Walking the Walk. case Study Science & Technology Facility

Similar documents
Science and Technology Facility, L a b o r a t o r i e s f o r t h e 2 1 s t C e n t u r y : C a s e S t u d i e s.

BOMA BESt Assessment Overview

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

Metrics for Energy Efficiency

SAM HOUSTON STATE UNIVERSITY

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

Energy-Efficient Laboratory Design

Flexibility, Efficiency In San Antonio Arena

Commissioning - Construction Documents (Page 1 of 6)

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

ENHANCED LABORATORY HVAC SYSTEM

Preliminary Final Proposal

Enclosed Football Stadium Design History and Lessons Learned

Sample - Existing Building Commissioning Plan

Bring the fresh in. Dedicated Outside Air Systems

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

SYSTEMS INTEGRATION SYSTEMS INTEGRATION. Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight

HVAC Systems: Overview

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

THE U.S. ENVIRONMENTAL PROTECTION AGENCY S NATIONAL VEHICLE AND FUEL EMISSIONS LABORATORY, ANN ARBOR, MICHIGAN

Using Time-of-Day Scheduling To Save Energy

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

Mechanical Systems Proposal revised

Creating Efficient HVAC Systems

EnergyPro Building Energy Analysis. Assisted Living Building

Element D Services Heating, Ventilating, and Air Conditioning

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services

Energy Efficient HVAC-system and Building Design

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Each icon on this map represents the physical location of a station.

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

Amplification of Notice ; Deduction for Energy Efficient Commercial Buildings

Innovent LASER Packaged Fresh Air Conditioning Units

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Methods for Effective Room Air Distribution. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

HVAC Systems in Schools & Commercial Buildings and Radon

HVAC Simplified Approach Option

- White Paper - Data Centre Cooling. Best Practice

NIDUS CENTER FOR SCIENTIFIC ENTERPRISE, ST. LOUIS, MISSOURI L ABORATORIES FOR THE 21ST C ENTURY: C ASE S TUDIES. Case Study Index.

Printing and Publishing Energy Savings Guide

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN

Glossary of Heating, Ventilation and Air Conditioning Terms

CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)

CHAPTER 4 VENTILATION

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Rules of Thumb Energy Efficiency in Buildings

Facilities Maintenance Standards rev

Geothermal Heat Pumps: A Pathway to Zero Net Energy (ZNE) for Schools, Homes and Businesses

APPLICATION GUIDE. Comparison of Latent Cooling Performance of Various HVAC systems in a Classroom Application

LOW-PRESSURE-DROP HVAC DESIGN FOR LABORATORIES

Collaborative Laboratory Commissioning and Sustaining the Optimal Building. By E. Lon Brightbill, P.E Facility Dynamics

HEAT RECOVERY FROM CHILLED WATER SYSTEMS. Applications for Heat Reclaim Chillers

Dehumidification Design

Sustainable Energy and Resource Saving Concepts for HVAC/Process/Water/Wastewater. Thomas H. (Tom) Durkin, PE Dr. Glenn Krueger, EdD Bob Jacobi

What is LEED? Why pursue LEED accreditation? How does LEED accomplish these goals? Sustainable sites Water efficiency Energy and Atmosphere

BUILDING PERFORMANCE METRICS

Pool Dehumidification Basics

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

case Study Building At a Glance Building Team

ULTRA-EFFICIENT HVAC DESIGN AND CONTROL

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

Energy Efficiency: Integrated Design and HVAC Systems HEALTHCARE - TOP 5 GREEN BUILDING STRATEGIES

Defining Quality. Building Comfort. Precision. Air Conditioning

Sustainable Smart Laboratories

HVAC Processes. Lecture 7

Chapter 5: Lighting, HVAC, and Plumbing

FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING

1.2 Refrigerant Equipment. General

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Condensing Boiler Efficiency

EFFICIENCY EVIDENT. meet biosafety regulations and prevent cross contamination.

Engineers Newsletter. Understanding Single-Zone VAV Systems. providing insights for today s hvac system designer. volume 42 2

Element D Services Heating, Ventilating, and Air Conditioning

HEATING, VENTILATION & AIR CONDITIONING

By Tom Brooke PE, CEM

Gloria Marshall Elementary School. Spring Independent School District Houston, TX

ASHRAE Rocky Mountain Chapter. RickPhillips Phillips, P.E., PE LEED AP Senior Mechanical Engineer The RMH Group, Inc.

