MISSION CRITICAL DATA CENTER FACILITIES QUALIFICATIONS & EXPERIENCE



Similar documents
Capital One Financial Data Center

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

How To Visit An Internet Data Center

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

6 FAM 1700 SPACE ALLOCATION AND RELATED SERVICES

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital

Revised Work Scope Dated April 23 rd, 2015

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning

Planning and Construction Management Services

Volume II- Project Development Processes

12/14/2015 HOT TOPICS IN MULTI-USE BUILDINGS: INSURANCE, CONSTRUCTION AND DEVELOPMENT INTRODUCTION AND OVERVIEW

HOT TOPICS IN MULTI-USE BUILDINGS: INSURANCE, CONSTRUCTION AND DEVELOPMENT

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1

Move Management. Patricia Henriques. Summary CLIENT NEEDS. 1 Supplemental Architectural Services 2000 AIA MOVE MANAGEMENT SERVICES

RULES AND REGULATIONS CONTRACTOR WORK

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

AT&T Internet Data Center Site Specification Dallas Area (Allen, Tx)

PROJECT MANAGEMENT BUSINESS TRANSITION & MOVE MANAGEMENT SERVICES

Responsibility Due/Done Relocation Task Comments

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)

Management Services. Optimum. Property Management Facility Management Construction Management Relocation Management NAI OPTIMUM

IBM Data Center Services. Building or upgrading your data center, while helping to minimize cost, risk and delay

MOVING INTO THE DATA CENTRE: BEST PRACTICES FOR SUCCESSFUL COLOCATION

CBRE Project Management North America presents COST ANALYSIS TENANT IMPROVEMENT PROJECTS. Released September 23, 2013

Office Relocation Planning Guide. The Department of Administrative Services (DAS) offers these guidelines to help plan office relocations.

OPERATOR - FACILITY ADDRESS - DATE

Agility Logistics Datacenter Trends in Enterprises. Ben N. Hasnai VP IT Infrastructure and Operations

IT Relocation Checklist

XPRESS MOVERS MOVING NOTIFICATION CHECKLIST

Core & Shell Construction. Rules and Regulations

GENERAL SERVICES ADMINISTRATION Federal Acquisition Service Mission Oriented Business Integrated Services (MOBIS) SCHEDULE PRICE LIST

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

Data Center Overview Document

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)

IBM Twin Data Center Complex Ehningen Peter John IBM BS 2011 IBM Corporation

Experience Matters...

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX VAZATA.COM

Data Centers, Information Technology and Low Current Services

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

Office Move Checklist

Post Occupancy Evaluation (POE) Technical Instructions

Data Centers: Outsource or Own? Presented by: Rachel Dines, Forrester Research, Inc. Christopher Nicolini, Windstream Hosted Solutions

How To Move Your Data Center

Computer Data Center Program (Established under A.R.S ) INSTRUCTIONS FOR APPLICATION FOR CDC CERTIFICATION 1

CBRE GROUP INC. leadership in every major market Respect, Integrity, Service and Excellence (RISE)

OFFICE OF PERSONNEL MANAGEMENT ATLANTA OVERSIGHT DIVISION ATLANTA, GEORGIA

A Sustainable, Master-Planned Data Center Park.

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

CASE STUDY SOFTWARE. Zendesk s Cloud-Based Customer Ser vice Platform Lives in RagingWire s Mission Critical Data Centers

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

Cx for Enhanced Healthcare Project Delivery. Presentation Format. Project features and timeline

Security Whitepaper: ivvy Products

The Power Of Managed Services. Features

Case Studies. Disaster Recovery Restoration Remediation Decontamination

Engineering & Support Services

Lease Security Standards: Instructions for Lease Acquisitions

Data Center Commissioning: What you need to know

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

CSC-DIVISION 1-MASTER SECTIONS Description

Request of Qualification Proposal for Construction Management Services

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.

