** PROPRIETARY ** SAMPLE COUNTY DATA CENTER PROJECT BUDGET ** PROPRIETARY **



Similar documents
SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

How To Write An Infrastructural Standard For Data Center Infrastructure

Data Center Management

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

ANSI/TIA-942 Telecommunications Infrastructure Standard for Data Centers

ANSI/TIA-942 Telecommunications Infrastructure Standards for Data Centers

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

NOTICE TO CONTRACTORS

Georgia Tech Aerospace Server French building Server Room. Server Room Policy Handbook: Scope, Processes and Procedure

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

UC Berkeley Data Center Overview

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

Data Center Security 100% UPTIME PUZZLE. Page 1

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Presenters Brett Weiss, Gabe Martinez, Brian Kroeger.

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION

How To Visit An Internet Data Center

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)

Data Center Presentation

NeuStar Ultra Services Physical Security Overview

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

Telecommunications Infrastructure Standard for Data Centers Tutorial

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

UBC Technical Guidelines Section Edition Secure Access: General Standards Page 1 of 7

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

Designing A Communications Cabling System for the Colocation Data Center Larry Smith President, ABR Consulting Group, Inc.

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

College of the Siskiyous Insurance Requirements

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

This directive establishes Department of Homeland Security (DHS) policy regarding the physical protection of facilities and real property.

KIEWIT CM/GC Enabling/Utilities

2014 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo and other marks are trademarks of AT&T Intellectual Property.

Project Close Out Summary

DATA CENTRE DATA CENTRE MAY 2015

Borges Construction Company A limited liability Corporation Page1 of 1

Building Condition Assessment Report

Construction Technologies Career Field Pathways and Course Structure

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Policy Title-Aquia Data Center Operational Policy & Procedure. Policy ID - TSD-ADC001. Version - Version: 1.0. Supersedes Version 1.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

Estimating Database Checklist

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED*

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

RFP for Case Management & Tracking System for the Office of Advocate General, Madhya Pradesh

Upper Perkiomen School District

Building Condition Assessment Report

DATA CENTER SOLUTIONS

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.

Data Center Infrastructure & Managed Services Outline

Your Company Name. Your Company Address Your City, State, Zip Your Phone Number Your Address. Project Information

AT&T Internet Data Center Site Specification Dallas Area (Allen, Tx)

DESIGN GUIDELINES. Local Area Network

CHARLOTTE COUNTY Community Development Department

Important Information for Owners of Buildings in Flood Zones

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

PEPPER VINER HOMES WARRANTY GUIDELINES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

IBM Portable Modular Data Center Overview for Critical Facilities Round Table

City and County of San Francisco Department of Public Works TABULATION OF BIDS

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

NAHB PRODUCT DEFINITION

HERNDON/MUNCEY, INC. Office: (281) INVESTIGATIVE PLUMBING

REQUEST FOR PROPOSALS PINE CREST DEVELOPMENT CORPORATION COLOCATION DATA CENTER OPERATOR

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Dimensions (HxDxW) Total Cabinet Area 89.96x x 24 in/ 2,285 x 1, x mm 95.47x 48 x 32 in/ 2,425 x 1,219.2 x 812.

Data Centers and Mission Critical Facilities Operations Procedures

Out-of-Band Management: the Integrated Approach to Remote IT Infrastructure Management

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015

Secure your IT equipment with confidence... secure with NetClosure

DATA CENTRE DATA CENTRE

TELECOMMUNICATIONS NETWORK STANDARDS AND GUIDELINES FOR THE NEW ADMINISTRATION BULDING

Notice to Property Owners

ADDENDUM # 1 To: RFP for: Various Construction Maintenance & Repair Services

Water Leak 1: Intrusion Policy

Contact us for a free consultation today! officemove@aie195.com

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

What is a Datacenter?

