SECTION DVD01: VOLTAGE DROP/VOLTAGE FLICKER AND TRANSFORMER SIZING GUIDELINES



Similar documents
GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

1. The type of service available at any particular location should be determined by inquiry at PG&E's local office.

Three phase circuits

Transfer Equipment Controls

Power Quality Standards for Electric Service

SIZING THE PRIMARY POWER SYSTEM FOR RESISTANCE WELDERS

Short Circuit Current Calculations

Rule Fast Track Analysis for National Life Insurance Co.

7. Reactive energy compensation

BASIC NEC CODE RULES AND DESIGN PRACTICE

BC Hydro. Electric Distribution System Cost of Service Study

Introduction. Harmonics and IEEE 519 Page 1 of 19

Radial Distribution Test Feeders

PROPER SELECTION OF CONTROL CIRCUIT TRANSFORMERS WHITE PAPER BULLETIN 1497, 1497A, AND 1497B

Digital Energy ITI. Instrument Transformer Basic Technical Information and Application

Single and Three Phase Transformer Testing Using Static Motor Circuit Analysis Techniques

UNDERSTANDING POWER FACTOR AND INPUT CURRENT HARMONICS IN SWITCHED MODE POWER SUPPLIES

Modeling of PV Based Distributed Generator Systems with Diverse Load Patterns

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

Primary Electric Distribution for Industrial Plants

Step Voltage Regulators

Voltage Tolerance Boundary

ENA Customer Guide to Electricity Supply

DISTRIBUTION SYSTEMS INDEX NOV 06 SECTION 2. Detroit Ann Arbor Mt. Clemens Port Huron

Power Quality Centre VOLTAGE FLUCTUATIONS IN THE ELECTRIC SUPPLY SYSTEM. Technical Note No. 7 August 2003

Power measurement in balanced 3 phase circuits and power factor improvement. 1 Power in Single Phase Circuits. Experiment no 1

How To Wire A Three Phase, Single Phase, Wye Transformer

POWER FACTOR CORRECTION

The electrical energy produced at the gen

General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System

Power Electronics. Prof. K. Gopakumar. Centre for Electronics Design and Technology. Indian Institute of Science, Bangalore.

Selecting Current Transformers Part 1 By Darrell G. Broussard, P.E.

Chapter 12: Three Phase Circuits

Rotary Phase Converters

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer

Type SA-1 Generator Differential Relay

Tamura Closed Loop Hall Effect Current Sensors

The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire.

Section 3: Load Planning Bill Brown, P.E., Square D Engineering Services

Line Reactors and AC Drives

ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only

13 common causes of motor failure

SECTION 4 ELECTRIC MOTORS UNIT 17: TYPES OF ELECTRIC MOTORS

Motor Efficiency and Power Factor ME 416/516

SAFETY PRECAUTIONS AND INSTRUCTIONS FOR USE OF TECHNICAL INFORMATION

Product Data Bulletin

Three-Phase Electric Power Distribution for Computer Data Centers

The following table shows approximate percentage wise the

APPLICATION NOTE. Increasing PV Hosting Capacity on LV Secondary Circuits with the Gridco System empower TM Solution

Voltage Unbalance and Motors

Three-phase AC circuits

PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP

VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES

Supply Standards: Electricity Supply Standard July JULY 2011 ISSUE 6 UNCLASSIFIED UNCONTROLLED COPY IF PRINTED

3) What is the difference between "Insulating", "Isolating", and "Shielded Winding" transformers?

Motor Protection Voltage Unbalance and Single-Phasing

RETAIL ELECTRIC SERVICE TARIFF P.S.C. Md. No. 3 R Sheet 61

SYNCHRONOUS MACHINE TESTING WITH MOTOR CIRCUIT ANALYSIS INSTRUMENTATION

HARMONIC DISTORTION IN THE ELECTRIC SUPPLY SYSTEM

3-Phase AC Calculations Revisited

WHR Series STABILINE Voltage Regulators

Power Quality. Uninterruptible Power Supply

Power transformers. Special transformers Railway

Basics of Electricity

Power Factor Correction for Power Systems First Semester Report Spring Semester 2007

Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26

Federal Wage System Job Grading Standards for Electric Power Controlling, Table of Contents

Equipment: Power Supply, DAI, Synchronous motor (8241), Electrodynamometer (8960), Tachometer, Timing belt.

