OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003



Similar documents
ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

Electrical. This section applies to the design and installation of building power distribution systems.

Reticulation sewers in basements Technical guidelines

ADDENDUM NO. 2 TO PROJECT NO

Excerpts from the Canadian National Building Code (NBC)

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

Raceway and Boxes for Electrical Systems Page 1 of 7

SECTION ACCESS CONTROL SYSTEM. CONDITIONS OF THE CONTRACT AND DIVISION 1, as applicable, apply to this Section.

BUILDING SAFETY UNIT

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

City of Oviedo Commercial Shell Building Permit Application Guidelines

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

Design and Construction Design Phase Deliverables

SECTION MORTUARY REFRIGERATORS

HEANEY General Contracting, Inc.

Scope: Communications and Electronic Systems addressed in this section include:

SECTION COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY

Seattle Public Schools Building Excellence IV Projects Under Construction

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

800 Communications Circuits

UNDERSTANDING PROJECT DESIGN CRITERIA

The Telecommunications Closet and Building Services

Building Condition Assessment Report

Building Condition Assessment Report

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

Minimum Standards for Data/Voice Infrastructure in New Building Construction

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

TELECOMMUNICATIONS STRUCTURED CABLING GUIDELINES AND SPECIFICATIONS. University of Chicago IT Services Infrastructure Services October 2011

FIRE RATED WIRING. What the FT4! Paul Latreille, C.E.T. Ottawa Branch Manager

Doughty Environmental Hygiene Associates

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

SECTION GENERAL PROVISIONS FOR HVAC WORK

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Element Z General Design Requirements Standards and Other Requirements

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

Building Permit Application

MECHANICAL PLAN REVIEW REQUIREMENTS

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

School Construction Authority Architecture & Engineering

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION SECURITY SYSTEMS

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

University of North Carolina at Charlotte Design and Construction Manual Section 3, Annex K, 49er Card Systems ANNEX K 49ER CARD SYSTEMS

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Mechanical, Plumbing, and Fire Protection Conditions

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

Security Systems Intrusion Alarm

QUESTIONS & ANSWERS. Re: Invitation for Bid # (West Covina DMV Cabling, Electrical, and Hardware Installation Services)

Gramercy Place Condo Association, Inc.

Asbestos Procedures. Asbestos Products

A. Shop Drawing submittals shall include, but not be limited to, the following:

Presenters Brett Weiss, Gabe Martinez, Brian Kroeger.

PLAN SUBMITTAL INFORMATION

TCTC Cabling Specifications

SECTION FACILITY STORM DRAINAGE PIPING

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

PDmB, Inc. Definitions

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

4 Installation Requirements

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

Building Telecommunications Infrastructure Requirements

RFQ # PR Replace Kitchen Equipment in the CGR

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

HomeSpec REPORT SUMMARY

October 5, 2015 Dear Client,

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

How To Make A House Safe

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MRI RF SHIELDING DESIGN

2. What building projects are exempted? (permit not required)

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

7014 E. Camelback Road, Scottsdale, AZ 85251

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute

Department of Facilities Building NE49

The purpose of this document is to provide standards for persons requesting or subject to County building inspections.

BUILDING PERMIT SPECIFICATIONS

Building Code Inspections and Fees

Transcription:

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor was installing box and conduit 1 Electrical Pryor & Morrow Jose Arellano sizes for voice/data outlets in CMU wall on North classroom addition. Per construction documents voice/data boxes shall be 411/16 with single gang plaster ring with 11/4 conduit to cable tray. 2 Electrical Pryor & Morrow Jose Arellano Electrical contractor shall not stack conduits crossing over grade beams. 3 Electrical Pryor & Morrow Jose Arellano Electrical contractor shall relocate large amounts of conduits running parallel on grade beams. 4 Electrical Pryor & Morrow Jose Arellano Electrical shall provide 11/2 spacing between conduits on grade beams. 5 Electrical Pryor & Morrow Jose Arellano Electrical contractor shall provide grounding electrode to building footing. 6 Plumbing Pryor & Morrow Jose Arellano 7 General/Electric al Pryor & Morrow Jose Arellano Plumbing contractor had installed sanitary piping on top of grade beams in some locations. General note No. 2 on plumbing drawings states sanitary sewer and domestic water piping are to be sleeved through grade beams. Structural engineer to recommend solution to this issue. All future sanitary piping installed on this project MUST be installed below grade beams stub ups shall be sleeved through grade beams. General or Electrical contractor shall provide photos to engineer of ALL power and communications duct banks prior to concrete encasement. Engineer will then notify contractor if duct banks are approved for concrete encasement of duct banks. 2/11/2013 Communication ductbank photos General/Electrical provided.