EXPERIENCE INVESTMENT MANAGEMENT & REAL ESTATE SERVICES

The Logicalis Data Center Practice We help you bridge the gap between the data center you have today and the data center strategy you will need

NY-1 DATACENTER AT A GLANCE. NY-1 is a Tier III-rated, SAS SSAE16 and HIPAA-certified data center

POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008

Relevant Mission Critical Experience

Covance Construction Management Staffing Plan Chandler, Arizona

PROCUREMENT, FABRICATION & CONSTRUCTION

Construction Management Standards of Practice

Element Z General Design Requirements Owner Standards and other Requirements

Enterprise Remote Monitoring

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

Datacenter Hosting and Cloud Computing Services

Section Summary of Work Contract Security System, Network Infrastructure and UPS Power

The following terms should be understood prior to review of the Services Policy:

The consultant found that the original contract s objective of modernizing the state s IT infrastructure has been largely achieved.

Department of Veterans Affairs VHA HANDBOOK Washington, DC July 1, 2011 INTERIOR DESIGN OPERATIONS AND SIGNAGE

mybpos are a leading provider of business support services based in the UK

Establishment of State s Second Data Center. Business Continuity and Disaster Recovery. North Carolina. Office of Information Technology Services

Subject: County of Los Angeles Data Center Space Requirement

Request for Qualifications. Owner s Project Manager. Design and Construction of a New School Facility. K~8 Charter School

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Why Corporations Need to Automate IT Systems Management

FAIR Act Inventory Functions and Service Contract Inventory Product Service Codes Crosswalk Attachment I

Transcription:

MISSION CRITICAL DATA CENTER FACILITIES QUALIFICATIONS & EXPERIENCE

Complete Real Estate Solutions Success is much more than on time and within budget. Choosing the right firm for your complete real estate solutions adds value to your project saving time and money. Project Solutions Group is that firm. PSG has overseen more than 12,000,000 SF of new construction and renovation projects for commercial offices, base buildings, institutions, retail venues, call centers and data centers. Both private and public sector clients retain our services to oversee portfolio assignments, which begin as early as pre-leasing and site selection to beyond the move into their new space. In order to support our clients needs we have added relocation management, facilities management, and real estate transaction advisory services. We are steadily developing impressive portfolios in each of these disciplines. PRINCIPALS: Michael Wolff David Zorger FOUNDED: October 2002 Schedule Holder GS-29F-0022T BUSINESS ORGANIZATION HEADQUARTERS: Project Solutions Group, Inc. 3725 Concorde Parkway, Suite 105 Chantilly, Virginia 20151 Phone: 703-668-0090 Fax: 703-668-0091 OFFICES: Chantilly, Virginia Irvine, California Los Angeles, California AREAS OF EXPERTISE: Project Management Construction Management Relocation Management Facilities Management MAJOR CLIENTS: Capital One CARFAX Computer Sciences Corporation Exxon Mobil Gap Google Lincoln Financial NII Holdings Sprint/Nextel U.S. Department of Interior U.S. Department of Transportation U.S. Immigration and Customs Enforcement U.S. Patent and Trademark Office U.S. Securities and Exchange Commission U.S. Supreme Court Virginia Commerce Bank XO Communications