Specifying a Variable Frequency Drive s

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V V V (at 50 Hz)

Typical Data Requirements Data Required for Power System Evaluation

Chapter 24. Three-Phase Voltage Generation

2. A conductor of length 2m moves at 4m/s at 30 to a uniform magnetic field of 0.1T. Which one of the following gives the e.m.f. generated?

Current Transformers

Current and Temperature Ratings

PG&E Transmission Interconnection Handbook. Section L3: SUBSTATION DESIGN FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Power Factor The Basics

CHAPTER 2 EXAMPLES AND TABLES

ACCURACY OF POTENTIALTRANSFORMERS

PowerFlex Dynamic Braking Resistor Calculator

Power Quality for Information Technology System

Transformers Energy efficient transformer solutions European Minimum Energy Performance Standard (MEPS)

Module Title: Electrotechnology for Mech L7

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Modeling and Simulation of a Large Chipper Drive

PHASOR DIAGRAMS HANDS-ON RELAY SCHOOL WSU PULLMAN, WA. RON ALEXANDER - BPA

Power System Harmonics

FIXED CHARGE: This is a cost that goes towards making the service available, including

Current Limiting Protector For Systems rated kV and continuous currents through 5000A.

Voltage Drop. Voltage Drop 1

Power Quality & Custom Power

Effective: September 10, 2006 Vermont Attachment 1 to Rule Public Service Board Page 1 of 6

Reduction of Power Losses Using Phase Load Balancing Method in Power Networks

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

INDUCTION MOTOR PERFORMANCE TESTING WITH AN INVERTER POWER SUPPLY, PART 2

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

Inverter technology. bulletin

Transcription:

Issued 06-01-07 DESIGN Section DVD00 INFORMATION SECTION Page 1 of 1 INDEX SECTION DVD01: VOLTAGE DROP/VOLTAGE FLICKER AND TRANSFORMER INTRODUCTION... Page 2 LOAD ESTIMATING AND TRANSFORMER SIZING GUIDELINES...Page 3 TOOLS FOR ESTIMATING TRANSFORMER LOAD AND CALCULATING VOLTAGE DROP... Page 7 VOLTAGE DROP AND TRANSFORMER SIZING PROGRAM... Page 7 VOLTAGE DROP CHARTS...Page 12 SECTION DVD02: VOLTAGE FLICKER DEFINITION... Page 1 INTRODUCTION... Page 1 PERMISSIBLE FLICKER LIMITS... Page 1 VOLTAGE FLUCTUATION CAUSES... Page 1

Issued 08-01-08 DESIGN Section DVD01 INFORMATION SECTION Page 1 of 21 ALLIANT ENERGY VOLTAGE DROP / VOLTAGE FLICKER AND TRANSFORMER September, 1998 Voltage Drop Team: Mark Peterson Mike Warntjes Tony Mak Ron Johnson Revised January 2005: Mark Peterson

