aberfoyle Pit Rehabilitation The Aberfoyle pit has been in operation since the 1950's and progressive rehabilitation has returned portions of the site to a naturalized state. In the late 1970's, trees were planted which are now large and mature, providing wildlife habitat and ecological diversity. Rehabilitation along the edges of the pond areas has been designed to support fish species such as trout and bass. To enhance the habitat in near shore areas, CBM recently installed Aquamats in the ponds. Over 30 ha have been progressively rehabilitated at this site. Areas where extraction is complete now support a variety of potential after uses, which include agriculture, naturalized areas, ponds and a thriving aquatic environment. Rehabilitation of the site involves: Landshaping Wetland and shoreline creation Seeding Using aquamats to increase aquatic rehabilitation Ongoing tree planting Aquatic Enhancements To enhance the habitat in near shore areas, CBM recently installed Aquamats to the ponds. Naturalization Areas where extraction is complete now support a variety of potential after uses, which include naturalized areas. Tree Planting Since the 1970's, many trees have been planted which provide wildlife habitat and ecological diversity.

The Stouffville pit's north face after seeding Stouffville Pit Rehabilitation CBM's Stouffville pit is located in the Township of Whitchurch Stouffville, in the Region of York, near the intersection of Bloomington Road and Hwy 48. The 22 hectare site is within the Oak Ridges Moraine. The pit was operated between 1990 and 2001. Rehabilitation of the site included, Excavator loading material Grading the setbacks around the extraction area to create gentle side slopes. Replacing the topsoil using material that was stored on site. Harrowing and seeding the area to re-establish ground cover. Seeding the north slope. Before rehabilitation. After rehabilitation.

Lakefield Pit Rehabilitation CBM Aggregates Lakefield Pit has been in operation since 1950. The pit is located in Smith Township, Peterborough County just four km west of the Town of Lakefield. Rehabilitation of the Lakefield Pit included, Completing rehabilitation of 8.5 ha in 2007. This work complemented the 2 hectares undertaken in 2006. Allowing for future use of the land for agriculture or recreational use. Naturalizing the pit floor and shoreline by establishing a solid base of overburden and topsoil. Spreading a grass seed mixture of timothy, perennial rye and sweet clover and planting sixteen hundred native trees including white cedar, white spruce and sugar maple. Placing oversized stones along the pond edge. The final grade of the floor was 6:1. Planting trees in windrows to allow agricultural crops to be planted.

Nutrient Cycling Sunderland Pit Rehabilitation CBM Aggregates Sunderland Pit, located in Brock Township, Durham Region has been in operation since 1954. The north section of the pit has presented many rehabilitation challenges. The hurdles included eroding slopes and clear, nutrient poor water in the pond. Rehabilitation of the 11 hectare area began in the late 1990's and was completed in 2006. Rehabilitation of the site included, Stabilizing the slopes by creating terraces and several trenches that were lined with filter cloth and boulders. The terraces were designed to slope inward, catching water and directing it into the trenches. Channeling the water into the appropriate drainage locations greatly minimized the amount of soil erosion. In 2003 pond rehabilitation began with the installation of aquamats to increase nutrient levels, promote aquatic vegetation growth, while creating fish and invertebrate habitat. Soil bioengineering (live fascine) to stabilize the high water line and develop a shrubby riparian cover. Creating new habitat diversity by utilizing logs and rocks to add structural diversity and these created micro-habitat diversity. Installation of wetland (aquatic) plants in the near shoreline to begin re-vegetation. In the spring of 2005 brook trout were stocked in the pond. Zooplankton, forage fish and predators were added to the lake sequentially as each population stabilized. Hydroseeding the slopes in 2003 and again in the spring of 2005. Shoreline Creation Soil bioengineering (live fascine) Structural and Micro-habitat diversity Zooplankton and forage fish are added

McDonnell Pit Rehabilitation CBM Aggregates McDonnell Pit, located in Murray Township, Northumberland County, began operation in the spring of 1991. When extraction was complete along the northeast floor and face, the slope was steep. The area rehabilitated was 2.7 hectares. Rehabilitation of the site included, Stabilization and grading of the northeast floor and face began in September 2005. The project was completed a year later. A new gentler side slope was created, as the old extraction face was benched from the bottom up. Once the slopes were established, the overburden and topsoil were spread and fine graded. A seed spreader distributed seed over the 2.7 hectare area. The seed mix consisted of 20% Perennial Ryegrass and 80% Red Fescue. Before rehabilitation Following earthmoving and grading The finished product

For more information contact the following St. Marys Cement/CBM Aggregates staff. Melanie Horton 55 Industrial Street Toronto, Ontario Canada M4G 3W9 416 696-4459 mthorton@vcsmc.com Paul Hartnett 7152 Concession 2 R. R. # 22 Cambridge, Ontario N3C 2V4 519 823-4450 pjhartnett@vcsmc.com Mike LeBreton or Colin Evans 410 Waverley Road R. R. # 2 Bowmanville, Ontario L1C 3K3 905 623-1722 mrlebreton@vcsmc.com crevans@vcsmc.com www.stmaryscement.com Prepared by Sherry Yundt, S. E. Yundt Limited for St. Marys Cement/CBM Aggregates, 2008. Graphic Design by CARTOGRAPHICS.