City of St. Charles Basement Finish or Remodel

Transcription:

1.0 SECTION I - DESIGN AND ENGINEERING FEES 1.0.1 Project Management and Administration Costs $25,000 1.0.2 Architectural and Space Planning 1.0.2.1 Design Development 1.0.2.1.1 Lead Architect 500 $130.0 $65,000 1.0.2.1.2 Architect 600 $115.0 $69,000 1.0.2.1.3 CAD Support 400 $75.0 $30,000 1.0.2.2 Bid & Negotiation 120 $120.0 $14,400 1.0.2.3 Construction Administration 700 $120.0 $84,000 Total Architectural and Space Planning 2320 $262,400 1.0.3 Electrical and UPS Design 1.0.3.1 Lead Electrical Engineer 400 $120.0 $48,000 1.0.3.2 Other Engineer 500 $80.0 $40,000 1.0.3.3 CAD Support 300 $80.0 $24,000 1.0.3.4 Construction Administration 250 $120.0 $30,000 Total Electrical Engineering Design 1450 $142,000 1.0.4 Plumbing and Mechanical Design 200 $140.0 $28,000 1.0.5 Fire Supression Design 200 $140.0 $28,000 1.0.6 Fire Alarm Design 200 $120.0 $24,000 1.0.7 Security/Access Control Design 160 $120.0 $19,200 1.0.8 Voice and Data Cabling Design 160 $120.0 $19,200 1.0.9 Network Design 600 $130.0 $78,000 1520 $196,400 Sub Total Section I -Design and Engineering Costs $625,800 Page 1 Version 1.3

2.0 SECTION II - CONSTRUCTION COSTS 2.1 Demolition 2.1.1 Sub Total: Demolition $0 2.2 Interior Construction 2.2.1 Rough Carpentry for Computer Room Areas 0 2.2.2 Perimeter Furring 2,500 $4.5 $11,250 2.2.3 Drywall for Computer Room Areas (1 hr. Rated Walls) 6,000 $8.0 $48,000 2.2.4 Drywall for Computer Room Areas (2 hr. Rated Walls) 18,000 $10.0 $180,000 2.2.5 Vapor Barrier 18,000 $0.6 $10,800 2.2.6 Raised Floor (1,250 lb Floor) 2.2.6.1 18" Access Floor with Zone 4 Seismic Preparation 12,700 $20.0 $254,000 12,700 Square Feet 2.2.6.2 Sealing of Floor 12,700 $2.5 $31,750 2.2.6.3 Two Cleanings of Floor 12,700 $0.5 $6,350 2.2.7 Raised Floor (1,500 lb Floor) 2.2.7.1 18" Access Floor with Zone 4 Seismic Preparation 2,300 $22.0 $50,600 2,300 Square Feet 2.2.7.2 Sealing of Floor 2,300 $2.5 $5,750 2.2.7.3 Two Cleanings of Floor 2,300 $0.5 $1,150 2.2.7.3 Tile Cuts 120 $35.0 $4,200 2.2.8 Acoustical Ceiling 15,000 $4.0 $60,000 2.2.9 Doors/Frame/Hardware $25,000 3 large doors w/ security. 4 other doors w/ security 2.2.10 Painting/Wall Covering 15,000 $2.0 $30,000 2.2.11 Glass and Glazing 2.2.12 Bathrooms 2.2.13 Ceramic Tile 2.2.14 Carpeting/Misc. Floor Covering 600 $21.0 $12,600 2.2.15 Carpet Clean/Static Treat 600 $1.0 $600 2.2.16 Other Sub Total: Interior Construction $732,050 2.3 Plumbing/Process Piping 2.3.1 Plumbing/Process Piping 15,000 $2.6 $39,000 Sub Total: Plumbing/Process Piping $39,000 2.4 Fire Protection 2.4.1 Pre-Action, Dry Pendant 15,000 $9.0 $135,000 2.4.2 FM-200 Fire Suppression System (Underfloor Only) 15,000 $9.0 $135,000 Sub Total: Fire Protection $270,000 Page 2 Version 1.3