Section DVD01 DESIGN Issued 08-01-08 Page 2 of 21 INFORMATION SECTION 1. INTRODUCTION Voltage Drop: The difference between the voltage magnitudes at the source and the receiving (load) ends of a feeder, secondary, or service. This drop is based on the length, the resistance and the reactance of the conductor and the amount of load being carried. Impedance: The characteristic of electrical conductors (lines or transformers) that tends to oppose or resist the flow of alternating current (AC) electricity. Impedance is composed of two parts: resistance and reactance. The impedance of a conductor decreases as the length of the conductor decreases or the size of the conductor selected increases. Nominal Voltage: A term used to describe a class of voltage levels, such as 120/240 V, 120/208 V, 277/480 V, 7.2/12.47 kv, etc. Service Voltage: The voltage at the customer s meter or point of interconnection between the utility s system and the customer s system. Steady State Voltage: A voltage level that exists for an extended period of time, usually five minutes or longer. Voltage Fluctuations: Sharp changes in voltage level which persist for only a few seconds or cycles. The objective of system voltage control is to economically provide to each customer the voltage that conforms to the voltage design limitations of electrical equipment. Voltage drop exists in each part of the power system from the source to the customer s service entrance and is proportional to the magnitude and phase angle (power factor) of the load current flowing through the entire power system. This means that a customer electrically close to the source would receive a higher voltage than a customer more remote from the source. Each customer operates practically the same electrical equipment, which makes it necessary to provide each with almost equal supply voltage. A compromise has been required between the allowable deviation from nameplate voltage that is supplied and the deviation above and below the nameplate voltage at which satisfactory performance can be obtained. If voltage limits maintained by the power company were too broad, the cost of appliances would be high because they would have to be designed to operate at any voltage within the limits. If voltage limits were too narrow, the cost of providing power would become too high. Alliant Energy has several nominal voltages that it offers to its customers in the various operating companies electric tariffs. Generally, for retail service the variations of voltage will be no more than five percent above or below the nominal voltage.

Issued 08-01-08 DESIGN Section DVD01 INFORMATION SECTION Page 3 of 21 Typically, the voltage level at the distribution substation is set at 125 Volts. The control on voltage regulators or load tap changer (LTC) will typically maintain this level within +/- 1 Volt of the voltage setting. This would be a 2 Volt bandwidth. Using 120 V as a base, +/- 5% gives a range of 114-126 V as the allowable voltage level. The table below shows Alliant s voltage drop guidelines. MAXIMUM DESIGN DISTRIBUTION SYSTEM VOLTAGE DROPS Feeder Component Residential Feeder Rural Feeder Primary Feeder 4.35 % 5.6 % Distribution Transformer 2.0 % 2.0 % Secondary 2.0 % * Service 0.75 % 1.5 % TOTAL: 9.1% 9.1% * For rural applications, it is assumed the majority of applications will have no secondary. The maximum design voltage drops shown above are intended to be a guide for those responsible for the planning, design and engineering of the distribution system. The voltage drop for each component is intended to minimize the cost of the distribution system while maintaining an acceptable voltage to all Alliant Energy customers. The table is based on a typical Alliant Energy distribution system and will not be applicable to all situations. 2. LOAD ESTIMATING AND TRANSFORMER In 2005, new guidelines for estimating transformer loads and sizing transformers were developed by the Distribution Transformer Sizing Six Sigma Team. The team s recommendations for loading distribution transformers, along with a list of the team s members, are shown on the following page. Flow charts that were developed by the team for estimating load and sizing transformers are also included. The team also revised the equations used by the GIS transformer load management (TLM) program so the results provided will reflect the most resent company load data.