Innovation PHILOSOPHY & OBJECTIVES Unparalleled Service and Dedication Our staff is focused entirely on your best interests. Personalized Service on a National Platform We are committed to providing our clients with customized services regardless of their location. The Whole is Greater than the Sum of its Parts We assemble a team uniquely qualified for your project s individualized needs. It s Much More than On Time and Within Budget Realizing your project goals and objectives is our mission. Guarantee of Value Our optional pricing methodology is based on your satisfaction. Comprehensive Service Offering Real Estate and Transaction Advisory Services Planning Relocation management and coordination Design coordination Building permit coordination Construction management Furniture, fixtures, and equipment coordination IT coordination Security, signage and audio-visual coordination Food service, artwork and plantscaping coordination Project close out services Facilities management Asset management (for FF&E) Property Management Real Estate Technology WHAT MAKES PSG DIFFERENT? PSG offers over 25 national purchasing contracts at no cost or fee to our clients. This program reduces clients overall project costs and improves lead times. PSG s pricing model is unique to the industry and is not based on per square foot, hourly or managed cost percentages. It is based on the work to be performed and can be presented in a lump sum cost invoiced over the length of the project. PSG offers services through the entire project life cycle, from real estate advisory services through occupancy. Our service offering extends well beyond design and construction management. PSG includes web-based project collaboration as part of its standard service offering. PSG s service delivery model, templates, documents, processes and procedures are highly customizable and are designed to be modified to fit the needs of the client, not the other way around. A PSG Principal is assigned to each project as the Project Executive, making certain that the project and client goals and objectives are met. PSG executives and staff have documented experience working for real estate developers, real estate service providers, general contractors, electrical and mechanical contractors and architecture firms, thus providing the capability to evaluate project issues from the subject matter expert point of view.

Commitment to Excellence National Purchasing Programs PSG has negotiated proprietary National Purchasing Contracts with over 25 major manufacturers and suppliers of construction and office furnishing and equipment. These contracts have been established utilizing the volume of work that we process annually, to provide our clients with access to materials routinely procured at pricing below subcontractor level or with expedited lead times. Our National Purchasing Program provides our clients the benefit of high volume purchasing, our manufacturing partners have access to new markets and clients, and we have a program that significantly differentiates us from our competition. In addition, we have never received a fee from our manufacturing partners for their access to our clientele. Our manufacturing partners and their products: Supplemental Cooling Units - Manufacturer ATS- Stulz, Liebert Uninterruptable Power Systems (UPS s): MGE, APC, Liebert Emergency Generators (1,000 kw and larger): Caterpillar Power Distribution Units (PDU s): Liebert, MGE, United Power Carpeting: Shaw, Mannington, Bentley, Milliken, Masland Light Fixtures: Finelite, Lithonia, Focal Point Ceiling Systems: Armstrong System Furniture: Haworth, Herman Miller, Steelcase, Knoll Case Goods: Gunlocke, Paoli Sprinkler Systems: Grinnell Fire Alarm Systems: ADT, Simplex Grinnell Security: CCTV: ADT Client-Focused Services PSG s client-focused service relies on these unique service delivery principles: The client is an integral member of the project team. Project success is collective to all team members. Comprehensive documentation is necessary, and must be tailored to each client s individual needs. Our proprietary templates allow us to complement our client s workflow process. We landmine our assignments in the beginning to foresee any future problems and make adjustments accordingly. Communication must be thorough and comprehensive. Project specific websites are part of our standard offering on all assignments. Numbers never tell the entire story. Our proprietary Project Success Plan defines the methodology for realizing the different factors that our Clients require for a successful project. Our representation and advisory efforts are designed to guarantee that on the first day in a new space, the computer logs on, the telephone rings, and there is a trash can under Project Solution Group s ability to promote the development of a high performing team was absolutely critical to the success of this project. Debbie Landesman, Vice President XO Communications, National Real Estate

