Wiring for Health Care Facilities NEC Article 517



Similar documents
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

Top Commercial / Residential Electrical Requirements *

ELECTRICAL REQUIREMENTS FOR HEALTH CARE FACILITIES

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Electrical Contractors. and the. New Jersey. Rehabilitation Code

2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes

BASIC NEC CODE RULES AND DESIGN PRACTICE

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

Ontario Electrical Safety Code 25 th Edition/ 2012

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

ELECTRICAL INSPECTION BULLETIN (Effective )

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS

Significant Changes in the 2011 NEC Prepared by Bryan Holland City of North Port

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

SECTION MECHANICAL: ELECTRICAL: PLUMBING

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY STANDARDS

Fire Alarm System Plans Review Checklist Property location Date of Review

MONTGOMERY COUNTY EXECUTIVE REGULATION Offices of the County Executive. 101 Monroe Street. Rockville, Maryland 20850

Electrical Practices for Construction Work

Requirements for Electrical Installations

IRRIGATION PUMPING Table of Contents - Section 900

GENERAL ELECTRICAL REQUIREMENTS

Electrical Code Regulation

ELECTRICAL EMERGENCY SYSTEM PLAN REVIEW OVERVIEW OF CODE REQUIREMENTS

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

CSA Z32 TESTING GUIDELINE AND PROCEDURES

Article 10 - ADMINISTRATIVE SECTION

Line Loss WSDOT Winter 2008 BZA

City of Riverside Building & Safety Division Phone: (951)

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23

Electrical Grounding. Appendix C

Electrical. This section applies to the design and installation of building power distribution systems.

IntelliBrite Controller (For IntelliBrite Pool, Spa and Landscape Lighting Fixtures) Installation and User s Guide

HOUSING QUALITY STANDARDS (HQS)

REHABILITATION OF MOBILE HOMES R

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D

Generator DoCKInG StatIonS

SINGLE FAMILY DWELLING ELECTRICAL SERVICES RATED 225 TO 600 AMPS

Tech Report 2: Electrical System Existing Conditions

County of Riverside Building and Safety Department

TOP 10 CHANGES 2013 CALIFORNIA ELECTRICAL CODE 2013 CALIFORNIA ENERGY CODE (ELECTRICAL)

Residential Electrical Inspection Checklist

Building Permit Application

Name Of Occupancy Date. Yes No Describe

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

Element D Services Electrical

Ceiling Fan Installation Instructions

Inverter / Charger Installation General Operations and AC and DC Connections

Exhibit C Design Review Guidelines

PSU-U-24V/AC-6A/10/FTA-TR-MC PSAC 0624

Short Circuit Current Calculations

Homeowner Information Guide Electrical Safety. British Columbia Safety Authority

Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

Voltage Drop (Single-Phase)

Residential Electrical Inspection. Checklist

Chapter 9. Bonding and Grounding

Applying For New or Revised Electric Service

Mike Holt s Illustrated Guide to. Rule , Articles 445, 700, 701, and 702. Based on the 2011 NEC

CITY OF LOS ANGELES CALIFORNIA

INSPECTION GUDELINES

Three-Phase Electric Power Distribution for Computer Data Centers

Commercial/Industrial Electricity

STABILOY BRAND FEEDER SOLUTIONS ASSISTED LIVING FACILITIES

Electrical Hazards. Power Tools. Extension Cords

DC disconnects for solar photovoltaic installations. Connecting the. power of the sun

Installation Instructions

2011 National Electrical Code Changes

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

How To Make A House Safe

Section 5 Meters and Service Entrance Equipment

Arc Fault Circuit Interrupters Frequently Asked Questions

Build A Simple Electric Motor (example #1)

Argus Technologies Pathfinder10kW to Cordex3.6kW Shelf Replacement Procedure

Title: Grounding and Bonding Rev-01

How To Get A Power Line Extension

Mobile Home Pre-Inspection Checklist

June July 18, of 7

Parallel Redundant Uninterruptible Power Supply

Electrical Service Guidelines

Section 10: Emergency and Standby Power Systems

Grounding Practice at Data and Communications Centers. David Brender, P.E., CPQ National Program Manager Copper Development Association Inc.

Dennis Fire Department Fire Prevention Mark Dellner Fire Chief

Department of Labor and Industry Electrical Licensing

Hyperlinks are Inactive

COUNTY OF LOS ANGELES BUILDING AND SAFETY DIVISION ELECTRICAL CODE FEE SCHEDULE (Title 27 of the County of Los Angeles Code, Ord No.

INSTALLATION INSTRUCTIONS

0.8 U N /0.5 U N 0.8 U N /0.5 U N 0.8 U N /0.5 U N 0.2 U N /0.1 U N 0.2 U N /0.1 U N 0.2 U N /0.1 U N

Services. Three Phase Service

The U.S. Department of Labor projects that electrician careers will grow to 698,200 by 2022.