Section DVD01 DESIGN Issued 08-01-08 Page 4 of 21 INFORMATION SECTION Lean Six Sigma Transformer Utilization Team Distribution Transformer Loading Recommendations 03/02/05 The following guidelines should be considered when installing distribution transformers. The guidelines are based on the loss of insulation life characteristics (of our present standard transformers), the average load profiles of each class of customers and average annual temperatures across the Alliant Energy territory. Residential For new developments or rebuilds, distribution transformers should be typically loaded at 110% at peak. This will allow 40 years of load growth at.75% per year, which has been the average load growth per transformer in the past. The goal is to ultimately load residential transformers to a target maximum of 140%. Transformers will be flagged in TLM when the load exceeds 180%. Residential load estimating tools Load on existing transformers can be estimated using the TLM program in ArcFM. Load for new homes can be estimated using the transformer sizing spreadsheet or the residential diversity curves. The diversity curves were developed using load research data and are a better representation of smaller existing homes. Tools will be added to the Design Voltage Drop (DVD) section of the Electric Construction Standards (ECS) manual. Small Commercial For new small commercial installations or rebuilds, or transformers serving a combination of residential and commercial customers, distribution transformers should typically be loaded to 110% of rating at peak if expected load growth is unknown. The goal is to ultimately load transformers to a target maximum of 140%. If enough information is available to estimated expected load growth, the transformer should be sized such that the initial load plus expected load growth does not exceed 140%. Voltage drop must be considered as it may be the most limiting factor. Large Commercial New or replacement transformer installations for large commercial customers (with load factors greater than 60%) should be loaded to a maximum of 105%. If excessive harmonic loads are suspected, the maximum loading limit may need to be reduced. Consult with distribution engineer. Industrial The typical load factor for industrial customers is about 80%. At this level, large pad mount transformers will not loose significant insulation life if loaded below 105% at peak. However, due to the high harmonic content of many of the more common industrial loads such as variable speed drives, florescent lighting, arc welders, arc furnaces, electronic power supplies and battery chargers, the maximum loading may need to be reduced significantly. Consult with distribution engineer when sizing transformers for industrial loads. Commercial and Industrial load estimating tools - Load on existing transformers can be estimated using the TLM program in ArcFM. Individual demand metered loads are available in CSS or CIS. Load for new customers can be estimated using information from the customer, load from similar customers or section D3PUD-3 (and appendix A) of the ECS manual. Team members: John Helbling, Black Belt Steve Carlson, Special Projects Manager Mark Peterson, Lead Distribution Engineer Centerville, IA Bruce Bielema, Manager Customer Service Clinton, IA Dan Holzman, Engineering Technician Berlin, WI Nate Pollock, GIS Business Analyst

Issued 08-01-08 DESIGN Section DVD01 INFORMATION SECTION Page 5 of 21

Section DVD01 DESIGN Issued 08-01-08 Page 6 of 21 INFORMATION SECTION

Issued 08-01-08 DESIGN Section DVD01 INFORMATION SECTION Page 7 of 21 AVAILABLE TOOLS FOR ESTIMATING TRANSFORMER LOAD AND CALCULATING VOLTAGE DROP Several tools are available to estimate transformer load and to calculate voltage drop on the distribution transformer, secondary and service. A transformer sizing and voltage drop spreadsheet program is available as well as a set of load estimating and voltage drop charts. The spreadsheet is intended as a tool for designing the distribution systems for new residential subdivisions whereas the voltage drop charts may be used to calculate the voltage drop on any section of conductor. The transformer sizing spreadsheet is also provided in a hard copy table and graph. A table and graph is provided for estimating load for existing homes as well. Primary voltage drop and motor start calculations should be referred to the area Distribution Engineer. 1. VOLTAGE DROP AND TRANSFORMER SIZING PROGRAM An Excel spreadsheet program has been developed which will size the distribution transformer and calculate the voltage drop on the transformer, secondary and service (overhead or underground) to residential customers. There are four customer types to choose from and up to four secondaries or pedestals may be modeled. The program will calculate the load in kva on each secondary and on the distribution transformer. A suggested minimum transformer size is calculated based on a given loading factor. The advantage of this program is that the customer diversity load curves are built into the program. This means that the user does not have to adjust for the fact that most customers do not peak at the same time. As more customers are modeled on a transformer, the program automatically reduces the load per customer according to the diversity curves within the program. Detailed step by step instructions for using the spreadsheet and a hard copy of the program as it appears on the computer screen are included in the following pages. A graph of the output of the transformer sizing spreadsheet is also available for summer loads with air conditioning (type A and C) which may be easier to use. However, for the results to be accurate all of the customers served from the transformer must be of the same type. A table and graph is provided for estimating load for existing homes as well. Copies of the voltage drop and transformer sizing program as well as the graphs mentioned above are available on the IPL Field Engineering Team West web site. The methodology to calculate the transformer loading is based on the project team of Dick Wight of Energy Market Solutions, Diane Cunningham of Applied Energy Group, Dr. Russ Heikes and Dr. Bill Hines of Georgia Institute of Technology. Please refer to WP&L Residential Load Modeling 1995 report prepared by Energy Market Solutions.