Mission Critical Facilities Project Solutions Group knows the concerns of call center clients. We offer a unique knowledge of the technical capabilities and the crucial elements that drive all mission critical projects. PSG understands the issues that make a mission critical project successful include Speed-to-Market, 24X7, total redundancy and disaster avoidance. Our proven, creative and proprietary processes are what differentiate us from our competition. Speed to Market PSG knows how to deliver mission critical facilities fast. We understand the importance of opening and beginning operations in a timely fashion. Failure to achieve this can cost our clients the ability to work and maintain their business. Our team-based approach to mission critical projects provides exceptional results. 24 x 7 PSG knows how essential it is for a company to maintain a continuously operating call or data center. Through our Project Success Plan, we landmine every assignment to identify issues and proactively implement solutions without compromising established budgets and schedules. PSG s national purchasing agreements include emergency generators, supplemental cooling units, Uninterruptible Power Systems (UPS) and Power Distribution Units (PDUs). Despite the usual long lead time, PSG guarantees below market pricing and delivery time. Budget PSG understands the importance of adhering to a budget. Our proprietary budget forms maintain a constant vigilance on current and potential project budgets. The depth of our resources and experience covers the management of reliability audits, diagnostic and commissioning services to site selection assessments. Our experience includes managing: Power quality and discrimination surveys Adaptable and resilient building procedures Sophisticated detection and fire suppression systems Passive and non-passive security systems Structured raceways for flexible cabling installations Redundant and resilient HVAC systems for climate control Flexible, state-of-the-art audiovisual systems Operating procedures to improve the reliability of existing facilities

SCOPE OF SERVICES - CONSTRUCTION MANAGEMENT SITE & BASE BUILDING SHELL The Project Manager serves as the Client liaison and representative ensuring the cost, quality and timely realization of project goals and objectives with responsibilities that include: Planning Prepare master project schedule Develop preliminary master budget Site Analysis and Evaluation Geotechnical Engineering and Environmental Management Coordinate efforts of zoning professionals in securing maximum allowable land value Participate in site tours to understand and evaluate potential alternative sites Financing Coordination Manage and coordinate the preparation of applications for payment Construct budget-tracking model in a format conforming to Client s financial reporting Design Oversight and Coordination Manage the design team to ensure timely completion of the assigned tasks Oversee value engineering process to identify alternative construction methods or materials Site and Building Permit procurement oversight Construction Management General Contractor procurement and periodic site inspections Review and confirm the project schedule and monitor progress of work Implement a quality control program Administer change orders, track contractor RFIs and facilitate resolution of conflicts Vendor Oversight IT Coordination Exterior Signage Security Coordination Project Closeout Prepare punch list and conduct all necessary inspections Obtain all close out items Conduct inspection 11 months after occupancy to confirm proper operation of all warranted items Building Commissioning

SCOPE OF SERVICES - CONSTRUCTION MANAGEMENT INTERIOR CONSTRUCTION The Project Manager serves the Client as liaison and Client representative to all project team members ensuring the cost, quality and timely realization of project goals and objectives with responsibilities that include: Pre-Lease Services Perform building tours to analyze and evaluate building systems Assist in lease agreement negotiation Planning Prepare master project schedule Develop preliminary master budget Design Management Manage formation of the Design Team Review or develop standards for office space utilization Manage the preparation of preliminary and final space plans Oversee preparation of final contract documents Building Permit procurement oversight Construction Management General Contractor Procurement Review and confirm the project schedule and monitor progress of work Implement a quality control program Perform periodic site inspections Administer change orders by determining merit and cost Track contractor RFIs and facilitate resolution of conflicts Vendor Oversight IT Coordination Audio-Visual Coordination Furniture, Fixtures and Equipment Coordination Security Coordination Project Closeout Prepare punch list and conduct all necessary inspections Obtain all close out items

SCOPE OF SERVICES: RELOCATION MANAGEMENT AND COORDINATION Project Solutions Group understands the importance of a cost effective and timely relocation. Our relocation scope of services is all-encompassing and includes: Developing a move plan that will define personnel and equipment relocation requirements This plan will be reviewed with the Client for scope, completeness and conformity with company standards Preparing a Request For Proposal (RFP) for procurement of a relocation company. Included in this effort will be the development of relocation specifications, conducting a walk-through and pre-bid conference, analysis and recommendation of the proposals received and negotiation of a final contract Hosting pre-move meetings with designated tenant coordinators. At these meetings, PSG will formulate details for packing, labeling, diagramming individual office furniture arrangements, etc. Coordinating activities with Client s IT department Conducting a pre-move walkthrough Move Day on-site management, oversight and coordination Overseeing contract close out including invoice review and claims coordination In addition, PSG will perform the following activities: Interact with the moving company on Client s behalf Develop a list of appropriate relocation companies Give the movers a tour of the origin and destination Answer logistical questions from the movers pertaining to the move Confirm that the elevator(s) have been padded and locked off for the move Make sure that protective covering is used on the floors and walls Make sure that the protective covering and debris is removed after the move Make sure that all computer peripherals arrive at the right location Coordinate the delivery of move containers (boxes, tuck and tote, etc.) Make sure that each work surface is clean and ready for work Make sure that the right furniture is in the right office Make sure that the office is arranged according to the plans Handle post-move fine tuning Schedule the pick up of the empty containers Walk through the origin at the end of the move to check for any property damage