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

Los Angeles Community College District

Case Study -Sandy Grove Middle School First Net Positive Energy P3 School In North Carolina

Green House, Hungary

Integrated Solar Radiant Systems

Variable Refrigerant Flow Systems

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

Part III. Administrative, Procedural, and Miscellaneous

Glossary of HVAC Terms

Second Place: Industrial Facilities or Processes, New

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?

Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP

L ABORATORIES FOR THE 21ST C ENTURY: ENERGY ANALYSIS. U.S. Department of Energy Energy Efficiency and Renewable Energy

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.

HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems

Development of Design Guidance for K-12 Schools from 30% to 50% Energy Savings

Energy Audit Data Collection Form

Transcription:

case Study Science & Technology Facility The following article was published in High Performing Buildings, Summer 2008. Copyright 2008 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes only. This article may not be copied and/or distributed electronically or in paper form without permission of ASHRAE. Walking the Walk Photo Bill Timmerman/PIX 14969 By Anna Hoenmans, P.E., Member ASHRAE; and Otto Van Geet, P.E., Member ASHRAE Sustainable buildings often feature photovoltaic applications. But, where does research and development of new photovoltaic technologies take place? Now, it occurs in a new light-filled, energy-efficient research facility on the Golden, Colo., campus of the U.S. Department of Energy s (DOE) National Renewable Energy Laboratory (NREL). From within the lab, researchers can look outside to a scenic view surrounding the building. Completed in August 2006, NREL s 71,347 ft 2 Science and Technology Facility (S&TF) houses nine laboratories for advanced materials synthesis, analysis, characterization, and support, as well as a 10,170 ft 2 process development and integration laboratory (PDIL). 14 High Performing Buildings Summer 2008

Surpassing Gold As a partner with the Laboratories for the 21st Century (Labs21 ), NREL set aggressive goals for energy savings, daylighting, and achieving a USGBC LEED for New Construction (NC) Gold rating. Through the Labs21 program, NREL staff worked with the design team to analyze, design, review, and implement the energysaving features highlighted in this case study. Staff also coordinated documentation for the LEED submittal, oversaw an analysis to validate the project s energy simulation, and prepared documentation to showcase the project through design awards and other venues. The S&TF laboratories are designed to accelerate renewable energy process and manufacturing research for near-term technologies, such as thin-film solar cells, and next-generation technologies, such as organic and nanostructured solar cells. Energy costs for this building are estimated through computer simulation to be 41% lower than those of a comparable facility designed to ANSI/ASHRAE/ IESNA Standard 90.1-1999, Energy Standard for Buildings Except Low- Rise Residential Buildings, for an estimated savings of $96,000 per year. The estimated annual energy savings are 10,648 million Btu. The added cost for the energy savings features was $482,500. This represents a five-year simple payback. The S&TF surpassed the LEED rating goal, receiving a LEED Platinum rating. The S&TF is using more Photo Bill Timmerman/PIX 14967 Photo Pat Corkery/PIX 15433 Building At a Glance Building Name Science & Technology Facility Location NREL s Golden, Colo., campus Size 71,347 ft 2 Started February 2005 Completed August 2006 Use Research facility with laboratories Cost $29.8 million Building Distinctions LEED-NC Platinum; First Place, 2008 ASHRAE Region X Chapter Regional Conference; Recognized as trendsetter in laboratory design in R&D Magazine s 2008 Laboratory of the Year competition; 2006 Federal Energy Saver Showcase Award; 2006 Design Excellence Award from Jefferson, Colo., County Board of Commissioners Building Team Owner NREL Architect and MEP Engineer SmithGroup Civil Engineer Martin-Martin Landscape Designer Wenk Landscape Architects Structural Engineer Paul Koehler Leffler General Contractor M.A. Mortenson summer 2008 High Performing Buildings 15