8 Electrical Pryor & Morrow Jose Arellano 9 Electrical Pryor & Morrow Jose Arellano 10 Electrical Pryor & Morrow Jose Arellano 11 Electrical Pryor & Morrow Jose Arellano 12 Electrical Pryor & Morrow Jose Arellano 13 Electrical Pryor & Morrow Jose Arellano 14 Electrical Pryor & Morrow Jose Arellano 15 Electrical Pryor & Morrow Jose Arellano Electrical contractor shall install one (1) 1 conduit to each floor box for Voice/Data cabling due to conduit openings in floor boxes. Contractor shall use factory provided conduit openings for the power and communications compartments. Contractor is advised not to install power and communications conduits in same compartment provided in floor boxes. 2/11/2013 Electrical contractor is advised to coordinate above ceilings conduit stub out elevations with Mechanical contractor to prevent conflicts with conduit and duct work. 2/11/2013 Electrical shall provide a detailed layout of ALL electrical rooms based on the equipment that will be used on this project. See specification section 16050-1.3 (A4) 2/11/2013 Electrical is also reminded that ALL above ceiling Voice/Data conduits shall be stubbed out into corridors and extended to cable tray. See communications legend and electrical drawings E3.1, E3.2, and E3.3 for cable tray locations 2/11/2013 Electrical contractor has NOT submitted ALL items required in specification section 16050-1.3 (A). ALL items listed in this section MUST be submitted for engineers review. We are concerned if these submittals are not provided to engineer for review ASAP this could delay the completion of this project. 2/11/2013 Electrical contractor is reminded that ALL conduits rising from slab MUST be rigid steel. 2/11/2013 Electrical contractor did NOT appear to have installed a 2 conduit raceway from panel MDP for exterior grounding TRIAD as advised in field observation report # 1 electrical item # 6. See photo #1 below. 2/11/2013 Electrical is advised to support conduits penetrating slab. It appeared conduits rising from slab in random locations were NOT installed plumb and straight. It appeared the feeder conduits for panel MDP were installed to close together for grounding bushings to be installed. Electrical shall remove concrete and straighten these conduits in exposed locations. 2/11/2013

16 Plumbing Pryor & Morrow Jose Arellano 17 Plumbing Pryor & Morrow Jose Arellano 19 Mechanical Pryor & Morrow Jose Arellano 20 Plumbing Pryor & Morrow Jose Arellano 21 Fire Protection Pryor & Morrow Jose Arellano The vent for the floor drain installed in mechanical room 322A had been snapped at the top of the concrete floor has not been repaired. Remove the concrete floor as required to repair the broken fitting. 2/11/2013 Plumbing contractor shall provide proper adhesive where domestic piping insulation appeared to be 4/16/2013 separating. It was noted that in wall rough-in boxes and conduit were NOT installed for thermostats and humidistat 5/4/2013 serving common areas in North and South classroom wings. Plumbing contractor shall provide insulated cast iron 7/5/2013 pipe and P traps in ALL return air plenums. Sprinkler contractor has installed sprinkler pipe under duct opening in Hall 407 South classroom wing. 7/15/2013 Contractor shall relocate sprinkler line. 22 Electrical Pryor & Morrow Jose Arellano Electrical contractor had installed cable tray under duct opening in Hall 407. Contractor shall coordinate with mechanical contractor and relocate cable tray. 7/15/2013 23 Electrical Pryor & Morrow Jose Arellano Electrical contractor shall label ALL electrical panels, disconnects, and transformers through out project. 24 Mechanical Pryor & Morrow Jose Arellano Mechanical contractor shall label ALL duct work through project. 25 Plumbing Pryor & Morrow Jose Arellano Plumbing contractor label ALL domestic water piping through out project. 26 Plumbing Pryor & Morrow Jose Arellano Plumbing contractor shall provide saddle protection at ALL domestic water pipe hangers through project. Electrical contractor shall label ALL electrical junction 27 Electrical Pryor & Morrow Jose Arellano boxes covers with permanent marker indicating circuit and panel designation. Mechanical contractor shall provide EZ filter rack in 28 Mechanical Pryor & Morrow Jose Arellano OSA duct located in ALL Classroom mechanical closets. 29 Mechanical Pryor & Morrow Jose Arellano Mechanical contractor shall remove filters from ALL Classroom ERV S 30 Mechanical Pryor & Morrow Jose Arellano Mechanical contractor shall reverse installation of ERV- 3 in Classroom 103.