Section DVD01 DESIGN Issued 08-01-08 Page 8 of 21 INFORMATION SECTION VOLTAGE DROP AND TRANSFORMER SIZING PROGRAM INSTRUCTIONS Description Any questions call Mark Peterson (641) 437-5271. This spreadsheet contains three worksheets, a "Transformer Sizing" worksheet and two "Secondary / Service Voltage Drop" worksheets. The Transformer Sizing worksheet contains an algorithm to determine the peak kva demand for a group of "new" customers based on the number and type of each customer. The customers can be grouped by up to four load distribution points "nodes" which can be overhead or underground. The outputs include the non-coincident peak for each load point (Node 1 through Node 4) and the peak transformer load. The transformer load includes diversity between the load points. An additional table is included called Inputs to: "Coincident Peak kva" which displays the coincident load at each node (their sum equals the calculated transformer load). These loads can then be entered into either "Secondary / Service Voltage Drop" worksheet to calculate the voltage drop at any point on a secondary system. The voltage drop worksheets are identical except "Secondary-Service Volt Drop (%)" will calculate voltage drop in percent and "Secondary-Service Volt Drop (V)" will calculate the voltage on a 120 V base. Refer to section DVD-1 of the Electric Construction Standards manual for the maximum design distribution system voltage drops. Instructions Transformer Sizing Spreadsheet 1. Fill in "Location", "Pole or Pedestal No.", and "Tx No." if needed to identify file or hard copy. 2. Determine appliance codes from "Electric Appliance Combo Table". 3. Enter number of customers on a white box - always start with "Node 1". The "Noncoincident Peak kva" table will display the calculated peak load for each node (load point) and the transformer, as well as the minimum transformer size (load + loading factor) and the number of customers. 4. The "Coincident Peak kva" table will display the calculated transformer load, distributed proportionally to each pedestal. These outputs are also displayed in the "Secondary-Service Volt Drop" sheets. Secondary-Service Voltage Drop 1. Click the "Clear Sheet" button to zero the conductor lengths and kva loads on the pedestals and meters. 2. Enter the inputs as instructed for each input variable. The outputs from the "Transformer Sizing" worksheet are available in the table in the upper right portion of each "Secondary-Service Volt Drop". 3. Transformer voltage drop and load will be shown in the table representing the transformer. 4. The voltage drop for each pedestal and meter will be shown at each location modeled. Modeling More Than Four Load Points If it is desired to model more than four load points utilizing the Transformer Sizing worksheet, all of the customers served by the transformer of each type should be entered into a single node (1) location. The load should then be distributed to each node in the volt drop worksheet by the proportion of customers served at the node.

Issued 08-01-08 DESIGN Section DVD01 INFORMATION SECTION Page 9 of 21 New Residential Customer Transformer Sizing Module

Section DVD01 DESIGN Issued 08-01-08 Page 10 of 21 INFORMATION SECTION Single Phase Secondary / Service Voltage Drop Calculator

Issued 08-01-08 DESIGN Section DVD01 INFORMATION SECTION Page 11 of 21

Section DVD01 DESIGN Issued 08-01-08 Page 12 of 21 INFORMATION SECTION Load Estimating Graphs for New and Existing Homes 2. VOLTAGE DROP CHARTS The voltage drop charts on the following pages are designed to show the percent voltage drop between the source and load ends of a length of secondary or a service. The charts show percent voltage drop per 100 feet. Follow these steps to use the charts: 1. Determine the proper chart to use by determining whether the load is single- or three-phase and what the nominal voltage is. 2. Determine the AWG size and length of the secondary/service conductor. 3. Determine the load current in amperes. For parallel runs (i.e. More than one conductor per phase), divide the total load in amps by the number of runs. Use this number in the charts. 4. Locate the value of amps on the X (horizontal) axis. 5. Read the percent voltage drop from the Y (vertical) axis corresponding to the conductor being used. 6. For conductor lengths other than 100 feet, adjust this number accordingly. Example: for 200 feet, multiply the number by two. For 50 feet, multiply the number by 0.5