Exterior pedestrian walkways and enclosed service corridors connect S&TF to the Solar Energy Research Facility (SERF). Photo Marjorie Schott/PIX 15122 The covered entry welcomes visitors into a light-filled lobby. energy than the simulation predicted, but significantly less energy than a comparable facility designed to comply with Standard 90.1. Photo Pat Corkery/PIX 15164 S&TF: A Better Lab The S&TF is a two-story, 71,347 ft 2 laboratory building completed in 2006 at a total construction cost of $22.7 million ($318/ft 2 ) and a total project cost of $29.8 million. The ground floor includes laboratories, office space and a lobby. The second floor houses laboratories and includes the PDIL. An elevated bridge connects the second floor service corridor to the adjacent 117,000 ft 2 Solar Energy Research Facility (SERF). The third level houses the bulk of the S&TF s mechanical support functions, including laboratory exhaust fans. The exterior consists primarily of precast concrete panels and metal panels at the entry that complement the exterior of the adjacent building. Seven interaction spaces encourage informal discussions among researchers. Each space features seating, a whiteboard, access to a local area computer network, and views to open space outside. The building s centerpiece is the 10,170 ft 2 PDIL. It was designed to accommodate a new class of deposition, processing, analysis, 16 High Performing Buildings Summer 2008

film photovoltaics, hydrogen nanostructures for production and storage, thin-film window coatings, and solid-state lighting. The intent is to reduce risk and cost to industry associated with these processes. The PDIL allows researchers to move samples between large tools under vacuum, which prevents the samples from contacting airborne contaminants. Researchers bring samples under vacuum to the lab in mobile transport pods. Providing Flexibility Laboratory spaces were designed around a common module to provide flexibility and distribution of utilities and services. The selected planning module is 10 ft by 27 ft. Structural bays allow an appropriate span for the second floor to reduce vibrations. Designers arranged building spaces to reflect the relationship of labs to one another, to offices, and to support spaces. The need to use toxic and flammable materials in some labs also influenced the plan. and characterization tools. These flexible tools can be integrated into prototype processes for developing thin-film and nanoscale devices and low-cost, high-throughput manufacturing processes that are not yet available in the United States. The processes can be applied to thin- Photo Brent Nelson/PIX 14840 Daylight enters the PDIL summer through 2008 windows High high Performing on the north and south Buildings walls. 17

On the first level of the two-story laboratory portion of the building are labs that are more sensitive to vibration and noise and need to be darkened. Lab spaces were organized along a service corridor nearly identical to that of the second floor. The rectangular PDIL is centrally located on the second-floor ground level (because the site slopes) and along support laboratories to improve operational efficiency and make future expansions easier. Large second-floor labs required the largest available floor plate, a direct connection to the SERF for service, and proximity to the PDIL. Vibrations are controlled by a structural slab beneath the PDIL. Both floors feature daylighting and exterior views. The office area is a structurally separate one-story module east and south of the labs. Advantages of this design include lower cost; enhanced safety due to separation of staff from labs using hazardous materials; and allowing daylight to enter offices from the south and north sides. Utility Servicing Laboratories are organized along a central service corridor that supports them on each floor, like a spine supporting limbs. The service corridor is required to distribute hazardous production materials (HPM) to the labs because the S&TF is classified as high hazard occupancy 5 (H5) under the International Building Code (IBC). The service corridor accommodates gas lines, water lines, exhaust and supply ductwork, electrical, and signal system distribution to the back of the labs. The front of each lab includes access to an exit corridor that links to the rest of the building. The service corridor includes notched areas for heat- and noise-producing equipment. An infloor utility trench allows this equipment to be connected to equipment inside the labs. Simple Payback Site The S&TF is oriented along an east-west axis so that windows on the north and south façades can provide natural lighting. A butterfly roof over the office module collects storm water and directs it to detention ponds with xeriscape land scaping. The construction contractor recycled more than 80% of the construction waste by weight. In addition, a portion of the excavation soils was retained and used to restore a previously disturbed portion of the site. Per the Labs21 Environmental Performance Criteria (the basis for the LEED Application Guide for Laboratories, expected to be published in 2009), NREL contracted for an exhaust effluent study using wind tunnel modeling to define the impact of emissions from exhaust sources at the building intake and other sensitive locations. The study suggested minimum acceptable design Measure savings Per Year Payback (Years) VAV Only $92,120 3.3 Energy Recovery $36,487 2.2 Lab Supplementary Cooling & Raised Primary Supply Air Temperature $14,873 10.1 Overhangs & Glazing $4,400 n /A* Lighting Power Density $5,694 n /A* Daylight Controls $4,111 2.4 Office Underfloor Air & Evaporative Cooling $3,103 6.4 Chiller Plant Upgrades $12,607 2.6 Tower-Free Cooling $6,754 8.9 Process Commercial Hot Water for Preheating $4,752 10.1 Lab Air-Handling Unit Evaporative Section $3,758 5.3 Fan Pressure Drops $19,064 n /A* Fan Staging $4,691 8.0 Boiler & Domestic Hot Water Improvements $8,972 2.7 *These measures are part of the building architecture, and incremental cost could not be broken out separately. 18 High Performing Buildings Summer 2008