How Much Voltage Drop Is Acceptable?

Inspections must be conducted every three years in order to maintain an "approved" status on the City Of Bozeman Safe Rental Unit List.

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

Walking and Working Surface Checklist:

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

Transcription:

Wiring for Health Care Facilities NEC Article 517

I. General Scope: This article applies to electrical construction and installation criteria for facilities that provide services for human beings. II. Important Definitions 517.2 1. Health Care Facilities. Buildings or portions of buildings I which medical, dental, psychiatric, nursing, obstetrical, or surgical care are provided. Health care facilities include but are not limited to hospitals, nursing homes, limited care facilities, clinics, medical and dental offices, and ambulatory care centers, whether permanent of movable. 2. Alternate Power Source. One or more generator sets or battery systems where permitted to provide power during the interruption of the normal service

3. Critical Branch. A subsystem of the emergency system consisting of feeders and branch circuits supplying energy to task illumination, special power circuits and, related receptacles serving areas and functions related to patient care which are connected to alternate power sources 4. Life Safety Branch. A subsystem of the emergency system consisting of feeders and branch circuits meeting the requirements of article 700 intended to provide adequate power needs to ensure safety to patients and personal, and which are automatically connected to alternate power sources during interruption of the normal power source 5. Emergency System. A system of circuits and equipment intended to supply alternate power to a limited number of prescribed functions vital to the protection of life and safety. 6. Electrical Life-Support Equipment. Electrically powered equipment whose continuous operation is necessary to maintain a patient s life.

III. Areas of Special Considerations A) General Care Areas 517.18 Patient Bed Locations: Shall be supplied by a minimum of 2 branch circuits. 1 from Normal system and 1 from Emergency system. Emergency system receptacles shall be identified. Patient Bed Location Receptacles*: Each Patient Bed Locations shall be provided with a minimum of 4 receptacles. All receptacles shall be listed Hospital Grade and labeled. Pediatric Locations: Receptacles shall be tamper resistant and have a listed tamper resistant cover. *Receptacles shall have insulated copper equipment grounding conductor

B) Critical Care Areas 517.19 Patient Bed Locations: Shall be supplied by a minimum of 2 branch circuits. 1 from Normal system and 1 from Emergency system. Emergency system receptacles shall be identified. Patient Bed Location Receptacles*: Each Patient Bed Locations shall be provided with a minimum of 6 receptacles. All receptacles shall be listed Hospital Grade and labeled. At least one shall be from the normal system or to a different transfer switch than the others in the same location. *Receptacles shall have insulated copper equipment grounding conductor

C) Wet Locations All wet locations shall be provided with a GFCI IV. Load Calculations A) Lighting & Receptacles Sqft *2VA for Lighting Load 220.12 180 VA for a 2 socket Receptacle and 360 VA for a 4 socket Receptacle 220.14 (I) Carga continua será aquella que opere por 3hr o más. Art. 210.19(A)(1) Carga continua se dará ampacidad de 25% adicional. 100-(I)

B) Calentador de agua, 220.14(B) @ 240V, circuito de 50A (de línea, 9.5kW) @ 240V, circuito de 30A (tanque, 5kW) C) Secadoras 220.14(B) 220.54 Secadoras a 5kW @ 240V son 21A, se usa circuito de 30A D) Acondicionadores de Aire Según artículo 440 Tener en cuenta el EER O SEER E) Motores Según artículo 430

V. Important Figures A) Fig 517.30 N2 Minimum requirements for Transfer Switch Arrangements (150 KVA or less)

B) Fig 517.30 N1 Minimum requirements for Transfer Switch Arrangements It is very important to make these specifications in the one line diagram.

VI. Special Consideration A) Nursing home minimum criteria for electrical systems Figures 517.41 N2 and 517.41 N1 B) Receptacles Identification: All receptacles and cover plates from the emergency system shall be of a different color and be identified to be easily identifiable. Receptacles in patient bed locations: Shall be easily to access, therefore should be placed 5 feet above ground. They shall also have insulated grounding conductor as well as GFCI.

C) Egress Illumination and Exit signs 517.31 (A)(B) Egress Illumination: Shall be placed along corridors, passageways, stairways and landing on exit doors and all necessary ways to approach an exit. Exit signs: Shall be placed in direction of an exit door, and in a easy to see location. D) Panel Boards Bonding: All panel Boards From the same branch shall be bonded together with a # 10 AWG or larger insulated copper continuous conductor. Disconnecting Devices: each panel board or switch box shall have its own disconnecting mean. If outdoors panel should be lock in tag out or normally open lock.