2.5 Mechanical 2.5.1 Chilled water system, CRUs, HVAC, other 15,000 $65.0 $975,000 Some systems on rooftop and in equipment yard Sub Total: Mechanical $975,000 2.6 Electrical 2.6.1 Data Center (generator, switchgear, ATS, main panels, PDUs and PDU Cables, UPS/battery) 15,000 $180.0 $2,700,000 Some systems on rooftop and in equipment yard 2.6.2 Voice and Data Cabling (Data Center) 15,000 $7.5 $112,500 2.6.3 Voice and Data Cabling (Office Area) 30,000 $5.0 $150,000 2.6.4 Security Cabinet and Installation $20,000 Sub Total: Electrical $2,982,500 2.7 Security 2.7.1 Security for IT spaces $60,000 Sub Total: Security $60,000 2.8 Environmental Monitoring 2.8.1 Monitoring system for environmental systems $80,000 Sub Total: Environmental Monitoring $80,000 2.9 Command Console 2.9.1 32-position production and network command console $150,000 Sub Total: Command Console $150,000 SUB-TOTAL CONSTRUCTION COSTS $5,288,550 3.0 Fees and Conditions 3.1 Fees and Permits @ 0.5% $26,443 3.2 General Conditions @ 1.5% $79,328 3.3 Liability Insurance @ 2.0% $105,771 3.4 Performance and Payment Bonds @ 1.5% $79,328 3.5 Construction Management Fee @ 6.0% $317,313 3.6 Overhead and Profit @ 3.0% $158,657 SUB TOTAL FEES AND CONDITIONS $766,840 Sub-Total Section II - Construction Costs $6,055,390 Page 3 Version 1.3

3.0 SECTION III - NETWORK EQUIPMENT COSTS 3.1 Network Equipment and Data Circuits 3.1.1 19" Server Cabinets w/power strips 27 $6,000 $162,000 3.1.2 Network Cabinets w/power strips 13 $5,000 $65,000 3.1.3 KVM Switches for server cabinets 27 $800 $21,600 3.1.4 2U CRTs and keyboards for server cabinets 27 $1,200 $32,400 3.1.5 Cisco 7500 Router 5 $70,000 $350,000 3.1.6 Switches various $500,000 $500,000 3.1.7 Cisco Firewall 1 $50,000 $50,000 3.1.8 Other Firewall Systems 3 $40,000 $120,000 3.1.9 VPN Equipment $100,000 3.1.10 Costs for installation and testing of network hardware $10,000 3.1.11 Console Terminal Servers 4 $5,000 $20,000 3.1.12 Modems (racks, rackmounts, standalones) 70 $1,000 $70,000 3.1.13 DSUs (racks, rackmounts, standalones) 30 $1,000 $30,000 3.1.14 Adtran mux equipment 1 $20,000 $20,000 3.1.15 Patch Panels (5-RS232, 2-V35, 1-T1, 4-Coax) 1 $12,000 $12,000 3.1.16 RS232, V.35, T1 and Coax patch panels 18 $2,000 $36,000 3.1.17 Cabinet rack-mounted slider equipment 100 $250 $25,000 3.1.18 All specialized Telecom/Network patch panels & cords 1 $40,000 $40,000 3.1.19 Main Distribution Frame & accessories 1 $12,000 $12,000 Sub Total Network Hardware $1,676,000 3.1.20 Contingency (7%) for unanticipated items $117,320 3.1.21 Estimated Tax @ 8.25% $138,270 3.1.22 Estimated Freight @ 9.0% $150,840.00 Sub Total Tax and Freight $289,110 3.2 Network Consultants 3.2.1 Network Consulting and Project Management 600 $135.0 $81,000 Sub Total Network Consultants $81,000 3.3 Seismic Bracing 3.3.1 Labor and Materials for Complete Seismic Bracing 12300 $0.5 $6,150 Sub Total Seismic Bracing $6,150 Sub Total Network Equipment Costs $2,169,580 Page 4 Version 1.3

4.0 SECTION IV - SERVER SYSTEMS 4.1 CTM server 1 $20,000 $20,000 4.2 Sun Servers 7 $30,000 $210,000 4.3 Other Servers 15 $5,000 $75,000 4.4 Contingency (10%) for unanticipated items $30,500 Sub Total Server Systems $335,500 4.5 Estimated Tax @ 8.25% $27,679 4.6 Estimated Freight @ 9.0% $30,195 Sub Total Tax and Freight $57,874 Sub Total Server Systems $393,374 5.0 SECTION V - FIBER ENTRANCE FACILITIES 5.1 Provide and Install Fiber Entrance Facility - Includes Trenching 1 $500,000 Sub Total Fiber Entrance Facilities $500,000 Page 5 Version 1.3