Capital One Financial Corporation Project and Construction Mangement Data Center Description Capital One Financial Corporation is a McLean, Virginia-based bank holding company and a member of the Fortune 500. Project Solutions Group (PSG) and Capital One enjoy a successful and continuing relationship that began in 2004. PSG performs construction management services for Capital One projects ranging from multi-million dollar data centers and call centers in occupied facilities to branch bank construction in occupied offices to new construction of stand-alone banking facilities. In May 2008, Capital One, having determined that its future corporate growth depended on creating a new data center and expanding the associated infrastructure, selected Project Solutions Group (PSG) to manage the construction of its new 23,000 square foot Tier 3 mission critical data center in Richmond, Virginia. Its new infrastructure included five 1825 KW generator sets, four 600-ton cooling towers and a 265,000 gallon make-up water storage tank. Working closely with Capital One, PSG assembled the project team through procurement of the design team, construction management firm, and the independent commissioning agent. With the group in place, PSG managed the team s collaboration on documenting goals and objectives, budgets, plans and schedules, and design development phases. Major challenges of the Richmond Data Center project included working within the infrastructure of the existing data centers while strictly adhering to Capital One s restrictive security procedures. To preclude disruption of Capital One s ongoing critical business operations, all work required approved proposed Methods of Procedure (MOP). To assist in following Capital One s processes and procedures, PSG provided daily onsite personnel overseeing these endeavors. The Richmond Data Center is the only data center to receive Green Building Initiative s (GBI) certification. The project received a certification of One Green Globe. The Richmond Data Center was delivered on schedule and, at 18% under budget, with significant savings.

NII Holdings, Inc. Data Center Reston, Virginia Description Continuous change and growth in the international cellular communications market required NII Holdings, Inc. to rapidly grow beyond the capacity of their current office space and associated Data Center. NII engaged PSG in what amounted to over two years of combined planning and execution to relocate their entire operation and operating Data Center to a completely new facility incorporating high end corporate office space and a 24/7, N+1 level facility. The requirement from NII to have corporate office space in the same facility as the Data Center presented quite a few logistical and operational challenges. The Project Team was faced with installing major equipment in a building designed specifically for typical tenant / office type space. To further complicate the project, the building chosen by NII resides in the middle of a major Town Center with very limited available space and strict noise and aesthetic concerns by the Property Manager. A challenge felt during the entire project was ongoing base building construction and the daily coordination with the base building team. The use of only one, medium sized freight elevator, utilized by hundreds or workers daily required daily planning for movement of even the most standard materials. PSG worked with NII to assemble the Design and Construction Team, down to the level of MEP subcontractor selection. The Team selection was critical to ensure the workforce and knowledge was available at every level to meet the 16 week design to completion schedule. Work included: Specifying and pre-purchasing the new electrical and mechanical equipment for the Data Center thus eliminating up to thirty week lead time component from the schedule. Pre-purchasing several major data center components through PSG s proprietary National Purchasing Program, reducing original budgeted costs. Extensive communication and negotiation with the Property Manager / Developer to allow for placement of a generator, separate fuel tank and delivery system and HVAC roof-top equipment. The complete 75,000sf and associated Data Center project was delivered on schedule and the Data Center Network infrastructure was migrated successfully over a very narrow maintenance window allowing NII the ability to be fully operational as planned, with no interruption in normal operating business hours.