Issued 08-01-08 DESIGN Section DVD01 INFORMATION SECTION Page 13 of 21

Section DVD01 DESIGN Issued 08-01-08 Page 14 of 21 INFORMATION SECTION

Issued 08-01-08 DESIGN Section DVD01 INFORMATION SECTION Page 15 of 21

Section DVD01 DESIGN Issued 08-01-08 Page 16 of 21 INFORMATION SECTION

Issued 08-01-08 DESIGN Section DVD01 INFORMATION SECTION Page 17 of 21

Section DVD01 DESIGN Issued 08-01-08 Page 18 of 21 INFORMATION SECTION

Issued 08-01-08 DESIGN Section DVD01 INFORMATION SECTION Page 19 of 21

Section DVD01 DESIGN Issued 08-01-08 Page 20 of 21 INFORMATION SECTION

Issued 08-01-08 DESIGN Section DVD01 INFORMATION SECTION Page 21 of 21 (END)

Issued 06-01-07 DESIGN Section DVD02 INFORMATION SECTION Page 1 of 6 VOLTAGE FLICKER 1. DEFINITION VOLTAGE FLICKER: A phenomenon caused by sudden changes of brief duration in the voltage supplied to a customer. 2. INTRODUCTION Electric Utility delivery systems provide relatively constant voltage. Power system voltage fluctuations are generally caused by large changes with customers loads. Large current changes are causing the voltage to fluctuate and another customer has seen lamp flicke, experienced problems with a process, or otherwise been disturbed. There are two forms of power system voltage fluctuations: (1) voltage fluctuations caused by utilization equipment resulting in lamp flicker, and (2) voltage fluctuations caused by transient system faults resulting in utilization equipment downtime. Human sensitivity and tolerance varies considerably and depends upon the magnitude and frequency of the voltage flicker. It is, therefore, difficult to establish flicker limits that are economically justified and satisfactory to all customers. Historically, voltage fluctuation limit guidelines have been based on customer and equipment tolerance curves. More recently, flicker limits and system design guidelines have been established by regulatory bodies through input from consumer organizations and utilities. 3. PERMISSIBLE FLICKER LIMITS The maximum amount of acceptable flicker voltage cannot be stated concisely for several reasons. Flicker that one individual may feel is objectionable may not be perceptible to another. The type of lighting fixture used is also important. Incandescent and fluorescent lamps are affected differently by a change in supply voltage. Cyclic or rapidly recurring voltage changes are generally more objectionable than non-cyclic. For non-cyclic changes, the annoyance due to the flicker is affected by the rate of change, duration of change, and frequency of occurrence of the flicker. 4. VOLTAGE FLUCTUATION CAUSES Most of the voltage fluctuations on distribution systems are due to the operation of customers utilization equipment. Following are some of the more common types of equipment known to cause flicker. Several more typical solutions for correcting the voltage fluctuation to within permissible limits are also provided. a. Motor Starting 1) Probably the most common cause of voltage flicker problems is the starting of motors. For reasons of cost, efficiency, and reliability, commercial general purpose motors require a momentary starting current several times their full load running current in order to produce sufficient starting torque. The magnitude of starting current may cause a dip in the reference voltage and result in objectionable flicker.

Section DVD02 DESIGN Issued 06-01-07 Page 2 of 6 INFORMATION SECTION VOLTAGE FLICKER There are three general classes of motor installations: Single-phase fractional horsepower motors commonly used in homes and small stores. Small multi-horsepower single and polyphase motors operated from secondary distribution circuits, such as in small shops, large stores and buildings, and recently in an increasing number of homes for air conditioning. Large horsepower three-phase motors operated from primary lines, mostly for industrial applications. 2) The magnitude of voltage dip caused by a motor load during starting depends on: a) The system impedance (size and length of transmission line, size of substation transformer, and size and length of distribution line). b) The size and impedance of the (distribution) transformer feeding the load. c) The length and size of the secondary conductor between the motor and transformer. d) The starting current (locked rotor amps) requirements of the motor. 3) Flicker can be improved by reducing the system impedance by: a) Increasing the size of the substation and/or distribution transformers. b) Adding distribution transformers or moving existing transformers closer to the load to reduce the length of the secondary conductor. c) Increasing the size or number (parallel runs) of the secondary conductor. d) Reducing the starting current requirements of the motor through reduced voltage starting equipment (auto transformer and reactor type reduced voltage starter, wye-delta starting, or part winding starting). * Note this is the preferred method, however the effects of reduced voltage starting equipment on the starting torque characteristics of the motor must be analyzed. Consult your distribution engineer for assistance. Motor nameplate information, as well as specifics concerning the use and type of application, will be required. b. Electric Welders Due to their relatively small size and widespread use, welders can create voltage fluctuations on many segments of the distribution and delivery systems. Most welders have a smaller on time than off time, and consequently, the total energy consumed is small compared with the instantaneous demand. Fortunately, most welders are located in industrial applications with other processes, which may require a larger amount of power. Supply facilities typically are of larger capacity to reduce the amount of flicker. In isolated cases,