Advertisement formerly in this space. HPB.hotims.com/19564-6

Floor Plan North First Floor Office Laboratory Service Corridor (connects via bridge to another lab building on the second floor) Second Floor parameters in terms of exhaust stack height, exit velocity, volume flow and exhaust, and location of intake air. The recommendations were used in designing the air intake location and exhaust system. Energy Efficiency The energy-efficiency features of the S&TF were designed to provide a 41% reduction in energy cost in comparison to a standard laboratory building. These features include a variable-air-volume (VAV) supply and exhaust system, variable-frequency motor drives, efficient fume hoods and fans, energy recovery, efficient heating and cooling equipment, and underfloor air distribution. VAV Supply and Exhaust System Requirements The minimum occupied airflow is 1 cfm/ft 2 as required by IBC H5 occupancy. The VAV system allows more supply air as needed for fume hoods and other exhaust devices. The facility s chemical fume hoods feature an automatic sash closer to ensure that the sash is open no 20 High Performing Buildings Summer 2008

Annual Energy Use Measured System Design Simulation (April 2007 March 2008) Ventilation* 25.6 kwh/ft 2 9.6 kwh/ft 2 10.1 kwh/ft 2 Cooling Plant 7.3 kwh/ft 2 4.8 kwh/ft 2 13.0 kwh/ft 2 Lighting 2.3 kwh/ft 2 2.3 kwh/ft 2 Process/Plug 19.8 kwh/ft 2 21.3 kwh/ft 2 more than 18 in. when operating. An ANSI/ASHRAE Standard 110-1995, Method of Testing Performance of Laboratory Fume Hoods, test verified that the hood is performing to the recommended level by ANSI Z9.5-2003. In laminar-flow hoods, HEPAfiltered air is introduced to protect the product, and air is drawn in through the sash to protect the user. Laminar-flow hoods are a big energy user at NREL, so the S&TF hoods were designed to have two-speed blower motor control. When the sash is closed and no product is being tested, this signals the blower motor to operate at low speed and the VAV system to operate at a low setpoint volume, reducing airflow by 40%. The Standard 110-1995 test verified the hoods containment performance. 15.7 kwh/ft 2 ** Heating Plant 91.9 kbtu/ft 2 91.9 kbtu/ft 2 136.7 kbtu/ft 2 (simulation) * sum of energy of all supply and exhaust fans ** lighting and process/plug are combined because the office lighting and plug are on the same meter. The biggest difference between design and simulation methods for calculating energy use is the value for ventilation air. Calculations are based on nameplate values and assumed full loads. They follow Labs21 benchmark procedures and are included for comparison to other Labs21 data sets. The simulation model predicts loads based on a schedule and the typical 1 cfm/ft 2 of lab ventilation rather than design capacities and is assumed to be more accurate. Total Electric and Gas 279.5 kbtu/ft 2 223.4 kbtu/ft 2 269.0 kbtu/ft 2 Exhaust Fans The building s six exhaust stacks are on the southeast side. Each is connected to a dedicated direct-drive 20,000 cfm exhaust fan. Fans are staged on and off to maintain an exhaust plenum negative static pressure setpoint of approximately 1.5 in. w.c. The fans are started in sequence until they exceed the setpoint; then, the bypass damper in the exhaust plenum modulates open to maintain the setpoint pressure as the system reacts to varying lab conditions. When the bypass damper modulates to 80% fully open, an exhaust fan shuts down and the bypass damper modulates toward closed to maintain the negative setpoint pressure. This saves considerable energy in comparison to running a full-capacity fan and large bypass damper in part-load conditions. Fan Coils Fan coil units provide heating and cooling directly to laboratory spaces, nearly eliminating the need for inefficient reheating systems. Fan coils allow the ventilation system to supply only the tempered air required for minimum ventilation (1 cfm/ft 2 ) and makeup air for exhaust devices. Fan coils provide cooling for areas with high internal heat gain. Energy Recovery A runaround coil system with an estimated 63% sensible effectiveness reduces the heating and cooling requirements associated with conditioning ventilation air in labs. The system recovers energy from exhaust air to precondition supply air and uses waste heat from the process water loop to preheat ventilation air. This also provides free cooling for process cooling water when the outside temperature is below 60 F, for savings in chiller energy and cooling tower water. l abs21 Prior to the inception of Laboratories for the 21st Century (Labs21) in 1999, laboratories were an underserved market in the area of sustainable design. In general, laboratories used five to 10 times the energy of standard office buildings due to health and safety concerns such as intensive ventilation requirements. The Labs21 program recognizes the great potential to save energy in laboratories. Through the program, dedicated voluntary partners improve the environmental performance of U.S. laboratories. Labs21 examines the entire facility from a whole building perspective to improve efficiency. Areas of improved efficiency include reducing ventilation energy, moving air efficiently, using energy recovery where applicable and installing energy-efficient equipment. Labs21 is supported by DOE and EPA. Visit www. labs21century.gov for more information. 21