Arlington County Network Operations Center Arlington, Virginia Description Project Solutions Group served as a consultant to the landlord, Vornado, in this 9,000 square foot renovation of Arlington County s Network Operation Center. PSG was hired to assist the Vornado Construction Division to provide technical guidance and alleviate some of the workload. The existing NOC power and cooling were insufficient and the older equipment presented quite a few logistical and operational challenges. The Project Team was faced with installing major equipment to cover the past few years of growth and also future expansion. They were also confronted with very limited pathways, opened shaft walls and engineer revised piping specs. Some of the key factors during the project were the engineering design and review, the equipment selection phase and review of new equipment. The Team selection was critical to ensure the workforce and knowledge was available at every level to meet the design to completion schedule. Work included: Replacing the generator Replacing and upsizing fuel tanks Replacing cooling (HVAC) Data center supports Arlington County s TV stations, dispatch (911), county functions such as accounting & revenue tracking By negotiating pricing and change order control PSG was successful in reducing the costs of this project. The team provided technical submittal review and insisted and qualified the use of MOP s on all critical activities.

Nextel Communications Data Center Atlanta, Georgia Description In support of its continuing growth in the wireless communications industry, Nextel Communications utilized our project and construction management services for the conversion of an existing single-story administrative facility to a fully redundant 24/7 data processing center. The scope of the project was complicated by the need to relocate existing administrative staff within the facility and maintain a fully functional environment during the conversion of 30,000 SF to a data center, with an electrical requirement of 100 watts per square foot. In addition, Nextel imposed exceptionally tight budget and scheduled constraints on the project, a result of the highly competitive wireless communications industry market conditions. To meet the restrictive budget and schedule constraints imposed by the client, a new process for data center development was formulated and implemented. Work included: Researching alternate CRAC units, ultimately specifying a high-air volume unit that reduced the quantity of CRAC s from 40 to 24. Specifying and pre-purchasing the new electrical switch-gear for the building thus eliminating a forty-week lead time component. Pre-purchasing all major data center components through PSG s proprietary National Purchasing Program, saving almost 25% of the material s budgeted costs. An external utility corridor was created within the facility to centrally locate and manage all engineered systems that support the data center s operations. The data center was delivered to Nextel within the company s exceptionally tight schedule and budget. All business functions of the facility remained in full operations during the construction period despite numerous off-hour shutdowns to upgrade the electrical service to the building, installing a new electrical distribution system, and reworking the entire mechanical (HVAC), fire alarm and sprinkler systems. The project received an Engineering Excellence Award from Georgia Engineering Alliance for its innovative design and installation of state-of-the-art building plant systems. Completion Initial project 2004 In 2006, PSG managed an upgrade of the facility.

VISA Data Super Center McLean, Virginia Description Project Solutions Group personnel, in previous capacities, managed the planning, design and construction of a 72,000 SF data super center in McLean, Virginia. The project required a unique combination of skill sets, including advanced structural engineering. VISA required that the superstructure be built to California earthquake standards. Work also included specialized security knowledge (a bulletproof and intrusion proof structure was required) and exceptional management skills, which integrated the interests of a technical end user, land developer, and a design-build mission critical infrastructure integrator. The final challenge on the assignment involved the project schedule, because the data center needed to be on-line and fully operational prior to the start of the Christmas buying season. Our team undertook several activities to meet the unique challenges of this assignment: Including specialty consultants such as California licensed structural engineers, advanced security design consultants, and even cabling infrastructure specialists to manage the proposed cabling network Hosting and facilitating an offsite meeting to unify client goals with teammate project objectives, establish project expectations, confirm roles, responsibilities and lines of communication Creating a specific process to implement base building modifications during construction that supported changes to the data center environment and updated by the mission critical facility integrator This project was delivered to VISA on time to provide full operational capabilities prior to the onset of the Christmas buying season. The facility was fully survivable and redundant up to full N+1 capabilities, including paralleling UPS s and switchgear, multiple backup generators, diverse and redundant connections to private telecom utilities, and a remote cooling tower farm. The unique physical requirements of the facility were fully incorporated into the final deliverable, including earthquake protection, intrusion resistance, and a bullet-proof environment.