Issued 06-01-07 DESIGN Section DVD02 INFORMATION SECTION Page 3 of 6 VOLTAGE FLICKER but nonetheless important, the welder may be the major load in the area, and serious flicker may be imposed on distribution systems that are otherwise adequate for serving ordinary loads. Practically all welders in service are single phase, and the most commonly used welder is the resistance welder. Various types of electric welders are: 1) Flash welders 2) Pressure butt welders 3) Projection welders 4) Resistance welders a. Spot b. Seam Basically, the source of voltage, usually 240, 480, or 2,300 volts, is stepped down to a few volts to send high currents through the parts to be welded. Although bridge rectifier circuits are used in resistance welders, some saturation of the welding transformer usually will exist. This effect, together with the short successive pulses of high current, creates the objectionable voltage dip. Corrective measures for voltage dips caused by welders range from motor-generator sets installed in the customer s plant to supply circuit changes by the utility. Supply circuit changes may be accomplished by increasing the feeder size or the substation capacity. Separate distribution feeder lines to the welding load also are possible economic solutions. As with all fluctuating loads, the object is to decrease the system impedance between the source and objectionable load. Consult your distribution engineer for assistance. Welder nameplate information, as well as specifics concerning the use and type of application, will be required. c. Electric Furnaces There are three types of electric furnaces resistance, induction, and arc. Depending on the size of the furnace, each type could cause a voltage fluctuation problem. When an electric furnace load is proposed for our system, distribution engineering and/or distribution planning must perform a detailed study of possible voltage problems. Induction furnaces are single-phase devices that are typically connected phase-tophase. When configured with capacitors and inductors, induction furnaces can simulate a three-phase load and operate relatively balanced with a power factor close to unity. Induction furnaces connected phase-to-phase cause significant voltage fluctuations due to delivery system load imbalance. One phase will see a significant voltage drop while the other phase incurs a slight voltage rise during the operation of the furnace. Induction furnaces,depending upon the size and operated to simulate a three-phase load create minimal, if any, voltage concerns.

Section DVD02 DESIGN Issued 06-01-07 Page 4 of 6 INFORMATION SECTION VOLTAGE FLICKER Consult your distribution engineer for assistance. Furnace nameplate information, as well as specifics concerning the use and type of application of the equipment and system supply impedance, will be required. d. Miscellaneous Under this category comes special equipment such as electric shovels, strip mining equipment, stone crushers, heavy rolling mills, and similar installations. Most of these must be considered individually as to special features and the type of power supply required. Again, your Distribution Engineer should be consulted for assistance to assure that these devices can be operated with the least amount of system voltage fluctuation. e. Residential Voltage Flicker Tables On the next several pages are tables showing maximum secondary and service lengths for various transformer sizes. These tables are based on voltage flicker limits only. In most cases, if not all, these limits are more restrictive than voltage drop limits. In other words, taking voltage flicker into account tends to restrict the length of secondary and services more so than voltage drop due to steady state load. However, the voltage drop should also be checked against the guidelines to make sure limits are not exceeded. The tables are set up to limit flicker at points common to multiple customers (transformers, pedestals) to 3% and at the meter to 4%.