31 Fire Protection Pryor & Morrow Jose Arellano Fire Protection contractor shall relocate sprinkler main piping installed over electrical panel P4 in North Classroom Wing Mechanical/Electrical room 322. Sprinkler Piping shall penetrate West wall in fire riser room per Fire Protection drawings sheet FP2.3 and Fire Protection contractors shop drawings. 32 Pryor & Morrow Jose Arellano MEP ITEMS NORTH CLASSROOM WING: 1. Electrical contractor shall install ceiling mounted 33 Electrical Pryor & Morrow Jose Arellano fire alarm devices or rough-in boxes prior to installing ceiling tile. 34 Electrical Pryor & Morrow Jose Arellano 2. CCTV cabling has not been installed for cameras above ceilings. 35 Electrical Pryor & Morrow Jose Arellano 3. Access control cabling has not been installed above ceilings. 36 Electrical Pryor & Morrow Jose Arellano 4. Electrical shall install exits lights and can lights. 37 Plumbing Pryor & Morrow Jose Arellano 5. Plumbing contractor label ALL domestic water piping located above ceilings through out project. 38 Mechanical Pryor & Morrow Jose Arellano 6. Plumbing contractor was installing saddle protection at ALL domestic water pipe hangers. 39 Mechanical Pryor & Morrow Jose Arellano 7. Mechanical contractor shall provide return air grill in Office/Conference room 321. 8. Mechanical contractor MUST provide and install 30% pleated filters in ALL HVAC equipment operating during construction. Contractor shall also provide and install filter media over ALL return air grills while 40 Mechanical Pryor & Morrow Jose Arellano building is under construction. These filters MUST be checked on a daily bases and replaced as needed. If dirty filters are discovered during our next site visit HVAC equipment will disabled until these requirements are meet. 41 Mechanical Pryor & Morrow Jose Arellano 9. Mechanical contractor is reminded to remove filters from ALL Classroom ERV S. 42 Fire Protection Pryor & Morrow Jose Arellano 43 Mechanical Pryor & Morrow Jose Arellano 44 Mechanical Pryor & Morrow Jose Arellano 10. Fire Protection contractor has NOT relocated sprinkler main piping installed over electrical panel P4 in North Classroom Wing Mechanical/Electrical room 322. Sprinkler Piping shall penetrate West wall in fire riser room per Fire Protection drawings sheet FP2.3 and Fire Protection contractors shop drawings. 11. Mechanical contractor shall extend piping sleeves through exterior walls and seal sleeves. 12. HVAC Controls shall be installed in conduit on Mechanical Mezzanines and exterior locations.

45 General Pryor & Morrow Jose Arellano 46 Electrical Pryor & Morrow Jose Arellano 13. Proper opens do not appear to have been installed for exterior louvers, correction required by General contractor. Electrical contractor was nearing completion of cable tray installation. Contractor was advised that cable tray shall be extended into DATA room 204 per drawing sheet E3.2. 11/4/2013