XO Communications Data Center Fremont, California Description Project Solutions Group was hired to manage the integration, design and construction of a data center in an existing 57,000 square foot space. Immediate actions were required to reduce construction time, and all project-related expenditures. Our team managed: A multiple phase project Restructuring construction of a contracted data center Designing a 65 watt square feet Pre-purchasing all major data center components through PSG s existing National Purchasing Program In the late 90 s data centers were being built at high speeds, XO Communications planned to build over 30. The PSG team was hired to manage the very first Data Center. During this time period a crash in the telecommunications industry occurred, causing XO communication to rethink its plans. The client asked PSG in the middle of the process to change the project objectives, thus building into phases. PSG redesigned the project in order to meet XO s business plan. The goals achieved included: Remaining on schedule for a multiple phase project, 2/3 phase 1, 1/3 phase 2, which completed construction in 162 days Minimizing overall project expenditures thus reducing the outlay from both operational and capital budgets Constructing building to have n + 2 capabilities and back-up power including UPS rotary Developing standardized processes and policies to expedite the development of this new data center Providing high level communications to the client representative, and minimize the impact of project decisions on the client representative s daily schedule

XO Communications Data Center Herndon, Virginia Description Space planning and existing building conditions were leading considerations in XO Communications decision to relocate their corporate headquarters office and network facility in the Northern Virginia area. XO reached out to PSG after having relied on PSG s assistance for many years, to help them through the complete Real Estate services requirements, followed closely by the design and build out of their new corporate office space and related Network / Data Center facility. XO was limited in their flexibility to locate their Network Facility remotely and ultimately decided to integrate the Data Center within their new Tenant space. The property presented numerous challenges as the building chosen by XO was built for standard tenant type office space, not a fully functioning redundant Data Center. PSG worked closely with the Property Management Company as the building is a multi tenant Class A facility where any noise and other tenant interruptions were not an option. There were very limited options to locate a new generator and through many discussions, a mutually acceptable location was found, which minimized impact to the facility and located the generator close to the building, reducing construction related costs and time on the schedule. The Design and Construction Team selection process included the variables of finding companies whose talents and experience included both Fast-Track High-End Tenant and Mission Critical experience. PSG researched numerous companies and presented the best of the best and the up-front research paid off with excellent communication and coordination by the entire team, which allowed the project to come in on time and under budget. In addition to the normal Project Management process, our challenges included: Combined pre-purchase of all long lead items (Tenant & Data Center) requiring additional upfront design time, but saving many weeks off of the construction schedule. Pre-purchasing several major data center components through PSG s proprietary National Purchasing Program, reducing original budgeted costs. Daily consideration of the existing tenants to minimize any evidence of Construction related activity both outside and inside the building. Working with the Property Manager closely and scheduling and completing major underground utility work with no disruption to auto or pedestrian traffic. The 100,000sf tenant build out which incorporated the Data Center was completed in advance of the original expected time frame. PSG s ability to provide oversight and guidance from the point of space consideration, through and including the move management of all personnel, as well as continuing facility maintenance allowed XO to concentrate on their ongoing business activities during the entire process with very little distraction.

PROJECT SOLUTIONS GROUP CONTACT Dave Rezash 703-673-8591 Sharon Elder 202-769-9677 Headquarters 3725 Concorde Parkway, Suite 105 Chantilly, Virginia 20151 Main: 703-668-0090 Fax: 703-668-0091 California 949-254-6030 Known By The Companies We Keep