Issued 06-01-07 DESIGN Section DVD02 INFORMATION SECTION Page 5 of 6 VOLTAGE FLICKER 10 kva Transformer, No Secondary* Maximum Service Length (Ft.) #2 (OH) #1/0 (OH/UG) #4/0 (OH/UG) 350 MCM (UG) 50 75 100 150 *Do not serve multiple residential customers from a 10 kva transformer. Assuming 60 amp inrush at 0.65 pf, which creates 3.4% flicker through 10 kva transformer. Allowing 4% @ meter, primary flicker not accounted for. 25 kva Transformer, Maximum Service Length (Ft.) No Secondary #2 (OH) #1/0 (OH/UG) #4/0 (OH/UG) 350 MCM (UG) 100 150 250 350 25 kva Transformer, 1/0 Secondary Length of 1/0 Secondary Maximum Service Length Conductor (Ft.) #2 (OH) #1/0 (OH/UG) #4/0 (OH/UG) 350 MCM (UG) 50 75 100 175 250 75 60 75 125 175 25 kva Transformer, 4/0 Secondary Length of 4/0 Secondary Maximum Service Length (Ft.) Conductor (Ft.) #2 (OH) #1/0 (OH/UG) #4/0 (OH/UG) 350 MCM (UG) 50 95 120 200 250 75 85 105 175 225 100 75 90 150 200 125 65 75 125 175 150 55 60 100 150 25 kva Transformer, 350 Secondary Length of 350 Secondary Maximum Service Length (Ft.) Conductor (Ft.) #2 (OH) #1/0 (OH/UG) #4/0 (OH/UG) 350 MCM (UG) 50 ---- 125 200 300 75 ---- 115 185 275 100 ---- 105 170 250 125 ---- 95 155 225 150 ---- 85 140 200 175 ---- 75 125 175 200 ---- 65 110 150 Assuming 100 amp inrush at 0.65 pf, which creates 2% flicker through 25 kva transformer. Allowing 3% flicker @ pedestal, 4% @ meter, primary flicker not accounted for.

Section DVD02 DESIGN Issued 06-01-07 Page 6 of 6 INFORMATION SECTION VOLTAGE FLICKER 50 kva Transformer, No Secondary Maximum Service Length (Ft.) #2 (OH) #1/0 (OH/UG) #4/0 (OH/UG) 350 MCM (UG) 150 225 375 525 50 kva Transformer, 1/0 Secondary 50 kva Transformer, 4/0 Secondary Length of 1/0 Secondary Con- Maximum Service Length (Ft.) ductor (Ft.) #2 (OH) #1/0 (OH/UG) #4/0 (OH/UG) 350 MCM (UG) 50 125 175 290 410 75 110 150 250 350 100 95 125 210 290 125 80 100 170 235 150 65 75 125 175 Length of 4/0 Secondary Maximum Service Length (Ft.) Conductor (Ft.) #2 (OH) #1/0 (OH/UG) #4/0 (OH/UG) 350 MCM (UG) 50 150 195 325 455 75 140 180 300 420 100 130 165 275 385 125 120 150 250 350 150 110 135 225 315 175 100 120 200 280 200 90 105 175 245 225 80 90 150 210 250 70 75 125 175 50 kva Transformer, 350 Secondary Length of 350 Secondary Conductor (Ft.) Maximum Service Length (Ft.) #2 (OH) #1/0 (OH/UG) #4/0 (OH/UG) 350 MCM (UG) 50 ---- 200 345 475 75 ---- 190 325 450 100 ---- 180 305 425 125 ---- 170 285 400 150 ---- 160 265 375 175 ---- 150 250 350 200 ---- 140 235 325 225 ---- 130 220 300 250 ---- 120 200 275 275 ---- 110 180 250 300 ---- 100 165 225 325 ---- 90 145 200 350 ---- 75 125 175 Assuming 100 amp inrush at 0.65 pf, which creates 1% flicker through 50 kva transformer. Allowing 3% flicker @ pedestal, 4% @ meter, primary flicker not accounted for. (END)