Efficient Heating and Cooling The S&TF uses a high-efficiency condensing boiler and variablespeed chiller, indirect evaporative cooling, and a heat exchanger that allows cooling water to bypass chillers and be cooled directly by the cooling tower. Direct evaporative cooling cools offices and provides cooling and humidity control in labs. Modulating indirect gas-fired heating sections in the makeup air units heat makeup air for labs and reduce hot water piping needs. The condensing boiler provides heat for offices and fan coil units in labs. Photo Pat Corkery/PIX 15440 Underfloor Air Distribution The offices are conditioned by a VAV underfloor air-distribution system. It provides fan energy savings and increases the number of hours when the economizer and evaporative cooling can be used by raising the supply air temperature. It also minimizes overhead ductwork. Water Efficiency In addition to using a storm water detention system for irrigation water, the building contains lowwater-consuming fixtures, such as ultra-low-flow (0.5 gallon per flush) urinals. The cooling towers operate at six cycles of concentration, reducing makeup water requirements in comparison to those of a tower operating at more conventional cycles of concentration (e.g., two or three). The cycles of concentration represent the relationship between the concentration of dissolved solids in the bleed-off to the concentration in makeup water. Increasing the cycles of concentration of the tower from three to six reduces makeup water consumption by a factor of four. Photo Pat Corkery/PIX 15430 A VAV underfloor air-distribution system, daylight and outside views create a comfortable working environment.

Advertisement formerly in this space.

Daylighting meets 50% of the labs lighting needs. Photo Pat Corkery/PIX 15434 Indoor Environmental Quality The goal was to provide 100% daylighting in first-floor office spaces between 10 a.m. and 2 p.m. and for daylighting to meet 50% of the labs lighting needs. The daylighting system includes north- and south-facing windows and clerestories coupled with automated lighting controls, which dim or turn off electric lights as needed. The performance of the daylighting system was simulated to verify that the performance objectives would be met. Commissioning NREL contracted directly with a third-party commissioning authority to work with the A/E project manager, construction contractor team, and NREL project manager to commission the building during each of these phases: schematic design and design development, construction documents, construction and acceptance, and warranty. Commission ing at the construction and acceptance phase includes startup and testing of selected equipment. For the warranty phase, it includes coordinating required sea- sonal or deferred testing and performance evaluations and reviewing the building 10 months after occupancy. The commissioning authority evaluated the central automation systems; laboratory air supply and exhaust systems and controls; lifesafety systems; the toxic gas monitoring system; central plant systems; process and specialty gas systems, including hazardous production materials; all HVAC equipment; process cooling water systems; deionized water; backup power systems; lighting control systems; and domestic hot water systems. 24 High Performing Buildings Summer 2008