6.0 SECTION VI - MIS EQUIPMENT COSTS 6.1 MIS Equipment 6.1.1 New IBM Mainframe 1 $650,000 $650,000 6.1.2 New IBM RAMAC DASD 1 $300,000 $300,000 6.1.3 Automatic Tape Library 1 $500,000 $500,000 6.1.4 HP Vantage System for HP console management 1 $25,000 $25,000 Sub Total MIS Equipment $1,450,000 6.2 MIS Connecting Cables 6.2.1 Plenum-Rated Bus & Tag 20 $1,200 $24,000 6.2.2 Plenum-Rated Fiber ESCON Cables 60 $300 $18,000 Sub Total MIS Connecting Cables $24,000 6.3 Vendor Consulting 6.3.1 IBM 120 $220 $26,400 6.3.2 Hewlett-Packard 80 $220 $17,600 6.3.3 Other 60 $140 $8,400 Sub Total Vendor Consulting $52,400 6.4 Vendor Training 6.4.1 IBM $60,000 6.4.2 Hewlett-Packard $30,000 6.4.3 Other $10,000 Sub Total Vendor Training $100,000 6.5 Other Vendor 6.5.1 MIS Connecting Cable Installation $12,000 Sub Total Other Vendor $12,000 Sub Total MIS Equipment Costs $1,638,400 Page 6 Version 1.3

7.0 SECTION VII - RELOCATION COSTS 7.1 IBM Mainframe and I/O Hardware 7.1.1 Relocate all IBM equipment $120,000 Sub Total IBM Mainframe and I/O Hardware $120,000 7.2 Hewlett-Packard Compute Servers 7.2.1 Relocate H-P Compute Servers $50,000 Sub Total Hewlett-Packard Compute Servers $50,000 7.3 Storage Technology Tape Sub-Systems 7.3.1 Relocate Storage Technology Tape Sub-Systems $50,000 Sub Total Storage Technology Tape Sub-Systems $50,000 7.4 NEC Fingerprint System 7.4.1 Relocate NEC fingerprint system $50,000 Sub Total Storage Technology Tape Sub-Systems $50,000 7.5 Mail Server System 7.5.1 Relocate AS400 Mail Server system $50,000 Sub Total AS400 Mail Server $50,000 7.6 Other Relocations 7.6.1 Relocate Tape Library $14,000 7.6.2 Relocate Servers $20,000 7.6.3 Relocate Printer Room (less large printers) $6,000 7.6.4 Relocate Warrant Room $4,000 7.6.5 Relocate Forms Storage $6,000 7.6.6 Network/Server Hardware $20,000 Sub Total Other Relocations $70,000 7.7 Relocation Consulting/Project Management 7.7.1 J&M/ABR Consulting/Project Management 2400 $130.0 $312,000 7.7.2 IBM Consulting/Project Management 300 $220.0 $66,000 7.7.3 Storage Technology Consulting/Project Management 80 $180.0 $14,400 7.7.4 Other Consulting/Project Management 60 $180.0 $10,800 Sub Total Relocation Consulting/Project Management $403,200 7.8 Pre-Move Installation of Computer Cables 7.8.1 Pre-Move Installation of Bus & Tag/LIC Cables $8,000 Sub Total Pre-Move Installation of Computer Cables $8,000 Page 7 Version 1.3

7.9 Circuit Relocation Costs 7.9.1 Telco Circuit Retermination Costs 80 $1,200 $96,000 7.9.2 New Analog lines 50 $500 $25,000 7.9.3 Temporary circuits 10 $1,500 $15,000 7.9.4 Relocate Microwave 1 $3,500 $3,500 Sub Total Circuit Relocation Costs $139,500 Sub Total Relocation Costs $940,700 8 SECTION VIII - SUMMARY OF COSTS Section I Sub Total Design and Engineering Costs $625,800 Section II Sub Total Construction Costs $6,055,390 Section III Sub Total Network Equipment Costs $2,169,580 Section IV Sub Total Server Systems $393,374 Section V Sub Total Fiber Entrance Facilities $500,000 Section VI Sub Total MIS Equipment Costs $1,638,400 Section VII Sub Total Relocation Costs $940,700 Total Project Costs $12,323,244 Page 8 Version 1.3