This cost approximately 0.5% of the total construction budget, or about $1.60/ft 2 of building area. Lessons Learned Plan Implementation Even with a detailed monitoring plan, determining actual annual energy use and energy metrics has been challenging. Some BAS and electrical meter data was lost. Part of the challenge is that a central plant that also serves other buildings provides the chilled water and heating water. Btu meters measure the energy use of the chilled water and heating water for the S&TF. However, to determine actual energy use, cooling system and boiler energy use in the central plant must be measured. This is complicated because much of the chilled water is provided by the tower-free cooling system. The actual cooling energy use is determined by multiplying the Btu meter reading by the tower-free cooling system energy use (about 0.1 kw/ton) or the chiller system energy use (about 0.45 kw/ton), depending on the mode of operation. This calculation needed to be done for every hour of operation for the year. A measurement and evaluation plan was in place. However, implementation of the plan did not go as expected. Even with submeters to break out energy use by appropriate categories, obtaining useful information from the readings proved harder than expected. The team needed a better understanding of who, how and when to execute the measurement and evaluation plan. sures, ventilation air volumes, heating load and boiler efficiency. Electrical systems are measured by nine electric sub meters. The meters identify four types of loads in the S&TF, including lighting, lab process load, office load and building load. Domestic water and natural gas use are also metered. The central building automation system (BAS) provides measured or calculated values for mechanical systems. It can monitor some equipment and show trends over time. Advanced Performance Metrics Despite commissioning and a talented building operator, the HVAC systems operations have not been optimized. The supply air to the laboratories is being overheated and then recooled by the fan coils. In addition, the operation of the evaporative coolers (supplying cooling and humidification to the laboratories and cooling to the offices) has not been optimized, resulting in excessive heating and cooling energy use. While collecting performance data for this article, calculation of annual energy use identified these control issues. The control sequences have been modified, and energy use and energy metrics will be monitored. Good performance metrics are necessary to find and solve these types of problems. Process Loads The measured process loads in the laboratories are lower than design. The process load will increase in the future as more process equipment is added. The measured combined lighting and plug/process loads are 15.7 kwh/ft 2. The combined design lighting and plug/process loads were estimated between 22 and 23.6 kwh/ft 2. Typically, process loads are lower than estimated during design. Even when using a similar building to calculate design process loads, the actual process load numbers come out lower than the design numbers. Often, researchers receive only a small percentage of the energy-efficient lab equipment they expect, and the equipment is not run as often as anticipated. Measurement and Evaluation Continuous metering and monitoring equipment measure various systems. Mechanical systems monitored include constant and variable motor loads, variable-frequency drive operations, chiller efficiency at variable loads (kw/ton), cooling load, air and water economizer and heat recovery cycles, air-distribution static preselectric meters record electrical energy, demand and power quality. Conclusion The measured annual energy use is 17% higher than predicted by the simulation. This result is not unusual because the simulation assumes optimized operation of HVAC systems, and the HVAC systems actual operation has not been optimized. Collecting energy use data identified control issues. The control sequences have been modified, and NREL believes the energy use will be reduced. The S&TF saves significant amounts of energy compared to a standard lab building. A Standard 90.1-2004, Appendix G, Performance Rating Method, building located in Golden, Colo., would be expected to have an annual energy consumption of 361 kbtu/ft 2. The actual annual energy use of the S&TF is 24% less, 269 kbtu/ft 2. (See the Annual Energy Use Table on page 21.) Most importantly, the S&TF provides a superior work environment for employees to conduct state-of-theart research. NREL will continue to monitor and document the building s performance so others can learn from this experience. Acknowledgments This article is based on a case study of the S&TF written by NREL for the Labs21 Program. For the case study, see www.labs21century.gov/pdf/cs_nrel_508.pdf. About the Authors Anna Hoenmans, P.E., is a senior mechanical engineer in the Site Operations Group and Otto Van Geet, P.E., is a senior mechanical engineer in the Strategic Energy Analysis and Applications Center at NREL in Golden, Colo. The authors were involved in the design, construction and operation of the S&TF. summer 2008 High Performing Buildings 25